Top Banner
Required Fields Optional Fields Fiscal Year County Respon- sible Agency Project Name Limits Length Primary Work Type Project Description Phase Advance Construct Federal Cost ($1000s) Federal Fund Source State Cost ($1000s) State Fund Source Local Cost ($1000s) Local Fund Source Total Phase Cost ($1000s) MDOT Job No. Local ID No. MPO/ Rural Action Date Amendment Type Air Quality Comments Total Project Cost ($1000s) Local Priority EJ Federal Approva l Date Capped Federal Cost ($1000s) Date Obligate d Amount Obligated ($1000s) Let Date 2011 STATEWIDE MDOT Regionwide arious in Bay Region Roadside facility Restriping of carpool lots CON 5 ST 1 M 6 103389 10/27/10 NA 6 10/27/10 2011 CHIPPEWA MDOT I-75 BL NW quadrant of I-75 and 3 Mile Rd Roadside facility Install Carpool lot lighting CON 12 ST 3 M 14 107601 10/27/10 NA 15 10/27/10 07/26/11 2 2011 SANILAC MDOT M-25 M-25 Port Sanilac Carpool Lot Roadside facility Pave Carpool Parking Lot CON 80 ST 18 M 98 107032 10/27/10 NA 98 10/27/10 10/13/10 98 2011 STATEWIDE MDOT Section 5311 Transit operations RTAP T-Ops 296 5311 296 10/27/10 NA 296 10/27/10 2011 VAN BUREN MDOT M-40 0.5 miles south of the illage of Lawton 0.27 Widen - minor Two Right Turn Lanes CON 510 EDA 510 108014 10/27/10 NA 568 10/27/10 03/22/11 357 2011 ALGER Alger County Little Beaver Road from H-58 to Little Beaver Campground 3.45 Restore & rehabilitate Rehabilitate CON 1,000 FLH 1,000 105168 10/27/10 NA PIRO 15(1) 1,000 10/27/10 2011 STATEWIDE MDOT Section 5317 Transit operations New Freedom T-Ops 693 5317 693 M 1,386 10/27/10 NA 1,386 10/27/10 2011 STATEWIDE MDOT Section 5316 Transit operations Job Access/Reverse Commute T-Ops 1,022 5316 1,022 M 2,045 10/27/10 NA 2,045 10/27/10 2011 STATEWIDE MDOT Section 5310 Transit operations Elderly and Disabled T-Ops 1,000 5310 1,270 M 2,270 10/27/10 NA 2,270 10/27/10 2011 STATEWIDE MDOT Section 5309 Transit operations Capital Bus T-Ops 3,622 5309 3,750 M 7,372 10/27/10 NA 7,372 10/27/10 2011 OCEANA MDOT US-31 Polk Rd to N Branch of Pntwtr Rvr 5.89 Reconstruct Reconstruction CON AC 20,412 M 20,412 90073 10/27/10 NA Tagged as AC 21,212 10/27/10 01/26/11 13,070 2012 LAPEER MDOT I-69 at Lake Pleasant Road Roadside facility Resurface Carpool Lot CON 43 ST 9 M 52 73163 10/27/10 NA 56 10/27/10 06/07/12 19 2012 ANTRIM Antrim County Jordan Rvr. Nat. Fish Hatchery Jordan River National Fish Hatchery Miscellaneous PE for Entrance and Parking PE 100 FLH 100 105498 10/27/10 NA 100 10/27/10 2012 MANISTEE MDOT US-31 US-31 at Memorial Drive 0.12 Traffic ops/safety Intersection Improvement CON 508 HPSL 113 M 621 86076 10/27/10 NA 675 10/27/10 12/30/11 643 2013 TUSCOLA Mayville Fulton St Main Street to Mill Street, Mayville 0.50 Resurface Resurface CON ACC 90 STL 90 109312 10/27/10 NA $90,198 ARL funds in FY2010. $39,842 STL ACC conversion in FY2013. 1511 Certification 1/25/10. 167 10/27/10 02/23/10 2013 SCHOOLCRAFT Schoolcraf t County Seney National Wildlife Refuge Seney National Wildlife Refuge Miscellaneous Replace J to H WCS/Bridge CON 1,095 FLH 1,095 110126 10/27/10 NA 1,095 10/27/10 2014 STATEWIDE MDOT Regionwide Regionwide Roadside facility Restriping of Carpool Lots CON 5 ST 1 M 6 107017 10/27/10 NA 6 10/27/10 2011 HURON MDOT M-25 Over White River 1.01 Bridge replacement Superstructure replacement CON 972 ST 216 M 1,188 104611 10/28/10 NA 1,188 10/29/10 10/15/10 1,765 2011 STATEWIDE MDOT Regionwide North Region Miscellaneous Warranty Adminstration- Bridge CON 2 M 2 111877 10/28/10 NA 2 12/2/10 11/08/10 2 2011 ALLEGAN MDOT M-89 West of US-131 east to Florence St. in Plainwell 1.72 Reconstruct Reconstruct Existing, No widen ROW 20 ST 5 M 25 90028 10/28/10 NA 9,835 12/2/10 09/02/11 25 2011 ARENAC MDOT M-61 at I-75 Roadside facility Lighting CON 30 ST 7 M 37 110651 10/28/10 NA 37 12/2/10 02/08/11 37 2011 OTTAWA MDOT Grand Region Carpool Lots Grand Region Carpool Lots Roadside facility Signing Upgrade for Carpool Lot CON 69 ST 15 M 84 102951 10/28/10 NA 84 12/2/10 03/31/11 13 2011 GRAND TRAVERSE MDOT US-31 South of Kay Ray Road on US-31 Roadside facility New Carpool Lot CON 74 ST 16 M 90 109989 10/28/10 NA 100 12/2/10 07/15/11 86 2011 SCHOOLCRAFT Schoolcraf t County County Road 433 US 2 to CR 438 6.12 Resurface resurface CON 51 EDDF 42 M 1 CNTY 94 111254 10/28/10 NA 94 12/2/10 04/20/11 93 2011 SCHOOLCRAFT Schoolcraf t County County Road 434 US 2 to CR 432 3.84 Resurface resurface CON 51 EDDF 42 M 1 CNTY 94 111253 10/28/10 NA 94 12/2/10 08/18/11 94 2011 SCHOOLCRAFT Schoolcraf t County County Rd 437 Iron Creek nthly 5.5 mi to end of pavement 0.44 Resurface resurface CON 51 EDDF 42 M 1 CNTY 94 111252 10/28/10 NA 94 12/2/10 01/19/11 93 2011 STATEWIDE Small Urban Program Small Urban Program Statewide Miscellaneous Small Urban Program - Transit Projects CON 115 ST 29 CNTY 144 10/28/10 NA 144 12/2/10 2011 WEXFORD Cadillac Seventh Street Third Ave-First Ave, Farrar St-Mitchell St Reconstruct Reconstruct CON 150 EDF 38 CITY 188 110962 10/28/10 NA 188 12/2/10 10/20/10 150 2011 NEWAYGO Newaygo County State Street elma Matson Upper Elem. School, City of Newaygo Roadside facility Bike/Ped Safety improvements CON 202 SRSI 202 111567 10/28/10 NA 202 12/2/10 03/02/11 220 2011 GOGEBIC MDOT US-2 Tourist Park Rd to Curry Street 1.11 Reconstruct Pavement reconstruction PE 326 NH 72 M 398 110584 10/28/10 NA 4,973 12/2/10 06/17/11 676 2011 VAN BUREN MDOT M-140 City of Watervliet to CR 378 7.22 Resurface Two Course HMA Overlay PE 327 ST 73 M 400 110107 10/28/10 NA 6,500 12/2/10 02/22/11 600 2011 VAN BUREN MDOT I-94 on CR652 at the ramp terminals N and S of I- 94 (exit 66) Traffic ops/safety Construct two modern roundabouts CON ACC 400 CMG 400 107461 10/28/10 NA 400 12/2/10 08/09/10 331 2011 STATEWIDE MDOT DBE Support Services Regionwide DBE Support Services CON 400 ST 400 10/28/10 NA 400 12/2/10 2011 LAPEER MDOT M-53 at Hough Road 0.57 Traffic ops/safety Add Center Left Turn Lane CON 340 CM 85 M 425 111272 10/28/10 NA 456 12/2/10 08/12/11 426 2011 STATEWIDE MDOT Local Tech Assistance Program Miscellaneous Local Techincal Assistance Program CON 235 ST 235 M 470 10/28/10 NA 470 12/2/10 2011 EMMET MDOT US-31 US-31 from west of Division to Manvel and M-119 1.22 Traffic ops/safety Geometric modifications CON 655 HPP 164 M 819 79065 10/28/10 NA Moved from FY 2012 1,192 12/2/10 12/08/10 233 2011 HURON MDOT M-142 M-142 over Pigeon River Bridge replacement Bridge Replacement CON 1,276 ST 283 M 1,559 100745 10/28/10 NA 1,672 12/2/10 06/22/11 2,012 2011 STATEWIDE MDOT Regionwide North Region, various locations Miscellaneous Install Environmental Sensors CON 1,280 ST 284 M 1,563 105741 10/28/10 NA From illustrative list 2,000 12/2/10 06/17/11 1,334 2011 WEXFORD Harrietta Forest Highway 37 Lake County Line to Forest Highway 38 11.00 Reconstruct Reconstruction CON AC 2,437 M 609 CITY 3,046 107752 10/28/10 NA Tagged as AC 3,118 12/2/10 06/20/11 3,471 2011 STATEWIDE MDOT I-69 M-71 over I-69, Shiawassee County Bridge replacement Bridge replacement CON AC 3,399 M 3,399 87169 10/28/10 NA Tagged as AC 3,694 12/2/10 12/22/10 3,232 2011 STATEWIDE MDOT CPM CSM Bridge Trunkline GPA Statewide GPA CPM CSM Bridge Trunkline CON 2,976 ST 705 M 3,680 10/28/10 NA 3,680 12/2/10 FY 2011 - 2014 STIP Project Data 06.07.13 E-File v. 2.0 (06.21.10)
30

FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Apr 08, 2018

Download

Documents

vonhi
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

2011 STATEWIDE MDOT Regionwide Various in Bay Region Roadside facility Restriping of carpool lots CON 5 ST 1 M 6 103389 10/27/10 NA 6 10/27/10

2011 CHIPPEWA MDOT I-75 BLNW quadrant of I-75 and 3 Mile Rd

Roadside facility Install Carpool lot lighting CON 12 ST 3 M 14 107601 10/27/10 NA 15 10/27/10 07/26/11 2

2011 SANILAC MDOT M-25M-25 Port Sanilac Carpool Lot

Roadside facility Pave Carpool Parking Lot CON 80 ST 18 M 98 107032 10/27/10 NA 98 10/27/10 10/13/10 98

2011 STATEWIDE MDOT Section 5311 Transit operations RTAP T-Ops 296 5311 296 10/27/10 NA 296 10/27/10

2011 VAN BUREN MDOT M-400.5 miles south of the Village of Lawton

0.27 Widen - minor Two Right Turn Lanes CON 510 EDA 510 108014 10/27/10 NA 568 10/27/10 03/22/11 357

2011 ALGERAlger County

Little Beaver Road

from H-58 to Little Beaver Campground

3.45Restore & rehabilitate

Rehabilitate CON 1,000 FLH 1,000 105168 10/27/10 NA PIRO 15(1) 1,000 10/27/10

2011 STATEWIDE MDOT Section 5317 Transit operations New Freedom T-Ops 693 5317 693 M 1,386 10/27/10 NA 1,386 10/27/10

2011 STATEWIDE MDOT Section 5316 Transit operationsJob Access/Reverse Commute

T-Ops 1,022 5316 1,022 M 2,045 10/27/10 NA 2,045 10/27/10

2011 STATEWIDE MDOT Section 5310 Transit operations Elderly and Disabled T-Ops 1,000 5310 1,270 M 2,270 10/27/10 NA 2,270 10/27/102011 STATEWIDE MDOT Section 5309 Transit operations Capital Bus T-Ops 3,622 5309 3,750 M 7,372 10/27/10 NA 7,372 10/27/10

2011 OCEANA MDOT US-31Polk Rd to N Branch of Pntwtr Rvr

5.89 Reconstruct Reconstruction CON AC 20,412 M 20,412 90073 10/27/10 NA Tagged as AC 21,212 10/27/10 01/26/11 13,070

2012 LAPEER MDOT I-69 at Lake Pleasant Road Roadside facility Resurface Carpool Lot CON 43 ST 9 M 52 73163 10/27/10 NA 56 10/27/10 06/07/12 19

2012 ANTRIMAntrim County

Jordan Rvr. Nat. Fish Hatchery

Jordan River National Fish Hatchery

MiscellaneousPE for Entrance and Parking

PE 100 FLH 100 105498 10/27/10 NA 100 10/27/10

2012 MANISTEE MDOT US-31US-31 at Memorial Drive

0.12 Traffic ops/safetyIntersection Improvement

CON 508 HPSL 113 M 621 86076 10/27/10 NA 675 10/27/10 12/30/11 643

2013 TUSCOLA Mayville Fulton StMain Street to Mill Street, Mayville

0.50 Resurface Resurface CON ACC 90 STL 90 109312 10/27/10 NA

$90,198 ARL funds in FY2010. $39,842 STL ACC conversion in FY2013.�1511 Certification 1/25/10.

167 10/27/10 02/23/10

2013 SCHOOLCRAFTSchoolcraft County

Seney National Wildlife Refuge

Seney National Wildlife Refuge

MiscellaneousReplace J to H WCS/Bridge

CON 1,095 FLH 1,095 110126 10/27/10 NA 1,095 10/27/10

2014 STATEWIDE MDOT Regionwide Regionwide Roadside facility Restriping of Carpool Lots CON 5 ST 1 M 6 107017 10/27/10 NA 6 10/27/10

2011 HURON MDOT M-25 Over White River 1.01 Bridge replacementSuperstructure replacement

CON 972 ST 216 M 1,188 104611 10/28/10 NA 1,188 10/29/10 10/15/10 1,765

2011 STATEWIDE MDOT Regionwide North Region MiscellaneousWarranty Adminstration-Bridge

CON 2 M 2 111877 10/28/10 NA 2 12/2/10 11/08/10 2

2011 ALLEGAN MDOT M-89West of US-131 east to Florence St. in Plainwell

1.72 ReconstructReconstruct Existing, No widen

ROW 20 ST 5 M 25 90028 10/28/10 NA 9,835 12/2/10 09/02/11 25

2011 ARENAC MDOT M-61 at I-75 Roadside facility Lighting CON 30 ST 7 M 37 110651 10/28/10 NA 37 12/2/10 02/08/11 37

2011 OTTAWA MDOTGrand Region Carpool Lots

Grand Region Carpool Lots

Roadside facilitySigning Upgrade for Carpool Lot

CON 69 ST 15 M 84 102951 10/28/10 NA 84 12/2/10 03/31/11 13

2011GRAND TRAVERSE

MDOT US-31South of Kay Ray Road on US-31

Roadside facility New Carpool Lot CON 74 ST 16 M 90 109989 10/28/10 NA 100 12/2/10 07/15/11 86

2011 SCHOOLCRAFTSchoolcraft County

County Road 433

US 2 to CR 438 6.12 Resurface resurface CON 51 EDDF 42 M 1 CNTY 94 111254 10/28/10 NA 94 12/2/10 04/20/11 93

2011 SCHOOLCRAFTSchoolcraft County

County Road 434

US 2 to CR 432 3.84 Resurface resurface CON 51 EDDF 42 M 1 CNTY 94 111253 10/28/10 NA 94 12/2/10 08/18/11 94

2011 SCHOOLCRAFTSchoolcraft County

County Rd 437Iron Creek nthly 5.5 mi to end of pavement

0.44 Resurface resurface CON 51 EDDF 42 M 1 CNTY 94 111252 10/28/10 NA 94 12/2/10 01/19/11 93

2011 STATEWIDESmall Urban Program

Small Urban Program

Statewide MiscellaneousSmall Urban Program - Transit Projects

CON 115 ST 29 CNTY 144 10/28/10 NA 144 12/2/10

2011 WEXFORD Cadillac Seventh StreetThird Ave-First Ave, Farrar St-Mitchell St

Reconstruct Reconstruct CON 150 EDF 38 CITY 188 110962 10/28/10 NA 188 12/2/10 10/20/10 150

2011 NEWAYGONewaygo County

State StreetVelma Matson Upper Elem. School, City of Newaygo

Roadside facilityBike/Ped Safety improvements

CON 202 SRSI 202 111567 10/28/10 NA 202 12/2/10 03/02/11 220

2011 GOGEBIC MDOT US-2Tourist Park Rd to Curry Street

1.11 Reconstruct Pavement reconstruction PE 326 NH 72 M 398 110584 10/28/10 NA 4,973 12/2/10 06/17/11 676

2011 VAN BUREN MDOT M-140City of Watervliet to CR 378

7.22 Resurface Two Course HMA Overlay PE 327 ST 73 M 400 110107 10/28/10 NA 6,500 12/2/10 02/22/11 600

2011 VAN BUREN MDOT I-94on CR652 at the ramp terminals N and S of I-94 (exit 66)

Traffic ops/safetyConstruct two modern roundabouts

CON ACC 400 CMG 400 107461 10/28/10 NA 400 12/2/10 08/09/10 331

2011 STATEWIDE MDOTDBE Support Services

Regionwide DBE Support Services CON 400 ST 400 10/28/10 NA 400 12/2/10

2011 LAPEER MDOT M-53 at Hough Road 0.57 Traffic ops/safetyAdd Center Left Turn Lane

CON 340 CM 85 M 425 111272 10/28/10 NA 456 12/2/10 08/12/11 426

2011 STATEWIDE MDOTLocal Tech Assistance Program

MiscellaneousLocal Techincal Assistance Program

CON 235 ST 235 M 470 10/28/10 NA 470 12/2/10

2011 EMMET MDOT US-31US-31 from west of Division to Manvel and M-119

1.22 Traffic ops/safety Geometric modifications CON 655 HPP 164 M 819 79065 10/28/10 NA Moved from FY 2012 1,192 12/2/10 12/08/10 233

2011 HURON MDOT M-142M-142 over Pigeon River

Bridge replacement Bridge Replacement CON 1,276 ST 283 M 1,559 100745 10/28/10 NA 1,672 12/2/10 06/22/11 2,012

2011 STATEWIDE MDOT RegionwideNorth Region, various locations

MiscellaneousInstall Environmental Sensors

CON 1,280 ST 284 M 1,563 105741 10/28/10 NA From illustrative list 2,000 12/2/10 06/17/11 1,334

2011 WEXFORD HarriettaForest Highway 37

Lake County Line to Forest Highway 38

11.00 Reconstruct Reconstruction CON AC 2,437 M 609 CITY 3,046 107752 10/28/10 NA Tagged as AC 3,118 12/2/10 06/20/11 3,471

2011 STATEWIDE MDOT I-69M-71 over I-69, Shiawassee County

Bridge replacement Bridge replacement CON AC 3,399 M 3,399 87169 10/28/10 NA Tagged as AC 3,694 12/2/10 12/22/10 3,232

2011 STATEWIDE MDOTCPM CSM Bridge Trunkline GPA

Statewide GPA CPM CSM Bridge Trunkline

CON 2,976 ST 705 M 3,680 10/28/10 NA 3,680 12/2/10

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

Page 2: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2011 CLARE MDOTUS-127 BR/M-61

County Farm Road Southeasterly to M-61 East

2.72 Resurface Two Course HMA Overlay CON AC 3,981 M 3,981 106844 10/28/10 NA Tagged as AC 4,134 12/2/10 12/20/10 3,541

2011 MENOMINEE MDOT US-41COUNTY ROAD G-12 TO BAGLEY

7.96Restore & rehabilitate

CRUSH&SHAPE&HMA RESURFACING

CON AC 4,215 M 4,215 87551 10/28/10 NA Tagged as AC 4,360 12/2/10 02/01/11 4,155

2011 STATEWIDERural Task Forces

Rural Task Force

Statewide MiscellaneousRural Task Force Program - Transit Projects

CON 3,655 ST 754 M 152 CNTY 4,561 10/28/10 NA 4,561 12/2/10

2011 ALLEGAN DouglasBlue Star Highway

At Kalamazoo River, Douglas & Saugatuck

Bridge restore & rehabilitate

Bridge rehabilitation CON AC 5,054 M 266 CITY 5,321 105337 10/28/10 NA Tagged as AC 5,321 12/2/10 07/15/11 4,241

2011 MANISTEE MDOT US-31South of Coates Highway to Maidens Road

6.50 ResurfaceCrush and Shape, Resurface

CON AC 5,390 M 5,390 87083 10/28/10 NA Tagged as AC 5,565 12/2/10 12/08/10 3,650

2011 BAY MDOT I-75Nine Bridges in Bay County along I-75

6.13Bridge restore & rehabilitate

Deep Overlay and Replacement

CON AC 6,778 M 6,778 108681 10/28/10 NA Tagged as AC 7,461 12/2/10 01/14/11 4,389

2011 LENAWEE MDOT US-223East of Silberhorn Hwy to west of Rodesiler Road

3.45 Resurface Mill and resurface CON AC 6,792 M 6,792 84028 10/28/10 NA Tagged as AC 7,510 12/2/10 01/26/11 6,177

2011 BERRIEN MDOT M-140Dan Smith Road to Watervliet North City Limits

2.29 ReconstructPavement Reconstruction.

CON AC 8,000 M 8,000 87321 10/28/10 NA Tagged as AC 9,500 12/2/10 12/20/10 6,976

2011 STATEWIDESmall Urban Program

Small Urban Program

Statewide MiscellaneousSmall Urban Program - Road Projects

CON 7,061 ST 2,711 CNTY 9,771 10/28/10 NA 9,771 12/2/10

2011 STATEWIDE MDOTState Funded Required Program

RegionwideState Funded Required Program

CON 10,430 M 10,430 10/28/10 NA

The State Funded Required Program was the former Non-Discretionary M Program

10,430 12/2/10

2011 MARQUETTE MDOT M-35from north of Little Lake to north of Marshall

2.85Restore & rehabilitate

Crush & Shape & Resurface

CON 110309 10/28/10 NAProject moved to Hwy RR GPA

12/2/10

2011 SCHOOLCRAFT MDOT M-94Fifth Street east to Chippewa Ave

0.37 Reconstruct HMA Reconstruct CON 110307 10/28/10 NAProject moved to Hwy RR GPA

12/2/10

2011 HOUGHTON MDOT M-26over Gooseneck Creek, two branches

1.33 Bridge replacement Culvert Replacement CON 110196 10/28/10 NAProject moved to Bridge RR GPA.

12/2/10

2011 STATEWIDE MDOTSouthwest Region

Southwest Region 42.87 Traffic ops/safety Freeway Signing Upgrade PE 109747 10/28/10 NA 12/2/10

2011 BRANCH MDOT I-69 under Jonesville Road 0.37Bridge restore & rehabilitate

Abutment repair, Full paint

CON 108711 10/28/10 NAProject moved to Bridge RR GPA.

12/2/10

2011 ALLEGAN MDOT US-131 under 106th Avenue 0.44Bridge restore & rehabilitate

Substructure Repair CON 108606 10/28/10 NAProject moved to Bridge RR GPA.

12/2/10

2011 CHIPPEWA MDOT I-75BSI-75BS, Portage Avenue

0.62 ReconstructParticipation in City CSO road

CON 107972 10/28/10 NAProject moved to Hwy RR GPA

12/2/10

2011 CHIPPEWA MDOT I-75Easterday Avenue over I-75, Sault Ste. Marie

0.25Bridge restore & rehabilitate

Deep Overlay CON 107231 10/28/10 NAProject moved to Bridge RR GPA.

12/2/10

2011 CHIPPEWA MDOT I-75Easterday Avenue over I-75, Sault Ste. Marie

0.25Bridge restore & rehabilitate

Bridge Widening for Path CON 107191 10/28/10 NAProject moved to Bridge RR GPA.

12/2/10

2011 LEELANAU MDOT M-22From M-204 north approx. .82 miles

0.82Restore & rehabilitate

Crush and Shape CON 106843 10/28/10 NAProject moved to Hwy RR GPA

12/2/10

2011 OCEANA MDOT US-31NB over US-31 Business Route (Monroe Road)

Bridge restore & rehabilitate

Substructure Repair CON 106297 10/28/10 NAProject moved to Bridge RR GPA.

12/2/10

2011 BERRIEN MDOT I-196NB & SB over Coloma Road

0.28Bridge restore & rehabilitate

Deep Overlay, Beam Repair

CON 106108 10/28/10 NAProject moved to Bridge RR GPA.

12/2/10

2011 HURON MDOT M-53 Cleveland Street Drain MiscellaneousDrainage Outlet Construction

CON 103279 10/28/10 NAProject moved to Bridge RR GPA.

12/2/10

2011 CHARLEVOIX MDOT M-32M-32 from East Jordan southerly to Rogers Road

1.89Restore & rehabilitate

Crush and Shape CON 103023 10/28/10 NAProject moved to Hwy RR GPA

12/2/10

2011 CALHOUN MDOT I-94under M-199 (26 Mile Road) and 22 1/2 Mile Road

0.31Bridge restore & rehabilitate

Concrete Shallow Overlay CON 100581 10/28/10 NAProject moved to Bridge RR GPA.

12/2/10

2011 WEXFORD MDOT M-37M-115 to North of 10 Road

4.00 ResurfaceCrush and Shape and Resurface

PE 90234 10/28/10 NA 12/2/10

2011 ARENAC MDOT I-75

Sterling Road over I-75 (S07-06111) and US-23 Ramp F over I-75 (S13 of 06111)

0.72Bridge restore & rehabilitate

Deep Overlay CON 89615 10/28/10 NAProject moved to Bridge RR GPA.

12/2/10

2011 WEXFORD MDOT US-131 BRover Clam River, Cadillac

0.29 Bridge replacement Deck Replacement CON 87218 10/28/10 NAProject moved to Bridge RR GPA.

12/2/10

2011 MONTCALM MDOT M-91Ellis Road to Snows Lake Road

2.12 ResurfaceCold milling, HMA resurfacing

CON 87111 10/28/10 NAProject moved to Hwy RR GPA

12/2/10

2011 IONIA MDOT M-91 M-44 to Ellis Road 1.24Restore & rehabilitate

Crush & Shape, HMA Overlay

CON 87110 10/28/10 NAProject moved to Hwy RR GPA

12/2/10

2011 WEXFORD MDOT US-131BRRiver Street to North of Boon Road

2.12 ReconstructReconstruct, Mill & Resurface

CON 87041 10/28/10 NAProject moved to Hwy RR GPA

12/2/10

2011 ANTRIM MDOT US-31from Elk Rapids to Campbell Road

4.70Restore & rehabilitate

Crush and Shape CON 83592 10/28/10 NAProject moved to Hwy RR GPA

12/2/10

2011 ALPENA MDOT M-32Intersection at Ripley Street in Alpena

0.46 Reconstruct Intersection Reconstruct CON 74900 10/28/10 NAProject moved to Hwy RR GPA

12/2/10

2012 SCHOOLCRAFT

Schoolcraft County Public Transportation

Area Wide Transit

Schoolcraft Co Transit, Manistique

0.20Transit vehicle additions/replacements

Vehicle Upgrade CON 30 EDDF 8 M 38 102947 10/28/10 NA 38 12/2/10

Page 3: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2012 OGEMAW MDOT I-75 BLon I-75 BL at I-75 and Cook Road interchange

Roadside facilityResurfacing of exisitng lot

CON 42 ST 9 M 52 110708 10/28/10 NA 56 12/2/10 10/27/11 43

2012 STATEWIDE MDOTDBE Support Services

Regionwide DBE Support Services CON 400 ST 400 10/28/10 NA 400 12/2/10

2012 BARRYBarry County

Finkbeiner RdThornapple Rvr & Spring Creek

0.19 Bridge replacement Bridge Replacement CON ACC 2,008 HPSL 2,008 109247 10/28/10 NAAC $504,569 STL in 2012.

2,982 12/2/10 04/14/10

2012 NEWAYGO MDOT M-37At Downing Drain, North of Grant

Restore & rehabilitate

Culvert Replacement CON 109691 10/28/10 NA 12/2/10

2012 MARQUETTE MDOT US-41under Champion Street, City of Marquette

Bridge restore & rehabilitate

Deep Overlay CON 108364 10/28/10 NA 12/2/10

2012 OGEMAW MDOT I-75NB over Br of Laporte Creek

1.20 Bridge replacement Culvert Replacement CON 106152 10/28/10 NA 12/2/10

2012 OCEANA MDOT US-31 BR50' East of Wythe Street

Restore & rehabilitate

Culvert Replacement CON 106096 10/28/10 NA 12/2/10

2012 CHIPPEWA MDOT I-75BSI-75 BS from Easterday Ave to Power Canal

0.25 ReconstructParticipation in mainline rec

CON 104842 10/28/10 NA 12/2/10

2012 MONTCALM MDOT US-131NB over Tamarack Creek

0.69 Bridge replacement Deck Replacement CON 90209 10/28/10 NA 12/2/10

2012 MONTCALM MDOT US-131Pierson Road north to Cutler Road

9.73 MiscellaneousTemporary HMA Cross-overs

CON 90040 10/28/10 NA 12/2/10

2012 IRON MDOT US-2US-2 from 9th Street to River Street in Iron River

0.58 Reconstruct HMA Reconstruction CON 87555 10/28/10 NA 12/2/10

2013 STATEWIDE MDOTDBE Support Services

Regionwide DBE Support Services CON 400 ST 400 10/28/10 NA 400 12/2/10

2014 STATEWIDE MDOTDBE Support Services

Regionwide DBE Support Services CON 400 ST 400 x 10/28/10 NA 400 12/2/10

2014 OSCEOLA MDOT US-131 NBSouth County Line to North of US-10

5.60 ResurfaceCrush and Shape, HMA Resurface

PE 90219 10/28/10 NA 12/2/10

2014 VAN BUREN MDOTBlue Star Highway

over Black River Bridge replacement Bridge Replacement CON 83574 10/28/10 NA 12/2/10

2011 MARQUETTE MDOTMichigan Iron Museum Access Rd

Michigan Iron Industry Museum

0.05 Miscellaneous Drainage Modifications PE 1 MIR 1 112364 01/06/11 NA 12 1/24/11 05/17/11 11

2011 MENOMINEE MDOT US-2At the Powers Weigh Station

Traffic ops/safety Message Sign installation CON 8 ST 2 M 10 112099 01/06/11 NA 10 1/24/11 01/28/11 10

2011 LAPEER MDOT M-240.26 miles north of Newark Road

Bridge replacement Replace Culvert ROW 9 HPSL 2 M 11 112269 01/06/11 NA 761 1/24/11 02/08/11 11

2011 MARQUETTE MDOTMichigan Iron Museum Access Rd

Michigan Iron Industry Museum

0.05 Miscellaneous Drainage Modifications CON 11 MIR 11 112364 01/06/11 NA 12 1/24/11 05/17/11 11

2011 STATEWIDE MDOT Regionwide Various Locations Roadside facility Pavement Markings CON 12 ST 3 M 15 110735 01/06/11 NA 15 1/24/11 03/03/11 17

2011 MENOMINEE MDOT US-41COUNTY ROAD G-12 TO BAGLEY

7.96Restore & rehabilitate

CRUSH&SHAPE&HMA RESURFACING

UTL 50 NH 11 M 62 87551 01/06/11 NA 4,360 1/24/11 12/08/10 62

2011 CRAWFORD MDOT I-75 NBat Grayling Rest Area, Beaver Creek Twsp

Roadside facility Replace existing PITWS CON 61 ST 14 M 75 110738 01/06/11 NA 75 1/24/11 04/05/11 74

2011 LAPEER MDOT M-240.26 miles north of Newark Road

Bridge replacement Replace Culvert PE 60 HPSL 15 M 75 112269 01/06/11 NA 761 1/24/11 01/28/11 75

2011 STATEWIDE

Michigan Technological University

Statewide At LTAP Center at MTU Miscellaneous 2011 MERL Program EPE 73 STT 18 M 92 112265 01/06/11 NA 92 1/24/11 12/28/10 92

2011 ALLEGANAllegan County

11th StreetBaseline Road to 1700' north of Baseline Road

0.32 Resurface Resurface CON 100 EDA 33 OLF 133 112174 01/06/11 NA 133 1/24/11 02/03/11 143

2011 LENAWEELenawee County

M-34 (Main Street)

Findlay Trail are within the City of Hudson; S. Maple Grove Ave. running 4000' parallel to and south of Main St. (M-34) to S. Munson Hwy at the Northwest corner of the Industrial Park. The proposed pedestrian bridge crosses the Garrison Drain West of McKenzie Dr. to connect the two trail halves.

Miscellaneous Pedestrian Bridge CON 96 CM 39 OLF 135 112413 01/06/11 NA 135 1/24/11 06/14/11 165

2011 LENAWEELenawee County

Treat Highway

Treat Highway .40 mile south of US-223 at Madison Schools north driveway

Miscellaneous

Approximately 1100 foot long passing flair in front of Madison Schools in order to alleviate congestion. CMAQ Grant #11033

CON 112 CM 28 CNTY 140 112412 01/06/11 NA 140 1/24/11 07/20/11 92

2011 MARQUETTEMarquette County

Various locations

Birchview Elementary School, City of Ishpeming

Roadside facilityBike/ped safety improvements

CON 170 SRSI 170 112487 01/06/11 NA 170 1/24/11 06/03/11 172

2011 MONTCALM GreenvilleFred Meijer Heartland Trail

Hillcrest to Meijer Drive along Greenville West +

0.93 MiscellaneousComplete portion of ped trail

CON 240 HPSL 60 CITY 300 111527 01/06/11 NA 300 1/24/11 01/13/11 266

2011 LENAWEELenawee County

Steger Industrial Drive

18.00 Reconstruct Reconstruct CON 326 EDA 109 CNTY 435 112179 01/06/11 NA 435 1/24/11 03/25/11 326

Page 4: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2011 IOSCO MDOT US-23Cresent Dr. to Au Sable River Bridge

4.70Restore & rehabilitate

HMA Crack Relief Layer PE 444 NH 98 M 542 105981 01/06/11 NA 5,975 1/24/11 02/08/11 542

2011 ALLEGAN MDOT I-196SB only 130th Avenue north to US-31

7.38Restore & rehabilitate

Major Rehabilitation PE 538 IM 60 M 597 106587 01/06/11 NA 15,133 1/24/11 12/16/10 350

2011 MONTCALM GreenvilleFred Meijer Heartland Trail

Pedestrian trail outside Greenville City limits

MiscellaneousComplete portion of ped trail

CON 640 HPSL 160 M 800 102229 01/06/11 NADemo ID MI 176, HPP #1548

860 1/24/11 04/22/11 1,350

2011 GRATIOT MDOT US-127Washington Road to North of Polk Road

2.80 Resurface Two Course HMA Overlay PE 724 NH 160 M 884 110485 01/06/11 NA 7,452 1/24/11 01/21/11 884

2011 STATEWIDE MDOT Statewide Statewide Miscellaneous Training BOH FY 2011 EPE 1,000 ST 1,000 110435 01/06/11 NA 1,000 1/24/11 10/13/10 1,140

2011 MACKINAC MDOT US-2 M-117 to Naubinway 5.09Restore & rehabilitate

Aggr lift w/3 crs HMA resurf

CON AC 5,565 M 5,565 87543 01/06/11 NATagged as AC. Moved from FY 2013

5,788 1/24/11 11/10/10 4,952

2012 JACKSONJackson County

Jefferson RdUS127-Village of Brooklyn

5.50 Resurface Resurface CON 111815 01/06/11 NAProject is in Jackson MPO.

1/24/11

2011 VAN BURENVan Buren County

Countywide Countywide Miscellaneous EPE 12 CMG 12 112753 03/04/11 NA 12 3/31/11 05/23/11 12

2011 LENAWEELenawee County

M-52 and US-223

M-52 @ M-34 and US-223 @ Division St

Traffic ops/safetyTraffic Signal Modernization

PE 44 CMG 44 112818 03/04/11 NA 350 3/31/11 04/06/11 44

2011 CASSCass County

Countywide CountywideTransit vehicle additions/replacements

Bus Replacement EPE 56 CM 14 CNTY 70 112678 03/04/11 NA 70 3/31/11 08/22/11 70

2011 BERRIENBerrien County

Areawide AreawideTransit vehicle additions/replacements

Bus replacement EPE 60 CM 15 OLF 75 112683 03/04/11 NA 75 3/31/11 08/22/11 75

2011 LAPEER MDOT WB I-69WB I-69, M-24 to Lapeer/St Clair COL

17.16Restore & rehabilitate

Conc Pavt Rprs, Diamond Grind

PE 94 IM 10 M 105 108689 03/18/11 NA 4,605 3/31/11 08/01/11 105

2011 IOSCOIosco County

Monument Road

Monument and Wilber Roads (MI PFH 11)

17.49 Reconstruct Reconstruct PE 160 FFH 40 CNTY 200 105167 03/04/11 NA MI PFH 11. 710 3/31/11 06/20/11 69

2011 TUSCOLA MDOT M-25Dickerson Road to Ringle Road

5.44 ResurfaceHMA Overlay with Shoulders

ROW 205 NH 45 M 250 90283 03/04/11 NA 4,283 3/31/11 04/11/11 250

2011 LENAWEELenawee County

M-52 and US-223

M-52 @ M-34 and US-223 @ Division St

Traffic ops/safetyTraffic Signal Modernization

CON 306 CMG 306 112818 03/04/11 NA 350 3/31/11 07/27/11 282

2011 LENAWEELenawee County

BeecherAdrian City Limits-Parr Hwy

Reconstruct Reconstruct CON 300 EDF 75 CNTY 375 110969 03/18/11 NA 375 3/31/11 03/18/11 300

2011 LENAWEE Adrian Beecher StreetTreat St-Eastern City Limit

Reconstruct Reconstruct CON 375 EDF 94 CITY 469 110967 03/18/11 NA 469 3/31/11 03/18/11 375

2011 MIDLANDMidland County

Bay City Road Multiple Reconstruct Resurface CON 3,632 EDA 1,697 CNTY 5,328 112178 03/04/11 NA 5,328 3/31/11 01/19/11 3,632

2011 STATEWIDE MDNRFY 2011 Recreational Trails Program

Statewide Roadside facilityImprovements to three recreational trails plus program audit costs

CON 6,697 NRT 6,697 113443 03/17/11 NA 7,279 3/31/11 08/31/11 1,974

2011 STATEWIDERural Task Forces

Rural Task Force

Statewide MiscellaneousRural Task Force Program - Road Projects

CON 18,679 ST 3,984 M 6,506 CNTY 29,169 02/16/11 NA

Cost has been administratively reduced - 02/16/2011

29,169 3/31/11

2011 STATEWIDE MDOTTerry and Fullerton Streets

Noble and Burns Elementary Schools, Detroit

MiscellaneousBike/ped safety improvements

CON 111432 03/17/11 NA

Programmed as a Statewide project and should be in SEMCOG TIP.

3/31/11

2011 CHIPPEWA MDOT M-28west of I-75 at Dafter TST

0.10New route/structure (capacity increase)

Construct New PITWS CON 110631 03/04/11 NA 3/31/11

2011 HILLSDALE MDOT US-12 East of Jonesville 0.01 Roadside facilityInstall Wireless equipment

CON 110621 03/04/11 NA 3/31/11

2011 STATEWIDE MDOT RegionwideVarious locations in Metro Region

1.00 Traffic ops/safety ITS System Modifications CON 107609 03/17/11 NA

Programmed as a Statewide project and should be in SEMCOG TIP.

3/31/11

2012 MONTCALM MDOT US-131 at M-82 SW Quadrant Roadside facilityResurface carpool lot with Minor Widening

CON 42 ST 9 M 51 102916 03/17/11 NAYear change from FY 2011 to FY 2012

51 3/31/11 10/27/11 28

2011 TUSCOLA MDOT M-25Bay/Tuscola County Line to Dickerson Road

5.43 Resurface HMA Mill & Overlay ROW 8 NH 2 M 10 86950 04/20/11 NA 4,142 5/23/11 04/13/11 10

2011 CHEBOYGAN MDOT US-23from Cheboygan east county line to Cordwood

6.84Restore & rehabilitate

Crush & Shape, HMA Resurface

UTL 41 ST 9 M 50 79651 04/20/11 NA 4,727 5/23/11 04/28/11 50

2011 STATEWIDE MDOT Statewide Statewide MiscellaneousFY 2011 TRAC (RCWD) Program

EPE 70 ST 70 113342 04/01/11 NARCWD Project - split out from JN 101361.

3,339 5/23/11 05/25/11 70

2011 IOSCO MDOT US-23AuSable River Bridge to F-41

1.85 ReconstructHot Mix Asphalt Reconstruction

ROW 65 NH 15 M 80 90192 04/20/11 NA 7,813 5/23/11 08/16/11 80

2011 MONTCALM GreenvilleFred Meijer Heartland Trail

Meijer Drive/Maplewood Drive to W Baldwin Lake Dr

Roadside facility Construct Multi-use path CON 72 HPSL 18 CITY 90 113481 05/05/11 NA 90 5/23/11 05/10/11 91

2011 DICKINSONDickinson County

Leeman RoadFrom County Road 581 to Lerza Road

7.15 Traffic ops/safetyPavement marking and gravel shoulder

CON 74 HPSL 13 M 6 CNTY 93 113456 05/05/11 NA 93 5/23/11 07/12/11 97

2011 STATEWIDE MDOT Statewide Statewide MiscellaneousFY 2011 CTP (RCWD) Program

EPE 100 ST 100 113339 04/01/11 NARCWD Project - split out from JN 101361.

3,339 5/23/11 04/07/11 100

2011 GOGEBIC MDOT US-2US-2 EB, between Tamarack Street and Pine Street

0.24 Roadside facility Construct PITWS CON 84 ST 19 M 103 113409 05/05/11 NA 110 5/23/11 08/11/11 115

2011 DICKINSONDickinson County

Fifth StreetNorth Elementary School, City of Iron Mountain

Roadside facilityBike/Ped safety improvements

CON 212 SRSI 212 110131 04/21/11 NA 212 5/23/11 05/04/11 210

Page 5: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2011 GLADWINGladwin County

Judy MaeBlades Rd to Judy Mae St; M-18 to Von Dale St

Reconstruct RCNSTRCT CON 202 EDA 22 CNTY 224 113424 04/20/11 NA 224 5/23/11 04/13/11 202

2011 HOUGHTON MDOT M-26M-26, Houghton County

3.13 ResurfaceMill & Two Course Overlay

PE 224 ST 50 M 274 107008 04/20/11 NA 4,032 5/23/11 04/20/11 274

2011 GRATIOT MDOT US-127North of Polk Road to North of Van Buren Road

2.69 Resurface Two Course HMA Overlay PE 284 NH 63 M 347 112711 05/05/11 NA 7,590 5/23/11 09/02/11 347

2011 STATEWIDE MDOT Grand Region Grand Region 56.03 Traffic ops/safety Freeway Signing Upgrade PE 555 IMG 555 113334 04/20/11 NA 4,810 5/23/11 04/05/11 555

2011 STATEWIDE MDOT Statewide Statewide 0.01 MiscellaneousWetland Mitigation/Monitoring

CON 491 ST 109 M 600 113244 04/20/11 NA 600 5/23/11 07/19/11 590

2011 STATEWIDE MDOT Statewide Statewide MiscellaneousFY 11 fed const proj training

CON 491 ST 109 M 600 112186 04/20/11 NA 1,200 5/23/11 12/15/10 600

2011 MARQUETTE Negaunee Croix StreetFrom US-41 to Maas Street, City of Negaunee

0.50 Roadside facility Parking reconstruction CON 500 OFHWA 213 CITY 713 108731 04/21/11 NA

Funding source - DSTP (not available in drop down menu).

713 5/23/11

2011 STATEWIDE MDOT Statewide Statewide Miscellaneous FY 2011 RCWD Program EPE 834 ST 834 101361 04/01/11 NA

Cost reduced to split out the three new RCWD JNs - JN 113339, JN 113341, and JN 113342.

3,339 5/23/11 04/07/11 100

2011 MIDLANDMidland County

Waldo AvenueSalzburg Road to 3,700 feet north

Reconstruct RCNSTRCT CON 451 EDA 551 CNTY 1,002 113421 04/20/11 NA 1,002 5/23/11 04/13/11 451

2011 STATEWIDE MDOTEnhancements Trunkline GPA

Statewide GPA Enhancements Trunkline CON 2,257 STE 281 M 738 CNTY 3,276 04/20/11 NA 3,276 5/23/11

2011 IONIA MDOT M-66South of GRE RR north to M-21

0.53 Reconstruct Concrete Reconstruction CON 2,152 ST 477 M 1,135 CITY 3,764 90033 05/05/11 NAObligated as regular federal aid

4,224 5/23/11 10/29/10 3,100

2011 CHEBOYGAN MDOT US-23from Cheboygan east county line to Cordwood

6.84Restore & rehabilitate

Crush & Shape, HMA Resurface

CON AC 3,820 M 3,820 79651 04/20/11 NAMoved from FY 2012 to FY 2011

4,120 5/23/11 04/13/11 4,355

2011 ALLEGAN MDOT M-8928th Street east to Kalamazoo Street

7.52 ReconstructMulti Cse HMA Ovly & Pavt Repr

CON 3,132 ST 695 M 3,827 87249 05/05/11 NAObligated as regular federal aid

5,675 5/23/11 01/13/11 2,898

2011 IONIA MDOT I-96 EBat the Saranac Rest Area #532

0.54 Roadside facilityBuilding Replacement/Site Work

CON AC 3,850 M 3,850 101616 04/20/11 NAMoved from FY 2012 to FY 2011

4,150 5/23/11 06/22/11 3,415

2011 ROSCOMMON MDOT M-55Roscommon Co WCL to US-127

2.21Restore & rehabilitate

Crush and shape CON 3,248 ST 720 M 3,969 106683 05/05/11 NAObligated as regular federal aid

4,380 5/23/11 12/22/10 2,030

2011 EMMET MDOT US-31 Paradise Tr to I-75 5.12Restore & rehabilitate

Crush & Shape CON 3,375 NH 748 M 4,123 103443 05/05/11 NAObligated as regular federal aid

4,371 5/23/11 02/17/11 2,747

2011 STATEWIDE MDOTState of Good Repair FTA Grant

StatewideTransit vehicle additions/replacements

Bus replacements/additions for 19 transit agencies

T-Cap 3,834 5309 959 CTF 4,793 04/21/11 NAState of Good Repair Grant

4,793 5/23/11

2011 STATEWIDEEnhancements Local GPA

Regionwide GPA Enhancements Local CON 4,200 STE 2,007 CNTY 6,207 04/20/11 NA 6,207 5/23/11

2011 STATEWIDEHighway Safety Local GPA

Statewide GPA Highway Safety Local CON 5,567 STH 234 M 990 CNTY 6,791 04/20/11 NA 6,791 5/23/11

2011 MECOSTA MDOT M-20M-20 @ Schrader Creek

0.44New route/structure (capacity increase)

New Bridge on Existing Route

CON AC 7,800 M 7,800 73737 04/01/11 NA

Administrative change on 04/01/2011 to AC project.

8,760 5/23/11 09/06/11 7,800

2011 CALHOUN MDOT I-94 WB23 Mile Road to 29 Mile Road

6.20 ResurfaceMultiple Course HMA overlay

CON 10,218 IM 1,135 M 11,353 86970 05/05/11 NAObligated as regular federal aid

14,900 5/23/11 01/05/11 8,671

2011 STATEWIDE MDOT

Rural Bridge Replacement and Rehabilitate Trunkline GPA

Regionwide GPA Rural Bridge Replacement and Rehabilitate Trunkline

CON 19,590 ST 4,391 M 98 OLF 24,079 04/20/11 NA 24,079 5/23/11

2011 STATEWIDE MDOTHighway Safety Trunkline GPA

Statewide GPA Highway Safety Trunkline CON 24,304 ST 239 M 24,543 04/20/11 NA 24,543 5/23/11

2011 STATEWIDE MDOT

Rural Highway Rehab and Reconstruct Trunkline GPA

Regionwide GPA Rural Highway Rehab and Reconstruct Trunkline

CON 20,666 ST 4,460 M 568 CNTY 25,693 04/20/11 NA 25,693 5/23/11

2011 STATEWIDE MDOTCPM Road Trunkline GPA

Statewide GPA CPM Road Trunkline CON 32,074 ST 7,029 M 58 CNTY 39,161 04/20/11 NA 39,161 5/23/11

2011 STATEWIDE MDOT Section 5311 Transit operations Non-UZA Formula T-Ops 16,759 5311 30,014 M 39,503 TRAL 86,277 04/01/11 NACost increase for state and local funds

86,277 5/23/11

2012 GOGEBIC MDOT US-2at Lakeshore Drive in Wakefield

Roadside facility New Carpool Lot CON 34 ST 7 M 41 112331 04/21/11 NA 45 5/23/11

2012 GRATIOT MDOT M-57Northwest quadrant of the US-127/M-57 interchange

Roadside facilityResurfacing of existing Lot

CON 36 ST 8 M 44 113219 04/21/11 NA 44 5/23/11 08/16/12 44

2012 SANILACSanilac County

Maple Valley RdM90 to North City Limits

0.38 Resurface resurface CON 113 EDF 28 CNTY 141 112606 04/21/11 NA 141 5/23/11 09/17/12 142

2012 IOSCO MDOT US-23South of Aster Road to north of Point Road

2.00Restore & rehabilitate

Passing Lane Rehabilitation

PE 350 NH 78 M 428 109659 04/21/11 NA 4,064 5/23/11 09/14/12 428

2012 CALHOUN MDOT I-9417 1/2 to 21 1/2 Mile Road

4.45 ResurfaceMultiple Course HMA Overlay

SUB 459 IM 51 M 510 110138 04/20/11 NA 510 5/23/11 05/18/12 510

2012 LAPEER MDOT M-24 over Plum Creek 1.04 Bridge replacement Bridge Replacement CON 572 BHT 143 M 715 102796 04/21/11 NA 815 5/23/11 02/06/12 959

2012 CALHOUN MDOT I-94 17 1/2 to 23 Mile Road 5.30 ResurfaceMultiple Course HMA Overlay

PE 1,382 IM 154 M 1,536 110138 04/20/11 NAMoved from FY 2011 to FY 2012

18,900 5/23/11 05/18/12 1,700

2013 MECOSTA MDOT US-131 SB6 Mile Rd north to 13 Mile Rd

7.33Restore & rehabilitate

Crush & Shape CON AC 5,800 M 5,800 109049 04/21/11 NA 6,000 5/23/11 12/18/12 5,538

2013 CHIPPEWA MDOT M-28 Racco Conc Section 5.14Restore & rehabilitate

Aggregate lift w/ 3 Crs HMA

CON AC 5,923 M 5,923 103229 04/21/11 NA 6,121 5/23/11 01/25/13 5,741

Page 6: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2014GRAND TRAVERSE

MDOT M-113N. of M-186 south to US-131

5.09Restore & rehabilitate

Crush and Shape CON AC 3,420 M 3,420 103027 04/21/11 NA 4,085 5/23/11

2011 STATEWIDE MDOT Statewide Statewide MiscellaneousFY11 state const proj training

CON 25 M 25 112185 05/26/11 50 7/11/11 12/13/10 25

2011 BERRIENCity of Watervliet

Red Arrow Highway (St. Joseph Avenue), Medical Park Drive and public easement

Commencing at Watervliet High School and extending east on the south side of Red Arrow Highway (St. Joseph Avenue) to Medical Park Drive, then continuing south on the west side of Medical Park Drive to Cobblestone Village Senior Housing Development by way of a public easement

Miscellaneous

CMAQ Grant # 11117 Install and construct 400' of an 8' wide sidewalk on Red Arrow Highway and 1,800' of a 6' wide sidewalk along Medical Park Drive and a public easement, to alleviate air emissions and to complete a connecting pathway between the Cobblestone Village Senior Housing Development and downtown area.

CON 48 CM 12 CNTY 60 112962 07/06/11 NA 60 7/11/11 09/08/11 72

2011 LENAWEE Tecumseh Russell Road300' W of S Evans St-Mill Hwy

Resurface Resurface CON 115 EDF 64 CITY 179 110963 05/26/11 179 7/11/11 04/29/11 173

2011 TUSCOLATuscola County

Colling RdGilford Rd-Deckerville Rd.

Resurface Resurface CON AC 181 M 46 CNTY 227 110968 05/26/11 NA Obligated as AC 227 7/11/11 03/15/11 138

2011 STATEWIDE MDOT I-94Various locations from MI/IN border to I-69

104.00 MiscellaneousTruck Parking & Info Management System

PE 240 OFHWA 60 M 300 113689 06/30/11 NA

Actual federal fund source is TPFD - Truck Parking Federal Discretionary

300 7/11/11 07/28/11 300

2011 HURON MDOT M-25from County Road to Caseville County Park

0.18 Widen - minor

Construct shoulder improvements and HMA paving to extend the existing dedicated center-left turn lane. The `A? Phase CMAQ grant number is 11120.

CON 251 CM 63 M 314 113532 05/26/11 NA 314 7/11/11 07/26/11 314

2011 MENOMINEE MDOT M-35Jimtown road South 9.42 miles

9.42Restore & rehabilitate

Coldmilling and Resurfacing

PE 354 ST 79 M 433 110682 05/26/11 NA Moved from FY 2013 6,135 7/11/11 05/20/11 735

2011 IOSCOOscoda County

Arrow Street Mission Drive-F41 Reconstruct Reconstruct CON 375 EDF 135 CNTY 510 110965 05/26/11 NA 510 7/11/11 04/21/11 375

2011GRAND TRAVERSE

MDOT M-113N. of M-186 south to US-131

5.09Restore & rehabilitate

Crush and Shape PE 520 ST 115 M 635 103027 06/29/11 NA Moved from FY 2012 4,085 7/11/11 06/08/11 635

2011 STATEWIDE MDOT I-94Various locations from MI/IN border to I-69

104.00 MiscellaneousTruck Parking & Info Management System

EPE 1,408 OFHWA 352 M 1,760 113689 06/30/11 NA

Actual federal fund source is TPFD - Truck Parking Federal Discretionary

1,760 7/11/11 07/28/11 1,760

2011 LENAWEE MDOT M-50Ridge Hwy to the EVL of Britton, Lenawee County

2.16 Resurface HMA Mill and Resurface CON AC 3,586 M 3,586 87514 05/26/11 NA Moved from FY 2012 3,959 7/11/11 08/26/11 2,607

2011 MARQUETTE MDOT M-94M-94 over C & NW RAILROAD

0.42 Bridge - otherConc Box Beam Replacement

CON 112757 06/29/11 NAMoved to Trunkline Crossings GPA

7/11/11

2011 LENAWEELenawee County

US-12 US-12 at M-50 0.04 Roadside facility Historic Preservation CON 112479 06/29/11 NAMoved to Local Enhancement GPA

7/11/11

2011 CASSCass County

Evan StreetAt Grand Trunk Western in Jefferson Township

Traffic ops/safety Install overhead lighting CON 112414 06/30/11 NAProject is included in the Local Rail GPA

7/11/11

2011 STATEWIDE MDOT RegionwideVarious locations in the Grand Region

Traffic ops/safety2011 Control Room Ops. WMTMC

EPE 111293 05/26/11 NAProject is in Grand Rapids TIP

7/11/11

2011 IONIA MDOT M-66The Grand River north to GRE RR

0.53Restore & rehabilitate

Pvt Repairs & Diamond Grinding

CON 109051 06/29/11 NAProject moved to Hwy RR GPA

7/11/11

2011 ROSCOMMON MDOT M-55Roscommon Co WCL to US-127

2.21Restore & rehabilitate

Crush and shape ROW 106683 05/26/11 NA 7/11/11

2011 OCEANA MDOT M-20 at US-31 NE Quadrant Roadside facilityCrack Sealing - carpool lot

CON 87479 05/26/11 NA 7/11/11

2012 STATEWIDE MDOT RegionwideVarious Locations in Superior Region

Roadside facility Sign Upgrades CON 27 ST 6 M 33 113497 05/26/11 NA 36 7/11/11 01/09/12 30

2012 IOSCO MDOT M-65Turtle Rd to 1200' North of Sherman Street

5.97Restore & rehabilitate

Crush & Shape, Resurface

ROW 41 ST 9 M 50 79433 05/26/11 NA Moved from FY 2011 4,534 7/11/11 12/02/11 50

2012 ALGER MDOT M-94at M-67 & 94 intersection in Alger County

Roadside facilityExpand existing lot for additional parking

CON 57 ST 13 M 69 113745 05/26/11 NA 73 7/11/11

2012 STATEWIDESmall Urban Program

Small Urban Program

Statewide MiscellaneousSmall Urban Program - Transit Projects

CON 153 ST 38 M 7 TRAL 198 09/20/12 NAAdjusted costs administratively - 09.20.12

35 7/11/11

2012 SCHOOLCRAFT MDOT M-28between the Seeney Rest Area and Seeney

3.70 ReconstructThickened pavement section for WIM

CON 164 ST 36 M 200 113746 05/26/11 NA 210 7/11/11 02/21/12 266

2012 STATEWIDE MDOT Section 5311 Statewide Transit operations RTAP T-Ops 296 5311 296 06/15/11 NA 296 7/11/11

2012 STATEWIDE MDOT TSC Wide TSC Wide 6.72 Resurface Crack treatment CON 400 ST 400 113489 06/01/11 NATLCR - Toll Credit Amount is $72,599.

411 7/11/11 02/06/12 382

2012 STATEWIDE MDOT Region Wide LANSING TSC WIDE 4.08 ResurfaceHMA CRACK SEALING AND OVERBAND

CON 430 ST 430 113544 06/01/11 NATLCR - Toll Credit Amount is $77,963.

450 7/11/11 02/06/12 280

2012 STATEWIDE MDOT Various TSC Wide Resurface HMA Crack Treatment CON 443 ST 443 113613 06/01/11 NATLCR - Toll Credit Amount is $80,450.

450 7/11/11 03/29/12 444

2012 IOSCO MDOT US-23Auelrich Road to Kirkland Drive

3.83Restore & rehabilitate

HMA Crack Relief Layer PE 390 NH 86 M 476 112946 05/26/11 NA 5,517 7/11/11 09/14/12 476

2012 ROSCOMMON MDOT US-127 Muskegon River north 3.75Restore & rehabilitate

Cold milling; crush and shape

PE 411 NH 91 M 502 106863 06/29/11 NA Moved from FY 2011 502 7/11/11 05/10/12 502

Page 7: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2012 IONIA MDOT I-96at Ionia Weigh Station Ramps

0.74Restore & rehabilitate

Joint Repairs & Skip Patching

CON 415 ST 92 M 507 110024 05/26/11 NA 507 7/11/11 01/03/12 579

2012 HILLSDALE MDOT M-34 M-34, M-99 to US-127 10.51 ResurfaceDouble Microsurface Treatment

CON 1,060 ST 1,060 113563 06/01/11 NATLCR - Toll Credit Amount is $192,467.

1,091 7/11/11 01/10/12 1,021

2012 PRESQUE ISLE MDOT M-33M-33, Presque Isle County�M-72, Alcona County

28.64 Resurface Single Course Chip Seal CON 1,278 ST 1,278 113337 06/01/11 NATLCR - Toll Credit Amount is $231,895.

1,314 7/11/11 01/23/12 1,448

2012 STATEWIDE MDOT I-94 Indiana State Line to M-40

Miscellaneous Dynamic Message Signs CON 1,485 HSIP 1,485 109707 06/01/11 NATLCR - Toll Credit Amount is $148,500.

1,710 7/11/11 06/19/12 1,020

2012 CHARLEVOIX MDOT M-66Hugh Street to Sequonta Road

8.35 Resurface Mill and Fill CON 1,541 NH 1,541 113115 06/01/11 NATLCR - Toll Credit Amount is $279,664.

1,664 7/11/11 02/06/12 1,367

2012 ALLEGAN MDOT US-131 under M-89, Plainwell 0.39Restore & rehabilitate

Deep Overlay, Pt, Railing Repl

CON 1,729 NH 1,729 89306 06/01/11 NATLCR - Toll Credit Amount is $313,771.

1,844 7/11/11 01/24/12 1,527

2012 STATEWIDE MDOT Section 5310 Transit operations Elderly and Disabled T-Ops 1,500 5310 375 M 1,875 07/01/11 NA 2,770 7/11/11

2012 ROSCOMMON MDOT StatewideMultiple locations on I-75

243.19 Roadside facility ITS applications CON 2,021 NH 2,021 106682 06/01/11 NATLCR - Toll Credit Amount is $366,821.

2,499 7/11/11 01/31/12 1,912

2012 STATEWIDERural Task Forces

Rural Task Force

Statewide MiscellaneousRural Task Force Program - Transit Projects

CON 1,625 ST 437 M 28 TRAL 2,090 09/20/12 NAAdjusted costs administratively - 09.20.12

1,351 7/11/11

2012 LENAWEE MDOT M-52

South north to Valley�James River Rd to US-223

4.11 Resurface Single Course M&F CON 2,324 ST 2,324 113164 06/01/11 NATLCR - Toll Credit Amount is $421,728.

2,390 7/11/11 02/28/12 2,326

2012 IONIA MDOT I-96M-66 east to the Ionia East County Line

12.99Restore & rehabilitate

Concrete Joint Repairs CON 2,359 IM 2,359 109045 06/01/11 NATLCR - Toll Credit Amount is $235,900.

2,359 7/11/11 12/23/11 2,334

2012 IONIA MDOT M-21Detmers Rd to Lincoln Ave

3.25 ResurfaceMill, ASCRL, HMA Resurface

CON 2,490 ST 2,490 59567 06/01/11 NATLCR - Toll Credit Amount is $451,934.

2,665 7/11/11 01/23/12 2,814

2012 WEXFORD MDOT M-11545 Road to west of 48 1/2 Road

1.49 ReconstructRemove and replace pavement

CON 2,529 NH 2,529 103028 06/01/11 NATLCR - Toll Credit Amount is $459,017.

2,652 7/11/11 12/22/11 2,435

2012 LENAWEE MDOT US-223 over River Raisin 0.24 Bridge replacement Bridge replacement CON 2,763 BRT 2,763 102851 06/01/11 NATLCR - Toll Credit Amount is $552,649.

3,004 7/11/11 01/23/12 2,340

2012 CHIPPEWA MDOT I-75N of M-28 to 3 Mi Rd. Exit

5.63 ResurfaceTru-Pave & Fiber Mat w/HMA Oly

CON 2,772 NH 2,772 113138 06/01/11 NATLCR - Toll Credit Amount is $503,112.

3,001 7/11/11 01/17/12 2,799

2012 CHEBOYGAN MDOT M-68east of King Road to west of Old 27

2.05 Reconstruct HMA crack relief layer CON 3,367 ST 3,367 110536 06/01/11 NATLCR - Toll Credit Amount is $611,174.

3,737 7/11/11 07/27/12 2,962

2012 MECOSTA MDOT US-131 OLD19 Mile to Mecosta/Osceola County Line

5.02 ResurfaceMill, Fiber Mat & Resurface

CON 3,500 ST 3,500 88885 06/01/11 NATLCR - Toll Credit Amount is $635,250.

3,782 7/11/11 01/09/12 3,742

2012 OGEMAW MDOT I-75 BL I-75 to Woodland Dr 2.08Restore & rehabilitate

HMA inlay CON 5,117 NH 5,117 103442 06/01/11 NATLCR - Toll Credit Amount is 928,723.

5,454 7/11/11 11/01/11 5,797

2012 IOSCO MDOT US-23AuSable River Bridge to F-41

1.85 ReconstructHot Mix Asphalt Reconstruction

CON 7,281 NH 7,281 90192 06/01/11 NA

Moved from FY 2014. TLCR - Toll Credit Amount is $1,321,477.

7,420 7/11/11 01/05/12 7,243

2012 STATEWIDESmall Urban Program

Small Urban Program

Statewide MiscellaneousSmall Urban Program - Road Projects

CON 8,105 ST 3,455 OLF 11,559 09/20/12 NAAdjusted costs administratively - 09.20.12

11,684 7/11/11

2012 STATEWIDERural Task Forces

Rural Task Force

Statewide MiscellaneousRural Task Force Program - Road Projects

CON 26,558 ST 7,672 M 7,265 OLF 41,495 09/20/12 NAAdjusted costs administratively - 09.20.12

42,234 7/11/11

2012 BRANCH MDOT US-12over Michigan Southern Railroad

0.19 Bridge replacement Bridge Replacement CON 108712 05/26/11 NAMoved to Illustrative List

7/11/11

2012 MIDLAND MDOT US-10Four bridges along US-10 in Midland County

2.71Restore & rehabilitate

Deep Overlay CON 108695 05/26/11 NAMoved to Illustrative List

7/11/11

2012 BERRIEN MDOT I-94at Nickerson Ave in Benton Township

Roadside facility Resurface existing lot CON 103293 05/26/11 NA

Project is now entirely in the Benton Harbor - St. Joseph MPO.

7/11/11

2012 MONTCALM MDOT US-131at 22 Mile Road/ M-46 NW Quadrant

Roadside facilityCrack Sealing - carpool lot

CON 102922 05/26/11 NA 7/11/11

2013 LAPEER MDOT M-240.26 miles north of Newark Road

Miscellaneous Replace Culvert CON 540 HPSL 135 M 675 112269 05/26/11 NA 761 7/11/11 01/31/13 483

2013 ALLEGAN MDOT I-196SB only 130th Avenue north to US-31

7.38Restore & rehabilitate

Major Rehabilitation CON 106587 05/26/11 NA 7/11/11

2013 STATEWIDE MDOT RegionwideVarious locations in Bay Region

Roadside facility Lighting for Carpool Lots CON 103395 05/26/11 NAProject is now entirely within the Saginaw MPO

7/11/11

2013 VAN BUREN MDOT I-94 at Mattawan Roadside facility Resurface carpool lots CON 103295 05/26/11 NA 7/11/11

2014 MENOMINEE MDOT M-35Jimtown road South 9.42 miles

9.42Restore & rehabilitate

Coldmilling and Resurfacing

CON AC 5,465 M 5,465 110682 05/26/11 NA 6,201 7/11/11

2014 LIVINGSTON MDOT I-96US-23 NB over I-96 WB

0.16 Bridge replacement Bridge Replacement CON 112877 05/26/11 NA In SEMCOG TIP 7/11/11

2014 VAN BUREN MDOT M-140City of Watervliet to CR 378

7.22 Resurface Two Course HMA Overlay CON 110107 05/26/11 NAMoved to Illustrative List

7/11/11

2014 STATEWIDE MDOT Regionwide Superior Region Traffic ops/safetyTransportation Mgmt Center

CON 107436 05/26/11 NAMoved to Illustrative List

7/11/11

2014 ALLEGAN MDOT US-131 under M-222 Bridge replacement Bridge Replacement CON 73748 05/26/11 NA 7/11/11

Page 8: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2011 BENZIEBenzie County

Countywide CountywideTransit vehicle additions/replacements

Purchase 2 vans. CMAQ Grant# 11111

EPE 54 CM 13 OLF 67 112951 08/08/11 NA

Admin Change - 08/08/2011 - updated project description.

67 8/8/11 08/22/11 67

2011 VAN BURENVan Buren County

S. Center Street

from I-94 to Main Street in City of Hartford

MiscellaneousCenter LT lane with bike lane

CON 193 CM 48 OLF 242 112958 08/08/11 NA

Admin Change - 08/08/2011 - updated the cost information.

242 8/8/11 08/26/11 260

2011 LEELANAU MDOT M-109Trailway Project, Leelanau Scenic Heritage Route

3.20 Roadside facility

Trail way along M-22 and M-109 Highways in Sleeping Bear Dunes National Lakeshore from Hunter Road to South Forest Haven Drive

CON 800 SBD 200 M 1,000 108626 08/08/11 NA

Admin Change - 08/08/2011 - updated limits and project description.

1,000 8/8/11 08/10/11 1,000

2011 MASONLudington MTA

Areawide AreawideTransit vehicle additions/replacements

Bus replacement T-Cap 95 CM 24 OLF 118 112952 08/10/11 NA

Admin Change - 08/10/2011 - Updated the Responsible Agency to Ludington MTA. CMAQ Grant# 11112.

118 8/11/11 08/22/11 118

2011 LAPEER

Greater Lapeer Transportation Authority

Areawide AreawideTransit vehicle additions/replacements

CMAQ Grant # 11145 Replace one bus with one medium duty clean diesel bus.

T-Cap 135 CMG 135 114114 08/11/11 NACMAQ Grant# 11145.

135 8/11/11 08/30/11 135

2011 STATEWIDE

Michigan Department of Natural Resources

White Pine Trail1/4 mile southwest of McKinley Road extending 1.6

1.60 Roadside facility Construct multi-use path CON 216 HPSL 54 CITY 270 114101 08/11/11 NA

SAFETEA-LU Earmark MI229, HPP 3043 (with job #108733)

270 8/11/11 08/12/11 238

2011 EMMET MDOT US-31 US-31 @ Manvel Rd 0.29 Widen - minor Geometric modifications PE 10 HPP 3 M 13 114279 08/24/11 NA 100 9/14/11 09/20/11 13

2011 HOUGHTON MDOT US-41

US-41, M-26 - Houghton County, various locations within boundaries of Copper Country Trail National Byway

Miscellaneous

Historic Resource Preservation Plan for Copper Country that identifies historic properties within the byway region that are eligible for listing on the National Register of Historic Places.

EPE 61 SBD 15 OLF 76 114805 09/13/11 NA

Copper Country Preserviation, Inc is providing $15,243 in cash match. JN changed from JN 114421 to JN 114805 due to technical problems.

76 9/14/11 09/20/11 76

2011 CHIPPEWA MDOT M-123M-28/M-123 west jct to M-28/M-123 east jct

62.51 Roadside facility

Implementation of marketing and interpretive kiosks at Tahquamenon Heritage Route

EPE 82 SBD 25 OLF 107 102982 08/24/11 NA

NSBP Grant # SB-2007-54096. Admin Change - 08/10/2011 - updated the project description. In-Kind services amount of $7,000.

107 9/14/11 09/20/11 88

2011 EMMET MDOT US-31US-31 and M-119 in Petoskey

2.16 Traffic ops/safetyGeometric modifications and access management

PE 93 HPP 23 M 116 113442 09/08/11 NA 494 9/14/11 08/23/11 116

2011 LENAWEELenawee County

Treat Highway

at .40 miles south of US-223 @ Madison Schools north driveway

Miscellaneoussignal upgrade/interconnect

CON 124 CM 31 OLF 155 112956 08/24/11 NA 155 9/14/11 09/14/11 123

2011 HOUGHTONHoughton County

Federal Forest Road 16

Houghton/Ontonagon CL South 7.8 Mi

7.80 ResurfaceReplace culverts, reestablish ditches, widen lanes

PE 230 FLH 230 114368 08/24/11 NA 2,650 9/14/11 09/15/11 230

2011 STATEWIDE Statewide

On the Job Training (OJT) - Provide Career Programs and Internships

Statewide MiscellaneousOn the Job Training - Provide Career Programs and Internships

EPE 300 ST 300 08/24/11 NA 300 9/14/11

2011 LEELANAU MDOT M-22at Sleeping Bear Heritage Trail

3.34 MiscellaneousDesign for a Non-motorized trail-way

PE 328 SBD 82 CNTY 410 114418 08/24/11 NA$82,000 match is from the National Park Service.

410 9/14/11 09/16/11 410

2011 WEXFORD MDOT M-37 M-115 to 4 Road 6.44 Resurface

Crush and Shape and HMA Resurfacing, Partial realignment at Sherman Hill, Miscellaneous safety and drainage improvements.

ROW 368 NH 82 M 450 90234 09/08/11 NACost and Scope Changes.

4,690 9/14/11 09/15/11 450

2011 BAY MDOT I-75North of Pinconning Rd to Bay/Arenac COL

3.19Restore & rehabilitate

Rehab, Drainage & Safety PE 880 IM 98 M 978 110397 09/08/11 NAYear and Cost Changes. Shift from FY 2012 to FY 2011.

13,000 9/14/11 09/02/11 978

2011 STATEWIDE MDOT

Program Development Scoping Trunkline GPA

Regionwide GPA Program Development Scoping Trunkline

EPE 1,003 ST 215 M 1,218 08/24/11 NA 1,218 9/14/11

2011 STATEWIDERail Safety Local GPA

Regionwide GPA Rail Safety Local CON 799 ST 533 M 1,332 08/24/11 NA 1,332 9/14/11

2011 LENAWEE MDOT M-34 Hazen Creek to M-52 5.73Restore & rehabilitate

2 course Mill & Resurface PE 1,163 ST 258 M 1,420 110627 09/08/11 NAYear and Cost Changes. Shift from FY 2012 to FY 2011.

11,774 9/14/11 09/08/11 1,420

Page 9: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2011 LEELANAU MDOT M-109In the NPS between Pierce Stocking and Dune Climb

2.23 MiscellaneousNPS Trailway Construction

CON 1,330 ST 295 M 1,625 113048 09/08/11 NA

Year and Cost Changes. Moved from FY 2014 to FY 2011.

1,625 9/14/11 08/12/11 1,625

2011 STATEWIDE MDOTRail Xings Trunkline GPA

Regionwide GPA Rail Xings Trunkline CON 1,376 ST 387 M 1,764 08/24/11 NA 1,764 9/14/11

2011 STATEWIDE MDOT Statewide Statewide MiscellaneousFY 2011 YDMP (RCWD) Program

EPE AC 2,335 M 2,335 113341 09/09/11 NARCWD Project - split out from JN 101361. Obligated as AC.

3,339 9/14/11 04/07/11 2,335

2011 BERRIEN MDOT I-94 EBPark Road to Hennesey

2.14 Reconstruct Two Course HMA Overlay CON 2,952 IM 328 M 3,280 106483 09/09/11Obligated as regular federal aid

3,280 9/14/11 09/02/11 3,280

2011 TUSCOLA MDOT M-46M-46 over Sucker Cr and M-25 over Harbor Beach Cr

Bridge replacement Bridge Replacement CON 3,127 ST 693 M 3,820 100622 08/24/11 NA

Year and Cost Increases. Project moved from FY 2012 to FY 2011 per a discretionary award for M-25 over Harbor Beach

4,132 9/14/11 09/21/11 3,899

2011 BAY MDOT I-75Linwood Rd to Pinconning Rd

9.95Restore & rehabilitate

Rubblize & HMA Resurface

CON 6,510 IM 1,628 M 8,138 106856 09/09/11 NA

Cost in STIP administratively changed - project costs are split between the Bay MPO and the Non-MPO area. 02/16/11. Obligated as regular federal aid.

33,000 9/14/11 01/14/11 7,029

2011 ALLEGAN MDOT M-222West of Eastern Avenue

0.40 Miscellaneous Slope Stabilization CON AC 10,450 M 10,450 107575 08/24/11 NAProject is an AC project.

10,450 9/14/11 05/23/11 9,931

2011 STATEWIDEBridge Local GPA

Statewide GPA Bridge Local CON 6,532 BRO 5,025 M 695 CNTY 12,252 08/24/11 NA 12,252 9/14/11

2011 STATEWIDE MDOTPre-Construction Phases GPA

Statewide GPA Pre-Construction Phases Trunkline

17,601 ST 2,217 M 0 OLF 19,819 08/24/11 NA 19,819 9/14/11

2011 KEWEENAWKeweenaw County

Brockway Mountain Drive

Top of Brockway Mountain Loop to Cooper Harbor

3.60 Roadside facilityRestoration of existing rock walls and rock fence.

CON 113755 08/24/11

Admin Change - $85,000 for in-kind contributions (07-29-11)

360 9/14/11

2011 LENAWEELenawee County

Treat Highway

at .40 miles south of US-223 @ Madison Schools north driveway

Miscellaneoussignal upgrade/interconnect

PE 112956 08/24/11 NA 9/14/11

2012GRAND TRAVERSE

Grand Traverse County

Silver Lake Road

Traverse City West Middle School, Traverse City

Roadside facilityBike/ped safety improvements

CON 181 SRSI 181 110132 08/24/11 NA 181 9/14/11 04/20/12 232

2012 GOGEBIC MDOT US-2Tourist Park Rd to Curry Street

1.11 Reconstruct Pavement reconstruction ROW 164 NH 36 M 200 110584 09/09/11 NAMoved from FY 2011 to FY 2012

4,973 9/14/11 09/19/12 200

2012 IOSCO MDOT US-23AuSable River Bridge to F-41

1.85 ReconstructHot Mix Asphalt Reconstruction

UTL 37 NH 8 M 240 CNTY 285 90192 08/24/11 NA 7,813 9/14/11 03/26/12 300

2012 STATEWIDE MDOTLocal Tech Assistance Program

MiscellaneousLocal Techincal Assistance Program

CON AC 470 M 470 08/24/11 NAProject will be obligated as an Advance Construct

470 9/14/11

2012 HOUGHTONHoughton County

Federal Forest Road 16

Houghton/Ontonagon CL South 7.8 Mi

7.80 ResurfaceReplace culverts, reestablish ditches, widen lanes

CON 2,420 FLH 2,420 114368 08/24/11 NA 2,650 9/14/11

2012 STATEWIDE MDOT Statewide Statewide MiscellaneousFiscal year 2012 Bureau of Highways training

EPE 1,140 ST 1,140 114983 10/25/11 NA 1,140 10/28/11 10/28/11 1,140

2011 STATEWIDE MDOT Statewide Statewide MiscellaneousEnhance outreach and recruitment efforts about DBE

CON 276 BOWD 276 114468 09/21/11 NA

Administrative modification on 09.21.11 - changed phase from EPE to CON. 11.21.11 - FHWA reviewed admin mods during next amendment cycle.

276 11/21/11 09/20/11 276

2011 BRANCH MDOT US-12Tibbits Opera House, Coldwater

0.16 Roadside facility Building restoration CON 500 SBD 970 CITY 1,470 105383 09/21/11 NA

SB-2008-MI-04 Administrative modification on 09.21.11 - changed phase from EPE to CON. 11.21.11 - FHWA reviewed admin mods during next amendment cycle.

1,470 11/21/11 09/16/11 1,470

2012 STATEWIDE MDOT Statewide Statewide MiscellaneousFY 12 state construction project training

CON 20 M 20 115103 10/25/11 NA 20 11/21/11 11/14/11 20

2012 BENZIE

Benzie Transportation Authority

Countywide Benzie CountyTransit vehicle additions/replacements

Bus Purchase: Replace one less than 30' bus (replace bus #16)

EPE 56 CM 14 TRAL 70 115064 10/25/11 NA 70 11/21/11 08/27/12 70

2012 LUCE MDOT M-280.1 mile west of CR 399 intersection

Roadside facilityConstruct New Carpool lot

CON 59 ST 13 M 72 110737 10/25/11 NA shift from FY 2011 76 11/21/11 01/24/12 43

Page 10: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2012 HURON

Northeast Council of Governments

Huron Shores Heritage Route Interpretive Program

US-23 through Cheboygan, Alpena, Arenac, Alcona, Iosco, and Presque Isle counties.

Heritage routes

The development and implementation of an interpretive program for six counties along the US-23 Herigate Route. The Scenic Byways grant will fund an asset inventory, guidebook, and maps.

EPE 184 SBD OLF 184 115222 10/25/11 NASB-2010-MI-02. In-kind contribution amount is $36,814.

185 11/21/11 01/26/12 147

2012 HOUGHTON

Western Upper Peninsula Planning and Development Region

US-41 Copper Country Trail

US-41 Copper Country Trail

Heritage routesTrails, Rest Area, and Signage

CON 253 SBD OLF 253 10/25/11 NASB-2011-MI-02. In-kind contribution amount is $60,164.

253 11/21/11

2012 MONTCALMMontcalm County

Fred Meijer Heartland Trail

From Grove Street to Flat River Trail

MiscellaneousConstruction of non-motor path - Fred Meijer Trail

CON 185 HPSL 73 CNTY 259 115042 10/25/11 NA 259 11/21/11 01/13/12 226

2012 SCHOOLCRAFTSchoolcraft County

Maple StreetEmerald Elem. and Manistique Mid. Sch., Manistique

Roadside facilityBike/ped safety improvements

CON 261 SRSI 261 115152 10/25/11 NA 261 11/21/11 03/29/12 275

2012 CLAREClare County

Various locations

Farwell Elementary and Middle Schools, Farwell

Roadside facilityBike/ped safety improvements

CON 435 SRSI 435 112501 10/25/11 NA shift from FY 2011 435 11/21/11 06/21/12 421

2012 STATEWIDE MDOT Statewide Statewide MiscellaneousFY12 federal aid eligable const proj training

CON 409 ST 91 M 500 115105 10/25/11 NA 500 11/21/11 11/16/11 500

2012 GOGEBIC MDOT US-2Curry Street to Roosevelt Road

0.96 Reconstruct Pavement reconstruction PE 502 NH 111 M 613 110585 10/25/11 NA

11.21.11 - FHWA reviewed admin mods during next amendment cycle.

4,526 11/21/11 10/18/11 613

2012 VAN BUREN MDOT I-94Berrien County Line to 0.8 miles east of CR 681

2.00 ReconstructRepair Existing and Multiple Course HMA Overlay

PE 810 IM 90 M 900 114292 10/25/11 NA 11,900 11/21/11 12/02/11 900

2012 ONTONAGONOntonagon County

Federal Forest Highway 16

M-38 to Houghton County Line

6.24 Resurface Resurface CON 760 HPSL 190 CNTY 950 103212 10/25/11 NA Shift from FY 2011 950 11/21/11

2012 OGEMAW MDOT M-55/I-75 BLI-75 BL from Husted to Gray Road

1.10Widen - major (capacity increase)

Add center left turn lane CON 1,316 HSIP 146 M 1,462 109229 10/25/11 NA 1,597 11/21/11 10/27/11 1,299

2012 STATEWIDE MDOT Statewide Statewide MiscellaneousC & T Indirect Testing FY 2012

PE 1,500 M 1,500 114829 10/25/11 NA 4,500 11/21/11 10/13/11 1,500

2012 IRON

Iron County Road Commission

US-2 Iron County Heritage Trail Non-motorized Pathway

US-2 Iron County Heritage Trail Non-motorized Pathway

Heritage routesUS-2 Iron County Heritage Trail Non-motorized Pathway

CON 1,118 SBD 500 OLF 1,618 10/25/11 NASB-2011-MI-04. In-kind contribution amount is $122,250.

1,618 11/21/11

2012 ALLEGAN MDOT US-131114th Avenue north to 120th Avenue

3.40 ResurfaceCold Mill and HMA resurface

CON 1,900 NH 1,900 113037 10/25/11 NATLCR - Toll Credit Amount is $344,850. Shift from FY 2011.

1,900 11/21/11 01/24/12 1,771

2012GRAND TRAVERSE

MDOT US-31

Remove and replace an existing deteriorated box culvert at Tobeco Creek. A detour will be required for the project and the effected road area will need to be rebuilt / reconstructed.

0.11 Reconstruct Culvert Replacement CON 1,965 NH 1,965 103007 10/25/11 NA

Year and Cost Changes. Shift from FY 2014. TLCR - Toll Credit Amount is $356,607.

1,965 11/21/11 06/14/12 1,321

2012 HOUGHTON MDOT M-26TAMARACK TO HUBBEL

1.22 Reconstruct HMA RECONSTRUCTION CON 2,228 NH 2,228 87569 10/25/11 NATLCR - Toll Credit Amount is $404,328.

2,228 11/21/11 01/31/12 2,709

2012 ST. JOSEPH MDOT US-131 St. Joseph County 10.29New route/structure (capacity increase)

Design & Construction of PA-5

UTL 1,842 NH 408 M 2,250 46269 10/25/11 NA 40,124 11/21/11 12/02/11 2,250

2012 STATEWIDE MDOT Statewide Statewide MiscellaneousC & T Indirect Testing FY 2012

CON 3,000 M 3,000 114829 10/25/11 NA 4,500 11/21/11 10/13/11 3,135

2012 STATEWIDE MDOT Statewide Statewide MiscellaneousDrain Assessments FY 2012

CON 4,125 M 4,125 114833 10/25/11 NA 4,125 11/21/11 11/09/11 4,125

2012 MARQUETTE MDOT US-41/M-28Bayout St to the Carp River

2.29Restore & rehabilitate

Reconstruction CON 4,512 NH 4,512 80147 10/25/11 NA

TLCR - Toll Credit Amount is $819,000. Shift from FY 2011 to FY 2012.

4,512 11/21/11 12/22/11 5,080

2012 STATEWIDE MDOT Section 5311 Statewide Transit operations Non-UZA Formula T-Ops 18,142 5311 30,911 M 40,682 TRAL 89,735 09/21/11 NA

Administrative modification on 09/21/2011 to add $821,000.

89,735 11/21/11

2012 LENAWEE MDOT M-34 Hazen Creek to M-52 5.73Restore & rehabilitate

2 course Mill & Resurface ROW 110627 10/25/11 NA 11/21/11

2012 LAPEER MDOT M-24 at Sutton Road Roadside facilityConstruct New Carpool Lot

CON 75892 10/25/11 NA 11/21/11

2013 MISSAUKEEMissaukee County

Russell StreetLake City Lower, Upper Elem. and Middle School

Roadside facilityBike/ped safety improvements

CON 138 SRSI 138 115148 11/16/12 NAAdministrative Change from FY 2012 to FY 2013

138 11/21/11 11/19/12 138

2014 STATEWIDE MDOT Grand Region Grand Region 56.03 Traffic ops/safety Freeway Signing Upgrade CON 113334 10/25/11 NA 11/21/11

2014 CALHOUN MDOT I-9417 1/2 to 21 1/2 Mile Road

4.45 ResurfaceMultiple Course HMA Overlay

CON 110138 10/25/11 NA 11/21/11

Page 11: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2012 STATEWIDE MDOT RegionwideUniversity - Regionwide

Miscellaneous Warranty Admin - Bridge CON 5 M 5 114183 12/06/11 NA 5 12/20/11 11/21/11 5

2012 STATEWIDE MDOT RegionwideVarious locations in Bay Region

Roadside facilityRestriping and Signing of Carpool Lots

CON 5 ST 1 M 6 103393 12/06/11 NA 6 12/20/11 01/05/12 6

2012 BERRIEN MDOT US-12Red Arrow Highway to the Galien River

1.64Restore & rehabilitate

Roadway Reconstruction SUB 35 ST 8 M 43 45662 12/06/11 NA 8,993 12/20/11 05/16/12 43

2012 LENAWEE MDOT US-223 over River Raisin 0.24 Bridge replacement Bridge replacement UTL 50 BRT 13 M 63 102851 12/06/11 NA 3,266 12/20/11 01/09/12 63

2012 STATEWIDE MDOT StatewideMichigan Technological University (MTU)

Miscellaneous2012 Michigan Engineer's Resource Library (MERL) Program

EPE 73 STT 18 M 92 115071 12/06/11 NA 12/20/11 12/28/11 91

2012 MASON

Ludington Mass Transportation Authority

Areawide Mason CountyTransit vehicle additions/replacements

Purchase one less than 30' medium duty replacement bus (replace bus #4)

EPE 98 CM 25 TRAL 123 115289 12/06/11 NA

CMAQ eligible determined by FHWA on 11/3/11. - E Fowler

123 12/20/11 08/27/12 123

2012 LENAWEELenawee Transportation

Countywide Lenawee CountyTransit vehicle additions/replacements

Replace 2005 medium-duty diesel bus with new diesel engine bus. The old bus currently meets FTA useful life criteria of 7 years.

EPE 106 CM 27 TRAL 133 115246 12/06/11 NA 133 12/20/11 08/27/12 133

2012 LENAWEELenawee Transportation

Countywide Lenawee CountyTransit vehicle additions/replacements

Replace 2003 medium-duty diesel bus with new diesel engine bus. The old bus currently meets FTA useful life criteria of 7 years.

EPE 106 CM 27 TRAL 133 115245 12/06/11 NA 133 12/20/11 08/27/12 133

2012 HURONThumb Area Transit

Areawide AreawideTransit vehicle additions/replacements

Replace one 2002 model year INTERNATIONAL 444E bus with one 2012 model year medium duty mid-size CLEAN DIESEL cut away 28-passenger bus.�

EPE 112 CM 38 TRAL 150 112751 12/06/11 NA 150 12/20/11 08/27/12 151

2012 CHEBOYGANCheboygan County

M-68Inland Lakes Elem. and Mid. Schools, Tuscarora Twp

0.84 Roadside facilityBike/Ped safety improvements

CON 156 SRSI 156 111482 12/06/11 NA Shift from FY 2011 156 12/20/11

2012 HURON MDOT M-25Richie Road to Campground Access

0.16 Widen - minor

Construct shoulder improvements and HMA paving provide a dedicated center-left turn lane.

CON 141 CM 35 M 176 115248 12/06/11 NA 176 12/20/11 06/21/12 176

2012 ALLEGAN Allegan M-40Hillside Learning and Behavior Center, Allegan

0.45 Roadside facilityBike/Ped safety improvements

CON 214 SRSI 214 115403 12/06/11 NA 214 12/20/11 03/22/12 191

2012 ALLEGAN Allegan Grove StreetHillside Learning and Behavior Center, Allegan

Roadside facilityBike/Ped safety improvements

CON 367 SRSI 367 114136 12/06/11 NA Shift from FY 2011 367 12/20/11 01/05/12 118

2012 STATEWIDE MDOT StatewideMichigan Technological University (MTU)

Miscellaneous 2012 RoadSoft contract EPE 560 STL 140 M 700 115412 12/06/11 NA 700 12/20/11 12/22/11 700

2012 STATEWIDE MDOT Section 5304 Transit operationsStatewide Transportation Planning

T-Cap 637 5304 159 CTF 796 12/06/11 NA 1,904 12/20/11

2012 STATEWIDE MDOT RegionwideVarious locations in Superior Region

1.00 MiscellaneousInstall environmental Sensors

CON 1,211 ST 269 M 1,479 115175 12/06/11 NA 1,507 12/20/11 09/13/12 2,009

2012 STATEWIDE MDOT RegionwideVarious locations in Superior Region

Traffic ops/safetyDesign, Install approx. 10 ESS

CON 1,493 ST 1,493 107425 12/06/11 NATLCR - Toll Credit Amount is $544,492.

1,493 12/20/11 04/16/12 660

2012 STATEWIDE MDOT Section 5316 Transit operationsJob Access/Reverse Commute

T-Ops 1,057 5316 847 M 1,904 12/06/11 NA 1,904 12/20/11

2012 MARQUETTEMarquette County

CR 565M-35 to CR476/CR 565 to 9150 W of CR 565

Reconstruct RCNSTRCT CON 925 EDA 995 CNTY 1,920 115231 12/06/11 NA 1,920 12/20/11

2012 GOGEBICGogebic County

County Road 519

M-28 to Orvana Mineral Site Access Road

12.82 ResurfaceRsrfc, Grdrail, Drainage, Site Access Road, Bridge

CON 2,311 EDA 1,191 CNTY 3,502 115234 12/06/11 NA 3,502 12/20/11

2013 IONIA MDOT I-96at Jordan Lake Road NW quadrant

Roadside facilityCrack treatment of lot surface

CON 2 ST 1 M 3 106326 12/06/11 NA 3 12/20/11 11/02/12 3

2013 EMMET MDOT US-31 Townsend to Eppler 2.89Widen - major (capacity increase)

Widening for center left turn lane FY 2015

PE 18 HSIP 2 M 20 113598 12/06/11 NA 3,522 12/20/11 05/14/13 20

2013 VAN BUREN MDOT M-140City of Watervliet to CR 378

7.22 Resurface Two Course HMA Overlay ROW 20 ST 5 M 25 110107 12/06/11 NA Shift from FY 2012 6,500 12/20/11

2013 EMMET MDOT US-31 US-31 @ Manvel Rd 0.29 Widen - minor Geometric modifications CON 70 HPP 17 M 87 114279 12/06/11 NA 100 12/20/11 04/10/13 110

2014 MECOSTA MDOT US-131at Jefferson Road NE Quadrant

Roadside facility Carpool lot resurfacing CON 37 ST 8 M 45 106349 12/06/11 NA 45 12/20/11

2014 OSCEOLA MDOT US-131 SBSouth County Line to North of US-10

5.63Restore & rehabilitate

Crush & Shape, Resurface

CON AC 3,705 M 3,705 103041 12/06/11 NA 3,705 12/20/11

2014 IOSCO MDOT US-23Cresent Dr. to Au Sable River Bridge

4.70Restore & rehabilitate

HMA Crack Relief Layer CON AC 5,924 M 5,924 105981 12/06/11 NA 6,466 12/20/11

2014 VAN BUREN MDOT I-94Berrien County Line to 0.8 miles east of CR 681

2.00 ReconstructRepair Existing and Multiple Course HMA Overlay

CON AC 11,000 M 11,000 114292 12/06/11 NA 11,900 12/20/11

2014 OTTAWA MDOT M-104at Pine Street NE Quadrant

Roadside facilityCrack Sealing - carpool lot

CON 106352 12/06/11 NA 12/20/11

Page 12: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2011 MARQUETTEMarquette County

S Bridge St Scott to Jenne 0.14 Resurface Reconstruct CON 112139 02/02/12 NA 3/27/12

2012 IRON MDOT US-2US-2 in Iron River 0.16 miles west of M-73

Roadside facilityConstruct new carpool lot.

CON 12 ST 3 M 15 113723 02/02/12 75 3/27/12

2012 LENAWEELenawee County

Countywide Lenawee CountyTransit vehicle additions/replacements

Replace (1) 2008 gas-powered mini-van with one (1) new gas powered accessible mini-van. The old vehicle currently meets the FTA useful life criteria of 4 years.

T-Cap 32 CM 8 M 40 02/02/12 NA 40 3/27/12

2012 MECOSTA MDOT US-131US-131 over Muskegon River

2.10 Bridge - otherEpoxy Overlay, joint replacement

PE 120 BHN 30 M 150 115159 02/02/12 9,988 3/27/12 11/30/11 150

2012 TUSCOLATuscola County

West StreetCampbell Elem. and Cass City Middle School

Roadside facilityBike/ped Safety improvements

CON 199 SRSI 199 111566 02/02/12 NA FY 2011 to FY 2012 199 3/27/12 01/13/12 238

2012 STATEWIDE MDOT

Section 5320 - Transit in Parks Discretionary Program

StatewideTransit vehicle additions/replacements

Purchase Backpacker Bus in Pictured Rocks National Lakeshore for ALTRAN Public Transit

T-Cap 175 5320 44 CTF 219 02/02/12 NA

Section 5320 - Transit in Parks Discretionary Program

219 3/27/12

2012 NEWAYGONewaygo County

Elder StGrant Prim., Elem. and Mid. School, City of Grant

Roadside facilityBike/ped safety improvements

CON 247 SRSI 247 115452 02/02/12 247 3/27/12 05/11/12 211

2012 OSCEOLA MDOT US-131 SBSouth County Line to North of US-10

5.63Restore & rehabilitate

Crush & Shape, Resurface

PE 209 NH 46 M 255 103041 02/02/12 NA FY 2013 to FY 2012 4,569 3/27/12 12/22/11 255

2012 ROSCOMMONRoscommon

Sunset DriveRoscommon Elementary and Middle Schools, Roscommon

Roadside facilityBike/Ped safety improvements

CON 276 SRSI 276 114144 02/02/12 NA FY 2011 to FY 2012 276 3/27/12 04/11/12 218

2012 STATEWIDE Statewide

On the Job Training (OJT) - Provide Career Programs and Internships

Statewide MiscellaneousOn the Job Training - Provide Career Programs and Internships

EPE 300 ST 300 02/02/12 NA 300 3/27/12

2012 LENAWEELenawee County

US-223at Cadmus Road Intersection

Traffic ops/safety

Extension of passing lane to reduce congestion and improve traffic flow from the intersection of US-223/M-52 west past the K-Mart Drive

CON 259 CM 65 OLF 324 02/02/12 NA 324 3/27/12

2012 NEWAYGONewaygo County

Division AvenueFremont M.S, Daisy Brook E.S. and Pathfinder E.S.

Roadside facilityBike/ped safety improvements

CON 330 SRSI 330 115453 02/02/12 330 3/27/12 06/21/12 368

2012 PRESQUE ISLEPresque Isle County

W Huron AveRogers City Elementary and Middle/High School

Roadside facilityBike/ped safety improvements

CON 364 SRSI 364 115465 02/02/12 364 3/27/12 04/11/12 345

2012 VAN BURENVan Buren County

Bronson StreetS Williams St to George St

Reconstruct RCSTRCT and WDN CON 400 EDA 400 113929 02/02/12 NA FY 2011 to FY 2012 400 3/27/12 01/17/12 335

2012 MANISTEEManistee County

Filer City RoadNelson-Falleen, Falleen-Filer Ave, Filer-Stronach

Reconstruct Reconstruct CON 320 EDF 80 CNTY 400 110972 02/02/12 NA 400 3/27/12 01/17/12 419

2012 MASONMason County

Dowland StreetWashington Avenue to Rath Avenue

Reconstruct Reconstruct CON 360 EDF 90 CNTY 450 114409 02/02/12 450 3/27/12 01/30/12 360

2012 MIDLANDMidland County

Salzburg StreetSaginaw Road to Waldo Avenue

Reconstruct Reconstruct CON 360 EDF 90 CNTY 450 114407 02/02/12 450 3/27/12 01/20/12 360

2012 LAPEERLapeer County

Village West Drive

In the praries and ponds area

0.86 Roadside facility

Construction of 4,520 feet 10' wide bituminous walk/bike path to link an existing walk/bike path to a series of existing sidewalks. Project will link existing residential area to large commericial institutional area.

CON 487 CM 114 CNTY 601 115581 02/02/12 601 3/27/12 09/13/12 472

2012 MECOSTA MDOT US-131US-131 over Muskegon River

2.10 Bridge - otherEpoxy Overlay, joint replacement

SUB 519 BHN 130 M 649 115159 02/02/12 9,988 3/27/12 11/30/11 649

2012 ALLEGAN MDOT M-89over Kalamazoo River Mill Race, Plainwell

0.20 Bridge replacement Bridge Replacement CON 1,275 BRT 319 M 1,594 100217 02/02/12 NA 1,594 3/27/12 01/24/12 1,718

2012 STATEWIDE MDOTState Funded Required Program

RegionwideState Funded Required Program

CON 2,880 M 2,880 02/02/12 NA 2,880 3/27/12

2012 CHIPPEWA MDOT M-129and M-48 North in the northwest quadrant

0.10 Roadside facility Construct new carpool lot CON 113571 02/02/12 NA 3/27/12

2012 BERRIEN MDOT US-12US-23 Ramp F over I-75 (S13 of 06111) Arenac County

0.17 Widen - minor Left Turn Lane CON 108015 02/02/12 NA 3/27/12

2013 GRATIOT MDOT US-127Washington Road to North of Polk Road

2.80 Resurface Two Course HMA Overlay ROW 2 NH 1 M 3 110485 02/02/12 NA FY 2012 to FY 2013 7,452 3/27/12

2013GRAND TRAVERSE

MDOT US-313-mile to Holiday Hills Road

1.48Restore & rehabilitate

Roadway Rehabilitation ROW 205 NH 45 M 250 109985 02/02/12 NA FY 2012 to FY 2013 8,961 3/27/12

Page 13: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2013 STATEWIDE Statewide

On the Job Training (OJT) - Provide Career Programs and Internships

Statewide MiscellaneousOn the Job Training - Provide Career Programs and Internships

EPE 300 ST 300 02/02/12 NA 300 3/27/12

2014 STATEWIDE Statewide

On the Job Training (OJT) - Provide Career Programs and Internships

Statewide MiscellaneousOn the Job Training - Provide Career Programs and Internships

EPE 300 ST 300 x 02/02/12 NA 300 3/27/12

2012 STATEWIDE MDOT Statewide Statewide MiscellaneousFY 2012 TRAC (RCWD) Program

EPE 100 ST 100 116079 04/06/12 NA 4,068 4/9/12 05/07/12 100

2012 STATEWIDE MDOT Statewide Statewide MiscellaneousFY 2012 RCAR (RCWD) Program

EPE 700 ST 700 116076 04/06/12 NA 4,068 4/9/12 04/26/12 700

2012 STATEWIDE MDOT Statewide Statewide MiscellaneousFY 2012 YDMP (RCWD) Program

EPE 3,268 ST 3,268 116078 04/06/12 NA 4,068 4/9/12 04/11/12 3,268

2012 LAPEER MDOT M-24over Abandoned CR Railroad

0.60 Bridge replacementRem structure repl w/ culvert

UTL 5 BRT 1 M 6 90239 04/10/12 NA 1,339 5/4/12 01/09/12 6

2012 VAN BUREN

Southwest Michigan Planning Commission

Countywide Van Buren County Miscellaneous

SW MI Planning Commission Rideshare Program works to effect behavioral change among citizens and businesses to reduce traffic congestion and improve air quality

EPE 12 CMG 12 115847 04/10/12 NA 12 5/4/12 06/21/12 12

2012 LENAWEE MDOT US-223 at Cadmus Road 0.39 Traffic ops/safetyExtension of passing lane to reduce congestion and improve traffic flow

PE 24 CM 6 M 30 115709 04/10/12 NA 354 5/4/12 05/22/12 30

2012 LAPEER MDOT M-53 at Bowers Rd 0.24 Traffic ops/safetyAdd Center Left Turn Lane

PE 40 CM 10 M 50 115233 04/10/12 NA 490 5/4/12 05/11/12 50

2012 STATEWIDE MDOT STATEWIDE Statewide MiscellaneousFY 2012 Heritage Route Program Administration

EPE 57 M 57 116229 04/10/12 NA 57 5/4/12 04/16/12 57

2012 BERRIEN

Berrien County Transportation Authority

Rural Berrien County

Rural Berrien CountyTransit vehicle additions/replacements

Replace 1 cutaway diesel engine bus with 1 newer gas engine extended cutaway bus

EPE 52 CM 13 TRAL 65 115794 04/10/12 NA 65 5/4/12 08/27/12 65

2012 STATEWIDE MDOT Statewide

At Michigan Technological University and Ferris State University

MiscellaneousFY 2012 NSTI - National Summer Transportation Institute

EPE 90 SST 90116693/116694

04/10/12 NA 90 5/4/12 06/14/12 55

2012 VAN BUREN

Van Buren Public Transit

CountywideMunicipal Transit Bus Service Area

0.00Transit vehicle additions/replacements

Replcaement of one 2005 medium duty model diesel bus

EPE 101 CM 29 M 130 115849 04/10/12 NA 130 5/4/12 08/27/12 129

2012 BERRIEN

Berrien County Transportation Authority

Rural Berrien County

Rural Berrien CountyTransit vehicle additions/replacements

replace 1 medium duty diesel engine bus with 1 newer diesel engine medium duty bus

EPE 108 CM 27 TRAL 135 115793 04/10/12 NA 135 5/4/12 08/27/12 135

2012 MARQUETTE Negaunee Croix StLakeview Elementary School, Negaunee

Roadside facilityBike/Ped safety improvements

CON 136 SRSI 136 114137 04/10/12 NA FY 2011 to FY 2012 136 5/4/12 05/31/12 134

2012 VAN BUREN DecaturSouth Williams Street

From Beers Street to Special-Lite, Inc.

0.07 Roadside facility

Construct 10' wide concrete non-motoized path on the west side of S. Williams Street. The path will provide an oppporunity for residents and employees to visit and conduct business without compromising safety or impacting vehicular traffic along South Williams Street

CON 144 CM 36 CITY 180 115848 04/10/12 NA 180 5/4/12

2012 CASS Dowagiac N. Paul StreetM-51/62 to 300' east of Lowe St intersection

0.78 Resurface Resurface CON 184 EDA 36 CITY 220 115818 04/10/12 NA 220 5/4/12 03/05/12 219

2012 EMMETEmmet County

Hoyt RoadBlackbird & Shay Elem. & Harbor Springs Mid. Sch.

Roadside facilityBike/ped safety improvements

CON 237 SRSI 237 112493 04/10/12 NA FY 2011 to FY 2012 237 5/4/12 04/30/12 285

2012 CHIPPEWASault Ste. Marie

East Spruce Street

Johnston Street to Easterday, Sault Ste Marie

0.50 Resurface Resurfacing CON 220 HPSL 55 CITY 275 116075 04/10/12 NA 275 5/4/12

2012 LENAWEE MDOT US-223 at Cadmus Road 0.39 Traffic ops/safetyExtension of passing lane to reduce congestion and improve traffic flow

CON 259 CM 65 M 324 115709 04/10/12 NA 354 5/4/12 07/30/12 326

2012 OTSEGO MDOT I-75 NBat the Gaylord Rest Area #405

0.36 Roadside facilityBuilding Replacement/Site Work

PE 360 IM 40 M 400 101606 04/10/12 NA 4,327 5/4/12 04/06/12 400

2012 ST. JOSEPHSt. Joseph County

Lafeyette StreetN Centerville Rd to Broadus/Lafayette to Dresser

Reconstruct Reconstruct CON 375 EDF 118 CNTY 493 114411 04/10/12 NA 493 5/4/12 03/20/12 375

2012 ROSCOMMONRoscommon County

Old 27 (North Harrison Road)

M-55 to Bradford Drive 0.00 Resurface RSFCE CON 375 EDF 120 CNTY 495 114935 04/10/12 NA 495 5/4/12 06/07/12 463

Page 14: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2012 STATEWIDE MDOT StatewideAll trunkline freeways in non-attainment areas

Miscellaneous

Acquire software that will integrate MDOT traffic, incident, construction, weather data and other traffic information.

EPE 500 CMG 500 116131 04/10/12 NA 500 5/4/12 05/11/12 500

2012 GRATIOT MDOT Countywide Maple River Watershed Wetland mitigationWetland Mitigation Bank Site

CON 523 ST 116 M 639 107962 04/10/12 NA FY 2014 to FY 2012 735 5/4/12 08/31/12 538

2012 OCEANAOceana County

Winston RoadUS-31 to 4200' east of 80th Avenue

0.00 Resurface Resurface CON 1,020 EDA 1,020 115873 04/10/12 NA 1,020 5/4/12 04/17/12 1,164

2012 LEELANAU MDOT M-22Pierce Stocking Drive to Empire

1.69 Miscellaneous2.7 miles of NPS Trailway Construction

CON 1,094 ST 243 M 1,337 115927 04/10/12 NA 1,337 5/4/12 09/12/12 1,633

2012 LAPEER MDOT M-24over Abandoned CR Railroad

0.60 Bridge replacementRem structure repl w/ culvert

CON 2,179 BRT 545 M 2,723 90239 04/10/12 NA 2,723 5/4/12 02/08/12 2,381

2012 TUSCOLA MDOT M-25Dickerson Road to Bay Park Road

5.44 Resurface HMA Mill & Overlay CON AC 3,046 NH 675 M 3,721 90283 04/10/12 NA 5/4/12 09/19/12 3,844

2012 TUSCOLA MDOT M-25Bay/Tuscola County Line to Dickerson Road

5.43 Resurface HMA Mill & Overlay CON AC 3,178 NH 704 M 3,882 86950 04/10/12 NA 4,152 5/4/12 09/14/12 4,742

2012 TUSCOLA MDOT M-25over Quanicassee River

0.76 Bridge replacement Bridge Replacement CON AC 4,442 BRT 1,110 M 5,552 102952 04/10/12 NA 5,900 5/4/12 06/20/12 5,023

2012 BERRIEN MDOT US-12Red Arrow Highway to Hoder Road

1.64Restore & rehabilitate

Recycle Exisiting Conc Pavt

CON AC 7,080 ST 1,570 M 8,650 45662 04/10/12 NA 9,293 5/4/12 08/28/12 8,523

2013 TUSCOLA MDOT M-25Ringle Road to the Huron County Line

4.18 ResurfaceHMA Overlay and Shoulders

ROW 41 ST 9 M 50 109334 04/10/12 NA FY 2012 to FY 2013 4,251 5/4/12

2013 CALHOUN MDOT I-69 at N Drive North Roadside facility New Carpool Lot CON 113668 04/10/12 NA 5/4/12

2014 IONIA MDOT I-96I-96 under Cutler Road

0.60 Bridge replacement Bridge Replacement PE 34 IM 4 M 38 115817 04/10/12 NA 4,047 5/4/12

2014 DELTA MDOT US-2over the Escanaba River

0.36 Bridge replacement Bridge Replacement PE 44 BRT 11 M 55 115866 04/10/12 NA 19,875 5/4/12

2014 IONIA MDOT I-96I-96 under Cutler Road

0.60 Bridge replacement Bridge Replacement SUB 165 IM 18 M 184 115817 04/10/12 NA 4,047 5/4/12

2014 DELTA MDOT US-2over the Escanaba River

0.36 Bridge replacement Bridge Replacement SUB 296 BRT 74 M 370 115866 04/10/12 NA 19,875 5/4/12

2014 LEELANAU MDOT M-22Westman Rd to Port Oneida Rd.

3.34 Miscellaneous3.8 miles of NPS Trailway Construction

CON 1,646 FLH 197 CNTY 1,843 115983 04/10/12 NA 1,843 5/4/12

2014 TUSCOLA MDOT M-15 over Cass River 0.10 Bridge replacement Bridge Replacement CON 3,199 BHT 3,199 102456 04/10/12 NATLCR - Toll Credit Amount is $639,774. FY 2012 to FY 2014.

3,399 5/4/12

2014 BAY MDOT US-10M-47 NB and SB over US-10

0.02 Bridge replacementBridge Removal and Replacement

CON 3,476 BHN 869 M 4,346 108778 04/10/12 NA 4,608 5/4/12

2014 IONIA Muir Prairie Street over Maple River 0.00 Bridge replacement Bridge Replacement CON 3,600 BRT 675 M 225 CITY 4,500 115684 04/10/12 NA 4,500 5/4/12

2012 LAPEER MDOT I-69 EBM-24 to Lapeer/St Clair COL

17.19Restore & rehabilitate

Conc Pavt Rprs, Diamond Grinding

PE 32 IM 4 M 35 115855 05/22/12 NA 4,200 6/11/12 06/21/12 35

2012 LUCE MDOT M-123from Newberry to Eckerman

63.00 Roadside facility Non-Motorized Trail Plan EPE 56 SBD 14 CNTY 70 116551 06/07/12 NASBD# SB-2010-MI-56001

70 6/11/12 7/12/2012 70

2012 MACKINAC MDOT I-75From N of M-123 to N of M-134

7.30 ResurfaceSingle Crs HMA Overlay w/ crack relief interlayer.

PE 124 NH 28 M 152 116383 05/22/12 NA 4,250 6/11/12 07/09/12 152

2012 HOUGHTON

Western Upper Peninsula Planning and Development Region

US-41

Intersection of US-41 and No. 9 Road (Houghton County Hwy F22) to intersection of US-41 and Airpark Blvd.

10.17 Heritage routes

This project will remove blighted structures and debris, construct viewing platforms for pedestrians, pit toilets, interpretive signs and a covered pavilion.

CON 193 SBD 48 OLF 241 117251 06/07/12 NA

SBD# SB-2011-MI-56748. Local Other Funds - $42,564 cash and $5,600 in-kind contributions. Was originally MDOT JN 115853. This was changed to MDOT JN 117251.

241 6/11/12 08/10/12 235

2012 GRATIOT MDOT US-127Van Buren Road to Begole Road

3.41Restore & rehabilitate

Two Course HMA Overlay PE 302 NH 67 M 370 115805 05/22/12 NA 8,131 6/11/12 08/16/12 320

2012 VAN BUREN Mattawan Murray StreetMattawan Early and Later Elem. Schools, Mattawan

Roadside facilityBike/Ped safety improvements.

CON 380 SRSI 380 114142 05/22/12 NA FY 2011 to FY 2012 380 6/11/12 06/14/12 424

2012 LEELANAU MDOT M-22from Thoreson Rd to 0.9 miles east of Basch Rd

2.42Restore & rehabilitate

New 5 ft paved shoulders CON 409 ST 91 M 500 116658 05/22/12 NA 500 6/11/12 9/7/2012 529

2012 MARQUETTEMarquette County

CR 492US-41 to Brookton Rd/Commerce Dr

0.00 Reconstruct RCNSTRCT & WDN CON 375 EDF 125 CNTY 500 114936 05/22/12 NA 500 6/11/12 5/22/2012 375

2012 ST. JOSEPH MDOT US-131from Broadway Road to Coon Hollow Road

1.17 ReconstructReconstruct existing, no widening

PE 575 NH 128 M 703 116377 05/22/12 NA 8,500 6/11/12 09/07/12 703

2012 STATEWIDE MDOT Statewide Statewide 0.01 Miscellaneous

Perform in house corrective actions at various wetland mitigation sites throughout the state. Corrective actions will include planting, minor regrading, invasive species control.

CON 1,056 ST 234 M 1,290 115826 05/22/12 NA FY 2014 to FY 2012 1,290 6/11/12 05/08/12 1,290

2013 BENZIE MDOT US-31 at Joyfield Road 0.10 Widen - minor Construct right turn lane ROW 10 CMG 10 116331 05/22/12 NA 150 6/11/12

Page 15: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2013 LAPEER MDOT M-53 at Hunters Creek Road 0.87 Traffic ops/safety

Add Center Left Turn Lane and widen Western/Weston Drain structure (B02) to the east to accomodate the turn lane

PE 32 CM 8 M 40 115814 05/22/12 NA 675 6/11/12 12/11/12 42

2013 KALKASKA MDOT US-131from 500 ft south to 1500 ft south of Wallace Rd

0.19 ResurfaceCold milling, HMA resurfacing

CON 40 ST 9 M 48 116657 05/22/12 NA 51 6/11/12 03/29/13 48

2013 ST. JOSEPH MDOT US-131from Broadway Road to Coon Hollow Road

1.17 ReconstructReconstruct existing, no widening

ROW 61 NH 14 M 75 116377 05/22/12 NA 8,500 6/11/12

2013 LAPEERLapeer County

Imlay City RdImlay City Road at Myers Road

0.03 Widen - minor

Add right-turn lanes to the north and east legs of the Imlay City/Myers Road intersection. Work shall include hot mix asphalt paving, curb and gutter installation, sidewalk ramps, and minor drainage work; and all together with necessary related work.

CON 76 CM 50 CNTY 126 116715 05/22/12 NA 126 6/11/12 03/06/13 90

2013 MASON MDOT US-10US-10 (LUDINGTON) @ NELSON

Traffic ops/safetyRadio Interconnect & Modernization

CON 200 CMG 200 111324 05/22/12 NA 240 6/11/12

2013 LAPEERLapeer County

VariousVarious intersections in Lapeer County

Traffic ops/safety

The intersections of Saginaw and Nepessing, Saginaw and Genesee, Saginaw and McCormick, and Genesee and Court.

CON 420 CMG 420 116717 05/22/12 NA 420 6/11/12

2013 STATEWIDE MDOT RegionwideNorth Region, various locations

Miscellaneous ITS DMS and detection CON 1,467 ST 325 M 1,793 107598 05/22/12 NA 2,288 6/11/12

2013 IRON MDOT M-189NORTH OF HIAWATHA ROAD TO US-2

1.12 Reconstruct HMA RECONSTRUCTION CON AC 3,670 M 3,670 100329 05/22/12 NA 4,060 6/11/12 01/23/13 3,897

2013 MACKINAC MDOT I-75From N of M-123 to N of M-134

7.30 ResurfaceSingle Crs HMA Overlay w/ crack relief interlayer.

CON AC 4,098 M 4,098 116383 05/22/12 NA 4,250 6/11/12 02/04/13 4,600

2013 LAPEER MDOT I-69 EBM-24 to Lapeer/St Clair COL

17.19Restore & rehabilitate

Conc Pavt Rprs, Diamond Grinding

CON AC 4,165 M 4,165 115855 05/22/12 NA 4,200 6/11/12 11/09/12 3,932

2013 IOSCO MDOT M65TURTLE RD TO 1200' NORTH OF SHERMAN STREET

5.97Restore & rehabilitate

CRUSH & SHAPE, RESURFACE,

CON AC 4,191 M 4,191 79433 05/22/12 NA 4,534 6/11/12 01/29/13 4,606

2013 ANTRIM MDOT M-88BELLAIRE TO CENTRAL LAKE

5.54Restore & rehabilitate

CRUSH & SHAPE, HMA RESURF

CON AC 4,511 M 4,511 75082 05/22/12 NA 4,835 6/11/12 03/19/13 4,047

2013 LAPEER MDOT M-24I-69 to Nepessing Street, Lapeer

2.06 Reconstruct HMA Reconstruct CON AC 11,218 M 11,218 48945 05/22/12 NA 12,383 6/11/12

2013 STATEWIDE MDOT

Rural Highway Rehab and Reconstruct Trunkline GPA

Regionwide GPA Rural Highway Rehab and Reconstruct Trunkline

CON 10,740 ST 2,381 M 13,121 05/22/12 NA 13,121 6/11/12

2013 MIDLAND MDOT US-10Midland/Isabella County Line Easterly to M-18

6.84Restore & rehabilitate

Rubblize and HMA Resurfacing

CON AC 20,925 M 20,925 106848 05/22/12 NA 21,275 6/11/12 10/26/12 19,445

2013 STATEWIDEBridge Local GPA

Regionwide GPA Bridge Local CON 17,959 BRO 13,767 M 1,670 OLF 33,396 05/22/12 NA 33,396 6/11/12

2013 STATEWIDE MDOTCPM Road Trunkline GPA

Regionwide GPA CPM Road Trunkline CON 34,742 ST 7,425 M 42,167 05/22/12 NA 42,167 6/11/12

2014 BENZIE MDOT M-115from Bridge Street east 4 miles

4.11Restore & rehabilitate

Crush and Shape, Resurface

ROW 8 ST 2 M 10 79645 05/22/12 NA 6,779 6/11/12

2014 WEXFORD MDOT US-131 at M-55 Interchange Roadside facility New Carpool Parking Lot CON 101 ST 22 M 123 107459 05/22/12 NA FY 2013 to FY 2014 132 6/11/12

2014 LAPEERLapeer County

Bowers RdBowers road at Roods Lake Road

0.04 Widen - minor

Add a passing flare for eastbound traffic at the Bowers/Roods Lake intersection. Work shall include hot mix asphalt paving, curb and gutter installation, and minor drainage work; and all together with necessary related work.

CON 144 CMG 144 116711 05/22/12 NA 144 6/11/12

2014 STATEWIDE MDOT RegionwideVarious (I-69, I-96, I-496, US-127)

MiscellaneousAddition of ITS devices (DMS and CCTV).

PE 150 CMG 150 116407 05/22/12 NA 1,250 6/11/12

2014 MASON MDOT US-10US10 (LUDINGTON) @ JACKSON ST

Traffic ops/safetyRadio Interconnect & Modernization

CON 170 CMG 170 111325 05/22/12 NA 204 6/11/12

2014 STATEWIDE MDOT RegionwideVarious locations in Metro Region

2.00 Traffic ops/safetyITS System Modernizations

CON 682 ST 151 M 833 107612 05/22/12 NA 953 6/11/12

2014 BENZIE MDOT M-115from Bridge Street east 4 miles

4.11Restore & rehabilitate

Crush and Shape, Resurface

PE 703 ST 156 M 859 79645 05/22/12 NA 6,779 6/11/12

Page 16: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2014 CRAWFORD I-75at North Down River Road

Miscellaneous

Completion of the interchange at I-75 at North Down River Road from a partial interchange to a full interchange by adding two ramps to allow for southbound access and northbound exiting, replace the bridges on North Down River road over I-75 and over the East Branch AuSable River, and reconstruct and widen North Down River road from just east of I-75 westward to M-93.

PE 800 OFHWA 200 OLF 1,000 x 05/22/12 NA TIGER IV Grant 10,800 6/11/12

2014 STATEWIDE MDOT RegionwideVarious locations in Superior Region

Traffic ops/safetyDesign & Install approx. 8 ESS

CON 1,637 ST 363 M 2,000 107426 05/22/12 NA 2,215 6/11/12

2014 STATEWIDE MDOT Regionwide Southwest Region Miscellaneous I-94 CCTV and Detectors CON 2,047 ST 454 M 2,501 107965 05/22/12 NA 3,001 6/11/12

2014 HOUGHTON MDOT M-26M-26, Houghton County

3.13 ResurfaceMill & Two Course Overlay

CON AC 3,608 M 3,608 107008 05/22/12 NA 4,032 6/11/12

2014 ALLEGAN MDOT I-196 SBat the Saugatuck Rest Area #727

0.59 Roadside facilityBuilding Replacement/Site Work

CON AC 4,097 M 4,097 101615 05/22/12 NA 4,397 6/11/12

2014 CALHOUN MDOT I-94 BL29 Mile Road/Clark Street to I-94

1.96 ResurfaceMultilple course HMA Overlay

CON AC 4,102 M 4,102 86969 05/22/12 NA 4,452 6/11/12

2014 LEELANAU MDOT M-22 from M-201 to Omena 5.04Restore & rehabilitate

Crush and Shape CON AC 4,334 M 4,334 83588 05/22/12 NA 4,656 6/11/12

2014 GOGEBIC MDOT US-2Tourist Park Rd to Curry Street

1.11 Reconstruct Pavement reconstruction CON AC 4,653 M 4,653 110584 05/22/12 NA 5,529 6/11/12

2014 ROSCOMMON MDOT US-127 Muskegon River north 3.75Restore & rehabilitate

Cold milling; crush and shape

CON AC 6,382 M 6,382 106863 05/22/12 NA 6,884 6/11/12

2014 CRAWFORD I-75at North Down River Road

Miscellaneous

Completion of the interchange at I-75 at North Down River Road from a partial interchange to a full interchange by adding two ramps to allow for southbound access and northbound exiting, replace the bridges on North Down River road over I-75 and over the East Branch AuSable River, and reconstruct and widen North Down River road from just east of I-75 westward to M-93.

CON 7,840 OFHWA 1,960 OLF 9,800 x 05/22/12 NA TIGER IV Grant 10,800 6/11/12

2014 BAY MDOT I-75Pinconning Road to Bay/Arenac COL

3.27Restore & rehabilitate

Rubblize and HMA Overlay

CON AC 12,453 M 12,453 110397 05/22/12 NA 13,431 6/11/12

2014 MECOSTA MDOT US-131S Mecosta Co Line to 6 Mile Rd

6.06Restore & rehabilitate

Coldmill, C&S, HMA Resurface

CON AC 12,992 M 12,992 105524 05/22/12 NA 13,600 6/11/12

2014 GRATIOT MDOT US-127Washington Road to North of Polk Road

2.80 Resurface Two Course HMA Overlay CON 110485 05/22/12 NA 6/11/12

2012 STATEWIDE MDOT Statewide Statewide MiscellaneousPurchase Enterprise Ver. of the DARWin-ME Software

EPE 4 RP 28 M 32 117051 08/06/12 NA 32 8/23/12 08/24/12 32

2012 CASS

Cass County Transportation Authority

Countywide CountywideTransit vehicle additions/replacements

Replace one (1) 2007 cutaway bus with one (1) new 2012 or newer gas engine cutaway bus. The old bus will exceed the FTA useful life criteria of 5 years or 150,000 miles.

EPE 57 CM 14 M 71 116926 08/06/12 NA 71 8/23/12 08/27/12 71

2012 DELTADelta County

North 9th Street

North 5th Street to North Lakeshore Drive

ResurfaceResurface roadway including shoulder work.

CON 69 EDF 17 CNTY 86 117052 08/06/12 NA 86 8/23/12 09/11/12 72

2012 CASSCass County

Eagle Point Road

at Carlton Dr, east then north to Colony Bay Dr

0.60New route/structure (capacity increase)

0.60 mi mulity-use pathway construction with hot mix asphalt paving, aggregate base and shoulders, clearing, and grading from Eagle Point Road to Colony Bay Drive.

CON 85 CM 21 CNTY 106 116925 08/06/12 NA 106 8/23/12

2012 LAPEER MDOT I-69at Lake Nepessing Road

Roadside facilityExpand, pave carpool lot and add lighting

CON 107 ST 27 M 134 103307 08/06/12 NA 60 8/23/12 07/09/12 133

2012 ANTRIM MDOT M-88BELLAIRE TO CENTRAL LAKE

5.54Restore & rehabilitate

CRUSH & SHAPE, HMA RESURF

ROW 150 M 150 75082 08/06/12 NA 4,935 8/23/12

2012 HURON Areawide AreawideTransit vehicle additions/replacements

Purchase one medium duty bus to expand transit service.

EPE 121 CM 30 M 151 116934 08/06/12 NA 151 8/23/12

2012 MARQUETTE Marquette Tierney StreetBothwell Middle School, Marquette

Roadside facilityBike/Ped safety improvements

CON 175 SRSI 175 114145 08/06/12 NA FY 2011 to FY 2012 175 8/23/12 08/07/12 174

Page 17: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2012 LENAWEE Hudson areawide areawide Miscellaneous

Construction of 4800ft. of non-motorized pathway to provide a direct and shorter route to and from downtown Hudson and reduce heavy traffic congestion and emissions along M34 (Main Street) and Maple Grove Ave, which is the current vehicle route to the north section of town.�

CON 131 CM 51 CITY 182 117122 08/06/12 NA 182 8/23/12 08/23/12 179

2012 HURONHuron County

Various routesBad Axe Intermediate and Junior High School

Roadside facilityBike/ped safety improvements

CON 258 SRSI 258 112483 08/06/12 NA FY 2011 to FY 2012 258 8/23/12

2012 OCEANA MDOT US-31Fruitvale Road north to Winston Road

5.37 ResurfaceCold Mill, Joint Repairs, HMA Resurfacing

PE 313 NH 69 M 382 112158 08/06/12 NA FY 2013 to FY 2012 8,785 8/23/12 07/17/12 382

2012 MENOMINEE MDOT M-35NCL of Menominee North 6 miles

6.00Restore & rehabilitate

HMA Coldmilling and Resurface

PE 368 ST 82 M 450 110684 08/06/12 NA 5,206 8/23/12 08/31/12 450

2012 IOSCO MDOT US-23Tawas Beach Road to Aulerich Road

1.83 Reconstruct Total Reconstruction PE 464 NH 103 M 567 103019 08/06/12 NA FY 2013 to FY 2012 5,923 8/23/12 09/14/12 567

2012 BARRY MDOT M-43over Thornapple River in Hastings

0.17Restore & rehabilitate

Deep Overlay, Beam Repair

CON 743 BHT 743 100132 08/06/12 NATLCR - Toll Credit Amount is $290,731.

1,573 8/23/12 01/26/12 743

2012 EMMET MDOT M-68 over Crooked River 0.26 Bridge replacementDeck Repl w/shoulder widening

CON 868 BHT 868 90130 08/06/12 NATLCR - Toll Credit Amount is $318,081.

868 8/23/12 06/19/12 868

2012 ONTONAGONOntonagon County

Boundary Rd Summit Park - M107 Reconstruct RECONSTRUCT CON 974 STL 0 244 CNTY 1,218 78872 08/06/12 NA 1,218 8/23/12

2012 ONTONAGONOntonagon County

SOUTH BOUNDARY RD

Summit Park Rd - Gogebic County Line

5.00 ResurfaceMILLING AND RESURFACING

CON 1,000 STL 0 250 CNTY 1,250 78909 08/06/12 NA 1,250 8/23/12

2012 GOGEBIC MDOT US-2US-2 Marenisco to Gogebic Station

10.24 Resurface HMA Mill and Resurface CON 1,554 NH 1,554 113136 08/06/12 NATLCR - Toll Credit Amount is $396,396.

1,554 8/23/12 01/23/12 1,554

2012 BENZIE MDOT US-31from Beulah Bridge to M-115

0.61 ResurfaceCrack Relief Layer and Overlay

CON 1,621 NH 1,621 87355 08/06/12 NATLCR - Toll Credit Amount is $362,751.

2,229 8/23/12 01/26/12 1,621

2012 MDOTLeelanau County

Sleeping Bear Heritage Trail Segment 8 in Sleeping Bear Dunes National Lakeshore

starts at Port Oneida Road and ends at Leelanau County Road 669/Bohemian Road all within Cleveland Township

3.17 MiscellaneousConstruct an ADA compliant non-motorized path

CON 1,630 OFHWA 1,630 08/06/12 NA

This project is utilzing PLHD funds. The original grant is for $1,620,000. Another $10,000 is included for signage -the signage money and project will eventually be split into a separate JN.

1,630 8/23/12

2012 CHEBOYGAN MDOT I-75 NB & SBLevering to US-31 Ramp

9.03Restore & rehabilitate

Full depth concrete pavt repairs FY 2012

CON 2,598 NH 2,598 113596 08/06/12 NATLCR - Toll Credit Amount is $620,730.

3,420 8/23/12 12/23/11 2,598

2012 IONIA MDOT I-96EB and WB over abandoned CSX Railroad

0.03 Bridge replacement Bridge Replacement CON 2,674 IM 2,674 90210 08/06/12 NATLCR - Toll Credit Amount is $335,300.

3,553 8/23/12 03/01/12 2,674

2012 IOSCOIosco County

Monument Road

Monument and Wilber Roads

17.49 Reconstruct Reconstruct CON 2,760 FLH 2,760105167

& 117737

08/06/12 NA

JN 117737 was programmed to utilize left over money from JN 105167. The total dollar amounts and scope remains the same.

3,000 8/23/12 06/12/12 1,443

2012 ALPENA MDOT M-65over North Branch of Thunder Bay River

0.49 Bridge replacement Bridge Replacement CON AC 3,003 M 3,003 102987 08/06/12 NA FY 2013 to FY 2012 3,179 8/23/12 7/23/2012 3,068

2012 MARQUETTEMarquette County

Triple A RoadTriple A Road; M-95; County Road 601

Reconstruct Reconstruct CON 2,638 EDA 659 CNTY 3,297 117106 08/06/12 NA 3,297 8/23/12

2012 BARRY MDOT M-43M-37/M-43 (State Street) to North Street

1.33Restore & rehabilitate

Reconstruction & Resurfacing

CON 3,642 ST 3,642 83975 08/06/12 NATLCR - Toll Credit Amount is $838,742.

5,221 8/23/12 01/26/12 3,642

2012 LAPEER MDOT WB I-69WB I-69, M-24 to Lapeer/St Clair COL

17.16Restore & rehabilitate

Conc Pavt Rprs, Diamond Grind

CON 3,738 IM 3,738 108689 08/06/12 NATLCR - Toll Credit Amount is $450,000.

4,605 8/23/12 12/23/11 3,738

2012 MACKINAC MDOT US-2Borgstrum Road to Hiawatha Trail

8.69 Resurface HMA Overlay CON 3,882 NH 3,882 83545 08/06/12 NA TLCR - Toll Credit Amount is $882,992.

4,878 8/23/12 01/23/12 3,882

2012 LENAWEE MDOT M-52US-223 North to South of M-34

0.78 Reconstruct HMA Reconstruction CON AC 5,646 M 5,646 87522 08/06/12 NA 8,187 8/23/12 02/28/12 5,646

2012 MENOMINEE MDOT M-35US-41 north to 48th Ave.

0.95 Reconstruct Reconstruct Existing CON 2,979 NH 661 M 2,251 CITY 5,891 103311 08/06/12 NA 6,084 8/23/12 08/28/12 5,496

2012 MONTCALM MDOT US-131 NBN of Cannonsville Rd to S of M-46

5.45Restore & rehabilitate

Concrete Inlay CON 5,984 NH 5,984 90035 08/06/12 NATLCR - Toll Credit Amount is $ $1,274,674.

7,023 8/23/12 11/01/11 5,984

2012 MONTCALM MDOT US-131 SBNorth of Cannonsville Road to South of M-46

5.39Restore & rehabilitate

Concrete Inlay CON 7,775 NH 7,775 87108 08/06/12 NA

Moved from FY 2014. TLCR - Toll Credit Amount is $1,728,424.

10,267 8/23/12 11/01/11 7,775

Page 18: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2012 ALLEGAN MDOT M-89West of US-131 east to Florence St. in Plainwell

1.72 ReconstructReconstruct Existing, No widen

CON 8,494 ST 8,494 90028 08/06/12 NATLCR - Toll Credit Amount is $1,716,990.

10,415 8/23/12 01/24/12 8,494

2012 ROSCOMMON MDOT I-75from Ogemaw CL to Maple Valley Road

12.57Restore & rehabilitate

Crush & Shape, HMA resurface

CON AC 8,816 M 8,816 83288 08/06/12 NA Tagged as AC 10,521 8/23/12 02/23/12 8,816

2013 EMMET MDOT US-31 Townsend to US-131 3.37Restore & rehabilitate

Crush and Shaping ROW 16 NH 4 M 20 110605 08/06/12 NA FY 2012 to FY 2013 7,359 8/23/12

2013 SHIAWASSEE MDOT M-52M-21, Chestnut to M-52, M-52, M-21 to Ardelean

3.27 ResurfaceHMA cold mill and resurface

ROW 82 ST 18 M 100 87244 08/06/12 NA FY 2012 to FY 2013 7,623 8/23/12

2013 LENAWEE MDOT M-501700 ft East of Rogers Highway continuing easterly

0.36 Widen - minorWiden to connect center left turn lanes

CON 289 EDA 289 116617 08/06/12 NA 331 8/23/12 05/07/13 326

2013 MENOMINEEMenominee

30th AvenueFrom 13th St to 22nd St, Menominee

0.53 ReconstructReconstruction of street surface, curb and gutter

CON 235 HPSL 59 CITY 294 116813 08/06/12 NA 294 8/23/12

2013 IONIAIonia County

Riverside Drive/Cleveland St

Riverside Drive/Cleveland Street

Reconstruct Reconstruct CON 360 EDF 90 CNTY 450 117124 08/06/12 NA 450 8/23/12 05/23/13 397

2013 IRON

Michigan Department of Natural Resources

County Road 424

from Caspian to Pentoga Park, Iron County

7.85 Roadside facilityIron County Heritage Trail

CON 996 SBD 488 OLF 1,483 116742 08/06/12 NA SB-2011-MI-56524 1,483 8/23/12

2013 ISABELLA MDOT M-20 At Leaton Road 0.54 Traffic ops/safetyConstruct a Narrow Boulevard

CON 2,015 HSIP 2,015 110754 08/06/12 NATLCR - Toll Credit Amount is $201,483. FY 2012 to FY 2013

2,330 8/23/12

2013 SHIAWASSEE MDOT M-52M-21, Chestnut to M-52, M-52, M-21 to Ardelean

3.27 ResurfaceHMA cold mill and resurface

CON AC 6,800 M 6,800 87244 08/06/12 NA FY 2014 to FY 2013 7,623 8/23/12

2014 CLARE MDOT CountywideTittabawassee River Watershed

0.30 Miscellaneous Wetland Mitigation CON 465 ST 103 M 568 101328 08/06/12 NA FY 2013 to FY 2014 903 8/23/12

2012 LEELANAU

Pathways to Sleeping Bear Campaign

M-109Sleeping Bear Heritage Trail

Roadside facility

This project is for fabricating and installing wayfinding and interpretive signage along the first segment of the Sleeping Bear Heritage Trail

CON 11 SBD 4 OLF 15 117399 08/28/12 15 9/5/12 09/19/12 15

2012 OTSEGOOtsego County

Milbocker/McCoy Road

From South Townline Road to M-32

MiscellaneousSurvey and design engineering

PE 110 HPSL 27 CNTY 137 117356 08/28/12 137 9/5/12 09/11/12 137

2012 BERRIENBerrien County

Countywide11 crossings in Berrien County on AMTRAK line

Transit operations Consolidate crossings PE 223 HSG 223 117408 08/28/12 2,232 9/5/12

2012 CHIPPEWAChippewa County

Spruce Street ResurfaceResurface and curb and gutter

CON 310 EDF 77 CNTY 387 117321 08/28/12 387 9/5/12

2012 CHIPPEWA

Eastern U.P. Transportation Authority

M-134St. Marys River Ferry Dock, Chippewa County

0.67 Transit facilityAcquistion of land adjacent to Detour Ferry Termin

ROW 238 FBD 1,137 TRAL 1,375 114944 08/27/12 NAPhase changed from EPE to ROW

1,375 9/5/12 09/19/12 298

2012 BERRIENBerrien County

Countywide11 crossings in Berrien County on AMTRAK line

Transit operations Consolidate crossings CON 2,009 HSG 2,009 117408 08/28/12 2,232 9/5/12

2012 STATEWIDE MDOT Statewide DNR Recreation Trails MiscellaneousDNR Obligation for FY 2012

EPE 2,170 NRT 2,170 115506 08/27/12 NA 2,170 9/5/12 08/08/12 2,170

2012 ST. JOSEPH MDOT US-131 St. Joseph County 10.29New route/structure (capacity increase)

Design & Construction of PA-5

CON AC 22,570 M 22,570 46269 08/27/12 NA 35,864 9/5/12 09/07/12 22,107

2012 STATEWIDE MDOT

Section 5312 for Veteran Transportation and Community Living Initiative Discretionary II (VTCLI II)

Statewide Transit Capital

This is the research component of the "expanding 2-1-1 system into a One-Call/One-Click Center project.

T-Cap 50 5312 50 09/20/12Approved by FTA 09.12.12

1,842 9/12/12

2012 STATEWIDE MDOT

Section 5309 - Bus and Bus Facilities Discretionary

Statewide Transit Capital Transit Bus Replacements T-Cap 325 5309 81 CTF 406 09/20/12

Carry over funding from FY 2010 Section 5309. Approved by FTA 09.12.12

406 9/12/12

2012 STATEWIDE MDOTSection 5317 - New Freedom Program

Statewide Transit OperationsSection 5317 New Freedom Program

T-Ops 650 5317 65 M 265 OLF 980 09/20/12Approved by FTA 09.12.12

955 9/12/12

2012 STATEWIDE MDOT

Section 5309 for Veteran Transportation and Community Living Initiative Discretionary II (VTCLI II)

Statewide Transit CapitalThis will be for expanding 2-1-1 system into a One-Call/One-Click Center.

T-Cap 1,420 5309 372 OLF 1,792 09/20/12Approved by FTA 09.12.12

1,842 9/12/12

2012 STATEWIDE MDOT StatewideAt Michigan LTAP Center at MTU

Miscellaneous FY 2013 LTAP Program EPE 425 STL 68 OLF 493

JN 117233,

JN 117238,

JN 117239

09/20/12 JNs added 09.20.12 493 9/13/12

Page 19: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2012 STATEWIDE MDOT Statewide Statewide MiscellaneousFY 2012 RCAR (RCWD, YDMP, TRAC) Program

EPE 4,068 ST 4,068 09/10/12 4,068 9/13/12

2012 BAY MDOT I-75Parish Road to Linwood Road

2.81Restore & rehabilitate

Major Rehabilitation PE 270 IM 30 M 300 116087 10/22/12 NA FY 2013 to FY 2012 12,683 11/15/12 09/12/12 250

2012 HOUGHTON MDOT US-41 US-41, Hancock 0.93 Reconstruct Reconstruct PE 368 ST 82 M 450 110594 10/22/12 NA FY 2013 to FY 2012 5,742 11/15/12 08/31/12 450

2012 ROSCOMMON MDOT US-127 M-55 to Muskegon River Bridge

10.75Restore & rehabilitate

Crush and shape and resurface and cold milling

PE 384 NH 85 M 469 113455 10/22/12 NA FY 2013 to FY 2012 10,794 11/15/12 08/08/12 469

2012 MECOSTA MDOT US-131 NB6 Mile Road north to 13 Mile Road

7.37Restore & rehabilitate

Coldmill, C&S, HMA Resurface

PE 632 NH 140 M 772 112464 10/22/12 NA FY 2013 to FY 2012 7,257 11/15/12 09/19/12 772

2012 STATEWIDERail Safety Local GPA

Regionwide GPA Rail Safety Local CON 1,451 STR 586 MRR 2,037 10/22/12 NA 1,716 11/15/12

2012 STATEWIDE MDOTRail Xings Trunkline GPA

Regionwide GPA Rail Xings Trunkline CON 1,976 ST 741 M 2,717 10/22/12 NA 1,850 11/15/12

2012 STATEWIDEEnhancements Local GPA

Regionwide GPA Enhancements Local CON 1,648 STE 1,318 OLF 2,965 10/22/12 NA 3,211 11/15/12

2012 STATEWIDE MDOTEnhancements Trunkline GPA

Regionwide GPA Enhancements Trunkline CON 2,559 STE 615 M 65 OLF 3,238 10/22/12 NA 1,889 11/15/12

2012 STATEWIDE MDOT

Program Development Scoping Trunkline GPA

Regionwide GPA Program Development Scoping Trunkline

EPE 1,330 ST 3,517 M 49 OLF 4,896 10/22/12 NA 580 11/15/12

2012 STATEWIDE MDOTCPM CSM Bridge Trunkline GPA

Regionwide GPA CPM CSM Bridge Trunkline

CON 5,125 ST 998 M 6,123 10/22/12 NA 4,583 11/15/12

2012 STATEWIDEHighway Safety Local GPA

Regionwide GPA Highway Safety Local CON 6,896 ST 3 M 1,811 OLF 8,709 10/22/12 NA 4,687 11/15/12

2012 STATEWIDE MDOT

Rural Bridge Replacement and Rehabilitate Trunkline GPA

Regionwide GPA Rural Bridge Replacement and Rehabilitate Trunkline

CON 10,052 ST 2,104 M 12,156 10/22/12 NA 12,003 11/15/12

2012 STATEWIDEBridge Local GPA

Regionwide GPA Bridge Local CON 6,081 BRO 7,954 M 780 OLF 14,816 10/22/12 NA 22,105 11/15/12

2012 STATEWIDE MDOT

Rural Highway Rehab and Reconstruct Trunkline GPA

Regionwide GPA Rural Highway Rehab and Reconstruct Trunkline

CON 13,455 ST 2,440 M 1,293 OLF 17,188 10/22/12 NA 13,016 11/15/12

2012 STATEWIDE MDOTPre-Construction Phases GPA

Regionwide GPA Pre-Construction Phases Trunkline

15,828 ST 2,903 M 749 OLF 19,480 10/22/12 NA 9,335 11/15/12

2012 STATEWIDE MDOTHighway Safety Trunkline GPA

Regionwide GPA Highway Safety Trunkline CON 27,996 ST 204 M 44 OLF 28,244 10/22/12 NA 22,585 11/15/12

2012 STATEWIDE MDOTCPM Road Trunkline GPA

Regionwide GPA CPM Road Trunkline CON 33,242 ST 7,143 M 251 OLF 40,636 10/22/12 NA 33,884 11/15/12

2012 STATEWIDE MDOT Metro RegionOakland and Macomb Counties

27.82 Traffic ops/safety Freeway Signing Upgrade PE 116825 10/22/12 NA 11/15/12

2012 CALHOUN Albion AreawideCity of Albion and surrounding area

Transit vehicle additions/replacements

Transit vehicle replacement

CON 115745 10/22/12 NA 11/15/12

2012 CALHOUN MDOT I-94 BL at I-69, Marshall Roadside facilityExpansion and HMA Overlay

CON 113658 10/22/12 NA 11/15/12

2013 EMMET MDOT US-31 US-31 in Petoskey 0.63 Traffic ops/safetyGeometric modifications and access management

ROW 4 HPP 1 M 5 113442 10/22/12 NA FY 2012 to FY 2013 394 11/15/12

2013 IOSCO MDOT US-23Auelrich Road to Kirkland Drive

3.83Restore & rehabilitate

HMA Crack Relief Layer ROW 10 M 10 112946 10/22/12 NA FY 2012 to FY 2013 5,517 11/15/12

2013 MENOMINEE MDOT M-35Jimtown road South 9.42 miles

9.42 ResurfaceColdmilling and Resurfacing

ROW 12 ST 3 M 15 110682 10/22/12 NA 6,216 11/15/12 03/19/13 15

2013GRAND TRAVERSE

MDOT M-113N. of M-186 south to US-131

5.09Restore & rehabilitate

Crush and Shape ROW 25 ST 5 M 30 103027 10/22/12 NA FY 2012 to FY 2013 4,085 11/15/12

2013 CASS Dowagiac Hill StreetSoutheast section of City of Dowagiac

Roadside facility

Southeast section of city, connecting downtawn area to cemetery & walking/biking trails in nature preserve.

CON 39 CM 10 CITY 49 118078 10/22/12 NA 49 11/15/12

2013 MENOMINEEMenominee

US-41From 38th Avenue to 48th Avenue, City of Menominee

0.76 Roadside facility Relighting CON 54 DOG 54 118045 10/22/12 NA

Reallocation of FY03-06 unobligated balances effort of Fall 2013

54 11/15/12 12/04/12 55

2013 CASS DowagiacCity of Dowagiac

Dowagiac Dial-a-ride service area

Transit vehicle additions/replacements

Purchase new medium duty public transportation bus to replace 2008 cutaway model.

EPE 48 CM 12 M 60 118086 10/22/12 NA 60 11/15/12

2013 CASS DowagiacMiddle Crossing Road

Northwest section of city leading to Russom Park.

Roadside facility

Install and construct non-motorized pathway to alleviate air omissions including sidewalks and crosswalk.

CON 57 CM 14 CITY 71 118074 10/22/12 NA 71 11/15/12

2013 ALGERAlger County

M-28Willam G. Mather Elem. & Munising Mid./High School

Roadside facilityBike/ped safety improvements

CON 104 SRSI 104 117744 10/22/12 NA 104 11/15/12 04/12/13 102

2013 BERRIENBerrien Springs

Sylvester Avenue

Sylvester Elem. School & Berrien Springs Mid. Sch.

Roadside facilityBike/ped safety improvements

CON 132 SRSI 132 116835 10/22/12 NA 132 11/15/12 05/08/13 141

Page 20: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2013 LENAWEE Adrian Citywide CitywideTransit vehicle additions/replacements

Replace medium-duty deisel engine bus.

CON 106 CM 27 OLF 133 118025 10/22/12 NA 133 11/15/12

2013 BERRIENBerrien County

Countywide CountywideTransit operations equipment

Bus purchase - replace 1 2006 medium duty, diesel engine bus with 1 2013 or newer medium duty bus. the old bus will exceed the FTA useful life criteria of 7 years or 200,000 miles.

EPE 108 CM 27 M 135 118093 10/22/12 NA 135 11/15/12

2013 HOUGHTON MDOT M-26M-26, Houghton County

3.13 ResurfaceMill & Two Course Overlay

ROW 123 ST 27 M 150 107008 10/22/12 NA FY 2012 to FY 2013 4,032 11/15/12

2013 BENZIE Frankfort M-22Frankfort Elem. School, City of Frankfort

Roadside facilityBike/ped safety improvements

CON 194 SRSI 194 116849 10/22/12 NA 194 11/15/12

2013 ST. JOSEPH Centreville Clark StreetCentreville Elem. & Junior/Senior High School

Roadside facilityBike/ped safety improvements

CON 408 SRSI 408 117743 10/22/12 NA 408 11/15/12 04/04/13 412

2013 LUCE Newberry M-123Victory Way to Railroad Street, City of Newberry

Miscellaneous Streetscaping. MI098 CON 497 DOG 497 117891 10/22/12 NA

Reallocation of FY03-06 unobligated balances effort of Fall 2013

40 11/15/12 12/04/12 589

2013 STATEWIDE MDOT Statewide Statewide MiscellaneousC & T Indirect Testing FY 2013

PE 1,500 M 1,500 117622 10/22/12 NA 4,500 11/15/12 10/18/12 1,500

2013 STATEWIDE MDOT Statewide Statewide MiscellaneousFY 2013 Bureau of Highways Training Program

EPE 1,549 ST 136 M 1,685

JN 117715,

JN 117721,

JN 117723

10/22/12 FY 2012 to FY 2013 1,685 11/15/12 10/18/12 1,140

2013 STATEWIDE MDOT I-94Various locations from MI/IN border to I-69

104.00 MiscellaneousTruck Parking & Info Management System

CON 1,840 OFHWA 460 M 2,300 113689 10/22/12 NA FY 2012 to FY 2013 2,300 11/15/12 04/04/13 1,424

2013 STATEWIDE MDOT Statewide Statewide MiscellaneousC & T Indirect Testing FY 2013

CON 3,000 M 3,000 117622 10/22/12 NA 4,500 11/15/12 10/18/12 3,000

2013 STATEWIDE MDOT Statewide Statewide TransitChicago - Detroit/Pontiac consultant contract

CON 3,228 CTF 570 OLF 3,798 115797 10/22/12 NA

Federal Rail Adminstration. 80% is FRA funds. 5% is state funds. 10% is Local funds. 5 % is Private funds.

3,798 11/15/12

2013 STATEWIDE MDOT Statewide Statewide MiscellaneousDrain Assessments FY 2013

CON 4,932 M 4,932 117625 10/22/12 NA 4,932 11/15/12 10/23/12 4,932

2013 STATEWIDE MDOT State WideHigh speed rail corridor btwn Kalamazoo & Dearborn

Transit operationsDesign & early acquis for items to begin resotorat

CON 40,629 CTF 40,629 115852 10/22/12 NA

Federal Rail Adminstration. 83% is FRA funds. 17% is State funds.

40,629 11/15/12

2013 OSCEOLA MDOT US-131at US-10 interchange. Reed City

Roadside facilityConstruct new carpool parking lot

CON 115249 10/22/12 NA 11/15/12

2013 EMMET MDOT I-75 NBat Cadillac Street extension

Roadside facilityConstruct safe enforcement site with PITWS

CON 113792 10/22/12 NA 11/15/12

2013 MARQUETTE MDOT M-553M-553/US-41 City of Marquette, Marquette County

0.10 Roadside facility New Carpool Lot CON 113715 10/22/12 NA 11/15/12

2013 MARQUETTE MDOT US-41US-41/M-28, Negaunee, Marquette County

0.33 Roadside facilityConstruct New Carpool Lot

CON 113713 10/22/12 NA 11/15/12

2013 IONIA MDOT M-66at M-44 (Belding Rd) SW Quadrant

Roadside facilityResurface of existing carpool lot.

CON 113528 10/22/12 NA 11/15/12

2013 ALLEGAN MDOT US-131 at 12th Street Roadside facility Resurface Carpool Lot CON 110953 10/22/12 NA 11/15/12

2013 STATEWIDE MDOT Regionwide Regionwide Roadside facility Restriping of Carpool Lots CON 107018 10/22/12 NA 11/15/12

2013 CALHOUN MDOT I-94 BL at I-69 Roadside facilityCrack seal carpool lot surface

CON 103284 10/22/12 NA 11/15/12

2013 OCEANA MDOT US-31 NBat the Rothbury Rest Area #529

0.65 Roadside facilityBuilding Replacement/Site Work

CON 101596 10/22/12 NA 11/15/12

2013 ALLEGAN MDOT US-131 NBat the new Martin Township Rest Area

0.79 Roadside facilityNew Rest Area Construction

CON 81685 10/22/12 NA 11/15/12

2014 ST. JOSEPH MDOT M-60In the village of Mendon

1.09 Reconstruct Roadway Reconstruction CON 3,275 ST 726 M 4,001 103154 10/22/12 NA 4,592 11/15/12

2014 MECOSTA MDOT US-131US-131 over Muskegon River

2.10 Bridge - otherEpoxy Overlay, joint replacement

CON 7,351 BHN 1,838 M 9,189 115159 10/22/12 NA FY 2013 to FY 2014 9,988 11/15/12

2014 DICKINSON MDOT M-69at M-95/M-69 south intersection (Randville)

Roadside facilityMilling and Resurfacing of Carpool Lot

CON 113722 10/22/12 NA 11/15/12

2014 STATEWIDE MDOT RegionwideOne Location in Bay Region

Roadside facilitySolar Lighting - Carpool Lots

CON 107019 10/22/12 NA 11/15/12

Page 21: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2014 BERRIEN MDOT I -94 EB Watervliet Township Roadside facility New facility CON 51268 10/22/12 NA 11/15/12

2013 BRANCH MDOT US-12at I-69. Coldwater facility

Roadside facilityCrack seal carpool lot surface

CON 6 ST 1 M 8 103283 12/06/12 NA 9 12/21/12 01/08/13 5

2013 IONIA MDOT I-96 EBSaranac Rest Area # 532

Roadside facilityNew well, sewer and heat pumps

CON 26 M 26 118291 12/06/12 NA 26 12/21/12 12/06/12 26

2013 LENAWEE MDOT US-12at Springville Highway, Lenewee County

0.13 Traffic ops/safety Add Passing Flare PE 28 CM 7 M 35 118129 12/06/12 NA 285 12/21/12 02/06/13 35

2013 ALLEGAN MDOT I-196 I-196 EB over CSX RR 0.28 Bridge - other Railroad oversight CON 40 IM 4 M 44 118127 12/06/12 NA 44 12/21/12

2013 OTSEGOOtsego County

Mankowski Rd Mankowski RoadNew route/structure (capacity increase)

Construct roadway for access management

ROW 38 HPSL 9 OLF 47 117459 12/06/12 NAMI263, TI 198 Earmark

355 12/21/12

2013 VAN BURENVan Buren County

CountywideMunicipal transit bus area for countywide

Transit vehicle additions/replacements

2013 - Replacement of 2004 diesel bus with 2013 cleaner emission modal

EPE 45 CM 11 M 56 118124 12/06/12 NA 56 12/21/12

2013 HOUGHTON MDOT US-41US-41 over Portage Lake

Bridge - otherCPM, mechanical, electrical work

PE 48 ST 11 M 59 118271 12/06/12 NA 6,250 12/21/12 02/27/13 59

2013 BERRIENBerrien County

Countywide Berrien Countywide Transit

Replace one (1) 2006 medium duty, diesel engine bus with one (1) 2013 or newer cutaway bus. The old bus will exceed the FTA useful life criteria of 7 years or 200,000 miles.�

EPE 51 CM 13 M 64 118591 12/06/12 NA 64 12/21/12

2013 BENZIEBenzie County

Countywide Benzie - Countywide Transit

Bus purchase - purchase one less than 30' replacement bus (replace bus #15). Bus #15 is a 5-year old bus, delivered in 2008 and currently has 162,779 miles.It is eligible to be replaced in 2013 based on years and it is estimated it will also be eligible based on miles.

EPE 58 CM 14 M 72 118587 12/06/12 NA 72 12/21/12

2013 CASSCass County

Countywide CountywideTransit operations equipment

Van purchase - replace 2 2008 minivans with 2 2012 or newer minivans. The old minivans will exceed the FTA useful life criteria of 4 years or 100,000 miles

EPE 59 CM 15 M 74 118097 12/06/12 NA 74 12/21/12

2013 STATEWIDE

Michigan Technological University

Statewide At LTAP Center at MTU Miscellaneous 2013 MERL program EPE 72 STT 18 M 90 118301 12/06/12 NA 90 12/21/12 01/07/13 90

2013 STATEWIDE MDOT Statewide

At Michigan Technological University and Ferris State University

MiscellaneousFY 2013 NSTI - National Summer Transportation Institute

EPE 90 SST 90 12/06/12 NA 90 12/21/12

2013 LAPEERLapeer County

Countywide Lapeer Countywide Transit

Replacement of one medium duty bus (yr 2004) with a (yr 2013) medium duty bus.�

EPE 100 CM 25 M 125 118596 12/06/12 NA 125 12/21/12

2013 MASONMason County

Countywide Mason Countywide Transit

Purchase one less than 30? medium duty replacement bus (replace bus #8) Bus #8 is a 7 year bus and was delivered in FY2006 making it eligible in 2013. It currently has 177,900 miles.�

EPE 102 CM 26 M 128 118607 12/06/12 NA 128 12/21/12

2013 MECOSTA MDOT US-131NB and SB over 3 Mile Road

0.17 Bridge replacementSuperstructure Replacement

SUB 131 NH 29 M 160 118289 12/06/12 NA 4,397 12/21/12 01/14/13 160

2013 STATEWIDESmall Urban Program

Small Urban Program

Statewide MiscellaneousSmall Urban Program - Transit Projects

CON 153 ST 38 M 191 12/06/12 NA 191 12/21/12

2013 MECOSTA MDOT US-131NB and SB over 3 Mile Road

0.17 Bridge replacementSuperstructure Replacement

PE 157 NH 35 M 192 118289 12/06/12 NA 4,397 12/21/12 01/14/13 192

2013 LENAWEELenawee County

Citywide Adrian - Citywide Transit

Replace three (3) gas-powered cut-away buses (## 23,27,29) with lifts with three (3) new cut-away buses with lifts. The old vehicles currently meet the FTA useful life criteria of 5 years.�

EPE 158 CM 40 M 198 118601 12/06/12 NA 198 12/21/12

Page 22: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2013 STATEWIDE MDOT Statewide Statewide Transit operationsEnvironmental work related to accelerated rail

CON 164 CTF 38 OLF 202 118132 12/06/12 NA 202 12/21/12

2013 HOUGHTON MDOT US-41US-41 over Portage Lake

Bridge - otherCPM, mechanical, electrical work

SUB 542 ST 120 M 662 118271 12/06/12 NA 6,250 12/21/12 02/27/13 662

2013 STATEWIDERail Safety Local GPA

Regionwide GPA Rail Safety Local CON 924 STR 196 M 1,120 12/06/12 NA 1,120 12/21/12

2013 OTSEGOOtsego County

Milbocker Road400' E of S Townline Road to 400' W of Dickerson R

1.77 Reconstruct Reconstruct CON 410 EDFF 375 M 420 CNTY 1,205 117318 12/06/12 NA FY 2012 to FY 2013 1,205 12/21/12

2013 OTSEGO GaylordMilbocker/McCoy Road

From South Townline Road to M-32

Miscellaneous Road rehabilitation CON 921 HPSL 515 CITY 1,436 117356 12/06/12 NASAFETEALU Earmark MI250, HPP 4338

1,573 12/21/12

2013 BAY MDOT M-13 over Johnson Creek Bridge replacement Bridge Replacement CON 1,896 BHT 1,896 84909 12/06/12 NAFY 2014 to FY 2013. TLCR - Toll Credit Amount is $379,143.

1,896 12/21/12

2013 STATEWIDERural Task Forces

Rural Task Force

Statewide MiscellaneousRural Task Force Program - Transit Projects

CON 2,000 ST 500 M 2,500 12/06/12 NA 2,500 12/21/12

2013 VAN BUREN MDOT I-1964 bridges on I-196/US-31, south of South Haven

1.31Restore & rehabilitate

Concrete ovly, Bm & Substr repair

CON AC 3,698 M 3,698 113251 12/06/12 NA FY 2014 to FY 2013 4,053 12/21/12

2013 STATEWIDE MDOTCPM CSM Bridge Trunkline GPA

Regionwide GPA CPM CSM Bridge Trunkline

CON 5,699 ST 1,098 M 6,797 12/06/12 NA 6,797 12/21/12

2013 STATEWIDEHighway Safety Local GPA

Regionwide GPA Highway Safety Local CON 8,222 ST 68 M 2,118 OLF 10,407 12/06/12 NA 10,407 12/21/12

2013 STATEWIDESmall Urban Program

Small Urban Program

Statewide MiscellaneousSmall Urban Program - Road Projects

CON 7,507 ST 3,420 OLF 10,927 12/06/12 NA 10,927 12/21/12

2013 STATEWIDERural Task Forces

Rural Task Force

Statewide MiscellaneousRural Task Force Program - Road Projects

CON 31,651 ST 7,996 M 7,531 OLF 47,178 12/06/12 NA 47,178 12/21/12

2013 LAPEER MDOT M-53 at Hunters Creek Road 0.87 Traffic ops/safety

Add Center Left Turn Lane and widen Western/Weston Drain structure (B02) to the east to accomodate the turn lane

SUB 115814 12/06/12 NA 12/21/12

2014 BENZIEBenzie County

Countywide Benzie Countywide Transit

Purchase one less than 30' replacement bus (replace bus #14). Bus #14 is a 7-year bus, it was delivered in FY2008. It currently has 143,556. It will be eligible for replacement in FY2014 based on estimated miles.�

EPE 60 CM 15 M 75 118589 12/06/12 NA 75 12/21/12

2014 STATEWIDE MDOT Statewide

At Michigan Technological University and Ferris State University

MiscellaneousFY 2014 NSTI - National Summer Transportation Institute

EPE 90 SST 90 x 12/06/12 NA 90 12/21/12

2014 BERRIENBerrien County

Countywide CountywideTransit operations equipment

Bus purchase -replace 1 2007 medium duty, diesel engine bus with 1 2014 or newer extended cutaway bus. The old bus will exceed the FTA useful life criteria of 7 years or 200,000 miles

EPE 75 CM 19 M 94 118094 12/06/12 NA 94 12/21/12

2014 LAPEERLapeer County

Countywide Lapeer Countywide Transit

Replacement of one medium duty bus (yr 2004) with a (yr 2014) medium duty bus.�

EPE 100 CM 25 M 125 118597 12/06/12 NA 125 12/21/12

2014 CASSCass County

Countywide CountywideTransit operations equipment

Bus purchase - replace 1 2006 medium duty bus with 1 2013 or newer medium duty bus. The old bus will exceed the FTA replacement criteria of 7 years or 200,000 miles

EPE 100 CM 25 M 125 118099 12/06/12 NA 125 12/21/12

2014 VAN BURENVan Buren County

CountywideBangor municipal bus service area - countywide

Transit vehicle additions/replacements

2014 - Replacement of 2004 diesel bus with 2014 cleaner emission modal

EPE 101 CM 25 M 126 118125 12/06/12 NA 126 12/21/12

Page 23: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2014 LENAWEELenawee County

Citywide Adrian Citywide Transit

Replace one (1) medium-duty diesel engine bus (#21) with lift with one (1) new medium-duty diesel engine bus with lift. The old vehicle currently meets the FTA useful life criteria of 7 years.�

EPE 106 CM 27 M 133 118602 12/06/12 NA 133 12/21/12

2014 MASONMason County

AreawideMason County areawide

Transit

Purchase one less than 30? medium duty replacement bus (replace bus #7) Bus #7 is a 7 year bus and was delivered in FY2006 making it eligible in 2013. It currently has 177,900 miles.�

EPE 106 CM 27 M 133 118608 12/06/12 NA 133 12/21/12

2014 BERRIEN MDOT I-94 WB Watervliet Rest Area 0.39 Roadside facilityExpand truck parking area

CON 1,402 OFHWA 351 M 1,753 117756 12/06/12 NA

TPFD - Truck Parking Facilities Discretionary - actual fund source

2,000 12/21/12

2014 MECOSTA MDOT US-131NB and SB over 3 Mile Road

0.17 Bridge replacementSuperstructure Replacement

CON AC 4,045 M 4,045 118289 12/06/12 NA 4,397 12/21/12

2014 BRANCH MDOT I-69 NBat Coldwater Weigh Station

0.68 Roadside facility Scale and Signage CON 113769 12/06/12 NA 12/21/12

2014 OSCODA MDOT M-33Clinton Twp T28N, R3E, Sec. 22

Wetland mitigation Wetland Construction CON 76612 12/06/12 NA 12/21/12

2013 LAPEER MDOT M-24I-69 to Nepessing Street, Lapeer

2.06 Reconstruct HMA Reconstruct UTL 2 ST 1 M 3 48945 02/01/13 NA 12,383 2/7/13

2013 STATEWIDE MDOT Statewide Statewide Miscellaneous2013 Road Construction Workforce Development (RCWD) - Yes! Expo

EPE 6 ST 6 118936 02/01/13 NA 6 2/7/13 03/25/13 6

2013 STATEWIDE MDOT Statewide Statewide Miscellaneous

2013 Road Construction Workforce Development (RCWD) - Construction Career Days

EPE 10 ST 10 118935 02/01/13 NA 10 2/7/13

2013 STATEWIDE MDOT Statewide Statewide Miscellaneous

2013 Road Construction Workforce Development (RCWD) - National Summer Trans Institute

EPE 11 ST 11 118941 02/01/13 NA 11 2/7/13 03/25/13 11

2013GRAND TRAVERSE

Grand Traverse County

AreawideState owned railroad ROW near City of Mayfield

0.00 Miscellaneous Culvert repair CON 17 CTF 17 118775 02/01/13 NA 17 2/7/13

2013 ISABELLA MDOT M-20East of Summerton Road to Commercial Drive

0.38 Traffic ops/safetyConstruct a Narrow Boulevard

UTL 20 CITY 20 44114 02/01/13 NA 1,300 2/7/13

2013 STATEWIDE MDOT Statewide Statewide Miscellaneous

2013 Road Construction Workforce Development (RCWD) - OHR recruitment, outreach, career fairs

EPE 32 ST 32 118939 02/01/13 NA 32 2/7/13 03/25/13 32

2013 STATEWIDE MDOT Statewide Statewide Miscellaneous

On the Job Training (OJT) Workforce Development Program (WDP)

CON 38 SST 38 118931 02/01/13 NA 38 2/7/13

2013 STATEWIDE MDOT StatewideRail passenger service in West Michigan

0.00 MiscellaneousFY13 funding for West Michigan rail marketing prog

CON 50 CTF 50 118763 02/01/13 NA 50 2/7/13

2013 CRAWFORD MDOT I-75 M-93 to M-32 19.76 ResurfaceHMA Cold Milling & Overlay

PE 46 NH 10 M 57 118776 02/01/13 NA 4,025 2/7/13 01/11/13 57

2013 STATEWIDE MDOT Statewide Statewide Miscellaneous

2013 On the Job Training (OJT) Student Summer Engineering Internship Prg

CON 60 SST 60 118932 02/01/13 NA 60 2/7/13

2013 STATEWIDE MDOT Statewide Statewide Miscellaneous2013 On The Job Training (OJT)/Technical Assistance

CON 76 SST 76 118929 02/01/13 NA 76 2/7/13

2013 LENAWEE Hudson Main Streetfrom N. Maple Grove Ave. to Meadowbrook Dr.,

0.66 Roadside facility

0.66 mi of hot mix asphalt shared?use path on Sunrise Meadows Trail from Murdock�Trail at N. Maple Grove Ave. east to Meadowbrook Dr. in Sunrise Meadows�subdivision adjacent to Munson Highway

CON 107 CM 27 CITY 134 118742 02/01/13 NA 134 2/7/13 04/11/13 123

2013 BAY MDOT US-10US-10 under Nine Mile Road, Bay County

0.61 Bridge replacement Bridge Replacement PE 122 ST 27 M 149 118329 02/01/13 NA 4,247 2/7/13 01/08/13 149

2013 STATEWIDE MDOT Section 5311 Statewide Transit operations RTAP T-Ops 296 5311 296 12/17/12 NA 296 2/7/13

Page 24: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2013 HURONHuron County

Verona Roadat Huron City Road intersection� 0.55 Traffic ops/safety

Construct right turn lane on NB Verona Road, Close/Abandon southern portion of Huron City Rd, Re-route Huron City Rd to intersect Verona Rd north of current intersection at 90 degree angle. ** ADDITIONAL INFORMATION: There is an existing agriculture business at the existing skewed intersection. This will help traffic, including agriculture trucks, move more smoothly through the intersection and reduce back-ups at the intersection, also allowing vehicles to turn NB more efficiently.�

CON 240 CM 60 CNTY 300 118745 02/01/13 NA 300 2/7/13

2013 LAPEER MDOT M-24I-69 to Nepessing Street, Lapeer

2.06 Reconstruct HMA Reconstruct ROW 246 ST 54 M 300 48945 02/01/13 NA 12,383 2/7/13 01/02/13 300

2013 BAY MDOT US-10US-10 under Nine Mile Road, Bay County

0.61 Bridge replacement Bridge Replacement SUB 319 ST 71 M 390 118329 02/01/13 NA 4,247 2/7/13 01/08/13 390

2013 STATEWIDE MDOT StatewideState owned railroad right-of-way statewide

MiscellaneousThree year weed/brush spray program

CON 450 CTF 450 118833 02/01/13 NA 450 2/7/13

2013 LAPEER MDOT M-53 at Hunters Creek Road 0.87 Traffic ops/safety

Add Center Left Turn Lane and widen Western/Weston Drain structure (B02) to the east to accomodate the turn lane

CON 368 CM 92 M 460 115814 02/01/13 NA 675 2/7/13

2013 ISABELLA MDOT M-20East of Summerton Road to Commercial Drive

0.36 Traffic ops/safetyConstruct a Narrow Boulevard

CON 1,280 CNTY 1,280 44114 02/01/13 NA 1,280 2/7/13

2013 STATEWIDE MDOT Section 5339 Statewide Transit Capital Bus and Bus Facilities T-Cap 1,204 5339 301 CTF 1,505 12/17/12 NA 1,505 2/7/13

2013 STATEWIDE MDOT StatewideUniversity, Bay, North, and Metro Regions

MiscellaneousIntelligent Transport. System

CON 1,653 ST 367 M 2,020 106928 02/01/13 NA 1,948 2/7/13

2013 DICKINSONIron Mountain

Quinn Lake Antoine Dr

from US-2 in Quinnesec to US-2 in Iron Mountain

Restore & rehabilitate

Resurface and reconstruct

CON 196 EDAF 2,010 M 317 CITY 2,523 118961 02/01/13 NA 2,523 2/7/13

2013 STATEWIDE MDOT StatewideHigh speed Rail Corridor

Transit maintenance equipment and parts

State portion of maintenance management of HPRC

CON 2,600 CTF 2,600 118307 02/01/13 NA 2,600 2/7/13

2013 STATEWIDE MDOTSection 5317 - New Freedom Program

Statewide Transit OperationsSection 5317 New Freedom Program

T-Ops 1,400 5317 1,400 CTF 2,800 12/17/12 NA 2,800 2/7/13

2013 STATEWIDE MDOT Statewide Statewide Miscellaneous

2013 Youth Development Mentoring Program (YDMP) - Road Construction Workforce Development (RCWD) program

EPE 3,500 ST 3,500 118899 02/01/13 NA 3,500 2/7/13 03/25/13 3,245

2013 CRAWFORD MDOT I-75 M-93 to M-32 19.76 ResurfaceHMA Cold Milling & Overlay

CON 3,248 NH 720 M 3,969 118776 02/01/13 NA 4,025 2/7/13 04/05/13 4,085

2013 STATEWIDE MDOT Section 5310 Statewide Transit Capital Elderly and Disabled T-Cap 4,000 5310 1,000 CTF 5,000 12/17/12 NA 4,000 2/7/13

2013 STATEWIDE MDOTHighway Safety Trunkline GPA

Regionwide GPA Highway Safety Trunkline CON 34,117 ST 2,022 M 249 OLF 36,388 02/01/13 NA 36,388 2/7/13

2013 STATEWIDE MDOT Section 5311 Statewide Transit operations Non-UZA Formula T-Ops 19,200 5311 32,400 CTF 42,600 TRAL 94,200 12/17/12 NA 94,200 2/7/13

2013 STATEWIDE MDOT RegionwideVarious locations in Grand Region

Miscellaneous

FY 2013 ITS device maintenance and operations in multiple counties in Grand Region.

EPE 116275 02/01/13 NA 633 2/7/13

2013 STATEWIDE MDOT RegionwideVarious locations in the Grand Region

Miscellaneous

FY 2013 Control Room Operations contract for the West Michigan Transportation Operations Center.

EPE 116272 02/01/13 NA 500 2/7/13

2014 BENZIE Frankfort CitywideCity of Frankfort�

1.00 Miscellaneous

replacement of one Light Duty (under 13,000 lbs g.v.w.) Truck with a newer vehicle with cleaner emissions and enhanced fuel efficiency�

EPE 24 CM 6 CITY 30 118754 02/01/13 NA 30 2/7/13

2014 BENZIE Honor CountywideBenzie County�

1.00 Miscellaneous

Replacement of one Heavy Duty (#330, over 13,000 bs g.v.w.) with a newer vehicle with cleaner emissions.�

EPE 35 CM 14 CITY 49 118752 02/01/13 NA 49 2/7/13

Page 25: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2014 BAY MDOT US-10US-10 over Hoppler Creek

0.25 Bridge - other Block Floor CON 74 ST 16 M 90 113228 02/01/13 NA 115 2/7/13

2014 CRAWFORD MDOT M-72Kalkaska County line to M-93 intersection

6.05Restore & rehabilitate

Crush and shape and resurface�FY 2017

PE 688 NH 153 M 840 116416 02/01/13 NA 5,818 2/7/13

2014 STATEWIDE MDOT AreawideRegional - SMART and LETC Service Areas

Miscellaneous

Replace old, age- and mileage- eligible diesel (4) and biodiesel (7) buses in the fleets of SMART and LETC with new, cleaner-burning diesel (3), biodiesel (7), and hybrid diesel-electric buses (1). Approved 2014 CMAQ project.

EPE 2,737 CM 684 M 3,421 118841 02/01/13 NA 3,421 2/7/13

2014 CALHOUN MDOT M-99 M-99 (Superior Street) 0.37 ReconstructBrick Paver Reconstruction.

PE 116324 02/01/13 NA 6,250 2/7/13

2014 CALHOUN MDOT M-99 M-99 (Superior Street) 0.37 ReconstructBrick Paver Reconstruction.

ROW 116324 02/01/13 NA 6,250 2/7/13

2014 STATEWIDE MDOT RegionwideVarious locations in Grand Region

Miscellaneous

FY 2014 ITS device maintenance and operations in multiple counties in Grand Region.

EPE 116278 02/01/13 NA 650 2/7/13

2014 STATEWIDE MDOT RegionwideVarious locations in the Grand Region

Miscellaneous

FY 2014 Control Room Operations contract for the West Michigan Transportation Operations Center.

EPE 116277 02/01/13 NA 500 2/7/13

2014 SANILAC MDOT M-25 M-25 over Mill Creek 0.12 Bridge replacement Bridge Replacement CON 113232 02/01/13 NA 2,396 2/7/13

2014 OTTAWA MDOT I-96at 68th Avenue SE Quadrant

Roadside facilityCrack Sealing - carpool lot

CON 106351 02/01/13 NA 12 2/7/13

2013 STATEWIDE MDOT Statewide Statewide Miscellaneous

Unclaimed Federal-aid Reimbursement for the advance ROW acquisition costs not previously submitted

ROW AC 30,000 M 30,000 02/22/13 NA 30,000 2/26/13

2013 STATEWIDE MDOT Statewide Statewide Miscellaneous

2013 Road Construction Apprenticeship Readiness (RCAR) - Road Construction Workforce Development (RCWD) Program

EPE 150 ST 150118898 and JN 119508

02/01/13 NA

JN 119508 - Administrative Modification - 03.07.13. JN 119508 is for the Y Achievers program. This program is $20,000 and is related to the RCWD program.

150 3/7/13 03/08/13 140

2013 BARRY MDOT M-66

M66: Pearl St - Brumm Rd,�M79: M66-WVL Nashville

1.48Restore & rehabilitate

reconstruction & rehabilitation

SUB 1 ST 0 M 1 118771 04/23/13 NA 5,000 4/30/13

2013 TUSCOLA MDOT M-15 over Cass River 0.10 Bridge replacement Bridge Replacement ROW 28 BHT 7 M 35 102456 04/23/13 NA 4,247 4/30/13

2013 OTTAWAOttawa County

CountywideHarbor Transit - Countywide

Miscellaneous

Facility improvements - development of new transit liquid petroleum filling station

EPE 30 CM 8 M 38 119945 04/23/13 NA 38 4/30/13

2013 BENZIE MDOT US-31 at Joyfield Road 0.10 Widen - minor Construct right turn lane PE 31 CMG 7 M 38 116331 04/23/13 NA 38 4/30/13

2013 LAPEER Lapeer VariousVarious intersections in Lapeer County

Traffic ops/safety

Traffic signal upgrades at the specified intersections to modernize and interconnect the Saginaw Street corridor along with ADA ramp upgrades.

PE 39 CMG 39 116717 04/23/13 NA 420 4/30/13

2013 HURONHuron County

CountywideTransit routes in Huron County

Miscellaneous

Bus purchase - purchase one (1) medium duty bus to expand transit service in Huron County

EPE 112 CM 22 M 134 119845 04/23/13 NA 134 4/30/13

2013 VAN BUREN MDOT I-196 NBat I-196 BL (Phoenix Rd. Exit 20)

Traffic ops/safetyNew exit loop ramp from I-196 NB to I-196 BL WB

PE 110 CM 25 M 135 118927 04/23/13 NA 665 4/30/13

2013 CHIPPEWAChippewa County

JKL Bahweting Anishnabe School

JKL Bahweting Anishnabe School

Roadside facilityBike/ped safety improvements

CON 148 SRSI 148 112489 04/23/13 NA FY 2012 to FY 2013 148 4/30/13 03/05/13 126

Page 26: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2013 MONTCALM MDOTYellow Jacket Drive Connector

Between Yellow Jacket Drive and Hillcrest Street

0.02New route/structure (capacity increase)

Construction of new connector

CON 190 CITY 190 118185 04/23/13 NA 200 4/30/13

2013 TUSCOLATuscola County

AreawideAt Huron and Eastern Railway, City of Vassar

0.00 MiscellaneousGrade crossing reconstruction

CON 400 CTF 400 119333 04/23/13 NA 400 4/30/13

2013 CHIPPEWAChippewa County

Riverside Drive3 Mile Road to 4 Mile Road

Resurface Resurface CON 324 EDF 81 CNTY 405 117323 04/23/13 405 4/30/13 02/01/13 557

2013 LENAWEE TecumsehRogers Highway

M-50 to Russell Road ResurfaceResurface/Widen/Turn Lane/Flares

CON 412 EDA 54 OLF 466 116546 04/23/13 NA FY 2012 to FY 2013 466 4/30/13 04/08/13 485

2013 BARRY MDOT M-66

M66: Pearl St - Brumm Rd,�M79: M66-WVL Nashville

1.48Restore & rehabilitate

reconstruction & rehabilitation

PE 448 ST 99 M 548 118771 04/23/13 NA 5,000 4/30/13

2013 STATEWIDE MDOTEnhancements Trunkline GPA

Regionwide GPA Enhancements Trunkline CON 613 STE 180 M 124 OLF 917 04/23/13 NA 917 4/30/13

2013 ISABELLA MDOT US-10West of Loomis to Midland/Isabella COL

4.28Restore & rehabilitate

Rubblize and HMA Resurfacing

PE 957 NH 212 M 1,169 118947 04/23/13 NA 14,030 4/30/13

2013 STATEWIDE MDOT Statewide Statewide MiscellaneousFY 2014 Bureau of Highway's Training Program

EPE 1,250 ST 1,250 119772 04/23/13 NA 1,250 4/30/13

2013 STATEWIDE MDOT Statewide DNR Recreation Trails MiscellaneousDNR Obligation for FY 2013

EPE 2,100 NRT 2,100 04/23/13 NA 2,100 4/30/13

2013 BRANCH MDOT I-69 NBat Coldwater Weigh Station

0.68 Roadside facility Pavement Rehabilitation CON 1,721 ST 382 M 318 OLF 2,421 113731 04/23/13 NA 2,071 4/30/13 03/06/13 2,294

2013 IONIAIonia County

Cleveland Street

Over Grand River, Ionia Co

Restore & rehabilitate

Bridge Rehab CON AC 2,456 M 147 CNTY 2,602 112262 04/23/13 NA 2,602 4/30/13 01/07/13 2,602

2013 WEXFORD MDOT M-37M-115 to North of 10 Road

4.00 ResurfaceCrush and Shape and Resurface

CON AC 5,039 M 5,039 90234 04/23/13 NA Tagged as AC 5,039 4/30/13 12/20/12 5,039

2013 NEWAYGO MDOT M-82M-120 east to Industrial Drive

3.14 Resurface Mill, ASCRL, HMA Overlay CON AC 5,152 M 5,152 105535 04/23/13 NA 5,542 4/30/13

2013 BENZIE Frankfort CitywideCity of Frankfort�

1.00 Miscellaneous

replacement of one Light Duty (under 13,000 lbs g.v.w.) Truck with a newer vehicle with cleaner emissions and enhanced fuel efficiency�

EPE 118753 04/23/13 NA 29 4/30/13

2013 BENZIE Honor CountywideBenzie County�

1.00 Miscellaneous

Replacement of one Heavy Duty (#320, over 13,000 bs g.v.w.) with a newer vehicle with cleaner emissions.�

EPE 118751 04/23/13 NA 49 4/30/13

2013 BERRIEN MDOT I-94On I-94 WB from I-196 to M-140

7.12 ResurfaceMultiple Course Hot Mix Asphalt Overlay

PE 115751 04/23/13 NA 4/30/13

2013 MARQUETTE MDOT M-35at CR-492 and Empire Mine Ent. Road, Marquette Co.

0.60 Traffic ops/safetyRe-align Intersection & Add Pass Flare

CON 114943 04/23/13 NA 4/30/13

Page 27: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2014 STATEWIDE MDOT Statewide Statewide Miscellaneous 2014 Yes! Expo (RCWD) EPE 6 ST 6 119689 04/23/13 NA 6 4/30/13

2014 STATEWIDE MDOT Statewide Statewide Miscellaneous2014 Construction Science Fair (RCWD)

EPE 10 ST 10 119706 04/23/13 NA 10 4/30/13

2014 STATEWIDE MDOT Statewide Statewide Miscellaneous2014 Construction Career Days

EPE 10 ST 10 119685 04/23/13 NA 10 4/30/13

2014 STATEWIDE MDOT Statewide Statewide Miscellaneous2014 RCWD - National Summer Trans Institute

EPE 12 ST 12 119698 04/23/13 NA 12 4/30/13

2014 HILLSDALEKey Opportunities, Inc.

TransitCountywide, Key Opportunities, Inc.

0.00 Miscellaneous Vehicle Equipment EPE 10 STL 3 TRAL 13 119297 04/23/13 NA 13 4/30/13

2014 STATEWIDE MDOT Statewide Statewide Miscellaneous2014 Y Achievers. Reimbursement cost-college

EPE 20 ST 20 119711 04/23/13 NA 20 4/30/13

2014 STATEWIDE MDOT Statewide Statewide Miscellaneous2014 OHR Recruitment, Outreach, and Career Fairs

EPE 32 ST 32 119694 04/23/13 NA 32 4/30/13

2014 MACKINAC MDOT I-75I-75 / US-2 Interchange

MiscellaneousRenovation of Existing Freeway Lighting.

CON 113 IM 13 M 125 119811 04/23/13 NA 145 4/30/13

2014 STATEWIDE MDOT Statewide Statewide Miscellaneous2014 RCAR (RCWD) program

EPE 130 ST 130 119681 04/23/13 NA 130 4/30/13

2014 LAPEERLapeer County

Countywide Countywide Miscellaneous

Bus purchase - replacement of one medium duty bus (year 2004) with a (year 2014) medium duty bus

EPE 105 CM 26 M 131 120027 04/23/13 NA 131 4/30/13

2014 LENAWEE MDOT US-12at Springville Highway, Lenewee County

0.13 Traffic ops/safety Add Passing Flare CON 200 CM 50 M 250 118129 04/23/13 NA 285 4/30/13

2014 STATEWIDESmall Urban Program

Small Urban Program

Statewide MiscellaneousSmall Urban Program - Transit Projects

CON 200 ST 50 M 250 04/23/13 NA 250 4/30/13

2014 STATEWIDE MDOT Statewide Statewide Miscellaneous2014 TRAC (RCWD) program

EPE 363 ST 363 119671 04/23/13 NA 363 4/30/13

2014 STATEWIDE MDOT Statewide Statewide Miscellaneous2014 Wounded Vets (RCWD) program

EPE 375 ST 375 119676 04/23/13 NA 375 4/30/13

2014 VAN BUREN MDOT I-196 NBat I-196 BL (Phoenix Rd. Exit 20)

Traffic ops/safetyNew exit loop ramp from I-196 NB to I-196 BL WB

CON 434 CM 96 M 530 118927 04/23/13 NA 665 4/30/13

2014 STATEWIDE MDOT Statewide Statewide MiscellaneousFY 2015 Bureau of Highway's Training Program

EPE 1,250 ST 1,250 119773 04/23/13 NA 1,250 4/30/13

2014 STATEWIDERural Task Forces

Rural Task Force

Statewide MiscellaneousRural Task Force Program - Transit Projects

CON 2,000 ST 500 M 2,500 04/23/13 NA 2,500 4/30/13

2014 STATEWIDE MDOT Statewide Statewide Miscellaneous2014 YDMP (RCWD) program

EPE 3,500 ST 3,500 119666 04/23/13 NA 3,500 4/30/13

2014 BARRY MDOT M-66

M66: Pearl St - Brumm Rd,�M79: M66-WVL Nashville

1.48Restore & rehabilitate

reconstruction & rehabilitation

CON 3,643 ST 808 M 4,451 118771 04/23/13 NA 5,000 4/30/13

2014 HOUGHTON MDOT US-41US-41 over Portage Lake

Bridge - otherCPM, mechanical, electrical work

CON 118271 04/23/13 NA 4/30/13

2014 BERRIEN MDOT I-196 M-63 over I-196 0.30 Bridge replacement Bridge Replacement PE 115754 04/23/13 NA 4/30/132014 BERRIEN MDOT I-196 M-63 over I-196 0.30 Bridge replacement Bridge Replacement SUB 115754 04/23/13 NA 4/30/13

2014 LUCE MDOT M-28Adjacent to Luce Co Airport

0.20New route/structure (capacity increase)

Construct New PITWS CON 110632 04/23/13 NA 4/30/13

2014 VAN BUREN MDOT M-40M-40 at M-43, Glendale/Gobles facility

Roadside facility Resurface carpool lots CON 103294 04/23/13 NA 4/30/13

2013 BENZIE MDOT M-22 over Platte River 0.07 Bridge replacement Bridge Replacement CON 1,627 ST 361 M 1,988 106168 05/09/13 NASTP Programmatic Match Project

2,163 5/9/13

Page 28: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2012 ANTRIM MDOT US-131

from the north junction of M-32 to north of Thumb Lake Road

7.65 Reconstruct Crack Relief Layer PE 82 NH 18 M 100 109982 05/13/13 NA

Project obligated in FY 2012. Significant scope changes. Cost increases listed under same JN in FY 2013.

6,000 5/17/13 12/02/11 100

2013 VAN BURENVan Buren County

CountywideVan Buren County - countywide

Miscellaneous Rideshare EPE 12 CMG 12 120081 05/13/13 NACorrected JN and County information.

12 5/17/13

2013 LENAWEELenawee County

Countywide Countywide Miscellaneous

Bus purchase - replace (1) 2008 gas-powered mini-van with (1) new gas-powered accessible mini-van. The old vehicle currently meets the FTA useful life criteria of 4 years.

EPE 32 CM 8 M 40 120209 05/09/13 NA 40 5/17/13

2013 CALHOUN MDOT M-60from Van Wert Road west to Brembo driveway

0.14Restore & rehabilitate

Trench and replace shoulders

CON 48 ST 11 M 58 120069 05/09/13 NA 64 5/17/13

2013 HURON MDOT M-142 at Riskey Rd 0.16 Traffic ops/safetyAdd WB right turn lane and EB passing flair

PE 102 CM 23 M 125 115833 05/09/13 NA 550 5/17/13

2013 STATEWIDE MDOT Statewide Statewide MiscellaneousWetland Mitigation/Monitoring

CON 205 ST 45 M 250 120394 05/09/13 NA 250 5/17/13

2013 ANTRIM MDOT US-131

from the north junction of M-32 to north of Thumb Lake Road

7.65 Reconstruct Crack Relief Layer PE 286 NH 64 M 350 109982 05/13/13 NA

Project obligated in FY 2012. Significant scope and cost increases. Cost increases in FY 2013 are reflected in FY 2013.

6,000 5/17/13 12/02/11 100

2013 MIDLANDMidland County

Washington Street

from Patrick to East Washington

1.00 Resurface Resurface CON 760 STUL 190 M 950 120326 05/09/13 NA 950 5/17/13

2013 STATEWIDE MDOT

Bus and Bus Facilities State of Good Repair Program

Statewide Transit facility

Bus Facility for Thunder Bay Transportation Authority; Statewide equipment projects for transit agencies.

T-Cap 6,747 5309 1,671 CTF 16 OLF 8,433 04/23/13 NAApproved by FTA 05/21/2013

8,433 5/21/13

2013 STATEWIDE MDOT Section 5304 Statewide Transit operationsStatewide Transportation Planning

T-Cap 916 5304 112 CTF 117 OLF 1,145 04/23/13 NA

Approved by FTA 05/21/2013. Costs administratively increased from $800,000 federal to $915,940 on 06/05/13.

1,000 5/21/13

2013 STATEWIDE MDOT Section 5316 Statewide Transit operationsJob Access/Reverse Commute

T-Ops 2,300 5316 2,100 CTF 4,400 04/23/13 NAApproved by FTA 05/21/2013

4,400 5/21/13

2013 STATEWIDE MDOTState of Good Repair FTA Grant

StatewideTransit vehicle additions/replacements

Bus replacements/additions

T-Cap 2,246 5309 562 CTF 16 OLF 2,823 04/23/13 NAApproved by FTA 05/21/2013

2,823 5/21/13

2014 STATEWIDE MDOT Section 5311 Statewide Transit operations RTAP T-Ops 250 5311 250 04/23/13 NAApproved by FTA 05/21/2013

250 5/21/13

2014 STATEWIDE MDOT Section 5311 Statewide Transit operations Non-UZA Formula T-Ops 17,100 5311 33,500 CTF 40,900 OLF 91,500 04/23/13 NAApproved by FTA 05/21/2013

94,200 5/21/13

2013 CHIPPEWA MDOT M-123between Trout Lake and M-28

1.30 MiscellaneousRestoration of road slope (MDNR Grant 12-036).

CON 39 CNTY 39 115507 06/05/13 Year NA FY 2012 to FY 2013 39 6/10/13

2013 LAPEER MDOT M-53 at Bowers Rd 0.24 Traffic ops/safetyAdd Center Left Turn Lane

CON 356 CM 79 M 435 115233 06/05/13 Year NA FY 2012 to FY 2013 490 6/10/13

2013 DICKINSON MDOT US-2US-2 from Dawn's Lake Road to Baler Road

0.95 ReconstructPavt Rem, HMA reconstruct, Drainage improvements

PE 409 NH 91 M 500 113708 06/05/13 Year NA FY 2014 to FY 2013 4,000 6/10/13

2013 PRESQUE ISLEPresque Isle County

West 638 Highway

West 638 Highway/Glasier Road/Petersville Road

Reconstruct Reconstruct CON 1,484 EDA 464 CNTY 1,948 117107 06/05/13 Year NA FY 2012 to FY 2013 1,948 6/10/13

2014 MARQUETTE MDOT US-41US-41, Marquette County

2.91 ReconstructResurfacing & Restoration

ROW 16 NH 4 M 20 116378 06/05/13 Year NA FY 2013 to FY 2014 6,060 6/10/13

2013 MONTCALMMontcalm County

Yellow Jacket Drive Connector

Between Yellow Jacket Drive and Hillcrest Street

0.02New route/structure (capacity increase)

Construction of new connector

CON 118185 06/05/13 Delete NA double listed 6/10/13

2013 LENAWEE Adrian Citywide CitywideTransit vehicle additions/replacements

Replace gas-powered cut-away buses.

CON 118028 06/05/13 Delete NA 6/10/13

2013 DICKINSON MDOT US-2US-2 from Dawn's Lake Road to Baler Road

0.95 ReconstructPavt Rem, HMA reconstruct, Drainage improvements

ROW 113708 06/05/13 Delete NA 4,000 6/10/13

2013 HOUGHTON MDOT US-41 US-41, Hancock 0.93 Reconstruct Reconstruct ROW 110594 06/05/13 Delete NA 5,742 6/10/13

2013 GOGEBIC MDOT US-2Curry Street to Roosevelt Road

0.96 Reconstruct Pavement reconstruction ROW 110585 06/05/13 Delete NA 6/10/13

2014 HURON MDOT M-142 Nugent Rd to Joyce Dr 0.78 Traffic ops/safetyAdd Center Left Turn Lane

CON 115822 06/05/13 Delete NA FY 2013 to FY 2014 622 6/10/13

Page 29: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2013 MIDLAND MDOT M-2056021-R01, City of Midland

1.04 Bridge - otherSubstrc repair: FRP wrap piers and Bm end reprs

CON 276 MER 276 117316 06/05/13 Cost NA 276 6/10/13

2013 STATEWIDE MDOTRail Xings Trunkline GPA

Regionwide GPA Rail Xings Trunkline CON 458 ST 51 M 508 06/05/13 Cost NA 508 6/10/13

2013 EMMET MDOT US-31US-31 and M-119 in Petoskey

2.16 Traffic ops/safetyGeometric modifications and access management

CON 378 HPP 95 M 197 CITY 671 113442 06/05/13 Cost NA 671 6/10/13

2013 STATEWIDE MDOT

Program Development Scoping Trunkline GPA

Regionwide GPA Program Development Scoping Trunkline

EPE 1,012 ST 224 M 1,236 06/05/13 Cost NA 1,236 6/10/13

2013 STATEWIDE MDOTEnhancements Local GPA

Regionwide GPA Enhancements Local CON 2,465 STE 1,146 OLF 3,610 06/05/13 Cost NA 3,610 6/10/13

2013 STATEWIDE MDOTPre-Construction Phases GPA

Regionwide GPA Pre-Construction Phases Trunkline

14,786 ST 2,454 M 191 OLF 17,431 06/05/13 Cost NA 17,431 6/10/13

2013 STATEWIDE MDOT

Rural Bridge Replacement and Rehabilitate Trunkline GPA

Regionwide GPA Rural Bridge Replacement and Rehabilitate Trunkline

CON 15,459 ST 4,007 M 47 OLF 19,513 06/05/13 Cost NA 19,513 6/10/13

2013 LAPEER MDOT M-53 at Bowers Rd 0.24 Traffic ops/safety Add Left Turn Lane ROW 4 CM 1 M 5 115233 06/05/13 Add NA 490 6/10/13

2013 ALGERAlger-Marquette CAB

TransitCountywide - Alger County Public Transit

Miscellaneous Vehicle Equipment - Tires T-Cap 18 STL 4 M 22 119451 06/05/13 Add NA 22 6/10/13

2013 OSCODA

Oscoda County Transportation System

TransitCountywide, Oscoda County Area Transit Specialists

Miscellaneous Van Purchase T-Cap 30 STL 8 M 38 119503 06/05/13 Add NA 38 6/10/13

2013 ALGERAlger-Marquette CAB

TransitCountywide, Alger County Public Transit

Miscellaneous Van Purchase T-Cap 35 STL 9 M 43 119449 06/05/13 Add NA 43 6/10/13

2013 MIDLAND MidlandBailey Bridge Road

Bus Road to Rockwell Drive

0.50 Resurface Resurfacing CON 39 STUL 11 OLF 50 120562 06/05/13 Add NA 50 6/10/13

2013 MIDLAND Midland Wackerly RoadSaginaw Road to Stark Road

0.62 Resurface Resurfacing CON 39 STUL 11 OLF 50 120558 06/05/13 Add NA 50 6/10/13

2013 MIDLAND Midland Burns RoadW. River Road to Lake Sanford Road

0.52 Resurface Resurfacing CON 41 STUL 9 OLF 50 120552 06/05/13 Add NA 50 6/10/13

2013 ALGERAlger-Marquette CAB

TransitCountywide - Alger County Public Transit

MiscellaneousMaintenance Equipment - Portable Life/Tools

T-Cap 46 STL 11 M 57 119448 06/05/13 Add NA 57 6/10/13

2013 MIDLAND MidlandBailey Bridge Road

Saginaw Road to Bus Road

0.22 Reconstruct Reconstruction CON 55 STUL 15 OLF 70 120561 06/05/13 Add NA 70 6/10/13

2013 MIDLAND Midland Saginaw RoadMeridian Road to Pinesboro Drive

0.61 Resurface Resurfacing CON 63 STUL 17 OLF 80 120563 06/05/13 Add NA 80 6/10/13

2013 ALGERALTRAN Transit Authority

TransitCountywide - Alger County Public Transit

Miscellaneous Bus Purchase T-Cap 74 STL 18 M 92 120536 06/05/13 Add NA 92 6/10/13

2013 MIDLAND Midland Pine River Road4 3/4 Mile Road to Homer Road

0.93 Resurface Resurfacing CON 79 STUL 21 CITY 100 120565 06/05/13 Add NA 100 6/10/13

2013 MIDLAND Midland 4 3/4 Mile RoadGordonville Road to Pine River Road

0.82 Resurface Resurfacing CON 79 STUL 21 OLF 100 120564 06/05/13 Add NA 100 6/10/13

2013 MIDLAND Midland Stark RoadPrive Road to Beamish Road

1.00 Resurface Resurfacing CON 82 STUL 18 OLF 100 120555 06/05/13 Add NA 100 6/10/13

2013 MIDLAND MidlandLake Sanford Road

Burns Road to 1 mi north

1.02 Resurface Resurfacing CON 82 STUL 18 OLF 100 120553 06/05/13 Add NA 100 6/10/13

2013 MIDLAND Midland Saginaw Road8 Mile Road to 7 Mile Road

1.16 Resurface Resurfacing CON 101 STUL 39 OLF 140 120554 06/05/13 Add NA 140 6/10/13

2013 MIDLAND Midland Homer RoadPine River Road to M-20/Isabella Road

1.61 Resurface Resurfacing CON 118 STUL 32 OLF 150 120566 06/05/13 Add NA 150 6/10/13

2013 MIDLAND Midland Saginaw RoadWaldo Court to southeast 0.72 miles

0.34 Resurface Resurfacing CON 118 STUL 32 OLF 150 120559 06/05/13 Add NA 150 6/10/13

2013 MIDLAND MidlandGordonville Road

Badour Road to Poseyville Road

2.14 Resurface Resurfacing CON 135 STUL 80 OLF 215 120556 06/05/13 Add NA 215 6/10/13

2013 MIDLAND Midland Eastman RoadMonroe Road to Hubbard Road

2.50 Resurface Resurfacing CON 201 STUL 64 CITY 265 120567 06/05/13 Add NA 265 6/10/13

2013 MIDLAND Midland W. River RoadSaginaw Road to Burns Road

3.59 Resurface Resurfacing CON 234 STUL 126 OLF 360 120551 06/05/13 Add NA 360 6/10/13

2013 BAYBay County

Garfield RoadMidland Road north to railroad tracks

0.24 Reconstruct Reconstruction CON 200 STUL 240 OLF 440 120557 06/05/13 Add NA 440 6/10/13

2013 CRAWFORD MDOT M-72Kalkaska County line to M-93 intersection

6.05Restore & rehabilitate

Crush and shape and resurface�FY 2017

EPE 164 NH 36 M 200 116416 06/05/13 Add NA 5,818 6/10/13

2013 HURONHuron County

Areawide Huron County Miscellaneous One Bus Replacement T-Cap 106 CM 27 M 133 120636 06/05/13 Add NA 133 6/10/13

2014 STATEWIDE MDOTCPM CSM Bridge Trunkline GPA

Regionwide GPA CPM CSM Bridge Trunkline

CON 198 ST 49 M 247 06/05/13 Add NA 247 6/10/13

2014 STATEWIDE MDOTEnhancements Trunkline GPA

Regionwide GPA Enhancements Trunkline CON 385 STE 96 M 481 06/05/13 Add NA 481 6/10/13

Page 30: FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description

Required Fields Optional Fields

Fiscal Year County

Respon-sible

Agency Project Name Limits LengthPrimary Work

Type Project Description PhaseAdvance

Construct

Federal Cost

($1000s)

Federal Fund

Source

State Cost

($1000s)

State Fund

Source

Local Cost

($1000s)

Local Fund

Source

Total Phase Cost

($1000s)MDOT

Job No.Local

ID No.

MPO/ Rural Action Date

Amend-ment Type

Air Quality Comments

Total Project

Cost ($1000s) x

Local Priority EJ

Federal Approva

l Date

Capped Federal

Cost ($1000s)

Date Obligate

d

Amount Obligated ($1000s) Let Date

FY 2011 - 2014 STIP Project Data06.07.13

E-File v. 2.0 (06.21.10)

2014 STATEWIDE MDOT

Rural Bridge Replacement and Rehabilitate Trunkline GPA

Regionwide GPA Rural Bridge Replacement and Rehabilitate Trunkline

CON 1,287 ST 274 M 1,561 06/05/13 Add NA 1,561 6/10/13

2014 STATEWIDE MDOTCPM Road Trunkline GPA

Regionwide GPA CPM Road Trunkline CON 1,376 ST 305 M 1,681 06/05/13 Add NA 1,681 6/10/13

2014 STATEWIDE MDOTPre-Construction Phases GPA

Regionwide GPA Pre-Construction Phases Trunkline

5,287 ST 812 M 6,099 06/05/13 Add NA 6,099 6/10/13

2014 STATEWIDE MDOT

Rural Highway Rehab and Reconstruct Trunkline GPA

Regionwide GPA Rural Highway Rehab and Reconstruct Trunkline

CON 6,451 ST 1,431 M 7,882 06/05/13 Add NA 7,882 6/10/13

2014 STATEWIDESmall Urban Program

Small Urban Program

Statewide MiscellaneousSmall Urban Program - Road Projects

CON 6,797 ST 2,410 CNTY 9,207 06/05/13 Add NA 9,771 6/10/13

2014 STATEWIDE MDOTHighway Safety Trunkline GPA

Regionwide GPA Highway Safety Trunkline CON 24,090 ST 1,004 M 25,095 06/05/13 Add NA 25,095 6/10/13

2014 STATEWIDEBridge Local GPA

Regionwide GPA Bridge Local CON 28,382 BRO 5,662 M 1,792 OLF 35,836 06/05/13 Add NA 35,836 6/10/13

2014 STATEWIDERural Task Forces

Rural Task Force

Statewide MiscellaneousRural Task Force Program - Road Projects

CON 39,053 ST 8,963 CNTY 48,016 06/05/13 Add NA 48,016 6/10/13