Required Fields Optional Fields Fiscal Year County Respon- sible Agency Project Name Limits Length Primary Work Type Project Description Phase Advance Construct Federal Cost ($1000s) Federal Fund Source State Cost ($1000s) State Fund Source Local Cost ($1000s) Local Fund Source Total Phase Cost ($1000s) MDOT Job No. Local ID No. MPO/ Rural Action Date Amendment Type Air Quality Comments Total Project Cost ($1000s) Local Priority EJ Federal Approva l Date Capped Federal Cost ($1000s) Date Obligate d Amount Obligated ($1000s) Let Date 2011 STATEWIDE MDOT Regionwide arious in Bay Region Roadside facility Restriping of carpool lots CON 5 ST 1 M 6 103389 10/27/10 NA 6 10/27/10 2011 CHIPPEWA MDOT I-75 BL NW quadrant of I-75 and 3 Mile Rd Roadside facility Install Carpool lot lighting CON 12 ST 3 M 14 107601 10/27/10 NA 15 10/27/10 07/26/11 2 2011 SANILAC MDOT M-25 M-25 Port Sanilac Carpool Lot Roadside facility Pave Carpool Parking Lot CON 80 ST 18 M 98 107032 10/27/10 NA 98 10/27/10 10/13/10 98 2011 STATEWIDE MDOT Section 5311 Transit operations RTAP T-Ops 296 5311 296 10/27/10 NA 296 10/27/10 2011 VAN BUREN MDOT M-40 0.5 miles south of the illage of Lawton 0.27 Widen - minor Two Right Turn Lanes CON 510 EDA 510 108014 10/27/10 NA 568 10/27/10 03/22/11 357 2011 ALGER Alger County Little Beaver Road from H-58 to Little Beaver Campground 3.45 Restore & rehabilitate Rehabilitate CON 1,000 FLH 1,000 105168 10/27/10 NA PIRO 15(1) 1,000 10/27/10 2011 STATEWIDE MDOT Section 5317 Transit operations New Freedom T-Ops 693 5317 693 M 1,386 10/27/10 NA 1,386 10/27/10 2011 STATEWIDE MDOT Section 5316 Transit operations Job Access/Reverse Commute T-Ops 1,022 5316 1,022 M 2,045 10/27/10 NA 2,045 10/27/10 2011 STATEWIDE MDOT Section 5310 Transit operations Elderly and Disabled T-Ops 1,000 5310 1,270 M 2,270 10/27/10 NA 2,270 10/27/10 2011 STATEWIDE MDOT Section 5309 Transit operations Capital Bus T-Ops 3,622 5309 3,750 M 7,372 10/27/10 NA 7,372 10/27/10 2011 OCEANA MDOT US-31 Polk Rd to N Branch of Pntwtr Rvr 5.89 Reconstruct Reconstruction CON AC 20,412 M 20,412 90073 10/27/10 NA Tagged as AC 21,212 10/27/10 01/26/11 13,070 2012 LAPEER MDOT I-69 at Lake Pleasant Road Roadside facility Resurface Carpool Lot CON 43 ST 9 M 52 73163 10/27/10 NA 56 10/27/10 06/07/12 19 2012 ANTRIM Antrim County Jordan Rvr. Nat. Fish Hatchery Jordan River National Fish Hatchery Miscellaneous PE for Entrance and Parking PE 100 FLH 100 105498 10/27/10 NA 100 10/27/10 2012 MANISTEE MDOT US-31 US-31 at Memorial Drive 0.12 Traffic ops/safety Intersection Improvement CON 508 HPSL 113 M 621 86076 10/27/10 NA 675 10/27/10 12/30/11 643 2013 TUSCOLA Mayville Fulton St Main Street to Mill Street, Mayville 0.50 Resurface Resurface CON ACC 90 STL 90 109312 10/27/10 NA $90,198 ARL funds in FY2010. $39,842 STL ACC conversion in FY2013. 1511 Certification 1/25/10. 167 10/27/10 02/23/10 2013 SCHOOLCRAFT Schoolcraf t County Seney National Wildlife Refuge Seney National Wildlife Refuge Miscellaneous Replace J to H WCS/Bridge CON 1,095 FLH 1,095 110126 10/27/10 NA 1,095 10/27/10 2014 STATEWIDE MDOT Regionwide Regionwide Roadside facility Restriping of Carpool Lots CON 5 ST 1 M 6 107017 10/27/10 NA 6 10/27/10 2011 HURON MDOT M-25 Over White River 1.01 Bridge replacement Superstructure replacement CON 972 ST 216 M 1,188 104611 10/28/10 NA 1,188 10/29/10 10/15/10 1,765 2011 STATEWIDE MDOT Regionwide North Region Miscellaneous Warranty Adminstration- Bridge CON 2 M 2 111877 10/28/10 NA 2 12/2/10 11/08/10 2 2011 ALLEGAN MDOT M-89 West of US-131 east to Florence St. in Plainwell 1.72 Reconstruct Reconstruct Existing, No widen ROW 20 ST 5 M 25 90028 10/28/10 NA 9,835 12/2/10 09/02/11 25 2011 ARENAC MDOT M-61 at I-75 Roadside facility Lighting CON 30 ST 7 M 37 110651 10/28/10 NA 37 12/2/10 02/08/11 37 2011 OTTAWA MDOT Grand Region Carpool Lots Grand Region Carpool Lots Roadside facility Signing Upgrade for Carpool Lot CON 69 ST 15 M 84 102951 10/28/10 NA 84 12/2/10 03/31/11 13 2011 GRAND TRAVERSE MDOT US-31 South of Kay Ray Road on US-31 Roadside facility New Carpool Lot CON 74 ST 16 M 90 109989 10/28/10 NA 100 12/2/10 07/15/11 86 2011 SCHOOLCRAFT Schoolcraf t County County Road 433 US 2 to CR 438 6.12 Resurface resurface CON 51 EDDF 42 M 1 CNTY 94 111254 10/28/10 NA 94 12/2/10 04/20/11 93 2011 SCHOOLCRAFT Schoolcraf t County County Road 434 US 2 to CR 432 3.84 Resurface resurface CON 51 EDDF 42 M 1 CNTY 94 111253 10/28/10 NA 94 12/2/10 08/18/11 94 2011 SCHOOLCRAFT Schoolcraf t County County Rd 437 Iron Creek nthly 5.5 mi to end of pavement 0.44 Resurface resurface CON 51 EDDF 42 M 1 CNTY 94 111252 10/28/10 NA 94 12/2/10 01/19/11 93 2011 STATEWIDE Small Urban Program Small Urban Program Statewide Miscellaneous Small Urban Program - Transit Projects CON 115 ST 29 CNTY 144 10/28/10 NA 144 12/2/10 2011 WEXFORD Cadillac Seventh Street Third Ave-First Ave, Farrar St-Mitchell St Reconstruct Reconstruct CON 150 EDF 38 CITY 188 110962 10/28/10 NA 188 12/2/10 10/20/10 150 2011 NEWAYGO Newaygo County State Street elma Matson Upper Elem. School, City of Newaygo Roadside facility Bike/Ped Safety improvements CON 202 SRSI 202 111567 10/28/10 NA 202 12/2/10 03/02/11 220 2011 GOGEBIC MDOT US-2 Tourist Park Rd to Curry Street 1.11 Reconstruct Pavement reconstruction PE 326 NH 72 M 398 110584 10/28/10 NA 4,973 12/2/10 06/17/11 676 2011 VAN BUREN MDOT M-140 City of Watervliet to CR 378 7.22 Resurface Two Course HMA Overlay PE 327 ST 73 M 400 110107 10/28/10 NA 6,500 12/2/10 02/22/11 600 2011 VAN BUREN MDOT I-94 on CR652 at the ramp terminals N and S of I- 94 (exit 66) Traffic ops/safety Construct two modern roundabouts CON ACC 400 CMG 400 107461 10/28/10 NA 400 12/2/10 08/09/10 331 2011 STATEWIDE MDOT DBE Support Services Regionwide DBE Support Services CON 400 ST 400 10/28/10 NA 400 12/2/10 2011 LAPEER MDOT M-53 at Hough Road 0.57 Traffic ops/safety Add Center Left Turn Lane CON 340 CM 85 M 425 111272 10/28/10 NA 456 12/2/10 08/12/11 426 2011 STATEWIDE MDOT Local Tech Assistance Program Miscellaneous Local Techincal Assistance Program CON 235 ST 235 M 470 10/28/10 NA 470 12/2/10 2011 EMMET MDOT US-31 US-31 from west of Division to Manvel and M-119 1.22 Traffic ops/safety Geometric modifications CON 655 HPP 164 M 819 79065 10/28/10 NA Moved from FY 2012 1,192 12/2/10 12/08/10 233 2011 HURON MDOT M-142 M-142 over Pigeon River Bridge replacement Bridge Replacement CON 1,276 ST 283 M 1,559 100745 10/28/10 NA 1,672 12/2/10 06/22/11 2,012 2011 STATEWIDE MDOT Regionwide North Region, various locations Miscellaneous Install Environmental Sensors CON 1,280 ST 284 M 1,563 105741 10/28/10 NA From illustrative list 2,000 12/2/10 06/17/11 1,334 2011 WEXFORD Harrietta Forest Highway 37 Lake County Line to Forest Highway 38 11.00 Reconstruct Reconstruction CON AC 2,437 M 609 CITY 3,046 107752 10/28/10 NA Tagged as AC 3,118 12/2/10 06/20/11 3,471 2011 STATEWIDE MDOT I-69 M-71 over I-69, Shiawassee County Bridge replacement Bridge replacement CON AC 3,399 M 3,399 87169 10/28/10 NA Tagged as AC 3,694 12/2/10 12/22/10 3,232 2011 STATEWIDE MDOT CPM CSM Bridge Trunkline GPA Statewide GPA CPM CSM Bridge Trunkline CON 2,976 ST 705 M 3,680 10/28/10 NA 3,680 12/2/10 FY 2011 - 2014 STIP Project Data 06.07.13 E-File v. 2.0 (06.21.10)
30
Embed
FY 2011 - 2014 STIP Project Data - Michigan€¦ · Required Fields Optional Fields Fiscal Year County Respon-sible Agency Project Name Limits Length Primary Work Type Project Description
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Required Fields Optional Fields
Fiscal Year County
Respon-sible
Agency Project Name Limits LengthPrimary Work
Type Project Description PhaseAdvance
Construct
Federal Cost
($1000s)
Federal Fund
Source
State Cost
($1000s)
State Fund
Source
Local Cost
($1000s)
Local Fund
Source
Total Phase Cost
($1000s)MDOT
Job No.Local
ID No.
MPO/ Rural Action Date
Amend-ment Type
Air Quality Comments
Total Project
Cost ($1000s) x
Local Priority EJ
Federal Approva
l Date
Capped Federal
Cost ($1000s)
Date Obligate
d
Amount Obligated ($1000s) Let Date
2011 STATEWIDE MDOT Regionwide Various in Bay Region Roadside facility Restriping of carpool lots CON 5 ST 1 M 6 103389 10/27/10 NA 6 10/27/10
2011 CHIPPEWA MDOT I-75 BLNW quadrant of I-75 and 3 Mile Rd
Roadside facility Install Carpool lot lighting CON 12 ST 3 M 14 107601 10/27/10 NA 15 10/27/10 07/26/11 2
2011 SANILAC MDOT M-25M-25 Port Sanilac Carpool Lot
Roadside facility Pave Carpool Parking Lot CON 80 ST 18 M 98 107032 10/27/10 NA 98 10/27/10 10/13/10 98
Roadside facility Replace existing PITWS CON 61 ST 14 M 75 110738 01/06/11 NA 75 1/24/11 04/05/11 74
2011 LAPEER MDOT M-240.26 miles north of Newark Road
Bridge replacement Replace Culvert PE 60 HPSL 15 M 75 112269 01/06/11 NA 761 1/24/11 01/28/11 75
2011 STATEWIDE
Michigan Technological University
Statewide At LTAP Center at MTU Miscellaneous 2011 MERL Program EPE 73 STT 18 M 92 112265 01/06/11 NA 92 1/24/11 12/28/10 92
2011 ALLEGANAllegan County
11th StreetBaseline Road to 1700' north of Baseline Road
0.32 Resurface Resurface CON 100 EDA 33 OLF 133 112174 01/06/11 NA 133 1/24/11 02/03/11 143
2011 LENAWEELenawee County
M-34 (Main Street)
Findlay Trail are within the City of Hudson; S. Maple Grove Ave. running 4000' parallel to and south of Main St. (M-34) to S. Munson Hwy at the Northwest corner of the Industrial Park. The proposed pedestrian bridge crosses the Garrison Drain West of McKenzie Dr. to connect the two trail halves.
Miscellaneous Pedestrian Bridge CON 96 CM 39 OLF 135 112413 01/06/11 NA 135 1/24/11 06/14/11 165
2011 LENAWEELenawee County
Treat Highway
Treat Highway .40 mile south of US-223 at Madison Schools north driveway
Miscellaneous
Approximately 1100 foot long passing flair in front of Madison Schools in order to alleviate congestion. CMAQ Grant #11033
CON 112 CM 28 CNTY 140 112412 01/06/11 NA 140 1/24/11 07/20/11 92
2011 MARQUETTEMarquette County
Various locations
Birchview Elementary School, City of Ishpeming
Roadside facilityBike/ped safety improvements
CON 170 SRSI 170 112487 01/06/11 NA 170 1/24/11 06/03/11 172
Roadside facility Construct Multi-use path CON 72 HPSL 18 CITY 90 113481 05/05/11 NA 90 5/23/11 05/10/11 91
2011 DICKINSONDickinson County
Leeman RoadFrom County Road 581 to Lerza Road
7.15 Traffic ops/safetyPavement marking and gravel shoulder
CON 74 HPSL 13 M 6 CNTY 93 113456 05/05/11 NA 93 5/23/11 07/12/11 97
2011 STATEWIDE MDOT Statewide Statewide MiscellaneousFY 2011 CTP (RCWD) Program
EPE 100 ST 100 113339 04/01/11 NARCWD Project - split out from JN 101361.
3,339 5/23/11 04/07/11 100
2011 GOGEBIC MDOT US-2US-2 EB, between Tamarack Street and Pine Street
0.24 Roadside facility Construct PITWS CON 84 ST 19 M 103 113409 05/05/11 NA 110 5/23/11 08/11/11 115
2011 DICKINSONDickinson County
Fifth StreetNorth Elementary School, City of Iron Mountain
Roadside facilityBike/Ped safety improvements
CON 212 SRSI 212 110131 04/21/11 NA 212 5/23/11 05/04/11 210
Required Fields Optional Fields
Fiscal Year County
Respon-sible
Agency Project Name Limits LengthPrimary Work
Type Project Description PhaseAdvance
Construct
Federal Cost
($1000s)
Federal Fund
Source
State Cost
($1000s)
State Fund
Source
Local Cost
($1000s)
Local Fund
Source
Total Phase Cost
($1000s)MDOT
Job No.Local
ID No.
MPO/ Rural Action Date
Amend-ment Type
Air Quality Comments
Total Project
Cost ($1000s) x
Local Priority EJ
Federal Approva
l Date
Capped Federal
Cost ($1000s)
Date Obligate
d
Amount Obligated ($1000s) Let Date
FY 2011 - 2014 STIP Project Data06.07.13
E-File v. 2.0 (06.21.10)
2011 GLADWINGladwin County
Judy MaeBlades Rd to Judy Mae St; M-18 to Von Dale St
Reconstruct RCNSTRCT CON 202 EDA 22 CNTY 224 113424 04/20/11 NA 224 5/23/11 04/13/11 202
2011 HOUGHTON MDOT M-26M-26, Houghton County
3.13 ResurfaceMill & Two Course Overlay
PE 224 ST 50 M 274 107008 04/20/11 NA 4,032 5/23/11 04/20/11 274
2011 GRATIOT MDOT US-127North of Polk Road to North of Van Buren Road
2.69 Resurface Two Course HMA Overlay PE 284 NH 63 M 347 112711 05/05/11 NA 7,590 5/23/11 09/02/11 347
2011 STATEWIDE MDOT Grand Region Grand Region 56.03 Traffic ops/safety Freeway Signing Upgrade PE 555 IMG 555 113334 04/20/11 NA 4,810 5/23/11 04/05/11 555
CON 10,218 IM 1,135 M 11,353 86970 05/05/11 NAObligated as regular federal aid
14,900 5/23/11 01/05/11 8,671
2011 STATEWIDE MDOT
Rural Bridge Replacement and Rehabilitate Trunkline GPA
Regionwide GPA Rural Bridge Replacement and Rehabilitate Trunkline
CON 19,590 ST 4,391 M 98 OLF 24,079 04/20/11 NA 24,079 5/23/11
2011 STATEWIDE MDOTHighway Safety Trunkline GPA
Statewide GPA Highway Safety Trunkline CON 24,304 ST 239 M 24,543 04/20/11 NA 24,543 5/23/11
2011 STATEWIDE MDOT
Rural Highway Rehab and Reconstruct Trunkline GPA
Regionwide GPA Rural Highway Rehab and Reconstruct Trunkline
CON 20,666 ST 4,460 M 568 CNTY 25,693 04/20/11 NA 25,693 5/23/11
2011 STATEWIDE MDOTCPM Road Trunkline GPA
Statewide GPA CPM Road Trunkline CON 32,074 ST 7,029 M 58 CNTY 39,161 04/20/11 NA 39,161 5/23/11
2011 STATEWIDE MDOT Section 5311 Transit operations Non-UZA Formula T-Ops 16,759 5311 30,014 M 39,503 TRAL 86,277 04/01/11 NACost increase for state and local funds
86,277 5/23/11
2012 GOGEBIC MDOT US-2at Lakeshore Drive in Wakefield
Roadside facility New Carpool Lot CON 34 ST 7 M 41 112331 04/21/11 NA 45 5/23/11
2012 GRATIOT MDOT M-57Northwest quadrant of the US-127/M-57 interchange
Roadside facilityResurfacing of existing Lot
CON 36 ST 8 M 44 113219 04/21/11 NA 44 5/23/11 08/16/12 44
2012 SANILACSanilac County
Maple Valley RdM90 to North City Limits
0.38 Resurface resurface CON 113 EDF 28 CNTY 141 112606 04/21/11 NA 141 5/23/11 09/17/12 142
2012 IOSCO MDOT US-23South of Aster Road to north of Point Road
2.00Restore & rehabilitate
Passing Lane Rehabilitation
PE 350 NH 78 M 428 109659 04/21/11 NA 4,064 5/23/11 09/14/12 428
2012 CALHOUN MDOT I-9417 1/2 to 21 1/2 Mile Road
4.45 ResurfaceMultiple Course HMA Overlay
SUB 459 IM 51 M 510 110138 04/20/11 NA 510 5/23/11 05/18/12 510
2012 LAPEER MDOT M-24 over Plum Creek 1.04 Bridge replacement Bridge Replacement CON 572 BHT 143 M 715 102796 04/21/11 NA 815 5/23/11 02/06/12 959
CON AC 5,923 M 5,923 103229 04/21/11 NA 6,121 5/23/11 01/25/13 5,741
Required Fields Optional Fields
Fiscal Year County
Respon-sible
Agency Project Name Limits LengthPrimary Work
Type Project Description PhaseAdvance
Construct
Federal Cost
($1000s)
Federal Fund
Source
State Cost
($1000s)
State Fund
Source
Local Cost
($1000s)
Local Fund
Source
Total Phase Cost
($1000s)MDOT
Job No.Local
ID No.
MPO/ Rural Action Date
Amend-ment Type
Air Quality Comments
Total Project
Cost ($1000s) x
Local Priority EJ
Federal Approva
l Date
Capped Federal
Cost ($1000s)
Date Obligate
d
Amount Obligated ($1000s) Let Date
FY 2011 - 2014 STIP Project Data06.07.13
E-File v. 2.0 (06.21.10)
2014GRAND TRAVERSE
MDOT M-113N. of M-186 south to US-131
5.09Restore & rehabilitate
Crush and Shape CON AC 3,420 M 3,420 103027 04/21/11 NA 4,085 5/23/11
2011 STATEWIDE MDOT Statewide Statewide MiscellaneousFY11 state const proj training
CON 25 M 25 112185 05/26/11 50 7/11/11 12/13/10 25
2011 BERRIENCity of Watervliet
Red Arrow Highway (St. Joseph Avenue), Medical Park Drive and public easement
Commencing at Watervliet High School and extending east on the south side of Red Arrow Highway (St. Joseph Avenue) to Medical Park Drive, then continuing south on the west side of Medical Park Drive to Cobblestone Village Senior Housing Development by way of a public easement
Miscellaneous
CMAQ Grant # 11117 Install and construct 400' of an 8' wide sidewalk on Red Arrow Highway and 1,800' of a 6' wide sidewalk along Medical Park Drive and a public easement, to alleviate air emissions and to complete a connecting pathway between the Cobblestone Village Senior Housing Development and downtown area.
CON 48 CM 12 CNTY 60 112962 07/06/11 NA 60 7/11/11 09/08/11 72
2011 LENAWEE Tecumseh Russell Road300' W of S Evans St-Mill Hwy
Resurface Resurface CON 115 EDF 64 CITY 179 110963 05/26/11 179 7/11/11 04/29/11 173
2011 TUSCOLATuscola County
Colling RdGilford Rd-Deckerville Rd.
Resurface Resurface CON AC 181 M 46 CNTY 227 110968 05/26/11 NA Obligated as AC 227 7/11/11 03/15/11 138
2011 STATEWIDE MDOT I-94Various locations from MI/IN border to I-69
104.00 MiscellaneousTruck Parking & Info Management System
PE 240 OFHWA 60 M 300 113689 06/30/11 NA
Actual federal fund source is TPFD - Truck Parking Federal Discretionary
300 7/11/11 07/28/11 300
2011 HURON MDOT M-25from County Road to Caseville County Park
0.18 Widen - minor
Construct shoulder improvements and HMA paving to extend the existing dedicated center-left turn lane. The `A? Phase CMAQ grant number is 11120.
CON 251 CM 63 M 314 113532 05/26/11 NA 314 7/11/11 07/26/11 314
2011 MENOMINEE MDOT M-35Jimtown road South 9.42 miles
9.42Restore & rehabilitate
Coldmilling and Resurfacing
PE 354 ST 79 M 433 110682 05/26/11 NA Moved from FY 2013 6,135 7/11/11 05/20/11 735
2011 IOSCOOscoda County
Arrow Street Mission Drive-F41 Reconstruct Reconstruct CON 375 EDF 135 CNTY 510 110965 05/26/11 NA 510 7/11/11 04/21/11 375
2011GRAND TRAVERSE
MDOT M-113N. of M-186 south to US-131
5.09Restore & rehabilitate
Crush and Shape PE 520 ST 115 M 635 103027 06/29/11 NA Moved from FY 2012 4,085 7/11/11 06/08/11 635
2011 STATEWIDE MDOT I-94Various locations from MI/IN border to I-69
104.00 MiscellaneousTruck Parking & Info Management System
EPE 1,408 OFHWA 352 M 1,760 113689 06/30/11 NA
Actual federal fund source is TPFD - Truck Parking Federal Discretionary
1,760 7/11/11 07/28/11 1,760
2011 LENAWEE MDOT M-50Ridge Hwy to the EVL of Britton, Lenawee County
2.16 Resurface HMA Mill and Resurface CON AC 3,586 M 3,586 87514 05/26/11 NA Moved from FY 2012 3,959 7/11/11 08/26/11 2,607
2011 MARQUETTE MDOT M-94M-94 over C & NW RAILROAD
0.42 Bridge - otherConc Box Beam Replacement
CON 112757 06/29/11 NAMoved to Trunkline Crossings GPA
7/11/11
2011 LENAWEELenawee County
US-12 US-12 at M-50 0.04 Roadside facility Historic Preservation CON 112479 06/29/11 NAMoved to Local Enhancement GPA
7/11/11
2011 CASSCass County
Evan StreetAt Grand Trunk Western in Jefferson Township
Traffic ops/safety Install overhead lighting CON 112414 06/30/11 NAProject is included in the Local Rail GPA
7/11/11
2011 STATEWIDE MDOT RegionwideVarious locations in the Grand Region
Traffic ops/safety2011 Control Room Ops. WMTMC
EPE 111293 05/26/11 NAProject is in Grand Rapids TIP
7/11/11
2011 IONIA MDOT M-66The Grand River north to GRE RR
0.53Restore & rehabilitate
Pvt Repairs & Diamond Grinding
CON 109051 06/29/11 NAProject moved to Hwy RR GPA
7/11/11
2011 ROSCOMMON MDOT M-55Roscommon Co WCL to US-127
2.21Restore & rehabilitate
Crush and shape ROW 106683 05/26/11 NA 7/11/11
2011 OCEANA MDOT M-20 at US-31 NE Quadrant Roadside facilityCrack Sealing - carpool lot
CON 87479 05/26/11 NA 7/11/11
2012 STATEWIDE MDOT RegionwideVarious Locations in Superior Region
Roadside facility Sign Upgrades CON 27 ST 6 M 33 113497 05/26/11 NA 36 7/11/11 01/09/12 30
2012 IOSCO MDOT M-65Turtle Rd to 1200' North of Sherman Street
5.97Restore & rehabilitate
Crush & Shape, Resurface
ROW 41 ST 9 M 50 79433 05/26/11 NA Moved from FY 2011 4,534 7/11/11 12/02/11 50
2012 ALGER MDOT M-94at M-67 & 94 intersection in Alger County
Roadside facilityExpand existing lot for additional parking
CON 57 ST 13 M 69 113745 05/26/11 NA 73 7/11/11
2012 STATEWIDESmall Urban Program
Small Urban Program
Statewide MiscellaneousSmall Urban Program - Transit Projects
CON 153 ST 38 M 7 TRAL 198 09/20/12 NAAdjusted costs administratively - 09.20.12
35 7/11/11
2012 SCHOOLCRAFT MDOT M-28between the Seeney Rest Area and Seeney
3.70 ReconstructThickened pavement section for WIM
CON 164 ST 36 M 200 113746 05/26/11 NA 210 7/11/11 02/21/12 266
2011 EMMET MDOT US-31 US-31 @ Manvel Rd 0.29 Widen - minor Geometric modifications PE 10 HPP 3 M 13 114279 08/24/11 NA 100 9/14/11 09/20/11 13
2011 HOUGHTON MDOT US-41
US-41, M-26 - Houghton County, various locations within boundaries of Copper Country Trail National Byway
Miscellaneous
Historic Resource Preservation Plan for Copper Country that identifies historic properties within the byway region that are eligible for listing on the National Register of Historic Places.
EPE 61 SBD 15 OLF 76 114805 09/13/11 NA
Copper Country Preserviation, Inc is providing $15,243 in cash match. JN changed from JN 114421 to JN 114805 due to technical problems.
76 9/14/11 09/20/11 76
2011 CHIPPEWA MDOT M-123M-28/M-123 west jct to M-28/M-123 east jct
62.51 Roadside facility
Implementation of marketing and interpretive kiosks at Tahquamenon Heritage Route
EPE 82 SBD 25 OLF 107 102982 08/24/11 NA
NSBP Grant # SB-2007-54096. Admin Change - 08/10/2011 - updated the project description. In-Kind services amount of $7,000.
107 9/14/11 09/20/11 88
2011 EMMET MDOT US-31US-31 and M-119 in Petoskey
2.16 Traffic ops/safetyGeometric modifications and access management
PE 93 HPP 23 M 116 113442 09/08/11 NA 494 9/14/11 08/23/11 116
2011 LENAWEELenawee County
Treat Highway
at .40 miles south of US-223 @ Madison Schools north driveway
Miscellaneoussignal upgrade/interconnect
CON 124 CM 31 OLF 155 112956 08/24/11 NA 155 9/14/11 09/14/11 123
CON 2,420 FLH 2,420 114368 08/24/11 NA 2,650 9/14/11
2012 STATEWIDE MDOT Statewide Statewide MiscellaneousFiscal year 2012 Bureau of Highways training
EPE 1,140 ST 1,140 114983 10/25/11 NA 1,140 10/28/11 10/28/11 1,140
2011 STATEWIDE MDOT Statewide Statewide MiscellaneousEnhance outreach and recruitment efforts about DBE
CON 276 BOWD 276 114468 09/21/11 NA
Administrative modification on 09.21.11 - changed phase from EPE to CON. 11.21.11 - FHWA reviewed admin mods during next amendment cycle.
276 11/21/11 09/20/11 276
2011 BRANCH MDOT US-12Tibbits Opera House, Coldwater
0.16 Roadside facility Building restoration CON 500 SBD 970 CITY 1,470 105383 09/21/11 NA
SB-2008-MI-04 Administrative modification on 09.21.11 - changed phase from EPE to CON. 11.21.11 - FHWA reviewed admin mods during next amendment cycle.
1,470 11/21/11 09/16/11 1,470
2012 STATEWIDE MDOT Statewide Statewide MiscellaneousFY 12 state construction project training
CON 20 M 20 115103 10/25/11 NA 20 11/21/11 11/14/11 20
Bus Purchase: Replace one less than 30' bus (replace bus #16)
EPE 56 CM 14 TRAL 70 115064 10/25/11 NA 70 11/21/11 08/27/12 70
2012 LUCE MDOT M-280.1 mile west of CR 399 intersection
Roadside facilityConstruct New Carpool lot
CON 59 ST 13 M 72 110737 10/25/11 NA shift from FY 2011 76 11/21/11 01/24/12 43
Required Fields Optional Fields
Fiscal Year County
Respon-sible
Agency Project Name Limits LengthPrimary Work
Type Project Description PhaseAdvance
Construct
Federal Cost
($1000s)
Federal Fund
Source
State Cost
($1000s)
State Fund
Source
Local Cost
($1000s)
Local Fund
Source
Total Phase Cost
($1000s)MDOT
Job No.Local
ID No.
MPO/ Rural Action Date
Amend-ment Type
Air Quality Comments
Total Project
Cost ($1000s) x
Local Priority EJ
Federal Approva
l Date
Capped Federal
Cost ($1000s)
Date Obligate
d
Amount Obligated ($1000s) Let Date
FY 2011 - 2014 STIP Project Data06.07.13
E-File v. 2.0 (06.21.10)
2012 HURON
Northeast Council of Governments
Huron Shores Heritage Route Interpretive Program
US-23 through Cheboygan, Alpena, Arenac, Alcona, Iosco, and Presque Isle counties.
Heritage routes
The development and implementation of an interpretive program for six counties along the US-23 Herigate Route. The Scenic Byways grant will fund an asset inventory, guidebook, and maps.
PE 1,500 M 1,500 114829 10/25/11 NA 4,500 11/21/11 10/13/11 1,500
2012 IRON
Iron County Road Commission
US-2 Iron County Heritage Trail Non-motorized Pathway
US-2 Iron County Heritage Trail Non-motorized Pathway
Heritage routesUS-2 Iron County Heritage Trail Non-motorized Pathway
CON 1,118 SBD 500 OLF 1,618 10/25/11 NASB-2011-MI-04. In-kind contribution amount is $122,250.
1,618 11/21/11
2012 ALLEGAN MDOT US-131114th Avenue north to 120th Avenue
3.40 ResurfaceCold Mill and HMA resurface
CON 1,900 NH 1,900 113037 10/25/11 NATLCR - Toll Credit Amount is $344,850. Shift from FY 2011.
1,900 11/21/11 01/24/12 1,771
2012GRAND TRAVERSE
MDOT US-31
Remove and replace an existing deteriorated box culvert at Tobeco Creek. A detour will be required for the project and the effected road area will need to be rebuilt / reconstructed.
0.11 Reconstruct Culvert Replacement CON 1,965 NH 1,965 103007 10/25/11 NA
Year and Cost Changes. Shift from FY 2014. TLCR - Toll Credit Amount is $356,607.
1,965 11/21/11 06/14/12 1,321
2012 HOUGHTON MDOT M-26TAMARACK TO HUBBEL
1.22 Reconstruct HMA RECONSTRUCTION CON 2,228 NH 2,228 87569 10/25/11 NATLCR - Toll Credit Amount is $404,328.
2,228 11/21/11 01/31/12 2,709
2012 ST. JOSEPH MDOT US-131 St. Joseph County 10.29New route/structure (capacity increase)
Design & Construction of PA-5
UTL 1,842 NH 408 M 2,250 46269 10/25/11 NA 40,124 11/21/11 12/02/11 2,250
Replace (1) 2008 gas-powered mini-van with one (1) new gas powered accessible mini-van. The old vehicle currently meets the FTA useful life criteria of 4 years.
T-Cap 32 CM 8 M 40 02/02/12 NA 40 3/27/12
2012 MECOSTA MDOT US-131US-131 over Muskegon River
Construction of 4,520 feet 10' wide bituminous walk/bike path to link an existing walk/bike path to a series of existing sidewalks. Project will link existing residential area to large commericial institutional area.
CON 487 CM 114 CNTY 601 115581 02/02/12 601 3/27/12 09/13/12 472
2012 MECOSTA MDOT US-131US-131 over Muskegon River
UTL 5 BRT 1 M 6 90239 04/10/12 NA 1,339 5/4/12 01/09/12 6
2012 VAN BUREN
Southwest Michigan Planning Commission
Countywide Van Buren County Miscellaneous
SW MI Planning Commission Rideshare Program works to effect behavioral change among citizens and businesses to reduce traffic congestion and improve air quality
CON 136 SRSI 136 114137 04/10/12 NA FY 2011 to FY 2012 136 5/4/12 05/31/12 134
2012 VAN BUREN DecaturSouth Williams Street
From Beers Street to Special-Lite, Inc.
0.07 Roadside facility
Construct 10' wide concrete non-motoized path on the west side of S. Williams Street. The path will provide an oppporunity for residents and employees to visit and conduct business without compromising safety or impacting vehicular traffic along South Williams Street
CON 144 CM 36 CITY 180 115848 04/10/12 NA 180 5/4/12
2012 CASS Dowagiac N. Paul StreetM-51/62 to 300' east of Lowe St intersection
0.78 Resurface Resurface CON 184 EDA 36 CITY 220 115818 04/10/12 NA 220 5/4/12 03/05/12 219
CON 2,179 BRT 545 M 2,723 90239 04/10/12 NA 2,723 5/4/12 02/08/12 2,381
2012 TUSCOLA MDOT M-25Dickerson Road to Bay Park Road
5.44 Resurface HMA Mill & Overlay CON AC 3,046 NH 675 M 3,721 90283 04/10/12 NA 5/4/12 09/19/12 3,844
2012 TUSCOLA MDOT M-25Bay/Tuscola County Line to Dickerson Road
5.43 Resurface HMA Mill & Overlay CON AC 3,178 NH 704 M 3,882 86950 04/10/12 NA 4,152 5/4/12 09/14/12 4,742
2012 TUSCOLA MDOT M-25over Quanicassee River
0.76 Bridge replacement Bridge Replacement CON AC 4,442 BRT 1,110 M 5,552 102952 04/10/12 NA 5,900 5/4/12 06/20/12 5,023
2012 BERRIEN MDOT US-12Red Arrow Highway to Hoder Road
1.64Restore & rehabilitate
Recycle Exisiting Conc Pavt
CON AC 7,080 ST 1,570 M 8,650 45662 04/10/12 NA 9,293 5/4/12 08/28/12 8,523
2013 TUSCOLA MDOT M-25Ringle Road to the Huron County Line
4.18 ResurfaceHMA Overlay and Shoulders
ROW 41 ST 9 M 50 109334 04/10/12 NA FY 2012 to FY 2013 4,251 5/4/12
2013 CALHOUN MDOT I-69 at N Drive North Roadside facility New Carpool Lot CON 113668 04/10/12 NA 5/4/12
2014 IONIA MDOT I-96I-96 under Cutler Road
0.60 Bridge replacement Bridge Replacement PE 34 IM 4 M 38 115817 04/10/12 NA 4,047 5/4/12
2014 DELTA MDOT US-2over the Escanaba River
0.36 Bridge replacement Bridge Replacement PE 44 BRT 11 M 55 115866 04/10/12 NA 19,875 5/4/12
2014 IONIA MDOT I-96I-96 under Cutler Road
0.60 Bridge replacement Bridge Replacement SUB 165 IM 18 M 184 115817 04/10/12 NA 4,047 5/4/12
2014 DELTA MDOT US-2over the Escanaba River
0.36 Bridge replacement Bridge Replacement SUB 296 BRT 74 M 370 115866 04/10/12 NA 19,875 5/4/12
2014 LEELANAU MDOT M-22Westman Rd to Port Oneida Rd.
3.34 Miscellaneous3.8 miles of NPS Trailway Construction
CON 1,646 FLH 197 CNTY 1,843 115983 04/10/12 NA 1,843 5/4/12
2014 TUSCOLA MDOT M-15 over Cass River 0.10 Bridge replacement Bridge Replacement CON 3,199 BHT 3,199 102456 04/10/12 NATLCR - Toll Credit Amount is $639,774. FY 2012 to FY 2014.
3,399 5/4/12
2014 BAY MDOT US-10M-47 NB and SB over US-10
0.02 Bridge replacementBridge Removal and Replacement
CON 3,476 BHN 869 M 4,346 108778 04/10/12 NA 4,608 5/4/12
2014 IONIA Muir Prairie Street over Maple River 0.00 Bridge replacement Bridge Replacement CON 3,600 BRT 675 M 225 CITY 4,500 115684 04/10/12 NA 4,500 5/4/12
2012 LAPEER MDOT I-69 EBM-24 to Lapeer/St Clair COL
17.19Restore & rehabilitate
Conc Pavt Rprs, Diamond Grinding
PE 32 IM 4 M 35 115855 05/22/12 NA 4,200 6/11/12 06/21/12 35
PE 124 NH 28 M 152 116383 05/22/12 NA 4,250 6/11/12 07/09/12 152
2012 HOUGHTON
Western Upper Peninsula Planning and Development Region
US-41
Intersection of US-41 and No. 9 Road (Houghton County Hwy F22) to intersection of US-41 and Airpark Blvd.
10.17 Heritage routes
This project will remove blighted structures and debris, construct viewing platforms for pedestrians, pit toilets, interpretive signs and a covered pavilion.
CON 193 SBD 48 OLF 241 117251 06/07/12 NA
SBD# SB-2011-MI-56748. Local Other Funds - $42,564 cash and $5,600 in-kind contributions. Was originally MDOT JN 115853. This was changed to MDOT JN 117251.
241 6/11/12 08/10/12 235
2012 GRATIOT MDOT US-127Van Buren Road to Begole Road
3.41Restore & rehabilitate
Two Course HMA Overlay PE 302 NH 67 M 370 115805 05/22/12 NA 8,131 6/11/12 08/16/12 320
2012 VAN BUREN Mattawan Murray StreetMattawan Early and Later Elem. Schools, Mattawan
Roadside facilityBike/Ped safety improvements.
CON 380 SRSI 380 114142 05/22/12 NA FY 2011 to FY 2012 380 6/11/12 06/14/12 424
2012 LEELANAU MDOT M-22from Thoreson Rd to 0.9 miles east of Basch Rd
2.42Restore & rehabilitate
New 5 ft paved shoulders CON 409 ST 91 M 500 116658 05/22/12 NA 500 6/11/12 9/7/2012 529
2012 MARQUETTEMarquette County
CR 492US-41 to Brookton Rd/Commerce Dr
0.00 Reconstruct RCNSTRCT & WDN CON 375 EDF 125 CNTY 500 114936 05/22/12 NA 500 6/11/12 5/22/2012 375
2012 ST. JOSEPH MDOT US-131from Broadway Road to Coon Hollow Road
1.17 ReconstructReconstruct existing, no widening
PE 575 NH 128 M 703 116377 05/22/12 NA 8,500 6/11/12 09/07/12 703
Perform in house corrective actions at various wetland mitigation sites throughout the state. Corrective actions will include planting, minor regrading, invasive species control.
CON 1,056 ST 234 M 1,290 115826 05/22/12 NA FY 2014 to FY 2012 1,290 6/11/12 05/08/12 1,290
2013 BENZIE MDOT US-31 at Joyfield Road 0.10 Widen - minor Construct right turn lane ROW 10 CMG 10 116331 05/22/12 NA 150 6/11/12
Required Fields Optional Fields
Fiscal Year County
Respon-sible
Agency Project Name Limits LengthPrimary Work
Type Project Description PhaseAdvance
Construct
Federal Cost
($1000s)
Federal Fund
Source
State Cost
($1000s)
State Fund
Source
Local Cost
($1000s)
Local Fund
Source
Total Phase Cost
($1000s)MDOT
Job No.Local
ID No.
MPO/ Rural Action Date
Amend-ment Type
Air Quality Comments
Total Project
Cost ($1000s) x
Local Priority EJ
Federal Approva
l Date
Capped Federal
Cost ($1000s)
Date Obligate
d
Amount Obligated ($1000s) Let Date
FY 2011 - 2014 STIP Project Data06.07.13
E-File v. 2.0 (06.21.10)
2013 LAPEER MDOT M-53 at Hunters Creek Road 0.87 Traffic ops/safety
Add Center Left Turn Lane and widen Western/Weston Drain structure (B02) to the east to accomodate the turn lane
PE 32 CM 8 M 40 115814 05/22/12 NA 675 6/11/12 12/11/12 42
2013 KALKASKA MDOT US-131from 500 ft south to 1500 ft south of Wallace Rd
0.19 ResurfaceCold milling, HMA resurfacing
CON 40 ST 9 M 48 116657 05/22/12 NA 51 6/11/12 03/29/13 48
2013 ST. JOSEPH MDOT US-131from Broadway Road to Coon Hollow Road
1.17 ReconstructReconstruct existing, no widening
ROW 61 NH 14 M 75 116377 05/22/12 NA 8,500 6/11/12
2013 LAPEERLapeer County
Imlay City RdImlay City Road at Myers Road
0.03 Widen - minor
Add right-turn lanes to the north and east legs of the Imlay City/Myers Road intersection. Work shall include hot mix asphalt paving, curb and gutter installation, sidewalk ramps, and minor drainage work; and all together with necessary related work.
CON 76 CM 50 CNTY 126 116715 05/22/12 NA 126 6/11/12 03/06/13 90
CON AC 4,098 M 4,098 116383 05/22/12 NA 4,250 6/11/12 02/04/13 4,600
2013 LAPEER MDOT I-69 EBM-24 to Lapeer/St Clair COL
17.19Restore & rehabilitate
Conc Pavt Rprs, Diamond Grinding
CON AC 4,165 M 4,165 115855 05/22/12 NA 4,200 6/11/12 11/09/12 3,932
2013 IOSCO MDOT M65TURTLE RD TO 1200' NORTH OF SHERMAN STREET
5.97Restore & rehabilitate
CRUSH & SHAPE, RESURFACE,
CON AC 4,191 M 4,191 79433 05/22/12 NA 4,534 6/11/12 01/29/13 4,606
2013 ANTRIM MDOT M-88BELLAIRE TO CENTRAL LAKE
5.54Restore & rehabilitate
CRUSH & SHAPE, HMA RESURF
CON AC 4,511 M 4,511 75082 05/22/12 NA 4,835 6/11/12 03/19/13 4,047
2013 LAPEER MDOT M-24I-69 to Nepessing Street, Lapeer
2.06 Reconstruct HMA Reconstruct CON AC 11,218 M 11,218 48945 05/22/12 NA 12,383 6/11/12
2013 STATEWIDE MDOT
Rural Highway Rehab and Reconstruct Trunkline GPA
Regionwide GPA Rural Highway Rehab and Reconstruct Trunkline
CON 10,740 ST 2,381 M 13,121 05/22/12 NA 13,121 6/11/12
2013 MIDLAND MDOT US-10Midland/Isabella County Line Easterly to M-18
6.84Restore & rehabilitate
Rubblize and HMA Resurfacing
CON AC 20,925 M 20,925 106848 05/22/12 NA 21,275 6/11/12 10/26/12 19,445
2013 STATEWIDEBridge Local GPA
Regionwide GPA Bridge Local CON 17,959 BRO 13,767 M 1,670 OLF 33,396 05/22/12 NA 33,396 6/11/12
2013 STATEWIDE MDOTCPM Road Trunkline GPA
Regionwide GPA CPM Road Trunkline CON 34,742 ST 7,425 M 42,167 05/22/12 NA 42,167 6/11/12
2014 BENZIE MDOT M-115from Bridge Street east 4 miles
4.11Restore & rehabilitate
Crush and Shape, Resurface
ROW 8 ST 2 M 10 79645 05/22/12 NA 6,779 6/11/12
2014 WEXFORD MDOT US-131 at M-55 Interchange Roadside facility New Carpool Parking Lot CON 101 ST 22 M 123 107459 05/22/12 NA FY 2013 to FY 2014 132 6/11/12
2014 LAPEERLapeer County
Bowers RdBowers road at Roods Lake Road
0.04 Widen - minor
Add a passing flare for eastbound traffic at the Bowers/Roods Lake intersection. Work shall include hot mix asphalt paving, curb and gutter installation, and minor drainage work; and all together with necessary related work.
2014 STATEWIDE MDOT RegionwideVarious locations in Metro Region
2.00 Traffic ops/safetyITS System Modernizations
CON 682 ST 151 M 833 107612 05/22/12 NA 953 6/11/12
2014 BENZIE MDOT M-115from Bridge Street east 4 miles
4.11Restore & rehabilitate
Crush and Shape, Resurface
PE 703 ST 156 M 859 79645 05/22/12 NA 6,779 6/11/12
Required Fields Optional Fields
Fiscal Year County
Respon-sible
Agency Project Name Limits LengthPrimary Work
Type Project Description PhaseAdvance
Construct
Federal Cost
($1000s)
Federal Fund
Source
State Cost
($1000s)
State Fund
Source
Local Cost
($1000s)
Local Fund
Source
Total Phase Cost
($1000s)MDOT
Job No.Local
ID No.
MPO/ Rural Action Date
Amend-ment Type
Air Quality Comments
Total Project
Cost ($1000s) x
Local Priority EJ
Federal Approva
l Date
Capped Federal
Cost ($1000s)
Date Obligate
d
Amount Obligated ($1000s) Let Date
FY 2011 - 2014 STIP Project Data06.07.13
E-File v. 2.0 (06.21.10)
2014 CRAWFORD I-75at North Down River Road
Miscellaneous
Completion of the interchange at I-75 at North Down River Road from a partial interchange to a full interchange by adding two ramps to allow for southbound access and northbound exiting, replace the bridges on North Down River road over I-75 and over the East Branch AuSable River, and reconstruct and widen North Down River road from just east of I-75 westward to M-93.
PE 800 OFHWA 200 OLF 1,000 x 05/22/12 NA TIGER IV Grant 10,800 6/11/12
2014 STATEWIDE MDOT RegionwideVarious locations in Superior Region
Traffic ops/safetyDesign & Install approx. 8 ESS
CON 1,637 ST 363 M 2,000 107426 05/22/12 NA 2,215 6/11/12
2014 STATEWIDE MDOT Regionwide Southwest Region Miscellaneous I-94 CCTV and Detectors CON 2,047 ST 454 M 2,501 107965 05/22/12 NA 3,001 6/11/12
2014 HOUGHTON MDOT M-26M-26, Houghton County
3.13 ResurfaceMill & Two Course Overlay
CON AC 3,608 M 3,608 107008 05/22/12 NA 4,032 6/11/12
2014 ALLEGAN MDOT I-196 SBat the Saugatuck Rest Area #727
0.59 Roadside facilityBuilding Replacement/Site Work
CON AC 4,097 M 4,097 101615 05/22/12 NA 4,397 6/11/12
2014 CALHOUN MDOT I-94 BL29 Mile Road/Clark Street to I-94
1.96 ResurfaceMultilple course HMA Overlay
CON AC 4,102 M 4,102 86969 05/22/12 NA 4,452 6/11/12
2014 LEELANAU MDOT M-22 from M-201 to Omena 5.04Restore & rehabilitate
Crush and Shape CON AC 4,334 M 4,334 83588 05/22/12 NA 4,656 6/11/12
2014 GOGEBIC MDOT US-2Tourist Park Rd to Curry Street
1.11 Reconstruct Pavement reconstruction CON AC 4,653 M 4,653 110584 05/22/12 NA 5,529 6/11/12
2014 ROSCOMMON MDOT US-127 Muskegon River north 3.75Restore & rehabilitate
Cold milling; crush and shape
CON AC 6,382 M 6,382 106863 05/22/12 NA 6,884 6/11/12
2014 CRAWFORD I-75at North Down River Road
Miscellaneous
Completion of the interchange at I-75 at North Down River Road from a partial interchange to a full interchange by adding two ramps to allow for southbound access and northbound exiting, replace the bridges on North Down River road over I-75 and over the East Branch AuSable River, and reconstruct and widen North Down River road from just east of I-75 westward to M-93.
CON 7,840 OFHWA 1,960 OLF 9,800 x 05/22/12 NA TIGER IV Grant 10,800 6/11/12
2014 BAY MDOT I-75Pinconning Road to Bay/Arenac COL
3.27Restore & rehabilitate
Rubblize and HMA Overlay
CON AC 12,453 M 12,453 110397 05/22/12 NA 13,431 6/11/12
2014 MECOSTA MDOT US-131S Mecosta Co Line to 6 Mile Rd
6.06Restore & rehabilitate
Coldmill, C&S, HMA Resurface
CON AC 12,992 M 12,992 105524 05/22/12 NA 13,600 6/11/12
2014 GRATIOT MDOT US-127Washington Road to North of Polk Road
2.80 Resurface Two Course HMA Overlay CON 110485 05/22/12 NA 6/11/12
2012 STATEWIDE MDOT Statewide Statewide MiscellaneousPurchase Enterprise Ver. of the DARWin-ME Software
EPE 4 RP 28 M 32 117051 08/06/12 NA 32 8/23/12 08/24/12 32
Replace one (1) 2007 cutaway bus with one (1) new 2012 or newer gas engine cutaway bus. The old bus will exceed the FTA useful life criteria of 5 years or 150,000 miles.
EPE 57 CM 14 M 71 116926 08/06/12 NA 71 8/23/12 08/27/12 71
2012 DELTADelta County
North 9th Street
North 5th Street to North Lakeshore Drive
ResurfaceResurface roadway including shoulder work.
CON 69 EDF 17 CNTY 86 117052 08/06/12 NA 86 8/23/12 09/11/12 72
2012 CASSCass County
Eagle Point Road
at Carlton Dr, east then north to Colony Bay Dr
0.60New route/structure (capacity increase)
0.60 mi mulity-use pathway construction with hot mix asphalt paving, aggregate base and shoulders, clearing, and grading from Eagle Point Road to Colony Bay Drive.
CON 85 CM 21 CNTY 106 116925 08/06/12 NA 106 8/23/12
2012 LAPEER MDOT I-69at Lake Nepessing Road
Roadside facilityExpand, pave carpool lot and add lighting
CON 107 ST 27 M 134 103307 08/06/12 NA 60 8/23/12 07/09/12 133
Construction of 4800ft. of non-motorized pathway to provide a direct and shorter route to and from downtown Hudson and reduce heavy traffic congestion and emissions along M34 (Main Street) and Maple Grove Ave, which is the current vehicle route to the north section of town.�
CON 131 CM 51 CITY 182 117122 08/06/12 NA 182 8/23/12 08/23/12 179
2012 HURONHuron County
Various routesBad Axe Intermediate and Junior High School
Roadside facilityBike/ped safety improvements
CON 258 SRSI 258 112483 08/06/12 NA FY 2011 to FY 2012 258 8/23/12
2012 OCEANA MDOT US-31Fruitvale Road north to Winston Road
PE 313 NH 69 M 382 112158 08/06/12 NA FY 2013 to FY 2012 8,785 8/23/12 07/17/12 382
2012 MENOMINEE MDOT M-35NCL of Menominee North 6 miles
6.00Restore & rehabilitate
HMA Coldmilling and Resurface
PE 368 ST 82 M 450 110684 08/06/12 NA 5,206 8/23/12 08/31/12 450
2012 IOSCO MDOT US-23Tawas Beach Road to Aulerich Road
1.83 Reconstruct Total Reconstruction PE 464 NH 103 M 567 103019 08/06/12 NA FY 2013 to FY 2012 5,923 8/23/12 09/14/12 567
2012 BARRY MDOT M-43over Thornapple River in Hastings
0.17Restore & rehabilitate
Deep Overlay, Beam Repair
CON 743 BHT 743 100132 08/06/12 NATLCR - Toll Credit Amount is $290,731.
1,573 8/23/12 01/26/12 743
2012 EMMET MDOT M-68 over Crooked River 0.26 Bridge replacementDeck Repl w/shoulder widening
CON 868 BHT 868 90130 08/06/12 NATLCR - Toll Credit Amount is $318,081.
868 8/23/12 06/19/12 868
2012 ONTONAGONOntonagon County
Boundary Rd Summit Park - M107 Reconstruct RECONSTRUCT CON 974 STL 0 244 CNTY 1,218 78872 08/06/12 NA 1,218 8/23/12
2012 ONTONAGONOntonagon County
SOUTH BOUNDARY RD
Summit Park Rd - Gogebic County Line
5.00 ResurfaceMILLING AND RESURFACING
CON 1,000 STL 0 250 CNTY 1,250 78909 08/06/12 NA 1,250 8/23/12
2012 GOGEBIC MDOT US-2US-2 Marenisco to Gogebic Station
10.24 Resurface HMA Mill and Resurface CON 1,554 NH 1,554 113136 08/06/12 NATLCR - Toll Credit Amount is $396,396.
1,554 8/23/12 01/23/12 1,554
2012 BENZIE MDOT US-31from Beulah Bridge to M-115
0.61 ResurfaceCrack Relief Layer and Overlay
CON 1,621 NH 1,621 87355 08/06/12 NATLCR - Toll Credit Amount is $362,751.
2,229 8/23/12 01/26/12 1,621
2012 MDOTLeelanau County
Sleeping Bear Heritage Trail Segment 8 in Sleeping Bear Dunes National Lakeshore
starts at Port Oneida Road and ends at Leelanau County Road 669/Bohemian Road all within Cleveland Township
3.17 MiscellaneousConstruct an ADA compliant non-motorized path
CON 1,630 OFHWA 1,630 08/06/12 NA
This project is utilzing PLHD funds. The original grant is for $1,620,000. Another $10,000 is included for signage -the signage money and project will eventually be split into a separate JN.
1,630 8/23/12
2012 CHEBOYGAN MDOT I-75 NB & SBLevering to US-31 Ramp
9.03Restore & rehabilitate
Full depth concrete pavt repairs FY 2012
CON 2,598 NH 2,598 113596 08/06/12 NATLCR - Toll Credit Amount is $620,730.
3,420 8/23/12 12/23/11 2,598
2012 IONIA MDOT I-96EB and WB over abandoned CSX Railroad
0.03 Bridge replacement Bridge Replacement CON 2,674 IM 2,674 90210 08/06/12 NATLCR - Toll Credit Amount is $335,300.
3,553 8/23/12 03/01/12 2,674
2012 IOSCOIosco County
Monument Road
Monument and Wilber Roads
17.49 Reconstruct Reconstruct CON 2,760 FLH 2,760105167
& 117737
08/06/12 NA
JN 117737 was programmed to utilize left over money from JN 105167. The total dollar amounts and scope remains the same.
3,000 8/23/12 06/12/12 1,443
2012 ALPENA MDOT M-65over North Branch of Thunder Bay River
0.49 Bridge replacement Bridge Replacement CON AC 3,003 M 3,003 102987 08/06/12 NA FY 2013 to FY 2012 3,179 8/23/12 7/23/2012 3,068
2012 MARQUETTEMarquette County
Triple A RoadTriple A Road; M-95; County Road 601
Reconstruct Reconstruct CON 2,638 EDA 659 CNTY 3,297 117106 08/06/12 NA 3,297 8/23/12
2012 BARRY MDOT M-43M-37/M-43 (State Street) to North Street
1.33Restore & rehabilitate
Reconstruction & Resurfacing
CON 3,642 ST 3,642 83975 08/06/12 NATLCR - Toll Credit Amount is $838,742.
5,221 8/23/12 01/26/12 3,642
2012 LAPEER MDOT WB I-69WB I-69, M-24 to Lapeer/St Clair COL
17.16Restore & rehabilitate
Conc Pavt Rprs, Diamond Grind
CON 3,738 IM 3,738 108689 08/06/12 NATLCR - Toll Credit Amount is $450,000.
4,605 8/23/12 12/23/11 3,738
2012 MACKINAC MDOT US-2Borgstrum Road to Hiawatha Trail
8.69 Resurface HMA Overlay CON 3,882 NH 3,882 83545 08/06/12 NA TLCR - Toll Credit Amount is $882,992.
4,878 8/23/12 01/23/12 3,882
2012 LENAWEE MDOT M-52US-223 North to South of M-34
0.78 Reconstruct HMA Reconstruction CON AC 5,646 M 5,646 87522 08/06/12 NA 8,187 8/23/12 02/28/12 5,646
2012 MENOMINEE MDOT M-35US-41 north to 48th Ave.
0.95 Reconstruct Reconstruct Existing CON 2,979 NH 661 M 2,251 CITY 5,891 103311 08/06/12 NA 6,084 8/23/12 08/28/12 5,496
2012 MONTCALM MDOT US-131 NBN of Cannonsville Rd to S of M-46
5.45Restore & rehabilitate
Concrete Inlay CON 5,984 NH 5,984 90035 08/06/12 NATLCR - Toll Credit Amount is $ $1,274,674.
7,023 8/23/12 11/01/11 5,984
2012 MONTCALM MDOT US-131 SBNorth of Cannonsville Road to South of M-46
5.39Restore & rehabilitate
Concrete Inlay CON 7,775 NH 7,775 87108 08/06/12 NA
Moved from FY 2014. TLCR - Toll Credit Amount is $1,728,424.
10,267 8/23/12 11/01/11 7,775
Required Fields Optional Fields
Fiscal Year County
Respon-sible
Agency Project Name Limits LengthPrimary Work
Type Project Description PhaseAdvance
Construct
Federal Cost
($1000s)
Federal Fund
Source
State Cost
($1000s)
State Fund
Source
Local Cost
($1000s)
Local Fund
Source
Total Phase Cost
($1000s)MDOT
Job No.Local
ID No.
MPO/ Rural Action Date
Amend-ment Type
Air Quality Comments
Total Project
Cost ($1000s) x
Local Priority EJ
Federal Approva
l Date
Capped Federal
Cost ($1000s)
Date Obligate
d
Amount Obligated ($1000s) Let Date
FY 2011 - 2014 STIP Project Data06.07.13
E-File v. 2.0 (06.21.10)
2012 ALLEGAN MDOT M-89West of US-131 east to Florence St. in Plainwell
1.72 ReconstructReconstruct Existing, No widen
CON 8,494 ST 8,494 90028 08/06/12 NATLCR - Toll Credit Amount is $1,716,990.
10,415 8/23/12 01/24/12 8,494
2012 ROSCOMMON MDOT I-75from Ogemaw CL to Maple Valley Road
12.57Restore & rehabilitate
Crush & Shape, HMA resurface
CON AC 8,816 M 8,816 83288 08/06/12 NA Tagged as AC 10,521 8/23/12 02/23/12 8,816
2013 EMMET MDOT US-31 Townsend to US-131 3.37Restore & rehabilitate
Crush and Shaping ROW 16 NH 4 M 20 110605 08/06/12 NA FY 2012 to FY 2013 7,359 8/23/12
2013 SHIAWASSEE MDOT M-52M-21, Chestnut to M-52, M-52, M-21 to Ardelean
3.27 ResurfaceHMA cold mill and resurface
ROW 82 ST 18 M 100 87244 08/06/12 NA FY 2012 to FY 2013 7,623 8/23/12
2013 LENAWEE MDOT M-501700 ft East of Rogers Highway continuing easterly
0.36 Widen - minorWiden to connect center left turn lanes
CON 289 EDA 289 116617 08/06/12 NA 331 8/23/12 05/07/13 326
2013 MENOMINEEMenominee
30th AvenueFrom 13th St to 22nd St, Menominee
0.53 ReconstructReconstruction of street surface, curb and gutter
CON 235 HPSL 59 CITY 294 116813 08/06/12 NA 294 8/23/12
2013 IONIAIonia County
Riverside Drive/Cleveland St
Riverside Drive/Cleveland Street
Reconstruct Reconstruct CON 360 EDF 90 CNTY 450 117124 08/06/12 NA 450 8/23/12 05/23/13 397
2013 IRON
Michigan Department of Natural Resources
County Road 424
from Caspian to Pentoga Park, Iron County
7.85 Roadside facilityIron County Heritage Trail
CON 996 SBD 488 OLF 1,483 116742 08/06/12 NA SB-2011-MI-56524 1,483 8/23/12
2013 ISABELLA MDOT M-20 At Leaton Road 0.54 Traffic ops/safetyConstruct a Narrow Boulevard
CON 2,015 HSIP 2,015 110754 08/06/12 NATLCR - Toll Credit Amount is $201,483. FY 2012 to FY 2013
2,330 8/23/12
2013 SHIAWASSEE MDOT M-52M-21, Chestnut to M-52, M-52, M-21 to Ardelean
3.27 ResurfaceHMA cold mill and resurface
CON AC 6,800 M 6,800 87244 08/06/12 NA FY 2014 to FY 2013 7,623 8/23/12
2014 CLARE MDOT CountywideTittabawassee River Watershed
0.30 Miscellaneous Wetland Mitigation CON 465 ST 103 M 568 101328 08/06/12 NA FY 2013 to FY 2014 903 8/23/12
2012 LEELANAU
Pathways to Sleeping Bear Campaign
M-109Sleeping Bear Heritage Trail
Roadside facility
This project is for fabricating and installing wayfinding and interpretive signage along the first segment of the Sleeping Bear Heritage Trail
Major Rehabilitation PE 270 IM 30 M 300 116087 10/22/12 NA FY 2013 to FY 2012 12,683 11/15/12 09/12/12 250
2012 HOUGHTON MDOT US-41 US-41, Hancock 0.93 Reconstruct Reconstruct PE 368 ST 82 M 450 110594 10/22/12 NA FY 2013 to FY 2012 5,742 11/15/12 08/31/12 450
2012 ROSCOMMON MDOT US-127 M-55 to Muskegon River Bridge
10.75Restore & rehabilitate
Crush and shape and resurface and cold milling
PE 384 NH 85 M 469 113455 10/22/12 NA FY 2013 to FY 2012 10,794 11/15/12 08/08/12 469
2012 MECOSTA MDOT US-131 NB6 Mile Road north to 13 Mile Road
7.37Restore & rehabilitate
Coldmill, C&S, HMA Resurface
PE 632 NH 140 M 772 112464 10/22/12 NA FY 2013 to FY 2012 7,257 11/15/12 09/19/12 772
2012 STATEWIDERail Safety Local GPA
Regionwide GPA Rail Safety Local CON 1,451 STR 586 MRR 2,037 10/22/12 NA 1,716 11/15/12
2012 STATEWIDE MDOTRail Xings Trunkline GPA
Regionwide GPA Rail Xings Trunkline CON 1,976 ST 741 M 2,717 10/22/12 NA 1,850 11/15/12
2012 STATEWIDEEnhancements Local GPA
Regionwide GPA Enhancements Local CON 1,648 STE 1,318 OLF 2,965 10/22/12 NA 3,211 11/15/12
2012 STATEWIDE MDOTEnhancements Trunkline GPA
Regionwide GPA Enhancements Trunkline CON 2,559 STE 615 M 65 OLF 3,238 10/22/12 NA 1,889 11/15/12
2012 STATEWIDE MDOT
Program Development Scoping Trunkline GPA
Regionwide GPA Program Development Scoping Trunkline
EPE 1,330 ST 3,517 M 49 OLF 4,896 10/22/12 NA 580 11/15/12
2012 STATEWIDE MDOTCPM CSM Bridge Trunkline GPA
Regionwide GPA CPM CSM Bridge Trunkline
CON 5,125 ST 998 M 6,123 10/22/12 NA 4,583 11/15/12
2012 STATEWIDEHighway Safety Local GPA
Regionwide GPA Highway Safety Local CON 6,896 ST 3 M 1,811 OLF 8,709 10/22/12 NA 4,687 11/15/12
2012 STATEWIDE MDOT
Rural Bridge Replacement and Rehabilitate Trunkline GPA
Regionwide GPA Rural Bridge Replacement and Rehabilitate Trunkline
CON 10,052 ST 2,104 M 12,156 10/22/12 NA 12,003 11/15/12
2012 STATEWIDEBridge Local GPA
Regionwide GPA Bridge Local CON 6,081 BRO 7,954 M 780 OLF 14,816 10/22/12 NA 22,105 11/15/12
2012 STATEWIDE MDOT
Rural Highway Rehab and Reconstruct Trunkline GPA
Regionwide GPA Rural Highway Rehab and Reconstruct Trunkline
CON 13,455 ST 2,440 M 1,293 OLF 17,188 10/22/12 NA 13,016 11/15/12
2012 STATEWIDE MDOTPre-Construction Phases GPA
Regionwide GPA Pre-Construction Phases Trunkline
15,828 ST 2,903 M 749 OLF 19,480 10/22/12 NA 9,335 11/15/12
2012 STATEWIDE MDOTHighway Safety Trunkline GPA
Regionwide GPA Highway Safety Trunkline CON 27,996 ST 204 M 44 OLF 28,244 10/22/12 NA 22,585 11/15/12
2012 STATEWIDE MDOTCPM Road Trunkline GPA
Regionwide GPA CPM Road Trunkline CON 33,242 ST 7,143 M 251 OLF 40,636 10/22/12 NA 33,884 11/15/12
2012 STATEWIDE MDOT Metro RegionOakland and Macomb Counties
27.82 Traffic ops/safety Freeway Signing Upgrade PE 116825 10/22/12 NA 11/15/12
2012 CALHOUN Albion AreawideCity of Albion and surrounding area
Transit vehicle additions/replacements
Transit vehicle replacement
CON 115745 10/22/12 NA 11/15/12
2012 CALHOUN MDOT I-94 BL at I-69, Marshall Roadside facilityExpansion and HMA Overlay
CON 113658 10/22/12 NA 11/15/12
2013 EMMET MDOT US-31 US-31 in Petoskey 0.63 Traffic ops/safetyGeometric modifications and access management
ROW 4 HPP 1 M 5 113442 10/22/12 NA FY 2012 to FY 2013 394 11/15/12
2013 IOSCO MDOT US-23Auelrich Road to Kirkland Drive
3.83Restore & rehabilitate
HMA Crack Relief Layer ROW 10 M 10 112946 10/22/12 NA FY 2012 to FY 2013 5,517 11/15/12
2013 MENOMINEE MDOT M-35Jimtown road South 9.42 miles
9.42 ResurfaceColdmilling and Resurfacing
ROW 12 ST 3 M 15 110682 10/22/12 NA 6,216 11/15/12 03/19/13 15
2013GRAND TRAVERSE
MDOT M-113N. of M-186 south to US-131
5.09Restore & rehabilitate
Crush and Shape ROW 25 ST 5 M 30 103027 10/22/12 NA FY 2012 to FY 2013 4,085 11/15/12
2013 CASS Dowagiac Hill StreetSoutheast section of City of Dowagiac
Roadside facility
Southeast section of city, connecting downtawn area to cemetery & walking/biking trails in nature preserve.
CON 39 CM 10 CITY 49 118078 10/22/12 NA 49 11/15/12
2013 MENOMINEEMenominee
US-41From 38th Avenue to 48th Avenue, City of Menominee
0.76 Roadside facility Relighting CON 54 DOG 54 118045 10/22/12 NA
Reallocation of FY03-06 unobligated balances effort of Fall 2013
54 11/15/12 12/04/12 55
2013 CASS DowagiacCity of Dowagiac
Dowagiac Dial-a-ride service area
Transit vehicle additions/replacements
Purchase new medium duty public transportation bus to replace 2008 cutaway model.
EPE 48 CM 12 M 60 118086 10/22/12 NA 60 11/15/12
2013 CASS DowagiacMiddle Crossing Road
Northwest section of city leading to Russom Park.
Roadside facility
Install and construct non-motorized pathway to alleviate air omissions including sidewalks and crosswalk.
CON 57 CM 14 CITY 71 118074 10/22/12 NA 71 11/15/12
2013 ALGERAlger County
M-28Willam G. Mather Elem. & Munising Mid./High School
Roadside facilityBike/ped safety improvements
CON 104 SRSI 104 117744 10/22/12 NA 104 11/15/12 04/12/13 102
2013 BERRIENBerrien Springs
Sylvester Avenue
Sylvester Elem. School & Berrien Springs Mid. Sch.
Roadside facilityBike/ped safety improvements
CON 132 SRSI 132 116835 10/22/12 NA 132 11/15/12 05/08/13 141
Required Fields Optional Fields
Fiscal Year County
Respon-sible
Agency Project Name Limits LengthPrimary Work
Type Project Description PhaseAdvance
Construct
Federal Cost
($1000s)
Federal Fund
Source
State Cost
($1000s)
State Fund
Source
Local Cost
($1000s)
Local Fund
Source
Total Phase Cost
($1000s)MDOT
Job No.Local
ID No.
MPO/ Rural Action Date
Amend-ment Type
Air Quality Comments
Total Project
Cost ($1000s) x
Local Priority EJ
Federal Approva
l Date
Capped Federal
Cost ($1000s)
Date Obligate
d
Amount Obligated ($1000s) Let Date
FY 2011 - 2014 STIP Project Data06.07.13
E-File v. 2.0 (06.21.10)
2013 LENAWEE Adrian Citywide CitywideTransit vehicle additions/replacements
Replace medium-duty deisel engine bus.
CON 106 CM 27 OLF 133 118025 10/22/12 NA 133 11/15/12
2013 BERRIENBerrien County
Countywide CountywideTransit operations equipment
Bus purchase - replace 1 2006 medium duty, diesel engine bus with 1 2013 or newer medium duty bus. the old bus will exceed the FTA useful life criteria of 7 years or 200,000 miles.
EPE 108 CM 27 M 135 118093 10/22/12 NA 135 11/15/12
2013 HOUGHTON MDOT M-26M-26, Houghton County
3.13 ResurfaceMill & Two Course Overlay
ROW 123 ST 27 M 150 107008 10/22/12 NA FY 2012 to FY 2013 4,032 11/15/12
2013 BENZIE Frankfort M-22Frankfort Elem. School, City of Frankfort
Roadside facilityBike/ped safety improvements
CON 194 SRSI 194 116849 10/22/12 NA 194 11/15/12
2013 ST. JOSEPH Centreville Clark StreetCentreville Elem. & Junior/Senior High School
Roadside facilityBike/ped safety improvements
CON 408 SRSI 408 117743 10/22/12 NA 408 11/15/12 04/04/13 412
2013 LUCE Newberry M-123Victory Way to Railroad Street, City of Newberry
Miscellaneous Streetscaping. MI098 CON 497 DOG 497 117891 10/22/12 NA
Reallocation of FY03-06 unobligated balances effort of Fall 2013
CountywideMunicipal transit bus area for countywide
Transit vehicle additions/replacements
2013 - Replacement of 2004 diesel bus with 2013 cleaner emission modal
EPE 45 CM 11 M 56 118124 12/06/12 NA 56 12/21/12
2013 HOUGHTON MDOT US-41US-41 over Portage Lake
Bridge - otherCPM, mechanical, electrical work
PE 48 ST 11 M 59 118271 12/06/12 NA 6,250 12/21/12 02/27/13 59
2013 BERRIENBerrien County
Countywide Berrien Countywide Transit
Replace one (1) 2006 medium duty, diesel engine bus with one (1) 2013 or newer cutaway bus. The old bus will exceed the FTA useful life criteria of 7 years or 200,000 miles.�
EPE 51 CM 13 M 64 118591 12/06/12 NA 64 12/21/12
2013 BENZIEBenzie County
Countywide Benzie - Countywide Transit
Bus purchase - purchase one less than 30' replacement bus (replace bus #15). Bus #15 is a 5-year old bus, delivered in 2008 and currently has 162,779 miles.It is eligible to be replaced in 2013 based on years and it is estimated it will also be eligible based on miles.
EPE 58 CM 14 M 72 118587 12/06/12 NA 72 12/21/12
2013 CASSCass County
Countywide CountywideTransit operations equipment
Van purchase - replace 2 2008 minivans with 2 2012 or newer minivans. The old minivans will exceed the FTA useful life criteria of 4 years or 100,000 miles
EPE 59 CM 15 M 74 118097 12/06/12 NA 74 12/21/12
2013 STATEWIDE
Michigan Technological University
Statewide At LTAP Center at MTU Miscellaneous 2013 MERL program EPE 72 STT 18 M 90 118301 12/06/12 NA 90 12/21/12 01/07/13 90
2013 STATEWIDE MDOT Statewide
At Michigan Technological University and Ferris State University
MiscellaneousFY 2013 NSTI - National Summer Transportation Institute
EPE 90 SST 90 12/06/12 NA 90 12/21/12
2013 LAPEERLapeer County
Countywide Lapeer Countywide Transit
Replacement of one medium duty bus (yr 2004) with a (yr 2013) medium duty bus.�
EPE 100 CM 25 M 125 118596 12/06/12 NA 125 12/21/12
2013 MASONMason County
Countywide Mason Countywide Transit
Purchase one less than 30? medium duty replacement bus (replace bus #8) Bus #8 is a 7 year bus and was delivered in FY2006 making it eligible in 2013. It currently has 177,900 miles.�
EPE 102 CM 26 M 128 118607 12/06/12 NA 128 12/21/12
2013 MECOSTA MDOT US-131NB and SB over 3 Mile Road
0.17 Bridge replacementSuperstructure Replacement
SUB 131 NH 29 M 160 118289 12/06/12 NA 4,397 12/21/12 01/14/13 160
2013 STATEWIDESmall Urban Program
Small Urban Program
Statewide MiscellaneousSmall Urban Program - Transit Projects
CON 153 ST 38 M 191 12/06/12 NA 191 12/21/12
2013 MECOSTA MDOT US-131NB and SB over 3 Mile Road
0.17 Bridge replacementSuperstructure Replacement
PE 157 NH 35 M 192 118289 12/06/12 NA 4,397 12/21/12 01/14/13 192
2013 LENAWEELenawee County
Citywide Adrian - Citywide Transit
Replace three (3) gas-powered cut-away buses (## 23,27,29) with lifts with three (3) new cut-away buses with lifts. The old vehicles currently meet the FTA useful life criteria of 5 years.�
EPE 158 CM 40 M 198 118601 12/06/12 NA 198 12/21/12
Required Fields Optional Fields
Fiscal Year County
Respon-sible
Agency Project Name Limits LengthPrimary Work
Type Project Description PhaseAdvance
Construct
Federal Cost
($1000s)
Federal Fund
Source
State Cost
($1000s)
State Fund
Source
Local Cost
($1000s)
Local Fund
Source
Total Phase Cost
($1000s)MDOT
Job No.Local
ID No.
MPO/ Rural Action Date
Amend-ment Type
Air Quality Comments
Total Project
Cost ($1000s) x
Local Priority EJ
Federal Approva
l Date
Capped Federal
Cost ($1000s)
Date Obligate
d
Amount Obligated ($1000s) Let Date
FY 2011 - 2014 STIP Project Data06.07.13
E-File v. 2.0 (06.21.10)
2013 STATEWIDE MDOT Statewide Statewide Transit operationsEnvironmental work related to accelerated rail
CON 164 CTF 38 OLF 202 118132 12/06/12 NA 202 12/21/12
2013 HOUGHTON MDOT US-41US-41 over Portage Lake
Bridge - otherCPM, mechanical, electrical work
SUB 542 ST 120 M 662 118271 12/06/12 NA 6,250 12/21/12 02/27/13 662
2013 STATEWIDERail Safety Local GPA
Regionwide GPA Rail Safety Local CON 924 STR 196 M 1,120 12/06/12 NA 1,120 12/21/12
2013 OTSEGOOtsego County
Milbocker Road400' E of S Townline Road to 400' W of Dickerson R
1.77 Reconstruct Reconstruct CON 410 EDFF 375 M 420 CNTY 1,205 117318 12/06/12 NA FY 2012 to FY 2013 1,205 12/21/12
2013 OTSEGO GaylordMilbocker/McCoy Road
From South Townline Road to M-32
Miscellaneous Road rehabilitation CON 921 HPSL 515 CITY 1,436 117356 12/06/12 NASAFETEALU Earmark MI250, HPP 4338
1,573 12/21/12
2013 BAY MDOT M-13 over Johnson Creek Bridge replacement Bridge Replacement CON 1,896 BHT 1,896 84909 12/06/12 NAFY 2014 to FY 2013. TLCR - Toll Credit Amount is $379,143.
1,896 12/21/12
2013 STATEWIDERural Task Forces
Rural Task Force
Statewide MiscellaneousRural Task Force Program - Transit Projects
CON 2,000 ST 500 M 2,500 12/06/12 NA 2,500 12/21/12
2013 VAN BUREN MDOT I-1964 bridges on I-196/US-31, south of South Haven
1.31Restore & rehabilitate
Concrete ovly, Bm & Substr repair
CON AC 3,698 M 3,698 113251 12/06/12 NA FY 2014 to FY 2013 4,053 12/21/12
2013 STATEWIDE MDOTCPM CSM Bridge Trunkline GPA
Regionwide GPA CPM CSM Bridge Trunkline
CON 5,699 ST 1,098 M 6,797 12/06/12 NA 6,797 12/21/12
2013 STATEWIDEHighway Safety Local GPA
Regionwide GPA Highway Safety Local CON 8,222 ST 68 M 2,118 OLF 10,407 12/06/12 NA 10,407 12/21/12
2013 STATEWIDESmall Urban Program
Small Urban Program
Statewide MiscellaneousSmall Urban Program - Road Projects
CON 7,507 ST 3,420 OLF 10,927 12/06/12 NA 10,927 12/21/12
2013 STATEWIDERural Task Forces
Rural Task Force
Statewide MiscellaneousRural Task Force Program - Road Projects
CON 31,651 ST 7,996 M 7,531 OLF 47,178 12/06/12 NA 47,178 12/21/12
2013 LAPEER MDOT M-53 at Hunters Creek Road 0.87 Traffic ops/safety
Add Center Left Turn Lane and widen Western/Weston Drain structure (B02) to the east to accomodate the turn lane
SUB 115814 12/06/12 NA 12/21/12
2014 BENZIEBenzie County
Countywide Benzie Countywide Transit
Purchase one less than 30' replacement bus (replace bus #14). Bus #14 is a 7-year bus, it was delivered in FY2008. It currently has 143,556. It will be eligible for replacement in FY2014 based on estimated miles.�
EPE 60 CM 15 M 75 118589 12/06/12 NA 75 12/21/12
2014 STATEWIDE MDOT Statewide
At Michigan Technological University and Ferris State University
MiscellaneousFY 2014 NSTI - National Summer Transportation Institute
EPE 90 SST 90 x 12/06/12 NA 90 12/21/12
2014 BERRIENBerrien County
Countywide CountywideTransit operations equipment
Bus purchase -replace 1 2007 medium duty, diesel engine bus with 1 2014 or newer extended cutaway bus. The old bus will exceed the FTA useful life criteria of 7 years or 200,000 miles
EPE 75 CM 19 M 94 118094 12/06/12 NA 94 12/21/12
2014 LAPEERLapeer County
Countywide Lapeer Countywide Transit
Replacement of one medium duty bus (yr 2004) with a (yr 2014) medium duty bus.�
EPE 100 CM 25 M 125 118597 12/06/12 NA 125 12/21/12
2014 CASSCass County
Countywide CountywideTransit operations equipment
Bus purchase - replace 1 2006 medium duty bus with 1 2013 or newer medium duty bus. The old bus will exceed the FTA replacement criteria of 7 years or 200,000 miles
EPE 100 CM 25 M 125 118099 12/06/12 NA 125 12/21/12
2014 VAN BURENVan Buren County
CountywideBangor municipal bus service area - countywide
Transit vehicle additions/replacements
2014 - Replacement of 2004 diesel bus with 2014 cleaner emission modal
EPE 101 CM 25 M 126 118125 12/06/12 NA 126 12/21/12
Required Fields Optional Fields
Fiscal Year County
Respon-sible
Agency Project Name Limits LengthPrimary Work
Type Project Description PhaseAdvance
Construct
Federal Cost
($1000s)
Federal Fund
Source
State Cost
($1000s)
State Fund
Source
Local Cost
($1000s)
Local Fund
Source
Total Phase Cost
($1000s)MDOT
Job No.Local
ID No.
MPO/ Rural Action Date
Amend-ment Type
Air Quality Comments
Total Project
Cost ($1000s) x
Local Priority EJ
Federal Approva
l Date
Capped Federal
Cost ($1000s)
Date Obligate
d
Amount Obligated ($1000s) Let Date
FY 2011 - 2014 STIP Project Data06.07.13
E-File v. 2.0 (06.21.10)
2014 LENAWEELenawee County
Citywide Adrian Citywide Transit
Replace one (1) medium-duty diesel engine bus (#21) with lift with one (1) new medium-duty diesel engine bus with lift. The old vehicle currently meets the FTA useful life criteria of 7 years.�
EPE 106 CM 27 M 133 118602 12/06/12 NA 133 12/21/12
2014 MASONMason County
AreawideMason County areawide
Transit
Purchase one less than 30? medium duty replacement bus (replace bus #7) Bus #7 is a 7 year bus and was delivered in FY2006 making it eligible in 2013. It currently has 177,900 miles.�
EPE 106 CM 27 M 133 118608 12/06/12 NA 133 12/21/12
2014 BERRIEN MDOT I-94 WB Watervliet Rest Area 0.39 Roadside facilityExpand truck parking area
CON 1,402 OFHWA 351 M 1,753 117756 12/06/12 NA
TPFD - Truck Parking Facilities Discretionary - actual fund source
2,000 12/21/12
2014 MECOSTA MDOT US-131NB and SB over 3 Mile Road
0.17 Bridge replacementSuperstructure Replacement
CON AC 4,045 M 4,045 118289 12/06/12 NA 4,397 12/21/12
2014 BRANCH MDOT I-69 NBat Coldwater Weigh Station
0.68 Roadside facility Scale and Signage CON 113769 12/06/12 NA 12/21/12
2014 OSCODA MDOT M-33Clinton Twp T28N, R3E, Sec. 22
Wetland mitigation Wetland Construction CON 76612 12/06/12 NA 12/21/12
2013 LAPEER MDOT M-24I-69 to Nepessing Street, Lapeer
2.06 Reconstruct HMA Reconstruct UTL 2 ST 1 M 3 48945 02/01/13 NA 12,383 2/7/13
2013 STATEWIDE MDOT Statewide Statewide Miscellaneous2013 Road Construction Workforce Development (RCWD) - Yes! Expo
2013 On the Job Training (OJT) Student Summer Engineering Internship Prg
CON 60 SST 60 118932 02/01/13 NA 60 2/7/13
2013 STATEWIDE MDOT Statewide Statewide Miscellaneous2013 On The Job Training (OJT)/Technical Assistance
CON 76 SST 76 118929 02/01/13 NA 76 2/7/13
2013 LENAWEE Hudson Main Streetfrom N. Maple Grove Ave. to Meadowbrook Dr.,
0.66 Roadside facility
0.66 mi of hot mix asphalt shared?use path on Sunrise Meadows Trail from Murdock�Trail at N. Maple Grove Ave. east to Meadowbrook Dr. in Sunrise Meadows�subdivision adjacent to Munson Highway
CON 107 CM 27 CITY 134 118742 02/01/13 NA 134 2/7/13 04/11/13 123
2013 BAY MDOT US-10US-10 under Nine Mile Road, Bay County
0.61 Bridge replacement Bridge Replacement PE 122 ST 27 M 149 118329 02/01/13 NA 4,247 2/7/13 01/08/13 149
Verona Roadat Huron City Road intersection� 0.55 Traffic ops/safety
Construct right turn lane on NB Verona Road, Close/Abandon southern portion of Huron City Rd, Re-route Huron City Rd to intersect Verona Rd north of current intersection at 90 degree angle. ** ADDITIONAL INFORMATION: There is an existing agriculture business at the existing skewed intersection. This will help traffic, including agriculture trucks, move more smoothly through the intersection and reduce back-ups at the intersection, also allowing vehicles to turn NB more efficiently.�
CON 240 CM 60 CNTY 300 118745 02/01/13 NA 300 2/7/13
2013 LAPEER MDOT M-24I-69 to Nepessing Street, Lapeer
2.06 Reconstruct HMA Reconstruct ROW 246 ST 54 M 300 48945 02/01/13 NA 12,383 2/7/13 01/02/13 300
2013 BAY MDOT US-10US-10 under Nine Mile Road, Bay County
0.61 Bridge replacement Bridge Replacement SUB 319 ST 71 M 390 118329 02/01/13 NA 4,247 2/7/13 01/08/13 390
2013 STATEWIDE MDOT RegionwideVarious locations in Grand Region
Miscellaneous
FY 2013 ITS device maintenance and operations in multiple counties in Grand Region.
EPE 116275 02/01/13 NA 633 2/7/13
2013 STATEWIDE MDOT RegionwideVarious locations in the Grand Region
Miscellaneous
FY 2013 Control Room Operations contract for the West Michigan Transportation Operations Center.
EPE 116272 02/01/13 NA 500 2/7/13
2014 BENZIE Frankfort CitywideCity of Frankfort�
1.00 Miscellaneous
replacement of one Light Duty (under 13,000 lbs g.v.w.) Truck with a newer vehicle with cleaner emissions and enhanced fuel efficiency�
EPE 24 CM 6 CITY 30 118754 02/01/13 NA 30 2/7/13
2014 BENZIE Honor CountywideBenzie County�
1.00 Miscellaneous
Replacement of one Heavy Duty (#330, over 13,000 bs g.v.w.) with a newer vehicle with cleaner emissions.�
EPE 35 CM 14 CITY 49 118752 02/01/13 NA 49 2/7/13
Required Fields Optional Fields
Fiscal Year County
Respon-sible
Agency Project Name Limits LengthPrimary Work
Type Project Description PhaseAdvance
Construct
Federal Cost
($1000s)
Federal Fund
Source
State Cost
($1000s)
State Fund
Source
Local Cost
($1000s)
Local Fund
Source
Total Phase Cost
($1000s)MDOT
Job No.Local
ID No.
MPO/ Rural Action Date
Amend-ment Type
Air Quality Comments
Total Project
Cost ($1000s) x
Local Priority EJ
Federal Approva
l Date
Capped Federal
Cost ($1000s)
Date Obligate
d
Amount Obligated ($1000s) Let Date
FY 2011 - 2014 STIP Project Data06.07.13
E-File v. 2.0 (06.21.10)
2014 BAY MDOT US-10US-10 over Hoppler Creek
0.25 Bridge - other Block Floor CON 74 ST 16 M 90 113228 02/01/13 NA 115 2/7/13
2014 CRAWFORD MDOT M-72Kalkaska County line to M-93 intersection
6.05Restore & rehabilitate
Crush and shape and resurface�FY 2017
PE 688 NH 153 M 840 116416 02/01/13 NA 5,818 2/7/13
2014 STATEWIDE MDOT AreawideRegional - SMART and LETC Service Areas
Miscellaneous
Replace old, age- and mileage- eligible diesel (4) and biodiesel (7) buses in the fleets of SMART and LETC with new, cleaner-burning diesel (3), biodiesel (7), and hybrid diesel-electric buses (1). Approved 2014 CMAQ project.
EPE 2,737 CM 684 M 3,421 118841 02/01/13 NA 3,421 2/7/13
2013 Road Construction Apprenticeship Readiness (RCAR) - Road Construction Workforce Development (RCWD) Program
EPE 150 ST 150118898 and JN 119508
02/01/13 NA
JN 119508 - Administrative Modification - 03.07.13. JN 119508 is for the Y Achievers program. This program is $20,000 and is related to the RCWD program.
150 3/7/13 03/08/13 140
2013 BARRY MDOT M-66
M66: Pearl St - Brumm Rd,�M79: M66-WVL Nashville
1.48Restore & rehabilitate
reconstruction & rehabilitation
SUB 1 ST 0 M 1 118771 04/23/13 NA 5,000 4/30/13
2013 TUSCOLA MDOT M-15 over Cass River 0.10 Bridge replacement Bridge Replacement ROW 28 BHT 7 M 35 102456 04/23/13 NA 4,247 4/30/13
2013 OTTAWAOttawa County
CountywideHarbor Transit - Countywide
Miscellaneous
Facility improvements - development of new transit liquid petroleum filling station
EPE 30 CM 8 M 38 119945 04/23/13 NA 38 4/30/13
2013 BENZIE MDOT US-31 at Joyfield Road 0.10 Widen - minor Construct right turn lane PE 31 CMG 7 M 38 116331 04/23/13 NA 38 4/30/13
2013 LAPEER Lapeer VariousVarious intersections in Lapeer County
Traffic ops/safety
Traffic signal upgrades at the specified intersections to modernize and interconnect the Saginaw Street corridor along with ADA ramp upgrades.
PE 39 CMG 39 116717 04/23/13 NA 420 4/30/13
2013 HURONHuron County
CountywideTransit routes in Huron County
Miscellaneous
Bus purchase - purchase one (1) medium duty bus to expand transit service in Huron County
EPE 112 CM 22 M 134 119845 04/23/13 NA 134 4/30/13
Traffic ops/safetyNew exit loop ramp from I-196 NB to I-196 BL WB
CON 434 CM 96 M 530 118927 04/23/13 NA 665 4/30/13
2014 STATEWIDE MDOT Statewide Statewide MiscellaneousFY 2015 Bureau of Highway's Training Program
EPE 1,250 ST 1,250 119773 04/23/13 NA 1,250 4/30/13
2014 STATEWIDERural Task Forces
Rural Task Force
Statewide MiscellaneousRural Task Force Program - Transit Projects
CON 2,000 ST 500 M 2,500 04/23/13 NA 2,500 4/30/13
2014 STATEWIDE MDOT Statewide Statewide Miscellaneous2014 YDMP (RCWD) program
EPE 3,500 ST 3,500 119666 04/23/13 NA 3,500 4/30/13
2014 BARRY MDOT M-66
M66: Pearl St - Brumm Rd,�M79: M66-WVL Nashville
1.48Restore & rehabilitate
reconstruction & rehabilitation
CON 3,643 ST 808 M 4,451 118771 04/23/13 NA 5,000 4/30/13
2014 HOUGHTON MDOT US-41US-41 over Portage Lake
Bridge - otherCPM, mechanical, electrical work
CON 118271 04/23/13 NA 4/30/13
2014 BERRIEN MDOT I-196 M-63 over I-196 0.30 Bridge replacement Bridge Replacement PE 115754 04/23/13 NA 4/30/132014 BERRIEN MDOT I-196 M-63 over I-196 0.30 Bridge replacement Bridge Replacement SUB 115754 04/23/13 NA 4/30/13
2014 LUCE MDOT M-28Adjacent to Luce Co Airport
0.20New route/structure (capacity increase)
Construct New PITWS CON 110632 04/23/13 NA 4/30/13
2014 VAN BUREN MDOT M-40M-40 at M-43, Glendale/Gobles facility
Roadside facility Resurface carpool lots CON 103294 04/23/13 NA 4/30/13
2013 BENZIE MDOT M-22 over Platte River 0.07 Bridge replacement Bridge Replacement CON 1,627 ST 361 M 1,988 106168 05/09/13 NASTP Programmatic Match Project
2,163 5/9/13
Required Fields Optional Fields
Fiscal Year County
Respon-sible
Agency Project Name Limits LengthPrimary Work
Type Project Description PhaseAdvance
Construct
Federal Cost
($1000s)
Federal Fund
Source
State Cost
($1000s)
State Fund
Source
Local Cost
($1000s)
Local Fund
Source
Total Phase Cost
($1000s)MDOT
Job No.Local
ID No.
MPO/ Rural Action Date
Amend-ment Type
Air Quality Comments
Total Project
Cost ($1000s) x
Local Priority EJ
Federal Approva
l Date
Capped Federal
Cost ($1000s)
Date Obligate
d
Amount Obligated ($1000s) Let Date
FY 2011 - 2014 STIP Project Data06.07.13
E-File v. 2.0 (06.21.10)
2012 ANTRIM MDOT US-131
from the north junction of M-32 to north of Thumb Lake Road
7.65 Reconstruct Crack Relief Layer PE 82 NH 18 M 100 109982 05/13/13 NA
Project obligated in FY 2012. Significant scope changes. Cost increases listed under same JN in FY 2013.
6,000 5/17/13 12/02/11 100
2013 VAN BURENVan Buren County
CountywideVan Buren County - countywide
Miscellaneous Rideshare EPE 12 CMG 12 120081 05/13/13 NACorrected JN and County information.
12 5/17/13
2013 LENAWEELenawee County
Countywide Countywide Miscellaneous
Bus purchase - replace (1) 2008 gas-powered mini-van with (1) new gas-powered accessible mini-van. The old vehicle currently meets the FTA useful life criteria of 4 years.
EPE 32 CM 8 M 40 120209 05/09/13 NA 40 5/17/13
2013 CALHOUN MDOT M-60from Van Wert Road west to Brembo driveway
0.14Restore & rehabilitate
Trench and replace shoulders
CON 48 ST 11 M 58 120069 05/09/13 NA 64 5/17/13
2013 HURON MDOT M-142 at Riskey Rd 0.16 Traffic ops/safetyAdd WB right turn lane and EB passing flair