Top Banner
US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of the Coast FY-13 Scheduled Contracts FY-14 Planned Contracts Christopher Frabotta Deputy Chief, Operations Division / Chief, Navigation Branch Southwestern Division - Galveston District October 24, 2012
98

FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

Apr 29, 2021

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

US Army Corps of Engineers BUILDING STRONG®

Galveston District – 2012 Dredging Conference

Custodians of the Coast

FY-13 Scheduled Contracts FY-14 Planned Contracts

Christopher Frabotta Deputy Chief, Operations Division / Chief, Navigation Branch Southwestern Division - Galveston District October 24, 2012

Page 2: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

SWG - Galveston District

OPERATIONS MANAGERS Paula Wise Alicia Rea Tricia Campbell Eddie Irigoyen Eric Russek

Page 3: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

US Army Corps of Engineers BUILDING STRONG®

Galveston District – 2012 Dredging Conference

Custodians of the Coast

Corpus Christi Ship Channel Sabine-Neches Waterway Texas City Channel

Paula Rankin Wise

Operations Manager

Navigation Branch

24 October 2012

Page 4: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Paula Wise Operations Manager

Corpus Christi Ship Channel Sabine-Neches Waterway Texas City Channel Cedar Bayou Trinity River & Tributaries Double Bayou Clear Creek & Clear Lake Dickinson Bayou

Page 5: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

FY 2013 Contracts Corpus Christi Ship Channel

Page 6: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Project: Corpus Christi Ship Channel PA 1 Levee Raising / DAMP

Type of Work: Improvements / DAMP

Dredging Width: NA

Dredging Length: NA

Dredging Quantity: NA

Material Type: NA

Placement Area: PA 1

Distance to Placement Area: NA

Type of Equipment: Bull dozers; Excavators

Env. Window: NA

Reason for Window: NA

Est. Start Date: Sept 9, 2013

Est. Completion Date: Jan 9, 2014

Corpus Christi Ship Channel

Ingleside Nueces

Bay

Corpus Christi

Port Aransas

Aransas Pass

BC

N 8

2 2

1

PA 1

Page 7: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Project: Corpus Christi Ship Channel PA 10 /13 Rock Stabilization

Type of Work: Improvements

Dredging Width: NA

Dredging Length: NA

Dredging Quantity: NA

Material Type: NA

Placement Area: PA 10; PA 13

Distance to Placement Area: NA

Type of Equipment: Bull dozers; Excavators

Env. Window: NA

Reason for Window: NA

Est. Start Date: TBD

Est. Completion Date: TBD

Corpus Christi Ship Channel

Ingleside Nueces

Bay

Corpus Christi

Port Aransas

Aransas Pass

BC

N 8

2 2

1

PA 10

PA 13

Page 8: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

FY 2014 Contracts Corpus Christi Ship Channel

Page 9: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Corpus Christi Ship Channel

Ingleside Nueces

Bay

Corpus Christi

Port Aransas

Aransas Pass

BC

N 8

2 2

1

Project: Corpus Christi Ship Channel Entrance / Jetty Channel

Dredging Depth: 49 - 47 ft. Required Depth

Dredging Width: 700 - 600 ft.

Dredging Length: Varies

Dredging Quantity: 900,000 cubic yards

Material Type: Silt/Sand

Placement Area: Offshore

Distance to Placement Area: 2.5 Mile Avg.

Type of Equipment: Hopper

Env. Window: Dec. 1 thru Mar. 31

Reason for Window: Sea Turtles

Award: 2nd Quarter

Page 10: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Project: Corpus Christi Ship Channel Inner Basin to Main Turning

Basin

Dredging Depth: 47 ft. Required Depth

Dredging Width: 400 - 600 ft

Dredging Length: Varies

Dredging Quantity: 2,500,000 cubic yards

Material Type: Silt/Sand

Placement Area: Open Water/Upland

Distance to Place Area: 1 Mile Avg.

Type of Equipment: Pipeline

Env. Window: Sept. – Mar.

Reason for Window: Turtles and Nesting Birds

Award: 3rd Quarter

Ingleside Nueces Bay

La Quinta Channel

Corpus Christi

Port Aransas

Aransas Pass

11

14-A

14

-B

PA 10 15

-A

15-B

16

-A

16-B

17

-A

17-B

B

CN

82

PA 6

2

PAs 7 & 8

PA 2

Page 11: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

FY 2013 Contracts Sabine-Neches Waterway

Page 12: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

1

2

3

4

Sabine Project: Sabine-Neches Waterway Outer Bar and Bank

Channel

Dredging Depth: 44 ft. Required Depth

Dredging Width: 800 ft.

Dredging Length: Varies

Dredging Quantity: 2,500,000 cubic yards

Material Type: Silt/Clay

Placement Area: Offshore

Distance to Placement Area: 3 Mile Avg.

Type of Equipment: Hopper

Env. Window: Dec. 1 thru Mar. 31

Reason for Window: Sea Turtles

Est. Start Date: September 24, 2013

Est. Completion Date: January 8, 2014

Page 13: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Project: Sabine-Neches Waterway Neches River

Dredging Depth: 42 ft. Required Depth

Dredging Width: 1400 - 200 ft.

Dredging Length: Varies

Dredging Quantity: 2,500,000 cubic yards

Material Type: Silt/Clay

Placement Area: Various Upland PAs

Distance to Placement Area: 1 Mile Avg.

Type of Equipment: Pipeline

Env. Window: NA

Reason for Window: NA

Est. Start Date: September 30, 2013

Est. Completion Date: March 18, 2014

Page 14: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

FY 2014 Contracts Sabine-Neches Waterway

Page 15: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Project: Sabine-Neches Waterway Port Arthur Canal, Turning

Basin, Junction Area and Taylors Bayou

Dredging Depth: 42 ft. Required Depth

Dredging Width: 400 - 1200 ft.

Dredging Length: Varies

Dredging Quantity: 2,500,000 cubic yards

Material Type: Silt/Clay

Placement Area: PA 8 and PA 9

Distance to Place Area: 1.5 - 2 Miles Avg.

Type of Equipment: Pipeline

Env. Window: NA

Reason for Window: NA

Award: 1st Quarter

9

8

Port Arthur

Port Arthur Turning Basins

Junction Area

Page 16: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

1

2

3

4

Sabine Project: Sabine-Neches Waterway Outer Bar and Bank

Channel

Dredging Depth: 44 ft. Required Depth

Dredging Width: 800 ft.

Dredging Length: Varies

Dredging Quantity: 3,000,000 cubic yards

Material Type: Silt/Clay

Placement Area: Offshore

Distance to Placement Area: 3 Mile Avg.

Type of Equipment: Hopper

Env. Window: Dec. 1 thru Mar. 31

Reason for Window: Sea Turtles

Award: 3rd Quarter

Page 17: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Project: Sabine-Neches Waterway Sabine Pass Channel

Dredging Depth: 42 ft. Required Depth

Dredging Width: 500 - 1150 ft.

Dredging Length: Varies

Dredging Quantity: 2,000,000 cubic yards

Material Type: Silt/Sand

Placement Area: PA 5A, 5B and 5C

Distance to Place Area: 3.5 Mile Avg.

Type of Equipment: Pipeline

Env. Window: NA

Reason for Window: NA

Award: 4th Quarter

Sabine

Gulf of Mexico

5 6

Page 18: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

FY 2013 Contract Texas City Channel

Page 19: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Texas City

Project: Texas City Channel DAMP of Placement Area

5&6

Type of Work: Dewatering

Dredging Width: NA

Dredging Length: NA

Dredging Quantity: NA

Material Type: NA

Placement Area: PA 5&6

Distance to Placement Area: NA

Type of Equipment: Excavators; Dozers; Marsh Buggy

Env. Window: NA

Reason for Window: NA

Est. Start Date: September 27, 2013

Est. Completion Date: March 12, 2014

Page 20: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

FY 2014 Contract Texas City Channel

Page 21: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Project: Texas City Channel Main Channel and Turning

Basin

Dredging Depth: 48 ft. Required Depth

Dredging Width: 400 - 1200 ft.

Dredging Length: Varies

Dredging Quantity: 2,000,000 cubic yards

Material Type: Silt/Sand

Placement Area: PA 5/6; SPPA’s 3, 4, 5

Distance to Place Area: 1 Mile Avg.

Type of Equipment: Pipeline

Env. Window: NA

Reason for Window: NA

Award: 4th Quarter

Page 22: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

For more information, contact:

Paula Rankin Wise Operations Manager

Navigation Branch, Operations Division

U.S. Army Corps of Engineers, Galveston 409-766-3948

[email protected]

Questions Comments?

For more information, contact:

Paula Rankin Wise Operations Manager

Navigation Branch, Operations Division

U.S. Army Corps of Engineers, Galveston 409-766-3948

[email protected]

Page 23: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

US Army Corps of Engineers BUILDING STRONG®

Galveston District – 2012 Dredging Conference

Custodians of the Coast

Alicia D. Rea

Operation Manager

Navigation Branch

24 October 2012

Brazos Island Harbor Gulf Intracoastal Waterway, TX Matagorda Ship Channel

Page 24: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Brazos Island Harbor (Brownsville) Gulf Intracoastal Waterway, TX Matagorda Ship Channel Channel to Port Mansfield Channel to Port Isabel Channel to Palacios Channel to Aransas Channel to Harlingen Channel to Port Bolivar

Alicia Rea Operations Manager

Page 25: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Beneficial Use: South Padre Island, Texas

Page 26: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

West Bay Mooring Beneficial Use Site

GIWW

Page 27: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

MSC-Placement Area 16 Bird Island

Page 28: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

FY 2013 Contracts Brazos Island Harbor (Brownsville Harbor)

Page 29: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

1 Port Isabel

2 3 4

5

7 8

Port of Brownsville

T E X A S

M E X I C O

Project: Brazos Island Harbor Brownsville Ship Channel

Dredging Depth: 46 ft. Required Depth

Dredging Width: 300 - 400 ft.

Dredging Length: Varies

Dredging Quantity: 350,000 cubic yards

Material Type: Silt

Placement Area: Upland

Distance to Place Area: 1 Mile Avg.

Type of Equipment: Pipeline

Env. Window: NA

Reason for Window: NA

Est. Start Date: June 15, 2013

Est. Completion Date: October 15, 2013

Page 30: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

1 Port Isabel

2 3 4

5

7 8

Port of Brownsville

T E X A S

M E X I C O

Project: Brazos Island Harbor Brownsville Jetty Channel

Dredging Depth: 46 ft. Required Depth

Dredging Width: 300 - 400 ft.

Dredging Length: Varies

Dredging Quantity: 350,000 cubic yards

Material Type: Sand

Placement Area: Beach/BU

Distance to Place Area: 2 Miles Avg.

Type of Equipment: Hopper/Pipeline

Env. Window: Oct-Mar

Reason for Window: Turtle/Tourism

Est. Start Date: October 1, 2013

Est. Completion Date: December 15, 2013

Page 31: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

FY 2014 Contract Brazos Island Harbor (Brownsville Harbor)

Page 32: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

1 Port Isabel

2 3 4

5

7 8

Port of Brownsville

T E X A S

M E X I C O

Project: Brazos Island Harbor Brownsville Jetty Channel

Dredging Depth: 46 ft. Required Depth

Dredging Width: 300 - 400 ft.

Dredging Length: Varies

Dredging Quantity: 350,000 cubic yards

Material Type: Sand

Placement Area: Beach/BU

Distance to Place Area: 2 Miles Avg.

Type of Equipment: Hopper/Pipeline

Env. Window: Oct-Mar

Reason for Window: Turtle/Tourism

Award: 4th Quarter

Page 33: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

FY 2013 Contracts Gulf Intracoastal Waterway, TX

Page 34: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Aransas Bay

Project: Gulf Intracoastal Waterway Construct Beneficial Use

(BU) Site at Aransas National Wildlife Refuge

Type of Work: BU Site

Dredging Width: NA

Dredging Length: NA

Dredging Quantity: NA

Material Type: Silt/Clay

Placement Area: NA

Distance to Place Area: NA

Type of Equipment: Marsh Buggy

Env. Window: NA

Reason for Window: NA

Est. Start Date: April 15, 2013

Est. Completion Date: September 30, 2013

Page 35: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Provide a map of that shows the work package. Add as many maps as you need

Port O’Connor

117

117-a

118

118

119

119

120

120 121

121-A 122

1 2

123

Project: Gulf Intracoastal Waterway Port O’Connor to San

Antonio Bay

Dredging Depth: 14 - 16 ft. Required Depth

Dredging Width: 125 ft.

Dredging Length: Varies

Dredging Quantity: 750,000 cubic yards

Material Type: Sand/Silt

Placement Area: Upland/Open Water/BU

Distance to Place Area: 1.0 Mile Avg.

Type of Equipment: Pipeline

Env. Window: April thru October

Reason for Window: Nesting Bird

Est. Start Date: May 1, 2013

Est. Completion Date: October 30, 2013

Page 36: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Provide a map of that shows the work package. Add as many maps as you need

Project: Gulf Intracoastal Waterway Main Channel Across

Aransas Bay

Dredging Depth: 14 - 16 ft. Required Depth

Dredging Width: 125 ft.

Dredging Length: Varies

Dredging Quantity: 600,000 cubic yards

Material Type: Sand/Silt

Placement Area: Open / BU

Distance to Place Area: 1 Mile Avg.

Type of Equipment: Pipeline

Env. Window: April thru Oct

Reason for Window: Whooping Crane/Nesting Birds

Est. Start Date: July 15, 2013

Est. Completion Date: December 15, 2013

Page 37: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Rollover Pass

28 29 30 31

32 33 34 35

36

Beach Nourishment Area

37 38

39 40

41

42

Bolivar Marsh 43

Bolivar Ferry Port Bolivar

Smith Point

Project: Gulf Intracoastal Waterway High Island to Bolivar, Channel to

Port Bolivar, and Across Galveston Bay

Dredging Depth: 16 ft. Required Depth

Dredging Width: 125 ft.

Dredging Length: Varies

Dredging Quantity: 400,000 cubic yards

Material Type: Fine Sand/Silt

Placement Area: Open / Upland Confined/BU

Distance to Place Area: 2 Miles Avg.

Type of Equipment: Pipeline

Env. Window: Oct-Mar

Reason for Window: Nesting Turtles

Est. Start Date: October 1, 2013

Est. Completion Date: February 15, 2014

Page 38: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

FY 2014 Contracts Gulf Intracoastal Waterway, TX

Page 39: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Project: Gulf Intracoastal Waterway Corpus Christi to Port Isabel

Dredging Depth: 16 ft. Required Depth

Dredging Width: 125 ft.

Dredging Length: Varies

Dredging Quantity: 2,000,000 cubic yards

Material Type: Fine Silt/Sand

Placement Area: Open/BU Sites

Distance to Placement Area: 3 Miles Avg.

Type of Equipment: Pipeline

Env. Window: Oct. – Mar.

Reason for Window: Seagrass

Award: 1st Quarter

Arroyo Colorado 227 226

225 224

223

222

221

Port Mansfield

229 230

231 232

233

234

235 236

Port Isabel

Rio Hondo

228-A 228-B

237 239 240 241

3

Arroyo City

208

208-B

207-B

208-A 208

208

209

210

211

220 / 7

212

213

214

215

216

217

218 219

221

Port Mansfield

Page 40: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

99

100

101-A 101 Boggy Bayou

104-A

103 104-B

104

105

106

106

108 108-A

109

Baxter Island

3

Colorado River Locks

Project: Gulf Intracoastal Waterway Boggy Bayou to Colorado

River

Dredging Depth: 16 ft. Required Depth

Dredging Width: 125 ft.

Dredging Length: Varies

Dredging Quantity: 1,000,000 cubic yards

Material Type: Fine Silt/Sand

Placement Area: Open/Upland Confined

Distance to Placement Area: 1 Miles Avg.

Type of Equipment: Pipeline

Env. Window: NA

Reason for Window: NA

Award: 1st Quarter

Page 41: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Project: Gulf Intracoastal Waterway Freeport to Brazos River

Crossing

Dredging Depth: 16 ft. Required Depth

Dredging Width: 125 ft.

Dredging Length: Varies

Dredging Quantity: 1,000,000 cubic yards

Material Type: Fine Silt/Sand

Placement Area: Open/Upland Confined/BU Sites

Distance to Placement Area: 2 Miles Avg.

Type of Equipment: Pipeline

Env. Window: NA

Reason for Window: NA

Award: 2nd Quarter

Page 42: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Project: Gulf Intracoastal Waterway Turnstake to Live Oak

Dredging Depth: 16 ft. Required Depth

Dredging Width: 125 ft.

Dredging Length: Varies

Dredging Quantity: 1,200,000 cubic yards

Material Type: Fine Silt/Sand

Placement Area: Open/BU Sites

Distance to Placement Area: 1 Mile Avg.

Type of Equipment: Pipeline

Env. Window: Apr. – Oct.

Reason for Window: Whooping Cranes

Award: 3rd Quarter

Beneficial Use Site ‘B’

Beneficial Use Site ‘A’

1 2

Page 43: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Project: Gulf Intracoastal Waterway Colorado River to Upper

Matagorda Bay

Dredging Depth: 16 ft. Required Depth

Dredging Width: 125 ft.

Dredging Length: Varies

Dredging Quantity: 2,000,000 cubic yards

Material Type: Fine Silt/Sand

Placement Area: Open/Upland Confined

Distance to Placement Area: 1 Miles Avg.

Type of Equipment: Pipeline

Env. Window: NA

Reason for Window: NA

Award: 4th Quarter

106

108 108-A

109

Baxter Island 3

Colorado River Locks

110

111

112-A

112-A 112-B

112-C 113 114

115 116

Page 44: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Project: Gulf Intracoastal Waterway High Island to Port Bolivar

Dredging Depth: 16 ft. Required Depth

Dredging Width: 125 ft.

Dredging Length: Varies

Dredging Quantity: 1,000,000 cubic yards

Material Type: Fine Silt/Sand

Placement Area: Open/Upland Confined/BU

Distance to Placement Area: 2 Miles Avg.

Type of Equipment: Pipeline

Env. Window: Oct. – Mar.

Reason for Window: Nesting Turtles

Award: 4th Quarter

Page 45: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

FY 2013 Contract Matagorda Ship Channel

Page 46: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

1 2

3

4

5

6

7 8 9 10

11

12

13 14

Port O’Connor

Point Comfort

Port Lavaca

Lavaca Bay

Palacios

Keller Bay

5

6 7 8

9

10

11 12

14 15

16 17 18 19

1

Carancahua Bay

20 21

22 23

117-a

Lavaca Bay

Red Bluff

Harbor Of Refuge

115 114 113 112-C

112-B 112-A

116

Project: Matagorda Ship Channel Matagorda Peninsula to

Point Comfort

Dredging Depth: 38 ft. Required Depth

Dredging Width: 200 - 1000 ft.

Dredging Length: Varies

Dredging Quantity: 1,100,000 cubic yards

Material Type: Sand/Silt

Placement Area: BU/Open Water

Distance to Place Area: 1 Mile Avg.

Type of Equipment: Pipeline Dredge

Env. Window: NA

Reason for Window: NA

Est. Start Date: November 20, 2012

Est. Completion Date: March 15, 2012

Page 47: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

FY 2014 Contract Matagorda Ship Channel

Page 48: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

1 2

3

4

5

6

7 8 9 10

11

12

13 14

Port O’Connor

Point Comfort

Port Lavaca

Lavaca Bay

Palacios

Keller Bay

5

6 7 8

9

10

11 12

14 15

16 17 18 19

1

Carancahua Bay

20 21

22 23

117-a

Lavaca Bay

Red Bluff

Harbor Of Refuge

115 114 113 112-C

112-B 112-A

116

Project: Matagorda Ship Channel Peninsula to Point Comfort

Dredging Depth: 38 ft. Required Depth

Dredging Width: 200 - 1000 ft.

Dredging Length: Varies

Dredging Quantity: 1,200,000 cubic yards

Material Type: Sand/Silt

Placement Area: BU/Open Water

Distance to Place Area: 1 Mile Avg.

Type of Equipment: Pipeline Dredge

Env. Window: NA

Reason for Window: NA

Award: 4th Quarter

Page 49: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Project: Matagorda Ship Channel – Construct Beneficial Use

Site

Type of Work: BU Site

Dredging Width: NA

Dredging Length: NA

Dredging Quantity: NA

Material Type: Silt/Clay

Placement Area: NA

Distance to Place Area: NA

Type of Equipment: Marsh Buggy

Env. Window: NA

Reason for Window: NA

Award: 2nd Quarter

1 2

3

4

5

6

7 8 9 10

11

12

13 14

Port O’Connor

Point Comfort

Port Lavaca

Lavaca Bay

Palacios

Keller Bay

5

6 7 8

9

10

11 12

14 15

16 17 18 19

1

Carancahua Bay

20 21

22 23

117-a

Lavaca Bay

Red Bluff

Harbor Of Refuge

115 114 113 112-C

112-B 112-A

116

Page 50: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

For more information, contact:

Paula Rankin Wise Operations Manager

Navigation Branch, Operations Division

U.S. Army Corps of Engineers, Galveston 409-766-3948

[email protected]

Questions Comments?

For more information, contact:

Alicia Rea Operations Manager

Navigation Branch, Operations Division

U.S. Army Corps of Engineers, Galveston 409-766-3995

[email protected]

Page 51: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

US Army Corps of Engineers BUILDING STRONG®

Galveston District – 2012 Dredging Conference

Custodians of the Coast

Galveston Harbor & Houston Ship Channel - Barbours Cut - Bayport Ship Channel - Greens Bayou

Tricia Campbell, P.E.

Operations Manager

Navigation Branch

24 October 2012

Page 52: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Tricia Campbell Operations Manager

Galveston Harbor Houston Ship Channel - Bayport Ship Channel - Barbour's Terminal Channel - Green's Bayou Channel

Page 53: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Galveston Notable Projects

Galveston Entrance Channel—Rental Job to alleviate draft restrictions

Page 54: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

FY 2013 Contracts Galveston Harbor

Page 55: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Pelican Island San Jacinto

San Jacinto PA DAMP

Project: Galveston Harbor & Channel - San Jacinto PA

Disposal Area Management Plan (DAMP)

Type of Work: DAMP

Dredging Width: NA

Dredging Length: NA

Dredging Quantity: NA

Material Type: Silt/Clay

Placement Area: San Jacinto

Distance to Place Area: NA

Type of Equipment: Marsh Buggy

Env. Window: NA

Reason for Window: NA

Est. Start Date: December 11, 2012

Est. Completion Date: June 13, 2012

Page 56: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Project: Galveston Harbor & Channel - Galveston Entrance, Outer and Inner Bar – (w/option for HSC

South of Redfish High Shoal Reach

Dredging Depth: 47-49 ft. Required Depth

Dredging Width: 800-1000 ft.

Dredging Length: Varies

Dredging Quantity: 3,500,000 cubic yards

Material Type: Silt/Sand

Placement Area: Offshore/BU

Distance to Place Area: 4 Mile Avg.

Type of Equipment: Hopper

Env. Window: NA

Reason for Window: NA

Est. Start Date: July 11,2013

Est. Completion Date: February 13, 2014

Page 57: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

FY 2014 Contract Galveston Harbor

Page 58: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Project: Galveston Harbor & Channel - Galveston Entrance, Outer and

Inner Bar

Dredging Depth: 47-49 ft. Required Depth

Dredging Width: 800 ft.

Dredging Length: Varies

Dredging Quantity: 1,500,000 cubic yards

Material Type: Silt/Sand

Placement Area: Offshore/BU

Distance to Place Area: 4 Mile Avg.

Type of Equipment: Hopper

Env. Window: NA

Reason for Window: NA

Award: 3rd Quarter

Page 59: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

HSC Notable Projects

Lost Lake Placement Area—Deep Soil Mixing

HSC Sunken Barge Removal

Page 60: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

FY 2013 Contracts Houston Ship Channel

- Barbours Terminal - Bayport Ship Channel - Greens Bayou

Page 61: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Morgan’s Point Project: Houston Ship Channel South of Redfish High Shoal Reach (Option on Galveston Entrance Channel Contract)

Dredging Depth: 47 ft. Required Depth

Dredging Width: 530 ft.

Dredging Length: Varies

Dredging Quantity: 1,000,000 cubic yards

Material Type: Sand

Placement Area: Offshore

Distance to Place Area: Varies

Type of Equipment: Pipeline

Env. Window: NA

Reason for Window: NA

Est. Start Date: July 11, 2013

Est. Completion Date: February 13, 2014

Page 62: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

15

14

Atkinson Is. La Porte

Spilman Is.

16

Project: Bayport Ship Channel Bayport Channel and

Turning Basin

Dredging Depth: 41 ft. Required Depth

Dredging Width: 300 - 5243 ft.

Dredging Length: Varies

Dredging Quantity: 500,000 cubic yards

Material Type: Silt

Placement Area: PA15

Distance to Place Area: 4 Mile Avg.

Type of Equipment: Pipeline Dredge

Env. Window: NA

Reason for Window: NA

Est. Start Date: December 4, 2012

Est. Completion Date: June 24, 2013

Page 63: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Project: Barbours Terminal Main Channel and Turning

Basin & Houston Ship Channel Morgan’s Point to SH-146

Dredging Depth: 42 ft. (Barbours) & 49 ft. (HSC) Required Depth

Dredging Width: 1222 - 300 ft.

Dredging Length: Varies

Dredging Quantity: 1,200,000 cubic yards

Material Type: Silt

Placement Area: Spilman

Distance to Place Area: 1 Mile Avg.

Type of Equipment: Pipeline

Env. Window: NA

Reason for Window: NA

Est. Start Date: April 15, 2013

Est. Completion Date: December 15, 2013

15

14

Atkinson Is. La Porte

Spilman Is.

16

Page 64: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Alexander Island PA DAMP Spilman

Island

Peggy Lake

Alexander Island

Atkinson Is.

16

14

15

La Porte

Project: Houston Ship Channel Alexander Island PA

Disposal Area Management Plan (DAMP)

Type of Work: DAMP

Dredging Width: NA

Dredging Length: NA

Dredging Quantity: NA

Material Type: Silt/Clay

Placement Area: San Jacinto

Distance to Place Area: NA

Type of Equipment: Marsh Buggy

Env. Window: NA

Reason for Window: NA

Est. Start Date: June 17, 2013

Est. Completion Date: December 6, 2013

Page 65: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Project: Houston Ship Channel Mid-Bay PA - Disposal Area

Management Plan

Type of Work: DAMP

Dredging Width: NA

Dredging Length: NA

Dredging Quantity: NA

Material Type: Silt

Placement Area: Midbay

Distance to Place Area: NA

Type of Equipment: Marsh Buggy

Env. Window: NA

Reason for Window: NA

Est. Start Date: August 5, 2013

Est. Completion Date: February 8, 2014

Morgan’s Point

Page 66: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Project: Houston Ship Channel Carpenters Bayou to Greens Bayou; with Greens Bayou

Dredging Depth: 47 ft. Required Depth

Dredging Width: 915 - 300 ft.

Dredging Length: Varies

Dredging Quantity: 900,000 cubic yards

Material Type: Silt

Placement Area: Lost Lake & Clinton PA

Distance to Place Area: 2.5 Mile Avg.

Type of Equipment: Pipeline

Env. Window: NA

Reason for Window: NA

Est. Start Date: September 13, 2013

Est. Completion Date: March 10, 2014

Lost Lake

Peggy Lake

West & East Jones

Green’s Bayou PA

Alexander Island PA

Goat Island

Page 67: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Project: Houston Ship Channel Peggy Lake Improvements

Type of Work: Improvements

Dredging Width: NA

Dredging Length: NA

Dredging Quantity: NA

Material Type: Silt/Clay

Placement Area: NA

Distance to Place Area: NA

Type of Equipment: Drag-line, varies

Env. Window: NA

Reason for Window: NA

Est. Start Date: August 21, 2013

Est. Completion Date: April 4, 2014

Lost Lake

West & East Jones

Green’s Bayou PA

Alexander Island PA

Goat Island

Peggy Lake Peggy Lake Improvements

Page 68: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

FY 2014 Contracts Houston Ship Channel

- Barbours Terminal - Bayport Ship Channel - Greens Bayou

Page 69: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

15

14

Atkinson Is. La Porte

Spilman Is.

16

Project: Houston Ship Channel Bayport Flare and Bayport

to Morgan’s Point

Dredging Depth: 47 ft. Required Depth

Dredging Width: 300 - 5243 ft.

Dredging Length: Varies

Dredging Quantity: 1,500,000 cubic yards

Material Type: Silt

Placement Area: PA14 and 15

Distance to Place Area: 4 Mile Avg.

Type of Equipment: Pipeline Dredge

Env. Window: NA

Reason for Window: NA

Award: 1st Quarter

Page 70: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Project: Houston Ship Channel Sims Bayou to Turning

Basin

Dredging Depth: 38 ft. Required Depth

Dredging Width: 300 - 250 ft.

Dredging Length: Varies

Dredging Quantity: 1,000,000 cubic yards

Material Type: Silt

Placement Area: Clinton

Distance to Place Area: 3 Miles Avg.

Type of Equipment: Pipeline Dredge

Env. Window: NA

Reason for Window: NA

Award: 1st Quarter

Page 71: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Alexander Island PA Levee Raise Spilman

Island

Peggy Lake

Alexander Island

Atkinson Is.

16

14

15

La Porte

Project: Houston Ship Channel Alexander Island PA Levee

Raise

Type of Work: Improvements

Dredging Width: NA

Dredging Length: NA

Dredging Quantity: NA

Material Type: Silt/Clay

Placement Area: Alexander Island

Distance to Place Area: NA

Type of Equipment: Dragline

Env. Window: NA

Reason for Window: NA

Award: 2nd Quarter

Page 72: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Lost Lake

Peggy Lake

Alexander Island

Goat Island

Spilman Island

Project: Houston Ship Channel Spilman Island PA Disposal

Area Management Plan (DAMP)

Type of Work: DAMP

Dredging Width: NA

Dredging Length: NA

Dredging Quantity: NA

Material Type: Silt/Clay

Placement Area: Spilman Island

Distance to Place Area: NA

Type of Equipment: Marsh Buggy/ Excavation Equipment

Env. Window: NA

Reason for Window: NA

Award: 4th Quarter

Page 73: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Glendale

House-Stimson Tracts Filter-Bed

Project: Houston Ship Channel House Tract & Glendale

Levee Raise

Type of Work: Improvements

Dredging Width: NA

Dredging Length: NA

Dredging Quantity: NA

Material Type: Silt/Clay

Placement Area: House Tract & Glendale

Distance to Place Area: NA

Type of Equipment: Dragline

Env. Window: NA

Reason for Window: NA

Award: 4th Quarter

Page 74: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

For more information, contact:

Paula Rankin Wise Operations Manager

Navigation Branch, Operations Division

U.S. Army Corps of Engineers, Galveston 409-766-3948

[email protected]

Questions Comments?

For more information, contact:

Tricia Campbell Operations Manager

Navigation Branch, Operations Division

U.S. Army Corps of Engineers, Galveston 409-766-3153

[email protected]

Page 75: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

US Army Corps of Engineers BUILDING STRONG®

Galveston District – 2012 Dredging Conference

Custodians of the Coast

Freeport Harbor Channel to Victoria Chocolate Bayou

Eddie Irigoyen

Operations Manager

Navigation Branch

24 October 2012

Page 76: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Freeport Harbor Channel to Victoria Chocolate Bayou

Eddie Irigoyen Operations Manager

Page 77: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

FY 2013 Contracts Freeport Harbor

Page 78: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Project: Freeport Harbor Inside Channel

Dredging Depth: 47- & 49-ft. Required Depth

Dredging Width: 280 - 1190 ft.

Dredging Length: Varies

Dredging Quantity: 400,000 cubic yards

Material Type: Sand/Silt

Placement Area: PA 1

Distance to Place Area: 2.5 Mile Avg.

Type of Equipment: Pipeline

Env. Window: NA

Reason for Window: NA

Est. Start Date: June 2013

Est. Completion Date: Sep 2013

Page 79: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

1 Quintana

Surfside

85

7

Brazosport Turning Basin

Brazos Harbor Turning Basin and Channel

Upper Turning Basin

1-A

88

Stauffer Channel (De-Authorized)

Buffer Zone

Limits of Discharge

Project: Freeport Harbor Entrance Channel

Dredging Depth: 47- & 49-ft. Required Depth

Dredging Width: 400 ft.

Dredging Length: Varies

Dredging Quantity: 1,000,000 cubic yards

Material Type: Sand/Silt

Placement Area: Offshore

Distance to Place Area: 2.5 Mile Avg.

Type of Equipment: Hopper

Env. Window: NA

Reason for Window: NA

Est. Start Date: July 17, 2013

Est. Completion Date: September 30, 2013

Page 80: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

FY 2014 Contract Freeport Harbor

Page 81: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

1 Quintana

Surfside

85

7

Brazosport Turning Basin

Brazos Harbor Turning Basin and Channel

Upper Turning Basin

1-A

88

Stauffer Channel (De-Authorized)

Buffer Zone

Limits of Discharge

Project: Freeport Harbor Entrance Channel

Dredging Depth: 47- & 49-ft. Required Depth

Dredging Width: 400 ft.

Dredging Length: Varies

Dredging Quantity: 1,500,000 cubic yards

Material Type: Sand/Silt

Placement Area: Offshore

Distance to Place Area: 2.5 Mile Avg.

Type of Equipment: Hopper

Env. Window: NA

Reason for Window: NA

Award: 4th Quarter

Page 82: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

FY 2013 Contract Channel to Victoria

Page 83: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Project: Channel to Victoria Raise Levee PA 2

Type of Work: Raise Levees

Dredging Width: NA

Dredging Length: NA

Dredging Quantity: NA

Material Type: Cohesive material (silt & clay)

Placement Area: PA 2

Distance to Place Area: NA

Type of Equipment: Varies

Env. Window: NA

Reason for Window: NA

Est. Start Date: May 2013

Est. Completion Date: Sep 2013

Channel to Seadrift

PA 2

1

Raise Levees

Page 84: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

FY 2014 Contract Channel to Victoria

Page 85: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

9

10 & 11

13

Turning Basin

8-C

8-B

12

7 6-A

Green Lake 8-A

Project: Channel to Victoria Upper Reach

Dredging Depth: 14-ft. Required Depth

Dredging Width: 125 – 818 ft.

Dredging Length: Varies

Dredging Quantity: 500,000 cubic yards

Material Type: Silt/Sand

Placement Area: Upland Confined

Distance to Placement Area: 2.5 Mile Avg.

Type of Equipment: Pipeline Dredge

Env. Window: NA

Reason for Window: NA

Award: 3rd Quarter

Page 86: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

FY 2014 Contract Chocolate Bayou

Page 87: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Project: Chocolate Bayou

Dredging Depth: 14 ft. Required Depth

Dredging Width: 125 ft.

Dredging Length: Varies

Dredging Quantity: 800,000 cubic yards

Material Type: Silt/Sand

Placement Area: BU / Upland Confined

Distance to Placement Area: 1.5 Mile Avg.

Type of Equipment: Pipeline Dredge

Env. Window: NA

Reason for Window: NA

Award: 4th Quarter

70

65 66

67

68

69

Page 88: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

For more information, contact:

Paula Rankin Wise Operations Manager

Navigation Branch, Operations Division

U.S. Army Corps of Engineers, Galveston 409-766-3948

[email protected]

Questions Comments?

For more information, contact:

Eddie Irigoyen Operations Manager

Navigation Branch, Operations Division

U.S. Army Corps of Engineers, Galveston 409-766-3130

[email protected]

Page 89: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

US Army Corps of Engineers BUILDING STRONG®

Galveston District – 2012 Dredging Conference

Custodians of the Coast

Brazos River Floodgates, Colorado River Locks & Mooring Buoy Maintenance

Eric Russek, P.E. Operations Manager

Project Operations Br, Galveston

24 October 2012

Page 90: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Brazos River Floodgates Colorado River Locks Mooring Buoy Maintenance Mouth of Colorado River Walkway Neches River Saltwater Barrier

Eric Russek, P.E. Operations Manager

Page 91: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Brazos River Floodgates Freeport, TX

Page 92: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Colorado River Locks Matagorda, TX

Page 93: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Project: Brazos River Flood Gates

Rehab 4 Sector Gates, Mechanical & Electrical Systems

Dredging Depth: NA

Dredging Width: NA

Dredging Length: NA

Dredging Quantity: NA

Material Type: NA

Placement Area: NA

Distance to Placement Area: NA

Type of Equipment: Construction, Mechanical & Electrical

Est. Start Date: November 11, 2010

Est. Completion Date: March 31. 2013

Contract Completion: September 30 , 2013

Contract Amount: $10,277,359.10

Contractor: K&K Industries, Inc.

Page 94: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Project: Brazos River Flood Gates

*West Road Repair

Dredging Depth: NA

Dredging Width: NA

Dredging Length: NA

Dredging Quantity: NA

Material Type: NA

Placement Area: NA

Type of Equipment: Excavation & Paving

Env. Window: NA

Reason for Window: NA

Est. Start Date: September 29, 2013

Est. Completion Date: March 1, 2014

*

Page 95: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Project: Colorado River Locks

Impressed Current Cathodic Protection

on 8 Sector Gates Dredging Depth: NA

Dredging Width: NA

Dredging Length: NA

Dredging Quantity: NA

Material Type: NA

Placement Area: NA

Type of Equipment: Mechanical & Electrical

Env. Window: NA

Reason for Window: NA

Est. Start Date: June 11, 2013

Est. Completion Date: February 15, 2014

Page 96: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

Galveston District Mooring Basins

Port Arthur Bolivar Peninsula Pelican Island

Chocolate Bayou

Brazos River Flood Gates

Colorado River Locks Oyster Lake Port O’Connor

Channel to Victoria Aransas National Wildlife Refuge

Corpus Christi Ship Channel Arroyo Colorado

Page 97: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

‘Can’ Buoy ‘Anvil’ Buoy

Damaged ‘Can’ Buoy Buoy Yard at Brazos River Flood Gates

Page 98: FY-13 Scheduled Contracts FY-14 Planned Contracts · 2012. 10. 25. · US Army Corps of Engineers BUILDING STRONG ® Galveston District – 2012 Dredging Conference Custodians of

BUILDING STRONG®

Galveston District – 2012 Dredging Conference - Custodians of the Coast

For more information, contact:

Paula Rankin Wise Operations Manager

Navigation Branch, Operations Division

U.S. Army Corps of Engineers, Galveston 409-766-3948

[email protected]

Questions Comments?

For more information, contact:

Eric Russek Operations Manager

Project Operation Branch, Operations Division

U.S. Army Corps of Engineers, Galveston 409-766-3007

[email protected]