FONDO NACIONAL DE INFRAESTRUCTURA
TRANSFORMING TRANSPORTATION9th Event
Washington ,D.C. -26.January.2012EMBARQ/WORLD BANK/BID/ADB
Carlos Mier-y-Teran Manager of PROTRAM
Programa de Apoyo Federal al Transporte Masivo
FUNDING URBAN PUBLIC TRANSPORTATION IN MEXICO
2
GROWING URBANIZATION EN BIG CITIES
In 1990 Mexico had 21 cities with more than 500,000 inhabitants reaching a population of 34 millions
!n 2010 Mexico had 35 cities with more than 500,000 inhabitants now with a population of 60 millions México City more than 20 millions 3 cities betwen 2.5 and 4.5 millions 7 cities betwen 1 and 2 millions 22 cities betwen 500,000 and 1 million
These cities are growimg to the peripheria with lower density , demanding more and more transportation
Now 53 % of the population of Mexico live in these big cities and these trend will remain
To achieve a sustainable urban development the City Plan need to promote a higher density where the Transit projects will play a relevant role,
3
• Automobiles grow 8% annually with an excessive use
• Inefficient Public Transportation and low quality
• Chronic Congestion of urban roads
• Growing carbon emissions ( 20%)
• Big investments in urban highways
• Limited investment in mass Transit
• Low tariffs for social inclusion
Parque Vehicular en México 1980-2006
5,000,000
10,000,000
15,000,000
20,000,000
25,000,000
1980 1983 1986 1989 1992 1995 1998 2001 2004
UNSUSTAINABLE TRENDS IN URBAN TRANSPORT
The chronic urban transport problem is affecting the competitiveness and quality of life of the cities.
in order achieve a sustainable urban mobility it is a priority to promote Transit Projects to reduce the excesive use of the private car.
4
Federal Funding for Urban Transportaction Projects
To promote a SUSTAINABLE URBAN MOBILITY especially in big cities the Federal government gives financial support to the state and municipal
governments and Concesionaries for MASS TRANSIT PROJECTS
Grants for Project preparation up to 50%
Grants for investment in Infrastructureup to 50%
Reimburstment support(Waranties and subordinated
credit)
FONDO NACIONAL DE INFRAESTRUCTURA
Programa de Apoyo Federal al Transporte Masivo -PROTRAM
BANOBRASUrban Transport
Transformation Project UTTP CTF & World Bank
Credit for infrastructure
Credits for vehícles with low gas emission
Crédit for Studies
5
Urban Mass Transit Approach
1.Sustainable Urban Mobility Plan
2.Urban Transit Authority
3.Transforming transport organization
4.Integrated Transit Systems (trunk-feeders)
5.Mass Transit Trunk Corridors
6. Rational use of urban roads
7.Efficient vehicles with low carbon emissions
8.Technology for centralized control (ITS)
9. Tariff integration and prepaid card
10. Finantial support for Transit projects
Mainly for cities with more than 500,000 inhabitants
TECHNICAL OPTIONS Bus Rapid Transit (BRT) or similar Light Rail Transit and Trams (LRT) Suburban trains and Metros
TRANSIT PROJECTS (PPP)• High social rentability • Cofinaced with local governments • Private investment. participation 34%
6
1. Urban transport problem analysis
2. Integral Sustainable Urban Mobility Plan
3. Technical Feasability Study (project, demand and costs)
4. Cost Benefit Analysis
5. Finantial analysis and project finance structuration
6. Transit Authority and PPP scheme proposed
Guidelines to prepare and evaluate the Projects
FONADIN can give a grant up to 50% to prepare these studies
7
Políticas, Guías y Metodologías
DOCUMENTOS BÁSICOS DEL PROTRAM
(Disponibles en la página de internet del Fondo Nacional de Infraestructura en BANOBRAS)
1.-LINEAMIENTOS DEL PROTRAM
2.-GUIA PARA LA PRESENTACIÓN Y EVALUACIÓN DE PROYECTOS
3.-MARCO DE SALVAGUARDAS AMBIENTALES Y SOCIALES (MASTU)
4.- MANUAL DE OPERACIÓN DE LOS CREDITOS DE BANOBRAS DEL PTTU (BIRF Y CTF))
ELABORACION DE DOCUMENTOS PROTRAM PARA 2012
5.-GUÍA PARA ANÁLISIS COSTO- BENEFICIO DE PROYECTOS DE TRANSPORTE MASIVO
6.- GUÍA PARA PLANES INTEGRALES DE MOVILIDAD URBANA SUSTENTABLE( PIMUS)
7.- MODELO DE CONVENIO DE APOYO FINANCIERO.
8.-MODELO DE FIDEICOMISO DEL PROYECTO.
9.-BASE DE DATOS DE INDICADORES DE PROYECTOS DE TRANSPORTE URBANO
10.- PARAMETROS DE COSTOS
DOCUMENTOS DE POLITICAS PUBLICAS DE TRANSPORTE URBANO.
10. POLITICAS PUBLICAS DE TRANSPORTE URBANO SUSTENTABLE. Con SCT y Banco Mundial
11. PROYECTO DE LEY FEDERAL DE TRANSPORTE SUSTENTABLE URBANO Y SUBURBANO
8
• Convenio Apoyo F
• Fideicomiso • Concesiones• Contratos de
Obra• Crédito
ElegibilidadPROTRAM
Autorización Apoyos por FONADIN
Projects conceptual
ideas10
Solicitud Apoyo para Inversión
• Realización y Beneficios del
Proyecto
FASE 3: Evaluation
FASE 2: Preparation
FASE 5: Follow up monitoring
FASE 4:
Bidding and finantial
clousure
FASE 1: Planning &
Identificatión
Projects Autorizaded
9
Projects at Feasability
analysis12
Projects in Evaluation GF
7
Projects in construction or operation
2
PIPELINE 40 PROJECTS DE PROTRAM
PROjECT AUTORIZATION CYCLE
9
Componentes del Corredor BRT
9
CORREDOR CON CARRILES EXCLUSIVOS TERMINALES Y ESTACIONES
AUTOBUSES DE ALTA CAPACIDAD con bajas emisiones GEI
INTELILGENT SYSTEMS :control , collect, ticketind and información
10
ESQUEMA DE ASOCIACION PUBLICO PRIVADA PPP PARA PROYECTO DE UN CORREDOR BRTCORREDOR BRT DE TRANSPORTE MASIVO
2. CONCESION OR PPP OF INFRASTRUCTUREInversión privada 380 MDP
(CAPITAL Y CRÉDITO) Fuente de pago = 30 % del pasaje
Estaciones y terminales Sistema de control y despacho de autobuses Sistemas de recaudo con tarjeta de prepago
1. PUBLC WORK BY THE STATE Inversión pública 620 MDP 100% RECURSOS PÚBLICOS
Segregated road for mass transit Bridges and underr passes
3. CONCESION FOR MASS TRANSITConsorcio integrado por los permisionarios
Inversión privada 540 MDP (CAPITAL Y CRÉDITO)
Fuente da Pago=Cuota por veh-kmAdquisición de los autobuses Operación y mantenimiento del equipo
CORREEDOR : 15 km Investment 1,540 MDP Demand 200 mil pax/day Tariff $7
FNI Grant up to 50%
Garantía de Crédito FNI para Obra del
50%
Garantía de Crédito FNI para Equipo
del 50%
11
Fideicomiso de Operación que hace bancable el Proyecto APP
Cobro del Pasaje con tarjeta inteligente de prepago
Sistema de Recaudo en estaciones y autobuses
Fideicomiso de Administración y Fuente de PagoConcentración y distribución de Ingresos