Top Banner
Fundamental Network Improvements Summer 2012 Activity May 14, 2012
6

Fundamental Network Improvements Summer 2012 Activity May 14, 2012.

Dec 13, 2015

Download

Documents

Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Fundamental Network Improvements Summer 2012 Activity May 14, 2012.

Fundamental Network Improvements

Summer 2012 Activity

May 14, 2012

Page 2: Fundamental Network Improvements Summer 2012 Activity May 14, 2012.

Really High Level

Focus on network resiliency• Reduce impact of device, interface & link failure• Allow for maintenance without significant outages• Reduce amount of firefighting

Page 3: Fundamental Network Improvements Summer 2012 Activity May 14, 2012.

High Level•Retire Fleming 6509 core switch done May 6•Core network hardware and route redundancy done May 6•Reduce complexity of layer 2 vlan structure•Entry and aggregation layer hardware and route redundancy•Reduce complexity of OSPF structure•Internet bandwidth management

Page 4: Fundamental Network Improvements Summer 2012 Activity May 14, 2012.

Layer 2 VLAN

•Layer 2 through the core• Extra broadcast traffic• Serious impact of network loops

•Push layer 3 out to buildings• Allows more resilient redundant links• Allows all routes to be active

Page 5: Fundamental Network Improvements Summer 2012 Activity May 14, 2012.

Follow Along

ITServices main page

• In the Spotlight• In the Works

Page 6: Fundamental Network Improvements Summer 2012 Activity May 14, 2012.

Questions?