_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
16313_SWM‐FSR_Iroquois Ridge_Dec 12, 2016
FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT REPORT
Proposed Iroquois Ridge Subdivision
AT 2337 Coronation Drive
Town of Oakville
Prepared for Strategy 4 Inc.
Dec 12, 2016
Issued for Application
REVISIONS
1109 BRITANNIA ROAD EAST, MISSISSAUGA, ON, L4W 3X1
TEL: (647)496‐8055 www.floradesigns.net
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 2 of 35
TABLE OF CONTENTS 1.0
INTRODUCTION 2.0
SITE DESCRIPTION 3.0
SITE PROPOSAL 4.0
TRANSPORTATION SYSTEM 5.0
BACKGROUND REPORTS 6.0
STORM DRAINAGE SYSTEM
6.1 Existing Conditions 6.2
Proposed Stormwater Management
6.2.1 Quantity Control 6.2.2
Quality Control
6.3 Downstream Capacity 7.0
SANITARY DRAINAGE SYSTEM
7.1 Subdivision Design 7.2
Proposed Sanitary Drainage System 7.3
Proposed Sanitary Service 7.4
Downstream Capacity
8.0 WATER SUPPLY SYSTEM 8.1
Existing Water Supply System 8.2
Proposed Water Supply Requirements 8.3
Proposed SWater Service
9.0
CONCLUSIONS AND RECOMMENDATIONS 9.1
Storm 9.2 Sanitary 9.1
Water
LIST OF TABLES Table 1
Pre‐development Peak Flows Table 2
Post‐development Peak Flows
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 3 of 35
TABLE OF CONTENTS...... (Continued) LIST OF APPENDICES Appendix "A" Plans
Location Map Site Plan Drawing
Appendix "B"
Stormwater Management
Subdivision Master Storm Drainage Area Plan (Ashley Herak Subdivision Phase 2)
Subdivision Storm Drainage Area Plan (Ashley Herak Subdivision Phase 1)
Subdivision Storm Drainage Area Plan (Ashley Herak Subdivision Phase 2A ‐ 2B)
Existing Storm Drainage Area Plan
Proposed Concept Rough Grading Plan
Proposed Storm Drainage Area Plan
Runoff Coefficient Calculations
Pre‐development Peak Flow Calculations
Post‐development Peak Flow Calculations
Storm Sewer Design Sheet
Subdivision Storm Sewer Design Sheet (Ashley Herak Subdivision Phase 2A ‐ 2B)
Appendix "C"
Sanitary Drainage System
Post‐development Sanitary Flow Calculations
Subdivision Sanitary Drainage Area Plan (Ashley Herak Subdivision Phase 2A ‐ 2B)
Proposed Sanitary Drainage Area Plan
Sanitary Sewer Design Sheet
Appendix "D" Water Supply System
Post‐development Water Supply Requirement Calculations
Proposed Water Distribution Plan
Appendix "E"
Statement of Limiting Conditions and Assumptions
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 4 of 35
1.0 INTRODUCTION Flora Designs
Inc. has been
retained by Strategy 4 Inc.
to prepare a Functional Servicing and Stormwater Management Report
(SWM‐FSR) for the proposed
Iroquois Ridge Subdivision,
in accordance with
the Development Engineering Procedures & Guidelines Manual provided by the
Town of Oakville, the Region of
Halton design guidelines and MOE
Stormwater Management Planning and Design Manual 2003 (SWMPD). This
report is prepared in support
of a Draft Plan of Residential
Subdivision &
Re‐Zoning Applications by Strategy 4 Inc. acting on behalf of the Halton Catholic District School Board. The purpose of this report is to provide site‐specific information for the Town and Region’s review with
respect to the infrastructure
required to support the proposed
development
regarding storm drainage, sanitary drainage and water supply. An
inventory of the existing
infrastructure in
the area of proposed development was
carried out. This report discusses the existing services together with the servicing requirements for the proposed development. 2.0
SITE DESCRIPTION The proposed
development site is located on
Coronation Drive, Town of Oakville,
Ontario (Appendix "A"). The site is bounded as follows:
Existing residential developments and North Ridge Trail beyond to the North,
Coronation Drive to the East,
Existing residential developments and Tesla Crescent beyond to the South, and
Existing residential developments and Eighth Line beyond to the West.
The major portion of the
proposed development lands are
located within
the Ashley Herak Subdivision Phase
2A and 2B designed by Anton
Kikas Ltd. A small portion of
the site
area adjoining north property line
is located within the Eighth
Line Argo
Subdivision designed by Stantec
Consulting. The subject site is
approximately 27,631.20 m2 (2.76
hectares) in
size. Currently the property is vacant. 3.0
SITE PROPOSAL The Draft Plan of Residential Subdivision Application proposes 52 single family detached houses and internal roads in accordance with the Town of Oakville standards. A reduced version of the draft
site plan of subdivision is
included in Appendix "A". Please
refer to the site
statistics provided by Strategy 4 Inc. 4.0
TRANSPORTATION SYSTEM The proposed development site is located at 2337 Coronation Drive and is in a good location to be
serviced by a minor local road
connecting to Northridge Trail and
Dundas Street
being collector road running east‐west and connecting to Eighth Line being a collector road running north‐south.
The existing road system will
provide good access to major
highways such
as Queen Elizabeth Way and Highway 403. Also, the existing road pattern will provide good access
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 5 of 35
to nearby commercial districts, municipal offices, community centres and parks. The proposed access to the site will be provided by proposed Street “A” connecting to Coronation Drive. 5.0
BACKGROUND REPORTS The major
portion of the proposed development
lands are located within
the Ashley Herak Subdivision Phase
2A and 2B designed by Anton
Kikas Ltd. A small portion of
the site
area adjoining the north property line is located within the Eighth Line Argo Subdivision designed by Stantec Consulting. Therefore,
the storm, sanitary and water
servicing design for the
subject lands must comply with the subdivision engineering design parameters in addition to the design standards provided by the Town of Oakville and the Region of Halton. The following documents have been reviewed in order to identify the constraints, which govern the development of the subject site:
1. Stormwater Management Design Brief
for Ashley Herak Iroquois Ridge
Community North District prepared by Anton Kikas Limited Revised February 2002.
2.
Drainage area plans and other design documents prepared
for
subdivisions 20M‐827, 20M‐828, 20M‐846 and 20M‐858.
6.0 STORM DRAINAGE SYSTEM
6.1 Existing Conditions Currently
the site is vacant and
rough graded to manage the
interim drainage. Per the
interim site grading design prepared by Anton Kikas Ltd., the entire site area drains towards south‐west corner of
the property
through overland sheet flow. A temporary swale is provided adjoining the south and west property lines to
capture the storm runoff, which
is subsequently discharging to
the existing infrastructure of storm
sewers located in the road
allowance of Eighth
Line through a 675mm diameter storm sewer running through an easement along the side
yards of two existing residential
units fronting Eighth Line. This
675mm diameter storm sewer is
sized to convey 0.38 m3/s flow
during the 100‐year rainfall event
from this 2.76 ha of site area, considering a runoff co‐efficient of 0.25. A
copy of the general storm
drainage plans identifying allowable
runoff coefficients and release rates from the Ashley Herak Subdivision design has been illustrated in Appendix "B". Furthermore, the subdivision design proposes approx 1.06 ha site area adjoining the west property
line (CA‐2‐Pre) that will discharge to the SWM
infrastructure located within the
road allowance of Eighth Line that
is sized to convey major system
flows. The remaining 1.70 ha of site area
located at the east portion of the site
(CA‐1‐Pre) will discharge to
the SWM infrastructure located within
the road allowance of Coronation Drive that is sized to convey minor system flows. A summary of
the pre‐development peak
flows and post‐development allowable release
at both outlet locations are
provided in Table‐1 below and a
detailed pre‐development peak flow calculation is included in Appendix "B".
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 6 of 35
Table‐1 Pre‐development Peak Flows Storm Event
Peak Flow (CA‐1‐Pre)
Outlet at Coronation Drive
(m3/s)
Peak Flow (CA‐2‐Pre) Outlet at Eighth Line
(m3/s) 5‐year 0.378 0.084 100‐year
0.664 0.148
6.2
Proposed Stormwater Management
The post‐development Stormwater Management will be
justified by discussing the following stormwater controls: 6.2.1
Quantity Control
Stormwater quantity control is
typically implemented to minimise
the potential for downstream flooding, stream bank erosion and overflow of infrastructure.
However, as outlined in the
Ashley Herak subdivision SWM design
prepared by Anton Kikas Ltd.,
the stormwater quantity control for
the site area occupied by the
proposed subdivision development is
provided in the end‐of‐pipe SWM
Wet Pond
facility located near Kestell Boulevard at the south edge of subdivision. In
order to comply with the
subdivision engineering design, the
post‐development drainage areas have
been separated into two
drainage systems discharging
at Coronation Drive and Eighth
Line. The site area discharging
at Coronation Dive (CA‐1‐Post,
CA‐2‐Post and
CA‐3‐Post) consists of 2.48 ha area and the site area discharging at Eighth Line (CA‐4‐Post) consists of 0.28 ha area. The value of the post‐development runoff coefficient
is based on the Town guidelines
for single family
detached homes. A summary of
the post‐development peak
flows at both outlet locations are provided in Table‐2 below and a detailed post‐development peak flow calculation is included in Appendix "B".
Table‐2 Post‐development Peak Flows Storm Event
Peak Flow (CA‐1‐Pre)
Outlet at Coronation Drive
(m3/s)
Peak Flow (CA‐2‐Pre) Outlet at Eighth Line
(m3/s) 5‐year 0.352 0.040 100‐year
0.619 0.070
The calculated values of pre‐development and post‐development flows at both
outlet location concludes that the
post development flow from these
development lands shall be less
than the
pre‐development allowable parameters established
in
the subdivision engineering design. Therefore, this development application does not propose any additional lot
level quantity control measures in
the post‐development condition. Detailed
calculations for the on‐site storm
sewer design, a copy of the
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 7 of 35
subdivision storm sewer design
sheet and the
post‐development drainage area plan for this site has been illustrated in Appendix "B".
6.2.2 Quality Control In
accordance with the MOE SWM
Planning & Design Manual,
various levels of treatment are
defined with the goal to maintain
or
enhance existing aquatic habitat based on the efficiency of total suspended solids (TSS) removal.
In accordance with the Town of Oakville standard for the site area, stormwater should be treated to Enhanced Protection
level as defined in the MOE
SWM Planning & Design Manual
(2003). However, per the subdivision engineering design parameters established by Anton Kikas Ltd.,
the stormwater quality control for
the site area occupied by the
proposed subdivision development is
provided in the
end‐of‐pipe SWM Wet Pond facility located near Kestell Boulevard at the south edge of subdivision. Therefore, this development application does not propose any additional lot level quality control measures in the post‐development condition.
6.3 Downstream Capacity The
subdivision engineering design is
prepared considering the site
area occupied by the this
development will contribute to the
existing subdivision infrastructure of
storm sewer and overland flow
paths. Since the post‐development
peak flows are less than the
allowable subdivision
parameters, there will be no need
to map the downstream capacity
of the existing
storm sewer infrastructure and the existing end‐of‐pipe SWM facility.
7.0
SANITARY DRAINAGE SYSTEM Currently
the property id
vacant. The proposed development on
site will be serviced by
the existing infrastructure of sanitary sewer located within the road allowance of Coronation Drive.
7.1 Subdivision Design
As outlined in the Ashley Herak subdivision design prepared by Anton Kikas Ltd., this 2.76 ha of site area was accounted
to contribute to
the existing municipal sanitary sewer
infrastructure located with the road
allowance of Coronation Drive
considering a population density of
285 persons. A copy of
sanitary drainage area plan from the Ashley Herak subdivision design has been illustrated in Appendix "C".
7.2
Proposed Sanitary Drainage System In
the post‐development condition, the
maximum anticipated population accountable
are 152 persons. Based on
calculated population density
and infiltration allowance,
the post‐development sanitary discharge
flows from
the site in accordance with the Region of Halton guidelines is calculated at 2.82 L/s. A Sanitary Sewer Design Chart showing detailed sanitary flow and sanitary sewer design calculations is included in Appendix "C".
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 8 of 35
7.3
Proposed Sanitary Service A 200mm diameter sanitary service connection was provided
in the subdivision engineering design from existing MH 44 A which
is not at a favourable
location for the proposed draft
plan of subdivision. Therefore, this
development application proposes a new 200mm diameter sanitary service connection and an internal
network of sanitary sewers in
accordance with the Region of
Halton design guidelines. The lots
fronting Coronation Drive will be
provided with separate sanitary
connections from the municipal
sanitary sewer located
on Coronation Drive. It is
anticipated that the existing 200mm
diameter
sanitary service would be specified to be removed at detail design stage.
7.4 Downstream Capacity The
subdivision engineering design is
prepared considering the site
area occupied by the proposed
subdivision development will contribute
to the existing infrastructure of
sanitary sewer located within the
road allowance
of Coronation Drive. Since the maximum anticipated population accountable from this
development lands are less than
the accounted subdivision
population, there will be no need to map the downstream capacity of the existing sanitary sewer infrastructure.
8.0
WATER SUPPLY SYSTEM Currently
the property id
vacant. The proposed development on
site will be serviced by
the existing infrastructure of 250mm
diameter watermain located within the
road allowance
of Coronation Drive.
8.1
Existing Water Supply System The water supply requirements for the existing land use was not analysed.
8.2
Proposed Water Supply Requirements
The post‐development water supply requirements are calculated
in accordance with the Water and Wastewater Linear Design Manual
provided by the Region of Halton.
This manual provides peaking factors
to calculate peak hour
and maximum day water demand. The estimated water consumption of approximately 1.09 L/s with a peak hourly demand
of 1.94 L/s will be required
to service the proposed
development. Detailed calculations are included in Appendix "D". The
Town of Oakville and Region of
Halton requires the fire flow
calculation based on the Water Supply for Public Fire Protection Guidelines provided by the Fire Underwriters Survey
(FUS). The actual fire flow
required for
the proposed development will be calculated at detailed engineering design stage considering gross
floor area of the proposed
residential units and its
proximity with
the adjoining units.
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 9 of 35
8.3
Proposed Water Service Currently two water services are provided to serve the proposed establishments are
not at the favourable location
for the proposed draft plan of
subdivision. Therefore, this development application proposes a new 200mm diameter water service
connection and an
internal network of 200mm diameter watermain
in accordance with the Region of
Halton design guidelines. The lots
fronting Coronation Drive will be provided with separate water service connections from the municipal watermain
located on Coronation Drive. It
is anticipated that the existing water services would be specified to be removed at detail design stage.
9.0
CONCLUSIONS AND RECOMMENDATIONS This report
is to be read
in conjunction with the submission materials for the project proposal known
as proposed Draft Plan of
Residential Subdivision Application for
Iroquois Ridge Subdivision located at
Coronation Drive, Town of Oakville.
Based on our investigation,
we conclude and recommend the following:
9.1 STORM
1. The subdivision engineering
design is prepared considering the
site area
occupied by the proposed
subdivision development will contribute
to
the existing subdivision infrastructure of storm sewer and overland flow paths.
2. The post‐development peak flows
are less than the allowable
subdivision parameters.
3.
The quality control for the site area occupied by the proposed development is provided
in the end‐of‐pipe SWM Wet Pond
facility
located near Kestell Boulevard at the south edge of subdivision.
4.
Erosion and Sediment controls are to be implemented during construction to prevent
silt‐laden runoff from leaving the
site in accordance with
the "Erosion & Sediment Control Guidelines for Urban Construction".
9.2 SANITARY 1. Per the
subdivision engineering design, the
2.76 ha site area occupied
by
proposed subdivision development was accounted to contribute the existing municipal
sanitary sewer infrastructure
located with the
road allowance of Coronation Drive considering a population density of 285 persons.
2.
The post development maximum anticipated population accountable
is
less than the allowable subdivision population.
3.
This development application proposes to remove existing 200mm diameter service connection provided with the subdivision engineering design.
4. This development application proposes
a new 200mm diameter
sanitary service connection and an internal network of sanitary sewers in accordance with the Region of Halton design guidelines.
9.3 WATER
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 10 of 35
1. The estimated water consumption
of approximately 1.09 L/s with a
peak hourly demand of 1.94 L/s
will be required to service the
proposed development with domestic water.
2.
The actual fire flow required for proposed development will be calculated at detailed engineering design stage.
3.
This development application proposes to remove two existing water service connections provided with the subdivision engineering design.
4. This development application proposes
a new 200mm diameter
water service connection and an
internal network of 200mm diameter watermain in accordance with the Region of Halton design guidelines.
We trust that this report
satisfies the requirements of the
Town of Oakville and Region
of Halton with respect to the
subject development. Should you have any questions, please
feel free to contact the undersigned.
Yours truly, FLORA DESIGNS INC.
Denish Kanani (EIT‐PEO)
Chirag C. Patel, P.Eng, PMP Project Coordinator
Senior Project Manager
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 11 of 35
Appendix "A" Plans
Location Map Site Plan Drawing
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 12 of 35
LOCATION MAP
(NTS)
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 13 of 35
SITE PLAN DRAWING
(NTS)
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 14 of 35
Appendix "B"
Storm Drainage System
Subdivision Master Storm Drainage Area Plan (Ashley Herak Subdivision Phase 2)
Subdivision Storm Drainage Area Plan (Ashley Herak Subdivision Phase 1)
Subdivision Storm Drainage Area Plan (Ashley Herak Subdivision Phase 2A ‐ 2B)
Existing Storm Drainage Area Plan
Proposed Concept Rough Grading Plan
Proposed Storm Drainage Area Plan
Runoff Coefficient Calculations
Pre‐development Peak Flow Calculations
Post‐development Peak Flow Calculations
Storm Sewer Design Sheet
Subdivision Storm Sewer Design Sheet (Ashley Herak Subdivision Phase 2A ‐ 2B)
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 15 of 35
SUBDIVISION MASTER STORM DRAINAGE AREA PLAN
(NTS) (Ref: SWM Report, Ashley Herak Subdivision Phase 2)
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 16 of 35
SUBDIVISION STORM DRAINAGE AREA PLAN
(NTS) (Ref: SWM Report, Ashley Herak Subdivision Phase 1)
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 17 of 35
SUBDIVISION STORM DRAINAGE AREA PLAN
(NTS) (Ref: SWM Report, Ashley Herak Subdivision Phase 2A and 2B)
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 18 of 35
EXISTING STORM DRAINAGE PLAN
(NTS)
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 19 of 35
PROPOSED CONCEPT ROUGH GRADING PLAN
(NTS)
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 20 of 35
PROPOSED STORM DRAINAGE AREA PLAN
(NTS)
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 21 of 35
RUNOFF COEFFICIENT CALCULATION In accordance with Development Engineering Procedures & Guidelines Manual, Town of Oakville
Landscape Areas 0.25
Asphalt, Concrete, Roof Areas 0.90
Pre‐Development Drainage Area
Area (m2)
Area (ha) Catchment # Imp. Total
Imp. Total
% Imp. Runoff Coeff. CA‐1‐Pre
0.00 17031.20 0.00 1.70 ‐‐
0.70 CA‐2‐Pre 0.00 10600.00 0.00
1.06 ‐‐ 0.25
0.00 27631.20 0.00 2.76 ‐‐
0.25 Pre‐development Runoff Coefficient ( C ) The runoff coefficients are based on the values allocated in the subdivision design
Post‐Development Drainage Area ‐ Discharge at Coronation Drive
Area (m2)
Area (ha) Catchment # Imp. Total
Imp. Total
% Imp. Runoff Coeff. CA‐1‐Post
2692.22 8974.06 0.27 0.90 30.00
0.45 CA‐2‐Post 3596.46 11988.21 0.36
1.20 30.00 0.45 CA‐3‐Post 1155.53
3851.75 0.12 0.39 30.00
0.45 TOTAL 7444.21 24814.02 0.74
2.48 30.00 0.45
Post‐Development Drainage Area ‐ Discharge at Eighth Line CA‐4‐Post
845.15 2817.18 0.08 0.28 30.00
0.45 TOTAL 845.15 2817.18 0.08
0.28 30.00 0.45
Post‐development Runoff Coefficient ( C ) C = 0.9 i + 0.25 (1 ‐ i), Where i=Imperviousness Ratio
Post‐Development Sub‐Catchment Area ‐ CA‐1‐Post
Area (m2)
Area (ha) Inlet Location Imp. Total
Imp. Total
% Imp.
Runoff Coeff. MH4 to MH3 1935.13
6450.42 0.19 0.65 30.00
0.45 MH3 to MH2 757.09 2523.64
0.08 0.25 30.00 0.45
2692.22 8974.06 0.27 0.90
30.00 0.45
Post‐Development Sub‐Catchment Area ‐ CA‐2‐Post Area (m2)
Area (ha) Inlet Location
Imp. Total Imp. Total % Imp.
Runoff Coeff.
MH6 to MH4 943.50 3144.99 0.09
0.31 30.00 0.45 MH6 to MH5
1487.02 4956.72 0.15 0.50 30.00
0.45 MH5 to MH3 1165.95 3886.50
0.12 0.39 30.00 0.45
3596.46 11988.21 0.36 1.20
30.00 0.45
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 22 of 35
PRE‐DEVELOPMENT PEAK FLOW CALCULATIONS
Drainage Area
Runoff Coefficient
Time of Concentration Catchment #
"A" in Hector "C" "Tc" in Minute CA-1-Pre 1.70 0.70 10 CA-2-Pre
1.06 0.25 10
Rational Method Calculation:
Q = 2.78CIA Where: Q = Runoff Quantity (Flow) in liter/sec A =
Drainage Area in Hectors C = Runoff Coefficient I = Average
Rainfall Intensity - mm/h Event 5 yr IDF Data Set, Town of Oakville
Coefficient, a = 1170.00
Coefficient, b = 5.80 ( I ) = a * (Tc + b)^c Exponent, c =
-0.84
Catchment # A (ha) I
(mm/h) C Q
(L/s) Q
(m3/s) CA-1-Pre 1.70 114.21 0.70 377.84 0.378 CA-2-Pre 1.06
114.21 0.25 84.14 0.084
Event 100 yr IDF Data Set, Town of Oakville Coefficient, a =
2150.00
Coefficient, b = 5.70 ( I ) = a * (Tc + b)^c Exponent, c =
-0.86
Catchment # A (ha) I
(mm/h) C Q
(L/s) Q
(m3/s) CA-1-Pre 1.70 200.80 0.70 664.29 0.664 CA-2-Pre 1.06
200.80 0.25 147.93 0.148
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 23 of 35
POST‐DEVELOPMENT PEAK FLOW CALCULATIONS
Drainage Area
Runoff Coefficient
Time of Concentration Catchment #
"A" in Hector "C" "Tc" in Minute CA-1-Post 0.90 0.45 10
CA-2-Post 1.20 0.45 10 CA-3-Post 0.39 0.45 10 CA-4-Post 0.28 0.45
10
Rational Method Calculation:
Q = 2.78CIA Where: Q = Runoff Quantity (Flow) in liter/sec A =
Drainage Area in Hectors C = Runoff Coefficient I = Average
Rainfall Intensity - mm/h Event 5 yr IDF Data Set, Town of Oakville
Coefficient, a = 1170.00
Coefficient, b = 5.80 ( I ) = a * (Tc + b)^c Exponent, c =
-0.84
Catchment # A (ha) I
(mm/h) C Q
(L/s) Q
(m3/s) CA-1-Post 0.90 114.21 0.45 127.16 0.127 CA-2-Post 1.20
114.21 0.45 169.55 0.170 CA-3-Post 0.39 114.21 0.45 55.10 0.055
TOTAL 0.352
CA-4-Post 0.28 114.21 0.45 39.56 0.040
Event 100 yr IDF Data Set, Town of Oakville Coefficient, a =
2150.00
Coefficient, b = 5.70 ( I ) = a * (Tc + b)^c Exponent, c =
-0.86
Catchment # A (ha) I
(mm/h) C Q
(L/s) Q
(m3/s) CA-1-Post 0.90 200.80 0.45 223.57 0.224 CA-2-Post 1.20
200.80 0.45 298.10 0.298 CA-3-Post 0.39 200.80 0.45 96.88 0.097
TOTAL 0.619
CA-4-Post 0.28 200.80 0.45 69.56 0.070
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 24 of 35
STORM SEWER DESIGN SHEET
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 25 of 35
SUBDIVISION STORM SEWER DESIGN SHEET (Ref: SWM Report, Ashley Herak Subdivision Phase 2A and 2B)
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 26 of 35
Appendix "C"
Sanitary Drainage System
Post‐development Sanitary Flow Calculations
Subdivision Sanitary Drainage Area Plan (Ashley Herak Subdivision Phase 2A ‐ 2B)
Proposed Sanitary Drainage Area Plan
Sanitary Sewer Design Sheet
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 27 of 35
POST‐DEVELOPMENT SANITARY FLOW CALCULATIONS (According
to Table 3-1, Design Criteria, Region of Halton)
Type of Development
Equivalent Population
Density (Persons/ha)
Unit Sewage Flow
(L/cap/day)
Infiltration Allowance (I)
(L/ha/s)
Single Family 55 275 0.28646
Dry Weather Flow Gross Site Area (A) = 2.76 ha
Average Dry Weather Flows (Q1) = ( ( P * q ) / 86400
) (Q1) = 0.48 L/Sec
Modified Harmon Peaking Factor
Design Population (P) = 0.152 In thousand
Harmon Peaking Factor (M) = ( 1 + ( 14 / ( 4 + P^0.5) ) ) (M) =
4.19
Infiltration Flow
Infiltration Flows (Q2) = ( I * A ) (Q2) = 0.79 L/Sec
Design Flow
Design Flows (Q) =
Average Dry
Weather Flow x
Average Peak Wastewater
+ Flow Factor
Infiltration Allowance
(I x A)
Design Flows (Q) = 2.82 L/Sec
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 28 of 35
SUBDIVISION SANITARY DRAINAGE AREA PLAN
(NTS) (Ref: SWM Report, Ashley Herak Subdivision Phase 2A and 2B)
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 29 of 35
PROPOSED SANITARY DRAINAGE AREA PLAN
(NTS)
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 30 of 35
SANITARY SEWER DESIGN SHEET
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 31 of 35
Appendix "D"
Water Supply System
Post‐development Water Supply Requirement Calculations
Proposed Water Distribution Plan
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 32 of 35
POST‐DEVELOPMENT WATER SUPPLY REQUIREMENT CALCULATIONS Post-development
population density (According to Table 2-1, Design Criteria, Region
of Halton) Development
Type Equivalent population
density (Persons/ha)
Area of Site (ha)
Population (Persons)
Single Family 55 2.76 152
Design water Demand is greater of following;
a) Max. Daily Demand Plus Fire Flow b) Max. Hourly Demand
Type of
Development Average Daily
Demand Unit
Single Family 275 liters/capita
Peaking Factors (Clause 2.4 & Table 2-2, Design Criteria,
Region of Halton)
Type of Development
Maximum Daily Demand
Maximum Hourly
Demand Single Family 2.25 4.00
Post-development Water Supply Requirements Design Water
Demand Population (Persons)
Per capita demand
(L/Cap/day)
Volume Required
(L/day)
Volume Required
(L/sec) Max. Daily Demand 152 619 94050 1.09
Max. Hourly Demand 152 1100 167200 1.94
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Page 33 of 35
PROPOSED WATER DISTRIBUTION PLAN
(NTS)
-
Functional Servicing and Stormwater Management Report Iroquois Ridge Subdivision, Coronation Drive, Town of Oakville, ON
File: 16313
_____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________