All Rights Reserved ©2015 Tokyo Electric Power Company, Inc. Fukushima Decommissioning Update Fukushima Decommissioning Update Spent Fuel Management Seminar Spent Fuel Management Seminar The Institute for Nuclear Materials Management The Institute for Nuclear Materials Management /U.S. Nuclear Infrastructure Council /U.S. Nuclear Infrastructure Council Arlington, Virginia Arlington, Virginia January 13 January 13 th th , 2015 , 2015 Kenji Tateiwa Kenji Tateiwa Manager, Nuclear Power Programs Manager, Nuclear Power Programs Tokyo Electric Power Company, Washington Office Tokyo Electric Power Company, Washington Office [email protected] [email protected]
19

Fukushima Decommissioning Update Fu… · Fukushima Decommissioning Update Spent Fuel Management Seminar ... Station Blackout Loss of Ultimate Heat Sink Cold Shutdown

Mar 30, 2018

Download

Documents

lynhu
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Fukushima Decommissioning Update Fu… · Fukushima Decommissioning Update Spent Fuel Management Seminar ... Station Blackout Loss of Ultimate Heat Sink Cold Shutdown

All Rights Reserved ©2015 Tokyo Electric Power Company, Inc.

Fukushima Decommissioning UpdateFukushima Decommissioning Update

Spent Fuel Management SeminarSpent Fuel Management SeminarThe Institute for Nuclear Materials ManagementThe Institute for Nuclear Materials Management

/U.S. Nuclear Infrastructure Council/U.S. Nuclear Infrastructure Council

Arlington, VirginiaArlington, VirginiaJanuary 13January 13thth, 2015, 2015

Kenji TateiwaKenji TateiwaManager, Nuclear Power ProgramsManager, Nuclear Power Programs

Tokyo Electric Power Company, Washington OfficeTokyo Electric Power Company, Washington [email protected]@tepco.co.jp

Page 2: Fukushima Decommissioning Update Fu… · Fukushima Decommissioning Update Spent Fuel Management Seminar ... Station Blackout Loss of Ultimate Heat Sink Cold Shutdown

2All Rights Reserved ©2015 Tokyo Electric Power Company, Inc.

Great East Japan Earthquake (March 11, 2011)

http://archive.shinsai.yahoo.co.jp/

http://archive.shinsai.yahoo.co.jp/

http://archive.shinsai.yahoo.co.jp/Cruise Ship Stranded

Houses Swept Away

Largest earthquake (M9.0) and tsunami (M9.1) in recorded history of Japan

20+ m tsunami run-up in coast line spanning 200 km

560 km2 flooded (10x Manhattan)

19,000 dead/missing

http://earthobservatory.nasa.gov/NaturalHazards/view.php?id=77331

Epicenter

Page 3: Fukushima Decommissioning Update Fu… · Fukushima Decommissioning Update Spent Fuel Management Seminar ... Station Blackout Loss of Ultimate Heat Sink Cold Shutdown

3All Rights Reserved ©2015 Tokyo Electric Power Company, Inc.

3/16-19

3/20

3/14

3/12

42 3642 1531

3/15

3/13

3/11

Fukushima Daini (2F)Fukushima Daiichi (1F)Date(2011)

3/14 17:00

3/14 1:24RHR

3/14 7:13RHR

3/14 15:42RHR

3/14 18:00

3/15 7:15

3/12 12:15

3/20 14:30

3/19 22:14RHR

3/12 8:13D/G-6B

3/22 10:35P/C-4D

3/22 10:36P/C-4D

3/20 15:46P/C-2C

3/20 15:46P/C-2C

3/19 5:00RHR

3/20 14:30

Station Blackout

Loss of Ultimate Heat Sink

Cold Shutdown

3/12 15:36 Unit 1 Explosion

3/15 6:00-6:10 Unit 4 Explosion

3/14 11:01 Unit 3 Explosion

3/11 15:27 1st Tsunami, 15:35 2nd Tsunami 3/11 15:22~ Tsunamis

Water Injection: NOHeat Removal: NO

Water Injection: YESHeat Removal: NO

Water Injection: YESHeat Removal: YES

Overview of the 10-Unit Simultaneous Accidents

Page 4: Fukushima Decommissioning Update Fu… · Fukushima Decommissioning Update Spent Fuel Management Seminar ... Station Blackout Loss of Ultimate Heat Sink Cold Shutdown

4All Rights Reserved ©2015 Tokyo Electric Power Company, Inc.

My Post-Accident Activities

IAEA Preliminary Mission(4/6/2011@Fukushima Daiichi NPS)

IAEA: International Atomic Energy Agency

Page 5: Fukushima Decommissioning Update Fu… · Fukushima Decommissioning Update Spent Fuel Management Seminar ... Station Blackout Loss of Ultimate Heat Sink Cold Shutdown

5All Rights Reserved ©2015 Tokyo Electric Power Company, Inc.

Current Status of Fukushima Daiichi (1F)

Unit 4

Unit 3

Unit 2Unit 1

Unit 2Unit 1

Unit 3

Live Camera View(as of 1/13/2015)

http://www.tepco.co.jp/en/nu/f1-np/camera/index2-e.htmlhttp://www.tepco.co.jp/en/nu/f1-np/camera/index-e.html

View 1

View 2

Page 6: Fukushima Decommissioning Update Fu… · Fukushima Decommissioning Update Spent Fuel Management Seminar ... Station Blackout Loss of Ultimate Heat Sink Cold Shutdown

6All Rights Reserved ©2015 Tokyo Electric Power Company, Inc.

Progress Made at 1F Unit 1

Remote-operated boat and robot identified leakage locations in torus room

Torus Room (11/13/2013)

Reactor Building (3/15/2011)

Reactor Building Cover (installed in Oct. 2011)

Torus Room (5/27/2014)

Page 7: Fukushima Decommissioning Update Fu… · Fukushima Decommissioning Update Spent Fuel Management Seminar ... Station Blackout Loss of Ultimate Heat Sink Cold Shutdown

7All Rights Reserved ©2015 Tokyo Electric Power Company, Inc.

Progress Made at 1F Unit 1 (cont’d)

Reactor building cover to be dismantled in preparation for fuel removal

Removal of Roof of Cover (10/31/2014)

Condition of Refueling Floor (10/31/2014)

Schematic of Fuel Removal Structure

Page 8: Fukushima Decommissioning Update Fu… · Fukushima Decommissioning Update Spent Fuel Management Seminar ... Station Blackout Loss of Ultimate Heat Sink Cold Shutdown

8All Rights Reserved ©2015 Tokyo Electric Power Company, Inc.

Progress Made at 1F Unit 2Blow-out Panel

Closed (3/11/2013)

Inside Containment (8/12/2013)

Steam Coming Out From Blow-out Panel (4/10/2011)

Cables(U shape)

CRD replacement rail

PedestalCamera

Video images obtained inside primary containment

Page 9: Fukushima Decommissioning Update Fu… · Fukushima Decommissioning Update Spent Fuel Management Seminar ... Station Blackout Loss of Ultimate Heat Sink Cold Shutdown

9All Rights Reserved ©2015 Tokyo Electric Power Company, Inc.

Progress Made at 1F Unit 2 (cont’d)

Robot retrieved core samples from refueling floor(March 2014)

Maneuverability Testing

Progressing through Obstacles

Core Sampling of the Floor

Page 10: Fukushima Decommissioning Update Fu… · Fukushima Decommissioning Update Spent Fuel Management Seminar ... Station Blackout Loss of Ultimate Heat Sink Cold Shutdown

10All Rights Reserved ©2015 Tokyo Electric Power Company, Inc.

Progress Made at 1F Unit 3

Spent Fuel Pool (Feb. 2013)

Large Rubble Removed (10/11/2013)

Crippled Reactor Building (3/15/2011)

MSIV Room (5/15/2014)

Robot found leakage location in reactor building

main steam lineexpansion joint

Page 11: Fukushima Decommissioning Update Fu… · Fukushima Decommissioning Update Spent Fuel Management Seminar ... Station Blackout Loss of Ultimate Heat Sink Cold Shutdown

11All Rights Reserved ©2015 Tokyo Electric Power Company, Inc.

Progress Made at 1F Unit 3 (cont’d)

Rubble in spent fuel pool being removed by remote operationPreparation to construct

fuel removal structure

Fuel Handling Machine (FHM)

Mast

Fuel Removal Structure

Fuel Handling MachineOverhead

CraneRain Cover

Page 12: Fukushima Decommissioning Update Fu… · Fukushima Decommissioning Update Spent Fuel Management Seminar ... Station Blackout Loss of Ultimate Heat Sink Cold Shutdown

12All Rights Reserved ©2015 Tokyo Electric Power Company, Inc.

コンクリート壁

使用済燃料プール

鋼製支柱

コンクリート壁

鋼製支柱

<コンクリート打設後>

<コンクリート打設前>

コンクリート壁

使用済燃料プール

鋼製支柱

コンクリート壁

鋼製支柱

<コンクリート打設後>

<コンクリート打設前>

Concrete wall

Progress Made at 1F Unit 4

Fuel Removal Structure (Nov. 2013)Water Injection byConcrete Pumper (3/22/2011)

Fuel Removal from SFP (11/18/2013)SFP Structure Reinforced

(7/30/2011)

Steel Pillars

Fuel removal from spent fuel pool began in Nov. 2013

Page 13: Fukushima Decommissioning Update Fu… · Fukushima Decommissioning Update Spent Fuel Management Seminar ... Station Blackout Loss of Ultimate Heat Sink Cold Shutdown

13All Rights Reserved ©2015 Tokyo Electric Power Company, Inc.

Progress Made at 1F Unit 4 (cont’d)

Successful removal of all fuels from SFP (12/22/2014)http://www.tepco.co.jp/en/decommision/index-e.html

Page 14: Fukushima Decommissioning Update Fu… · Fukushima Decommissioning Update Spent Fuel Management Seminar ... Station Blackout Loss of Ultimate Heat Sink Cold Shutdown

14All Rights Reserved ©2015 Tokyo Electric Power Company, Inc.

Circulating-Water Core Cooling System at 1F

All reactor cores stably cooledIncreasing water inventory posing challenge

Partially-treatedWater Tanks

347,000 m3= 140 x Olympic-size pool

GroundwaterInflow

+400 m3/day 3 km-longClosed Loop

Treated Water Tanks

RadioactiveWaste

Storage

Cesium Removal (Kurion/SARRY)

Chloride Removal (RO)

Turbine Bldg.

Reactor Bldg.

Contaminated Water

Core Injection320 m3/day

Multi-nuclides Removal (ALPS)

Page 15: Fukushima Decommissioning Update Fu… · Fukushima Decommissioning Update Spent Fuel Management Seminar ... Station Blackout Loss of Ultimate Heat Sink Cold Shutdown

15All Rights Reserved ©2015 Tokyo Electric Power Company, Inc.

Tackling Water Issues: “Seven Samurai”

Multiple water treatment facilities employed to reduce risk of contaminated water

Cs+Sr Adsorption(SARRY)

Cs+Sr Adsorption(KURION)

Mobile StrontiumRemoval

Multi-NuclideRemoval (ALPS) Improved ALPS

High-PerformanceALPS

RO Water Treatment(Sr-Removal)

Page 16: Fukushima Decommissioning Update Fu… · Fukushima Decommissioning Update Spent Fuel Management Seminar ... Station Blackout Loss of Ultimate Heat Sink Cold Shutdown

16All Rights Reserved ©2015 Tokyo Electric Power Company, Inc.

Tackling Water Issues: Emergency/Fundamental Measures

(c) GeoEye/Japan Space Imaging

Groundw

ater Flow

Groundwater BypassSub-drain

Frozen-Soil Wall

Sea-Side Impermeable

Wall

Water Glass

Prevent groundwater from being contaminatedPrevent

contaminated groundwater from flowing into seaReduce

groundwater inflow into buildings

Page 17: Fukushima Decommissioning Update Fu… · Fukushima Decommissioning Update Spent Fuel Management Seminar ... Station Blackout Loss of Ultimate Heat Sink Cold Shutdown

17All Rights Reserved ©2015 Tokyo Electric Power Company, Inc.

Tackling Water Issues: Frozen-Soil Wall

Stop groundwater inflow by impermeable barrierConstruction work commenced: June 2014Plan to begin freezing soil: March 2015Freezer plant: 230 kW x 30 units

Freezer plant

Freezer plant Unit 1

Unit 2

Unit 3

Unit 4

Freezer pipes1,500 m-long circulation

of refrigerant

Page 18: Fukushima Decommissioning Update Fu… · Fukushima Decommissioning Update Spent Fuel Management Seminar ... Station Blackout Loss of Ultimate Heat Sink Cold Shutdown

18All Rights Reserved ©2015 Tokyo Electric Power Company, Inc.

Decommissioning Roadmap for 1F

Phase-1 Phase-2 Phase-3

Begin removal of fuels from spent fuel pools

Cold ShutdownCondition Achieved(Dec., 2011)

Within2 years

Within10 years

30 to40 years

Begin retrieval of fuel debris

Complete decommissioning

Global collaboration vitally important to tackle this unprecedented undertaking

Common pool

CraneFuel Handling Machine

Unit 4: Nov. 2013

Stop Leakage Flood PCV andRemove Fuel Debris

Today

Page 19: Fukushima Decommissioning Update Fu… · Fukushima Decommissioning Update Spent Fuel Management Seminar ... Station Blackout Loss of Ultimate Heat Sink Cold Shutdown

19All Rights Reserved ©2015 Tokyo Electric Power Company, Inc. 19

TEPCO’s Post-Accident Activities in the U.S.

Professional Organizations, Think Tanks, NPOs, Media

AcademiaGlobal Organizations

Nuclear Industry Gov’t Agencies

Committed to sharing lessons learned; making nuclear power plants safer; carrying out decommissioning safely

Hosting Weekly Update Teleconferences