TEST OR INSPECTION ITEM STAGE II DECOMMISSIONING STAGE II DECOMMISSIONING NOTIFICATION TO STATE AUTOMATIC TANK GAUGE MONITORING CERTIFICATION PRECISION LINE AND LEAK DETECTOR TEST UST SYTEM INSPECTION BY MAINE CERTIFIED UNDERGROUND OIL STORAGE TANK INSTALLER OR INSPECTOR (CTI) CATHODIC PROTECTION TEST 1. FOR IMPRESSED SYSTEM 2. FOR SACRIFICIAL SYSTEM A/B OPERATOR INSPECTION REMOVAL OF SINGLE WALL STEEL UST SYSTEMS (TANK AND/OR PIPING) Petroleum Equipment Sales & Service PES WILD All requirements above are subject to change. Information provided for reference only. For full legal requirements, please consult state requirements and regulations. FREQUENCY REQUIREMENTS BY DEC 2013 NA ANNUAL NR ANNUAL ANNUAL ANNUAL WEEKLY END OF 30-YR WARRANTY WILDCO PETROLEUM EQUIPMENT SERVICE COMPLIANCE AND TESTING DIVISION MAINE FUEL TANK SYSTEM COMPLIANCE TESTING AND INSPECTION REQUIREMENTS