FUEL GAS HANDLING SYSTEM AND BOG RELIQUEFACTION FOR LNG CARRIER EIRIK MELAAEN WÄRTSILÄ OIL & GAS SYSTEMS AS 1 © Wärtsilä 12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen
26

Fuel Gas Handling System and BOG Reliquefaction for LNG

Feb 11, 2022

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Fuel Gas Handling System and BOG Reliquefaction for LNG

FUEL GAS HANDLING SYSTEMAND BOG RELIQUEFACTION

FOR LNG CARRIEREIRIK MELAAEN

WÄRTSILÄ OIL & GAS SYSTEMS AS

1 © Wärtsilä 12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

Page 2: Fuel Gas Handling System and BOG Reliquefaction for LNG

Wärtsilä Oil & Gas Systems

Agenda:• BOG Reliquefaction plant• Low Pressure Gas to Engine(e.g. DFDE, 2-Stroke DFE) and BOG

Reliquefaction System• High Pressure Gas to Engine(Gas Diesel Engine) and BOG

Reliquefaction System• Future concepts

12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen2 © Wärtsilä

Page 3: Fuel Gas Handling System and BOG Reliquefaction for LNG

Our Expertise in the Gas Value Chain

Exploration &development

ProductionFPSOFlare recoveryOil separation

LNG carrier

LNG liquefaction& terminal

Distribution & transportPower generation

Oil tankerwith VOC

Exploration & Drilling

Production & liquefaction

Transport & storage

Receiving terminals &

regasification

Distribution & transport to the

users

• LNG fuel gas systems for OSVs

• Gensets

• LNG fuel gas systems• LPG, LEG & LNG cargo

handling

• On- & Offshore small scale liquefaction

• Antiflaring/VOC• Oil separation• Gas FPSO

• Jetty & Floating regasification

• Bunkering & barges• Receiving terminals

• Gas/LNG distribution/logistics

• Feed gas to Power plants

LNG bunkering& barges

LNG fuelledvessels

Regasification(FSRU/JRU)

Small scale liquefaction plants

LNG/LBG

LNG receiving terminal

Re-liquefaction of Boil Off Gas,

12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen3 © Wärtsilä

Page 4: Fuel Gas Handling System and BOG Reliquefaction for LNG

• First free-standing small scale LNG plant in Northern Europe delivered March 2003.

• Hamworthy EPCIC contract with GASNOR.

• Technology feasibility and robustness thoroughly and successfully demonstrated.

35 LNG BOGReliquefaction systems

Kollsnes II LNG

• 2 x capacity of existing Linde plant (Kollsnes I).

• Hamworthy EPCIC contract with GASNOR.

• Full production August 2007.

Al Gattara (Hyundai) BOG ReliquefactionSystem (58,000 tpy )

Kollsnes II (Gasnor) LNG Plant(84,000 tpy )

Snurrevarden LNG Plant(22,000 tpy )

LNG Technology Development

Wärtsilä (Hamworthy) LNG process history

12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen4 © Wärtsilä

Page 5: Fuel Gas Handling System and BOG Reliquefaction for LNG

BOG RELIQUEFACTION PLANTBOG RELIQUEFACTION PLANT

Page 6: Fuel Gas Handling System and BOG Reliquefaction for LNG

BOG to Engines or Returned to Tank

Different solutions available for LNG carrier propulsion:1. Use BOG & LNG as fuel e.g steam turbines, dual-fuel diesel electric, dual-fuel engines

12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen6 © Wärtsilä

Pattern for ship’s using BOG & LNG as fuel for propulsion

Laden BallastBallast

Maximum(Laden voyage)

Minimum(Ballastvoyage)

LNG level in tanks

Minimum heel required for cool down of tanks

Fuel used during roundtrip(Natural BOG & forced)

Additional LNG delivered with full BOG Reliquefaction System

2. BOG reliquefaction, liquefy and sell excessive BOG or all LNG loaded onboard

Page 7: Fuel Gas Handling System and BOG Reliquefaction for LNG

Boil-off gas from cargo tanks vs. Fuelgas required by the engine

12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen7 © Wärtsilä

Speed of the Vessel (knots)

Boi

l-off

Gas

(kg/

hr)

Available BOG

BO

G c

onsu

med

in

the

engi

neE

xces

sB

OG

ForcedLNG

Balance between Vessel speed and BOG flow

Avai

labl

e B

OG

Page 8: Fuel Gas Handling System and BOG Reliquefaction for LNG

Boil-

off g

as

BOG Reliquefaction System (LNGRS – Mark III)No feeding of gas to engines (QFLEX vessels)

12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen8 © Wärtsilä

Page 9: Fuel Gas Handling System and BOG Reliquefaction for LNG

Mark III layout/QG

12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen9 © Wärtsilä

Cold box

Typical dimensions: 30 x 22,5 x 7 m (L x W x H)Equipment weights: 240 ton

LNG pump skid N2

reserviorN2 supply skid

BOG compressorsPre-heater

N2 companders

N2 companders

Page 10: Fuel Gas Handling System and BOG Reliquefaction for LNG

ENGINES REQUIRING LOW ENGINES REQUIRING LOW PRESSURE GAS PRESSURE GAS (DFDE, 2(DFDE, 2--STROKE DFE)STROKE DFE)

AND BOG RELIQUEFACTION AND BOG RELIQUEFACTION PLANTPLANT

Page 11: Fuel Gas Handling System and BOG Reliquefaction for LNG

Boil-

off g

as

12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen11 © Wärtsilä

LP-compressor

BOG Reliquefaction System (LNGRS)Low-Pressure Fuel Gas Supply System (LP FSSS)

Page 12: Fuel Gas Handling System and BOG Reliquefaction for LNG

Wärtsilä Oil & Gas Systems AS

12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen12 © Wärtsilä

Dual-fuel propulsion system

Page 13: Fuel Gas Handling System and BOG Reliquefaction for LNG

ENGINES REQUIRING HIGH ENGINES REQUIRING HIGH PRESSURE GAS PRESSURE GAS ((GasGas Diesel Diesel EngineEngine))

AND BOG RELIQUEFACTION AND BOG RELIQUEFACTION SYSTEMSYSTEM

Page 14: Fuel Gas Handling System and BOG Reliquefaction for LNG

BOG Reliquefaction System (LNGRS)High-Pressure Fuel Gas Supply System (HP FGSS)

12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen14 © Wärtsilä

HP-pump and Optimizer

Page 15: Fuel Gas Handling System and BOG Reliquefaction for LNG

PFD – Vaporization System

12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen15 © Wärtsilä

TO GAS ENGINE

HP PUMP

BRINE PUMP

LNG VAPORIZER

STEAM/HOT WATERHEATER

HIGH PRESSURE GASOR LNG FROM CARGO TANKSCONDENSATE FROM BOG RS

Temprature: 45 ±10°CPressure: Max 300 bar

Temprature: -160°CPressure: 3-5 bar

Page 16: Fuel Gas Handling System and BOG Reliquefaction for LNG

HP LNGpump (2)

Brine heater (1)

Brine circulationpump (2)

Pulsedamper (1)

Suctiondrum (1)

LNG vaporizer (1)

Updated Arrangement - Gas Supply System

Typical dimensions: 7 x 3 x 2 m (L x W x H)Equipment weights: Ca 25 ton

HP LNGpump (2)

12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen16 © Wärtsilä

Page 17: Fuel Gas Handling System and BOG Reliquefaction for LNG

BOG Reliquefaction System (LNGRS)High-Pressure Fuel Gas Supply System (HP FGSS)

12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen17 © Wärtsilä

HP-compressor and HP-pumpLNGRS for excessive BOG?

Page 18: Fuel Gas Handling System and BOG Reliquefaction for LNG

Wärtsilä Oil & Gas Systems AS

12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen18 © Wärtsilä

Layout – Burckhardt compressors + BOG Reliq plant

Typical dimensions:30 x 22,5 x 7 m (L x W x H)

Page 19: Fuel Gas Handling System and BOG Reliquefaction for LNG

FUTURE CONCEPTSFUTURE CONCEPTSNEW MRNEW MR

TWO REFERENCES:TWO REFERENCES:NEW MR DEMONSTRATION PLANT NEW MR DEMONSTRATION PLANT –– 2,5 TON/DAY2,5 TON/DAY

NEWMR EGE PLANT NEWMR EGE PLANT –– 11 TON/DAY11 TON/DAY

Page 20: Fuel Gas Handling System and BOG Reliquefaction for LNG

Demonstration plant – 2,5 ton/hr

12 November 201320 © Wärtsilä Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

Page 21: Fuel Gas Handling System and BOG Reliquefaction for LNG

New MR Process Overview

12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen21 © Wärtsilä

Page 22: Fuel Gas Handling System and BOG Reliquefaction for LNG

Pictures EGE - Project

12 November 201322 © Wärtsilä Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

Page 23: Fuel Gas Handling System and BOG Reliquefaction for LNG

Flow Sheet of Liquefaction Plant

12 November 201323 © Wärtsilä

H2O & CO2removal

LNG tank

Gas pre-

cooling

Cold Box

MR refrigeration

unit

Pre Cooling system

Main biomethane flow

Mixed refrigerant (MR) flow

CO2 from stripper column

Glycol cooling from pre-cooling unit

Return gas truck loading

Export LNG pump

Gas return from trucks

Raw gas inlet

To flare gas systemExpansion

Flare gas

H2O &

CO2

Pretreatment Liquefaction process

Storage system

LBG Truck Filling station

Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

Page 24: Fuel Gas Handling System and BOG Reliquefaction for LNG

BOG Reliquefaction System (LNGRS)

NewMR LP-Pressure Fuel Gas Supply System (LP FGSS)Compressor and Forcing VaporizerLNGRS for excessive BOG

12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen24 © Wärtsilä

Page 25: Fuel Gas Handling System and BOG Reliquefaction for LNG

Summary – Wärtsilä NewMR technology

BOG reliquefaction system on LNG vessels in the future

NewMR Why?• Demonstration plant proven

to be successful– Robust– Low OPEX– Load variations

• Robust main rotating machinery with high efficiency

• Designed for unmanned operation

• Shorter delivery time• Simple energy supply,

only electric power needed• Easy and quick start up and

shut down of all systems• Standardisation of

capacities: 1,5 ton/hr, 2,5 ton/hr etc.

• Supplied as modules• Refrigerant process with

phase changes which reduce the size of equipment and piping

• Simplified maintenance• Reduced CAPEX compared

to Nitrogen loop• Two references

12 November 201325 © Wärtsilä Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

Page 26: Fuel Gas Handling System and BOG Reliquefaction for LNG

EIRIK MELAAENEIRIK MELAAENBusiness DevelopmentBusiness Development ManagerManagerTel:Tel: +47 66 10 95 66+47 66 10 95 66Mobile: +47 959 67 377Mobile: +47 959 67 377Fax:Fax: +47 815 48 510+47 815 48 510EE--mail: mail: [email protected]@hamworthy.comWeb:Web: http://www.hamworthy.comhttp://www.hamworthy.com

Thank you for your attention!