3 June 2003 FT Status and Plans • Overall – CTS • Used to test VRBC boards • Qualified several AFE boards • Lots of changes made to VRBC’s – Current status • 50 >> old VRBC, new firmware • 51 >> old VRBC, new firmware • 52 >> new VRBC, new firmware • 53 >> new VRBC, new firmware • AFE board swap – Installed CFT board in FPD – Worked on CFT and FPS boards
FT Status and Plans. Overall CTS Used to test VRBC boards Qualified several AFE boards Lots of changes made to VRBC’s Current status 50 >> old VRBC, new firmware 51 >> old VRBC, new firmware 52 >> new VRBC, new firmware 53 >> new VRBC, new firmware AFE board swap - PowerPoint PPT Presentation
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
3 June 2003
FT Status and Plans
• Overall
– CTS
• Used to test VRBC boards
• Qualified several AFE boards
• Lots of changes made to VRBC’s
– Current status
• 50 >> old VRBC, new firmware
• 51 >> old VRBC, new firmware
• 52 >> new VRBC, new firmware
• 53 >> new VRBC, new firmware
• AFE board swap
– Installed CFT board in FPD
– Worked on CFT and FPS boards
3 June 2003
July Shutdown
• General items being considered– Cryostat work
• About 1 degK left in setting• Have been moving about 0.1• Will not warm up “unless” have further problems
– Cassette work• Only if we warm up• Perhaps install ‘testing’ cassette
– Will do• Pull and modify ALL AFE boards
– Unused channel fix for AFE brds– 53MHz readout
• Check/calibrate/fix AFE lvps monitoring• Add SEQ crate monitoring• Finish LED pulser boards and cabling• New firmware• Fix slot problems – AFE & SEQ
– 4B6 SVX Downloads– 6B2/3 SEQ signals @ SEQ BP
– May do• AC remote shutoff for AFE lvps• Re-cable back of SEQ crate PC04