Top Banner
FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC
24

FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC.

Mar 27, 2015

Download

Documents

Marissa Moran
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC.

FRR Request for ApprovalBAL-012-WECC-2-CR

W. Shannon Black

Manager, Business Practices and Standards Processes

June 2009 Operating Committee, SLC

Page 2: FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC.

FRRDT Criterion is Complete

● Solicited / Answered Comments Three times

● Final Drafting April 17, 2009

● Communicated to the OC 30-days notice May 22, 2009

http://www.wecc.biz/documents/2009/Standards/FRR/OC/OC%20notification%20letter%20for%20FRR%20Regional%20Criterion%20Vote.pdf

● Presented for your approval2

Page 3: FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC.

Majority Vote

● The Process requires a majority vote of the Team to move the criterion to the OC. 15 member team

9 = “Yes” 3 = “No” 1 = “Abstain” 2= “No Response”

3

Page 4: FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC.

Overview

Proposed Criteria

Page 5: FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC.

What it’s not…

● Not a standard. It is a criteria.

● Not a replacement for spinning reserves Reserve standards and criteria stay intact

BAL-002-WECC-1 BAL-STD-002-0

● Not a mandate to change governor settings Outside the stated scope of the Request

Page 6: FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC.

What it is…

A Measurement Criteria

Page 7: FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC.

How does it work?

● Resources Check the filing on the WECC Web

Over 100 pages of studies to support the direction and conclusions drawn by the drafting team. http://www.wecc.biz/index.php?module=pnForum&

func=viewtopic&topic=1005

Over 500 Web hits in the last few weeks

Page 8: FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC.

Where Did We Start?

● Keep the lights on Prevent triggering Under Frequency Load Shedding

Some trigger as early 59.5 Hz

● Assuming the worst Two largest generators tripped at the same time at

the same plant About 2800 MW of gen / NERC Category C event (AKA: Primary Frequency Response Amount)

Load was at its lowest 80 GW

8

Page 9: FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC.

Where Did We Start?

● If two of the three generators at Palo Verde dropped off line at the same time…

● On the day with the lightest reasonable load…

● What would we have to do to keep the lights on?

9

Page 10: FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC.

What’s in it?

● Modeled the data

● Showed two basic responses Primary Response

(AKA: Point C) Zero to 30 seconds

Secondary Response (AKA: Point B) 31 seconds to 15

minutes 10

Frequency Response

A = 60.000

C = 59.812

B = 59.874

59.750

59.775

59.800

59.825

59.850

59.875

59.900

59.925

59.950

59.975

60.000

60.025

60.050

-30 -20 -10 0 10 20 30 40 50 60

Time (Seconds)

Frequency (Hz)

Page 11: FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC.

A Question of Magnitude

● What should we measure in the Primary Response? “Plethora” of minor deviations each year

The benefit of measuring and responding was outweighed by the burden

“About 10” annually lower than 59.85 Hz Reasonable balance between benefit/burden Burden is light Significant enough to be a good indicator

11

Page 12: FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC.

A Question of Magnitude

● Frequency Response Measurement Event

● Trigger point Set at 59.85 Hz and below

● Measure response for two periods Primary

0 – 30 seconds

Secondary 31 seconds through 15 minutes or 59.9 which ever

comes first

12

Page 13: FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC.

What happens when an event occurs?● RC

Notes the excursion Within five business days

Tells the BAs or RSGs “Point A” (When the event begins) Total WECC gen on-line The BAs/RSGs “Allocation Ratio”

Needed so the BA/RSG can self score their response

13

Page 14: FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC.

Primary Frequency Response Percent (PFRP) Formula: A/B = CX100%

Primary Frequency Response Percent =

(PFR / PRO) * 100%.

A = PFR is the max change in NIa during the PFRP (1st 30 seconds)

B = PRO is

[PFRA * (0.5 BA Gen + 0.5 BA Load) + PFRT] * (AR)

Total WECC Gen

14

Page 15: FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC.

Just The Primary Basics

● Step 1 - Find it! (A) BA’s Max change in Net Actual Interchange during PFRP 15 MW

Assume 15 MW.

(B) BA’s total Gen plus Load divided in half 1500 MW Assume 1500 MW.

(C) WECC total on-line gen during the PFRP 150,000 MW Assume 150,000 MW

(D) N-2G 2800 MW Assume 2800 MW.

(E) Frequency delta .5 Hz Actual frequency minus schedule frequency. Assume .5 Hz drop.

● Step 2- Divide BA’s total Gen plus Load divided in half (B) / WECC gen (C) = (F) .1%

● Step 3 - Times ((F) X (D)) X (E) / .5 = (G) 28 MW

● A/G = Score!!! 53%

Page 16: FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC.

Primary Frequency Response (PFR)

● “Shall average greater than or equal to 100% during the Primary Frequency Response Measurement Period.”

● Why average 100%? Primary purpose

Measure interconnection – not punish the BA/RSG Machines are not “always” dependable but “on average”

they are The average mitigates the abnormal but serves as a

solid indicator of available reserves Risky to game / hard to recover from “zero”

16

Page 17: FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC.

Secondary Response Formula

If ACE is greater than or equal to zero:(For brevity the separate formula for less-than-zero is not covered in this PPT.)

n

BRR = {∑ [(10BΔFj + ACEj) / SROj] / n} * 100 j= 0

Bias Response Ratio = is the measure of a BA’s frequency response relative to a

BA’s Bias – measured by BA’s ACE or change in ACE

17

Page 18: FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC.

Just The Secondary BasicsIf Ace is greater than or equal to zero when event occurs

● Step 1 - Find it! (A) The Frequency Bias stated in MW/Hz. -750 MW

For the specific BA. Assume -750 MW/Hz.

(B) The frequency dip in HZ -0.126 HZ In a given scan rate. Assume -0.126.

(C) The frequency dip response in MW 94.5 MW A X B = C

(D) ACE -35 MW In a given scan rate. Assume -35 MW.

● Step 2 - Add The frequency dip response in MW (C) + ACE (D) = (E) 59.5 MW

● Step 3 - Divide ((E) / (C)) X 100 = The frequency dip response in MW 63%

● Your Score!!!!! 63%

Page 19: FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC.

Secondary Response

● Why a response average greater than or equal to 50% and less than or equal to 200%?

● Purpose Get enough response without violating SOLs

Enough is 50%o WECC Bias is about 2088 or twice what it takes to

restore frequency to normal for a 59.75 Hz dip once secondary period begins

Too much to 200%

19

Page 20: FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC.

Averaging the Scan Rates

● For each frequency event during the secondary response all scans are averaged until 59.9 Hz regardless of the number of scans.

Page 21: FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC.

Request for Approval: Errata

● Section D.1.3 Data Retention Refers to “M.1 through M7” Should be “M1 through M6”

● Should replace / retire current measurement criteria BAL-00X-1

● M5 has a typo where "during the" has been repeated. Delete one of them.

● R3.1.1 references M4.6, which doesn’t exist anymore. Corrected.

21

Page 22: FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC.

Request for Approval: Motion 1 of 2

● Suggested Motion

“Move that the Operating Committee approve BAL-012-WECC-2-CR known as the Frequency Responsive Reserves criteria and forward the criteria to the WECC Board of Directors for appropriate action.”

Page 23: FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC.

Request for Approval: Motion 2 of 2

● Suggested Motion if BAL-012-WECC-2-CR is approved

“Having approved BAL-012-WECC-2-CR as a replacement for the current Frequency Responsive Reserves criteria designated as BAL-00X-1 (also entitled Frequency Responsive Reserves), move to retire BAL-00X-1.”

Page 24: FRR Request for Approval BAL-012-WECC-2-CR W. Shannon Black Manager, Business Practices and Standards Processes June 2009 Operating Committee, SLC.

Questions?

Panel Mr. Baj Agrawal Mr. David Lemmons Mr. John Stout Mr. Ken Wilson