This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
K 04/10/2018 Balcony Post RemovedJ 03/10/2018 Change to Balcony GlassI 15/01/2018 Doors AmendedH 04/01/2018 Changes to first floor end wallsG 13/12/2017 Walkway AmendedF 21/11/2017 Adjusted First Floor Arrangement, Balcony and StructureE 04/10/2017 Block Plan UpdatedD 11/07/2017 Stairs AmendedC 08/06/2017 Weather Boarding AddedB 28/04/2017 First Floor AmendedA 28/04/2017 Planning Application
K 04/10/2018 Balcony Post RemovedJ 03/10/2018 Change to Balcony GlassI 15/01/2018 Doors AmendedH 04/01/2018 Changes to first floor end wallsG 13/12/2017 Walkway AmendedF 21/11/2017 Adjusted First Floor Arrangement, Balcony and StructureE 04/10/2017 Block Plan UpdatedD 11/07/2017 Stairs AmendedC 08/06/2017 Weather Boarding AddedB 28/04/2017 First Floor AmendedA 28/04/2017 Planning Application
REV DATE DESCRIPTION
B
Footpath
Retaining Wall
Bank
7473 75 76 77 80 81 82 83 847978
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
CHADDESLEY GLEN
CH
ADD
ESLEY GLEN
Block8COASTAL SLOPE
PROMENADE
POOLE H
EAD
BEACH
N
N
N
Front Perspective1:200
Site Plan1:100
Beach Perspective1:100
Side Perspective1:200
Block Plan1:500Location Plan
1:1250
Promenade
Steps
Beach
Flat Roof
Bank
DRAINAGE (SuDS)Rainwater will be added to exisitng system which flowsunder the promenade and onto the beach entering the sea.
EXTERNAL MATERIALSWalls White render and weather boardingRoof Mineral FeltWindows & Doors PVCu - WhiteFascias & Soffits PVCu - WhiteRainwater Goods Aluminium - BlackBalustrade Stainless steel and glass Air vents to be added to the rear of the building at ground and first floor.
Admin
Text Box
PLANNING DRAWINGS FOR REFERENCE ONLY - NOT CONSTRUCTION DRAWINGS
K 04/10/2018 Balcony Post RemovedJ 03/10/2018 Change to Balcony GlassI 15/01/2018 Doors AmendedH 04/01/2018 Changes to first floor end wallsG 13/12/2017 Walkway AmendedF 21/11/2017 Adjusted First Floor Arrangement, Balcony and StructureE 04/10/2017 Block Plan UpdatedD 11/07/2017 Stairs AmendedC 08/06/2017 Weather Boarding AddedB 28/04/2017 First Floor AmendedA 28/04/2017 Planning Application
REV DATE DESCRIPTION
Section BB as Proposed1:50
Rear (North) Elevation1:50
Rear (North) Elevation1:50
Front (South) Elevation1:50
Side (East) Elevation1:50
Side (West) Elevation1:50
Section BB as Existing1:50
Admin
Text Box
PLANNING DRAWINGS FOR REFERENCE ONLY - NOT CONSTRUCTION DRAWINGS