FRONT ELEVATION AS EXISTING (1:100) Rmfllles 1n mam the Exm'm House. Min 18' moi pilah. @- l—H—I SIDE ELEVATION AS EXISTING (1:100) me raised and replawd. CIII Mln. 600mm above the finished floor level. REAR ELEVATION As EXISTING (1:100) SIDE ELEVATION AS EXISTING (1:100) Null dormers to ho dad In lead covering. To be agreed with (he LAB.C. Inspeaor before inmlhfinn. FRONT ELEVATION AS PROPOSED (1:100) M Ifitchen ImHinm m ddmtnr. Lounge GROUND FLOOR PLAN AS PROPOSED (1:50) SIDE ELEVATION As PROPOSED (1:100) Bathroom IMJMM Noll mlrm Id!“ SAMPLE SAMPLE 1m mm; .11 mm Illuhmu m pumimhamn: Bedroom 2 Master Bedroom FIRST FLOOR PLAN AS PROPOSED (1:50) Wm riled and mum. Oil Min. mm m (m 1mm (ku- lml. Nu mm m m b SAMPLE «age bum. s.- mmnl mam: mus. REAR ELEVATION AS PROPOSED (1:100) SIDE ELEVATION As PROPOSED (1:100) F! | —I|__| 1mm mrww‘i: m mm um mu m dnllfiwi. Dmmrmnm flu: 3 Min. 30 m'mbsfn [1mm MIMI! MI oflhe mum. Filuplmdim bl!!! i!!! and mhrflfluflhl mmmmimmlh‘ck Pmsupefluxlxmd. . mlflly mnuy. I ¢— Izoamm —p| <— Enp: mum | 2000111111 Damn! LOFI' PLAN AS PROPOSED (1 :50) uwndmdmtummmn-m ivwmmlmwwm mmmmmmmmm- mum. b-liu wnwdmmmmwflh mum: mm.- In“: hm mam mun; mmmmmwmmflm WPLEmmMaWHE :uIIMiEmM mmmmfii rfl-NIWPLE _ _ _ m1mm1-‘umn' sun; mum: 13 m»- marm Bathroom _ Landing Bedroom 3 I Kitchen Hall sacnmmo, ExtenSIon DeSIgn Plans I I '$' Architectu ral SerVIces The Loft Conversion Design Specialists. SAMPLEjoifls. SAMPLEsMpsfnr mm mm. mug u...“ w,“ www.extension-design-plans.co.uk cuEm. Plojacr. . SAMPLE gaph J FIasmnaldand skimaeilirwmbeaminimm SAMPLE Left convefilon' Illwl fur ddllcfioll. MSAMPLE Waxisim (15mm (lick SAMPLE ailing is mmnd) m uivu ailing an overall a! SAMPLE NEW FLOOR JOIST FIXED TO m "”"m mm EXISTING SAMPLE (NTS) 524 - 1 A PURPOSE Planning Application :| moo Seal. :1: an: A3 Plot LLLLLuu—LIJLLL :l:'|:l:,':' July 2013 0 1000mm