From the Project Manager/Installer’s Perspective Roger Dixon MREA Certified Wind Site Assessor NABCEP Certified Level 3 Small Wind Installer NYSERDA Certified Wind Turbine Installer NJBPU Certified Wind Turbine Installer Skylands Renewable Energy, LLC 908.337.2057 [email protected] www.skylandsre.com
34

From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Jul 02, 2018

Download

Documents

lyhanh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

From the Project Manager/Installer’s Perspective

Roger Dixon

MREA Certified Wind Site AssessorNABCEP Certified Level 3 Small

Wind InstallerNYSERDA Certified Wind Turbine

InstallerNJBPU Certified Wind Turbine

Installer

Skylands Renewable Energy, LLC908.337.2057

[email protected]

Page 2: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Overview of Project Manager’s and Installer’s Scope of Work

1. Assessment of Site2. Choice of Equipment3. Zoning4. Permitting5. Utility Interconnection Agreement6. Site Work7. Excavation8. Foundation

• Cut & form rebar, build cages, make forms and templates, pour concrete• Electrical - grounding, underground wiring & conduit (part of the Electrical Subgroup)• Foundation inspection

9. Installation• Tower assembly• Turbine & blade attachment• System erection• Final connections and commissioning

10. Final Inspections • Construction• Electrical• Utility interconnection• State funding program

Page 3: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Our Area of Smart Wind Focus

Support Structures - Towers and Foundations

Our Challenge - How Do We Improve The Following:

1. The Manufacturing Process2. The Installation Process3. Maintenance and Serviceability4. Human and Equipment Safety

And while doing so, also reduce manufacturing and installation costs?

Page 4: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Towers and Foundations

Engineering Aspects1. Vertical load/weight2. Horizontal shear force3. Uplift4. Overturning moments5. Rotational force

All of these forces are transmitted to the foundation by the turbine and the tower.

Page 5: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Terrestrial Tower Types/Foundation Types(for “typical” soil conditions, Class 1 – Class 5)

Guyed Lattice/Monopole Free Standing Lattice Free Standing Monopole

Page 6: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Manual Tilting Towers Using a Winch and/or Gin Poles

1.Typical Foundations - Pier or Pad, Anchors for Guy Wires2. Typically Small Turbines w/Not Much Head Weight3. Uses Monopole Tower

Page 7: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Sample Tilting With Winch/Gin Pole Footing Schematic

Page 8: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Tilting With an Actuator Towers

1. Typical Foundations - Pier w/Pad, Caisson 2. Typically Turbines Up To 20 kW3. Use Hydraulic and/or Electric Tilt Mechanism4. Use Monopole Towers

Page 9: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Sample Tilting With Actuator Footing Schematic

Page 10: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Climbable Fixed, Guyed Towers

1. Typical Foundations - Pier w/Pad, Pad, Caisson2. Typically Turbines Up To 10 kW

Page 11: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Sample Climbable Guyed Tower Footing Schematic

Page 12: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Sample Climbable Guyed Tower Footing Schematic/Guy Anchors

Page 13: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Climbable Free Standing Lattice Towers

1. Typical Foundations - Pier w/Pad, Pad2. Typically Turbines 10 kW to 250 kW

Page 14: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Sample Free Standing Lattice Tower Footing

Page 15: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Sample Free Standing Lattice Tower Footing

Page 16: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Climbable Free Standing Monopole Towers

1. Typical Foundations - Pier w/Pad, Spread, Caisson 2. Typically Turbines 10 kW to MW+

Page 17: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Sample Monopole Tower Footing

Page 18: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Other Footing Types Drill, Drill and Bell, Drill and Anchor (Rock)

Page 19: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Other Footing Types Drill and Anchor (Helical Anchor)

Page 20: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Helical Anchor

Page 21: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Pros and Cons of Tower TypesFootprint

Page 22: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Pros and Cons of Manual Tilting TowersAdvantages

1. No climbing2. Maintenance and service

done at ground level3. Reasonably cheap by

comparison to free standing towers

Disadvantages

1. Large footprint2. Four sets of guy wires3. Need fairly level site4. Used for mostly smaller

turbines (10kW or less)5. Not climbable for minor

repairs/service6. Raising and lowering has

inherent risks

Page 23: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Pros and Cons of Tilting With an Actuator Towers

Advantages

1. No climbing2. Maintenance and service

done at ground level3. Mostly automated tower

raising/lowering

Disadvantages

1. Large footprint2. Need fairly level site3. Used for mostly smaller

turbines (20kW or less)4. Not climbable for minor

repairs & service5. Raising and lowering has

inherent risks6. More pricey due to lifting

mechanisms

Page 24: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Pros and Cons of Climbable Fixed, Guyed Towers

Advantages

1. Lowest cost tower and footing

2. Non-level sites are ok

Disadvantages

1. Three sets of guy wires2. Large footprint3. Used for mostly smaller

turbines (10kW or less)4. Must climb for repairs &

service5. Need crane for installation.

Adds to cost

Page 25: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Pros and Cons of Free Standing Lattice Towers

Advantages

1. Smaller footprint2. Non-level sites are ok3. No guy wires4. Safer installation than

manual tilting towers5. Taller tower choices

Disadvantages

1. Must climb for repairs & service2. Climbers must be trained3. Weather is an overriding factor4. Need crane for installation.

Adds to cost5. Tools and parts must be carried

or hauled up6. Larger, more expensive footing7. Labor intensive to assemble8. More costly than previous tower

types

Page 26: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Pros and Cons of Free Standing Monopole Towers

Advantages

1. Smallest footprint2. Non-level sites are ok3. No guy wires4. Slip fit tower sections can be

stacked for faster installation5. Typically tallest tower

choices

Disadvantages

1. Must climb for repairs & service2. Climbers must be trained3. Weather is an overriding factor4. Need crane for installation.

Adds to cost5. Tools and parts must be carried

or hauled up6. Larger, more expensive footing7. Most costly tower type

Page 27: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Installation and Service Safety IssuesGeneral Site Conditions

1. Access2. Weather

a. Temperature (heat & cold)b. Rain, mud & wind

3. Cranes and system weights a. Proper preparation makes

for a safe installationb. Correct crane staging is

essential

Page 28: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Work Baskets, Platforms, Climbing Pegs & Ladders

Work Baskets

1. Something is better than nothing

2. Something well designed is better yet

3. Climb a few towers before you manufacture a solution

Page 29: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Work Baskets, Platforms, Climbing Pegs & Ladders

Platforms

Page 30: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Work Baskets, Platforms, Climbing Pegs & LaddersClimbing Pegs vs. Ladders – The Ergonomics of Comfort & Safety

Page 31: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Some Areas of Potential Improvement

1. ARE Telecom & Wind 2. AnemErgonics, LLC 1. Modular Footings

Page 32: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Some Areas of Potential Improvement2. Online Monitoring

Page 33: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Other Areas of Potential Improvement

3. Reach and Workability 4.Tie Off Points 5.Yaw Locking Mechanisms 6. Ladders and Safe Climb Systems 7. Climbing Gear

Don’t Forget the Human Factors

“Think Outside the Box”

Page 34: From the Project Manager/Installer’s Perspectivedistributedwind.org/wp-content/uploads/2014/12/Smart... · 2015-01-19 · From the Project Manager/Installer’s Perspective Roger

Credits for Photos and Schematics

1. Mick Sagrillo, Sagrillo Power and Light2. Gary Harcourt, Great Rock Windpower3. Ian Woofenden, Home Power Magazine4. Alan Axworthy, Northern Power Systems5. Roger Dixon, Skylands Renewable Energy6. Bergey Windpower7. ARE Telecom and Wind8. AnemErgonics, LLC 9. Endurance Windpower6. Google and the Internet