From LEP to the LHC: Steve Myers Abstract: I will try to point out the strong overlap and interconnection between the 2 colliders not only through the common tunnel but also through the people, the technologies, and accelerator science the good, the bad, the ugly, and the unforeseen
the good, the bad, the ugly, and the unforeseen. From LEP to the LHC:. Abstract: I will try to point out the strong overlap and interconnection between the 2 colliders not only through the common tunnel but also through the people, the technologies, and accelerator science. Steve Myers. - PowerPoint PPT Presentation
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
From LEP to the LHC:
Steve Myers
Abstract:I will try to point out the strong overlap and interconnection between the 2 colliders not only through the common tunnel but also through the people, the technologies, and accelerator science
the good, the bad, the ugly, and the unforeseen
S. Myers From LEP to the LHC 2
Some Milestones• ISR (proton-proton) (70s and early 80s)• LEP design started in the late 70s (Schnell Keil,
Zilverschoon)
• 1983 while designing LEP: proposal for LHC in same tunnel (LEP Note 440; Myers and Schnell)
• 1989 First Collisions• 1989-2000 Operation• 2001-2003 Dismanteling
25th July 2014 CERN 60 Years
25th July 2014 CERN 60 Years S. Myers From LEP to the LHC 3
From LEP to LHC Timelines
25th July 2014 CERN 60 Years S. Myers From LEP to the LHC 4
Project Preparation for Approval (GB) approval LHC construction (LE) LHC Repair and
Operation (SM) LS1
Accelerator Depts. (SL)
(AB) SPS-LEP Department (LE + KHK + SM) SL - AB Department (SM) BE Department (PC)
Accelerator Depts. (AT) AT Department (PL) TE Department (FB + MJ)
Accelerator Depts. (TS) TS Department (AS + PC) EN Department (VV + RS)
From LEP to LHC Timelines
25th July 2014 CERN 60 Years S. Myers From LEP to the LHC 5
(April 1983)
Some extracts from LEP Note 440
• ..assume throughout that the maximum energy per beam is 8 TeV (9 T bending field) and injection is at 0.4 TeV.
• We assume that a twin-ring pp collider would also employ bunched beams, a likely choice if only to limit the stored energy in the beams.
• proposal by R. Palmer, pairs of magnets might be combined into "two-in-one" units, each having a common core and cryo- stat.
• the use of protons in both beams permits higher luminosities, a large number of bunches, eliminating the problem of unresolvable multiple events within one bunch-bunch crossing.
• the copper accelerating cavities will have already been replaced by superconducting ones before a p-LEP starts operation.
• At the highest proton currents, the synchrotron radiation power becomes a problem for cold-bore magnets .
• AcknowledgementThis work originated from a stimulating discussion with G. Brianti who also gave us a first report of the most recent developments in the United States.
6
Following LEP Note 440
• LEP Note 450 (June 1983)– “Beam Separations in p-bar LEP” (Myers and Schnell)
• LEP Note 460 (August 1983)– “Transverse Emittance and Beam Separation in a Large ppbar
Collider” (Myers and Schnell)
• LEP Note 470 (October 1983)– “Acceleration in the LEP Hadron Collider”. (Henke, Myers and
Schnell)
25th July 2014 CERN 60 Years S. Myers From LEP to the LHC 7
S. Myers From LEP to the LHC 825th July 2014 CERN 60 Years
LHC SM/WS paper Project Preparation for Approval (GB) appro
val LHC construction (LE) LHC Operation (SM) LS1
Accelerator Depts. (SL)
(AB) SPS-LEP Department (LE + KHK + SM) SL - AB Department (SM) BE Department (PC)
Accelerator Depts. (AT) AT Department (PL) TE Department (FB + MJ)
Accelerator Depts. (TS) TS Department (AS + PC) EN Department (VV + RS)
RestructuringVery difficult period for LHC construction due to the parallel running on LEP2, SPS, PS, etc etc
difficult period for LHC approval. Approval of the (SSC) in 1987 severely jeopardized hopes for the approval of the less powerful LHC collider. Following a series of cost reviews which pushed the SSC cost from 4.4 billion to more than 11 billion dollars, the US congress cancelled the project in 1993.
S. Myers QUB March 11, 2009 927km circumference underground tunnel (cross-section diameter 4m)
(was built for LEP collider in 1985)
The LEP/LHC Tunnel trace
9
S. Myers From LEP to the LHC 10
LEP Lay-Out
25th July 2014 CERN 60 Years
11
Why was LEP so Big? Why SC RF?
sh28
0
8b
sh
2RF
Cu lr11
E
ElrV
P
sRF40
4b
0 sinV1
E
EU
tot
40
4b
0totscI
E
EUIP
Losses due to Synchrotron Radiation
Power Dissipated in the walls of the Cu cavities
Power to Beam from the SC cavities.....
So to minimise power you need to be as large as possible i.e. large radius. The radius for LEP1 was optimised for around 80GeV with Cu cavities
For sc cavities the power needed is “only” proportional to the 4th power of energy. NOTE to operate LEP at 103 GeV with copper cavities would have needed 1280 cavities and 160MW of RF power!! Impossible for many reasons
LHC For protons since E0 is a factor of 1836 higher, the RF power is not an issue and the bending radius can be made as low as is technically possible. i.e. High fields
E0 = .511MeV for electrons and 938.256 for protons
25th July 2014 CERN 60 Years S. Myers From LEP to the LHC
S. Myers From LEP to the LHC 12
Competition from SLC: 1989 Start-Up• The Economist August 19, 1989
“The results from California are impressive, especially as they come from a new and unique type of machine. They may provide a sure answer to the generation problem before LEP does. This explains the haste with which the finishing touches have been applied to LEP. The 27km-long device, six years in the making was transformed from inert hardware to working machine in just four weeks--- a prodigious feat, unthinkable anywhere but at CERN. Even so, it was still not as quick as Dr. Carlo Rubbia, CERN’s domineering director-general might have liked”.
25th July 2014 CERN 60 Years
13
Short History with Beam
• 1988: July 12: Octant test• 1989:
• July 14, First turn (15 minutes ahead of schedule!)• August 13, First Collisions• Aug13--Aug 18: Physics pilot run• Aug 21--Sept 11: Machine Studies• Sept 20-- Nov 5 Physics
25th July 2014 CERN 60 Years S. Myers From LEP to the LHC 32
S. Myers From LEP to the LHC
Ponderomotive Oscillations
solution: keep cavities on resonance:
0
changes as a function of beam current need different setpoints
new tuning/damping scheme
Field Amplitude oscillates (by any reason ...)
Radiation "pressure"oscillates (instantly)
Cavity shapeoscillates(delay needed)
Cavity RF-frequencyoscillates (instantly)
Field amplitudeoscillates
(delay needed)
At high beam current and high field, cavities oscillate mechanically at 100Hz
culprit: ponderomotive oscillations
growth rate E2. ( detuning angle)
25th July 2014 CERN 60 Years 33
Super Bad: A Fortnight in Hell! (Mike)• 5 June RF unit dephased, lifetime 4 hours in physics
• 5 June power supply unstable
• 5 & 7 June two vacuum leaks in SPS plus fault on main power supply
• 8 - 10 June transformer, vacuum valves, power supplies, access system, main power supply in SPS, problems with the ‘ramp’ in LEP
• 12 June vacuum leak near a wire scanner, TWICE
• 13 June vacuum valves blocked in position
• 13 June RF frequency synthesiser broken
• 13 Juin vacuum leak on a separator (local heating by SR)
25th July 2014 CERN 60 Years S. Myers From LEP to the LHC 34
The Unforeseen
25th July 2014 CERN 60 Years S. Myers From LEP to the LHC 35
S. Myers From LEP to the LHC 36
Energy Calibration: Polarization
25th July 2014 CERN 60 Years
37
Use of transverse polarization
Precise determination of the LEP beam energy (10-5 relative accuracy, ~ 1 MeV)Precise measurement of the Z mass and width
Small changes of energy accurately measured(energy change from 1mm circumference change)
Very Unexpected “Problem”:
25th July 2014 CERN 60 Years S. Myers From LEP to the LHC
S. Myers From LEP to the LHC 38
Circumference variations
25th July 2014 CERN 60 Years
S. Myers From LEP to the LHC 39
Noise on the Beam Energy
25th July 2014 CERN 60 Years
S. Myers From LEP to the LHC 40
TGV: The Fast Train
• Influence on the beam energy– the moon, sun and tides– the level of lake Geneva– the amount of rain
• AND the fast train.........
25th July 2014 CERN 60 Years
S. Myers From LEP to the LHC 41
TGV induces current in LEP vacuum chamber
25th July 2014 CERN 60 Years
1996: Some things are sent to try us! (beam will not circulate)
QL10.L1Single Turn Stopper positrons
25th July 2014 CERN 60 Years S. Myers From LEP to the LHC 42
Zoom sur Quadrupole
beer bottle
25th July 2014 CERN 60 Years S. Myers From LEP to the LHC 43
10 metres to the right
beer bottle
Unsociable sabotage: both bottles were empty!!25th July 2014 CERN 60 Years S. Myers From LEP to the LHC 44
My present: Heineken Beam Stopperemail card
UK advertising at the time:Heineken; the beer that gets to places no other beer can!
25th July 2014 CERN 60 Years S. Myers From LEP to the LHC 45
Oops!!
25th July 2014 CERN 60 Years S. Myers From LEP to the LHC 46
Problems with sextupole families tripping after about 10-20 minutes
During the cruel year of 1997 the evil Lord of Synchrotron Radiation came to wage war against the peaceful tribes of the LEP2 region in the province of PCR (Prevessin Control Room).
Synchrotron Radiation: To keep ourselves sane!
25th July 2014 CERN 60 Years S. Myers From LEP to the LHC 47
The Cruel Lord, with the help of his personal guard, the evil Wigglers, burned vacuum transitions, scorched separators and melted the lead homes of the tribe of the Pious Polarizers.
Antoni Gaudi would have been proud of the newly melted lead shielding installed to protect the polarimeter against synchrotron radiation
We would write prose about our technical problems
Other Problems with cables
Where is the dirty rat who ate my cables?
25th July 2014 CERN 60 Years S. Myers From LEP to the LHC 48
S. Myers From LEP to the LHC 49
Even “Romeo and Juliette” was BAD
• Quote from our LEP memoirs (unpublished) by Helmut Burkhardt, Mike Lamont, Steve Myers, John Poole.
– Facts– Electrical short circuit dumped the beams– At the location of the short circuit, two deers were found dead
(electrocuted) in a lovers’ embrace
– Conclusion from the fact-finding team– Juliette bit into the electric cable– Romeo got a painful shock …..
25th July 2014 CERN 60 Years
Increasing the Beam Energy (the RF guys)
(the good, but expensive!)
25th July 2014 CERN 60 Years S. Myers From LEP to the LHC 50
S. Myers From LEP to the LHC 51
2900
3000
3100
3200
3300
3400
3500
3600
20
/5/9
9
27
/5/9
9
3/6
/99
10
/6/9
9
17
/6/9
9
24
/6/9
9
1/7
/99
8/7
/99
15
/7/9
9
22
/7/9
9
29
/7/9
9
5/8
/99
12
/8/9
9
19
/8/9
9
26
/8/9
9
2/9
/99
9/9
/99
16
/9/9
9
23
/9/9
9
30
/9/9
9
7/1
0/9
9
14
/10
/99
21
/10
/99
28
/10
/99
4/1
1/9
9
Date
MV Copper
SC
RF: pumping up the voltage
96 GeV
98 GeV
100 GeV
101/100 GeV
Strategy to maximise physics time:¨ Run at an energy where we have some RF margin¨ Increase the RF voltage gradually¨ When stable at sufficient voltage, increase the energy¨ Drink the champagne¨ Repeat as many times as possible...
But...keeping it there requires a huge effort!
25th July 2014 CERN 60 Years
With plenty of volts, it’s OK...
• 2 days at 101 GeV ...– available RF voltage 3510 MV– margin 210 MV (2 klystrons can trip)
...with a few less, it’s less easy • Still at 101 GeV...
– but available RF voltage down to 3440 MV– margin 140 MV (1 klystron can trip) This fill at 100 GeV
53
2000: Need More Beam Energy:
25th July 2014 CERN 60 Years S. Myers From LEP to the LHC 54
Reducing Jx :
As well as increasing the RF volts, we pulled out every trick we knew in order to squeeze the last drop of energy increase for the machine. E.g. using the horizontal orbit correctors as bending magnets.
S. Myers From LEP to the LHC 55
Tunnel Movements Affecting Operation
ID Task Name
1 SPS [614]+TI12 [120] (USA15)
2 SPS [614]+TI12 [120] (UX15)
3
4 IP1 (UX15)
5 TI8 cross-over [QD24.R8]
6 QL1.R5 (PX56)
7 IP5 (pillar)
dy<5mm
dy<5mm
dy<30mm
dx<2,dy<4mm
dy<3mm
dx<20mm
Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q22000 2001
LHC civil engineering (bad at the time, good now)
25th July 2014 CERN 60 Years
56
Performance in 2000
25th July 2014 CERN 60 Years S. Myers From LEP to the LHC
58
Performance in 2000
25th July 2014 CERN 60 Years S. Myers From LEP to the LHC
Year 2000: Run LEP2 in 2001 or STOP?
LEP vs LHC (old vs new)• running LEP would delay LHC by 0, 1, 1.5, 2 (?)
years• the competition with Tevatron• manpower transfers needed from LEP to LHC• “materials“ budget considerations (+electrical
power etc)
The first and only Civil war in CERN
• no consensus25th July 2014 CERN 60 Years S. Myers From LEP to the LHC 59
6025th July 2014 CERN 60 Years S. Myers From LEP to the LHC
The abridged story of 2000• 14th June: First candidate event 206.7 GeV
– Reconstructed Higgs mass 114.3 GeV/c2• 20th July: LEP Committee
– ALEPH present excess at high masses– Not seen by other experiments BUT combined excess for mass
hypothesis of 115 GeV/c2 of 1.1.– 2 reserve weeks - end of September granted
• 31st July & 21st Aug: events 2 & 3 for ALEPH– Things are heating up!
• 5th September: LEP Committee– Excess only in ALEPH, only 4 jets– Combination however agrees with Mh 114-115 GeV/c2– Request 2 months extension
• To double amount of lumi at 206.5 GeV which had already been collected.
• September 14th: Research board:– ONE MONTH GRANTED (LHC startup)
6125th July 2014 CERN 60 Years S. Myers From LEP to the LHC
October 10th: LEPC: Update of the results The signal excess grows up to 2.6s
16th October: Missing energy candidate from L3... November 2nd: end of LEP operations
We only managed about 50% of request to double sample. (half the time half the integrated lumi)
November 3rd, LEPC: The new data confirm the excess again. The significance grows up to 2.9s
Additional 2001 running not granted
LEP running in 2001 is requested
November 3rd LEPC - closed session: No unanimous recommendation
November 7th: Research board No unanimous recommendation (vote split 8 - 8)
November 8th: “LEP has closed for the last time:”
6225th July 2014 CERN 60 Years S. Myers From LEP to the LHC
NOT A POPULAR DECISION!BUT the right one! This allowed massive redeployment of skilled and experienced CERN staff from LEP2 to the LHC design. With this new focus, the design of the LHC gathered real momentum with L. Evans leading the overall project and the 3 accelerator department heads leading the technical design of the components (P. Lebrun (magnets, cryogenics and vacuum), P. Ciriani (infrastructure and technical services), S. Myers (radio frequency, accelerator physics, beam diagnostics, controls, injection extraction and beam dump, machine protection, and power supplies). It is important to highlight the enormous contributions of the CERN technical groups and group leaders in the design, fabrication, and testing of these very complex systems. The strength of CERN is imbedded in its technical groups.
Use the experience and expertise gained in LEP to prepare beam commissioning and operation of the LHC collider
• Evaluate and maximise the performance of the injectors,• Evaluate experience with other relevant machines,• Create a competent, experienced trained team,• Prepare a detailed scenario for initial commissioning,• Specify special software requirements for commissioning and operation.• Plan MD experiments for the LHC and its injectors
The physics data (luminosity, energy, energy calibration).
Operation in unique regime of ultra-strong damping:- Beam-beam limit with strong damping.- First confirmation of theory of transverse spin polarization.
LEP will be the reference for any future e+e- ring collider design.
Legacy to LHCRunning large accelerators (shutdown planning, cold checkouts…)
Training ground for future LHC leaders.Operation at high efficiency (controls software, control room management etc)Real-time feedback on beam parameters (orbit, tune, instabilities..)Running large Superconducting and cryo systems
…….
What is the Legacy of LEP?
64
LEP: Design and Reality
Parameter Design(55 / 95 GeV)
Achieved(46 / 98 GeV)
Bunch current 0.75 mA 1.00 mA
Total beam current 6.0 mA 8.4 / 6.2 mA
Vertical beam-beam parameter
0.03 0.045 / 0.083
Emittance ratio 4.0 % 0.4 %
Maximum luminosity 16 / 27 1030 cm-2s-1
23 / 1001030 cm-2s-1
IP beta function bx 1.75 m 1.25 m
IP beta function by 7.0 cm 4.0 cm
x 10
x 1.4 / 3.7
Reality better than design (result of many years work)! 65
66
The last beam in LEP (2000); A sad occasion
In the photo:• Roger Bailey, • Ralph Assmann, • Paul Collier, • Mike Lamont, • Steve Myers• Andy Butterworth
I had to prepare the dismantling with my LEP colleagues AArrggHH!
Goodbye my friends I must move on
25th July 2014 CERN 60 Years S. Myers From LEP to the LHC
67
Conclusions• LEP was a big challenge, a lot of effort but enormously
rewarding• Physics output was exceptional• LEP training of accelerator and detector people allowed the
rapid commissioning and exploitation of the LHC which resulted in the discovery of the Higgs’ boson.
• LEP achievements are based on the work of many hundreds of CERN technicians, engineers, and physicists from 1978 to 2000. 554 papers were published in Proceedings of the Chamonix workshops alone (from 118 authors).
• I would like to take this final opportunity to sincerely thank (once again) all those people who worked on LEP/LHC and the detectors for their motivation, devotion and hard work. It was a fantastic experience which none of us will ever forget
25th July 2014 CERN 60 Years S. Myers From LEP to the LHC
Thank you for your attention
25th July 2014 CERN 60 Years S. Myers From LEP to the LHC 68