French Test Site Athens, 8-10 November
Jan 02, 2016
Overview
LFOT an overview
Pilot test
Stakeholder forum
Some preliminary results
Current and next activities
LFOT an overview
An eCall system has been developed on two different systems,Windows CE at Danew GS410, Android at tactile Tablet,
Database server running MySQL and Apache
Web Site is on line at : http://telefot-set.utbm.fr/
Survey ToolsWeb based questionnaires to be filled by participants
Data analysis toolsExtract relevant information from the data collected
Testing area
Testing areaParticipants selectionA diversified community of 250 drivers is selected among registered users based on:
Age, Gender, Driving experience, …
Collaboration with SDIS (Service Départemental d’Incendie et de Secours) , the responsible of eCall processing in France
Overview
LFOT an overview
Pilot test
Stakeholder forum
Some preliminary results
Current and next activities
Pilot test
Pilot duration11 June 2011 – 30 June 2011
Number of participants15 participants driving in Belfort/Montbeliard city both in urban and highway environments
Piloting of questionnairesData are automatically stored and analyzed to check that all RQs can be answered
Latency was evaluated using two techniques, parallel eCall (13.46s) and sequential eCall (6s)
Feedback, issues and solutionsLatency is neither sensitive to the vehicle speed, nor to the distance between the vehicle and the server location
Other minor issues have been solved, e.g., alerts displyed on the map, all ND have the same serial number, ND assignments, …
Overview
LFOT an overview
Pilot test
Stakeholder forum
Some preliminary results
Current and next activities
Stakeholder forum
Opening ceremony of PVF-ITS 7th of July 2011
Maquette 1:1 quartier de ville
(9 ha)
Circuit d’essais véhicules intelligents et durables
(2 756 m)
Zone d’activitéR&D (38 ha) Centre de
formation du SDIS
Maquette 1:1 voie interurbaine
(3 000 m)
Tour de contrôleCentre d’essais sur route dédié à la formation et à
la sécurité (660 m)
Test scenario
1. Send an eCall alert (vehicle
crashed)
2. Send an alert to report the accident
3. Send the traffic jam alert
4. Send the traffic jam alert (APRR)
5. Confirm the accident
LFOT execution
Duration7th of July 2011 – 30 Dec 2011
Number of participants250 participants equipped with GS40 and tablets
Data collectionData are stored into the database
Data analysis and evaluation of users acceptance RQ-EC1: Is user acceptance influenced by perceived usefulness of device/function?
RQ-EC2: Is user acceptance influenced by perceived trust in device/function?
RQ-EC3: Is there a change in users’ acceptance over time?
Other RQs such as, drivers age, experience, and gender may have influence on using e-Call function
21
SDIS are participating into the eCall testing50 cars are equipped by NDs
During Sept. 26 interventions, and 22 of emergency calls have been made to confirm the accidents
Preliminary results from SDIS
Overview
LFOT an overview
Pilot test
Stakeholder forum
Some preliminary results
Current and next activities
23
Implementing functions to automatically extract results according to the research questions
Writing deliverablesDesign and operation, expected date 20th December
Results analysis and recommendations, March 2012
Preliminary results from SDIS