Freight AC electric loco KZ8A Passenger AC electric loco KZ4A ELEKTROVOZ KURASTYRU ZAUTY PRODUCT INDICATORS ENTERED: • December 2012 PARTICIPANTS: • JCS «NC «Kazakstan Temir Zholy» (50%) • «Alstom Transport S.A.» (France) (25%) • CJCS «TransMashHolding» (Russia) (25%) PROJECT COST: • 10,6 billion tenge (71 million dollars) CAPACITY: • Up to 100 sections per year LOCALIZATION: • actual: 24% • planned: 53% (2017) LABOUR PRODUCT-TY: • 75,8 million tenge (410 thousand dollars) JOBS: • actual: 168 • planned: 380 (2016)
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Freight AC electric loco KZ8A Passenger AC electric loco KZ4A
ELEKTROVOZ KURASTYRU ZAUTYPRODUCTINDICATORS
ENTERED: • December 2012
PARTICIPANTS: • JCS «NC «Kazakstan Temir Zholy» (50%)
• «Alstom Transport S.A.» (France) (25%)
• CJCS «TransMashHolding» (Russia) (25%)
PROJECT COST: • 10,6 billion tenge (71 million dollars)
CAPACITY: • Up to 100 sections per year
LOCALIZATION: • actual: 24% • planned: 53% (2017)
LABOUR PRODUCT-TY:• 75,8 million tenge (410 thousand dollars)
JOBS: • actual: 168 • planned: 380 (2016)
Freight AC electric loco KZ8A Passenger AC electric loco KZ4A
Speed 120 km/h
Power capacity 8800 kW
Axle arrangement Bo-Bo + Bo-Bo
Recuperation 7600 kW
Traction motor asynchronous
Temperature range -50С … +40С
Safety control system
KLUB-U
Radio RVS
Speed 200 km/h
Power capacity 4800 kW
Axle arrangement Bo-Bo
Recuperation 4400 kW
Traction motor asynchronous
Temperature range -50С … +40С
Safety control system
KLUB-U
Radio RVS
Advantages:
Energy saving up to 20%
Speed increase up to 10%
Weight of train increase by30%
Three times extended
maintenance cycle
+ 38%
+7%
Converters
Brakes
Subject to the development of production of these components within the EAEU level of production localization KZ8A will be more than 50%