Green or black windpower? Salzburg 30 August 2011 Frede Hvelplund Aalborg Universitet Department of Development and Planning
36

Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

Mar 26, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

Green or black windpower? Salzburg 30 August 2011

Frede HvelplundAalborg Universitet

Department of Development and Planning

Page 2: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

Ownership and marketconstructionI. Ownership construction ( Ownership for efficient

climate protection.Todays presentation)

II. Detailed marketconstruction:a. Feed in for wind power (cannot react on market

signals)b. Active market design for introduction and

management of an ”intermittency infrastructure”.The marketdesign is I+II

Page 3: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

I. Background for the ownership design

Page 4: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

Historical experience1. The Danish heat and electricity system has

been locally developed and owned by consumers and municipalities.

2. The recent successful (from 1975-1999) development of wind power and other Renewable Energy sources has been bottom up generated.

(3. New technologies in Denmark were established in a period of economic crises. So now Denmark and Europe has an innovation opportunity!)

Page 5: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

The present conflict between distant ownership and consumer ownership models

The “black trend”:1. Offshore wind parks are mainly owned by large power companies.2. The share of co-operative ownership is reduced.3. Offshore wind power is becoming increasingly expensive (DONG/Anholt)4. This is due to monopoly in the bidding process (DONG/Anholt)5. Lack of democracy in the research processes. (the Østerild testcenter case).The “green trend”:6. Consumer and municipality ownership examples. (Samsø, Wind People,

Ringkøbing Skjern wind energy planning, “Near shore” wind parks)The “1-5” development is against :

(a) the present technological needs, (b) the need for acceptance and participation, and (c )a long succesfull consumer ownership tradition on the Danish energy scene.

The “6” development is supporting (a),(b) and (c)

Page 6: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

II. Why is local/regional ownership necessary?

Page 7: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

Characteristics of present situation1. Very large turbines2. The paradigmatic change: A need for a new infrastructure

to integrate of intermittent wind energy into the grid.3. Reduced need for power companies and increase political

resistance from Power Companies.4. Not a free market. Only DONG was bidding at the Anholt

offshore park. 5. Increased need for income in the areas with much wind

(hinterland areas).

Page 8: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

1. Large wind turbinesa. Large investments, often more than 30

mill. Euro.(20 MW capacity- 7- 3MW turbines)

b. Visible in large areas.c. Ownership consequence (1) :

Ownership should be linked to a larger area than the closest neighbors. (Combined ownership models with municipal etc. ownership)

Page 9: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

2. The Paradigmatic changeFrom SCARCE STORED (fossil fuel/uranium) energy sources to

ABUNDANT INTERMITTENT renewable energy sources

THAT’S THE big change CHANGE!

Page 10: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

Balance electrical system and grid stability (Wind power 2-6% of electricity consumption. System in

Denmark untill around 1996)

Decentral producers

Wind/RE

Central power and cogeneration units

Consumption0

500

1000

1500

2000

2500

3000

3500

0

500

1000

1500

2000

2500

3000

3500

0

1000

2000

3000

4000

Active componentsIn-active components

www.planogmiljo.dk

Page 11: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

Decentral producers

Wind/RE

Central power plants and

cogenerationConsumption

0

500

1000

1500

2000

2500

3000

3500

0

1000

2000

3000

4000

System 2 (2000- wind power 15%-19%)

Activating RE via flexible decentral combined heat and power units

Active componentsIn-active components

www.planogmiljo.dk

Electricity distribution companies, heat companies, consumers, etc.

Page 12: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

Decentral producers

Renewable energy

Central power plants and

cogenerationConsumption

0

500

1000

1500

2000

2500

3000

3500

0

1000

2000

3000

4000

Heat pumps

System 3 (2011- wind power 25%-30%) Activating RE via increased electricity consumption

(heat pumps and water storage)Active componentsIn-active components

www.planogmiljo.dk

Electricity distribution companies, heat companies, consumers, etc.

Page 13: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

Decentral producers

Renewable energy

Central power plants and

cogenerationConsumption

0

500

1000

1500

2000

2500

3000

3500

0

1000

2000

3000

4000

Heat pumps

WindEl for

transportation etc.

System 4 (2015- wind power 50%-100%)

Activating RE via increased electricity consumption (for heat pumps and transportation)

Active componentsIn-active components

www.planogmiljo.dk

Electricity distribution companies, heat companies, consumers, etc

Page 14: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

Decentral CHPs

Renewableenergy

Central power plants and

Cogeneration/ CHP

ElectricityConsumption

0

500

1000

1500

2000

2500

3000

3500

0

1000

2000

3000

4000

Heatpumps

The evolving integrative SMART GRID Renewable Energy system (REC system)

Coordinating (1) district heating, (2) electricity, (3) renewable energy , (4) conservation and (5) transportation.

Active componentsIn-active components

Heat market

Heat storage

ElectricityHeat

Transportation market

Page 15: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

“Smart grid systems”Integration is the “smart grid” element: Integration of intermittent renewable energy into the energy system consisting of a combination of:

a. Electricity b. Heatc. Transportationd. Heat, electricity and transportation conservation e. And a sustainable use of biomass

Page 16: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

Reduction of transaction costs

When owners of intermittency infrastructure owns wind turbines, the transactions costs of establishing this infrastructure may be reduced.

Page 17: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

Minimising transactions costs

Windturbine ownership by owners of the ”intermittency

infrastructure owners” reduces the transaction costs

Page 18: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

Consequence for infrastructure and ownership

Technical infrastructure:a) Establishment of heat pump capacity.b) Establishment of heat storage capacity.c) Co-ordination with the a transition to electric cars.d) Co-ordination with energy conservation activitiese) Sustainable use of biomass (NEVER for heat!, and sometimes as back

up system for intermittent RE)This infrastructure is situated close to the consumer!

Ownership consequence (2): Households and organisations that OWN the above ACTIVITIES is important and should be given ownership priority to wind power both onshore and offshore. With this ownership model the transaction costs linked to solving the ”intermittency” ”problem”are minimized.

Page 19: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

3. Reduced need for power companies

Page 20: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

The OLD fuel based system: Where the money goes - or the value-added distribution in a coal-fired electricity system.

I. Direct Electricity Supply System

1. Fuel

26

2. Powerproduction9.3

3. Transmission

3.4

4. Distribution

14.6

8. Sale

100

II. Indirect Electricity Supply System

5. Power plantequipment27.6

6. Transmissionequipment8.6

7. Distributionequipment10.5

Page 21: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

Where the money goes - or the value-added distribution in a RE electricity system.

I. Direct Electricity Supply System

1. Fuel

26

2. Powerproduction9.3

3. Transmission

3.4

4. Distribution

14.6

8. Sale

100

II. Indirect Electricity Supply System

5. Power plantequipment27.6

6. Transmissionequipment8.6

7. Distributionequipment10.5

Lost value added and ”raison d’etre” for large power companies.

Page 22: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

The new integrative system: Where the money goes, or the coming renewable

energy systems

I. The Direct Electricity Supply System

II. The Indirect Electricity Supply System

(6 ) Sale100

III. Consumer level

(1 ) Transmission3.4

(2 ) Distribution14.6

(3 ) Centralisedrenewable energyequipment 27.3

(4 ) Decentralisedrenewable energy

equipment 27.3

(5 ) Consumerorganisedconservation andrenewable energy

equipment 27.3

Page 23: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

The reduced role of existing power companies

1. Wind- and photovoltaic ”powerplants” are automatons produced at factories (not in power companies).Once in place, they just feed electricity into the grid.

2. The value-added share of electricity prices linked to power company activities is reduced by 60%-80%.

3. The new ”power plants” are small flexible heat and power plants close to the consumers.

4. The needed regulation infrastructure is close to the consumers.

Ownership consequence 3. It has no technical or economical sence that wind turbines and photovoltaic plants are owned by the old power companies (DONG, Vattenfall, E.ON, RWE, EDF).

Page 24: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

4. Oligopolistic “competition” on the power market.

1. Low motivation for investing in wind power in DONG, Vattenfall, etc. More wind power gives lower prices at the Scandinavian Nordpool market, and losses to these companies.

2. Insufficient competition in the bidding process for offshore parks. (Only DONG at the 400 MW Anholt offshore park.)

3. Expensive wind power resulting in political resistance.Ownership consequence (4) : Establish Municipal etc. ownership, as competitor to the power companies when bidding on coming offshore plants.

Page 25: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

5. Need for accept of windpower

Page 26: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

Profit per kWh from wind parks (example) Wind turbine onshore, 2200 hours/ pay back time 13 years.Source Profit in Eurocent/per sold kWh

Via electricity sale 2

Via land rental 0,65

Income to local entrepreneurs: 10% of investment.

0,65

Total profit per kWh 3,3 (If locally owned)1,3 (If owned by distant

owners)

Page 27: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

Example:

A 400 MW regionally owned onshore wind park will give around 24 mill. Euro annually more in profit to the region than the same park with distant

ownership.

Page 28: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

Ownership consequence (5) :

Wind turbines should be owned by local/ regional actors in order to generate regional incomes and local accept and participation.

Page 29: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

III. Conclusions

Page 30: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

A coming ownership model (Example)Wind turbines1. 50% ownership by local municipalities, CHP

companies and/or local electricity distribution companies.

2. 30% ownership by local/regional households, farms and companies.

3. 20% ownership by large power companies.Alltogether at least 80% local/regional ownership.

District heating100% Consumer/municipality ownership of technical

monopoles. (Close to present situation!)

Page 31: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

Community integration of wind power”Community power” is important for the needed regulation infrastructure.

For instance by giving ownership priority to local municipalities, companies,households and organisations so that they are enabled to establish the above regulation infrastructure.

This also requires new policies designed in the parliament .

Page 32: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

Black wind power 1. Distant owners. (DONG, Vattenfall, E.ON, etc.) 2. Only minimal money flow goes to local actors.3. Minimal local and regional influence in the planning

process behind locating wind parks.4. Closed process, when establishing test centers. 5. Minimal environmental concern.6. Minimal local and regional technical integration of wind

power.7. Expensive wind power, as it is owned by companies

that needs profit without having much to give.8. Result: Wind power will be expensive and politically

unpopular, and thus only get a limited share of energy supply in the future.

Page 33: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

Green wind power1. Local and regional owners (Municipalities, el.

companies, households, etc.). 2. At least 80% of the ownership income stays in the

region.3. Local and regional influence in the planning Process.4. Open and local participation, when establishing

research and test centers. Include research in accept and participation in wind power projects.

5. Environmental concern has high priority.6. Maximum and economically efficient local and regional

integration of wind power.7. Relatively cheap wind power.8. Result: Wind power will supply a high share of the

energy production.

Page 34: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

Phases of development1. Civic driven and policy driven2. Policy driven3. New ”intermittency technology owner”

driven (New companies and civic driven)

Page 35: Frede Hvelplund Aalborg Universitet Department of ... · Frede Hvelplund Aalborg Universitet. Department of Development and Planning. Ownership and marketconstruction I. Ownership

Conclusion: Need to change the present trend from

black to green windpower!1. There is a tendency towards a centralised and

undemocratic wind power development, here named BLACK WIND POWER.

2. There is a technical and institutional need for a change towards openness and local and regional participation in the planning processes, and local/regional ownership. And co-ordination with energy conservation!This is here named GREEN WIND POWER.