122.763 122.738 122.715 122.653 122.693 122.672 122.613 122.632 122.604 122.596 122.581 122.569 122.561 122.554 122.549 122.545 122.543 4500 1200 4500 1200 4500 4500 1000 1000 PAARL 5000 APP. SLAB FRANSCHHOEK 5000 APP. SLAB 10890 30000 OVERALL DECK LENGTH 620 8940 8940 620 9250 11510 9250 Km 375.940 km 385.185 km 390.940 km 396.695 km 405.940 GROUND LINE ABUTMENT A PIER 1 PIER 2 ABUTMENT B TY6 BEAMS 60 PREMIX 60 PREMIX Ø750mm CFA PILES Ø750mm CFA PILES 7400 LIMITS OF RESTRICTED AREA 1235 1235 7400 LIMITS OF RESTRICTED AREA 4625 4624 10790 LIMITS OF RESTRICTED AREA 10790 LIMITS OF RESTRICTED AREA km 400.000 75mm BLINDING LAYER 75mm BLINDING LAYER km 390.000 750 117.393 116.193 117.309 116.109 117.203 116.203 116.983 115.983 0.000 2.000 3.000 5.000 7.950 12.850 15.850 17.000 19.500 118.777 0.000 3.000 4.000 15.500 17.300 18.500 19.000 20.000 23.000 118.132 0.000 1.950 6.500 10.850 11.850 13.000 14.950 15.870 19.550 119.023 BH 13 BH 14 BH 15 DESIGN FLOOD LEVEL 119.380 R.M.F LEVEL 120.410 122 1 VANWYKS RIVER 122 1 122 1 L1.7 R1.9 L1.9 R1.10 L1.8 R1.11 08 BH14 BH13 BH15 BH12 TP26 SW 0/7 SW 410 1,00 122,64 122,64 SW 410 1,06 121,55 122,64 Ø375 ECC PAARL FRANSCHHOEK CADASTRAL PROPOSED CULVERT 2000 3700 3700 2000 1800 13200 3 739 844 X 4 245 Y 3 739 885 X 4 258 Y 3 739 874 X 4 200 Y 340 360 380 420 440 400 FENCE CADASTRAL BUILDINGS STAKE LINE FENCE NEW ROAD RESERVE NEW ROAD RESERVE MR191 1:2 1:2 1:2 1:2 POINT OF INTERSECTION DECK SKEW : 13.3° COORDINATES Y = 4 227.871 m X = 3 739 865.370 m ROAD KM = 0.390 940 km LEFT TIE POINT 121.652 RIGHT TIE POINT 121.681 GUARDRAIL GUARDRAIL 2 % 1:2 4 5 6 7 8 9 10 11 1:2 60 PREMIX 1 2 3 2000 S 1800 SW 2000 S 3700 LANE 3700 LANE 2 % 600 600 14400 PAARL FRANSCHHOEK ABUTMENT A ABUTMENT B PIER 1 PIER 2 30000 OVERALL DECK LENGTH LEFT EDGE PARAPET UNITS RIGHT EDGE PARAPET UNITS Ø750mm CFA PILES Ø750mm CFA PILES Ø750mm CFA PILES Ø750mm CFA PILES SIDEWALK ENDBLOCK BASE ENDBLOCK BASE APPROACH SLAB TY6 BEAMS PRELIMINARY WHATSOEVER CAUSE OR HOWEVER ARISING LIABILITY OF ANY KIND FROM ONLY AND DOES NOT ATTRACT LEGAL ADMINISTRATIVE REVIEW PURPOSES THIS APPROVAL IS FOR PROCEDURAL AND APPROVED DATE CONSULTING ENGINEERS DATE PROVINCIAL ROADS ENGINEER WCPA INDEX No. WCPA STRUCTURES PLAN No. SCALE CONSULTANT'S PLAN No. CONTRACT No. P.R.E.'s FILE No. FOR CONSTRUCTION FOR TENDER PURPOSES FOR APPROVAL FOR INFORMATION ONLY CHECKED BY: DESIGNED BY: ADDITIONS AND AMENDMENTS CHECKED BY: DRAWN BY: DATE APPROVED No. PRE CONS. ENG. BELLVILLE 7535 TEL:(021) 912 3000 P.O.Box 398 FAX:(021) 912 3222 e-mail: [email protected]2 1 3 4 5 6 UPGRADING OF MAIN ROAD 191 (km 0,0 to km 9,57) GENERAL ARRANGEMENT VAN WYKS RIVER BRIDGE AT km 0.390 940 13/5/1/2/1-749.2 C749.2 MR191-VW RIVER-02 AS SHOWN A90/872 W BIJKER JR W BIJKER D V.D BERG W BIJKER Proposed Van Wyks River Bridge (8.2m/10.6m/8.2m Water Width Spans with 2 x 0.6m Piers) Description Unit CLASS 3 Catchment Area km² 35.2 Hydrological flood calculation method used: - Rational 3 Method 20 year flood peak (Q20) m³/s 54 Design flood recurrence interval for capacity and deck soffit freeboard criteria requirements yrs 15 Design flood QT for capacity and deck soffit freeboard criteria requirements m³/s 49 Design flood Q2T for shoulder break point overtopping criteria requirements m³/s 61 Regional Maximum Flood (RMF) m³/s 387 (Historical Bridge capacity < 160 m³/s - Railway embankment blocks runoff) HECRAS REACH NUMBER 205 INVERT LEVEL AT HECRAS REACH 117.7 Regional Maximum Flood (RMF) level (without bridge) m.a.s.l 120.248 Regional Maximum Flood (RMF) level (with bridge) m.a.s.l 120.41 Average slope of stream bed at structure m/m 0.0047 Natural design flood level (without bridge) with QT m.a.s.l 119.201 * Highest flood level to date m.a.s.l N/A Date of highest flood level yr N/A Natural design flow depth (without bridge) with QT m 1.501 Natural design flow velocity (without bridge) with QT m/s 0.924 Backwater caused by bridge m 0.179 Design high flood level for QT m.a.s.l 119.38 Minimum bridge upstream soffit level m.a.s.l 121.64 Design high flood level for Q2T m.a.s.l 119.48 Design flow velocity through bridge for QT m/s 1.37 Required freeboard to deck soffit (F = 0.78 log (QT) – 1.26) with min of 0.30m m 0.30 Available (existing) freeboard to deck soffit m 2.26 Freeboard excess m 1.96 Shoulder breakpoint (SBP) level m.a.s.l 122.44 Shoulder breakpoint (SBP) excess m 2.96 Freeboard dictated by bridge width Y/N y Design flood levels influenced by dams Y/N n SCALE 1: LONGITUDINAL SECTION ON C OF ROAD 100 L PAVEMENT DESIGN 1) 150mm BASE (G2) COMPACTED TO 88% OF BULK RELATIVE DENSITY. 2) 125mm STABILISED NATURAL GRAVEL UPPER SUBBASE (C4) COMPACTED TO 98% OF MODIFIED AASHTO DENSITY. 3) 125mm STABILISED NATURAL GRAVEL LOWER SUBBASE (C4) COMPACTED TO 98% OF MODIFIED AASHTO DENSITY. 4) 150mm UPPER SELECTED LAYER (G7) COMPACTED TO 95% OF MODIFIED AASHTO DENSITY. 5) 150mm LOWER SELECTED LAYER (G9) COMPACTED TO 95% OF MODIFIED AASHTO DENSITY (100% FOR SAND). 6) FILL COMPACTED TO 90% OF MOD AASHTO DENSITY. (APPLICABLE DENSITY (FOR SAND). 7) 20mm CONTINUOSLY FINE GRADE ASPHALT (AC) 8) 100mm BASE(G5) COMPACTED TO 98% OF MOD. AASHTO DENSITY. 9) FILL COMPACTED TO 90% OF MOD AASHTO DENSITY. (APPLICABLE DENSITY (FOR SAND). 10) 125mm UNSTABILISED NATURAL GRAVEL UPPER SUBBASE (G5) COMPACTED TO 98% OF MODIFIED AASHTO DENSITY. 11) 125mm UNSTABILISED NATURAL GRAVEL UPPER SUBBASE (G5) COMPACTED TO 98% OF MODIFIED AASHTO DENSITY. SCALE 1: RURAL CROSS SECTION 100 SCALE 1: SITE PLAN 200 1 SITE PLAN MR191-VW RIVER-01 2 3 GENERAL ARRANGEMENT 1 OF 2 4 GENERAL ARRANGEMENT 2 OF 2 5 FOUNDATION LAYOUT 6 ABUTMENT A AND B CONCRETE DETAIL 7 PIERS CONCRETE AND REBAR DETAIL 8 DECK CONCRETE DETAIL 9 DECK REBAR DETAIL 10 BEAM CONCRETE AND REBAR DETAIL 11 PARAPET LAYOUT 12 LEFT EDGE ENDBLOCK CONCRETE AND REBAR DETAIL 13 LEFT EDGE PARRAPET CONCRETE AND REBAR DETAIL 14 RIGHT EDGE ENDBLOCK CONCRETE AND REBAR DETAIL 15 RIGHT EDGE PARRAPET CONCRETE AND REBAR DETAIL 16 ENDBLOCK BASE CONCRETE AND REBAR DETAIL 17 STEEL SCHEDULES 1 OF 3 STEEL SCHEDULES 2 OF 3 DRAWING LIST 3D PRESENTATION OF BRIDGE N.T.S 18 ABUTMENT A AND B REBAR DETAIL MR191-VW RIVER-02 MR191-VW RIVER-03 MR191-VW RIVER-04 MR191-VW RIVER-05 MR191-VW RIVER-06 MR191-VW RIVER-07 MR191-VW RIVER-08 MR191-VW RIVER-09 MR191-VW RIVER-10 MR191-VW RIVER-11 MR191-VW RIVER-12 MR191-VW RIVER-13 MR191-VW RIVER-14 MR191-VW RIVER-15 MR191-VW RIVER-16 MR191-VW RIVER-17 MR191-VW RIVER-18
4
Embed
FRANSCHHOEK PAARL 191 Final BAR/Appendix B8... · 2017-10-31 · analyses with prokon 2-d plane frame and grillage. 3.2 design parameters 3.2.1 young’s modulus concrete (30 mpa)
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
10 BEAM CONCRETE AND REBAR DETAIL11 PARAPET LAYOUT12 LEFT EDGE ENDBLOCK CONCRETE AND REBAR DETAIL13 LEFT EDGE PARRAPET CONCRETE AND REBAR DETAIL14 RIGHT EDGE ENDBLOCK CONCRETE AND REBAR DETAIL15 RIGHT EDGE PARRAPET CONCRETE AND REBAR DETAIL16 ENDBLOCK BASE CONCRETE AND REBAR DETAIL17 STEEL SCHEDULES 1 OF 3