City of Franklin Water Treatment Plant Modifications
Sep 16, 2015
City of Franklin
Water Treatment Plant
Modifications
Schedule
May 28, 2015
Franklin Municipal Planning Commission Approval
June 1, 2015
Sealed Drawings and Specifications Submitted to TDEC
June 21, 2015
Public Advertisement for Bids
July 23, 2015
Public Bid Opening
August 2015
Project Award / Notice to Proceed
Early 2017
Final Completion and Acceptance of Project
Presentation Format
Finished Water
GAC Contactors
UV / Advanced Oxidation
Membrane Filtration Outside
Site Plan WTP Building
Inside
Site Plan
Northeast Elevation (Front)
Southeast Elevation (Left)
Southwest Elevation (Back)
Southeast Elevation (Right)
Southeast Elevation (Right)
Perspective View
Perspective View
Inside Plan View
Inside Southwest Elevation (Back)
Inside Perspective Membrane Racks
Inside Perspective UV / AOP System
Inside Perspective GAC Contact Tanks
Questions