Top Banner
Framework for Multi - Resolution Analyses of Advanced Traffic Management Strategies presented by Mohammed Hadi , Ph.D., PE Florida International University December 6, 2016
27

Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

Aug 30, 2018

Download

Documents

dangdiep
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

Framework for Multi-Resolution

Analyses of Advanced Traffic

Management Strategiespresented by

Mohammed Hadi, Ph.D., PE

Florida International University

December 6, 2016

Page 2: Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

Needs for the Framework

• Performance measurement and estimation is increasingly needed

• Combinations of advanced modeling tools are needed for advanced strategies

– Congested conditions, ML, construction and incident management, ATDM, ICM, and automated and connected vehicles

• Tools and methods are becoming available, however integration of tools is needed for effective modeling

2

Page 3: Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

Multi-Resolution Modeling

3

Page 4: Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

Objectives

• Investigate the ability of combinations of tools in estimating performance and analyzing congestion and advanced strategies

• Recommend a framework for use in support of agency analysis and modeling processes

• Apply and assess the utilization of tools in the modeling of use cases

4

Page 5: Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

Proposed Framework Components

5

Page 6: Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

Discussed Aspects

• Tool assessment criteria

• O-D estimation tools and inputs

• ML modeling applications– Fixed VOT versus VOT distribution

– Incorporating reliability in the assignment

– Ability of modeling ML shifts due to pricing change

– Modeling CAV on ML

– Demonstration of MRM use

• Work zone MRM modeling applications

• Capacity and signal timing Improvements MRM applications - varying demand levels

6

Page 7: Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

Criteria for Tool Assessment

7

• General Criteria (Hardware, Software, Interface, and etc.)

• Shortest Path and Path Choice

• Assignment type

• En-route dynamic routing (e.g., in-vehicle dynamic navigation system, DMS)

• Specification of fine-grained assignment interval (e.g., 15-30 minutes)

• Allows fixing paths for parts of the demands

• Convergence criteria

• Outputting and using interval-based convergence gap

• Assignment of individual vehicles

• Assignment of multiple demand types

Page 8: Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

Criteria for Tool Assessment (Con’t)

8

• Traffic Flow Model (TFM)

• Traffic flow model type

• Queuing and spillback

• Modeling of signalized arterials

• Modeling of freeways

• Modeling of alternative routes to facilities

• Automatic calculation of signal timing in dynamic traffic assignment

• Lane-by-lane simulation

• Merging/weaving simulation

• Modeling turn lane and bay Length

Page 9: Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

Criteria for Tool Assessment (Con’t)

9

• ML Modeling

• Generalized cost in assignment

• Incorporation of willingness-to-pay (WTP) into assignment

• Link access restrictions/prohibitions by vehicle type

• Modeling managed lanes and reversed lanes

• Fixed and time-of-day pricing by user types

• Dynamic pricing

• Inhomogeneous VOT and VOR

• Advanced Vehicle Technology

• Capacity as a function of proportion of vehicle types

• Fixed and time-of-day pricing by different percentage of advanced vehicle technology

Page 10: Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

ODME - Factorized Matrix Start Initial

10

Goodness-of-Fit Statistics

Initial Demand

Running DTA

without ODMERunning ODME Optimization

Macroscopic Model Mesoscopic Models Macroscopic Model Mesoscopic Models

MAE (veh/ln/15min) 108.13 101.56 - 123.48 80.74 68.21 - 112.51

MAPE (%) 18.69 16.11 - 20.61 13.32 12.52 - 15.35

RMSE (veh/ln/15min) 158.79 149.14 - 181.32 118.56 100.16 - 165.21

R squared 0.46 0.29 - 0.47 0.72 0.39 - 0.81

Improved Demand Estimation Utilizing

ODME Optimization (%)25.33 8.88 - 32.84

Page 11: Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

Impact of ODME – Fine-Tuned Initial

11

Goodness-of-Fit Statistics

Initial Demand

Running DTA

without ODMERunning ODME Optimization

Macroscopic Model Mesoscopic Models Macroscopic Model Mesoscopic Models

MAE (veh/ln/15min) 62.13 62.19 - 67.79 59.71 55.18 - 63.44

MAPE (%) 11.09 10.98 - 11.21 10.9 10.62 - 11.02

RMSE (veh/ln/15min) 91.24 91.33 - 95.15 87.68 81.03 - 93.15

R squared 0.821 0.80 - 0.832 0.95 0.81 - 0.96

Improved Demand Estimation Utilizing

ODME Optimization (%)3.9 2.09 - 11.27

Page 12: Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

Impact of Using Partial Trips (PT)

12

Page 13: Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

Using Partial Trips

13

Facility Type Initial (Before ODME) Counts-Only Adding Partial Trip

Freeway 28.43% 28.11% 22.01%

Freeway-Ramp 39.42% 37.86% 28.09%

Arterials 44.93% 34.69% 4.65%

Total 44.80% 39.10% 22.93%

Observed Count volume From Initial(No ODME) Counts Only Adding Partial Trip

26-894 44.75% 35.3% 6.81%

1308-2620 26.55% 26.18% 21%

Total 44.80% 39.10% 22.93%

Page 14: Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

ML Modeling VOT Distribution

Goodness-of-Fit Statistics

Value of Time $ (VOT)

$12 $20 $30 $40 $50$40 Fixed

(without Distribution)

MAPE (%) 16.50 9.70 11.86 4.01 5.73 9.03

RMSE(veh/ln/15min) 73.94 41.76 52.11 18.11 26.60 40.34

Page 15: Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

Impact of VOR Use

Goodness-of-Fit Statistics ELToD Meso Macro

With

Consideration of

VOR

RMSE

(veh/ln/15min)12.00 8.23-9.18 10.77

MAPE (%) 2.29 1.89-1.96 2.27

Without

Consideration of

VOR

RMSE

(veh/ln/15min)54.30 40.34-46.22 37.03

MAPE (%) 13.36 9.03-11.29 8.68

𝑇𝑇𝐼𝑛% = 𝑒(𝑗𝑛 𝐿𝐻𝐿+𝑘𝑛𝑑𝑐𝑐𝑟𝑖𝑡 +𝑙𝑛𝑅0.05" ) (4.1)

Where, 𝑇𝑇𝐼𝑛% = 𝑛𝑡ℎ 𝑝𝑒𝑟𝑐𝑒𝑛𝑡𝑖𝑙𝑒 𝑇𝑇𝐼 𝑣𝑎𝑙𝑢𝑒

𝐿𝐻𝐿 = 𝑙𝑎𝑛𝑒 − ℎ𝑜𝑢𝑟 𝑙𝑜𝑠𝑡 𝑑𝑐𝑐𝑟𝑖𝑡 = 𝑐𝑟𝑖𝑡𝑖𝑐𝑎𝑙 𝑑𝑒𝑚𝑎𝑛𝑑 − 𝑐𝑎𝑝𝑎𝑐𝑖𝑡𝑦 𝑟𝑎𝑡𝑖𝑜

𝑅0.05" = ℎ𝑜𝑢𝑟𝑠 𝑜𝑓 𝑟𝑎𝑖𝑛𝑓𝑎𝑙 𝑒𝑥𝑐𝑒𝑒𝑖𝑛𝑔 0.05 𝑖𝑛𝑐ℎ𝑒𝑠

𝑗𝑛 , 𝑘𝑛 ,𝑙𝑛 = 𝑐𝑜𝑒𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑡𝑠 𝑓𝑜𝑟 𝑛𝑡ℎ 𝑝𝑒𝑟𝑐𝑒𝑛𝑡𝑖𝑙𝑒

U 𝑎1 𝑇𝑇 + 𝑎2 𝑇𝐶 + 𝑎3 𝑇𝑇80% + 𝑎4 𝑇𝑇95%

Page 16: Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

Can Models Predict ML Shifts

Goodness-of-Fit StatisticsFixed Pricing and Static

Assignment(ELTOD)

Dynamic pricing with Dynamic Assignment

(Avenue)

New Toll PolicyRMSE (veh/ln/15min) 51.42 25.15

MAPE (%) 12.22 5.87

Old Toll policyRMSE (veh/ln/15min) 67.39 31.04

MAPE (%) 13.48 5.90

Page 17: Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

Macro+Meso+Micro Modeling

• Waiting for I-95 Model from FDOT D6

Page 18: Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

Estimation of CV MP

0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Per

cen

tage

of

CV

Year

Min MP

Max MP

MP Difference

Page 19: Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

Estimation of CV MP

Percentage of CACC Vehicles (%) Lane Capacity (veh/ln/hr)

0 2018

0 2092

40 2230

60 2500

80 2890

100 4000

Page 20: Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

Impact of CACC on ML Using DTA

Page 21: Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

0

5

10

15

20

25

30

35

40

45

50

0.8 0.9 1 1.1 1.2 1.3 1.4 1.5

Tra

vel D

ela

y(m

in)

Demand/Capacity Ratio

QDAT

Quickzone

Freeval

DTAlite

Queue theory

Vissim

Work Zone Modeling

Page 22: Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

Construction Diversion Analysis

• Demonstrate how day-to-day learning type assignment can be used in conditions, in which equilibrium cannot be assumed

• For work zones with different number of days utilizing DTALite learning

• Compare to user equilibrium and logit model

Page 23: Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

Diversion Analysis Results

Page 24: Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

Meso+Micro Modeling of WZ

0

10

20

30

40

50

60

I-595 I-95_NB Ramp I-95_SB Ramp

Without Diversion

With Diversion_long-term

With Diversion_short-term

Page 25: Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

ATM - Modeling Different Demands

Page 26: Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

Turning Movement in DTA

• Good estimation of link volume does not guarantee good turning movement volumes

• Turning movement volumes needed for many applications - need incorporating TM in calibration and updating zones and connecters

• Use TM counts, improve network connectors, and fine-tune demands to produce counts

Observed Count volume

PRMSE Without

Multilevel calibration

PRMSE With Multi

level Calibration

0 ~ 250 56.35% 26.96%

250 ~ 500 62.99% 26.55%

>500 82.90% 23.28%

Page 27: Framework for Multi-Resolution Analyses of … · Analyses of Advanced Traffic Management Strategies ... without ODME Running ODME ... •Testing the benefits of MRM for updating

Application of MRM to DTA

• Testing the benefits of MRM for updating capacity and signal control under different demands