FourStar Commissioning. Events 1. Sept 5, 2012 telecon – SAC signed off on the instrument itself. 2. Wendy has since OK’d waiver of original requirement.

Dec 16, 2015

Download

Documents

Daryl Gartside
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: FourStar Commissioning. Events 1. Sept 5, 2012 telecon – SAC signed off on the instrument itself. 2. Wendy has since OK’d waiver of original requirement.

FourStar Commissioning

Page 2: FourStar Commissioning. Events 1. Sept 5, 2012 telecon – SAC signed off on the instrument itself. 2. Wendy has since OK’d waiver of original requirement.

Events

1. Sept 5, 2012 telecon – SAC signed off on the instrument itself. 2. Wendy has since OK’d waiver of original requirement of a

pipeline, i.e., Dan’s.

3. Now we ask that the SAC officially waive the requirement and pass this recommendation along to the Council.

4. The Council then (hopefully) declares it commissioned.

Page 3: FourStar Commissioning. Events 1. Sept 5, 2012 telecon – SAC signed off on the instrument itself. 2. Wendy has since OK’d waiver of original requirement.

Meanwhile …

Two pipelines now “exist”:1. Dan’s – good for final or near-final data products, at the telescope; runs automatically as the data flow in. Probably not too easy to get working at a home institution, but this remains to be seen. Written in Python.

2. Andy Monson’s – hands-on, can be run at the telescope, but not automated as Dan’s is. Somewhat more general, and can be run elsewhere with a little help from Andy. Written in

shell scripts calling IRAF routines.

Page 4: FourStar Commissioning. Events 1. Sept 5, 2012 telecon – SAC signed off on the instrument itself. 2. Wendy has since OK’d waiver of original requirement.

Typical result of Dan’s

Some parameters: 1% filter at 1.18 microns 7 hour exposure 105 x 240 sec individual frames 2.5 pixels FWHM on final stacked image Depth is as advertised in online manual Note chip seams: gone; note increased noise Wavelet transform method for sky creation; yields very flat

background

Page 5: FourStar Commissioning. Events 1. Sept 5, 2012 telecon – SAC signed off on the instrument itself. 2. Wendy has since OK’d waiver of original requirement.

Cosmos field

Page 6: FourStar Commissioning. Events 1. Sept 5, 2012 telecon – SAC signed off on the instrument itself. 2. Wendy has since OK’d waiver of original requirement.
Page 7: FourStar Commissioning. Events 1. Sept 5, 2012 telecon – SAC signed off on the instrument itself. 2. Wendy has since OK’d waiver of original requirement.

Pipeline diagnostics page: shifts, phot offsets, # of stars, FWHM

Page 8: FourStar Commissioning. Events 1. Sept 5, 2012 telecon – SAC signed off on the instrument itself. 2. Wendy has since OK’d waiver of original requirement.

Thumbnails: current stack, coverage map, noise map

Page 9: FourStar Commissioning. Events 1. Sept 5, 2012 telecon – SAC signed off on the instrument itself. 2. Wendy has since OK’d waiver of original requirement.

Thumbnails: sky-subtracted frames

Page 10: FourStar Commissioning. Events 1. Sept 5, 2012 telecon – SAC signed off on the instrument itself. 2. Wendy has since OK’d waiver of original requirement.

47 Tuc example of wavelet method for sky

1. 2 minutes at Ks total2. 3.5 pix FWHM3. Main thing to notice is how flat sky is even in the presence of an extreme background gradient.