FORM 1075 – MECHANICAL INTEGRITY TEST. This presentation will assist you in the completion of the Form 1075. The mechanical integrity test. Date of Last.
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
FORM 1075 – MECHANICAL INTEGRITY TEST
FORM 1075 – MECHANICAL INTEGRITY TESTThis presentation will assist you in the completion of the Form 1075. The mechanical integrity test.
Date of Last Revision: 2009
Rule Requirement: OAC 165:10-5-6(d)(1)
Explanation of Form: A pressure or monitoring test must be performed on new and existing enhanced recovery injection wells and disposal wells. Information must be submitted on Form 1075 and witnessed by a Field Inspector. Forms shall be submitted to the Conservation Division's Underground Injection Control Department. [Reference 165:10-5-6]
Question concerning this Form: For more information contact Underground Injection Control at (405) 522-2764.
FORM 1075 – MECHANICAL INTEGRITY TEST
DATE OF THE TEST
FORM 1075 – MECHANICAL INTEGRITY TEST
OPERATOR’S NAME
FORM 1075 – MECHANICAL INTEGRITY TEST
OTC/OCC OPERATOR NUMBER
FORM 1075 – MECHANICAL INTEGRITY TEST
MAILING ADDRESS, PHONE NUMBER, CITY, STATE, ZIP CODE AND FAX NUMBER OF THE OPERATOR
FORM 1075 – MECHANICAL INTEGRITY TEST
TYPE OF TEST: - INITIAL TEST - RETREST - CHANGE OF OPERATOR
FORM 1075 – MECHANICAL INTEGRITY TEST
TYPE OF WELL – - COMMERICAL DISPOSAL - NON-COMMERICAL DISPOSAL - INJECTION
FORM 1075 – MECHANICAL INTEGRITY TEST
AUTHORIZING OCC ORDER NUMBER
FORM 1075 – MECHANICAL INTEGRITY TEST
ADDITIONAL ORDER NUMBERS
FORM 1075 – MECHANICAL INTEGRITY TEST
WELL NAME AND NUMBER
FORM 1075 – MECHANICAL INTEGRITY TEST
API NUMBER
FORM 1075 – MECHANICAL INTEGRITY TEST
LATITUDE AND LONGITUDE
FORM 1075 – MECHANICAL INTEGRITY TEST
LOCATION OF THE WELL – - QUARTER SECTION CALLS - SECTION - TOWNSHIP - RANGE - COUNTY
FORM 1075 – MECHANICAL INTEGRITY TEST
UNIT NAME AND UNIT ORDER NUMBER
FORM 1075 – MECHANICAL INTEGRITY TEST
REWORK PRIOR TO TEST? PLEASE ATTACH A COPY OF AN EXPLANATION IF MORE SPACE IS REQUIRED
FORM 1075 – MECHANICAL INTEGRITY TEST
PRESSURE TEST - PASS - FAIL
FORM 1075 – MECHANICAL INTEGRITY TEST
CASING/TUBULAR ANNULUS TESTED?
FORM 1075 – MECHANICAL INTEGRITY TEST
SURFACE CASING PRESSURE BEFORE TEST
FORM 1075 – MECHANICAL INTEGRITY TEST
TUBULAR PRESSURE BEFORE TEST
FORM 1075 – MECHANICAL INTEGRITY TEST
ANNULUS PRESSURE BEFORE TEST
FORM 1075 – MECHANICAL INTEGRITY TEST
FLOW-BACK VOLUME
FORM 1075 – MECHANICAL INTEGRITY TEST
MAXIMUM PRESSURE PER OCC ORDER
FORM 1075 – MECHANICAL INTEGRITY TEST
PACKER DEPTH PER OCC ORDER
FORM 1075 – MECHANICAL INTEGRITY TEST
ACTUAL PACKER DEPTH
FORM 1075 – MECHANICAL INTEGRITY TEST
ESTIMATED PACKER DEPTH
FORM 1075 – MECHANICAL INTEGRITY TEST
STARTING TEST PRESSURE
FORM 1075 – MECHANICAL INTEGRITY TEST
ENDING TEST PRESSURE
FORM 1075 – MECHANICAL INTEGRITY TEST
POSITIVE ANNULUS PRESSURE MONITORING?
FORM 1075 – MECHANICAL INTEGRITY TEST
IS THE WELL SHUT DOWN? - YES (GIVE REASON) - NO
FORM 1075 – MECHANICAL INTEGRITY TEST
ALTERNATIVE TESTING PROCEDURE AUTHORIZED BY OCC ORDER NUMBER