For personal use only  · Deposit Production/Reserves History Mineralisation Storliden, Sweden 1.86Mt @ 8.8% Zn, 3.1% Cu, producing 52kt of copper, 150kt of zinc. Discovered in 1998

Sep 24, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: For personal use only  · Deposit Production/Reserves History Mineralisation Storliden, Sweden 1.86Mt @ 8.8% Zn, 3.1% Cu, producing 52kt of copper, 150kt of zinc. Discovered in 1998

ANNUAL GENERAL MEETING24th November 2015Perth, Australia

Hannans Reward Ltd ABN: 52099862129

ASX:HNRwww.hannansreward.com

For

per

sona

l use

onl

y

Page 2: For personal use only  · Deposit Production/Reserves History Mineralisation Storliden, Sweden 1.86Mt @ 8.8% Zn, 3.1% Cu, producing 52kt of copper, 150kt of zinc. Discovered in 1998

DISCLAIMERThis Document and the information contained herein and any presentation (collectively referred to as “Information”) is proprietary toHannans Reward Limited (“the Company”, “Hannans Reward” or “Hannans”).

This Document is intended to provide general background on the Company. It is not a disclosure document and is not intended as anoffer, invitation, solicitation or recommendation with respect to any potential transaction.

Securities of micro cap exploration companies, typically involve a high degree of risk and as such, any investment in the Company mustbe considered as purely speculative. The Information in this presentation does not purport to cover all relevant information about anypotential investment in the Company. Accordingly potential investors are advised to seek appropriate independent advice, if necessary, todetermine the suitability of this investment. You should not solely act in reliance on the material in this presentation. This presentationdoes not purport to be all inclusive or to contain all information which its recipients require in order to make an informed assessment ofthe Company’s prospects. You should conduct your own investigation and perform your own analysis in order to satisfy yourself as to theaccuracy or completeness of the information, statements, and opinions contained in this presentation before deciding whether to makean investment into Hannans.

The Document contains reference to certain intentions, expectations and plans of the Company. Those intentions, expectations and plansmay or may not be achieved. They are based on certain assumptions which may not be met or on which views may differ. Theperformance and operations of the Company may be influenced by a number of factors, many of which are outside the control of theCompany. No representation or warranty, express or implied, is made by the Company or any of their respective directors, employees,agents, advisers and consultants that any intentions, expectations or plans will be achieved either totally or partially or within aprescribed timeframe or that any particular rate of return will be achieved.

The Information disclosed relates to the proposed business of the Company at the date of this Document. Material information may havechanged since the date the Document was compiled. No responsibility is accepted to advise any person of any change or update any ofthe Information.

Neither the provision of this Document nor any information contained in this Document or subsequently communicated to any person inconnection with this Document is, or should be taken as, constituting the giving of investment advice to any person. By accepting thisDocument you acknowledge and agree to be bound by each of the foregoing statements.

The currency used throughout the presentation is Australian Dollars unless otherwise stated.

Infrastructure, locomotives, ore wagons, unloading facilities, mining operations, drill rigs, windmills, ships nor reindeers are owned byHannans. Hannans does not own any of the infrastructure in this presentation.

2

For

per

sona

l use

onl

y

Page 3: For personal use only  · Deposit Production/Reserves History Mineralisation Storliden, Sweden 1.86Mt @ 8.8% Zn, 3.1% Cu, producing 52kt of copper, 150kt of zinc. Discovered in 1998

HIGHLIGHTSExposure to copper, gold nickel & ironPortfolio of free-carried projects & sole funded projectsJORC resources and greenfields explorationMining lease application for copper-gold to be lodged 2016

3

For

per

sona

l use

onl

y

Page 4: For personal use only  · Deposit Production/Reserves History Mineralisation Storliden, Sweden 1.86Mt @ 8.8% Zn, 3.1% Cu, producing 52kt of copper, 150kt of zinc. Discovered in 1998

STRATEGY

Vison

Our vision is to build a successful exploration and production company.

Mission

Our mission is to develop a company that has a material interest in a portfolio of mineral projectsthat are being rapidly progressed whether they are exploration, development or productionassets.

We recognise that maintaining a professional, knowledgeable and ethical team of directors,employees and consultants is the key to our business.

Our focus is to provide shareholders with a satisfactory return on investment by managing ourpeople, projects and capital in an entrepreneurial and responsible manner.

4

For

per

sona

l use

onl

y

Page 5: For personal use only  · Deposit Production/Reserves History Mineralisation Storliden, Sweden 1.86Mt @ 8.8% Zn, 3.1% Cu, producing 52kt of copper, 150kt of zinc. Discovered in 1998

ASSETS

‘Free-Carried’ Pahtohavare Copper-Gold Project (Sweden)

Copper oxide resource1 (1.4Mt @ 1.8% Cu) amenable to contract mining withexcellent access to infrastructure plus outstanding targets beneath shallow historic mines

Mining lease application to be lodged by joint venture partner during 2016

‘Free-Carried’ Exploration Portfolio (Australia)

Forrestania Nickel & Gold Project - Lake Johnston Nickel Project - QVR Nickel Project.

Lapland Nickel-Copper-PGE (Sweden)

High potential copper-nickel-PGE project targeting magmatic sulphides within gabbroic-ultramafic intrusives.

Rakkurijoki Iron Project (Sweden)

High quality iron project, strategically located with excellent access to infrastructure.

Lannavaara Iron Project (Sweden)

Large iron project at early stage of exploration.

Capital

Minimal cash, $0.8M receivable and $0.725M interest free loan facilities (~$0.05M drawn)

5

For

per

sona

l use

onl

y

Page 6: For personal use only  · Deposit Production/Reserves History Mineralisation Storliden, Sweden 1.86Mt @ 8.8% Zn, 3.1% Cu, producing 52kt of copper, 150kt of zinc. Discovered in 1998

ACHIEVEMENTS 2015Pahtohavare Copper Project

Entered into joint venture (JV) with Swedish mining company Lovisagruvan AB (LOVI) in March

JV partner completed diamond drill program at the Central oxide deposit in August,intercepted bonanza copper grades and agreed to proceed to next stage of JV in November.

Lapland Ni-Cu-PGE Project

Generated a 1st-class greenfields exploration project with the potential for significant multi-commodity mineralisation and completed initial field reconnaissance program in August.

Lake Johnston Nickel Project

JV partner announced anomalous nickel mineralisation from two diamond core holes.

Queen Victoria Rocks Nickel Project

JV partner drilled one diamond core hole to follow up historical intercept.

Forrestania Nickel Project

JV partner announced commencement of geochemical and geophysical exploration program.

Divestments

Sold exploration database to Neometals Ltd (ASX:NMT) for 20% free carried interest.

Sold North Ironcap gold rights in Western Australia.

Corporate

Key staff retained, operating costs decreased and no equity raisings completed.

6

For

per

sona

l use

onl

y

Page 7: For personal use only  · Deposit Production/Reserves History Mineralisation Storliden, Sweden 1.86Mt @ 8.8% Zn, 3.1% Cu, producing 52kt of copper, 150kt of zinc. Discovered in 1998

CHALLENGES 2015

Investor Sentiment

Investor sentiment continues to be very negative towards all companies in the resources sector and all metals.

Commodities Prices

Nickel price at 7 year low (<USD10,000/t)

Iron ore price at 7 year low (<USD50/t)

Copper price at 6 year low (<USD5,000/t)

Gold price at 5 year low (<USD1,100/oz)

Exchange Rates

Depreciating AUD made investing overseas more expensive.

Exploration

Fall in exploration expenditure by major mining companies on global basis made finding strategic partners very difficult - minimal appetite for greenfields exploration projects.

Funding

Discovery Zone transaction did not settle (AUD3M) – Hannans assessing its rights1.

North Ironcap transaction did not settle (AUD0.8M) – Hannans assessing its rights.

71: Refer ASX Announcements dated 9 and 28 October 2015

For

per

sona

l use

onl

y

Page 8: For personal use only  · Deposit Production/Reserves History Mineralisation Storliden, Sweden 1.86Mt @ 8.8% Zn, 3.1% Cu, producing 52kt of copper, 150kt of zinc. Discovered in 1998

PERFORMANCE OF MAJOR COMPANIES

8

Company 52 Week Range Last Sale% Drop from 52 Week High

Glencore 66.67 - 338.00 92.33 72%

BHP 27.84 - 57.05 29.10 49%

Rio Tinto 31.97 - 50.07 34.68 30%

Vale 3.75 - 9.55 3.80 60%

Freeport McMoRan 7.76 - 29.75 8.25 72%

Anglo American 417.20 - 1,376.50 446.5 67%

Fortescue Metals Group 1.58 - 3.03 2.18 28%

Barrick Gold 5.91 - 13.70 7.19 47%

Newcrest 9.17 - 15.79 11.48 27%

Antofagasta 465.90 - 811.50 508.00 37%

First Quantum 225.00 - 1,125 246.75 78%

Hannans Reward 0.002 – 0.006 0.004 33%

For

per

sona

l use

onl

y

Page 9: For personal use only  · Deposit Production/Reserves History Mineralisation Storliden, Sweden 1.86Mt @ 8.8% Zn, 3.1% Cu, producing 52kt of copper, 150kt of zinc. Discovered in 1998

GOALS 2016

Shareholder Returns

Implement a strategy giving shareholders the opportunity to recover their investment.

Joint Venture Projects

Pahtohavare, Forrestania, Lake Johnston and Queen Victoria Rocks.

Monitor joint venture partners’ activities.

Assist joint venture partners to unlock the value of these high potential projects.

Sole Funded Projects

Lapland, Rakkurijoki, Lannavaara and Särksjön.

Secure joint venture partners.

Corporate

Protect rights and finalise outcomes on North Ironcap and Discovery Zone transactions.

9

For

per

sona

l use

onl

y

Page 10: For personal use only  · Deposit Production/Reserves History Mineralisation Storliden, Sweden 1.86Mt @ 8.8% Zn, 3.1% Cu, producing 52kt of copper, 150kt of zinc. Discovered in 1998

Olof ForslundNon-Executive Director

• Director of Hannans Reward Ltd (2012).• Geophysicist with extensive international

experience in the mineral exploration industry.• Previously Regional Manager of SGU Mineral

Resources Information Office.

Jonathan MurrayNon-Executive Director

• Director of Hannans Reward Ltd (2010).• Partner of Steinepreis Paganin• Principal legal practice areas include equity

capital markets, takeovers, project acquisitions and divestments, corporate governance, commercial law and strategy.

DIRECTORS & MANAGEMENT

1010

Damian HicksManaging Director

• Co-Founder of Hannans Reward Ltd (2002).• Financial, legal and compliance qualifications• Non-executive director of funds management

company Growth Equities

Markus BachmannNon-Executive Director

• Director of Hannans Reward Ltd (2012).• Corporate finance professional and

founding partner of Craton Capital.• Craton Capital awarded Fund Manager of

the Year at the Mining Journal’s “Outstanding Achievement Awards” during December 2010.

Magnus ArnqvistNon-Executive Director, Kiruna Iron AB

• Ex-MD of Bergteamet

• Ex-MD of Europe’s largest zinc mine.

• Mining engineer with Rapallo (Australia) and Mine Manager of the Kristineberg, Storliden and Maurliden Mines (owned by Boliden).

Amanda ScottExploration Manager

• Geologist with 12 years experience.• Responsible for developing the Kiruna Iron

Project portfolio and the SCR gold and base metals portfolio since inception.

• Previously Exploration Manager for Hannans Reward Ltd (2008-2010) and Scandinavian Resources Ltd (2010–2012)

For

per

sona

l use

onl

y

Page 11: For personal use only  · Deposit Production/Reserves History Mineralisation Storliden, Sweden 1.86Mt @ 8.8% Zn, 3.1% Cu, producing 52kt of copper, 150kt of zinc. Discovered in 1998

CAPITAL STRUCTURE

11

# Name %

1 ERI 16.6

2 Craton Capital 8.9

3 Bruce Drummond 3.7

4 Marfield Pty Ltd 3.1

5 Jetosea Pty Ltd 2.6

Top 5 Subtotal 34.9

Top 20 Subtotal 49.4

1,307 Holders 100.0

Shares on issue 721,966,133

Options on issue 36,050,000Red: Hannans Reward Ltd Blue: ASX 300 Metals and Mining (Industry)

Source: ASX

For

per

sona

l use

onl

y

Page 12: For personal use only  · Deposit Production/Reserves History Mineralisation Storliden, Sweden 1.86Mt @ 8.8% Zn, 3.1% Cu, producing 52kt of copper, 150kt of zinc. Discovered in 1998

SWEDEN

12

Hannans’ three main explorationprojects are all located inNorrbotten, northern Sweden.

Hannans’ Rakkuri andPahtohavare Projects are located~8km from Kiruna.

Hannans’ exploration office islocated in Malå, approx. 440kmsouth of Kiruna.

For

per

sona

l use

onl

y

Page 13: For personal use only  · Deposit Production/Reserves History Mineralisation Storliden, Sweden 1.86Mt @ 8.8% Zn, 3.1% Cu, producing 52kt of copper, 150kt of zinc. Discovered in 1998

EXPLORING FOR HIGH GRADE DEPOSITS

13

Deposit Production/Reserves History Mineralisation

Storliden, Sweden

1.86Mt @ 8.8% Zn, 3.1% Cu, producing 52kt of copper, 150kt of zinc.

Discovered in 1998 by North Atlantic Natural Resources (renamed Lundin Mining), mining commenced in joint venture with Boliden in 2002, closed in 2008.

VMS

Svartliden, Sweden

3Mt @ 4.72g/t Au producing 370koz Discovered in 1994, acquired by Dragon Mining in 1999. Open pit mining commenced in 2004 followed by underground mining in 2011, closed in 2013

Lode Gold

Zinkgruvan, Sweden

Current reserves:Zn-Rich: 11.8Mt @ 9% Zn, 3.6% Pb, 76g/t AgCu-Rich: 3.9Mt @ 2.2% Cu, 0.4% Zn, 31g/t Ag

Discovered in 1857, acquired by Lundin Mining from Rio Tinto in 2004.

SEDEX

Kristineberg, Sweden

Total production to date (2013) 27.8Mt @ 3.74% Zn, 1.04% Cu, 1.4g/t Au, 39g/t Ag, 0.4% PbCurrent reserve: 4.8MtCurrent resource: 6.4Mt

Discovered in 1918. Mining commenced in 1940’s. Production by Boliden ongoing, currently at 650kt/yr.

VMS

Kylylahti, Finland

Current reserve: 4.2Mt @ 1.6% Cu, 0.7g/t Au, 0.6% ZnCurrent resource: 7.7Mt @ 1.3% Cu, 0.7g/t Au, 0.5% Zn

Discovered in 1984 by Outokumpu, acquired by Altona Mining Ltd (ASX:AOH) in 2010, mining recommenced in 2012 and was sold to Boliden in 2014

Ophiolite

Examples of high grade deposits discovered, developed and mined in Scandinavia

For

per

sona

l use

onl

y

Page 14: For personal use only  · Deposit Production/Reserves History Mineralisation Storliden, Sweden 1.86Mt @ 8.8% Zn, 3.1% Cu, producing 52kt of copper, 150kt of zinc. Discovered in 1998

COPPER-GOLD (PAHTOHAVARE)

14

All costs funded by JV partner.

Hannans retains a 25% free-carried interest through to aDecision to Mine.

Potential for 2-3 high gradecopper deposits across theProject.

Southern - high potential forcontinuation of copper orebeneath the lowest mined levelof ~200m. Historical productionof ~1.7Mt @ 1.9% Cu, 0.9g/t Au.

Central – high potential forcontinuation of copper-goldsulphide ore beneath oxide ore.

Between Southern and Centralthere is potential for copper-goldore, currently ZERO drillingtesting contiguous hoststratigraphy.

For

per

sona

l use

onl

y

Page 15: For personal use only  · Deposit Production/Reserves History Mineralisation Storliden, Sweden 1.86Mt @ 8.8% Zn, 3.1% Cu, producing 52kt of copper, 150kt of zinc. Discovered in 1998

COPPER-GOLD (PAHTOHAVARE)

15

Visible copper mineralisation in drillcore from PADH15005between 48.5-49m downhole.

Bonanza grade copper assay resultsreceived from diamond drilling at theCentral deposit.

Assay1 highlights for PADH15005 include:

14.2m @ 9.60% Cu, 2.43g/t Au, 16.98g/tAg from 40.0m inc. 4m @ 23.26% Cu,3.62g/t Au, 43.03g/t Ag from 47.5m.

14m @ 2.03% Cu, 0.53g/t Au, 4.07g/t Agfrom 7.2m inc. 3m @ 3.58% Cu, 1.02g/tAu, 8.47g/t Ag from 10.8m.

Highest grade 1m interval from withinPADH15005 was 31.5% Cu, 5.89 g/t Auand 63.1 g/t Ag from 50.5m.

Note that all widths are downhole as truewidths are not currently known.

1: Please refer ASX Announcement “1st Quarter Activities Report” dated 30th October 2015 for additional detailsregarding the diamond drilling at Pahtohavare including the JORC Table.

For

per

sona

l use

onl

y

Page 16: For personal use only  · Deposit Production/Reserves History Mineralisation Storliden, Sweden 1.86Mt @ 8.8% Zn, 3.1% Cu, producing 52kt of copper, 150kt of zinc. Discovered in 1998

COPPER-NICKEL-PGE (LAPLAND)

16

Project located in Sweden’s equivalent of the FraserRange province in Western Australia; a coincidentregional scale magnetic-gravity anomaly and multiplemafic intrusives located on the edge of a potentialcraton margin.

Work plan for the next twelve months includesstakeholder engagement, environmentalassessments, mapping, sampling and prospecting,geophysical surveys (in-fill airborne gravity andelectromagnetic surveys) and bedrock drilling.

For

per

sona

l use

onl

y

Page 17: For personal use only  · Deposit Production/Reserves History Mineralisation Storliden, Sweden 1.86Mt @ 8.8% Zn, 3.1% Cu, producing 52kt of copper, 150kt of zinc. Discovered in 1998

COPPER-NICKEL-PGE (LAPLAND)

17

Completed maiden field reconnaissance trip inAugust 2015 which identified outcroppinggabbro, anorthosite and ultramafic intrusives.

The Jalokoski prospect contained an ultramaficsample (SRTS15010) collected during the fieldtrip that showed evidence of differentiationwhich typically indicates dynamic magmaemplacement which is generally required fornickel sulphide mineralisation.

Nearby sample SRTS15011, whilstundifferentiated, contained olivine suggestingthat it may have formed from a more primitivemagma. Sample SRTS15011 also contained traceamounts of pentlandite. This may be howeverthe result of secondary alteration rather thanevidence for primary magmatic sulphides.

The Jalokoski and Kaalamakoski prospects willbecome the primary focus for future explorationat the Lapland Project.

For

per

sona

l use

onl

y

Page 18: For personal use only  · Deposit Production/Reserves History Mineralisation Storliden, Sweden 1.86Mt @ 8.8% Zn, 3.1% Cu, producing 52kt of copper, 150kt of zinc. Discovered in 1998

IRON (RAKKURIJOKI)

18

Potential open pit iron ore mine

Operating iron mine at 1,365m depth

Current JORC Inferred resource of 74.5Mt @ 39.7%Fe (down to 350m).

Mineralisation currently open at a depth of >400m.

Area of national interest for mining.

Iron upgrades to +68% Fe product (DTR-analysis).

Excellent Location:

• 6km from Kiruna

• ~1km from open access, heavy gauge rail

• 250m from the road

Open pit mining potential.

Positive scoping study completed in February 2013.

For

per

sona

l use

onl

y

Page 19: For personal use only  · Deposit Production/Reserves History Mineralisation Storliden, Sweden 1.86Mt @ 8.8% Zn, 3.1% Cu, producing 52kt of copper, 150kt of zinc. Discovered in 1998

IRON (LANNAVAARA)

19

Potential open pit iron ore mine

Operating iron mine at 1,365m depth

Potential to be a large, long-life (+25year) magnetite project.

High iron content product (+69% Fe inDTR testwork) in low sovereign riskjurisdiction.

The Project comprises exploiting a largemagnetite iron resource at Lannavaara,converting the ore into a high qualityiron product, transporting the product170km to an ice-free, deep-water portand shipping the product to market.

Completed slurry pipeline, portunloading-storage-loading scopingstudies in 2014 both of which confirmedthe concept to be viable.

Modelled airborne magnetic image over the Paljasjärvi magnetite prospect within the Lannavaara Iron Project.

For

per

sona

l use

onl

y

Page 20: For personal use only  · Deposit Production/Reserves History Mineralisation Storliden, Sweden 1.86Mt @ 8.8% Zn, 3.1% Cu, producing 52kt of copper, 150kt of zinc. Discovered in 1998

WESTERN AUSTRALIA

20

Hannans holds a 16-20% interest free-carriedto Decision to Mine in the Forrestania, LakeJohnston and Queen Victoria Rocks nickel andgold projects.

For

per

sona

l use

onl

y

Page 21: For personal use only  · Deposit Production/Reserves History Mineralisation Storliden, Sweden 1.86Mt @ 8.8% Zn, 3.1% Cu, producing 52kt of copper, 150kt of zinc. Discovered in 1998

NICKEL & GOLD (FORRESTANIA)

21

All costs funded by JV partner.

Joint venture partner Neometals Ltd(ASX:NMT) approves greenfields nickelsulphide exploration program at theForrestania Nickel Project.

Leading edge technology developed byconsultants Richard Stuart (geophysicist)and Gordon Kelly (geochemist) to confirmpotential for Flying Fox-style mines withinStormbreaker prospect.

Stormbreaker prospect located ~7kmalong strike to the north of the Flying Foxnickel mine and is hosted within the samefavourable western ultramafic komatiiteunit.

Tenements include prospecting licenseapplications over the historic high gradeBlue Haze gold mine.

For

per

sona

l use

onl

y

Page 22: For personal use only  · Deposit Production/Reserves History Mineralisation Storliden, Sweden 1.86Mt @ 8.8% Zn, 3.1% Cu, producing 52kt of copper, 150kt of zinc. Discovered in 1998

NICKEL (LAKE JOHNSTON)

22

All costs funded by JV partner.

Two diamond holes drilled in 2014 intersected a classicmafic-ultramafic pile of gabbro, amphibolite andserpentinite before entering the pillowed basaltfootwall. The serpentinised cumulate zones in bothholes contain very fine grained sulphides, are elevatedin nickel and sulphur and have very high MgO levels.

The holes have been cased with PVC to enable down-hole geophysics to be completed in the future.

For

per

sona

l use

onl

y

Page 23: For personal use only  · Deposit Production/Reserves History Mineralisation Storliden, Sweden 1.86Mt @ 8.8% Zn, 3.1% Cu, producing 52kt of copper, 150kt of zinc. Discovered in 1998

NICKEL (QUEEN VICTORIA ROCKS)

23

All costs funded by JV partner.

A re-interpretation of the geological setting at QVRhas resulted in the identification of a lava channeland basal contact.

The footwall contact remains untested, overlain bymultiple sulphidic sediments giving false EMconductors.

Future work will use PGE-vectoring and IP to ‘seethrough’ upper sediments and define co-incidenttargets on the ultramafic embayment contact.

For

per

sona

l use

onl

y

Page 24: For personal use only  · Deposit Production/Reserves History Mineralisation Storliden, Sweden 1.86Mt @ 8.8% Zn, 3.1% Cu, producing 52kt of copper, 150kt of zinc. Discovered in 1998

CONTACT DETAILS

24

Damian Hicks, Managing Director, +46703220226

Amanda Scott, Exploration Manager, +46703221497

Mindy Ku, Finance & Compliance Manager, +61893243388

www.hannansreward.com (W)

For

per

sona

l use

onl

y

Page 25: For personal use only  · Deposit Production/Reserves History Mineralisation Storliden, Sweden 1.86Mt @ 8.8% Zn, 3.1% Cu, producing 52kt of copper, 150kt of zinc. Discovered in 1998

COMPLIANCE STATEMENTSThe information in this document that relates to exploration results is based on information compiled by Amanda Scott, aCompetent Person who is a Member of the Australian Institute of Mining and Metallurgy (Membership No.990895). AmandaScott is a full-time employee of Hannans Reward Ltd. Amanda Scott has sufficient experience, which is relevant to the style ofmineralisation and types of deposits under consideration and to the activity which has been undertaken to qualify as aCompetent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results, MineralResources and Ore Reserves (JORC Code). Amanda Scott consents to the inclusion in the report of the matters based on herinformation in the form and context in which it appears.

The information in this document that relates to Mineral Resource and Exploration Target Estimates for Pahtohavare isextracted from the report entitled “Re-Release of Maiden JORC Resource at Pahtohavare To Comply With JORC” created on 31January 2014 and is available to view on the Company’s website (www.hannansreward.com). The Company confirms that it isnot aware of any new information or data that materially affects the information included in the original marketannouncement and in the case of Mineral Resources or Ore Reserves that all material assumptions and technical parametersunderpinning the estimates in the relevant market announcement continue to apply and have not materially changed. TheCompany confirms that the form and context in which the Competent Person’s findings are presented have not beenmaterially modified from the original market announcement.

The information in this document that relates to Mineral Resource Estimates for Rakkurijoki and Rakkurijärvi is extracted fromthe report entitled “Kiruna Iron Project JORC Resource Update” created on 17 January 2012 and is available to view on theCompany’s website (www.hannansreward.com). The Company confirms that it is not aware of any new information or datathat materially affects the information included in the original market announcement and in the case of Mineral Resources orOre Reserves that all material assumptions and technical parameters underpinning the estimates in the relevant marketannouncement continue to apply and have not materially changed. The Company confirms that the form and context in whichthe Competent Person’s findings are presented have not been materially modified from the original market announcement.

25

For

per

sona

l use

onl

y