Top Banner
High potential landholding in world class Macarthur River zinc province Large base metal system confirmed at 100% - owned Newman Project, WA Dominant tenement holder in emerging Forrestania Lithium and Nickel province Building a significant Australian zinc and base metals company Targeting metals with outstanding growth potential ASX Code: MZN For personal use only
12

For personal use only - ASX2016/11/30  · presentation. This presentation contains certain “forward-looking statements”. Forward looking statements can generally be identified

Jul 18, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: For personal use only - ASX2016/11/30  · presentation. This presentation contains certain “forward-looking statements”. Forward looking statements can generally be identified

• High potential landholding in world class Macarthur River zinc province

• Large base metal system confirmed at 100%-owned Newman Project, WA

• Dominant tenement holder in emerging Forrestania Lithium and Nickel province

Building a significant Australian zinc and base metals companyTargeting metals with outstanding growth potential

ASX Code: MZN

For

per

sona

l use

onl

y

Page 2: For personal use only - ASX2016/11/30  · presentation. This presentation contains certain “forward-looking statements”. Forward looking statements can generally be identified

Disclaimer

Page : 2

General Disclaimer

This presentation contains summary information about Marindi Metals Ltd (Marindi) and iscurrent as at 29 November 2016. The information in this presentation is of generalbackground and does not purport to be complete.

This presentation is not investment or financial product advice (nor tax, accounting or legaladvice) and is not intended to be used for the basis of making an investment decision. Theinformation contained in this presentation has been prepared without taking into accountthe objectives, financial situation or needs of individuals. Investors should obtain theirown advice before making any investment decision.

Marindi has prepared this document based on information available to it at the time ofpreparation. No representation or warranty, express or implied, is made as to the fairness,accuracy or completeness of the information, opinions and conclusions contained in thispresentation.

This presentation contains certain “forward-looking statements”. Forward lookingstatements can generally be identified by the use of forward looking words such as,“expect”, “should”, “could”, “may”, “predict”, “plan”, “will”, “believe”, “forecast”,“estimate”, “target” and other similar expressions. Indications of, and guidance on, futureearnings and financial position and performance are also forward-looking statements.Forward-looking statements, opinions and estimates provided in this presentation arebased on assumptions and contingencies which are subject to change without notice, asare statements about market and industry trends, which are based on interpretations ofcurrent market conditions.

Forward-looking statements including projections, guidance on future earnings andestimates are provided as a general guide only and should not be relied upon as anindication or guarantee of future performance. This presentation contains statements thatare subject to risk factors associated with Marindi and the mining exploration industry. It isbelieved that the expectations reflected in these statements are reasonable, but they maybe affected by a range of variables which could cause actual results or trends to differmaterially.

Marindi disclaim any intent or obligation to publicly update any forward lookingstatements, whether as a result of new information, future events or results or otherwise.

To the maximum extent permitted by law, Marindi, their related bodies corporate (as thatterm is defined in the Corporations Act 2001 (Cth)) and the officers, directors, employees,advisers and agents of those entities do not accept any responsibility or liability including,without limitation, any liability arising from fault or negligence on the part of any person,for any loss arising from the use of the presentation or its contents or otherwise arising inconnection with it.

Competent Person Reference

Information in this release that relates to Exploration Results is based on informationprepared by Mr Joseph Treacy and who is a Member of the Australian Institute ofGeoscientists and the Australasian Institute of Mining and Metallurgy. Mr Treacy is anemployee of Marindi Metals Ltd. Mr Treacy has sufficient experience which is relevant tothe styles of mineralisation and types of deposits under consideration and to the activitiesbeing undertaken to qualify as a Competent Person as defined in the 2012 Edition of the“Australasian Code for Reporting of Exploration Results, Mineral Resources and OreReserves”. Mr Treacy consents to the inclusion in this release of the matters based on hisinformation in the form and context in which it appears.

The company also confirms that The information in this announcement relating to theMinerals Resources within the Prairie Deposit is based on information prepared by MrMark Drabble, who is a Member of the Australasian Institution of Mining and Metallurgy.Mr Drabble is an employee of Optiro Pty Ltd. Mr Drabble has sufficient experience whichis relevant to the styles of mineralisation and types of deposits under consideration and tothe activities being undertaken to qualify as a Competent Person as defined in the 2012Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resourcesand Ore Reserves”. Details of which were released to the ASX on the 25th May 2015Marindi confirms that that it is not aware of any new information or data that materiallyaffects the information relating to the Prairie Deposit Mineral Resources included in the25th May 2015 announcement referred to above. Marindi confirms that all materialassumptions and technical parameters underpinning the Mineral Resource estimates inthe 25th May 2015 announcement continue to apply and have not materially changed.

For

per

sona

l use

onl

y

Page 3: For personal use only - ASX2016/11/30  · presentation. This presentation contains certain “forward-looking statements”. Forward looking statements can generally be identified

Corporate Overview

Page : 3

Aiming to build a substantial Australian

zinc company positioned to capitalise

on a significant expected future supply

shortage

Board and Management

Mr. Ross Ashton Non-Executive Chairman

Mr. Joe Treacy Managing Director

Mr. Geoff Jones Non-Executive Director

Mr. John Hutton Non-Executive Director

Mr. Jeremy Robinson Company Secretary

Capital Structure

Share Price (as at 29 November 2016) $0.016

Shares on Issue (ASX: MZN) 1,153M

Market Capitalisation $18.5M

Cash on hand (as at 31 September 2016) $2.0M

Enterprise Value $16.5M

Listed Options (ASX: MZNO) (ex 2c before 31 Dec 2016) 237M

Unlisted Options(ex 2.5c before 31 Dec 2019 subject to various conditions)

64M

22%

47%

31%

SHAREHOLDERS

Board andManagement

Other Top 20

Other

For

per

sona

l use

onl

y

Page 4: For personal use only - ASX2016/11/30  · presentation. This presentation contains certain “forward-looking statements”. Forward looking statements can generally be identified

Page : 4

• Primary focus on zinc – a commodity with extremely favourable supply/demand fundamentals

• Three Priority Projects:• Newman Zinc Project in the Capricorn Orogen

of Western Australia, including:• Prairie Deposit• Wolf Prospect

• McArthur River Zinc tenements in the Northern Territory:

• Caranbirini (100%)• Yalco JV (Teck JV)

• Forrestania Lithium Project

• Corporate Matters

• Please refer to the ASX Announcement 30th November 2016 “Corporate Update”

Newman/McArthur River projects provide a platform to build a

leading ASX Zinc Company

Marindi Snapshot Australian base metal explorer with a strong growth outlook

For

per

sona

l use

onl

y

Page 5: For personal use only - ASX2016/11/30  · presentation. This presentation contains certain “forward-looking statements”. Forward looking statements can generally be identified

Newman Base Metal ProjectOutstanding location in an emerging mineral province

Page : 5

• Located in the Capricorn Orogen, which lies between the Pilbara and Yilgarn Cratons

• Structurally controlled base metal, gold and uranium deposits fall within a major regional corridor defined by the Flint Hill and Tangadee lineaments

• Marindi believes the Newman Project represents another large base metal occurrence

For

per

sona

l use

onl

y

Page 6: For personal use only - ASX2016/11/30  · presentation. This presentation contains certain “forward-looking statements”. Forward looking statements can generally be identified

Page : 6

• Hosts 24km long regional structure – Prairie Downs Fault Zone (PDFZ)

• Project includes: • Prairie Deposit – JORC 2012

resource of 3Mt at 5% Zn, 1.6% Pb and 15g/t Ag*

• Wolf Prospect – large base metal system that has never been drilled out

• Interpreted mineralised corridor between Prairie and Wolf:• Significant mineralisation

intersected over 2.6km of strike

Newman Base Metal ProjectA Large-Scale System

• Data available to complete a scoping study, including;

• Detailed metallurgy and concentrate specifications

• Resource updated to JORC 2012 compliance and mostly in the indicated category

• Preliminary environmental, mining application and native title investigation completed previously

Getting Expanded

*Refer to ASX Release 25th May 2016

For

per

sona

l use

onl

y

Page 7: For personal use only - ASX2016/11/30  · presentation. This presentation contains certain “forward-looking statements”. Forward looking statements can generally be identified

Page : 7

Wolf – Prairie CorridorMajor Zinc System

For

per

sona

l use

onl

y

Page 8: For personal use only - ASX2016/11/30  · presentation. This presentation contains certain “forward-looking statements”. Forward looking statements can generally be identified

Page : 8

• Recently completed Gravity survey

• CSIRO collaboration

• 3D Modelling

• Previous drilling intersected high grade base metal sulphides including:

• 1m @ 17.3m % Zn, 1.1% Pb from 440.5m

• Interpretation to be completed by March 2017 and to be available for the commencement of the next field season.

• Yalco JV strong targets to be followed up next year.

• Corporate Matters

• Please refer to the ASX Announcement 30th November 2016 “Corporate Update”

Northern Territory ProjectsHigh-grade base metal sulphides in drilling

For

per

sona

l use

onl

y

Page 9: For personal use only - ASX2016/11/30  · presentation. This presentation contains certain “forward-looking statements”. Forward looking statements can generally be identified

Page : 9

Forrestania Lithium ProjectNew WA lithium district

• Marindi has secured a dominant position for lithium exploration in the Forrestania Greenstone Belt of WA

• Applications lodged for 850km2 of tenements over 90km strike length

• Minimal historical systematic lithium exploration within the Forrestania Greenstone belt despite ‘accidental’ drill intersections of spodumene pegmatites during nickel & gold exploration programs

• Marindi’s 100%-owned lithium project is located within 100km of one of the two operating spodumene mines in Australia at Mt Cattlin –which is owned by General Mining Ltd (ASX: GMM) and Galaxy Mining Ltd (ASX: GXY)

For

per

sona

l use

onl

y

Page 10: For personal use only - ASX2016/11/30  · presentation. This presentation contains certain “forward-looking statements”. Forward looking statements can generally be identified

Page : 10

Forrestania Lithium ProjectNew WA lithium district

• Option to acquire the Gem Pegmatite Mining Lease* located within Marindi’s Mount Hope project area

• Spodumene bearing pegmatites intersected in historic drilling and mining activities over a strike length of 1.5 km

• Drilling to commence early December subject to regulatory approval to determine size and dip of pegmatites

• Corporate Matters

• Please refer to the ASX Announcement 30th

November 2016 “Corporate Update”

*Refer ASX release dated 20 September 2016

For

per

sona

l use

onl

y

Page 11: For personal use only - ASX2016/11/30  · presentation. This presentation contains certain “forward-looking statements”. Forward looking statements can generally be identified

Page : 11

An outstanding ground-floor investment opportunity

in zinc

• Australian resource company with strong leadership and base metal experience

• Primary focus on zinc – a commodity with extremely favourable supply/demand fundamentals

• Outstanding zinc assets: Newman Base Metal Project and McArthur River Projects

• Forrestania lithium portfolio provides an opportunity to become a first-mover in an emerging WA lithium district

• Company confident in its position on both the Kidman and Rox matters and looks forward to their resolution

SummaryKey investment takeaways

For

per

sona

l use

onl

y

Page 12: For personal use only - ASX2016/11/30  · presentation. This presentation contains certain “forward-looking statements”. Forward looking statements can generally be identified

Marindi Metals Limited

Joe Treacy, Managing DirectorT: +61 8 9321 6330E: [email protected]: Level 3, 35 Havelock St, West Perth, 6005

For

per

sona

l use

onl

y