For me it all started with a term paper Ice Plant article by Richardson and Mapp, Southern Journal of Agricultural Economics (SJAE),1976 – used risk for feasibility analysis The article demonstrated the methodology for risk based feasibility studies, and first to report Probability of Economic Success Probabilistic Cash Flows to meet cash needs Project Feasibility Analysis
23

For me it all started with a term paper –Ice Plant article by Richardson and Mapp, Southern Journal of Agricultural Economics (SJAE),1976 – used risk for.

Dec 23, 2015

Download

Documents

Dwight Dean
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: For me it all started with a term paper –Ice Plant article by Richardson and Mapp, Southern Journal of Agricultural Economics (SJAE),1976 – used risk for.

• For me it all started with a term paper– Ice Plant article by Richardson and Mapp,

Southern Journal of Agricultural Economics (SJAE),1976 – used risk for feasibility analysis

– The article demonstrated the methodology for risk based feasibility studies, and first to report• Probability of Economic Success• Probabilistic Cash Flows to meet cash needs

• Financial/Economic analyses have been used hundreds of times for a wide variety of firm based problems

Project Feasibility Analysis

Page 2: For me it all started with a term paper –Ice Plant article by Richardson and Mapp, Southern Journal of Agricultural Economics (SJAE),1976 – used risk for.

• Read Chapter 13• Read three articles on web site

– J. Agribusiness Including Risk in Economic Feasibility Analysis: The Case of Ethanol Production in Texas

– IAMA Journal Article on economic feasibility of Bio-ethanol Production for Wheat in South Africa

– SJAE Use of Probabilistic Cash Flows• Lecture 18 Project Feasibility.xls• Lecture 18 Ethanol Feasibility.xls• Lecture 18 Growth Functions.xls

Materials for Lecture 18

Page 3: For me it all started with a term paper –Ice Plant article by Richardson and Mapp, Southern Journal of Agricultural Economics (SJAE),1976 – used risk for.

Project Feasibility Analysis• In business most feasibility studies use

Excel spreadsheet models– This trend by business started in mid-90s – Excel is the language of business analysis

• Feasibility studies generally ignore risk – many do a “What if …” study for the Best Case and Worst Case scenarios

• Some analysts think they considered risk by including a 10 year “average” price

• Excel deterministic feasibility models are easily converted to stochastic feasibility models– Just make the forecasted variables stochastic

using the residuals from the forecast models

Page 4: For me it all started with a term paper –Ice Plant article by Richardson and Mapp, Southern Journal of Agricultural Economics (SJAE),1976 – used risk for.

Project Feasibility Analysis• Risks to consider for a feasibility

analysis are:– Price of raw inputs, as fuel and labor – Price of the product or output– Production risk– Black Swan events– Competition and market share over the life

of investment (business)– Cost of the plant and product development– Cost of production for the finished product

• Project feasibility is where we put it all together in an analysis of Time, Money, and Economic Viability

Page 5: For me it all started with a term paper –Ice Plant article by Richardson and Mapp, Southern Journal of Agricultural Economics (SJAE),1976 – used risk for.

Project Feasibility Analysis• Project Feasibility: consider the Time, Money

(Cost), and Economic Viability of the finished business

• Simulate the Time to complete or build the plant

• Simulate the Cost of developing the plant incorporating risk into the plant’s development costs

• Simulate the Economic Viability of the completed plant (business)

Project Management

BidAnalysis

ProjectFeasibility

Rate of Return

Cost (money)

Time

P(T)

P(C)

P( )

Project Management

Analysis

ProjectFeasibility

Rate of Return

Cost (money)

Time

P(T)

P(C)

P( )

Page 6: For me it all started with a term paper –Ice Plant article by Richardson and Mapp, Southern Journal of Agricultural Economics (SJAE),1976 – used risk for.

Project Feasibility Analysis• Proposed business with a new product• Tasks and duration/costsTasks Description Time (mo.) Costs

($1,000)1 Plant Modification 3-5 300-3252 Product Development 1-3 200-3003 Distribution System 2-3 50-1004 Marketing Program 3-4 100-150

• Finance 100% of project costs @ 9%• Marginal cost of production/unit Uniform(10,15), a scenario

variable• Fixed Costs/year $200,000• Inflation Uniform(0.04, 0.05) percent per year• Demand ProjectionsYears Price/Unit Quantity Sold/Year1-3 U(13.5,14) U(500K, 600K)4-5 U(13,13.5) U(400K, 500K)6-10 U(12.5,13) U(300K, 400K)

Page 7: For me it all started with a term paper –Ice Plant article by Richardson and Mapp, Southern Journal of Agricultural Economics (SJAE),1976 – used risk for.

Project Feasibility Analysis• Setting the proposed project up in a

Project Management setting yields the following cost and time to complete the project

• If these answers are acceptable to management the next questions is – – Will the business be economically viable?

Page 8: For me it all started with a term paper –Ice Plant article by Richardson and Mapp, Southern Journal of Agricultural Economics (SJAE),1976 – used risk for.

Project Feasibility Analysis• The stochastic final cost of building the plant

becomes input into the project analysis phase of the analysis

Page 9: For me it all started with a term paper –Ice Plant article by Richardson and Mapp, Southern Journal of Agricultural Economics (SJAE),1976 – used risk for.

Project Feasibility Analysis• 10 Year analysis yields many potential

reports– Annual rate of return to assets– Things look bad after 6th year

CDF of Annual Rate of Return to Assets

0

0.2

0.4

0.6

0.8

1

-0.4 -0.2 0 0.2 0.4 0.6 0.8 1

Pro

b

ROR2007 ROR2008 ROR2009 ROR2010 ROR2011

ROR2012 ROR2013 ROR2014 ROR2015 ROR2016

Page 10: For me it all started with a term paper –Ice Plant article by Richardson and Mapp, Southern Journal of Agricultural Economics (SJAE),1976 – used risk for.

Project Feasibility Analysis• Scenario analysis of management control

variables to see if the plant could be more profitable.

CDF of Alternative Costs of Production/Unit

0

0.2

0.4

0.6

0.8

1

0.15 0.17 0.19 0.21 0.23

Pro

b

Average ROR: 1 Average ROR: 2

Average ROR: 3 Average ROR: 4

Page 11: For me it all started with a term paper –Ice Plant article by Richardson and Mapp, Southern Journal of Agricultural Economics (SJAE),1976 – used risk for.

KOVs for Multi-Year Analyses

• Multiple year investments require full consideration of returns over the planning horizon– Net Present Value (NPV)– Present Value of Ending Net Worth (PVENW)– Ending Cash Reserves (Cash flow statement)

• NPV is the present value of all earnings that leave the business plus the change in net worth minus beginning net worthNPV = -Beg Net Worth +∑{Dividends * (1/(1+r)^t) } + PVENWFor a family owned business substitute family living for dividends

• PVENW value of ending net worth in current dollarsPVENW = Ending Net Worth * (1/(1+r)^T)Where T is the number of years simulated, eg. 10

Page 12: For me it all started with a term paper –Ice Plant article by Richardson and Mapp, Southern Journal of Agricultural Economics (SJAE),1976 – used risk for.

Project Feasibility – Ethanol Plants in Texas

• Ethanol production is dependent on– Inputs could be: corn, sorghum, wheat, potatoes, etc– Fuel requirements are: natural gas and electricity– Sale of co-product of DDGS– Sale of ethanol

• Local communities want a plant because it hires more 35 people year around, farmers have dependable market for grain, and it generate jobs during the construction phase of 9 to12 months

Page 13: For me it all started with a term paper –Ice Plant article by Richardson and Mapp, Southern Journal of Agricultural Economics (SJAE),1976 – used risk for.

• Develop a Feasibility Model for an Ethanol plant in Texas

• Location: High Plains due to feedlots and local corn/sorghum supplies

• Rail transportation facilities available to import corn and ship ethanol

• KOVs– Net Present Value– Annual cash flows– Probability of cash flow deficits– Probability investors get their money back

or the P(Increase Real Net Worth)

Project Feasibility – Ethanol Plants in Texas

Page 14: For me it all started with a term paper –Ice Plant article by Richardson and Mapp, Southern Journal of Agricultural Economics (SJAE),1976 – used risk for.

• Stochastic variables– Corn and sorghum prices– DDGS price– Ethanol price– Electricity and natural gas prices

• Develop MVE distribution for these prices based on prices for the past 10 years

• Problem with stochastic prices– Must use Texas prices and we have forecasts for

National pricesTexas Price = a + b National Price + eSimulate a stochastic national price and use to simulate a Texas price

Project Feasibility – Ethanol Plants in Texas

Page 15: For me it all started with a term paper –Ice Plant article by Richardson and Mapp, Southern Journal of Agricultural Economics (SJAE),1976 – used risk for.

• Develop a Financial Simulation Model : Income Statement, Cash Flow, and Balance Sheet

• Simulate 10 years using corn as the feed stock, repeat process using sorghum

• Assume a learning curve for management to bring the plant up to its full capacity

• Validation exercises– 4 Ps – Touring test with other economists– Present results to local investors – Present results to politicians

Project Feasibility – Ethanol Plants in Texas

Page 16: For me it all started with a term paper –Ice Plant article by Richardson and Mapp, Southern Journal of Agricultural Economics (SJAE),1976 – used risk for.

• A new business may need a few months or years to grow sales to their potential

• May take months or years to learn how to reach potential for a prod function

• In either case, assume a stochastic growth function and simulate it, if nothing else is available, use a Uniform distribution

• Example of a growth function for 8 years

Learning Curve or Demand Cycle

Page 17: For me it all started with a term paper –Ice Plant article by Richardson and Mapp, Southern Journal of Agricultural Economics (SJAE),1976 – used risk for.

Fan Graph for Realized Sales over 10 Years

-

50,000

100,000

150,000

200,000

250,000

Sales1 Sales3 Sales5 Sales7 Sales9Average 5th Percentile 25th Percentile

75th Percentile 95th Percentile

Learning Curve or Demand Cycle

Page 18: For me it all started with a term paper –Ice Plant article by Richardson and Mapp, Southern Journal of Agricultural Economics (SJAE),1976 – used risk for.

• A new concept in project feasibility analysis

• Explicitly consider externalities– Such as cleanup costs at end of

business• Strip mining reclamation• Removal of underground fuel tanks• Removal of above ground assets • Restoration of site

– Prevention of future environmental hazards• Removal of waste materials• 100 year liners for ponds

Life Cycle Costing

Page 19: For me it all started with a term paper –Ice Plant article by Richardson and Mapp, Southern Journal of Agricultural Economics (SJAE),1976 – used risk for.

• Steps to Life Cycle Costing Analysis– Identify the potential externalities – Determine costs of these externalities– Assign probabilities to the chance of

experiencing each potential cost• Assume distributions with GRKS or

Bernoulli– Simulate costs given the probabilities– Incorporate costs of cleanup and

prevention into the project feasibility– These terminal costs may have big

Black Swans so prepare the investor

Life Cycle Costing

Page 20: For me it all started with a term paper –Ice Plant article by Richardson and Mapp, Southern Journal of Agricultural Economics (SJAE),1976 – used risk for.

• Bottom line is that LCC will increase the costs of a project and reduce its feasibility

• Affects the downside risk on returns • Does nothing to increase the positive

returns• Need to consider the FULL costs of a

proposed project to make the correct decision

• J. Emblemsvag – Life Cycle-Costing: Using Activity-Based Costing and Monte Carlo Simulation to

manage Future Costs and Risks John Wiley & Sons Inc. 2003

Life Cycle Costing

Page 21: For me it all started with a term paper –Ice Plant article by Richardson and Mapp, Southern Journal of Agricultural Economics (SJAE),1976 – used risk for.

• LCA is a tool for determining the impact of a new process or project on the environment and climate change

• LCAs are concerned with quantifying– Energy Use and CO2 Balance– Green House Gases (GHGs)– Water use and indirect Land use– Nutrient (N,P,K) use and other factors

• Thus far these are deterministic analyses – This will soon change

Life Cycle Analysis

Page 22: For me it all started with a term paper –Ice Plant article by Richardson and Mapp, Southern Journal of Agricultural Economics (SJAE),1976 – used risk for.

• May 2 in this room • Open book, notes and computer programs• Bring your own computers if you want• Two parts to the exam – Part A is short, do it first• Print each part as you finish it. • DO NOT wait until the end to print Part A!!!!• No talking, texting, tweeting, face booking or

other social interaction during the exam• Pizza will be provided at noon. Take a short break.• The type of problem for Part B will be familiar to

you• Practice advice: Redo all Labs on simulation

What to Expect on Lab Exam

Page 23: For me it all started with a term paper –Ice Plant article by Richardson and Mapp, Southern Journal of Agricultural Economics (SJAE),1976 – used risk for.

• Questions on all aspects of the material covered in class since the last exam

• Short answer essay questions– You should not need more space than what is

provided for a complete answer– DO NOT repeat the question as part of your

answer• It wastes time for you and the grader

• A few calculator questions• A One Page Cheat Sheet is permitted

What to Expect on Final Exam