Top Banner
for Joe Broghamer Philip S. Lee May 5, 2005 Implementing PIV Specifications HSPD-12 Workshop
7

For Joe Broghamer Philip S. Lee May 5, 2005 Implementing PIV Specifications HSPD-12 Workshop.

Mar 26, 2015

Download

Documents

Isabella Blake
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: For Joe Broghamer Philip S. Lee May 5, 2005 Implementing PIV Specifications HSPD-12 Workshop.

for Joe Broghamer

Philip S. Lee

May 5, 2005

ImplementingPIV Specifications

HSPD-12 Workshop

Page 2: For Joe Broghamer Philip S. Lee May 5, 2005 Implementing PIV Specifications HSPD-12 Workshop.

2

PIV Implementation Approach

• Adopt Industry Best Practices and Lessons Learned from other Government Smart Card Implementations

• DoD Common Access Card (CAC) Program– Card Profile– Card Management– Card Issuance

• DHS TSA Transportation Worker Identification Credential (TWIC) Program– Enrollment– Identity Management– CMS Integration

Page 3: For Joe Broghamer Philip S. Lee May 5, 2005 Implementing PIV Specifications HSPD-12 Workshop.

3

PIV Identity Verification and Issuance

EmployeeApplication

1:n biometric search

Confirm employment

ID Validation through standard government wide services

Government DB’s

Threat risk

1:n biometric search

Confirm employment

ID Validation through standard government wide services

Government DB’s

Threat risk

Identity VerificationIdentity Verification

Enrollment

Identity Management

System (IDMS)

Card Production & Personalization

21

4

5

Numbers Indicate Functional Areas of Responsibility

Green functions manageChain of Trust for Identity Verification

EmployerSponsorship

Issuer -Card Activation

6

PIV Activated forOperational Use

7

8

ApprovalAuthority3

EmployeeEnrolls

PIV Identity Verification and Issuance

Page 4: For Joe Broghamer Philip S. Lee May 5, 2005 Implementing PIV Specifications HSPD-12 Workshop.

4

PIV Functional Process Flow

Pre-Enrollment Enrollment IndividualFP Images

SegmentationCapture 10 Slaps

Two I-9 Doc Processing

Card Request PackageData Check

and Generate Audit

OPM Portal

GenerateEFTS

Records

EnrollmentDatabase

Duplicate Check

IAFIS & OtherBackground

Checks

Template GenerationANSI 378 Minutiae Templates

Other Templates (MOC)

GenerateCBEFFRecords

Card Management

Card Production

EmployeeApplication

Forms

Card Printing andContact & Contactless

Chip Encoding

Load FP TemplatesFacial Image

Applets EncryptionCertificate

Card Activation

1:1 MOS CardholderVerification

Load PIN

Load Certificates

Facial Image Capture

Physical Access

Logical Access

Desktop/Remote Logon

FP Biometrics1:1 Verification

Email Sign & Encryption

FASC-N

Relying Party Authorization

Operational Use

Biographic Info Capture

Two Best FPCharacterization

Page 5: For Joe Broghamer Philip S. Lee May 5, 2005 Implementing PIV Specifications HSPD-12 Workshop.

5

Enrollment Workstation

PIV Architecture

SQL DBStaging

DB

OpenIT

Agent

IdentityManagement

System

PACS

Meta Directory

CA RepositoryActive Directory

HQActive Directory

CertificateAuthority

Life Cycle Mgmt APINotification API

PACS AdaptorInterface

Card Issuance Workstation

Badging API

Issuance RequestNotifications

IssuanceRevocation

HRSecurity

Clearance

UserProvisioning

Authorization

HQNetworkAdmin

Browser

Hot List Subsystem

Office of SecurityRevocation

Browser

CardManagement& Production

System

PIV Card

PhysicalAccess

Logical Access

Page 6: For Joe Broghamer Philip S. Lee May 5, 2005 Implementing PIV Specifications HSPD-12 Workshop.

6

PIV Implementation Plan

• Sharing Lessons Learned and Seeking Stakeholder Buy-in via Integrated Product Testing (IPT) Process

• Physical and IT/Cyber Access Infrastructure Survey via Stakeholders

• PIV Implementation Plan to OMB by 6/27/05• IDMS DB Integration with HR/Security Clearance DB• Integration of PIV-1 Compliant IDMS, CMS and PACS• Integration of the Enterprise PACS Network with the Agency

IT Network• PIV-1 Implementation Ready by 10/27/05• Agency-wide Migration Strategy for Legacy PACS• Industry Participation toward Open API for Card Life Cycle

Management and Open Badging API for Interoperable Card Issuance System Component

• Migration to PIV-2 Smart Card & Biometrics Solutions by and beyond October 2006

Page 7: For Joe Broghamer Philip S. Lee May 5, 2005 Implementing PIV Specifications HSPD-12 Workshop.

7

Thanks!Q & A

Philip S. Lee

(202) 674-5104 (M)[email protected]

[email protected]