R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Activity Guide D60115GC10 Edition 1.0 February 2010 D65244 For Instructor Use Only. This document should not be distributed.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Activity Guide
D60115GC10
Edition 1.0
February 2010
D65244
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © 2010, Oracle. All rights reserved. Disclaimer This document contains proprietary information and is protected by copyright and other intellectual property laws. You may copy and print this document solely for your own use in an Oracle training course. The document may not be modified or altered in any way. Except where your use constitutes "fair use" under copyright law, you may not use, share, download, upload, copy, print, display, perform, reproduce, publish, license, post, transmit, or distribute this document in whole or in part without the express authorization of Oracle. The information contained in this document is subject to change without notice. If you find any problems in the document, please report them in writing to: Oracle University, 500 Oracle Parkway, Redwood Shores, California 94065 USA. This document is not warranted to be error-free. Restricted Rights Notice If this documentation is delivered to the United States Government or anyone using the documentation on behalf of the United States Government, the following notice is applicable: U.S. GOVERNMENT RIGHTS The U.S. Government’s rights to use, modify, reproduce, release, perform, display, or disclose these training materials are restricted by the terms of the applicable Oracle license agreement and/or the applicable U.S. Government contract. Trademark Notice Oracle is a registered trademark of Oracle Corporation and/or its affiliates. Other names may be trademarks of their respective owners.
Author
Debjit Nag
Technical Contributors and Reviewers
Ivy Farren, Mayank Khandelwal, Ruth Kukla, Erin Moss
This book was published using: Oracle Tutor
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Table of Contents i
Table of Contents
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices .........................................1-1 R12.x Oracle Project Costing Fundamentals Supplemental Student Practices..............................................1-3 Objectives ......................................................................................................................................................1-4 Overview of Oracle Project Costing..............................................................................................................1-5 Defining Projects for Costing ........................................................................................................................1-6
Practice - Create a Project..........................................................................................................................1-7 Solution - Create a Project .........................................................................................................................1-8 Practice - Define Transaction Controls......................................................................................................1-12 Solution - Define Transaction Controls .....................................................................................................1-13
Overview of Budgetary Controls, Budget Integration, and Core Budgeting .................................................1-15 Practice - Create a Bottom-Up Integrated Budget .....................................................................................1-16 Solution - Create a Bottom-Up Integrated Budget.....................................................................................1-19 Guided Demonstration - Transfer Budget Journal Entries to GL ..............................................................1-28
Entering Expenditures ...................................................................................................................................1-31 Practice - Enter an Expenditure Batch .......................................................................................................1-32 Solution - Enter an Expenditure Batch ......................................................................................................1-34 Practice - Use Expenditure Inquiry............................................................................................................1-39 Solution - Use Expenditure Inquiry ...........................................................................................................1-40 Guided Demonstration - Enter an Automatically Reversing Batch ...........................................................1-47
Implementing Expenditures...........................................................................................................................1-49 Practice - Define an Expenditure Type......................................................................................................1-50 Solution - Define an Expenditure Type .....................................................................................................1-51
Performing Cost Processing ..........................................................................................................................1-54 Practice - Distribute Costs .........................................................................................................................1-55 Solution - Distribute Costs.........................................................................................................................1-56 Guided Demonstration - Create Accounting for Costs ..............................................................................1-60
Accounting for Costs .....................................................................................................................................1-63 Guided Demonstration - Define a Lookup Set...........................................................................................1-64 Guided Demonstration - Define an AutoAccounting Rule ........................................................................1-65 Practice - Define an AutoAccounting Rule ...............................................................................................1-66 Solution - Define an AutoAccounting Rule...............................................................................................1-67 Guided Demonstration - Assign AutoAccounting Rules ...........................................................................1-69
Implementing Non-Labor Costing.................................................................................................................1-70 Practice - Define Non-Labor Resources ....................................................................................................1-71 Solution - Define Non-Labor Resources....................................................................................................1-72 Practice - Test Your Non-Labor Resources ...............................................................................................1-76 Solution - Test Your Non-Labor Resources ..............................................................................................1-78
Implementing Labor Costing.........................................................................................................................1-84 Practice - Define a Rate Schedule..............................................................................................................1-85 Solution - Define a Rate Schedule.............................................................................................................1-86 Guided Demonstration - Define an Organization Labor Costing Rule......................................................1-88 Guided Demonstration - Define a Labor Costing Override .......................................................................1-89
Implementing Burden Costing.......................................................................................................................1-90 Practice - Define a Burden Structure .........................................................................................................1-91 Solution - Define a Burden Structure ........................................................................................................1-92 Practice - Define a Burden Schedule .........................................................................................................1-95 Solution - Define a Burden Schedule ........................................................................................................1-97 Practice - Distribute Total Burdened Costs ...............................................................................................1-101 Solution - Distribute Total Burdened Costs...............................................................................................1-103
Performing Cost Adjustments........................................................................................................................1-107 Practice - Perform a Split and a Transfer...................................................................................................1-108 Solution - Perform a Split and a Transfer ..................................................................................................1-109
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Table of Contents ii
Practice - Correct an Approved Expenditure Item.....................................................................................1-116 Solution - Correct an Approved Expenditure Item ....................................................................................1-117
Integration with Oracle Purchasing and Oracle Payables..............................................................................1-122 Guided Demonstration - Review Committed Costs...................................................................................1-123 Practice - Enter a Project-Related Requisition...........................................................................................1-124 Solution - Enter a Project-Related Requisition ..........................................................................................1-126 Practice - AutoCreate a Project-Related Purchase Order...........................................................................1-131 Solution - AutoCreate a Project-Related Purchase Order ..........................................................................1-133 Practice - Create a Project-Related Supplier Invoice.................................................................................1-141 Solution - Create a Project-Related Supplier Invoice ................................................................................1-143 Practice - Interface Supplier Costs.............................................................................................................1-148 Solution - Interface Supplier Costs ............................................................................................................1-149 Guided Demonstration - Allow Adjustments for a Supplier Cost Transaction Source..............................1-153 Practice - Adjust Supplier Costs ................................................................................................................1-154 Solution - Adjust Supplier Costs ...............................................................................................................1-156 Guided Demonstration - Specify a Default Supplier Cost Credit Account................................................1-167
Integration with Oracle Internet Expenses.....................................................................................................1-168 Practice - Enter and Approve an Expense Report......................................................................................1-169 Solution - Enter and Approve an Expense Report .....................................................................................1-171 Guided Demonstration - Run Expense Report Export...............................................................................1-176 Practice - Interface Expense Report Costs.................................................................................................1-177 Solution - Interface Expense Report Costs ................................................................................................1-178
Integration with Oracle Time & Labor ..........................................................................................................1-184 Guided Demonstration - Set Timecard Approval Style .............................................................................1-185 Practice - Enter and Approve a Timecard..................................................................................................1-187 Solution - Enter and Approve a Timecard .................................................................................................1-189 Guided Demonstration - Import Timecard Costs.......................................................................................1-194
Allocations and AutoAllocations...................................................................................................................1-196 Practice - Define an Allocation Rule .........................................................................................................1-197 Solution - Define an Allocation Rule ........................................................................................................1-199 Practice - Process an Allocation Rule........................................................................................................1-205 Solution - Process an Allocation Rule .......................................................................................................1-207 Guided Demonstration - Review an AutoAllocation Set...........................................................................1-217
Asset Capitalization.......................................................................................................................................1-219 Practice - Define and Assign Assets ..........................................................................................................1-220 Solution - Define and Assign Assets .........................................................................................................1-223 Guided Demonstration - Create Final Subledger Accounting for Costs ....................................................1-236 Practice - Capitalize Assets .......................................................................................................................1-239 Solution - Capitalize Assets.......................................................................................................................1-241 Guided Demonstration - Define Standard Unit Costs for Asset Cost Allocations.....................................1-253 Practice - Define a Proceeds of Sale Expenditure Type ............................................................................1-254 Solution - Define a Proceeds of Sale Expenditure Type............................................................................1-255
Cross Charge .................................................................................................................................................1-256 Practice - Set Cross Charge Attributes for a Project ..................................................................................1-257 Solution - Set Cross Charge Attributes for a Project .................................................................................1-258 Practice - Create and Process Cross Charges.............................................................................................1-262 Solution - Create and Process Cross Charges ............................................................................................1-264 Guided Demonstration - Complete Cross Charge Processing ...................................................................1-272 Practice - Review Cross Charges...............................................................................................................1-275 Solution - Review Cross Charges ..............................................................................................................1-276 Practice - Define Transfer Price Rules.......................................................................................................1-279 Solution - Define Transfer Price Rules......................................................................................................1-280 Practice - Define a Transfer Price Schedule ..............................................................................................1-283 Solution - Define a Transfer Price Schedule..............................................................................................1-284
Appendix A: Integration with Oracle Inventory, Project Manufacturing, and Asset Tracking .....................1-286 Practice - Enter a Miscellaneous Transaction............................................................................................1-287 Solution - Enter a Miscellaneous Transaction ...........................................................................................1-288
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Table of Contents iii
Guided Demonstration - Process Miscellaneous Transactions ..................................................................1-291 Practice - View Inventory Expenditure Items............................................................................................1-294 Solution - View Inventory Expenditure Items ...........................................................................................1-295 Guided Demonstration - Create a Project-Enabled Transaction Type.......................................................1-297
Appendix B: Budgetary Controls and Budget Integration.............................................................................1-298 Guided Demonstration - Define a Budget Change Reason........................................................................1-299 Guided Demonstration - Define a Budget Type ........................................................................................1-300 Guided Demonstration - Define a Budget Entry Method ..........................................................................1-301
Appendix C: Asset Capitalization: Capitalizing Interest ...............................................................................1-302 Practice - Define a Capitalized Interest Rate Name...................................................................................1-303 Solution - Define a Capitalized Interest Rate Name ..................................................................................1-304 Practice - Define a Capitalized Interest Rate Schedule..............................................................................1-307 Solution - Define a Capitalized Interest Rate Schedule .............................................................................1-308 Guided Demonstration - Specify a Capitalized Interest Rate Schedule for a Capital Project Type...........1-311 Practice - Assign a Capitalized Rate Schedule to a Project .......................................................................1-312 Solution - Assign a Capitalized Rate Schedule to a Project.......................................................................1-313 Guided Demonstration - Set the Project Status Control for Capitalized Interest .......................................1-316
Summary of R12.x Project Costing Fundamentals........................................................................................1-317
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Table of Contents v
Preface
Profile
Before You Begin This Course
• Working experience with project management and project accounting
Prerequisites
• R12.x Oracle E-Business Suite Essentials for Implementers
• R12.x Project Foundation Fundamentals
How This Course Is Organized
This is an instructor-led course featuring lecture and hands-on exercises. Online demonstrations and written practice sessions reinforce the concepts and skills introduced.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Table of Contents vi
Related Publications
Oracle Publications Title Part Number
Oracle Project Costing User Guide E13438-03
Oracle Projects Implementation Guide E13582-03
Oracle Projects Fundamentals E13581-03
Additional Publications
• System release bulletins
• Installation and user’s guides
• Read-me files
• International Oracle User’s Group (IOUG) articles
• Oracle Magazine
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Table of Contents vii
Typographic Conventions
Typographic Conventions in Text Convention Element Example Bold italic Glossary term (if
there is a glossary) The algorithm inserts the new key.
Caps and lowercase
Buttons, check boxes, triggers, windows
Click the Executable button. Select the Can’t Delete Card check box. Assign a When-Validate-Item trigger to the ORD block. Open the Master Schedule window.
Courier new, case sensitive (default is lowercase)
Code output, directory names, filenames, passwords, pathnames, URLs, user input, usernames
Code output: debug.set (‘I”, 300); Directory: bin (DOS), $FMHOME (UNIX) Filename: Locate the init.ora file. Password: User tiger as your password. Pathname: Open c:\my_docs\projects URL: Go to http://www.oracle.com User input: Enter 300 Username: Log on as scott
Initial cap Graphics labels (unless the term is a proper noun)
Customer address (but Oracle Payables)
Italic Emphasized words and phrases, titles of books and courses, variables
Do not save changes to the database. For further information, see Oracle7 Server SQL Language Reference Manual. Enter [email protected], where user_id is the name of the user.
Quotation marks
Interface elements with long names that have only initial caps; lesson and chapter titles in cross-references
Select “Include a reusable module component” and click Finish. This subject is covered in Unit II, Lesson 3, “Working with Objects.”
Uppercase SQL column names, commands, functions, schemas, table names
Use the SELECT command to view information stored in the LAST_NAME column of the EMP table.
Arrow Menu paths Select File > Save. Brackets Key names Press [Enter]. Commas Key sequences Press and release keys one at a time:
[Alternate], [F], [D] Plus signs Key combinations Press and hold these keys simultaneously: [Ctrl]+[Alt]+[Del]
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Table of Contents viii
Typographic Conventions in Code Convention Element Example Caps and lowercase
Oracle Forms triggers
When-Validate-Item
Lowercase Column names, table names
SELECT last_name FROM s_emp;
Passwords DROP USER scott IDENTIFIED BY tiger;
PL/SQL objects OG_ACTIVATE_LAYER (OG_GET_LAYER (‘prod_pie_layer’))
Lowercase italic
Syntax variables CREATE ROLE role
Uppercase SQL commands and functions
SELECT userid FROM emp;
Typographic Conventions in Oracle Application Navigation Paths
This course uses simplified navigation paths, such as the following example, to direct you through Oracle Applications.
(N) Invoice > Entry > Invoice Batches Summary (M) Query > Find (B) Approve
This simplified path translates to the following:
1. (N) From the Navigator window, select Invoice then Entry then Invoice Batches Summary.
2. (M) From the menu, select Query then Find.
3. (B) Click the Approve button.
Notations:
(N) = Navigator
(M) = Menu
(T) = Tab
(B) = Button
(I) = Icon
(H) = Hyperlink
(ST) = Sub Tab
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Table of Contents ix
Typographical Conventions in Oracle Application Help System Paths
This course uses a “navigation path” convention to represent actions you perform to find pertinent information in the Oracle Applications Help System.
The following help navigation path, for example—
(Help) General Ledger > Journals > Enter Journals
—represents the following sequence of actions:
1. In the navigation frame of the help system window, expand the General Ledger entry.
2. Under the General Ledger entry, expand Journals.
3. Under Journals, select Enter Journals.
4. Review the Enter Journals topic that appears in the document frame of the help system window.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Table of Contents x
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 1
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 2
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 3
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 4
Objectives
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 5
Overview of Oracle Project Costing
This lesson does not have any practices or solutions.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 6
Defining Projects for Costing
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 7
Practice - Create a Project
Overview
In this practice, you will create a new project from an existing template and change the project currency to EUR.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Create a Project
Copy the Capital Services Template to create a new project with the values as specified in the following table:
Field Value
Project Number XXCS
Project Name XX Capital Services
Project Manager Gray, Mr. Donald R.
Organization Services-East
Project Start Date Today's Date
Project Finish Date Two Years from Today
Change the Project Currency
Your project is based in Paris. Change the project currency to EUR and select Corporate as the rate type to convert to project functional currency and to project currency.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 8
Solution - Create a Project
Create a Project
1. Login to Oracle Applications: − Username = SERVICES − Password = WELCOME
2. Responsibility = Projects, Vision Services (USA)
3. Navigate to the Find Projects window.
• (N) Projects
4. Find the Capital Services Template.
• Enter the find criteria: − Number = T, Capital Services
• (B) Find
5. Select the Capital Services Template on the Projects, Templates Summary window.
6. (B) Copy To...
7. Complete the fields on the Project Quick Entry window as specified in the following table:
Field Value
Project Number XXCS
Project Name XX Capital Services
Project Manager Gray, Mr. Donald R.
Organization Services-East
Project Start Date Today's Date
Project Finish Date Two Years from Today
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 9
8. (B) OK
9. Revise the project description.
Change the Project Currency
10. Select your new XXCS project.
11. (B) Open
12. Select the Currency option.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 10
13. (B) Detail
14. Complete the fields on the Currency window as specified in the following table:
Field Value
Project Currency EUR
Conversion Attributes to Project Functional Currency - Rate Type
Corporate
Conversion Attributes to Project Currency - Rate Type
Corporate
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 11
15. (I) Save
16. Close the open windows and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 12
Practice - Define Transaction Controls
Overview
In this practice, you will define exclusive transaction controls at the project level for the project you created in a previous practice.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Define Exclusive Transaction Controls at the Project Level
Define exclusive transaction controls for you XX Capital Services project to prohibit people from charging meals and telephone expenses to your project. As an exception, permit Emily Heather to charge telephone expenses. Let the task details determine whether her telephone expenses are capitalizable or not. When you are done, approve the project.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 13
Solution - Define Transaction Controls
Define Exclusive Transaction Controls at the Project Level
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Find Projects window.
• (N) Projects
3. Find your new capital services project.
• Enter the find criteria: − Number = XXCS − Name = XX Capital Services
• (B) Find
4. Select the XX Capital Services project on the Projects, Templates Summary window.
5. (B) Open
6. In the Options region, select Transaction Controls.
7. (B) Detail
8. Do not enable the Limit To Transaction Controls check box.
This approach creates exclusive transaction controls. By default, everything is chargeable.
9. Enter the transaction control lines as specified in the following table:
Expenditure Category
Expenditure Type
Employee Chargeable Capitalizable
Expenses Meals No No
Expense Telephone No No
Expenses Telephone Heather, Ms. Emily
Yes (enable) Task Level
Everything is chargeable, except for meals and telephone expenses. The exception is that Emily Heather can charge her telephone expenses.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 14
10. (I) Save
11. Close the Transaction Controls window.
12. Approve the project.
• (B) Change Status
• Select Approved.
• (B) OK
• (I) Save
13. Close the open windows and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 15
Overview of Budgetary Controls, Budget Integration, and Core Budgeting
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 16
Practice - Create a Bottom-Up Integrated Budget
Overview
In this practice, you will create a project, set up bottom-up budget integration for the project, enter a bottom-up integrated budget, and create a baseline budget version.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Prerequisite
The instructor must open the Encumbrance year in the GL to the current year.
If the submitted budgets remain in In Process status, then the instructor must submit the concurrent program Workflow Background Process for the class:
• Responsibility: System Administration, Vision Services (USA)
• Submit the concurrent program Workflow Background with the parameters as specified in the following table
Field Value
Item Type PA Budget Integration Workflow
Minimum Threshold Leave Blank
Maximum Threshold Leave Blank
Process Deferred Yes
Process Timeout Yes
Process Stuck Yes
Tasks
Create a Project
Use the responsibility Projects, Vision Service (USA). Copy the Service Center Template to create a new project with the values as specified in the following table:
Field Value
Project Number XXService
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 17
Project Name XX Service Center
Project Manager Gray, Mr. Donald R.
Project Start Date Today's date
Project Completion Date One year from today
Define Bottom-Up Budget Integration
Use the information as specified in the following table to set up bottom-up budget integration for your project:
Field Value
Budget Type Cost Budget - Needs Approval
Control Flag No
Balance Type Budget
Non-Project Budget BOTTOM-UP
Enter a Budget
Use the Cost Budget - Needs Approval budget type to enter a budget for your project. When you create the budget, select Project by GL Period as the entry method and Expenditure Category for the resource list. Enter budget lines as specified in the following table:
Resource Alias Amount Type Period 1 Period 2 Period 3 Period 4
Expenses Burdened Cost 2,000.00 2,000.00 2,000.00 2,000.00
Labor Burdened Cost 10,000.00 10,000.00 20,000.00 20,000.00
Chargebacks Burdened Cost 5,000.00 4,000.00 2,000.00 4,000.00
Material Burdened Cost 1,000.00 1,000.00 1,000.00 1,000.00
Your periods will depend on the dates of your project. For example, if your project started in February 2007, then the first four periods listed would be FEB-07, MAR-07, APR-07, and MAY-07.
Generate and View Budget Accounts
Use the Tools menu to generate and view budget accounting for your budget. Review the accounts by budget line and by account.
Create the Budget Baseline
Submit the budget and create a baseline version. The budget status will become In Progress. The budget is undergoing baseline processing. You can click the Find button on the Budgets window to update the status information for the budget. Note that the budget did not require
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 18
approval because the project type of your project is not enabled to use Workflow for budget status changes.
Use the Tools menu to monitor the budget processing and review funds check results.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 19
Solution - Create a Bottom-Up Integrated Budget
Create a Project
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Find Projects window.
• (N) Projects
3. Find the Service Center Template.
• Enter the find criteria: − Number = T, Service − Name = Service Center Template
• (B) Find
4. Select the Service Center Template on the Projects, Templates Summary window.
5. (B) Copy To...
6. Complete the fields on the Project Quick Entry window as specified in the following table:
Field Value
Project Number XXService
Project Name XX Service Center
Project Manager Gray, Mr. Donald R.
Project Start Date Today's date
Project Completion Date Two years from today
7. (B) OK
Define Bottom-Up Budget Integration
8. Select your new XXService project.
9. (B) Open
10. Select the Budgetary Control option.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 20
11. (B) Detail
12. Complete the fields on the Budget Integration window as specified in the following table:
Field Value
Budget Type Cost Budget - Needs Approval
Control Flag No
Balance Type Budget
Non-Project Budget BOTTOM-UP
The Levels and Time Phase regions do not apply to bottom-up integrated budgets. Fo
r Ins
truct
or U
se O
nly.
Th
is d
ocum
ent s
houl
d no
t be
dist
ribut
ed.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 21
13. (I) Save
14. Close the open windows and return to the Navigator.
Enter a Budget
15. Navigate to the Budgets window.
• (N) Budgets
16. Find the budget draft.
• Enter the find criteria: − Project Number = XXService − Project Name = XX Service Center − Budget Type = Cost Budget - Needs Approval
• (B) Find Draft
• (B) No (if you receive a message to save changes)
17. Enter the draft budget information as specified in the following table:
Field Value
Version Name Enter a name for the version
Change Reason Leave Blank
Description Leave Blank
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 22
Entry Method Project by GL Period
Resource List Expenditure Category
18. (B) Details
19. Enter the budget lines as specified in the following table:
Resource Alias Amount Type Period 1 Period 2 Period 3 Period 4
Expenses Burdened Cost 2,000.00 2,000.00 2,000.00 2,000.00
Labor Burdened Cost 10,000.00 10,000.00 20,000.00 20,000.00
Chargebacks Burdened Cost 5,000.00 4,000.00 2,000.00 4,000.00
Material Burdened Cost 1,000.00 1,000.00 1,000.00 1,000.00
Your periods will depend on the dates of your project. For example, if your project started in February 2007, then the first four periods listed would be FEB-07, MAR-07, APR-07, and MAY-07.20.
20. (I) Save.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 23
Generate and View Budget Accounts
21. (M) Tools > Generate Budget Accounting
22. (M) Tools > Review Budget Accounting
23. (T) By Budget Line
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 24
24. (T) By Account
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 25
Create the Budget Baseline
25. Close the Budget Account Details window.
26. Close the Budget Lines window.
27. (B) Submit
28. (B) Baseline For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 26
The budget status is now In Progress. The budget is undergoing baseline processing. You can click the Find button on the Budgets window to update the status information for the budget. Note that the budget did not require approval because the project type of your project is not enabled to use Workflow for budget status changes. If the status remains In Process, then see the Prerequisites section of this practice for further instructions.
29. Monitor the baseline processing.
• (M) Tools > Monitor Budget Workflows
• Review the information on the Monitor Activities History page
• (H) Close Window
30. View funds check results.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 27
• (M) Tools > View Funds Check Results
31. Close the open windows and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 28
Guided Demonstration - Transfer Budget Journal Entries to GL
Run Program to Transfer Journal Entries to Oracle General Ledger
The instructor will transfer the budget accounting to Oracle General Ledger for the entire class.
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Submit a New Request window.
• (M) View > Requests
• (B) Submit a New Request
3. Select to run a Single Request.
4. (B) OK
5. Select the program PRC: Transfer Journal Entries to GL from the list of values in the Name field and Vision Services for the operating unit.
6. Define the parameters for the program as specified in the following table:
Field Value
Process Category Budget
End Date Five month's from today
Post in General Ledger Yes
General Ledger Batch Name BottomUp
7. (B) OK
8. (B) Submit
9. (B) No in the Decision dialog box
10. Find your request.
• Select the All My Requests option button.
• (B) Find
11. Wait for the programs to finish.
• Use (B) Refresh Data to monitor the progress of the request processing.
The following programs run:
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 29
− PRC: Transfer Journal Entries to GL − Journal Import − Posting: Single Ledger − Subledger Accounting Balances Update
12. When the program is complete, close the Requests window and return to the Navigator.
View Budget Journal Entries
13. Switch your responsibility
• (M) File > Switch Responsibility
• Select General Ledger, Vision Services (USA)
• (B) OK
14. Navigate to the Find Journals window.
• (N) Journals > Enter
15. Find the journal entries.
• Enter the find criteria: − Batch = %BottomUp%
• (B) Find
16. Review the journal entry details.
• Select one of the journal entries.
• (B) Review Journal
17. Close the open windows and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 30
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 31
Entering Expenditures
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 32
Practice - Enter an Expenditure Batch
Overview
In this practice, you will enter, submit, and release a timecard expenditure batch.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Enter the Batch Information
Enter a timecard expenditure batch for the current week. Enter the header information as specified in the following table:
Field Value
Operating Unit Vision Services
Batch Name XXBATCH
Ending Date This Sunday's Date
Class Timecards
Description Timecards
All Negative Transactions Entered As Unmatched Leave Blank
Reverse Expenditures in a Future Period Option Not Available
Control Totals 40
Control Count 2
Note: For all expenditure items in this batch, use Unscheduled as the Assignment Name and Internal - capital as the Work Type.
Enter the First Expenditure
Enter expenditure items for Amy Marlin as specified in the following table:
Expnd Item Date
Project Number Task Number
Expnd Type Quantity Comment
Today's Date XXCS 1.1 Clerical 10 Review
Tomorrow's Date XXCS 1.2 Design 10 Documentation
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 33
Enter the Second Expenditure
Enter expenditure items for Ann Hamilton as specified in the following table:
Expnd Item Date
Project Number Task Number
Expnd Type Quantity Comment
Today's Date XXCS 3.0 Supervision 10 Project management
Tomorrow's Date XXCS 3.0 Supervision 10 Project management
Submit and Release the Batch
After you verify your control totals, submit and release the batch.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 34
Solution - Enter an Expenditure Batch
Enter the Batch Information
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Expenditure Batches window.
• (N) Expenditures > Pre Approved Batches > Enter
3. Enter the batch information as specified in the following table:
Field Value
Operating Unit Vision Services
Batch Name XXBATCH
Ending Date This Sunday's Date
Class Timecards
Description Timecards
All Negative Transactions Entered As Unmatched Leave Blank
Reverse Expenditures in a Future Period Option Not Available
Control Totals 40
Control Count 2
4. (I) Save
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 35
5. (B) Expenditures
Enter the First Expenditure
6. Enter the first expenditure as specified in the following table:
Employee Name Employee Number
Organization Expnd Ending Date
Marlin, Ms. Amy 34 Services-East This Sunday's Date
7. Enter the expenditure items for Amy Marlin as specified in the following table:
Expnd Item Date
Project Number Task Number
Expnd Type Quantity Comment
Today's Date XXCS 1.1 Clerical 10 Review
Tomorrow's Date XXCS 1.2 Design 10 Documentation
For all expenditure items: − Assignment Name = Unscheduled − Work Type = Internal - capital − UOM = Hours
8. (I) Save
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 36
Enter the Second Expenditure
9. Position your cursor in the row under where you entered Amy Marlin's name.
10. Enter the second expenditure as specified in the following table:
Employee Name Employee Number
Organization Expnd Ending Date
Control Total
Hamilton, Ms. Anne 37 Services-East This Sunday's Date 20
11. (I) Save
12. Enter the expenditure items for Anne Hamilton as specified in the following table:
Expnd Item Date
Project Number Task Number
Expnd Type Quantity Comment
Today's Date XXCS 3.0 Supervision 10 Project management
Tomorrow's Date XXCS 3.0 Supervision 10 Project management
For all expenditure items: − Assignment Name = Unscheduled − Work Type = Internal-Overhead − UOM = Hours
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 37
13. (I) Save
Submit and Release the Batch
14. Close the Expenditures window and return to the Expenditure Batches window.
15. (B) Submit
16. (B) Release
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 38
18. Close the Expenditure Batches window and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 39
Practice - Use Expenditure Inquiry
Overview
In this practice, you will use expenditure inquiry to view the cost distribution lines and accounting information for expenditure items.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Review Expenditure Items for Your Project
Use Expenditure Inquiry (Project) to review the expenditure items that you charged to your XX Capital Services project. Note that the expenditure items have no cost because you have not run costing programs for your project.
Review Straight Time Costs for Amy Marlin
Use Expenditure Inquiry (All) to perform a second query to review all straight time that Amy Marlin has charged since the beginning of January of 2006. Perform the query for the Vision Services operating unit. Determine the total burdened cost for Amy's time over this period of time.
Note the total project functional burdened cost in the total field at the bottom of the window: _______________
View Accounting for an Expenditure item
View the cost distribution lines, accounting, and T-accounts for one of the expenditure items.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 40
Solution - Use Expenditure Inquiry
Review Expenditure Items for Your Project
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Find Project Expenditure Items window
• (N) Expenditures > Expenditure Inquiry > Project
3. Query all expenditure items for your XX Capital Services Project
• Enter the find criteria: − Project Number = XXCS − Project Name = XX Capital Services
• (B) Find
4. Review the expenditure items.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 41
Note that the expenditure items have no cost because you have not run costing programs for your project.
5. Close the open windows and return to the navigator.
Review Straight Time Costs for Amy Marlin
6. Navigate to the Find Expenditure Items window
• (N) Expenditures > Expenditure Inquiry > All
7. For the Vision Services operating unit, query all straight time labor that Amy Marlin charged since January 2006.
• Enter the header find criteria: − Operating Unit = Vision Services − Expend Typ Class = Straight Time − Item Dates (from) = 01-JAN-2006
• (T) Resource
• Enter resource find criteria: − Employee Number = 34 − Employee Name = Marlin, Ms. Amy
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 42
• (B) Find
8. Review the total labor cost.
• (B) Totals
• Scroll to find the column named Proj Func Burdened Cost.
• Note the total project functional burdened cost in the total field at the bottom of the window: _______________
Note: Your total may differ from the amount in the screen capture. For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 43
View Accounting for an Expenditure item
9. Position your cursor on one of the queried items with an amount in the Project Func Burdened Cost field.
10. (B) Item Details
11. Select Cost Distribution Lines.
12. (B) OK
This selection opens the Cost Distribution Lines window.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 44
13. Review the information.
14. Close the Cost Distribution Lines window and return to the Expenditure Items window.
15. View subledger accounting information for the same expenditure item.
• Position your cursor on the same expenditure item.
• (M) Tools > View Accounting
• Review the accounting information on the View Expenditure Accounting window.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 45
16. Review the T-Accounts.
• (B) T Accounts
This button opens the Options window. You can set your T-Accounts options here.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 46
• (B) T Accounts
• Review the T-Accounts for the expenditure item.
17. Close the open windows and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 47
Guided Demonstration - Enter an Automatically Reversing Batch
Enter the Batch Information
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Expenditure Batches window
• (N) Expenditures > Pre Approved Batches > Enter
3. Enter the batch information as specified in the following table:
Field Value
Operating Unit Vision Services
Batch Name XXBATCH2
Ending Date This Sunday's Date
Class Miscellaneous Transaction
Description Accruals
All Negative Transactions Entered As Unmatched Leave Blank
Reverse Expenditures in a Future Period Select
Control Totals Leave Blank
Control Count Leave Blank
4. (I) Save
5. (B) Expenditures
Enter the Expenditure
6. Enter the expenditure as specified in the following table:
Employee Name Employee Number
Organization Expnd Ending Date
Leave Blank Leave Blank Services-East This Sunday's Date
7. Enter the expenditure items for Services-East as specified in the following table:
Expnd Item Date
Project Number Task Number
Expnd Type Quantity Comment
Today's Date Cost Reimbursable 1.1.1 Consulting 1000 Accrual
Tomorrow's Date Cost Reimbursable 2.0 Consulting 1500 Accrual
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 48
For all expenditure items: − Work Type = Commercial Customer-billable − UOM = Currency
8. (I) Save
Submit and Release the Batch
9. Close the Expenditures window and return to the Expenditure Batches window.
10. (B) Submit
11. (B) Release
Oracle Project Costing creates the reversing expenditure items when you release the batch.
Review the Reversing Expenditure Items
12. (B) Expenditures
You see two new reversing expenditure items, one for each expenditure item that you entered.
13. Review the accrual date.
• Position your cursor on the first expenditure item.
• (M) Folder > Show Field
• Select Provider Accrual Date.
• (B) OK
• Compare the accrual dates for the original and the reversing expenditure items.
14. Close the open windows and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 49
Implementing Expenditures
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 50
Practice - Define an Expenditure Type
Overview
In this practice, you will define a new expenditure type. Your company maintains a motor pool consisting of trucks that departments can use for deliveries. The motor pool charges other organizations for use of the trucks. This type of cost is a Usage in Oracle Project Costing.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Define an Expenditure Type
Define an expenditure type to record motor pool truck usage charges. Use the information as specified in the following table:
Name Expenditure Category
Revenue Category
UOM Rate Required
XXMotor Pool Trucks Chargebacks Other Day Yes
Enter a description and assign the expenditure type an expenditure type class of Usages.
Assign a Tax Classification Code for Billing Purposes
These internal charges are eligible for billing on some time and materials projects in Oracle Project Billing. Assign a tax classification code of Location for the Vision Services operating unit.
Assign a Cost Rate
Assign a cost rate of $250 USD a day for the Vision Services operating unit.
Note: In a future practice, you will create non-labor resources for this expenditure type and assign rate overrides.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 51
Solution - Define an Expenditure Type
Define an Expenditure Type
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Expenditure Types window.
• (N) Setup > Expenditures > Expenditure Types
3. Define the expenditure type.
• (T) Classifications
• Enter the basic expenditure type information as specified in the following table:
Name Expenditure Category
Revenue Category
UOM Rate Required
XXMotor Pool Trucks Chargebacks Other Day Yes
• (T) Description, Dates
• Enter the description and date information as specified in the following table:
Description Effective Date From Effective Date To
<Enter a brief description> Today's Date Leave Blank
• Assign an expenditure type class to the new expenditure type as specified in the following table:
Expenditure Type Class Effective Date From Effective Date To
Usages Today's Date Leave Blank
4. (I) Save
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 52
Assign a Cost Rate
5. Assign a cost rate to your expenditure type.
• (B) Cost Rates
• Enter the cost rate information as specified in the following table:
Operating Unit Currency Rate Effective Date From
Effective Date To
Vision Services USD 250 Today's Date Leave Blank
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 53
• (I) Save
6. Close the open windows and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 54
Performing Cost Processing
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 55
Practice - Distribute Costs
Overview
In this practice, you will run the cost distribution program for the XXBATCH expenditure batch that you entered in the practice titled "Enter an Expenditure Batch."
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Distribute Labor Costs
Submit the concurrent program PRC: Distribute Labor Costs for your XXBATCH expenditure batch. Ensure that you select your expenditure batch and project as program parameters. Review the output report.
Note your Request ID __________________________
Review the Results in Expenditure Inquiry
After the program is complete, query the expenditure items for your project in Expenditure Inquiry and review the cost distribution line information for one of the expenditure items. The distribution program calculates the raw and burdened cost for the four expenditure items.
The status of the cost distribution line is Pending. When the instructor runs the program PRC: Generate Cost Accounting Events, the program will derive the default credit account for the cost distribution line.
Note: The instructor will run the programs PRC: Generate Cost Accounting Events and PRC: Create Accounting for the entire class in the next guided demonstration.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 56
Solution - Distribute Costs
Distribute Labor Costs
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Submit a New Request window.
• (M) View > Requests
• (B) Submit a New Request
3. Select to run a Single Request.
4. (B) OK
5. Select the program PRC: Distribute Labor Costs from the list of values in the Name field and Vision Services for the operating unit.
6. Define the parameters for the program as specified in the following table:
Field Value
Expenditure Batch XXBATCH
Project Number XXCS
7. (B) OK
8. (B) Submit
• Note your Request ID __________________________
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 57
9. (B) No in the Decision dialog box
10. Find your request.
• Select the Specific Requests option button.
• Enter your request ID in the Request ID field.
• (B) Find
11. Wait for the program to finish. When the program is complete, select the program.
• Use (B) Refresh Data to monitor the progress of the request processing. When the Phase shows Completed, open the output report.
12. Review the output report.
• (B) View Output
13. Close the output page and the Requests window.
Review the Results in Expenditure Inquiry
14. Navigate to the Find Project Expenditure Items window
• (N) Expenditures > Expenditure Inquiry > Project
15. Query all expenditure items for your XX Capital Services Project.
• Enter the find criteria: − Project Number = XXCS − Project Name = XX Capital Services
• (B) Find
16. Review the expenditure items.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 58
The distribution program calculates the raw and burdened cost for the four expenditure items.
17. Review cost distribution line information.
• Position your cursor on one of the queried items with an amount in the Project Func Burdened Cost field.
• (B) Item Details
• Select Cost Distribution Lines.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 59
• (B) OK
• Review the cost distribution line information.
The status of the cost distribution line is Pending. When the instructor runs the program PRC: Generate Cost Accounting Events, the program will derive the default credit account for the cost distribution line.
18. Close the open windows and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 60
Guided Demonstration - Create Accounting for Costs
Run Programs to Create Accounting for Labor Costs
The instructor will submit a streamline program to create accounting for the entire class.
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Submit a New Request window.
• (M) View > Requests
• (B) Submit a New Request
3. Select to run a Single Request.
4. (B) OK
5. Select the program PRC: Submit Interface Streamline Processes from the list of values in the Name field and Vision Services for the operating unit.
6. Define the parameters for the program as specified in the following table:
Field Value
Streamline Option XL: Interface Labor Costs To GL
7. (B) OK
8. (B) Submit
9. (B) No in the Decision dialog box
10. Find your request.
• Select the All My Requests option button.
• (B) Find
11. Wait for the programs to finish.
• Use (B) Refresh Data to monitor the progress of the request processing. When the Phase shows Completed, open the output report.
The following programs run during streamline processing: − PRC: Submit Interface Streamline Processes − PRC: Generate Cost Accounting Events
− Process Category= Labor Costs
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 61
− PRC: Create Accounting − Process Category= Labor Costs
− Accounting Program − Journal Import − Posting: Single Ledger − Subledger Accounting Balances Update
12. When the streamline program is complete, close the Requests window and return to the Navigator.
Review the Results in Expenditure Inquiry
13. Navigate to the Find Expenditure Items window
• (N) Expenditures > Expenditure Inquiry > All
14. Query all expenditure items for the class.
• Enter the find criteria: − Operating Unit = Vision Services − Expenditure Type Class = Straight Time − Item Dates (from) = Date for the first day of this class
• (B) Find
• (B) Yes for the Decision message
15. Review cost distribution line information.
• Position your cursor on one of the queried items.
• (B) Item Details
• Select Cost Distribution Lines.
• (B) OK
• Review the cost distribution line information.
The status of the cost distribution line is Accepted -- Final Accounted in Oracle Subledger Accounting.
16. Close the Cost Distribution Lines window
17. Review the final subledger accounts.
• Position your cursor on the same expenditure item.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 62
• (M) Tools > View Accounting
• Review the accounting information on the View Expenditure Accounting window.
18. Close the open windows and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 63
Accounting for Costs
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 64
Guided Demonstration - Define a Lookup Set
Define a Lookup Set
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the AutoAccounting Lookup Sets window.
• (N) Setup > AutoAccounting > Lookup Sets
3. Enter lookup set header information as specified in the following table:
Field Value
Name XXExpCat/Indirect Cost Account
Description Uses expenditure category to look up indirect cost account values.
4. Enter Segment Value Lookups as specified in the following table:
Intermediate Value Segment Value
Chargebacks 7750
Expenses 7699
Labor 7580
Other Expenses 7740
Overhead 7740
Travel 7699
Note: Lists of values are not available when you define lookup sets.
You can map multiple intermediate values to the same segment value. This option enables you to capture more detail in Oracle Project Costing than you need in Oracle Subledger Accounting or Oracle General Ledger.
5. (I) Save
6. Close the AutoAccounting Lookup Sets window. Fo
r Ins
truct
or U
se O
nly.
Th
is d
ocum
ent s
houl
d no
t be
dist
ribut
ed.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 65
Guided Demonstration - Define an AutoAccounting Rule
Define an AutoAccounting Rule
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the AutoAccounting Rule window.
• (N) Setup > AutoAccounting > Rules
3. Define a rule using the lookup set you created in the previous demonstration.
• Enter the values as specified in the following table:
Field Value
Rule Name XX Indirect Cost Account Rule
Description Derives the default debit account for the indirect cost account based on expenditure category.
Intermediate Value: Source Parameter
Intermediate Value: Value Expenditure Category
Segment Value: Source Lookup Set
Segment Value: Lookup Set XXExpCat/Indirect Cost Account
• Optionally, use the Lookup Set button to review the lookup set values.
4. (I) Save
5. Close the AutoAccounting Rule window.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 66
Practice - Define an AutoAccounting Rule
Overview
In this practice, you will define a rule for use in AutoAccounting. Your company uses the expenditure organization associated with an expenditure item to determine what department to charge. You will define an AutoAccounting rule for this business scenario.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Define an AutoAccounting Rule
Define a rule for AutoAccounting that uses the expenditure organization to determine the account value. Name your rule XX Exp Org to Department Rule.
Your implementation team previously defined a lookup set that maps organizations to accounts. Use the lookup set Organization to Department Value in your rule. Review the lookup set as you define the rule.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 67
Solution - Define an AutoAccounting Rule
Define an AutoAccounting Rule
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the AutoAccounting Rule window.
• (N) Setup > AutoAccounting > Rules
3. Enter the values as specified in the following table:
Field Value
Name XX Exp Org to Department Rule
Description Enter a brief description
Intermediate Value: Source Parameter
Intermediate Value: Value Expenditure Organization
Segment Value: Source Lookup Set
Segment Value: Lookup Set Organization to Department Value
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 68
4. (I) Save
5. Review the lookup set.
• (B) Lookup Set
• Review the lookup set values.
6. Close the open windows and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 69
Guided Demonstration - Assign AutoAccounting Rules
Assign AutoAccounting Rules
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Assign AutoAccounting Rules window.
• (N) Setup > AutoAccounting > Assign Rules
3. Find the AutoAccounting function.
• Select Labor Cost Account in the Name field.
• (B) Find
4. In the Function Transactions region, scroll down and select the function transaction Indirect, All.
IMPORTANT: For this demonstration, do not enable the function transaction. Oracle Project Costing does not use disabled function transactions during processing. Caution students not to modify AutoAccounting rule assignments during class. Modifying AutoAccounting can affect the processing of future demonstrations and practices.
5. With Indirect, All selected, enter the Segment Rule Pairings as specified in the following table:
Number Segment Name Rule Name
0 Services Company Company Default Rule
1 Services Department XX Exp Org to Department Rule
2 Services Account Exp Type to Indirect Cost Account
3 Services Product Product Default Rule
• Optionally, select the Rule button to review each rule.
6. (I) Save
7. Close the Assign AutoAccounting Rules window and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 70
Implementing Non-Labor Costing
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 71
Practice - Define Non-Labor Resources
Overview
In this practice, you will define a non-labor resource. In a previous practice titled "Define an Expenditure Type," you defined an expenditure type named XXMotor Pool Trucks. You must now define non-labor resources that represent the two types of delivery trucks that the motor pool maintains for other departments to use. For each non-labor resource, you will specify the owning organization. You will enter a cost rate override for one of the non-labor resources.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Enter a Non-Labor Resource for Small Trucks
Define a non-labor resource named XXSmall Truck to select when a department is charged for use of a small truck from the motor pool. Associate it with the XXMotor Pool Trucks expenditure type that you defined in a previous practice. Assign the non-labor resource to the Shared Services organization (motor pool is part of this organization).
Small trucks cost less to operate and maintain, so the motor pool does not charge other organizations as much to use them. For the organization Vision Services, enter a cost rate override of $100 USD a day for the remainder of this year and $125 USD a day for next year.
Enter a Non-Labor Resource for Large Trucks
Define a non-labor resource named XXLarge Truck to select e when a department is charged for use of a large truck from the motor pool. Associate it with the XXMotor Pool Trucks expenditure type that you defined in a previous practice. Assign the non-labor resource to the Shared Services organization (motor pool is part of this organization).
Do not enter a cost rate override. Instead, Oracle Project Costing uses the cost rate of $250 USD a day that you defined for the expenditure type.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 72
Solution - Define Non-Labor Resources
Enter a Non-Labor Resource for Small Trucks
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Non-Labor Resources window.
• (N) Setup > Expenditures > Non-Labor Resources
3. Enter Non-Labor Resource information as specified in the following table:
Field Value
Name XXSmall Truck
Description Enter a brief description
Expenditure Type XXMotor Pool Trucks
Equipment Resource Class Leave Blank
Effective Date From Today's Date
Effective Date To Leave Blank
4. With your new non-labor resource selected, enter an owning organization as specified in the following table:
Name Effective Date From Effective Date To
Shared Services Today's Date Leave Blank
5. (I) Save
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 73
6. Enter cost rate override for Shared Services.
• Select Shared Services.
• (B) Cost Rates
• Enter cost rate override information for the remainder of this year as specified in the following table:
Field Value
Operating Unit Vision Services
Currency USD (View Only)
Rate 100
UOM Day (View Only)
Effective Date From Today's Date
Effective Date To 31-DEC of the current year
• (I) Save
• (I) New
• Enter cost rate override information for next year as specified in the following table:
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 74
Field Value
Operating Unit Vision Services
Currency USD (View Only)
Rate 125
UOM Day (View Only)
Effective Date From 01-JAN of next year
Effective Date To 31-DEC of next year
• (I) Save
7. Close the Cost Rate Overrides window and return to the Non-Labor Resources window.
Enter a Non-Labor Resource for Large Trucks
8. Place your cursor in the empty row below where you defined the XXSmall Truck non-labor resource.
9. Enter Non-Labor Resource information as specified in the following table:
Field Value
Name XXLarge Truck
Description Enter a brief description
Expenditure Type XXMotor Pool Trucks
Equipment Resource Class Leave Blank
Effective Date From Today's Date
Effective Date To Leave Blank
10. With your new non-labor resource selected, enter an owning organization as specified in the following table:
Name Effective Date From Effective Date To
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 75
Shared Services Today's Date Leave Blank
11. (I) Save
Note: Do not enter a cost rate override. Instead, Oracle Project Costing uses the cost rate of $250 USD a day that you defined for the expenditure type.
12. Close the Non-Labor Resources window and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 76
Practice - Test Your Non-Labor Resources
Overview
In this practice, you will test the non-labor resources that you defined in a previous practice. You will:
• Enter, submit, and release a usage expenditure batch.
• Run the cost distribution program for the batch.
• Verify the results in Expenditure Inquiry.
Your instructor can help you troubleshoot any issues that you encounter so that you can update your setup and retest.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Enter and Process a Test Expenditure Batch
To validate that your setup is correct, you need to test the non-labor resources that you created in the previous practice. First, enter an expenditure batch for the current week and name it XXTEST. Select the Usages class.
Enter two expenditures for Amy Marlin as specified in the following tables:
Expnd Item Date
Project Number
Task Number
Expnd Type Non-Labor Resource
Non-Labor Org
Today's Date XXCS 3.0 XXMotor Pool XXLarge Truck
Shared Services
Today's Date XXCS 3.0 XXMotor Pool XXSmall Truck
Shared Services
Work Type UOM Quantity Comment
Internal - capital Day 5 Enter a brief comment
Internal - capital Day 10 Enter a brief comment
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 77
Next, submit and release the batch. Run the program PRC: Distribute Usage and Miscellaneous Costs to distribute the expenditure items. Ensure that you specify your expenditure batch and project in the program parameters. Review the output report. If the report contains exceptions, then research the issues, fix them, and rerun the distribution process to test the fix. If you encounter missing cost rates exception, then verify that the cost rate is set up properly on the XXMotor Pool expenditure type.
Review the Results
Query the expenditure items in Expenditure Inquiry and verify that they are cost distributed. Use folder tools to display the fields that show the raw cost rate and project functional raw costs to validate the cost rates for the small and large trucks non-labor resources.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 78
Solution - Test Your Non-Labor Resources
Enter and Process a Test Expenditure Batch
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Expenditure Batches window.
• (N) Expenditures > Pre Approved Batches > Enter
3. Enter the batch information as specified in the following table:
Field Value
Operating Unit Vision Services
Batch Name XXTEST
Ending Date This Sunday's Date
Class Usages
Description Usages
All Negative Transactions Entered As Unmatched Leave Blank
Reverse Expenditures in a Future Period Option Not Available
Control Totals Leave Blank
Control Count Leave Blank
4. (I) Save
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 79
5. (B) Expenditures
6. Enter the expenditure information as specified in the following table:
Employee Name Employee Number
Organization Expnd Ending Date
Marlin, Ms. Amy 34 Services-East This Sunday's Date
7. Enter the expenditure items for Amy Marlin as specified in the following tables:
Expnd Item Date
Project Number
Task Number
Expnd Type Non-Labor Resource
Non-Labor Org
Today's Date XXCS 3.0 XXMotor Pool XXLarge Truck
Shared Services
Today's Date XXCS 3.0 XXMotor Pool XXSmall Truck
Shared Services
Work Type UOM Quantity Comment
Internal - capital Day 5 Enter a brief comment
Internal - capital Day 10 Enter a brief comment
8. (I) Save
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 80
9. Close the Expenditures window and return to the Expenditure Batches window.
10. (B) Submit
11. (B) Release
12. Close the Expenditure Batches window and return to the Navigator.
13. Navigate to the Submit a New Request window.
• (M) View > Requests
• (B) Submit a New Request
14. Select to run a Single Request.
15. (B) OK
16. Select the program PRC: Distribute Usage and Miscellaneous Costs from the list of values in the Name field and Vision Services for the operating unit.
17. Define the parameters for the program as specified in the following table:
Field Value
Expenditure Batch XXTEST
Project Number XXCS
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 81
18. (B) OK
19. (B) Submit
• Note your Request ID __________________________
20. (B) No in the Decision dialog box
21. Find your request.
• Select the Specific Requests option button.
• Enter your request ID in the Request ID field.
• (B) Find
22. Wait for the program to finish. When the program is complete, select the program.
• Use (B) Refresh Data to monitor the progress of the request processing. When the Phase shows Completed, open the output report.
23. Review the output report.
• (B) View Output
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 82
If the report contains exceptions, then research the issues, fix them, and rerun the distribution process to test the fix. If you encounter missing cost rates exception, then verify that the cost rate is set up properly on the XXMotor Pool expenditure type.
24. Close the output page and the Requests window.
Review the Results in Expenditure Inquiry
25. Responsibility = Projects, Vision Services (USA)
26. Navigate to the Find Project Expenditure Items window
• (N) Expenditures > Expenditure Inquiry > Project
27. Query the expenditure items from the XXTEST expenditure batch for task 3.0 on your project.
• Enter the header find criteria:: − Project Number = XXCS − Project Name = XX Capital Services − Task Number = 3.0 − Task Name = Project Management
• (T) Expenditure
• Enter expenditure find criteria: − Expenditure Batch = XXTEST
• (B) Find
28. Show the raw cost rate field.
• Place your cursor in the Quantity column.
• (M) Folder > Show Field
• Select Raw Cost Rate.
• (B) OK
29. Show the project functional raw cost field.
• Place your cursor in the Raw Cost Rate column.
• (M) Folder > Show Field
• Select Project Functional Raw Cost.
• (B) OK
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 83
30. Drag the Non-Labor Resource column to the position next to the Project Functional Raw Cost column.
31. Review the raw cost rates.
32. Close the open windows and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 84
Implementing Labor Costing
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 85
Practice - Define a Rate Schedule
Overview
In this practice, you will define a job cost rate schedule for Vision Services. Your company uses job-based cost rates to calculate the cost of straight time labor charged to projects. You maintain a job-based cost rate schedule in Oracle Project Costing to use in your company's organization labor costing rules.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Define a Cost Rate Schedule by Job
Define a job-based cost rate schedule. Enter the header information as specified in the following table:
Field Value
Operating Unit Vision Services
Organization Services-East
Schedule XXCost Rate by Job
Description Enter a brief description
Currency USD
Share Across Operating Units Leave check box disabled
After you define the header information, select the Job tab and enter the job cost rate information. Select the Vision Corporation job group and then enter jobs and rates as specified in the following table:
Job UOM Rate Effective Date From
Effective Date To
CON600.Consultant Hours 95 Today's Date Leave Blank
SMR400.SENIOR MANAGER Hours 105 Today's Date Leave Blank
STA700.Staff Administrator Hours 88.5 Today's Date Leave Blank
TRN500.Trainer Hours 97.75 Today's Date Leave Blank
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 86
Solution - Define a Rate Schedule
Define a Cost Rate Schedule by Job
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Rate Schedules window.
• (N) Setup > Expenditures > Rate Schedules
3. Enter the rate schedule header information as specified in the following table:
Field Value
Operating Unit Vision Services
Organization Services-East
Schedule XXCost Rate by Job
Description Enter a brief description
Currency USD
Share Across Operating Units Leave check box disabled
4. (T) Job
5. Enter the job rate information.
• Select Vision Corporation as the Job Group.
• Enter the jobs and rates as specified in the following table:
Job UOM Rate Effective Date From
Effective Date To
CON600.Consultant Hours 95 Today's Date Leave Blank
SMR400.SENIOR MANAGER Hours 105 Today's Date Leave Blank
STA700.Staff Administrator Hours 88.5 Today's Date Leave Blank
TRN500.Trainer Hours 97.75 Today's Date Leave Blank
• (I) Save
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 87
6. Close the Rate Schedules window and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 88
Guided Demonstration - Define an Organization Labor Costing Rule
Define an Organization Labor Costing Rule
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Organization Labor Costing Rules window.
• (N) Setup > Costing > Labor > Organization Labor Costing Rules
3. Enter the organization labor costing rules for Services-East as specified in the following table:
Field Value
Operating Unit Vision Services
Organization Services-East
Labor Costing Rule Compensation
Cost Rate Schedule XXCost Rate by Job (select one of the student's schedules from a previous practice)
Default Job Schedule Bill Rate by Job
Effective Date From One year from today
Effective Date To Leave Blank
Note: Enter an effective start date of one year from today. This organization labor costing rule is for demonstrations purposes only.
4. (I) Save
5. Close the Organization Labor Costing Rules window and return to the navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 89
Guided Demonstration - Define a Labor Costing Override
Define a Labor Costing Override
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Labor Costing Overrides window.
• (N) Setup > Costing > Labor > Labor Costing Overrides
3. Find the employee.
• Enter the find criteria: − Employee Name = Cagliastro, Ms. Joanne Lisa (Jo) − Employee Number = 10 − Overrides for Operating Unit = Vision Services
• (B) Find
4. Enter the labor cost override.
• Use the values as specified in the following table:
Field Value
Costing Rule Exempt
Override Type Rate
Costing Schedule Leave Blank
Rate 122.45
Currency CAD
Rate Type Corporate
Rate Date Expenditure Item Date
Exchange Rate Leave Blank
Effective Date From Today's Date
Effective Date To Leave Blank
• (I) Save
5. Close the Labor Costing Overrides window and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 90
Implementing Burden Costing
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 91
Practice - Define a Burden Structure
Overview
In this practice, you will define an additive burden structure. You will set up the burden structure to apply different burden costs to labor and to expense report raw costs.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Define the Burden Structure Header Information
Your company applies fringe, overhead, and general and administrative burden to various types of costs. The finance department always uses an additive approach to calculate the burden. Define the header information for a new additive burden structure and name it XXLabor and Expenses. Note that your company does not want users to use this structure for overrides.
Enter the Labor Cost Base
The finance department wants to apply fringe to labor costs to account for benefits and overhead to account for human capital management administrative support. Define a labor cost base that applies both types of burden costs to the following expenditure types:
− Administrative − Clerical − Design − Professional − Supervision
Enter the Expenses Cost Base
The finance department also wants to apply general and administrative burden to expense report costs to account for the cost of using an outside travel agency and overhead to account for managing the expense reports. Define an expenses cost base that applies both types of burden costs to the following expenditure types:
− Airfare − Car Rental − Hotel − Meals − Mileage − Telephone
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 92
Solution - Define a Burden Structure
Define the Burden Structure Header Information
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Labor Costing Overrides window.
• (N) Setup > Costing > Burden > Structures
3. Enter the header information as specified in the following table:
Field Value
Structure XXLabor and Expenses
Effective From Today's Date
Effective To Leave Blank
Description Enter a brief description
Structure Type Additive
Structure Usage in Schedule Overrides - Allowed No
Structure Usage in Schedule Overrides - Default No
4. (I) Save
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 93
Enter the Labor Cost Base
5. Select Labor from the list of values in the Cost Base field.
6. Enter the cost code for this cost base as specified in the following table:
Burden Cost Code Precedence (View Only)
Fringe 1
Overhead 1
7. Add the following expenditure types to this cost base: − Administrative − Clerical − Design − Professional − Supervision
8. (I) Save
Enter the Expenses Cost Base
9. Position your cursor in the empty row below Labor in the Cost Base Assignment region.
10. Select Expenses from the list of values in the Cost Base field.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 94
11. Enter the cost codes for this cost base as specified in the following table:
Burden Cost Code Precedence (View Only)
G&A 1
Overhead 1
12. Add the following expenditure types to this cost base: − Airfare − Car Rental − Hotel − Meals − Mileage − Telephone
13. (I) Save
14. Close Burden Structures window and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 95
Practice - Define a Burden Schedule
Overview
In this practice, you will define a provisional burden schedule and specify multipliers for each type of burden cost. You will assign the XXLabor and Expenses burden structure that you created in the previous practice to the schedule.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Define the Burden Schedule Header Information
You need to define a burden schedule to specify the burden multipliers for the cost codes on your XXLabor and Expenses burden structure. The finance department does not have the final multipliers at this time, so you must create a provisional burden schedule that will enable you to specify the actual multipliers when they are available.
Define the header information for the provisional burden schedule and name it XXInternal Costing. Use the organization hierarchy information as specified in the following table:
Field Value
Hierarchy Global
Version 1
Start Org Vision Corporation
Enter the Version Information
Create the initial version of the schedule. Name the first version and identify the first day of next month as the start date. You do not have an end date for this version at this time.
Enter the Multipliers and Compile the Version
Enter the multipliers for each burden cost code. First enter the multipliers for Vision Corporation, the start organization that you specified for the hierarchy. Costs for operating your Services-East organization are higher than in other organizations, so the finance department has provided you with a separate set of provisional multipliers for Services-East. Enter the multipliers as specified in the following table:
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 96
Organization Burden Cost Code Multiplier
Vision Corporation Fringe .35
Vision Corporation Overhead .155
Vision Corporation G&A .10
Services-East Fringe .55
Services-East Overhead .16
Services-East G&A .15
When you are finished, save and compile the new burden schedule version.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 97
Solution - Define a Burden Schedule
Define the Burden Schedule Header Information
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Burden Schedules window.
• (N) Setup > Costing > Burden > Schedules
3. Enter the header information
Field Value
Name XXInternal Costing
Description Enter a brief description
Structure XXLabor and Expenses
Effective From Today's Date
Effective To Leave Blank
Type Provisional
Hierarchy Global
Version 1
Start Org Vision Corporation
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 98
4. (I) Save
Enter the Version Information
5. Position your cursor in the Name field in the Versions region (above the label Name) and enter version information as specified in the following table:
Field Value
Name Enter a version name
Start Date First day of next month
End Date Leave Blank
Structure (view only) XXLabor and Expenses
6. (I) Save Fo
r Ins
truct
or U
se O
nly.
Th
is d
ocum
ent s
houl
d no
t be
dist
ribut
ed.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 99
Enter the Multipliers and Compile the Version
7. Enter the multipliers in the Multipliers region as specified in the following table:
Organization Burden Cost Code Multiplier
Vision Corporation Fringe .35
Vision Corporation Overhead .155
Vision Corporation G&A .1
Services-East Fringe .55
Services-East Overhead .16
Services-East G&A .15
8. (I) Save Fo
r Ins
truct
or U
se O
nly.
Th
is d
ocum
ent s
houl
d no
t be
dist
ribut
ed.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 100
9. (B) Compile
When you select the Compile button, Oracle Project Costing submits the concurrent program Compile Burden Schedule Revision.
10. Close the Burden Schedules window and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 101
Practice - Distribute Total Burdened Costs
Overview
In this practice, you will run the distribution program to distribute total burdened costs for your XX Capital Services project. After the program completes, you will review the total burdened accounting and research how Oracle Project Costing calculated the costs.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Distribute Total Burdened Costs
Submit the concurrent program PRC: Total Burdened Cost for your XX Capital Services project. Ensure that you select your project as a program parameter. Review the output report.
1. Note your Request ID __________________________
Review the Results in Expenditure Inquiry
After the program is complete, query the expenditure items for your project in Expenditure Inquiry and review the cost distribution line information for one of the expenditure items. The distribution program determines the default total burdened cost accounting for the expenditure items.
Note the following amounts: − Raw cost amount: − Burdened cost amount:
Note the following information about the expenditure item: − Project number: − Task number: − Expenditure type: − Expenditure item date: − Expenditure organization:
Research How the Total Burdened Amount was Calculated
Select one of the expenditure items on your XX Capital Services and research how Oracle Project Costing calculated the total burdened costs. Use the View Burdened Costs window to assist your research. Answer the following questions:
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 102
1) What is the name of the burden schedule that Oracle Project Costing used to calculate the burden amount?
2) Describe how Oracle Project Costing calculated the total burdened cost for the expenditure item (cost codes, multipliers, calculations)?
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 103
Solution - Distribute Total Burdened Costs
Distribute Total Burdened Costs
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Submit a New Request window.
• (M) View > Requests
• (B) Submit a New Request
3. Select to run a Single Request.
4. (B) OK
5. Select the program PRC: Distribute Total Burdened Cost from the list of values in the Name field and Vision Services for the operating unit.
6. Define the parameters for the program as specified in the following table:
Field Value
Project Number XXCS
7. (B) OK
8. (B) Submit
• Note your Request ID __________________________
9. (B) No in the Decision dialog box
10. Find your request.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 104
• Select the Specific Requests option button.
• Enter your request ID in the Request ID field.
• (B) Find
11. Wait for the program to finish. When the program is complete, select the program.
• Use (B) Refresh Data to monitor the progress of the request processing. When the Phase shows Completed, open the output report.
12. Review the output report.
• (B) View Output
13. Close the output page and the Requests window.
Review the Results in Expenditure Inquiry
14. Navigate to the Find Project Expenditure Items window
• (N) Expenditures > Expenditure Inquiry > Project
15. Query all expenditure items for your XX Capital Services Project.
• Enter the find criteria: − Project Number = XXCS − Project Name = XX Capital Services
• (B) Find
16. Review cost distribution line information.
• Position your cursor on one of the queried items.
• (B) Item Details
• Select Cost Distribution Lines.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 105
• (B) OK
• Review the cost distribution line information for the burdened debit and the burdened credit.
17. Note the following amounts: − Raw cost amount: − Burdened cost amount:
18. Close the Cost Distribution Lines window and return to the Project Expenditure Items window.
19. Note the following information about the expenditure item: − Project number: − Task number: − Expenditure type: − Expenditure item date: − Expenditure organization:
20. Close the open windows and return to the Navigator.
Research How the Total Burdened Amount was Calculated
21. Navigate to the View Burdened Costs window.
• (N) Setup > Costing > Burdened > View
22. View the burdened costs.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 106
• Enter information for your expenditure item (or use the data from the screen shot and change the date to today’s date).
• (B) Burden
• Select the Costing option button.
• Answer the following questions:
1) What is the name of the burden schedule that Oracle Project Costing used to calculate the burden amount?
2) Describe how Oracle Project Costing calculated the total burdened cost for the expenditure item (cost codes, multipliers, calculations)?
23. Close the View Burdened Costs window and return to the Navigator. Fo
r Ins
truct
or U
se O
nly.
Th
is d
ocum
ent s
houl
d no
t be
dist
ribut
ed.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 107
Performing Cost Adjustments
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 108
Practice - Perform a Split and a Transfer
Overview
In this practice, you will split an expenditure item on your project into two expenditure items and transfer one of the new expenditure items to a different task. You will also run the cost distribution program for your project to distribute the adjustment. Finally, you will run an adjustment activity report for your project.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Perform a Split and a Transfer
Amy Marlin has informed you that she incorrectly charged 10 hours of clerical work for the week to task 1.1. Amy should have charged 6 hours of the clerical work to task 2.1 and 4 hours to task 1.1. Adjust the expenditure items on your XX Capital Services project accordingly.
First, change the comment for the expenditure item to indicate that the Amy's supervisor, Donald Gray, has approved the transfer. Next, split the expenditure item for 10 hours of Amy's clerical work on task 1.1 into expenditure items of 6 and 4 hours. When you split the expenditure items, both should remain capitalizable. Finally, transfer 6 hours to task 2.1.
Cost Distribute the Adjusted Expenditure Items
Submit the concurrent program PRC: Distribute Labor Costs for your project to distribute the adjusted expenditure items. Review the output report.
Note your Request ID __________________________
Run an Adjustment Activity Report
Donald Gray has requested an audit of all adjustment activity on the XX Capital Services project. Run the AUD: Project Expenditure Adjustment Activity report to review all adjustment activity.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 109
Solution - Perform a Split and a Transfer
Perform a Split and a Transfer
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Find Project Expenditure Items window.
• (N) Expenditures > Expenditure Inquiry > Project
3. Query Amy Marlin's task 1.1 expenditure item for your XX Capital Services project.
• Enter the header find criteria:: − Project Number = XXCS − Project Name = XX Capital Services − Task Number = 1.1 − Task Name = Design Development
• (T) Resource
• Enter resource find criteria: − Employee Number = 34 − Employee Name = Marlin, Ms. Amy
• (B) Find
4. Review the results of the query.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 110
You see the expenditure item for 10 hours of clerical labor from the batch you entered in a previous practice.
5. Position your cursor on the expenditure item.
6. Change the comment to note the approval for the adjustment.
• (M) Tools > Change Comment
• After the existing comment, enter a comment such as: Transfer of 6 hours to task 2.1 approved by Donald Gray.
• (B) OK
7. Split the expenditure item.
• (M) Tools > Split
• Enter the split quantities as specified in the following table:
Split Quantity Capitalizable
6 Yes
4 Yes
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 111
• (B) OK
• (B) Yes in the Decision dialog box
8. Review the results. You will see three new expenditure items: − A reversing item of -10 hours − A new item of 6 hours − A new item of 4 hours
9. Position your cursor on the expenditure item with a quantity of 6 hours.
10. Transfer the expenditure item.
• (M) Tools > Transfer 1
• Enter the transfer information as specified in the following table:
Field Value
Project Number XXCS
Name XX Capital Services
Task Number 2.1
Name Framing
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 112
• (B) OK
• (B) Yes in the Decision dialog box
• (B) OK in the Note dialog box
• (B) Yes in the Decision dialog box
11. Review the results. You will see one new expenditure item for task 1.1: − A reversing item of -6 hours for task 1.1
In addition, the transfer created a new item of 6 hours for task 2.1. Because the original query was for task 1.1, you do not see the new item for task 2.1. Optionally, you can revise the query criteria to see all expenditure items for your project.
Cost Distribute the Adjusted Expenditure Items
12. Navigate to the Submit a New Request window.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 113
• (M) View > Requests
• (B) Submit a New Request
13. Select to run a Single Request.
14. (B) OK
15. Select the program PRC: Distribute Labor Costs from the list of values in the Name field and Vision Services for the operating unit.
16. Define the parameters for the program as specified in the following table:
Field Value
Project Number XXCS
17. (B) OK
18. (B) Submit
• Note your Request ID __________________________
19. (B) No in the Decision dialog box
20. Find your request.
• Select the Specific Requests option button.
• Enter your request ID in the Request ID field.
• (B) Find
21. Wait for the program to finish. When the program is complete, select the program.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 114
• Use (B) Refresh Data to monitor the progress of the request processing. When the Phase shows Completed, open the output report.
22. Review the output report.
• (B) View Output
23. Close the output page.
Run an Adjustment Activity Report
24. (B) Submit a New Request
25. Select to run a Single Request.
26. (B) OK
27. Select the program AUD: Project Expenditure Adjustment Activity from the list of values in the Name field and Vision Services for the operating unit.
28. Define the parameters for the program as specified in the following table:
Field Value
Project Number XXCS
29. (B) OK
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 115
30. (B) Submit
• Note your Request ID __________________________
31. (B) No in the Decision dialog box
32. Find your request.
• (B) Find Requests
• Select the Specific Requests option button.
• Enter your request ID in the Request ID field.
• (B) Find
33. Wait for the program to finish. When the program is complete, select the program.
• Use (B) Refresh Data to monitor the progress of the request processing. When the Phase shows Completed, open the output report.
34. Review the output report.
• (B) View Output
35. Close the output page.
36. Close the open windows and return to the Navigator. Fo
r Ins
truct
or U
se O
nly.
Th
is d
ocum
ent s
houl
d no
t be
dist
ribut
ed.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 116
Practice - Correct an Approved Expenditure Item
Overview
In this practice, you will correct an approved expenditure item that Anne Hamilton charged to an incorrect expenditure type.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
After reviewing her timecards, Anne Hamilton realizes that she incorrectly charged 10 hours of her time to your XX Capital Services project as Supervision. Anne has asked you to change the expenditure type for the timecard with the earliest date for the week from Supervision to Sales.
Enter the Batch Information
Enter a timecard batch for the current week so that you can reverse the incorrect expenditure item and enter a new corrected expenditure item. Name the batch XXCORRECTION.
Find and Reverse an Expenditure Item
Enter an expenditure for Anne Hamilton and then select the Reverse Original... button to find and reverse the incorrect expenditure item. Reverse the Supervision expenditure item with the earliest date for the current week that Ann charged to your project.
Enter a Corrected Expenditure Item
Enter a new corrected expenditure item as specified in the following tables:
Expnd Item Date
Project Number Task Number
Expnd Type Assignment Name
Same date as the reversing item
XXCS 3.0 Sales Unscheduled
Work Type UOM Quantity Comment
Internal-Overhead Hours 10 Sales meeting
Submit and Release the Batch
Submit and release the batch.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 117
Solution - Correct an Approved Expenditure Item
Enter the Batch Information
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Expenditure Batches window.
• (N) Expenditures > Pre Approved Batches > Enter
3. Enter the batch information as specified in the following table:
Field Value
Operating Unit Vision Services
Batch Name XXCORRECTION
Ending Date This Sunday's Date
Class Timecards
Description Enter a brief description
All Negative Transactions Entered As Unmatched Leave Blank
Reverse Expenditures in a Future Period Option Not Available
Control Totals Leave Blank
Control Count Leave Blank
4. (I) Save
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 118
5. (B) Expenditures
Find and Reverse an Expenditure Item
6. Enter the expenditure as specified in the following table:
Employee Name Employee Number
Organization Expnd Ending Date
Control Total
Hamilton, Ms. Anne 37 Services-East This Sunday's Date Leave Blank
7. (I) Save
8. (B) Reverse Original
9. Find and select the expenditure item to reverse:
• Enter the find criteria: − Employee = Hamilton, Ms. Anne (view only) − Org = Services-East (view only) − Project Number = XXCS
• (B) Find
• Select the Supervision expenditure item with the earliest expenditure item date.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 119
Note: Hold down the Ctrl key on your keyboard and left-click the expenditure item to select it.
10. (B) Reverse 1
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 120
Oracle Project Costing automatically creates the reversing expenditure item.
Enter a Corrected Expenditure Item
11. Place your cursor in the first empty row after the reversing expenditure item.
12. Enter a new corrected expenditure item as specified in the following tables:
Expnd Item Date
Project Number Task Number
Expnd Type Assignment Name
Same date as the reversing item
XXCS 3.0 Sales Unscheduled
Work Type UOM Quantity Comment
Internal-Overhead Hours 10 Sales meeting
13. (I) Save
Submit and Release the Batch
14. Close the Expenditures window and return to the Expenditure Batches window.
15. (B) Submit
16. (B) Release
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 121
17. Close the Expenditure Batches window and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 122
Integration with Oracle Purchasing and Oracle Payables
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 123
Guided Demonstration - Review Committed Costs
Prerequisite
Run the “PRC: Update Project Summary Amounts for a Single Project” program for the cost reimbursable project.
Review Committed Costs
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Find Project Status window.
• (N) Project Status Inquiry > Project Status Inquiry
3. Find the Cost Reimbursable project.
• Enter the find criteria: − Operating Unit = Vision Services − Number = Cost Reimbursable − Name = Cost Reimbursable
• (B) Find
4. View the amount in the Commit Amt column.
5. View the details of the commitments
• (B) Commitments
This project has Supplier Invoice, Purchase Orders, and Requisition commitments.
• Review the document number related to each commitment.
• Review whether the each commitment is related to an approved document or not.
6. Close the open windows and return to the Navigator.
Fo
r Ins
truct
or U
se O
nly.
Th
is d
ocum
ent s
houl
d no
t be
dist
ribut
ed.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 124
Practice - Enter a Project-Related Requisition
Overview
In this practice, you will create a project-related requisition in Oracle iProcurement and charge it to your XX Capital Services project.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
• If the student is not using the SERVICES User ID, then the instructor must ensure that each employee associated with a User ID is assigned a position in Oracle HRMS and that the position has adequate signing authority in Oracle Purchasing.
Tasks
Enter and Submit a Requisition in Oracle iProcurement
Your project manager has asked you to order 10 coffee makers for the project offices. You can charge the coffee makers to task 1.2 of the XX Capital Services project.
Enter and submit a non-catalog requisition in Oracle iProcurement. Use the responsibility iProcurement, Vision Services (USA). Enter the request information as specified on the following table:
Field Value
Item Type Goods billed by quantity
Item Description Coffee makers for project office
Category MISC.MISC
Quantity 10
Unit of Measure Each
Unit Price 35.99
Currency USD
RFQ Required No
Negotiated No
Contract Number Leave Blank
New Supplier No
Supplier Name Consolidated Supplies
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 125
Site HOUSTON
Contact Name Fuller, Ernie
Phone 713 678-4553
Supplier Item Leave Blank
During checkout, charge the project as specified in the following table:
Field Value
Project XXCS
Task 1.2
Expenditure Type Supplies
Expenditure Org Services-East
Expenditure Item Date Today's Date
Be sure to enter a brief justification and a message to the buyer. Your requisition does not require any approvals. Submit your requisition.
Note your requisition number: ________________________________
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 126
Solution - Enter a Project-Related Requisition
Enter and Submit a Requisition in Oracle iProcurement
1. Responsibility = iProcurement, Vision Services (USA)
2. Enter a non-catalog request.
• (T) Shop
• (ST) Non-Catalog Request
• Enter the request information as specified on the following table:
Field Value
Item Type Goods billed by quantity
Item Description Coffee makers for project office
Category MISC.MISC
Quantity 10
Unit of Measure Each
Unit Price 35.99
Currency USD
RFQ Required No
Negotiated No
Contract Number Leave Blank
New Supplier No
Supplier Name Consolidated Supplies
Site HOUSTON
Contact Name Fuller, Ernie
Phone 713 678-4553
Supplier Item Leave Blank Fo
r Ins
truct
or U
se O
nly.
Th
is d
ocum
ent s
houl
d no
t be
dist
ribut
ed.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 127
• (B) Add to Cart
3. (B) View Cart and Checkout
4. (B) Checkout
5. Revise the project information in the Billing region as specified in the following table:
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 128
Field Value
Project XXCS
Task 1.2
Expenditure Type Supplies
Expenditure Org Services-East
Expenditure Item Date Today's Date
6. (B) Next
7. Enter a justification and a note to the buyer.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 129
Note: Your requisition does not require any approvals.
8. (B) Next
9. Review and submit the requisition.
• (H) Show
• Review the information For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 130
• (B) Submit
• Note your requisition number: ________________________________
10. (H) Close Window
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 131
Practice - AutoCreate a Project-Related Purchase Order
Overview
In this practice, you will AutoCreate a purchase order in Oracle Purchasing using the requisition that you submitted in the previous practice. You will also view the purchase order as a commitment in Project Status Inquiry.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
• If the student is not using the SERVICES User ID, then the instructor must ensure that the employee associated with the student's User IDs is set up as a Buyer in Oracle Purchasing and that the employee's position has adequate signing authority.
• IMPORTANT: The instructor must set the current reporting period for Vision Services operating unit to the period for the current week before students update summary amounts:
• Responsibility = Projects, Vision Services (USA)
• (N) Setup > System > PA Periods
• (B) Set Reporting Period
• Select the period for the current week.
• (B) OK
• (I) Save
Tasks
AutoCreate a Purchase Order
The project manager of the XX Capital Services project has asked you to create a purchase order for the coffee makers. In Oracle Purchasing, use your requisition from the previous practice to AutoCreate a new purchase order. Use the responsibility Purchasing, Vision Services (USA).
Record your new document number ______________________
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 132
Review and Approve the Purchase Order
After you AutoCreate the new purchase order, review the project charging instructions on the Project tab of the Distributions window (accessed from the Shipments window). You entered this project information on the requisition and Oracle Purchasing copied it to the purchase order.
When you are ready, approve the purchase order. Verify that the status of the purchase order is Approved.
View the Commitment in Project Status Inquiry
Switch your responsibility to Projects, Vision Services (USA) to view the commitment against your project. First run the program PRC: Update Project Summary Amounts for a Single Project for your XX Capital Services project.
Note your Request ID __________________________
Use Project Status Inquiry to review the commitment details.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 133
Solution - AutoCreate a Project-Related Purchase Order
AutoCreate a Purchase Order
1. Responsibility = Purchasing, Vision Services (USA)
2. Navigate to the Find Requisition Lines window.
• (N) AutoCreate
3. Find the line from your requisition.
• (B) Clear
• Enter the following find criteria: − Operating Unit = Vision Services − Approved = Yes − Requisition = Your requisition number from the previous practice
• (B) Find
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 134
4. Enable the check box next to the line for your requisition.
5. (B) Automatic
6. Review the information on the New Document window. Accept the default values.
7. (B) Create
8. Record your new document number ______________________
Review and Approve the Purchase Order
9. Review the purchase order header information.
10. Review the project-related distribution line.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 135
• (B) Shipments
• (B) Distributions
• (T) Project
Note: You entered this project information on the requisition and Oracle Purchasing copied it to the purchase order.
11. Close the Distributions and the Shipments windows.
12. (B) Approve
13. Enable the Submit for Approval option. Fo
r Ins
truct
or U
se O
nly.
Th
is d
ocum
ent s
houl
d no
t be
dist
ribut
ed.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 136
14. (B) OK
15. Verify that the status of the purchase order is now Approved.
16. Close the AutoCreate for Purchase Orders window and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 137
View the Commitment in Project Status Inquiry
17. Switch your responsibility.
• (M) File > Switch Responsibility
• Select Projects, Vision Services (USA).
• (B) OK
18. Navigate to the Submit a New Request window.
• (M) View > Requests
• (B) Submit a New Request
19. Select to run a Single Request.
20. (B) OK
21. Select the program PRC: Update Project Summary Amounts for a Single Project from the list of values in the Name field and Vision Services for the operating unit.
22. Define the parameters for the program as specified in the following table:
Field Value
Project Number XXCS
Through Date Leave Blank
Summarize Cost Yes
Expenditure Type Class Leave Blank
Summarize Revenue Yes
Summarize Budgets Yes
Budget Type Leave Blank
Summarize Commitments Yes
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 138
23. (B) OK
24. (B) Submit
• Note your Request ID __________________________
25. (B) No in the Decision dialog box
26. Find your request.
• Select the Specific Requests option button.
• Enter your request ID in the Request ID field.
• (B) Find
27. Wait for the program to finish. When the program is complete, select the program.
• Use (B) Refresh Data to monitor the progress of the request processing. When the Phase shows Completed, open the output report.
28. Review the output report.
• (B) View Output Fo
r Ins
truct
or U
se O
nly.
Th
is d
ocum
ent s
houl
d no
t be
dist
ribut
ed.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 139
29. Close the output page and the Requests window.
30. Navigate to the Find Project Status window.
• (N) Project Status Inquiry > Project Status Inquiry
31. Find the XX Capital Services project.
• Enter the find criteria: − Operating Unit = Vision Services − Number = XXCS − Name = XX Capital Services
• (B) Find
32. View the amount in the Commit Amt column.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 140
33. View the details of the commitments
• (B) Commitments
• (B) Find
34. Close the open windows and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 141
Practice - Create a Project-Related Supplier Invoice
Overview
In this practice, you will create an Oracle Payables supplier invoice and match it to the purchase order that you created in the previous practice. After you review the invoice distributions, you will validate the invoice and create final subledger accounting for it.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
• IMPORTANT: The instructor must verify that the current AP period is open:
• Responsibility = Payables, Vision Services (USA)
• (N) Setup > Calendar > Accounting > Accounting Periods
• If necessary, open the period for the current month.
Match the Supplier Invoice to a Purchase Order
You received the invoice for the coffee makers that you ordered. In Oracle Payables, create an invoice. Use the responsibility Payables, Vision Services (USA). Enter or verify the invoice header information as specified in the following table:
Field Value
Operating Unit Vision Services
Type Standard
Trading Partner Consolidated Supplies (view only)
Supplier Num 1014 (view only)
Supplier Site HOUSTON
Invoice Date Today's Date
Invoice Number XX-INV
Invoice Curr USD
Invoice Amount 359.90
Match Action Purchase Order
GL Date Today's Date
Terms 4/10, 3/20, 2/30 Net 60
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 142
Payment Method Check
Pay Group Standard
Payment Curr USD
Payment Rate Date Today's Date
Terms Date Today's Date
Taxation Country United States
Match the invoice to the purchase order that you created in the previous practice. After you find your purchase order and complete the match, review the invoice line and the invoice distribution line.
Validate the Invoice and Create Accounting
You must validate the invoice and create final subledger accounting before you can interface the supplier costs to Oracle Project Costing as actual costs. First, validate the invoice. After the invoice is validated, create final subledger accounting for it. Select the Final Post option when you create accounting. Verify that the invoice status is Validated and that Accounted is Yes.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 143
Solution - Create a Project-Related Supplier Invoice
Match the Supplier Invoice to a Purchase Order
1. Responsibility = Payables, Vision Services (USA)
2. Navigate to the Invoices window.
• (N) Invoices > Entry > Invoices
3. Enter or verify the invoice header information as specified on the following table:
Field Value
Operating Unit Vision Services
Type Standard
Trading Partner Consolidated Supplies (view only)
Supplier Num 1014 (view only)
Supplier Site HOUSTON
Invoice Date Today's Date
Invoice Number XX-INV
Invoice Curr USD
Invoice Amount 359.90
Match Action Purchase Order
GL Date Today's Date
Terms 4/10, 3/20, 2/30 Net 60
Payment Method Check
Pay Group Standard
Payment Curr USD
Payment Rate Date Today's Date
Terms Date Today's Date
Taxation Country United States Fo
r Ins
truct
or U
se O
nly.
Th
is d
ocum
ent s
houl
d no
t be
dist
ribut
ed.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 144
4. (B) Match
5. Find the purchase order to match.
• Enter the find criteria: − Num = Your purchase order number from the previous practice.
• (B) Find
6. Select the Match check box next to the line for your purchase order.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 145
7. (B) Match on the Match to Purchase Orders window.
8. Review the invoice distributions
• (T) Lines
• Select the invoice line.
• (B) Distributions
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 146
• Scroll to the right to view the project information.
• Close the Distributions window.
Validate the Invoice and Create Accounting
9. Validate the invoice.
• (T) General
• (B) Actions... 1
• Enable the Validate option.
• (B) OK
10. Create accounting for the invoice.
• (B) Actions... 1
• Enable the Create Accounting option.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 147
• Select the Final Post option.
• (B) OK
• (B) OK for the note.
11. Verify that the invoice status is Validated and that Accounted is Yes.
12. Close the Invoices window and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 148
Practice - Interface Supplier Costs
Overview
In this practice, you will interface supplier costs from the supplier invoice that you validated in the previous practice to Oracle Project Costing. You will also use Expenditure Inquiry to review the supplier cost expenditure item.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Interface Supplier Costs
In the previous practice, you validated and created final subledger accounting for your supplier invoice. You can now interface the supplier costs to Oracle Project Costing as actual costs. Use the responsibility Projects, Vision Services (USA). Run the program PRC: Interface Supplier Costs. Ensure that you select your project as a program parameter. The program PRC: Interface Supplier Costs automatically submits the program AUD: Supplier Costs Interface Audit. Review the output report for AUD: Supplier Costs Interface Audit.
Note your Request ID __________________________
View the Expenditure Item
Use expenditure inquiry to query the expenditure item from the supplier invoice. Drill down to view the invoice overview information and invoice workbench for the supplier cost expenditure item. Fo
r Ins
truct
or U
se O
nly.
Th
is d
ocum
ent s
houl
d no
t be
dist
ribut
ed.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 149
Solution - Interface Supplier Costs
Interface Supplier Costs
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Submit a New Request window.
• (M) View > Requests
• (B) Submit a New Request
3. Select to run a Single Request.
4. (B) OK
5. Select the program PRC: Interface Supplier Costs from the list of values in the Name field and Vision Services for the operating unit.
6. Define the parameters for the program as specified in the following table:
Field Value
Project Number XXCS
Batch Name Leave Blank
Through GL Date Leave Blank
Through Transaction Date Leave Blank
Interface Supplier Invoices Yes
Interface Receipt Accruals No
Interface AP Discounts No
7. (B) OK
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 150
8. (B) Submit
• Note your Request ID __________________________
9. (B) No in the Decision dialog box
10. Find your request.
• Select the All My Requests option button.
• (B) Find
11. Wait for the program to finish. When the program is complete, select the program.
• Use (B) Refresh Data to monitor the progress of the request processing.
Note: Wait for the program with your Request ID to complete. The program PRC: Interface Supplier Costs automatically submits the program AUD: Supplier Costs Interface Audit. Look for the AUD: Supplier Costs Interface Audit program request with your Request ID in the parameters.
12. Review the output report for AUD: Supplier Costs Interface Audit.
• (B) View Output
13. Close the output page and the Requests window.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 151
View the Expenditure Item
14. Navigate to the Find Project Expenditure Items window
• (N) Expenditures > Expenditure Inquiry > Project
15. Query the expenditure items from the invoice XX-INV on your project.
• Enter the header find criteria:: − Project Number = XXCS − Project Name = XX Capital Services
• (T) Supplier
• Enter supplier find criteria: − Invoice Number = XX-INV
• (B) Find
16. Drill down to the invoice item details information.
• (B) Item Details
• Select AP Invoice.
• (B) OK
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 152
• (B) Invoice Workbench
17. Close the open windows and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 153
Guided Demonstration - Allow Adjustments for a Supplier Cost Transaction Source
Allow Adjustments for a Supplier Cost Transaction Source
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Transaction Sources window.
• (N) Setup > Expenditures > Transaction Sources
3. Find the Oracle Payables Supplier Invoices transaction source.
4. Enable the Allow Adjustments transaction source option.
5. (B) OK for the Note
6. (I) Save
7. Close the Transaction Sources window and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 154
Practice - Adjust Supplier Costs
Overview
In this practice, you will
• Transfer the supplier cost expenditure item from the previous practice to a different task.
• Distribute the supplier cost adjustment in Oracle Project Costing.
• Cancel the invoice in Oracle Payables.
• Create final subledger accounting for the cancelled invoice.
• Interface supplier costs from the canceled invoice to Oracle Project Costing.
• Analyze the expenditure items that result from the multiple adjustments.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
• The instructor must complete the activities in previous guided demonstration to allow adjustments for the Oracle Payables Supplier Invoices transaction source.
Tasks
Transfer an Expenditure Item in Oracle Projects
The project manager of the XX Capital Services project notifies you that you need to charge the coffee makers to task 3.0 and not task 1.2. In Oracle Project Costing, transfer the expenditure item to task 3.0 and then run the program PRC: Distribute Supplier Cost Adjustments to distribute the adjustment. Ensure that you select your project as a program parameter. Review the output report.
Note your Request ID __________________________
Cancel the Invoice in Oracle Payables
You discover that you have not yet received the coffee makers. After contacting the supplier, you learn that the coffee makers are discontinued and will not be shipped. In Oracle Payables, find and cancel the unpaid supplier invoice that you previously entered and validated. Use the responsibility Payables, Vision Services (USA). After you cancel the invoice, create final
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 155
subledger accounting for the invoice. Select the Final Post option when you create accounting. Verify that the invoice status is Cancelled and that Accounted is Yes.
Interface Supplier Costs
Interface the canceled invoice costs to Oracle Project Costing. Use the responsibility Projects, Vision Services (USA). Run the program PRC: Interface Supplier Costs. Ensure that you select your project as a program parameter. Review the output report for the program AUD: Supplier Costs Interface Audit.
Note your Request ID __________________________
View the Results in Expenditure Inquiry
Query all of the expenditure items from your XX-INV supplier invoice in Expenditure Inquiry. Limit the find criteria to query only the expenditure items related to your supplier invoice. Provide a brief analysis of when each expenditure item was created and the purpose of each expenditure item:
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 156
Solution - Adjust Supplier Costs
Transfer an Expenditure Item in Oracle Projects
1. Navigate to the Find Project Expenditure Items window.
• (N) Expenditures > Expenditure Inquiry > Project
2. Query the expenditure items from the invoice XX-INV on your project.
• Enter the header find criteria:: − Project Number = XXCS − Project Name = XX Capital Services
• (T) Supplier
• Enter supplier find criteria: − Invoice Number = XX-INV
• (B) Find
3. Position your cursor on the supplier cost expenditure item.
4. Transfer the expenditure item.
• (M) Tools > Transfer 1
• Enter the transfer information as specified in the following table:
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 157
Field Value
Project Number XXCS
Name XX Capital Services
Task Number 3.0
Name Project Management
• (B) OK
• (B) Yes in the Decision dialog box
• (B) OK in the Note dialog box
• (B) Yes in the Decision dialog box
5. Review the results. You will see two new expenditure items: − A new expenditure item for task 3.0 − A reversing expenditure item of for task 1.2 Fo
r Ins
truct
or U
se O
nly.
Th
is d
ocum
ent s
houl
d no
t be
dist
ribut
ed.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 158
6. Close the open windows and return to the navigator.
7. Navigate to the Submit a New Request window.
• (M) View > Requests
• (B) Submit a New Request
8. Select to run a Single Request.
9. (B) OK
10. Select the program PRC: Distribute Supplier Cost Adjustments from the list of values in the Name field and Vision Services for the operating unit.
11. Define the parameters for the program as specified in the following table:
Field Value
Project Number XXCS Fo
r Ins
truct
or U
se O
nly.
Th
is d
ocum
ent s
houl
d no
t be
dist
ribut
ed.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 159
12. (B) OK
13. (B) Submit
• Note your Request ID __________________________
14. (B) No in the Decision dialog box
15. Find your request.
• Select the Specific Requests option button.
• Enter your request ID in the Request ID field.
• (B) Find
16. Wait for the program to finish. When the program is complete, select the program.
• Use (B) Refresh Data to monitor the progress of the request processing. When the Phase shows Completed, open the output report.
17. Review the output report.
• (B) View Output
18. Close the output page and the Requests window.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 160
Cancel the Invoice in Oracle Payables
19. Switch your responsibility.
• (M) File > Switch Responsibility
• Select Payables, Vision Services (USA)
• (B) OK
20. Navigate to the Find Invoices window.
• (N) Invoices > Entry > Invoices
21. Find your invoice.
• Enter the header find criteria:: − Invoice Number = XX-INV
• (B) Find
22. Cancel the invoice.
• (B) Actions... 1
• Enable the Cancel Invoices option.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 161
• (B) OK
• (B) OK for the Caution message.
23. Create accounting for the invoice.
• (B) Actions... 1
• Enable the Create Accounting option.
• Select the Final Post option. Fo
r Ins
truct
or U
se O
nly.
Th
is d
ocum
ent s
houl
d no
t be
dist
ribut
ed.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 162
• (B) OK
• (B) OK for the message.
24. Verify that the invoice status is Cancelled and that Accounted is Yes.
25. Close the Invoices window and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 163
Interface Supplier Costs
26. Switch your responsibility.
• (M) File > Switch Responsibility
• Select Projects, Vision Services (USA)
• (B) OK
27. Navigate to the Submit a New Request window.
• (M) View > Requests
• (B) Submit a New Request
28. Select to run a Single Request.
29. (B) OK
30. Select the program PRC: Interface Supplier Costs from the list of values in the Name field and Vision Services for the operating unit.
31. Define the parameters for the program as specified in the following table:
Field Value
Project Number XXCS
Batch Name Leave Blank
Through GL Date Leave Blank
Through Transaction Date Leave Blank
Interface Supplier Invoices Yes
Interface Receipt Accruals No
Interface AP Discounts No
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 164
32. (B) OK
33. (B) Submit
• Note your Request ID __________________________
34. (B) No in the Decision dialog box
35. Find your request.
• Select the All My Requests option button.
• (B) Find
36. Wait for the program to finish. When the program is complete, select the program.
• Use (B) Refresh Data to monitor the progress of the request processing.
Note: Wait for the program with your Request ID to complete. The program PRC: Interface Supplier Costs automatically submits the program AUD: Supplier Costs Interface Audit. Look for the AUD: Supplier Costs Interface Audit program request with your Request ID in the parameters.
37. Review the output report for AUD: Supplier Costs Interface Audit.
• (B) View Output Fo
r Ins
truct
or U
se O
nly.
Th
is d
ocum
ent s
houl
d no
t be
dist
ribut
ed.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 165
38. Close the output page and the Requests window and return to the Navigator.
View the Results in Expenditure Inquiry
39. Navigate to the Find Project Expenditure Items window
• (N) Expenditures > Expenditure Inquiry > Project
40. Query the expenditure items from the invoice XX-INV on your project.
• Enter the header find criteria: − Project Number = XXCS − Project Name = XX Capital Services
• (T) Supplier
• Enter supplier find criteria: − Invoice Number = XX-INV
• (B) Find
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 166
Summary of the six expenditure items:
First, you interfaced supplier costs to Oracle Project Costing, which created the new supplier cost expenditure item for task 1.2.
Second, you transferred the cost to task 3.0. The transfer created a new expenditure item for task 3.0 and a reversal for the original expenditure item for task 1.2.
Third, you cancelled the invoice in Oracle Payables and interfaced supplier costs to Oracle Project Costing. The program PRC: Interface Supplier Costs created an expenditure item to reverse the transferred expenditure item on task 3.0. Oracle Payables did not know about the adjustment activity in Oracle Project Costing, so the cancellation created an expenditure item to reverse the original expenditure item for task 1.2. Because the transfer previously reversed the original expenditure item in Oracle Project Costing, the interface program created an expenditure item to reverse the cancellation reversal (appears as a positive expenditure item for task 1.2). The net outcome is that the total cost is now zero.
41. Close the open windows and return to the Navigator when finished. Fo
r Ins
truct
or U
se O
nly.
Th
is d
ocum
ent s
houl
d no
t be
dist
ribut
ed.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 167
Guided Demonstration - Specify a Default Supplier Cost Credit Account
Specify a Supplier Default Cost Credit Account
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Transaction Sources window.
• (N) Setup > System > Implementation Options
3. Select Vision Services in the Operating Unit field.
4. (B) Find
5. (T) Expnd/Costing
6. Enter 01-000-2220-000 as the Default Supplier Cost Credit Account.
7. (I) Save
8. Close the Implementation Options window and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 168
Integration with Oracle Internet Expenses
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 169
Practice - Enter and Approve an Expense Report
Overview
In this practice, you will enter and submit an expense report for Amy Marlin. You will then approve the expense report as Casey Brown and audit the expense report as Donald Gray.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Enter an Expense Report
You traveled to Montreal to meet with clients regarding the XX Capital Services project. Enter an expense report for your travel expenses. In Oracle Internet Expenses, create a new expense report. Use the responsibility iExpenses, Vision Services (USA). Enter the general expense report information as specified in the following table:
Field Value
Name Marlin, Ms. Amy (34)
Services Department 422
Reimbursement Currency USD - US dollar
Expense Template Travel
Purpose Meeting in Montreal
Approver Brown, Ms. Casey
Enter the receipt-based expenses as specified in the following table:
Line Date Receipt Amount
Receipt Currency
Expense Type
Justification
1 Yesterday's Date 260.50 USD Airfare Bird Airlines to Montreal
2 Today's Date 198.00 CAD Hotel Le Chateau Simard
Enter the project allocations as specified in the following table:
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 170
Line Project Number
Task Number
Project Expenditure Organization
1 XXCS 2.2 Services-East
2 XXCS 3.0 Services-East
Submit the expense report.
Record the expense report number: _______________________
Approve an Expense Report
You are now in the role of Casey Brown, the expense report approver. Log in as CBROWN with the password of WELCOME and select the iExpenses responsibility. Find the notification for your expense report (look for your expense report number) and approve it.
Audit the Expense Report
Log in as DGRAY with the password of WELCOME and select the Internet Expenses Auditor, Vision Services responsibility to audit the expense report. Use the advanced search option on the Expenses Audit tab to find your expense report. Enter today's date as the Receipt Package Received Date. Verify that you received the two receipts and then complete the audit.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 171
Solution - Enter and Approve an Expense Report
Enter an Expense Report
1. Responsibility = iExpenses, Vision Services (USA)
2. Navigate to the Expense Reports page.
• (N) Expenses Home
3. (B) Create Expense Report
4. Enter the general expense report information as specified in the following table:
Field Value
Name Marlin, Ms. Amy (34)
Services Department 422
Reimbursement Currency USD - US dollar
Expense Template Travel
Purpose Meeting in Montreal
Approver Brown, Ms. Casey
5. (B) Next
6. (B) Show Receipt Currency
7. Enter the receipt-based expenses as specified in the following table:
Line Date Receipt Amount
Receipt Currency
Expense Type
Justification
1 Yesterday's Date 260.50 USD Airfare Bird Airlines to Montreal
2 Today's Date 198.00 CAD Hotel Le Chateau Simard
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 172
• (B) Save
• (B) Next
8. Allocate the costs to your XX Capital Services project.
• (ST) Expense Allocations
• Enter the project allocations as specified in the following table: Line Project
Number Task
Number Project Expenditure
Organization
1 XXCS 2.2 Services-East
2 XXCS 3.0 Services-East
• (B) Save
9. Review the expense report.
• (B) Next
10. (B) Save
11. Review the Reimbursable Amounts.
• (B) Next
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 173
• Click the Warning icon to view any policy violations.
• (B) Return
12. (B) Submit
You have submitted the expense report for approval.
• Record the expense report number: _______________________
Approve an Expense Report
13. (H) Logout
14. Log in as Casey Brown.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 174
Field Value
User Name CBROWN
Password WELCOME
15. Responsibility = iExpenses
16. Approve the expense report.
• Review the list of open notifications on the Expenses Home page.
• Select the hyperlink for the expense report that you created (look for your expense report number).
• Review the expense report.
• (B) Approve
• (H) Home
17. (H) Logout
Audit the Expense Report
18. Log in as Donald Gray.
Field Value
User Name DGRAY
Password WELCOME
19. Responsibility = Internet Expenses Auditor, Vision Services
20. Find your expense report.
• Enter the expense report number in the Search by Expense Report Number field.
• (B) Go
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 175
21. Complete the audit.
• Enter today's date in the Receipt Package Received Date field.
• Select the Receipt Verified check box for the two receipts.
• Select Complete Audit from the list in the Expense Report Action field.
• (B) Apply
22. (H) Logout
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 176
Guided Demonstration - Run Expense Report Export
Run Expense Report Export
1. Log out
2. Log in Donald Gray.
Field Value
User Name DGRAY
Password WELCOME
3. Responsibility = Internet Expenses Auditor, Vision Services
4. (T) Expenses Export
5. Accept the default values on the Schedule Request: Name page.
6. (B) Next
7. Accept the default values on the Schedule Request: Parameters page.
8. (B) Next
9. Accept the default values on the Schedule Request: Schedule page.
10. (B) Next
11. Accept the default values on the Schedule Request: Notifications page.
12. (B) Next
13. Accept the default values on the Schedule Request: Printing page.
14. (B) Next
15. Review the request parameters.
16. (B) Submit
17. (B) OK
18. Select the Refresh button to update the status until the program is complete.
19. (ST) Export Results and review any rejections.
20. (H) Logout
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 177
Practice - Interface Expense Report Costs
Overview
In this practice, you will validate and create final subledger accounting for your expense report invoice in Oracle Payables. Next, you will interface the expense report costs for you project to Oracle Project Costing and review the expense report expenditure items.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Validate and Create Accounting for the Expense Report Invoice
As a result of the instructor running Expense Report Import in the previous guided demonstration, your expense report is now an expense report invoice in Oracle Payables. Log in as SERVICES with the password of WELCOME and select the Oracle Payables, Vision Services (USA) responsibility.
First, find the invoice on the Invoice Workbench in Oracle Payables. Next, validate the invoice. After the invoice is validated, create final subledger accounting for the invoice. Select the Final Post option when you create accounting. Verify that the invoice status is Validated and that Accounted is Yes.
Interface Expense Report Costs
Switch your responsibility to Projects, Vision Services (USA) and Run the program PRC: Interface Expense Reports from Payables. Ensure that you select your project as a program parameter. The program PRC: Interface Expense Reports from Payables automatically submits the program AUD: Supplier Costs Interface Audit. Review the output report for AUD: Supplier Costs Interface Audit.
Note your Request ID __________________________
View the Results in Expenditure Inquiry
After the program is complete, query the expense report expenditure items for your XX Capital Services project in Expenditure Inquiry. Review the expenditure items.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 178
Solution - Interface Expense Report Costs
Validate and Create Accounting for the Expense Report Invoice
1. Log in as SERVICES:
Field Value
User Name SERVICES
Password WELCOME
2. Responsibility = Payables, Vision Services (USA)
3. Navigate to the Find Invoices window.
• (N) Invoices > Entry > Invoices
• (I) Find
4. Find your expense report invoice.
• Enter the header find criteria:: − Invoice Number = Enter your expense report number
• (B) Find
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 179
5. Validate the invoice.
• (B) Actions... 1
• Enable the Validate option.
• (B) OK
6. Create accounting for the invoice.
• (B) Actions... 1
• Enable the Create Accounting option.
• Select the Final Post option.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 180
• (B) OK
• (B) OK for the message.
7. Verify that the invoice status is Validated and that Accounted is Yes.
8. Close the Invoices window and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 181
Interface Expense Report Costs
9. Switch your responsibility.
• (M) File > Switch Responsibility
• Select Projects, Vision Services (USA)
• (B) OK
10. Navigate to the Submit a New Request window.
• (M) View > Requests
• (B) Submit a New Request
11. Select to run a Single Request.
12. (B) OK
13. Select the program PRC: Interface Expense Reports from Payables from the list of values in the Name field and Vision Services for the operating unit.
14. Define the parameters for the program as specified in the following table:
Field Value
Project Number XXCS
Batch Name Leave Blank
End GL Date Leave Blank
End Expenditure Item Date Leave Blank
15. (B) OK
16. (B) Submit
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 182
• Note your Request ID __________________________
17. (B) No in the Decision dialog box
18. Find your request.
• Select the All My Requests option button.
• (B) Find
19. Wait for the program to finish. When the program is complete, select the program.
• Use (B) Refresh Data to monitor the progress of the request processing.
Note: Wait for the program with your Request ID to complete. The program PRCPRC: Interface Expense Reports from Payables automatically submits the program AUD: Supplier Costs Interface Audit. Look for the AUD: Supplier Costs Interface Audit program request with your Request ID in the parameters.
20. Review the output report for AUD: Supplier Costs Interface Audit.
• (B) View Output
21. Close the output page and the Requests window and return to the Navigator.
View the Results in Expenditure Inquiry
22. Navigate to the Find Project Expenditure Items window
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 183
• (N) Expenditures > Expenditure Inquiry > Project
23. Query the expenditure items from the expense report on your project.
• Enter the find criteria: − Project Number = XXCS − Project Name = XX Capital Services − Expenditure Type Class = Expense Reports
• (B) Find
24. Close the open windows and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 184
Integration with Oracle Time & Labor
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 185
Guided Demonstration - Set Timecard Approval Style
The approval process alerts the appropriate person when timecards are ready for review and approval. In Oracle Time & Labor, the approval style defines who approves timecards. The approval style also defines what data needs to be approved for each application, and which data changes require resubmission. For more information about defining approval styles, see the Oracle Time & Labor Implementation and User Guide.
In this guided demonstration, the instructor will set the Proj Override timecard approval style to Project Manager. As a result, when you submit a timecard for Amy Marlin in the next practice, Oracle Time & Labor will route it for approval to the project manager for each charged project.
Approve Timecards
1. Responsibility = OTL Application Developer, Vision Services (USA)
2. Navigate to the Preferences window.
• (N) Preferences
3. Update the approval style.
• (T) Preferences
• Select and expand the Preferences Tree tree node.
• Select and expand Proj Overrides tree node.
• Select Proj Override - Approval Style tree node.
• Click in the Preferences Values field.
• Change the values as specified in the following table:
Field Value
Approval Style Project Manager
Override Approval Style Project Manager Fo
r Ins
truct
or U
se O
nly.
Th
is d
ocum
ent s
houl
d no
t be
dist
ribut
ed.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 186
• (B) OK
• (I) Save
4. Close the open windows and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 187
Practice - Enter and Approve a Timecard
Overview
In this practice, you will enter a timecard and charge time to your XX Capital Services project and to the Feasibility Study project. You will then approve the resulting timecards as Donald Gray, the project manager of the XX Capital Services project, and as Bob Cochran, the project manager of the Feasibility Study project.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Prerequisite
IMPORTANT: Each student will submit a timecard as Amy Marlin. Because a person can have only one timecard for a period, the instructor must assign each student a period for which to create and submit a timecard for Amy Marlin. Starting with the period for next week, the instructor will assign each student a unique period to use for this practice.
Tasks
Enter a Timecard
Submit your timecard in Oracle Time & Labor to account for your work for the week. Use the responsibility OTL, Vision Services (USA).
Enter the general timecard information as specified in the following table:
Field Value
Period IMPORTANT: Select the unique period that the instructor assigns to you.
Overriding Approver Leave Blank
Comments Enter brief comments
Template Leave blank
Overwrite No
You worked 6 hours a day, Monday through Friday, performing professional duties on your XX Capital Services project. Charge this time to task 3.0. You also worked 2 hours a day performing clerical duties for the Feasibility Study project. Charge this time to task 1.1.1. After you enter the timecard lines, review and submit the timecard.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 188
In the previous demonstration, the instructor changed the timecard approval style to route timecards to project managers for approval. As a result, Oracle Time & Labor will route the approval notification for the XXCS project to Donald Gray for approval and the approval notification for the Feasibility Study project to Bob Cochran for approval.
Approve the Timecard for the XXCS Project as Donald Gray
Log in as the user DGRAY with the password of WELCOME. Navigate to Donald Gray's worklist. Select the hyperlink for the notification for the timecard that you submitted for Amy Marlin, review the notification, and approve the timecard. The 30 hours represents the amount charged to the XXCS project where Donald Gray is the project manager.
Important: Select the hyperlink that has the dates for the timecard period that your instructor assigned to you.
Approve the Timecard for the Feasibility Study Project as Bob Cochran
Log in as the user BCOCHRAN with the password of WELCOME. Navigate to Bob Cochran's worklist. Select the hyperlink for the notification for the timecard that you submitted for Amy Marlin, review the notification, and approve the timecard. The 10 hours represents the amount charged to the Feasibility Study project where Bob Cochran is the project manager.
Important: Select the hyperlink that has the dates for the timecard period that your instructor assigned to you.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 189
Solution - Enter and Approve a Timecard
Enter a Timecard
1. Responsibility = OTL, Vision Services (USA)
2. Navigate to the Recent Timecards page.
• (N) Time > Time Entry
3. (ST) Create Timecard
4. Enter the general timecard information as specified in the following table:
Field Value
Period IMPORTANT: Select the unique period that the instructor assigns to you.
Overriding Approver Leave Blank
Comments Enter brief comments
Template Leave blank
Overwrite No
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 190
Important: Be sure to select the period that your instructor has assigned to you. Amy Marlin can have only one timecard per period.
5. Enter the project information in the first timecard line as specified in the following table:
Field Value
Project XXCS
Task 3.0
Type Professional - (Straight Time)
6. Enter 6 hours of time for each day, Monday-Friday for the first line.
7. Enter the project information in the second timecard line as specified in the following table:
Field Value
Project Feasibility Study
Task 1.1.1
Type Clerical - (Straight Time)
8. Enter 2 hours of time for each day, Monday-Friday for the second line.
9. (B) Save
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 191
10. (B) Continue
11. (B) Submit
In the previous demonstration, the instructor changed the timecard approval style to route timecards for the appropriate project managers for approval. As a result, Oracle Time & Labor will route the time for the XXCS project to Donald Gray for approval and the time for the Feasibility Study project to Bob Cochran for approval.
Approve the Timecard for the XXCS Project as Donald Gray
12. (H) Logout
13. Log in as Donald Gray, as specified in the following table:
Field Value
User Name DGRAY
Password WELCOME
14. Responsibility = Workflow
15. Navigate to the Worklist.
• (N) Self Service Workflow > Notifications
16. Approve your timecard.
• Select the hyperlink for the notification for the timecard that you submitted for Amy Marlin.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 192
Important: Select the hyperlink that has the dates for the timecard period that your instructor assigned to you.
• Review the notification.
• (B) Approve
17. (H) Logout
Approve the Timecard for the Feasibility Study Project as Bob Cochran
18. Log in as Bob Cochran, as specified in the following table:
Field Value
User Name BCOCHRAN
Password WELCOME
19. Responsibility = Workflow
20. Navigate to the Worklist.
• (N) Self Service Workflow > Notifications
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 193
21. Approve your timecard.
• Select the hyperlink for the notification for the timecard that you submitted for Amy Marlin.
Important: Select the hyperlink that has the dates for the timecard period that your instructor assigned to you.
• Review the notification.
• (B) Approve
22. (H) Logout For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 194
Guided Demonstration - Import Timecard Costs
Import Timecard Costs
1. Log in as SERVICES as specified in the following table:
Field Value
User Name SERVICES
Password WELCOME
2. Responsibility = Projects, Vision Services (USA)
3. Navigate to the Submit Request window for Transaction Import.
• (N) Expenditures > Transaction Import > Import Transactions
4. Define the parameters for the program PRC: Transaction Import as specified in the following table:
Field Value
Transaction Source Oracle Time and Labor
Batch Name Leave Blank
5. (B) OK
6. (B) Submit
7. (B) No in the Decision dialog box
8. Find your request.
• (M) View > Requests
• Select the All My Requests option button.
• (B) Find
9. Wait for the programs to finish.
• Use (B) Refresh Data to monitor the progress of the request processing. When the Phase shows Completed, open the output report.
10. (B) View Output
11. Review the output report.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 195
12. Close the report page and open windows and return to the Navigator when finished.
Review the Imported Expenditure Items in Expenditure Inquiry
13. Navigate to the Find Expenditure Items window
• (N) Expenditures > Expenditure Inquiry > All
14. Query all expenditure items for the class.
• Enter the header find criteria: − Operating Unit = Vision Services − Item Dates (From) = Monday of the current week
• (T) Expenditure
• Enter supplier find criteria: − Transaction Source = Oracle Time and Labor
• (B) Find
• (B) Yes for the Decision message
15. Review the imported expenditure items.
16. Close the open windows and return to the Navigator when finished.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 196
Allocations and AutoAllocations
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 197
Practice - Define an Allocation Rule
Overview
In this practice, you will define an allocation rule to allocate a fixed amount of shared cost to tasks in your XX Capital Services project.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Define the General Allocation Rule Information
The finance department has asked you to define an allocation rule to allocate a fixed amount of shared costs each month to the tasks in your XX Capital Services project. The costs must be allocated in full once each GL period. The rule should prorate the costs based on the total burdened cost for each chargeable task.
Name your rule XXService Allocation. Enter the allocation rule information as specified in the following table:
Field Value
Operating Unit Vision Services
Name XXService Allocation
Description Enter a brief description
Effective Date From Today's Date
Effective Date To Leave Blank
Basis Method Prorate
Allocation Method Full
Allocation Period Type GL
Targets Selection Operating Unit
Expnd Org Services-East
Expnd Type Class Miscellaneous Transaction
Expnd Type Support Svcs Allocation
Auto Release No
Allow Duplicate Targets No
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 198
Define the Source
The finance department has calculated that they need to allocate a fixed shared cost amount of 100,000.00 USD each month. Use this information to define the source for the allocation rule.
Define the Targets
Allocate the costs to your XX Capital Services project. Your project manager has obtained an exception that exempts task 3.0 of your XX Capital Services project from the allocation. Define the targets for the allocation rule accordingly.
Define the Offset
The finance department wants you to create a transaction on task 8.0 of the Service Center project to offset the allocation transactions. Use the same expenditure organization, expenditure type class, and expenditure type for the offset transaction that you use for the allocation transactions.
Define the Basis Information
The amount that the rule allocates to each chargeable task is based on the actual total burdened cost for the fiscal year to date. Define the basis method and specify a relative period of 0 (current period) to determine the actual total burdened cost for each task.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 199
Solution - Define an Allocation Rule
Define the General Allocation Rule Information
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Allocation Rule window.
• (N) Allocations > Allocation Rules
3. Enter the allocation rule information as specified in the following table:
Field Value
Operating Unit Vision Services
Name XXService Allocation
Description Enter a brief description
Effective Date From Today's Date
Effective Date To Leave Blank
Basis Method Prorate
Allocation Method Full
Allocation Period Type GL
Targets Selection Operating Unit
Expnd Org Services-East
Expnd Type Class Miscellaneous Transaction
Expnd Type Support Svcs Allocation
Auto Release No
Allow Duplicate Targets No
4. (I) Save
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 200
Define the Source
5. (B) Sources
6. Enter the source information as specified in the following table:
Field Value
Allocation Pool % 100
Fixed Source Amount 100,000.00
7. (I) Save For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 201
8. Close the Sources window.
Define the Targets
9. (B) Targets
10. Enter the target information as specified in the following table:
Line Num
Project Task Exclude
10 XXCS Leave Blank No
20 XXCS 3.0 Yes
11. (I) Save
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 202
12. Close the Targets window.
Define the Offset
13. (B) Offset
14. Select the Specific Project and Task option button.
15. Specify the project and task as specified in the following table:
Field Value
Project Service Center
Task 8.0
16. Specify the Offset Transaction Attributes as specified in the following table:
Field Value
Expenditure Organization Services-East
Expenditure Type Class Miscellaneous Transaction
Expenditure Type Support Svcs Allocation
17. (I) Save
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 203
18. Close the Offset window.
Define the Basis Information
19. (B) Basis
20. Enter the Basis information as specified in the following table:
Field Value
Basis Category Actuals
Amount Type Total Burdened Cost
GL Amount Class FYTD
Relative Period 0
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 204
The basis uses the total burdened cost on each chargeable target task for the fiscal year to date to determine how much of the source to allocate to each task. The system creates an allocation transaction for each chargeable task based on its relative percentage of burdened cost within the project.
21. (I) Save
22. Close the open windows and return to the Navigator. For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 205
Practice - Process an Allocation Rule
Overview
In this practice, you will update project summary amounts for your project. You will then generate, review, and release allocation transactions for the allocation rule that you defined in the previous practice.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Prerequisite
If not done previously, the instructor must set the current reporting period for Vision Services operating unit to the period for the current week:
• Responsibility = Projects, Vision Services (USA)
• (N) Setup > System > PA Periods
• (B) Set Reporting Period
• Select the period for the current week.
• (B) OK
• (I) Save
Update Project Summary Amounts
Run the program PRC: Update Project Summary Amounts for a Single Project for your XX Capital Services project to summarize the costs. The allocation rule in this practice uses a prorate basis method. This basis method uses summary amounts during allocation generation processing to determine the basis percentage for each chargeable target task.
Generate the Allocation Transactions
You are ready to generate allocation transactions for the current GL period. Submit the program PRC: Generate Allocation Transactions for the Vision Services operating unit. Specify your rule name, the current GL period, and today's date as the expenditure item date in the program parameters.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 206
Note your Request ID __________________________
Review the output report. You may see exceptions on the report. For example, the exception code PA_AL_ZERO_TXN_BASIS_AMT means that no actual total burdened costs are associated with the target task. As a result, the program did not allocate costs to the task.
Review and Release the Allocation Run
Use the Review Allocation Runs window to review the status, basis details, source details, and transaction totals for the allocation run. Release the allocation run. When you release the allocation run, Oracle Project Costing submits the concurrent program PRC: Release Allocation Runs.
Note the request ID (appears at the bottom of the window):
Monitor the progress of the request and review the output report.
View the Expenditure Items
Use the Review Allocation Runs window to verify that the run is in Release Success status. Record the information in the Allocation Expnd Batch field: ________________
Use Expenditure Inquiry (All) to review the released expenditure items. Enter the expenditure batch number for your allocation run in the Find Expenditure Items window to limit your query.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 207
Solution - Process an Allocation Rule
Update Project Summary Amounts
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Submit a New Request window.
• (M) View > Requests
• (B) Submit a New Request
3. Select to run a Single Request.
4. (B) OK
5. Select the program PRC: Update Project Summary Amounts for a Single Project from the list of values in the Name field and Vision Services for the operating unit.
6. Define the parameters for the program as specified in the following table:
Field Value
Project Number XXCS
Through Date Leave Blank
Summarize Cost Yes
Expenditure Type Class Leave Blank
Summarize Revenue Yes
Summarize Budgets Yes
Budget Type Leave Blank
Summarize Commitments Yes
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 208
7. (B) OK
8. (B) Submit
• Note your Request ID __________________________
9. (B) No in the Decision dialog box
10. Find your request.
• Select the Specific Requests option button.
• Enter your request ID in the Request ID field.
• (B) Find
11. Wait for the program to finish. When the program is complete, select the program.
• Use (B) Refresh Data to monitor the progress of the request processing. When the Phase shows Completed, open the output report.
12. Review the output report.
• (B) View Output
13. Close the output report page.
Generate the Allocation Transactions
14. (B) Submit a New Request...
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 209
15. Select to run a Single Request.
16. (B) OK
17. Select the program PRC: Generate Allocation Transactions from the list of values in the Name field and Vision Services for the operating unit.
18. Define the parameters for the program as specified in the following table:
Field Value
Rule Name XXService Allocation
Period Name Select Period for the Current Month
Expenditure Item Date Today's Date
19. (B) OK
20. (B) Submit
• Note your Request ID __________________________
21. (B) No in the Decision dialog box
22. Find your request.
• (B) Find Requests
• Select the Specific Requests option button.
• Enter your request ID in the Request ID field.
• (B) Find
23. Wait for the program to finish. When the program is complete, select the program.
• Use (B) Refresh Data to monitor the progress of the request processing.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 210
24. (B) View Output
Review the output report. You may see exceptions on the report. For example, the exception code PA_AL_ZERO_TXN_BASIS_AMT means that no actual total burdened costs are associated with the target task. As a result, the program did not allocate costs to the task.
25. Close the output page and the Requests window and return to the Navigator.
Review and Release the Allocation Run
26. Navigate to the Find Allocation Runs window.
• (N) Allocations > Review Allocation Runs
27. Find your allocation rule.
• Enter the find criteria: − Operating Unit = Vision Services − Rule Name = XXService Allocation
• (B) Find
28. Verify that the Run Status is Draft Success.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 211
29. Review the basis details.
• (B) Basis Details
• Close the Basis Details window.
30. Review the source details.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 212
• (B) Source Details
• Close the Source Details window.
31. Review the transactions.
• (B) Transactions
• (B) Totals
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 213
The totals are all zeros because your rule uses an offset.
• Close the Transactions window.
32. Release the allocation run.
• (B) Release...
• (B) OK on the Caution dialog box
When you release the allocation run, Oracle Project Costing submits the concurrent program PRC: Release Allocation Runs.
Note the request ID (appears at the bottom of the window):
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 214
33. Close the open windows and return to the Navigator.
34. Monitor the program.
• (M) View > Requests
• Select the Specific Requests option button.
• Enter your request ID in the Request ID field.
• (B) Find
35. Wait for the program to finish. When the program is complete, select the program.
• Use (B) Refresh Data to monitor the progress of the request processing.
36. (B) View Output
37. Close the output page and the Requests window and return to the Navigator.
View the Expenditure Items
38. Navigate to the Find Allocation Runs window.
• (N) Allocations > Review Allocation Runs
39. Find your allocation rule
• Enter the find criteria: − Rule Name = XXService Allocation
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 215
• (B) Find
40. Record the information in the Allocation Expnd Batch field: ________________
41. Close the open windows and return to the navigator.
42. Navigate to the Find Expenditure Items window.
• (N) Expenditures > Expenditure Inquiry > All
43. Query all expenditure items for your allocation batch.
• Enter the header find criteria: − Operating Unit = Vision Services
• (T) Expenditure
• Enter supplier find criteria: − Expenditure Batch = The information you recorded from the Allocation Expnd
Batch field
• (B) Find
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 216
44. Review the expenditure items.
45. Close the open windows and return to the Navigator.
Note: Individual student’s results may not match the results displayed in the book, because each students will a use unique time period.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 217
Guided Demonstration - Review an AutoAllocation Set
Review the AutoAllocation Set Information
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the AutoAllocation Workbench window.
• (N) Allocations > AutoAllocations > Workbench
3. Query the RENT ALLOCATION SET AutoAllocation set.
Review the Steps
4. Review the AutoAllocation steps as specified in the following table: Step Type Batch/Rule Contact Allocation Method
1 Recurring Journal
Rent Recurring Journal SERVICES N/A
2 Project Allocation
Rent Allocation to Ind & Cap Proj SERVICES Incremental
5. Review the Recurring Journal batch.
• Position your cursor on the first step
• (B) Recurring Journals
Oracle Project Costing opens the Define Recurring Journal Formula window.
• (B) Lines
This batch creates a recurring journal for account 01-840-7420-000.
• Close the Journal Entry Line and Define Recurring Journal Formula windows.
6. Review the Project Allocation rule.
• Position your cursor on the second step.
• (B) Project Allocation
Oracle Project Costing opens the Allocation Rule window.
• (B) Sources
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 218
Note that the source for this allocation rule is account 01-840-7420-000 in Oracle General Ledger. The GL Allocation Batch in step one posts an amount to this account. The Project Allocation Rule then allocates the amount in this account to the target projects.
7. Close the open windows and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 219
Asset Capitalization
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 220
Practice - Define and Assign Assets
Overview
In this practice, you will assign an asset cost allocation method to your XX Capital Services project and set the grouping level for task 3.0 to Common Costs. You will also define two assets on your project and assign the assets to top-level tasks. Finally, you will run cost distribution programs for your project to begin preparing costs for capitalization.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Set the Cost Allocation Method for Your Project
After consulting with your project manager, you have decided that when the generate asset lines program cannot automatically associate an asset line with a single asset, the program should spread the asset costs evenly across the assets. Set the cost allocation method on your XX Capital Services project to Spread Evenly.
Set the Grouping Level for Task 3.0
In addition, you want to collect common costs on your project and allocate these costs to assets at a later point in time. Set the grouping level for task 3.0 to Common Costs.
Define and Assign Assets
The asset manager sent you information regarding two assets that you are building on your XX Capital Services project.
Define the first asset on your project as specified in the following table:
Field Value
Capitalization Details Tab
Asset Name XXLab Building
Project Asset Type Estimated
Asset Details Tab
Book SVCS CORP
Asset Category BUILDING-OFFICE
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 221
Asset Number XX1
Actual Units 1
Location, Employee Tab
Location USA-CA-SAN FRANCISCO-NONE
Depreciation Tab
Depreciate Yes
Depreciation Expense Account 01-510-7320-000
Amortize Adjustments Yes
Description Tab
Description (enter freeform) XXLAB BUILDING
Assign the XXLab Building asset to top task 1.0.
Define the second asset as specified in the following table:
Field Value
Capitalization Details Tab
Asset Name XXLab Computer
Project Asset Type Estimated
Asset Details Tab
Book SVCS CORP
Asset Category COMPUTER-SERVER
Asset Number XX2
Actual Units 1
Location, Employee Tab
Location USA-CA-SAN FRANCISCO-NONE
Depreciation Tab
Depreciate Yes
Depreciation Expense Account 01-510-7360-000
Amortize Adjustments Yes
Description Tab
Description (enter freeform) XXLAB COMPUTER
Assign the XXLab Computer asset to top task 2.0.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 222
Distribute Costs for Your Project
In preparation for capitalizing asset costs, you must run cost distribution programs for your project. First, submit the program PRC: Submit Project Streamline Processes and run the streamline option LU: Labor/Usage Cost for your project.
After the program completes, submit the program PRC: Distribute Total Burdened Cost for your XX Capital Services project. Ensure that you select your project as a program parameter. Review the output report.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 223
Solution - Define and Assign Assets
Set the Cost Allocation Method for Your Project
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Find Projects window.
• (N) Projects
3. Find your capital services project.
• Enter the find criteria: − Number = XXCS − Name = XX Capital Services
• (B) Find
4. Select the XX Capital Services project on the Projects, Templates Summary window.
5. (B) Open
6. In the Options region, select Capital Information.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 224
7. (B) Detail
8. Select Spread Evenly from the list in the Asset Cost Allocation Method field.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 225
9. (I) Save
10. Close the Capital Information window and return to the Projects, Templates window.
Set the Grouping Level for Task 3.0
11. In the Options region, select Tasks.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 226
12. Select task 3.0.
13. (B) Options
14. Double-click the Asset Assignment option.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 227
15. Select the option button for Common Costs.
16. (I) Save
17. Close the open windows and return to the Navigator.
Define and Assign Assets
18. Navigate to the Find Capital Projects window.
• (N) Capitalization > Capital Projects
19. Find your project.
• Enter the find criteria: − Operating Unit = Vision Services − Number = XXCS − Name = XX Capital Services
• (B) Find
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 228
20. (B) Assets
21. Select the Capital Project Assets option button at the top of the window.
22. Define the first asset as specified in the following table:
Field Value
Capitalization Details Tab
Asset Name XXLab Building
Project Asset Type Estimated
Asset Details Tab
Book SVCS CORP
Asset Category BUILDING-OFFICE
Asset Number XX1
Actual Units 1
Location, Employee Tab
Location USA-CA-SAN FRANCISCO-NONE
Depreciation Tab
Depreciate Yes
Depreciation Expense Account 01-510-7320-000
Amortize Adjustments Yes
Description Tab
Description (enter freeform) XXLAB BUILDING
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 229
23. (I) Save
24. (B) Assign Asset
Field Value
To Project No
To Task Yes
25. (T) Top Task
Top Task
1.0
26. (I) Save Fo
r Ins
truct
or U
se O
nly.
Th
is d
ocum
ent s
houl
d no
t be
dist
ribut
ed.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 230
27. Close the Assign Assets window.
28. (I) New
29. Define the second asset as specified in the following table:
Field Value
Capitalization Details Tab
Asset Name XXLab Computer
Project Asset Type Estimated
Asset Details Tab
Book SVCS CORP
Asset Category COMPUTER-SERVER
Asset Number XX2
Actual Units 1
Location, Employee Tab
Location USA-CA-SAN FRANCISCO-NONE
Depreciation Tab
Depreciate Yes
Depreciation Expense Account 01-510-7360-000
Amortize Adjustments Yes
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 231
Description Tab
Description (enter freeform) XXLAB COMPUTER
30. (I) Save
31. (B) Assign Asset
Field Value
To Project No
To Task Yes
32. (T) Top Task
Top Task
2.0
33. (I) Save
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 232
34. Close the open windows and return to the Navigator.
Distribute Costs for Your Project
35. Navigate to the Submit a New Request window.
• (M) View > Requests
• (B) Submit a New Request
36. Select to run a Single Request.
37. (B) OK
38. Select the program PRC: Submit Project Streamline Processes from the list of values in the Name field and Vision Services for the operating unit.
39. Define the parameters for the program as specified in the following table:
Field Value
Streamline Option LU: Labor/Usage Cost
Project Number XXCS
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 233
40. (B) OK
41. (B) Submit
• Note your Request ID __________________________
42. (B) No in the Decision dialog box
43. Find your request.
• Select the All My Requests option button.
• (B) Find
44. Wait for the streamline program to finish.
• Use (B) Refresh Data to monitor the progress of the request processing. When the Phase shows Completed, open the output report.
The following programs run during the streamline processing: − PRC: Submit Project Streamline Processes − PRC: Distribute Labor Costs − PRC: Distribute Usage and Miscellaneous Costs
45. (B) Submit a New Request
46. Select to run a Single Request.
47. (B) OK
48. Select the program PRC: Distribute Total Burdened Cost from the list of values in the Name field and Vision Services for the operating unit.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 234
49. Define the parameters for the program as specified in the following table:
Field Value
Project Number XXCS
50. (B) OK
51. (B) Submit
• Note your Request ID __________________________
52. (B) No in the Decision dialog box
53. Find your request.
• Select the Specific Requests option button.
• Enter your request ID in the Request ID field.
• (B) Find
54. Wait for the program to finish. When the program is complete, select the program.
• Use (B) Refresh Data to monitor the progress of the request processing. When the Phase shows Completed, open the output report.
55. Review the output report.
• (B) View Output
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 235
56. When finished, close the output page and the Requests window and return to the Navigator.
The instructor will generate cost accounting events and create final subledger accounting for the entire class in the next demonstration.
Note: Individual student’s results may not match the results displayed in the book, because each students will a use unique time period to enter a timecard.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 236
Guided Demonstration - Create Final Subledger Accounting for Costs
In preparation to generate asset lines, the instructor will finish processing costs for the entire class.
Generate Cost Accounting Events
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Submit a New Request window.
• (M) View > Requests
• (B) Submit a New Request
3. Select to run a Single Request.
4. (B) OK
5. Select the program PRC: Generate Cost Accounting Events from the list of values in the Name field and Vision Services for the operating unit.
6. Leave all the parameters blank. The program will generate cost accounting events for all process categories.
7. (B) OK
8. (B) Submit
9. (B) No in the Decision dialog box
10. Find your request.
• Select the All My Requests option button.
• (B) Find
11. Wait for the programs to finish.
• Use (B) Refresh Data to monitor the progress of the request processing. When the Phase shows Completed, open the output report.
• (B) View Output
12. Close the output report page.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 237
Create Accounting
13. (B) Submit a New Request
14. Select to run a Single Request.
15. (B) OK
16. Select the program PRC: Create Accounting from the list of values in the Name field and Vision Services for the operating unit.
17. Define the parameters for the program as specified in the following table:
Field Value
Process Category Leave Blank (program will process accounting events for all process categories)
End Date Friday of the current week
Mode Final
Errors Only No
Report Summary
Transfer to General Ledger Yes
Post in General Ledger Yes
General Ledger Batch Name Leave Blank
Include User Transaction Identifiers No
18. (B) OK
19. (B) Submit
20. (B) No in the Decision dialog box
21. Find your request.
• Select the All My Requests option button.
• (B) Find
22. Wait for the programs to finish.
The following programs run during streamline processing: − PRC: Create Accounting − Accounting Program − Journal Import − Posting: Single Ledger
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 238
− Subledger Accounting Balances Update
• Use (B) Refresh Data to monitor the progress of the request processing. When the Phase shows Completed, open the output report.
• (B) View Output
23. Close the output report page and the open windows and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 239
Practice - Capitalize Assets
Overview
In this practice, you will update summary amounts for your project, place your two assets in service, generate asset lines, and interface the assets to Oracle Assets. Finally, you will view the assets in Oracle Assets.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Update Project Summary Amounts
Run the program PRC: Update Project Summary Amounts for a Single Project for your XX Capital Services project to summarize the costs.
Place Assets in Service
Your project manager has certified that the XXLab Building and XXLab Computer assets are finished and ready for capitalization. Change the asset type for both assets to As-Built and record an actual in service date of 31-DEC-2006.
Note: You are entering 31-DEC-2006 in order to demonstrate the interface to Oracle Assets. If you enter today's date, you will not be able to interface the asset to Oracle Assets because the asset period is not open.
Generate Asset Lines
The costs on your project are final accounted in Oracle Subledger Accounting and the two assets have in service dates, so you are now ready to generate asset lines for your XX Capital Services project. To generate asset lines, use today's date as the Asset Date Through and this Sunday's date as the PA Through Date. You are also ready to include the costs from common cost task 3.0 when you generate asset lines.
Note your request ID:
Review the output report for the program PRC: Generate Asset Lines for a Single Project.
Review and Assign Asset Lines
Review the asset lines for your XX Capital Services project and answer the following questions:
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 240
1. Why are all asset lines for task 1.0 assigned to XXLab Building?
2. Why are all asset lines for task 2.0 assigned to XXLab Computer?
3. Why are all asset lines for task 3.0 split between the two assets?
4. Why are the asset lines grouped by expenditure types such as Clerical, Hotel, XXMotor Pool and Trucks?
After completing the asset line analysis, you decide to move some costs on task 3.0 from XXLab Computer to XXLab Building. Split an asset line assigned to XXLab Computer for task 3.0 and assign 85% of the cost to XX Lab Building and the remainder to XXLab Computer.
Interface the Assets to Oracle Assets
When you are satisfied with the asset lines, you are ready to interface the assets to Oracle Assets. Submit the program PRC: Interface Assets to Oracle Assets. Ensure that you enter your XXCS project number in both the From Project Number and To Project Number program parameter fields.
Note your request ID:
Review the output report.
View the Assets in Oracle Assets
You can now view your assets in Mass Additions in Oracle Assets. Use the responsibility Assets, Vision Services (USA). Navigate to the Find Mass Additions window to query the assets for you project. For the find criteria, also include SVCS CORP as the Book. Select one of the MERGED lines, review the details, and view the project details. Fo
r Ins
truct
or U
se O
nly.
Th
is d
ocum
ent s
houl
d no
t be
dist
ribut
ed.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 241
Solution - Capitalize Assets
Update Project Summary Amounts
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Submit a New Request window.
• (M) View > Requests
• (B) Submit a New Request
3. Select to run a Single Request.
4. (B) OK
5. Select the program PRC: Update Project Summary Amounts for a Single Project from the list of values in the Name field and Vision Services for the operating unit.
6. Define the parameters for the program as specified in the following table:
Field Value
Project Number XXCS
Through Date Leave Blank
Summarize Cost Yes
Expenditure Type Class Leave Blank
Summarize Revenue Yes
Summarize Budgets Yes
Budget Type Leave Blank
Summarize Commitments Yes For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 242
7. (B) OK
8. (B) Submit
• Note your Request ID __________________________
9. (B) No in the Decision dialog box
10. Find your request.
• Select the Specific Requests option button.
• Enter your request ID in the Request ID field.
• (B) Find
11. Wait for the program to finish. When the program is complete, select the program.
• Use (B) Refresh Data to monitor the progress of the request processing. When the Phase shows Completed, open the output report.
12. Review the output report.
• (B) View Output Fo
r Ins
truct
or U
se O
nly.
Th
is d
ocum
ent s
houl
d no
t be
dist
ribut
ed.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 243
13. Close the output report page and the open windows and return to the Navigator.
Place Assets in Service
14. Navigate to the Find Capital Projects window.
• (N) Capitalization > Capital Projects
15. Find your project.
• Enter the find criteria: − Operating Unit = Vision Services − Number = XXCS − Name = XX Capital Services
• (B) Find
16. (B) Assets
17. (T) Capitalization Details
18. Place each asset in service.
• Select the asset
• Change the Project Asset Type to As-Built
• Enter an Actual In-Service Date of 31-DEC-2006
Note: You are entering 31-DEC-2006 in order to demonstrate the interface to Oracle Assets. If you enter today's date, you will not be able to interface the asset to Oracle Assets because the asset period is not open.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 244
The Actual In-Service Date may not match the date in the book. You need to determine the Open Period for SRVC CORP in the Assets module.
• Repeat for the second asset.
19. (I) Save and close the Assets window.
Generate Asset Lines
20. (B) Generate...
Field Value
Asset Date Through Today's Date
PA Date Through This Sunday's Date
Include Common Tasks Yes
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 245
21. (B) OK
This initiates the Program PRC: Generate Asset Lines for a Single Project. Note your request ID:
You can see the ID at the bottom of the Oracle Applications window.
22. Close the Capital Projects window.
23. (M) View > Requests
24. Find your request.
• Select the Specific Requests option button.
• Enter your request ID in the Request ID field.
• (B) Find
25. Wait for the process to finish. When the process is complete, select the process.
26. (B) View Output Fo
r Ins
truct
or U
se O
nly.
Th
is d
ocum
ent s
houl
d no
t be
dist
ribut
ed.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 246
27. Close the output page and the Requests window and return to the Navigator.
Review and Assign Asset Lines
28. Navigate to the Find Capital Projects window
• (N) Capitalization > Capital Projects
29. 17. Find your project.
• Enter the find criteria: − Operating Unit = Vision Services − Number = XXCS − Name = XX Capital Services
• (B) Find
30. (B) Lines
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 247
1. Why are all asset lines for task 1.0 assigned to XXLab Building?
Answer: You assigned only XXLab Building to top task 1.0. As a result, the asset lines generation program assigned all costs to this asset.
2. Why are all asset lines for task 2.0 assigned to XXLab Computer?
Answer: You assigned only XXLab Computer to top task 2.0. As a result, the asset lines generation program assigned all costs to this asset.
3. Why are all asset lines for task 3.0 split between the two assets?
Answer: You set the grouping level for task 3.0 to Common Costs and assigned Spread Evenly as the cost allocation method for your project. As a result, the asset lines generation program divided the capitalizable costs for task 3.0 evenly between the two eligible assets.
4. Why are the asset lines grouped by expenditure types such as Clerical, Hotel, XXMotor Pool and Trucks?
Answer: The project type for your project is Construction. The grouping method assigned to the project type is Expenditure Type. As a result, the asset lines generation program grouped all costs by the expenditure type associated with the expenditure type for each capitalizable expenditure item.
31. Select one of the asset lines for task 3.0 and split it between the two assets.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 248
• Select an asset line.
• (B) Split Line...
• Enter the split information as specified in the following table:
Asset %
XXLab Building 85.00
XXLab Computer 15.00
32. (B) OK
33. (B) OK on the Caution dialog box
34. Close the open windows and return to the Navigator.
Interface the Assets to Oracle Assets
35. Navigate to the Submit a New Request window
• (M) View > Requests
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 249
• (B) Submit a New Request
36. (B) Submit a New Request
37. Select to run a Single Request.
38. (B) OK
39. Select the program PRC: Interface Assets to Oracle Assets from the list of values in the Name field and Vision Services for the operating unit.
40. Define the parameters for the program as specified in the following table:
Field Value
From Project Number XXCS
To Project Number XXCS
Date Placed in Service Through Leave Blank
Note: You must type your project number correctly. These fields are case and punctuation sensitive.
41. (B) OK
42. (B) Submit
• Note your Request ID __________________________
43. (B) No in the Decision dialog box
44. Find your request.
• Select the Specific Requests option button.
• Enter your request ID in the Request ID field.
• (B) Find
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 250
45. Wait for the program to finish. When the program is complete, select the program.
• Use (B) Refresh Data to monitor the progress of the request processing. When the Phase shows Completed, open the output report.
46. Review the output report.
• (B) View Output
47. Close the output page and the Requests window and return to the Navigator.
View the Assets in Oracle Assets
48. Switch your responsibility.
• (M) File > Switch Responsibility
• Select Assets, Vision Services (USA)
• (B) OK
49. Navigate to the Find Mass Additions window
• (N) Mass Additions > Prepare Mass Additions
50. Find your assets.
• Enter the find criteria: − Book = SVCS CORP − Project Number = XXCS
• (B) Find
51. Review the assets
You will see that your two assets are in the POST queue. Each individual asset line is also visible. They are MERGED.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 251
• Select one of the MERGED lines.
• (B) Open
• (B) Project Details...
You can drill back to Oracle Projects from Oracle Assets to see the asset line detail information.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 252
52. Close the open windows and return to the Navigator.
Note: Individual student’s results may not match the results displayed in the book, because each students will a use unique time period.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 253
Guided Demonstration - Define Standard Unit Costs for Asset Cost Allocations
Define Standard Unit Costs for Asset Cost Allocations
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Project Asset Standard Unit Costs window.
• (N) Setup > Capitalization > Assets > Standard Unit Costs
3. Enter the standard unit cost for an asset book and asset category combination as specified in the following table:
Field Value
Asset Book SVCS CORP
Asset Category COMPUTER-PC
Book Currency USD
Cost Per Unit 2,500.00
4. (I) Save
5. Close the Project Asset Standard Unit Costs window and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 254
Practice - Define a Proceeds of Sale Expenditure Type
Overview
In this practice, you will define a proceeds of sale expenditure type.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Define a Proceeds of Sale Expenditure Type
Your company records proceeds of sale amounts for retirement cost processing in Oracle Project Costing. Define a unique expenditure type to classify and account for the amounts as specified in the following table:
Field Value
Code XXPROCEEDS OF SALE
Meaning XX-Proceeds of Sale
Description XX-Proceeds of Sale expenditure type
Effective Date From Today’s Date
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 255
Solution - Define a Proceeds of Sale Expenditure Type
Define a Proceeds of Sale Expenditure Type
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Retirement Cost Classification Lookups window.
• (N) Setup > Capitalization > Assets > Retirement Cost Classification
3. Position your cursor in the first Code field.
4. (I) New
5. Define the proceeds of sale expenditure type as specified in the following table:
Field Value
Code XXPROCEEDS OF SALE
Meaning XXProceeds of Sale
Description XXProceeds of Sale expenditure type
Effective Date From Today’s Date
6. (I) Save
7. Close the Retirement Cost Classification Lookups window and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 256
Cross Charge
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 257
Practice - Set Cross Charge Attributes for a Project
Overview
In this practice, you will set cross charge attributes for your XX Capital Services project.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Set Cross Charge Attributes at the Project Level
Resources owned by another operating unit, Vision Services R&D, will perform work on your XX Capital Services project. Enable your project to receive cross charges from other operating units. Set up the project to use the Global TP Schedule to determine the transfer prices for both labor and non-labor cross charges.
Set Cross Charge Attributes at the Task Level
Allow resources from other operating units to charge only task 1.1. Set up task 1.1 to use the Global TP Schedule to determine the transfer prices for both labor and non-labor cross charges.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 258
Solution - Set Cross Charge Attributes for a Project
Set Cross Charge Attributes at the Project Level
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Find Projects window.
• (N) Projects
3. Find your capital services project.
• Enter the find criteria: − Number = XXCS − Name = XX Capital Services
• (B) Find
4. Select the XX Capital Services project on the Projects, Templates Summary window.
5. (B) Open
6. In the Options region, select Cross Charge.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 259
7. (B) Detail
8. Set the Cross Charge attributes for the project as specified in the following table:
Field Value
Allow Charges from other Operating Units Yes (enable check box)
Process Cross Charge For Labor Yes (enable check box)
Transfer Price Schedule: Labor Global TP Schedule
Fixed Date: Labor Leave Blank
Process Cross Charge For Non-Labor Yes (enable check box)
Transfer Price Schedule: Non-Labor Global TP Schedule
Fixed Date: Non-Labor Leave Blank
Intercompany Tax Receiving Task Leave Blank
9. (I) Save
10. Close the Project Multinational Setup window and return to the Projects, Templates window.
Set Cross Charge Attributes at the Task Level
11. In the Options region, select Tasks
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 260
12. (B) Detail
13. Double-click task 1.0 to show the subtasks.
14. Select Task 1.1.
15. (B) Options
16. Double-click the Cross Charge option in the Task Options window.
17. Set the Cross Charge attributes for the task 1.1 as specified in the following table:
Field Value
Allow Charges from other Operating Units Yes (enable check box)
Process Cross Charge For Labor Yes (enable check box)
Transfer Price Schedule: Labor Global TP Schedule
Fixed Date: Labor Leave Blank
Process Cross Charge For Non-Labor Yes (enable check box)
Transfer Price Schedule: Non-Labor Global TP Schedule
Fixed Date: Non-Labor Leave Blank
18. (I) Save
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 261
19. Close the open windows and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 262
Practice - Create and Process Cross Charges
Overview
In this practice, you will enter and process a cross-charged expenditure.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Enter Cross Charges in an Expenditure Batch
You are now in the role of Austin Sanders, a resource from Vision Services R&D. Log in as ASANDERS with the password of WELCOME and select the Projects, Vision Services R&D (USA) responsibility.
Enter a usage expenditure batch for the current week. Enter the header information as specified in the following table:
Field Value
Operating Unit Vision Services R&D
Batch Name XXCROSSCHARGE
Ending Date This Sunday's Date
Class Usages
Description Usages
All Negative Transactions Entered As Unmatched Leave Blank
Reverse Expenditures in a Future Period Option Not Available
Enter expenditure items for Austin Sanders as specified in the following tables:
Expnd Item Date
Project Number Task Number
Expnd Type
Non-Labor Resource
Non-Labor Org
Yesterday's Date XXCS 1.1 Computers Personal Information Services
Work Type UOM Quantity Comment
Internal - capital Hours 15 Computer use
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 263
Submit and release the batch.
Distribute Usage Costs
Submit the concurrent program PRC: Distribute Usage and Miscellaneous Costs for your XXCROSSCHARGE expenditure batch. Review the output report.
Note your Request ID __________________________
Distribute Total Burdened Costs
Submit the concurrent program PRC: Distribute Total Burdened Costs for your XXCROSSCHARGE expenditure batch. Review the output report.
Note your Request ID __________________________
Distribute Borrowed and Lent Amounts
Submit the concurrent program PRC: Distribute Borrowed and Lent Amounts. Define the parameters for the program as specified in the following table:
Field Value
Expenditure Group XXCROSSCHARGE
Through Date This Sunday's Date
Receiver Operating Unit Vision Services
From Project Number XXCS
To Project Number XXCS
Generate Report Yes
The program PRC: Distribute Borrowed and Lent Amounts automatically submits the program PRC: Borrowed and Lent Amounts Distribution Report. Review the output report for PRC: Borrowed and Lent Amounts Distribution Report.
Note your Request ID __________________________
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 264
Solution - Create and Process Cross Charges
Enter Cross Charges in an Expenditure Batch
1. Log out
2. Log in as Austin Sanders.
Field Value
User Name ASANDERS
Password WELCOME
3. Responsibility = Projects, Vision Services R&D (USA)
4. Navigate to the Expenditure Batches window.
• (N) Expenditures > Pre Approved Batches > Enter
5. Enter the batch information as specified in the following table:
Field Value
Operating Unit Vision Services R&D
Batch Name XXCROSSCHARGE
Ending Date This Sunday's Date
Class Usages
Description Usages
All Negative Transactions Entered As Unmatched Leave Blank
Reverse Expenditures in a Future Period Option Not Available For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 265
6. (I) Save
7. (B) Expenditures
8. Enter the expenditure as specified in the following table:
Employee Name Employee Number
Organization Expnd Ending Date
Control Total
Sanders, Austin 230 Engineering R+D
This Sunday's Date Leave Blank
9. (I) Save
10. Enter an expenditure item for Austin Sanders as specified in the following tables:
Expnd Item Date
Project Number Task Number
Expnd Type
Non-Labor Resource
Non-Labor Org
Yesterday's Date XXCS 1.1 Computers Personal Information Services
Work Type UOM Quantity Comment
Internal - capital Hours 15 Computer use
11. (I) Save
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 266
12. Close the Expenditures window and return to the Expenditure Batches window.
13. (B) Submit
14. (B) Release
15. Close the Expenditure Batches window and return to the Navigator.
Distribute Usage Costs
16. Navigate to the Submit a New Request window.
• (M) View > Requests
• (B) Submit a New Request
17. Select to run a Single Request.
18. (B) OK
19. Select the program PRC: Distribute Usage and Miscellaneous Costs from the list of values in the Name field and Vision Services R&D for the operating unit.
20. Define the parameters for the program as specified in the following table:
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 267
Field Value
Expenditure Batch XXCROSSCHARGE
21. (B) OK
22. (B) Submit
• Note your Request ID __________________________
23. (B) No in the Decision dialog box
24. Find your request.
• Select the Specific Requests option button.
• Enter your request ID in the Request ID field.
• (B) Find
25. Wait for the program to finish. When the program is complete, select the program.
• Use (B) Refresh Data to monitor the progress of the request processing. When the Phase shows Completed, open the output report.
26. Review the output report.
• (B) View Output
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 268
27. Close the output page when finished.
Distribute Total Burdened Costs
28. (B) Submit a New Request
29. Select to run a Single Request.
30. (B) OK
31. Select the program PRC: Distribute Total Burdened Cost from the list of values in the Name field and Vision Services R&D for the operating unit.
32. Define the parameters for the program as specified in the following table:
Field Value
Expenditure Batch XXCROSSCHARGE
33. (B) OK
34. (B) Submit
• Note your Request ID __________________________
35. (B) No in the Decision dialog box
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 269
36. Find your request.
• Select the Specific Requests option button.
• Enter your request ID in the Request ID field.
• (B) Find
37. Wait for the program to finish. When the program is complete, select the program.
• Use (B) Refresh Data to monitor the progress of the request processing. When the Phase shows Completed, open the output report.
38. Review the output report.
• (B) View Output
39. Close the output page when finished.
Distribute Borrowed and Lent Amounts
40. (B) Submit a New Request
41. Select to run a Single Request.
42. (B) OK
43. Select the program PRC: Distribute Borrowed and Lent Amounts from the list of values in the Name field and Vision Services R&D for the operating unit.
44. Define the parameters for the program as specified in the following table:
Field Value
Expenditure Group XXCROSSCHARGE
Through Date This Sunday's Date
Receiver Operating Unit Vision Services
From Project Number XXCS
To Project Number XXCS
Generate Report Yes
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 270
45. (B) OK
46. (B) Submit
• Note your Request ID __________________________
47. (B) No in the Decision dialog box
48. 48. Find your request.
• Select the All My Requests option button.
• (B) Find
49. Wait for the program to finish. When the program is complete, select the program.
• Use (B) Refresh Data to monitor the progress of the request processing.
Note: Wait for the program with your Request ID to complete. The program PRC: Distribute Borrowed and Lent Amounts automatically submits the program PRC: Borrowed and Lent Amounts Distribution Report. Look for the PRC: Borrowed and Lent Amounts Distribution Report program request with your Request ID in the parameters.
50. Review the output report for PRC: Borrowed and Lent Amounts Distribution Report.
• (B) View Output
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 271
51. Close the output page and open windows and return to the Navigator.
The instructor will complete the processing for your costs and cross charges in the next demonstration.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 272
Guided Demonstration - Complete Cross Charge Processing
The instructor will complete the processing for the costs and cross charges for the entire class.
Generate Cost Accounting Events
1. Log in as Austin Sanders.
Field Value
User Name ASANDERS
Password WELCOME
2. Responsibility = Projects, Vision Services R&D (USA)
3. Navigate to the Submit a New Request window.
• (M) View > Requests
• (B) Submit a New Request
4. Select to run a Single Request.
5. (B) OK
6. Select the program PRC: Generate Cost Accounting Events from the list of values in the Name field and Vision Services R&D for the operating unit.
7. Leave all the parameters blank. The program will generate cost accounting events for all process categories.
8. (B) OK
9. (B) Submit
10. (B) No in the Decision dialog box
11. Find your request.
• Select the All My Requests option button.
• (B) Find
12. Wait for the program to finish.
• Use (B) Refresh Data to monitor the progress of the request processing. When the Phase shows Completed, open the output report.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 273
• (B) View Output
13. Close the output report page.
Generate Cross Charge Accounting Events
14. (B) Submit a New Request
15. Select to run a Single Request.
16. (B) OK
17. Select the program PRC: Generate Cross Charge Accounting Events from the list of values in the Name field and Vision Services R&D for the operating unit.
18. Define the parameters for the program as specified in the following table:
Field Value
Process Category Borrowed and Lent
End GL Date Sunday of the current week
Generate Report Yes
19. (B) OK
20. (B) Submit
21. (B) No in the Decision dialog box
22. Find your request.
• Select the All My Requests option button.
• (B) Find
23. Wait for the program to finish.
• Use (B) Refresh Data to monitor the progress of the request processing. When the Phase shows Completed, open the output report.
• (B) View Output
24. Close the output report page.
Create Accounting
25. (B) Submit a New Request
26. Select to run a Single Request.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 274
27. (B) OK
28. Select the program PRC: Create Accounting from the list of values in the Name field and Vision Services R&D for the operating unit.
29. Define the parameters for the program as specified in the following table:
Field Value
Process Category Leave Blank (program will process accounting events for all process categories)
End Date Sunday of the current week
Mode Final
Errors Only No
Report Summary
Transfer to General Ledger Yes
Post in General Ledger Yes
General Ledger Batch Name Leave Blank
Include User Transaction Identifiers No
30. (B) OK
31. (B) Submit
32. (B) No in the Decision dialog box
33. Find your request.
• Select the All My Requests option button.
• (B) Find
34. Wait for the programs to finish.
The following programs run during create accounting processing: − PRC: Create Accounting − Accounting Program − Journal Import − Posting: Single Ledger − Subledger Accounting Balances Update
• Use (B) Refresh Data to monitor the progress of the request processing.
35. Close open windows and return to the Navigator when finished.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 275
Practice - Review Cross Charges
Overview
In this practice, you will review your cross-charged expenditure item in expenditure inquiry.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Review Cross-Charged Expenditure Item in Expenditure Inquiry
As Austin Sanders, use the responsibility Projects, Vision Services R&D (USA) and query the cross-charged expenditure item in Expenditure Inquiry (All). Use folder tools to show the following fields on the Expenditure Items window:
− Cross Charge Proc Method − Cross Charge Type − Transfer Proc Project Functional Amount
View the accounting for the expenditure item.
Perform an analysis to answer the following question:
How did Oracle Projects calculate the borrowed and lent amount?
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 276
Solution - Review Cross Charges
Review Cross-Charged Expenditure Item in Expenditure Inquiry
1. Responsibility = Projects, Vision Services R&D (USA)
Note: You are still logged in as ASANDERS.
2. Navigate to the Find Expenditure Items window
• (N) Expenditures > Expenditure Inquiry > All
3. Query the expenditure items from the XXCROSSCHARGE expenditure batch.
• Enter the header find criteria:: − Operating Unit = Vision Services R&D
• (T) Expenditure
• Enter expenditure find criteria: − Expenditure Batch = XXCROSSCHARGE
• (B) Find
4. Show additional fields:
• (M) Folder > Show Field...
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 277
• Select Transfer Price Project Functional Amount
• (B) OK
• Repeat the steps to show the following additional fields: − Cross Charge Proc Method − Cross Charge Type
Question: How did Oracle Projects calculate the borrowed and lent amount?
Answer: The program PRC: Distribute Borrowed and Lent Amounts used the Global TP Schedule transfer price schedule that you assigned to task 1.1 for non-labor costs. This transfer price schedule uses the Expenses - Cost+50% transfer price rule. This rule marks up the burdened cost 150% to determine the transfer price amount for non-labor costs.
5. View accounting for the expenditure item.
• Select the expenditure item.
• (M) Tools > View Accounting Fo
r Ins
truct
or U
se O
nly.
Th
is d
ocum
ent s
houl
d no
t be
dist
ribut
ed.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 278
6. Close the open windows and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 279
Practice - Define Transfer Price Rules
Overview
In this practice, you will define a labor and a non-labor transfer price rule.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Define Transfer Price Rules
Log in as SERVICES with the password of WELCOME and select the Projects, Vision Services (USA) responsibility.
You are implementing borrowed and lent cross charge at your company. Define two transfer price rules to use in your transfer price schedule that meet the following requirements:
• For labor cost - transfer price equals 100% of the raw cost. Name the rule XXLabor at Raw Cost.
• For non-labor cost - transfer price equals 100% of the burdened cost. Name the rule XXNon-Labor at Burdened Cost.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 280
Solution - Define Transfer Price Rules
Define Transfer Price Rules
1. Log out
2. Log in as SERVICES.
Field Value
User Name SERVICES
Password WELCOME
3. Responsibility = Projects, Vision Services (USA)
4. Navigate to the Transfer Price Rules window.
• (N) Setup > Costing > Cross Charge > Transfer Price Rules
5. Enter a transfer labor transfer price rule as specified in the following table:
Field Value
Name XXLabor at Raw Cost
Type Labor
Effective Dates From Today's Date
Effective Dates To Leave Blank
Description Enter a brief description
Basis Raw Cost
Use Basis
Apply 100% For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 281
6. (I) Save
7. (I) New
8. Enter a non-labor transfer price rule as specified in the following table:
Field Value
Name XXNon-Labor at Burdened Cost
Type Non-Labor
Effective Dates From Today's Date
Effective Dates To Leave Blank
Description Enter a brief description
Basis Burdened Cost
Use Basis
Apply 100%
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 282
9. (I) Save
10. Close the Transfer Price Rules window and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 283
Practice - Define a Transfer Price Schedule
Overview
In this practice, you will define a transfer price schedule.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Define a Transfer Price Schedule
You can use the transfer price rules that you defined in the previous practices to define a transfer price schedule. Name the new transfer price schedule XXServices East/West Schedule.
The organizations Services-East and Services-West have agreed to share resources for certain projects. They will transfer costs based on the XXLabor at Raw Cost and XXNon-Labor at Burdened Cost transfer price rules that you defined.
Define two lines on the transfer price schedule and assign your transfer price rules. Use an apply percentage of 100 percent (no discount or markup). For the first line, assign the rules for when Services-East provides the resources and Services-West receives the benefit of the resources. For the second line, reverse the relationship between the organizations.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 284
Solution - Define a Transfer Price Schedule
Define a Transfer Price Schedule
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Transfer Price Schedules window.
• (N) Setup > Costing > Cross Charge > Transfer Price Schedules
3. Enter the transfer price schedule header information as specified in the following table:
Field Value
Name XXServices East/West Schedule
Effective Dates From Today's Date
Effective Dates To Leave Blank
Description Enter a brief description
4. Enter the schedule lines as specified in the following tables:
Line Num Provider Receiver Labor Rule Apply %
10 Services-East Services-West XXLabor at Raw Cost 100
20 Services-West Services-East XXLabor at Raw Cost 100
Non-Labor Rule Apply % Transfer Price Amount Type
Effective Date From
Effective Date To
Default
XX-Non-Labor at Burdened Cost
100 Cost Transfer Today's Date Leave Blank
No
XX-Non-Labor at Burdened Cost
100 Cost Transfer Today's Date Leave Blank
No For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 285
5. (I) Save
6. Close the Transfer Price Schedules window and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 286
Appendix A: Integration with Oracle Inventory, Project Manufacturing, and Asset Tracking
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 287
Practice - Enter a Miscellaneous Transaction
Overview
In this practice, you will enter a Miscellaneous Transaction in Oracle Inventory using a project-enabled transaction type.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Enter a Miscellaneous Transaction
Use the responsibility Inventory, Vision Services (USA) to enter a miscellaneous transaction for your XX Capital Services project. When you access the Miscellaneous Transactions window for the first time, select Vision Services as the organization.
Create a non-serial-triggered Receipt From miscellaneous transaction and enter the transaction line information as specified in the following table:
Field Value
Item f75000
Subinventory Common
UOM Ea
Quantity 1
Account 01-000-1410-000
Source Project XXCS
Source Task 3.0
Expenditure Type Material
Expenditure Org Services-East
Save the miscellaneous transaction when you are finished entering the line. The instructor will process your miscellaneous transaction in the next guided demonstration.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 288
Solution - Enter a Miscellaneous Transaction
Enter a Miscellaneous Transaction
1. Responsibility = Inventory, Vision Services (USA)
2. Navigate to the Find Expenditure Items window.
• (N) Transactions > Miscellaneous Transaction
3. Select Vision Services as the organization.
4. (B) OK
5. Enter the miscellaneous transaction information as specified in the following table:
Field Value
Date Accept Default Value
Type Receipt From
Source Leave Blank
Account Leave Blank
Serial-Triggered No Fo
r Ins
truct
or U
se O
nly.
Th
is d
ocum
ent s
houl
d no
t be
dist
ribut
ed.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 289
6. (B) Transaction Lines
7. Enter the Receipt From information as specified in the following table:
Field Value
Item f75000
Subinventory Common
UOM Ea
Quantity 1
Account 01-000-1410-000
Source Project XXCS
Source Task 3.0
Expenditure Type Material
Expenditure Org Services-East
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 290
8. (I) Save
9. Close the Receipt From window and return to the Navigator.
The instructor will process your miscellaneous transaction in the next guided demonstration.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 291
Guided Demonstration - Process Miscellaneous Transactions
In this demonstration, the instructor will process the miscellaneous transactions for the entire class.
Cost Inventory Transactions
1. Log in as SERVICES.
Field Value
User Name SERVICES
Password WELCOME
2. Responsibility = Inventory, Vision Services (USA)
3. Navigate to the Interface Managers window
• (N) Setup > Transactions > Interface Managers
• If necessary, select Vision Services in the Organizations window.
4. Position your cursor in the Cost Manager row.
5. (M) Tools > Launch Manager
If you receive a message that the manager is already active, then click the OK button.
6. (B) Submit
7. (B) OK
8. Close the open windows and return to the Navigator.
Transfer Costs to Oracle Project Costing
9. Navigate to the Project Cost Transfers window.
• (N) Accounting Close Cycle > Project Cost Transfers
10. Enter 0 in the Number of Days to Leave Costs Uncollected field in the Parameters window.
11. (B) OK
12. (B) Submit
13. (B) No
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 292
14. Monitor the program.
• (M) View > Requests
• Select the All My Requests option button.
• (B) Find
• Wait for the Cost Collection Manager program to complete.
• Close the Requests window and return to the Navigator when finished.
Import Inventory Transactions
15. Switch your responsibility
• (M) File > Switch Responsibility
• Select Projects, Vision Services (USA)
• (B) OK
Instructor Note: Workflow takes about an hour to process/move the data to the project interface table.
16. Navigate to the Submit Request window for Transaction Import.
• (N) Expenditures > Transaction Import > Import Transactions
17. Define the parameters for the program PRC: Transaction Import as specified in the following table:
Field Value
Transaction Source Inventory Misc
Batch Name Select the batch name that is available on the list of value.
If no batch name is available, then return to Oracle Inventory and perform the step to transfer the cost to Oracle Project Costing again. The Cost Manager must complete processing before you can run the program to transfer costs to Oracle Project Costing.
18. (B) OK
19. (B) Submit
20. (B) No in the Decision dialog box
21. Find your request.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 293
• (M) View > Requests
• Select the All My Requests option button.
• (B) Find
22. Wait for the programs to finish.
• Use (B) Refresh Data to monitor the progress of the request processing. When the Phase shows Completed, open the output report.
23. (B) View Output
24. Review the output report.
You will see an expenditure group listed under the transaction source Inventory Misc on the second page of the report.
25. Close the report page and open windows and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 294
Practice - View Inventory Expenditure Items
Overview
In this practice, you will use Expenditure Inquiry (project) in Oracle Project Costing to view the expenditure item imported from Oracle Inventory.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
View Inventory Expenditure Items
Use Expenditure Inquiry (project) to view the expenditure item for the Receipt From miscellaneous transaction on your XX Capital Services project. Specify the transaction source Inventory Misc in your query criteria. Review the cost distribution lines for the expenditure item.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 295
Solution - View Inventory Expenditure Items
View Inventory Expenditure Items
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Find Expenditure Items window
• (N) Expenditures > Expenditure Inquiry > Project
3. Query all expenditure items for the class.
• Enter the header find criteria: − Project Number = XXCS − Project Name = XX Capital Services
• (T) Expenditure
• Enter supplier find criteria: − Transaction Source = Inventory Misc
• (B) Find
4. Review the cost distribution lines for the expenditure item.
• (B) Item Details
• Select Cost Distribution Lines
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 296
• (B) OK
5. Close the open windows and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 297
Guided Demonstration - Create a Project-Enabled Transaction Type
Create a Project-Enabled Transaction Type
1. Responsibility = Inventory, Vision Services (USA)
2. Navigate to the Transaction Types window.
• (N) Setup > Transactions > Types
• (T) User
3. (I) New
4. Enter the Transaction Type information as specified in the following table:
Field Value
Name XXProject Issue
Description Issue to Project
Source Type Inventory
Action Issue from stores
Project Yes (enable check box)
Shortage Message Online No
Shortage Message Notification No
Status Control No
Location Required No
Inactive On Leave Blank
5. (I) Save
6. Close the Transaction Types window and return to the Navigator. Fo
r Ins
truct
or U
se O
nly.
Th
is d
ocum
ent s
houl
d no
t be
dist
ribut
ed.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 298
Appendix B: Budgetary Controls and Budget Integration
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 299
Guided Demonstration - Define a Budget Change Reason
Define a Budget Change Reason
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Budget Change Reason Lookups window
• (N) Setup > Budgets > Change Reasons
3. Position your cursor in the first Code field
4. (I) New
Field Value
Code XXREDUCTION
Meaning XX-Budget Reduction
Description Reduction of Funding
Tag Leave Blank
Effective Date From Today’s Date
Effective Date To Leave Blank
5. (I) Save
6. Close the Budget Change Reason Lookups window
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 300
Guided Demonstration - Define a Budget Type
Define a Budget Type
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Budget Types window
• (N) Setup > Budgets > Budget Types
3. Enter a new budget type
Field Value
Budget Type XX-Capital Cost Budget
Description XX-Capital Cost Budget - Requires Approval
Effective Date From Today's Date
Effective Date To Leave Blank
Amount Type Cost Budget
Upgrade No
Use Workflow for Budget Status Changes
Yes
The Use Workflow for Budget Status Changes check box is at the bottom of the window.
4. (I) Save
5. Close the Budget Types window
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 301
Guided Demonstration - Define a Budget Entry Method
Define a Budget Entry Method
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Budget Entry Methods window
• (N) Setup > Budgets > Entry Methods
3. Enter a new budget entry method
Field Value
Budget Entry Method XX-Project at Completion
Description XX-Project at Completion with no resources
Effective Date From Today's Date
Effective Date To Leave Blank
Entry Level Project
Categorized By Resources No
Time Phased By None
Cost Enterable Fields
Quantity Yes
Raw Cost Yes
Burdened Cost Yes
Revenue Enterable Fields
Quantity Yes
Revenue Yes
4. (I) Save
5. Close the Budget Entry Methods window Fo
r Ins
truct
or U
se O
nly.
Th
is d
ocum
ent s
houl
d no
t be
dist
ribut
ed.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 302
Appendix C: Asset Capitalization: Capitalizing Interest
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 303
Practice - Define a Capitalized Interest Rate Name
Overview
In this practice, you will define a capitalized interest rate name for local debt costs.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Define the Basic Rate Name Information
Your company plans to calculate capitalized interest for costs incurred when you invest in long-term capital projects. Define a capitalized interest rate name to represent the interest type that the finance department plans to capitalize as specified in the following table:
Field Value
Rate Name XXDebt Costs-Local
Description Cost of Borrowings
Expenditure Type Interest
Define the Additional Information
Define additional information for the capitalized interest rate name. For the operating unit Vision Services, you want the expenditure organization source to be the project owning organization. Each project must have an Open CIP amount of 10,000.00 and be at least 30 days from the start date to meet the threshold for calculation of capitalized interest. Select Full as the current period convention to specify the portion of the current period CIP amount to include in the interest calculation. Choose to spread the amounts evenly across accounting periods. Finally, assign the Simple interest method to this capitalized interest rate name.
Define the Expenditure Type Exclusions
For Vision Services, exclude the following expenditure types from interest rate calculation for the capitalized interest rate name:
− F&A Costs − Fringe − Overhead
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 304
Solution - Define a Capitalized Interest Rate Name
Define the Basic Rate Name Information
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Capitalized Interest window.
• (N) Setup > Capitalization > Interest > Rate Names
3. Position your cursor in the first Rate Name field.
4. (I) New
5. Define a capitalized interest rate name as specified in the following table:
Field Value
Rate Name XXDebt Costs-Local
Description Cost of Borrowings
Expenditure Type Interest
Effective Date From Today's Date
6. (I) Save
Define the Additional Information
7. (B) Additional Information
8. Define the capitalized interest rate information as specified in the following table:
Field Value
Operating Unit Vision Services
Exp Organization Source Project Owning Org
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 305
Amount Type Open CIP
Budget Type Leave Blank
Plan Type Leave Blank
Project - Amount 10,000.00
Project - Days 30
Task - Amount Leave Blank
Task - Days Leave Blank
Current Period Convention Full
Period Rate Convention Spread Evenly
Interest Method Simple
9. (I) Save
10. Close the window with the additional information and return to the first window
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 306
Define the Expenditure Type Exclusions
11. (B) Expenditure Type Exclusion
12. Define capitalized interest rate exclusions for the operating unit Vision Services as specified in the following table:
Expenditure Type Expenditure Category (View Only)
F&A Costs Indirect Costs
Fringe Overhead
Overhead Overhead
13. (I) Save
14. Close the open windows and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 307
Practice - Define a Capitalized Interest Rate Schedule
Overview
In this practice, you will define a capitalized interest rate schedule for capital debt costs.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Tasks
Define Capitalized Interest Rate Schedule Header Information
Define a capitalized interest rate schedule to specify the multipliers for the XXDebt Costs-Local capitalized interest rate name that you defined in the previous practice. Define the information for the provisional capitalized interest rate schedule and name it XXDebt Cost Schedule. Use the organization hierarchy information as specified in the following table:
Field Value
Hierarchy Global
Version 1
Start Org Vision Corporation
Define the Version Information
Create the initial version of the schedule. Name the first version and identify the first day of current month as the start date. You do not have an end date for this version at this time.
Define the Multipliers and Compile
First, enter the multiplier for Vision Corporation, the start organization that you specified for the hierarchy. Interest rates for operating your Services-East organization are higher than for other organizations, so the finance department has provided you with a separate multiplier for Services-East. Enter the multipliers as specified in the following table:
Organization Rate Name Multiplier
Vision Corporation XXDebt Costs-Local .25
Services-East XXDebt Costs-Local .37
When you are finished, save and compile the schedule.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 308
Solution - Define a Capitalized Interest Rate Schedule
Define Capitalized Interest Rate Schedule Header Information
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Capitalized Interest Rate Schedule window.
• (N) Setup > Capitalization > Interest > Rate Schedules
3. Enter the rate schedule header information as specified in the following table:
Field Value
Name XXDebt Cost Schedule
Description Enter a brief description
Effective Date From Today's Date
Effective Date To Leave Blank
Hierarchy Global
Version 1
Start Org Vision Corporation
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 309
4. (I) Save
Define the Version Information
5. Enter the name and dates for the version as specified in the following table:
Field Value
Name Version 1
Start Date First day of the current month
End Date Leave Blank
6. (I) Save
Define the Multipliers and Compile
7. Enter the multiplier information as specified in the following table:
Organization Rate Name Multiplier
Vision Corporation XXDebt Costs-Local .25
Services-East XXDebt Costs-Local .37
8. (I) Save
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 310
9. (B) Compile
Selecting the Compile button submits a concurrent program - PRC: Compile Capitalized Interest Rate Schedule.
10. Close the Capitalized Interest Rate Schedule window and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 311
Guided Demonstration - Specify a Capitalized Interest Rate Schedule for a Capital Project Type
Specify a Capitalized Interest Rate Schedule for a Capital Project Type
For the guided demonstration, you will specify the capitalized interest rate schedule for an existing capital project type.
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Project Types window.
• (N) Setup > Projects > Project Types
3. Query the Construction project type.
• Enter query mode: (M) View > Query By Example > Enter
• Enter Construction in the Name field.
• Run the query: (M) View > Query By Example > Run
4. (T) Capitalization Information
5. Enter the capitalized interest information as specified in the following table:
Field Value
Default Schedule Select one of the student's XXDebt Cost Schedule from the previous practice.
Allow Override Yes (enable check box)
6. (I) Save
7. Close the Project Types window and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 312
Practice - Assign a Capitalized Rate Schedule to a Project
Overview
In this practice, you will define a capitalized interest rate name for local debt costs.
Assumptions
• Replace XX with the number that your instructor has assigned.
• You must have access to an Oracle Application Vision database or comparable training or test instance at your site on which to complete this practice.
Prerequisite
The instructor must perform the previous guided demonstration before you do this practice. The Allow Override check box for capitalized interest must be enabled for the Construction project type. Otherwise, you will be unable to update the capitalized interest rate schedule for your XX Capital Services project.
Tasks
Assign a Capitalized Rate Schedule to the XX Capital Services Project
Your project manager has asked you to set up your XX Capital Services project for capitalized interest calculation for a six month period. Assign the XXDebt Cost Schedule to the project, allow capitalized interest calculation, and specify a capitalized interest stop date.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 313
Solution - Assign a Capitalized Rate Schedule to a Project
Assign a Capitalized Rate Schedule to the XX Capital Services Project
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Find Projects window.
• (N) Projects
3. Find your capital services project.
• Enter the find criteria: − Number = XXCS − Name = XX Capital Services
• (B) Find
4. Select the XX Capital Services project on the Projects, Templates Summary window.
5. (B) Open
6. In the Options region, select Capital Information.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 314
7. Define the capital interest information as specified in the following table:
Field Value
Capitalized Interest Schedule XXDebt Cost Schedule
Allow Capital Interest Yes (enable check box)
Capital Interest Stop Date Enter a date six months from today For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 315
8. (I) Save
9. Close the open windows and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 316
Guided Demonstration - Set the Project Status Control for Capitalized Interest
Set the Project Status Control for Capitalized Interest
For the guided demonstration, you will set the project status control for capitalized interest for an existing project status.
1. Responsibility = Projects, Vision Services (USA)
2. Navigate to the Statuses window.
• (N) Setup > System > Statuses
3. Query the Submitted project status.
• Enter query mode: (M) View > Query By Example > Enter
• Enter Project in the Status Type field.
• Run the query: (M) View > Query By Example > Run
• Scroll down to find the Submitted project status.
4. In the Status Controls region, scroll down until you find the Capitalized Interest action.
5. Enable the Allow check box for the Capitalized Interest action.
6. (I) Save
7. Close the Statuses window and return to the Navigator.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 317
Summary of R12.x Project Costing Fundamentals
This lesson does not have any practices or solutions.
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.
Copyright © Oracle, 2010. All rights reserved.
R12.x Oracle Project Costing Fundamentals Supplemental Student Practices Chapter 1 - Page 318
For I
nstru
ctor
Use
Onl
y.
This
doc
umen
t sho
uld
not b
e di
strib
uted
.