This document is an Open Content – You may copy, distribute and display the work only if credit to the authors is given (attribution) WP4 Urban Programming Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area- Provincia di Foggia ERDF PP6 Version 01 Prepared by: Provincia di Foggia www.territorio.provincia.foggia.it Reviewed by: STATUS Content Management URBASOFIA www.urbasofia.eu Urban Planning Institute of the Republic of Slovenia www.uirs.si
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
This document is an Open Content – You may copy, distribute and display the work only if credit to the authors is given (attribution)
WP4 Urban Programming
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the
Pescasseroli-Candela Tratturo area- Provincia di Foggia
00 Barbara Music (UIRS) 1. Draft Template of the report 16/09/2014
01 Giovanna Caratù and
Adele Celino
1. Draft Draft of the report 17/10/2014
Review:
Version Reviewer Comment Date
01
Sabina Dimitriu (As. CM)
Pietro Elisei (CM)
Review of Report Template 2014
xx/xx/2014
01 Barbara Mušič (UIRS) Review of the v01 of the report 17/11/2014
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
4
Table of Contents
Table of Contents................................................................................................................................... 4
Table of Figures ..................................................................................................................................... 5
Abbreviation List ................................................................................................................................... 5
1 The importance/purpose of the Strategic Territorial Agenda (STA) ....................................... 6
2 Scope and vision of the STA 2030 ................................................................................................ 6
3 The process leading to design of the STA in Provincia of Foggia area ..................................... 7
4 Goals and projects of the STA .................................................................................................... 15
5 Implementation of the STA ........................................................................................................ 19
6 Project Fiches: Priority projects corresponding to each goal/objective of the STA .............. 23
7 The Poster Plan ............................................................................................................................ 34
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
22
5 Adjustment of Municipal
Master Plans to POI
6 Organize meetings to
participate to
"framework structure"
contents
7 Fit out the Territorial
Center at the “Museo del
Territorio”
8 Check and completing of
the recognition of
“signs” that make
recognizable the path
9 Executive projects of any
“signs” identified as
priorities
10 Installation of signage
and informational panels
11 Monitore phase for the
reconstitution of the
physical continuity of the
area of tratturo
12 Organize the first
National day of tratturo”
event
13 Applications for virtual
visits and assistance
14 Award of contract for the
Land Art "60 Steps in
nature" activity
15 “Lab and Art" sub-
activities of Land Art
event
16 “Target land art” sub-
activities of Land Art
event
17 Draft a experimental
cultivation plan and its
economic evaluation
18 Experimentation in the
field for experimental
cultivation
19 Monitor the status of
places for an integrated
network of soft mobility
20 Final design for soft
mobility
21 Study of connections
with other paths
22 Training of guides
23 Schedule for promotion
and dissemination
24 Finding lists of economic
operators and their
activities
25 Experimentation with
use of the App
26 Creating multifunctional
networks
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
23
27 Schedule for education
programs
5.2 Risk assessment
Table 4: Risk assessment
Identification of the risk Qualitative risk
assessment
Responding on the
risk
Monitoring and control
Priority
nr.
Identification of the risk Reason Potential
effects
Probability
of occurance
(high /
medium /
low)
Impact
(high /
medium /
low)
Strategy
(Avoidance /
Reduction /
Sharing /
Acceptance)
Measure Person responsible Timeline
(monthly,
weekly,…)
1 Lack of founds Avoidance
2 Lack of co-
ordination
Reduction
3 Political change Acceptance
4
5
5.3 Recommendations for the implementation of the STA
During the strategy implementation process, Regions, Province, Municipalities and stakeholders will collaborate in order to ensure the alignment of actions. The phases that are to be gone through during the implementation period of the strategy are summarized below:
Creating partnerships
Monitoring the strategy implementation
6 Project Fiches: Priority projects corresponding
to each goal/objective of the STA
Priority project nr. 1: Drafting of a document, for the RDP and ERDF negotiation table
Description
The project includes the participation to the negotiating table of Rural Development Program
(RDP 2014-2020) and Puglia Regional Operational Programme (ERDF 2014-2020), through the
drafting of a document to be submitted to the competent bodies during the negotiating table.
The project aims to orient or guide strategic policy choices of the next regional program 2014-
2020 in order to promote initiatives in support of all tratturi in the Provincia of Foggia. Among
other possible initiatives, the regional program could promote appropriate actions to guide the
agricultural practices or to improve the slow mobility in the area.
The actions of the STA are particularly consistent with the following priorities for the next RDP
2014-2020:
PRIORITY 2:
Strengthening the competitiveness of agriculture in all its forms and profitability of farms
PRIORITY 4:
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
24
Restoring, preserving and enhancing ecosystems dependent on agriculture and forestry
Preserve and restore biodiversity including Natura 2000 sites, the high nature value
farming and the natural landscape of the European
Location
All the Apulian area of the tratturo Pescasseroli-Candela
Status
The document was already drawn up, signed by the local institutions (Municipalities and
representative of union or association of farmers) and sent to the Apulia Region (Annex 6).
The document identifies opportunities for strategic enhancement of the Apulian tratturo and asks
that can be transposed into programming the new PSR Region Puglia, the following useful
indications for restoration, maintenance and enhancement of areas of the tratturi:
for measures 213 and 214, the extension of the areas eligible for funding to areas of tratturi,
both in the areas of "pertinence" in the "annexed" areas ;
for measures 211, 212, 214, greater premium for the areas used for grazing; such a premium
could be approximated to that of the homologous measures implemented by the DSP of the
Campania and Molise Regions;
under the measure 216, introduction of an action providing for the creation of buffer strips,
tree lines, hedges and dry stone walls along the bands of the tratturi, in consideration of their
recognized function of terrestrial ecological corridors;
under measure 221, the introduction of a specific action aimed at the restoration of "mezzane",
planting specific tree species;
under measure 311, between the various criteria for diversification measures in non-
agricultural activities, the introduction of rewarding for the "subsistence farm near the
tratturo";
adopt a slight signage for the purpose of tourist use of the cattle track, through the nature trails
(measure 313)
enhancing the tratturo with intangible assets (communication, measuring 421 etc.)
The document has been signed by:
The Extraordinary Commissioner of the Provincia di Foggia
The Mayor of Comune di Anzano
The Mayor of Comune di Monteleone di Puglia
The Mayor of Comune di Rocchetta S.Antonio
The Mayor of Comune di S.Agata di Puglia
The Mayor of Comune di Candela
Local Action Group Meridaunia
Confagricoltura Foggia (union of farmers)
Copagri Foggia (union of farmers)
Coldiretti Foggia (union of farmers)
Confederazione Italiana Agricoltori (union of farmers)
ConfCoperative Foggia (union of farmers)
Timeline
-
Investments costs estimation
The project have no cost
Funding opportunities
RDP and ERDF 2007-2020
Opportunities for partnership (if applicable)
Region, GAL, Famers Associations
Priority project nr. 2: Sharing the content of the POI10 "Renovation and development of
Pescasseroli-Candela”
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
25
Description
Because the existing instruments for programming don’t consider the tratturo as a territorial
resource around which to build recovery and enhancement actions, the project considers strategic
to share and co-ordinate territorial planning tools in order to take action more coherent and aligned
with the common goal.
The action involves the review and the sharing of the planning strategies of the Integrated
Operational Plan) proposed by the Province of Foggia as executive plan of the regional landscape
plan. In such a way local institution can co-ordinate their territorial planning tools in order to take
action more coherent and aligned with the common goal.
Location
All the Apulian area of the tratturo Pescasseroli-Candela
Status
The September 29, 2014, the institutional stakeholders (the concerned Municipalities) attended the
“conferenza dei servizi” (a sort of public agencies meeting) and signed the POI (Integrated
Operational Plan, (provided in the Apulian new landscape plan) devoted to safeguard and
valorization the tratturo Pescasseroli-Candela. (Annex 7)
Timeline
-
Investments costs estimation
The project have no cost
Funding opportunities
RDP 2007-2020
Opportunities for partnership (if applicable)
Region, Municipalities
Priority project nr. 3: Participation to the drafting of the "framework structure" of the “Park
of Tratturi”
Description
Because the existing instruments for programming don’t consider the tratturo as a territorial
resource around which to build recovery and enhancement actions, the project considers strategic
to share and co-ordinate territorial planning tools in order to take action more coherent and aligned
with the common goal.
The project expect the participation of local institutions to the drafting of the "framework
structure" of the “Park of Tratturi”; such a plan, together with the "document of valorization”, that
will introduce the elements to enhance the system of tratturo, is the general framework for
programming by the Apulia Region.
Location
All the Apulian area of the tratturo Pescasseroli-Candela
Status
In preparatory phase
Timeline
-
Investments costs estimation
The project have no cost
Funding opportunities
RDP 2007-2020
Opportunities for partnership (if applicable)
Region, Municipalities
Priority project nr. 4: Recovery of the signs that make recognizable the path
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
26
Description
The tratturo has to be clearly identified in order to enhance the community ability to recognize it.
The project expects to recovery those signs that made recognizable the pathway:
o the “cippi” – ancient stones boundary- are signals of the tratturo;
o works destined to make viable infrastructure, such as bridges
o artifacts of service to the shepherds and to their flocks, as the fountains
o properties for service and refreshments, such as taverns
o properties and artifacts of popular devotion linked to the pastoral life, such as churches,
sanctuaries, shrines and crosses road.
Making the tratturo recognizable and continuous could increase its fruition.
Location
All the area of the Regio tratturo Pescasseroli-Candela
Status
In preparatory phase.
In particular the “Archeologica S.r.l.”(a spin-off of the University of Foggia) is committed to
make the tratturo more visible, recognizable and usable as well as to make tratturo equipped for
the new features / services, through the study of signs that made it recognizable path.
Timeline
-
Investments costs estimation
-
Funding opportunities
Regional funds
Opportunities for partnership (if applicable)
Public Private Partnerships
Priority project nr. 5: Installation of signage and informational panels
Description
The tratturo has to be clearly identified in order to enhance the community ability to recognize it.
The signage and the informational panels will be installed along the way of tratturo (referring to
the signs of the cadastre of the Apulia Network Trekking and to the conventional signage of the
CAI (Italian Alpine Club).
Making the tratturo recognizable and continuous could increase its fruition.
Location
All the area of the Regio tratturo Pescasseroli-Candela
Status
In preparatory phase.
Timeline
-
Investments costs estimation
-
Funding opportunities
Regional funds
Opportunities for partnership (if applicable)
Public Private Partnerships, Municipalities
Priority project nr. 6: Reconstitution of the physical continuity of the area of tratturo
3. Using technology (basically building an app and a website): to support the process of participation and
involvement of local communities, to identify the pathways, to organize events, and, still, to support the
monitoring actions.
4. Organizing the "day of tratturi", involving the associations of the walkers, the riders, cyclists but also
schools and students. The CAI proposes an interregional event (with CAI and the regions of Puglia,
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
69
Campania and Abruzzo) of trekking; this event should be organized and promoted also by the
Municipalities. On the same day the event will be proposed for cyclists and riders.
5. Organizing the land art event.
GOVERNANCE
h. Critical issues
• there is a lack of coordination and planning • there is a lack of a comprehensive and coherent strategy to make the individual actions of local actors
efficient • the proposed development of a tratturo, as a great opportunity for territorial development, inevitably
requires the cooperation of local actors • we often talk of a segment of the tratturo, that one of the Puglia region, and not of the entire royal
tratturo Proposals
• The vision of the Pescasseroli-Candela tratturo must be introduced in a system vision: o at the regional level the tratturo must be connected:
to the regional network of the tratturi (for the park of tratturi, the Apulia region is currently drafting the "framework structure", which will be the general framework for programming, and the "document of valorization" that will introduce the elements to enhance the system of tratturi); the Regional Park of Tratturi is a regional park that would need the same
incentives of the other regional parks. On the other hand, it has a cultural, environmental, and
ecological relevance and it could have important implications in both the touristic and
transportation sectors
to the infrastructures system for soft mobility tratturi can host most of the mobility system slow) (rif. PPTR)
to the regional ecological network (the tratturi are “rivers of grass” that unite the two main poles: the Gargano and the mountains Dauni
o at interregional level, the track of tratturo must be connected: at interregional level, the track of tratturo must be connected; to the other paths (eg.: path of the Francigena route, funding from the Region for the signs;
homologation paths CAI) o at transactional and European level:
by relating the path of the Tratturo Pescasseroli-Candela with the other trails of transhumance in Europe; by sharing projects and experiences with other EU countries;
by protecting the tratturo as world heritage site (Unesco)
The Council of Europe has added the Via Francigena and the tratturi between the priority
paths . (The Municipality of Formello opened an info point)
You should refer to national and international users; in this vision, the path must be proposed in its
completeness.
• A consortium and a “control booth”, for the functions of coordination, are needed both to participate in the negotiating tables and to be accredited by the Ministry; with the Consortium and its design skills you might have direct access to European funding. It will be proposed as a tool that is able to access to different types and forms of financing for the enhancement of the tratturo. The Consortium would
allow a public dialogue. The consortium may give directions for the immediate promotion of the
products. The Consortium should be interregional and directed by trade associations (eg. Confescercenti, Confconsumatori, agricultural structures) and by local governments. Preparing a draft with the main features of the Consortium could be the first step towards the
certification by the Department of Tourism (Ministry of BBCC). Such a draft has to be organized in
order to access to 2014-2020 funding. The signing of an agreement by the various parties would be
important to carry out this initiative and establish a plan of action on tratturo
• Thematic groups could be set up; for these groups, the practice of reconstructing the landscape should be one of the strategic objectives to be pursued together.
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
70
To move forward …
What are the possible interventions?
What are the subjects that can achieve them?
With what resources or tools?
i. Critical issues • The current funding and programming do not consider the tratturo as common goods to be improved
and do not allocate financial resources for activities in that area. Greater efforts are needed to change such an idea.
• There is difficulty in identifying the tools that allow you to work in a more coordinated way. Proposals
• In the STATUS process it may be appropriate to prepare a document proposing the tratturo Pescasseroli-Candela as a priority and to bring to the negotiating table to the next programming 2014-2020. This document should identify opportunities for strategic valorization of the tratturi of Puglia, in order to guide strategic policy choices of the next regional program 2014-2020. The
associations of the agricultural world, together with the Regional Offices and the LAG Meridaunia,
must be interpreters and promoters of this initiative to get to the final draft of the negotiation document.
To move forward …
What are the possible interventions?
What are the subjects that can achieve them?
With what resources or tools?
ACCESSIBILITY
a. Critical issue: - Vi è una percezione limitata del tratturo
• The tratturo is a good of inestimable value, it is not always visible by the local community; This is, in part, because the tratturo has lost its original function
• The local community that seems to be indifferent to the issues of its protection and valorization • The agriculture, with its practices, is contributing to the modification of the original “river of grass • It is increasingly losing its accessibility, its continuity and the set of elements that make it recognizable • Much public money has been spent in the area, but this has not changed such a trend Proposals
• Make the area of tratturo an open-air museum Installations by land art along the Pescasseroli-Candela track may contribute to focus on the most significant places; such installations may be inspired by the themes of farming and the rural world and made with eco-sustainable materials. The project of SAC (Environment and Cultural Systems) “Monti Dauni e Lucera” is currently working on such an idea)
• The tratturo has to be clearly identified in order to enhance the community ability to recognize it. Appropriate signs could increase its fruition (ref. the signs on the paths for the formation of the cadastre of the Apulia Network Trekking; the signage conventional of the CAI (Italian Alpine Club); the use of “cippi” – ancient stones boundary)
• Promotional events could contribute to focus on the protection and valorization issues; the “tratturo
day” could become an interregional organized event involving the associations of trekkers, of knights,
of bikers but also the schools at all levels • Educational programs, also in schools, should be based on active citizenship and on the ability of
community to maintain the territory
• The “cippi” – ancient stones boundary- are signals of the tratturo
• We need to "grow" the riders, cyclists and walkers.
To move forward …
What are the possible interventions?
What are the subjects that can achieve them?
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
71
With what resources or tools?
b. Critical issue - Vi è una limitata fruibilità del tratturo Physical accessibility
• Not all the tratturo is practicable
• The area of tratturo is not always visible and physically perceived • Along the tratturo the morphological features are very different • The farmers, during plowing operations, divert the waters on tratturo making it not usable; in some
cases, occupying it with their crops.
Proposals
• Some interventions are necessary for the physical protection of the territory, including an appropriate
system management and maintenance; these are:
o securing of pedestrian and bicycle paths and of bridleways
o restoration of trails and/or runs on tracks that no longer exist
o projects of greenways and cycle routes that constitute the base of an integrated network of soft
mobility (ref. regional law 21/2003 "Norms on activities and excursions networks of Puglia " and
Regulation n.23/2007 “Regulation for the implementation of the Apulian excursions networks”)
o recovering of cultural heritage and of the sparse buildings
• The local nature and culture must be promoted by trained guides (youth cooperatives, network
businesses, educational farms)
• Everyone should have the opportunity to walk along the tratturo, perhaps using new technologies (eg
realizing applications for virtual visits and assistance with navigation tablet). The virtual recognizability
should be aimed at increasing the viability physical
• The farmers "concessions" must be sustainable and must be controlled to achieve the planned goals.
E.g.: the sod seeding could help to avoid the hydro-geological instability; in fact, during the plowing
actions, the drains (channels) of the surface are closed. It should only decide the better type of incentive
in order to change the practice.
• The slow mobility has to be organized: the tratturos are natural equestrian road and they can become
cycling routes, hiking routes and for people with disabilities. The receptivity should be organized in the
farms and taverns, which are currently uninhabited but all surveyed, to become a path, the historical
tratturo requires places of exchanges (eg. The park of Mezzane) and facilities for all kind of users.
Walkers need a special signage, safety, receptivity (water for wash, minimal accommodation) a
stopping every 30 miles (also every 10), the accessibility to the near villages, the “certification of
walker”. Bikers need an inventory of existing little fountains, small oasis with trees, a stopping every
10-15 miles, stopping areas.
• The critical and the potential issues of tratturo, proposed as a path, must be shown going through the
tratturo; only in such a way cycling routes and hiking routes could be organized The association
"Cicloamici" of Foggia proposes to follow the track of the tratturo trying to highlight what may be the
problems and the potential of the path. Such an assessment would be finalized to the organization of
cycle paths but, more importantly, to identify the type of services needed. Even for the bike stops and
services are needed. A few miles from the territory of Rocchetta, the tratturo could be to connected
with the European cycle route network.
• Actions are needed to ensure both the cleaning of micro landfills that now exist along the path, and
safety
• Establish the role of "guardian/keeper of the tratturo." Would be sufficient to ensure 1 keeper for every
30 km of track. The caretaker could ensure cleanliness and control.
• The tratturo must have the access gates to the park; if one, it could be in the middle of the track
To move forward …
What are the possible interventions?
What are the subjects that can achieve them?
With what resources or tools?
LANDSCAPE -
a. Critical issue – There are some activities that have a negative impacts on the environment and landscape
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
72
• The path along the tratturo is fragmented
• Not always the political and administrative choices have also been oriented to the safeguard of the
tratturo; many of the political and administrative choices are irreversibly transforming the landscape.
The existing wind farms, for example, are now difficult to displace and there are still political initiatives
that insist in such projects.
• Farmers have often occupied the central part of the tratturo, have left the pasture and have chosen crops
(or monocultures) that are not compatible with measures to protect the tratturo. There are not incentives
and opportunities for change such agricultural practices.
• The farmers practice monoculture too much
• The area of the tratturo is, in large part, occupied by paved roads (mainly road managed by the
Provincia di Foggia)
• The areas of the tratturo that are occupied by urban areas are irretrievably lost
• Landfills are everywhere; the abandonment of waste is an issue of sensitivity and culture; adults and
children should be behaved.
• there is no supervisory
• The process of fragmentation and trivialization of the landscape has caused a contraction and dwindling
of habitats
Proposals
• The maintenance of tratturo and its areas pertaining must be organized to ensure the physical security
of the tratturo. At the same time, the sensitivity to the issues of recovery and enhancement must grow.
In fact, recent maintenance actions have not produced the desired effect because they had not involved
the local community and farmers. The safety and maintenance may be a consequence of the recognition
of tratturo resource.
• Shares of landscape protection and of maintenance of the areas of the tratturo, could include:
o Native plants along the border of tratturo and actions of naturalization (see funding of RDP); buffer
strips, tree lines, hedgerows and dry stone walls along the bands of tratturo (because of their
recognized function of terrestrial ecological corridors);
o Tree-lined avenues of access to the cities;
o Wildflower (in peri-urban areas and / or fringe road) - aesthetic and landscape enhancement and
environmental restoration at low energy input of anthropic environments through the
characterization and use of wildflowers originated by species and ecotypes.
• Interventions of recovery / mitigation can reduce the visual impact of industrial areas (production areas
along the SS 89 and SS 16).
• In order to structure an integrated tourist offer (an offer with also certified quality), local guides must
be trained and guided tours should be organized on the territory.
To move forward …
What are the possible interventions?
What are the subjects that can achieve them?
With what resources or tools?
b. Critical issue – Instability of soil
Proposals
• Engineering projects to counteract natural hydro-geomorphological hazards
To move forward …
What are the possible interventions?
What are the subjects that can achieve them?
With what resources or tools?
PROPERTY MANAGEMENT
The royal tratturo is 110 meters wide; two-thirds side (the famous 60 steps from Naples) are given in
concession from Apulia region to farms and about 1/3 is still state-owned. This is a complex system to
manage.
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
73
a. Critical issue – Land instability
• Successful actions have to deal with the complexity of the different administrative use and ownership
• Every action needs to involve the dealers, the state and all stakeholders.
• In addition to agricultural soils there is also an urbanized part and a part that still preserves its
naturalness (remnant of the "river of grass")
• The stakeholders are many
Proposals
• Multi-functionality of the agricultural entrepreneur. The opportunities offered by regional park,
PSR, European funds and by the NOP must be exploited: the projects must be integrated across multiple
lines of financing (mainly PON and in agreement with the neighboring Regions)
• In concession areas, current agricultural practices (e.g. plowing, crop basis) must be oriented
towards the protection and preservation of the landscape (eg through the provision of incentives and
the concession of the areas of the tratturo). At the end of the "avenue armentizio", which now appears to
be largely illegally occupied by frontists resulting in compromised of continuity and readability of the
tratturo, the chaotic turf should be restored. The granting of the concession to farmers could be
conditioned with the commitment to act in order to safeguard the legibility of tratturo (e.g. through
plants and, in the case of use of arable land, respecting the direction of plowing parallel to the
longitudinal axis of the tratturo). Such a condition would be compensated, for example, with the
possibility of access to the benefits of the RDP, extended not only to the owners of the funds, but also to
those having non-ownership title to lead the funds, thus including tenants and licensees.
• Markets of close proximity
To move forward …
What are the possible interventions?
What are the subjects that can achieve them?
With what resources or tools?
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
74
Annex 6 – Signed document for the RDP and ERDF negotiation table
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
75
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
76
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
77
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
78
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
79
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
80
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
81
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
82
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
83
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
84
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
85
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
86
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
87
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
88
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
89
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
90
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
91
Annex 7 - “Conferenza dei servizi” for the signature of the POI
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
92
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
93
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
94
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
95
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
96
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
97
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
98
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
99
Annex 8 - Contribution edited by “FIAB Foggia Cicloamici” and “Associazione Culturale Lanterne” (cover)
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
100
Annex 5 – Monitoring the state of tratturo edited by “FIAB Foggia Cicloamici” (executive summary)
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
101
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
102
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
103
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
104
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
105
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
106
Annex 10 - First agenda of the “National Day of Tratturo” edited by “CAI Foggia
RECUPERO E VALORIZZAZIONE DEL TRATTURO PESCASSEROLI - CANDELA
AZIONE: 1) Indire la "Giornata nazionale dei Tratturi" - Con un sistema comunicativo che inizi dalle Regioni coinvolte e veda i Comuni lungo il Pescasseroli - Candela in prima fila a pubblicizzare l'evento con l'interessamento delle Associazioni e delle scuole che svolgano un "tema/ricerca" relativo alla cultura-storia che i tratturi hanno lasciato alle nostre generazioni; 2) Nello stesso momento, in tutti gli eventi organizzati, si dà il via al percorso al suono di una "campana" simbolicamente indicata in quella di Agnone; 3) Ogni Comune attraversato accoglie i camminatori con un "semplicissimo e pastorale rinfresco" in un festoso attraversamento del centro abitato; 4) Arrivo al termine di ogni percorso con semplice manifestazione a sfondo pastorale.
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx Ovviamente ogni Amministrazione è libera di organizzare l'evento che caratterizzi meglio la propria realtà sociale/tratturale.
A
T
T
O
R I
C.A.I. Club Alpino Italiano
Gruppi Regionali di: Abruzzo Molise
Campania Puglia
Sezioni coinvolte: Pescasseroli
Castel di Sangro Isernia
Campobasso Benevento
Avellino Foggia
Associazioni sportive di Cavalieri e Bikers
Associazioni coinvolte: Proloco, ………………….
A M M I N I S T R A Z I O N I P U B B L I C H E
Regione Provincia Comune
ABRUZZO
L'Aquila
Pescasseroli Opi
Civitella Alfedena Villetta Barrea
Barrea Alfedena
Scontrone Castel di Sangro
MOLISE
Isernia
Rionero Sannitico Forlì del Sannio
Isernia Pettoranello del Molise
Castel Petroso Santa Maria del Molise Cantalupo del Sannio
Campobasso
San Massimo Bojano
San Polo Matese Campochiaro Guardiaregia
Sepino
CAMPANIA
Benevento
Morcone Santa Croce del Sannio
Circello Reino
Pesco Sannita San Marco dei Cavoti San Giorgio la Molara
Buonalbergo
Avellino
Casalbore Montecalvo Irpino
Ariano Irpino Villanova del Battista
Zungoli
PUGLIA Foggia
Monteleone di Puglia Anzano di Puglia
Sant'Agata di Puglia Rocchetta Sant'Antonio
Candela
Criticità da affrontare Non vi sono particolari criticità al momento: tutte le Sezioni CAI coinvolte dovranno individuare, con la collaborazione degli uffici comunali competenti, il/i tratto/i ragionevolmente lungo/hi (10 – 15 km) già percorribile/i
Possibili soluzioni
Opportunità di finanziamento delle nuove proposte
Possibili effetti positivi o negativi
definizioni delle priorità
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
107
Annex 11 - Invitation letter to public tender (with technical annexes for APP implementation)
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
108
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
109
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
110
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
111
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
112
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
113
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
114
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area
ERDF PP6 - Province of Foggia(IT)
115
Annex 12 - Letter for starting competitive public tender on “60 passi nella natura“ project (technical annexes omissis)
Output 4.7 Integrated Strategic Territorial/Urban Agenda of the Pescasseroli-Candela Tratturo area