BGSU/PeopleSoft Financial Management Solutions Focus on FMS Features
2
The Benefits of FMS User Driven Configuration and Processing:
Hierarchical Tree Design for Rollup Effective Dated Tables Easy Access to Historical Transactions You Schedule the jobs to run when desired.
Menu Driven Navigation
Quicker Data Access & Reporting User Friendly Reporting Tools Drill Down to Details From Many Reports
Electronic Audit Trail
Workflow Approval in Purchasing
Other Universities to Look to for Solutions
3
Other Client Experiences 80 CIBER Higher Education Implementations in the US &
CAN
25% of the Total Higher Education Implementations of PeopleSoft
Clients Who have been through this:
BYU – Hawaii BYU – Provo Clarkson University University of New Orleans Marquette University of Maryland - University College University of Houston University of North Texas West Chester University Towson University University of Baltimore Cambridge University in the UK
4
Agenda FMS Modules
Commitment Control General Ledger Purchasing Accounts Payable Grants Management Asset Management
Questions and Answers
5
Commitment Control Foundation of the FMS System. All activity flows
through this sub-system for validation, spending authorization, and reporting.
Process is similar to present system with control at the parent level and tracking at the child level.
All transactions must pass budget checking.
6
APP2
Expense Bud/Appropriation
Revenue Budget
CURR_BUD GENLED
PURCHASINGOnline Journals
Interfaces
AFIN
FMS
BudgetJournals
Interfaces Online Journals
CC_PROJCC_APPROP ACTUAL
BUDGETOVERVIEW
PURCHASING
7
Compare and Contrast
Spending controlled at the Appropriation Level, e.g., 0250330O.
Spending controlled at the parent level, e.g. 025100 OPERATING
Budget and Actuals tracked by pre-defined object codes.
Budget and Actuals tracked by pre-defined account codes.
Budget transactions stored in the budget ledger. Accounting transactions are stored in the General Ledger.
All transactions stored in the KK ledgers.
APP2 screen shows one appropriation at a time. Can leap to another summary by account code screen (ASUM).
Budget Overview screen is customizable by value ranges and levels. It also provides drill down capability to the original transactions.
AFIN FMS
8
Significance of Changes
Budget Overview screen displays the summary at the operating level
Can drill down from the summary page to individual transactions
Allows user to specify the level of summarization and the detail values to be combined.
Reporting can be done from one ledger group.
12
Budget Structure The Budget Definition, Rule sets,
and Translation tables provide a flexible framework to establish different variations of budgeting.
Three basic configurations: 3-Way, 2-Way, and 1-Way.
Setup based on account and department cost center trees.
13
2401860FFull Time
A/OExpenseBudget
------------101020123010
3-WAY•Personnel•Fringes•Operating
AFIN
FMS
2551907FCentralized
Fringes
2401860OOperating
DCCExp LineBudget
------------510105201253100
Budget Definition
Rulesets
2-WAY•PERS•OPER
1-WAY•ALL_EXPENSE
AccountRollup
DCCRollup
14
Compare and Contrast
Appropriation setup first. Then Expense budget setup by individual object code mapped to the correct appropriation.
Department Cost Center and account are setup. Predefined rules establish the correct parent appropriation.
Each Agency/Org/Object combination can point to any appropriation.
Predefined rules decide the structure of the parental controls – 1,2, or 3 spending control appropriations for a DCC.
Setup errors occur, especially on the HR side, when the type of budget is not known.
The type of budget is pre-determined and thereby eliminates errors.
AFIN FMS
15
Significance of Changes
Pre-defined rules prevent setup errors. More structure allows for consistency. Structures: 3-WAY used for approved budgets with centralized
fringe funding.2-WAY used for Auxiliary budgets with fringes in the
personnel appropriation.1-WAY used for all other budgets. All expense
accounts pooled into one appropriation.
16
Revenue Budgets with Associated Expense Budgets As in our current system, FMS allows
revenue to optionally increase the spending authority of the appropriation.
Although the end-result is similar, the mechanics and reporting in FMS are different.
17
AFIN Process at Month-end:
Revenue deposited andrecognized
System automaticallyUpdates APP2
Spending authority
Month-end Batch Program updates
EXP2 and REV2 forRecognized Rev
Receipts = 8190 = Current Budgeted Rev
APP2Opt=Y
REV2Map to APP2
EXP28190
Month-end Reports
18
FMS Process Daily/Monthly
Revenue deposited andrecognized
System automaticallyUpdates
Spending authority
Year-endAllocation updates
Expense Budget forRecognized Rev
Month-endReports
Year-endClose
Carries forward Unobligated Budget
FMS Process Year-end
BudgetOverview
RevBudget
ExpBudget
RevBudget
ExpBudget2007
ExpBudget2008
19
Compare and Contrast
Revenue Rotary automatically updates APP2 screen and associated spending authority.
Associated revenue automatically updates Budget Overview screen and spending authority.
AFIN month-end batch process copies recognized revenue budget to expense object 8190 budget.
FMS month-end reports combine revenue and expense budgets to show available funding available.
Year-end carry-over based on APP2 unobligated amount which includes revenue rotary.
Year-end budget allocation process updates the budget for associated revenue recognized.
AFIN FMS
20
Significance of Changes Can use the FMS system as delivered while
maintaining our practice of allowing additional spending authority based on generated revenue.
Eliminates the need for custom batch process that would have to be maintained with each system upgrade.
Ad hoc report writers using Query will have to be aware of the need to incorporate revenue budget data with expense data to arrive at an accurate remaining balance amount.
21
Budget Transfers The Budget transfer process is used to
redistribute budget dollars within a Department Cost Center to other accounts in the same appropriation.
It can also be used to transfer budget dollars to other Department Cost Centers.
Defaults to Adjustment type so the change does not affect the next year’s Original budget amount.
22
SignedPaper
Request
EBReduceDonor
AFIN Process:
GrantRelated
?
Personnel?
No
No
Yes, forward form toVP Fin & Admin
Yes, forward form to Grants Office
Budget Admin initiatesand signs Budget transfer
EBIncreaseRecipient
Same APPR
?
Yes
NoApproved
?
No
Yes, return to Bus OfficeEB
ReduceDonor
EBIncreaseRecipient
APP2
APP2
23
FMS Process:
GrantRelated
?
Personnel?
No
Yes, notifyVP Fin & Admin
WithinSecurity
?
Yes
No
Approved?
No
BudgetTransfer
UpdateTransfer
Email notification to transferee
BudgetTransferSecurity
Error
Review TransferWith
Security Errors
UpdateTransfer
Yes
Email notification to transferor
UpdateTransfer
Email notification to transferor/ee
Email BOEmail Grants Off
BudgetActivity
BudgetActivity
BudgetActivity
24
Compare and ContrastPink form completed and signed by Bud Admin relinquishing budget dollars
Department inputs Budget Transfer.Department updates if within security list
Pink form mailed to the Business Office
E-mail notification to receiving department cost center administrator if different. Transferring Bud Admin emails Business Office.
Business Office inputs and updates two EB documents with a prefix of CVAT# (where CV is the inputers initials). The first document reduces the donor’s budget and the second increases the receiver’s budget
Security error prevents update if outside security list; Business Office will update if properly documented.
AFIN FMS
25
Significance of Changes Eliminates paper processing and mailing. Eliminates duplicate input. Shortens update time lapse and
notification. Notification process is delivered
functionality of FMS. Provides department with ability to easily
adjust their budget account distribution.
29
Agenda FMS Modules
Commitment Control General Ledger Purchasing Accounts Payable Grants Management Asset Management
Questions and Answers
30
General Ledger Business Processes
Create, approve, and process journal entries from other FMS modules using the Journal Generator
Create, approve, and process journal entries from other BGSU feeder systems
Create, approve, and process journal entries imported from spreadsheets
Create, approve, and process journal entries online real-time
Post all journals to appropriate ledgers
31
General Ledger Integrations Purchasing Asset Management Accounts Payable Accounts Receivable Grants Management Payroll
32
General Ledger Feeder Systems
Bookstore (MBS) Dining Services (CBord) Telecommunications Services (Pyramid) Parking Services (IPS) Health Services (Media Highway) Rec Sports (Class) Purchasing Card (JP Morgan) Office Depot Student Information System (SIS)
33
EXPENSE TRANSFERS White form sent to the Business
Office by the majority of users Business Office inputs from form and
updates IX document input and updated by
selected power users
34
SignedPaper
Request
Intra-InstitCross Chrg
IX
JournalVoucher
JV
Intra-InstitVoucher
II
GeneralLedger
AFIN Process:
FMS Process: EnterExp Trans
Journal
Inter-DCC?
Bus OffReview IX Source
&Post
Other DCC Review
Approve?
NoNo
Yes, email notification
GeneralLedger
Yes, email notification
35
FMS LEDGER PROCESSES
Budget Check, Edit, Post
DecentralizedIX
Online Journals
CC_PROJCC_APPROP ACTUAL
JOURNALGENERATOR
HCM
GRANTS
AR
ASSET MGMT
AP
PURCHASING
P-CARD
TELECOMM
SIS
PARKING
DINING
BOOKSTORE
JOURNALHEADER/
LINES
SPREADHEETS
SPREADSHEETIMPORT
36
Compare and ContrastWhite form completed and signed by Bud Admin relinquishing budget dollars
Department inputs Expense Transfer using Journal with an IX source.
White form mailed to the Business Office
E-mail notification to receiving department cost center administrator if different. Transferring Bud Admin emails Business Office.
Business Office inputs and updates a journal voucher with a prefix of CVIX# (where CV is the inputers initials). This document reduces the expense for the charging department and increases the receiver’s expense.
Business Office will post the journal if it is properly documented.
AFIN FMS
37
Significance of Changes Eliminates paper processing and mailing. Eliminates duplicate input. Shortens update time lapse and notification. Notification process is delivered functionality of
FMS. Provides department with ability to easily correct
errors in account distribution and charge other departments for shared expenses, e.g., copier usage.
38
Agenda FMS Modules
Commitment Control General Ledger Purchasing Accounts Payable Grants Management Asset Management
Questions and Answers
39
METHODS OF PURCHASING AFIN
PDQs Decentralized Purchase Orders
for Purchases under $1,500 PO1s
Paper Payment Orders for purchases under $1,500 not ordered on a PDQ
RXQs An On Line Requisition for
purchases P-Card Store Charge Travel & Business
Entertainment Green & Yellow forms
Bookstore & Dining Interface Manual vouchers created
by Business Office
FMS Quick Invoice
On Line entry for purchases under $100 Store Charges
Low Requisition On Line entry for purchases
under $1,500 Requisitions/Purchase Order
On Line entry for purchases over $1,500
ONL,CNF,BLK,SVC,CON P-Card Travel & Business
Entertainment Forms still submitted to
Business Office Bookstore & Dining Interface
will continue Voucher will be built in PS
during transmittal
40
DEFINITIONS OF APPROVERS Requestor – Designated employee by the
Departmental Senior Administrator Budget Administrator – In Academic Units,
most often the Chair, Administrative Unit, someone appointed by the Senior Admin
Senior Administrator – Dean, Director, Assistant or Associate Vice President or Vice Provost
Vice President – Departmental or Provost President – University President, Senior Vice
President of Finance & Administration, Provost
41
APPROVAL PROCESS Requestor
Can enter & approve direct purchase requisitions up to $1,499
Budget Administrator Can approve purchase requisitions up to $9,999
Senior Administrator Can approve purchase requisitions up to $49,999
Vice President Can approve purchase requisitions up to $99,999
President Can approve any requisition with amount equal
to or above $100,000
42
DOLLAR AMOUNT APPROVAL WORKFLOW
A need is determined within a Department
Departmental Requestor enters
a requisition
$1,500 or greater
Purchasing for Creation & Distribution of PO
Budget Administrator
Approval
$10,000 or greater
Senior Administrator
Approval
$50,000 or greater
Vice Presidential Approval
$100,000 or greater
Sr VP /Provost /
Presidential Approval
YES
YES
YES YES
LESS THAN $1,500
LESS THAN $10,000
LESS THAN $50,00
LESS THAN $ 100,000
43
SPECIAL CATEGORY APPROVAL AFIN
Computers Scanned/E-Mail from
Purchasing to ITS for approval
Audio-Visual Equipment Scanned/E-Mail from
Purchasing to IMS for approval
Radioactive Isotopes Paper form is sent
through ENVHS to Purchasing allowing purchase
FMS Computers Audio-Visual Radioactive Isotopes Lasers Alcohol Institutional
Memberships
All will be sent through electronic workflow before being sent through dollar amount approval.
45
CONSTRUCTION AFIN
Feasibility study is done If feasible, the process
begins Paper requisitions are sent
to Purchasing and purchase orders are created
Purchasing creates physical construction files & data bases for tracking purposes
Change orders are sent to purchasing by paper with all the proper signatures. Purchasing enters them
Often, initial costs are not easily linked to projects and not able to be tracked
FMS Feasibility study creates a
Project ID and money is transferred
Requisitions submitted on line by Design & Construction
Purchasing creates purchase orders for all vendors/contractors involved
Change orders will continue to be submitted as paper for the purchasing department to enter
Tracking exists from feasibility to project termination within FMS by project number
46
CONSTRUCTION WORKFLOWDesign & Cons has approval & now
requests feasibility study set up from Financial Accounting
F & A Creates
Project ID
Feasibility Study Funded
Single Requisition /PO/Voucher for
Feasibility
Feasible ?
END
Big Project ?
Money Transferred
to Fund Project
Bid Process &
Award
Board of Trustees Budget Money Into
Project
END
Single Requisition to Initiate Project
Workflow Approval Project
Mgr &
Purchasing
NO
Small
Project
Denied
Yes
YES
END
Denied
Source to Purchase Orders
Receiving
Voucher /Check
Change Orders
Paper Request for
change order w /signatures sent to
Purchasing & added to PO
Workflow
Approvals
Source Requisition
into Existing PO
Receive Goods/Services
Yes
Approved
48
HOW TO APPROVE ON LINE
Sign on to PeopleSoft FMS Open Worklist Verify Chartfields
Fund/Dept Cost Center/Account Approve/Recycle/Deny
After refresh, transaction no longer on worklist
51
Summary Entire process is now electronic
Travel & Business Entertainment will still be handled as it is today
History will be viewable on line No more file cabinets to rummage through Easily auditable Reports & Queries can be run to find
almost any information needed
52
Agenda FMS Modules
Commitment Control General Ledger Purchasing Accounts Payable Grants Management Asset Management
Questions and Answers
53
METHODS OF PAYMENT AFIN
Forms Blue, Green, Yellow, White
encompassing many kinds of transactions
Invoices Payments made for items
ordered outside of AFIN PO Vouchers
Payment of Purchase Orders
Reimbursements/Stipends Memos/E-Mails/
Spreadsheets sent from departments
Payments from Interfaces Manual Checks
Student/Customer accommodation
FMS PO Voucher
Copied from the purchase order
Quick Invoice Voucher Created from end users’
entry of Quick Invoice Direct Voucher
Used for payment of Travel & Business Entertainment
Created by Interfaces Express Payment
Manual & emergency checks
54
ONBASE DOCUMENT IMAGING All source paperwork will be sent to
the scanning headquarters to be scanned and linked to its corresponding voucher
While on several voucher pages in FMS, all will be able to link to the invoice for easy viewing
56
THREE WAY MATCH All payments need a three way match
between Purchase Order, Receipt, and Voucher
Workflow is set up for matching errors Pricing errors will be redirected to the
Buyer in Purchasing to correct Receiving errors will be redirected to the
Requester
57
MATCH WORKFLOW
PO Voucher is created
System looks for a PO and
a Receipt3 Way Match?
System finds PO but can not find Receipt –Sends to Requesters
worklist and appropriate transaction is created
System finds both PO & Receipt but pricing does
not match – Sends to Purchasing Buyers
worklist and appropriate transaction is created
Matching Runs in Batch
Process
Voucher is sent to Pay
Cycle Manager
recycle recycle
Yes
58
Summary
Voucher is created
Match Exceptions
are run and matched
Voucher
enters Pay Cycle
Trial Registry is
approved
Checks are
Printed
Positive Pay and EFT Files are
created for Treasury Office
transmital
59
Agenda FMS Modules
Commitment Control General Ledger Purchasing Accounts Payable Grants Management Asset Management
Questions and Answers
60
Grants Management Business Processes
Prepare budgets for awards
Grant budget accounting integration
Process grants-related payments
61
Preparing an Award Budget Today
Pre-award office prepares detailed Excel spreadsheet without AFIN OBJ codes
Post-award office loads into AFIN after assigning OBJ codes
Entire process not integrated within financial system
62
Preparing an Award Budget Today
AFIN
Basic proposal and budget information entered in FMP db, housed on GRAD
COLL server
SPAR discusses proposed
budget with Faculty
Budget is prepared in
Microsoft Excel and stored in
SPAR fileshare
Finalized budget is printed for Faculty for internal review and
submission to sponsor
63
Preparing an Award Budget in PeopleSoft
Pre-award office utilizes same module and account codes as post-award
Eliminates post-award replication of data
Facilitates later budget revisions
All revisions, changes, tracked in common system, integrated with FMS and HCM
64
Preparing an Award Budget in PeopleSoft
Budget is prepared AND
stored in PS GM
SPAR discusses proposed
budget with Faculty
SPAR establishes
Faculty member in PS GM table
Basic proposal and complete
budget entered in PS GM
P e o p le S o f t A p p l i c a t io n S e r v e r
H C M S t u d e n tA d m i nF M S
G r a n t s M a n a g e m e n t
P e o p le S o f t A p p l i c a t io n S e r v e r
H C M S t u d e n tA d m i nF M S
G r a n t s M a n a g e m e n t
65
Generating a Grant Award Today
Several manual processes
Maintain two separate databases
Limited coordination between pre- and post-award offices
Duplication of budget data entry
66
Generating a Grant Award Today
SPAR retreives approved budget from
its File Share and sends to Grants
Accounting
SPAR updates info in FMP db, housed on GRAD
COLL server
Sponsor approves award to BGSU
Notice of award arrives at SPAR
Grants Accounting enters data from SPAR budget into it’s own spreadsheet
Grants Accounting loads budget into AFIN
SPAR Notifies PI , Chair , Dean ,
President of award
67
Generating a Grant Award in PeopleSoft
Integrates workflow between two office functions
Eliminates duplicate budget data entry
Facilitates post-award coordination between the two offices
Automated processes replace several manual processes
68
Generating a Grant Award in PeopleSoft
PeopleSoft Application Server
HCM StudentAdmin
FMS
Grants Management
PeopleSoft Application Server
HCM StudentAdmin
FMS
Grants Management
Sponsor approves award
to BGSU
Notice of award arrives
at SPAR
SPAR generates an award from PS , finalizes budget , and notifies Grants
Accounting of Award
Grants Accounting administers
budget
SPAR notifies PI that he/she must complete
FMS training and receive security
access
PI is able to log in to system and administer grant
69
Grant Numbers Today
FUND: 4-digit code designating funding source(i.e., 4105, separate fund for this grant)
AGCY: 3-digit code denoting department, college, etc.(i.e., 025 is the legacy code for Biological Sciences)
ORGN: itemizes activities within the AGCY(i.e., in Grants, the ORGN was usually the same as FUND)
FUND
4105
AGCY
025
ORGN
4105+ +
70
Grant Numbers Today
With very few exceptions, every grant has its own fund and therefore its own balance sheet
Three funds dedicated to federal letters of credit (4401=NIH, 4402=ED, 4403=NSF)
Some fund ranges designate type of funding while others designate type of activity
AGCY+ORGN provide the unique number for each Appropriation with ORGN=FUND except in the case of the letters of credit
RESULT: Unique numbering combinations become limited making “recycling” of old numbers necessary, thereby making tracking difficult
71
Grant Numbers in PeopleSoft
FUND: for grants, focused purpose to facilitate year-end financial reporting
PROJECT/GRANT: provides a unique identifier for university projects (i.e., construction) and externally sponsored programs and research
FUND
40000
PROJECT/GRANT
10250013
+
72
Grant Numbers in PeopleSoft
Both FUND and PROJECT/GRANT number will be required for transactions
Only 5 funds: 40000 (federal), 41000 (state), 42000 (local), 43000 (other), and 47000 (BGSU Foundation)
Project numbers begin with “9”Grant numbers begin with “1”
73
Grant Purchases in PeopleSoft Definition of Approvers
Requestor –Employee designated by the Departmental Budget Administrator
Special Category – Approval for special commodities
PI – Principal Investigator on the Grant, responsible for all activity
Grants Accounting – Approves budget item and availability of funds
Budget Administrator – Chair of the Department or Director of the Program
Senior Administrator – Dean, Assistant or Associate Vice President or Vice Provost
Vice President – VP of the Division
President – University President, Senior VP of Finance & Administration, Provost
74
Special Category Approves all special category commodities, no matter what
cost Principal Investigator
Approves all requests, and requisitions up to $1,499 Grants Accounting
Approves ALL requests for appropriateness to awarded budget and availability of funds
Budget Administrator Approval required for requisitions up to $9,999
Senior Administrator Approval required for requisitions up to $49,999
Vice President Approval required for requisitions up to $99,999
President Approval required for requisitions with amount equal to or
above $100,000
Grant Purchases in PeopleSoft Approval Process
75
Approved grant budget includes item
Requestor enters a requisition
$1,500 or greater
Purchasing for Creation & Distribution of PO
Budget Administrator
Approval
$10,000 or greater
Senior Administrator
Approval
$50,000 or greater
Vice Presidential Approval
$100,000 or greater
Sr VP /Provost /
Presidential Approval
YES
YES
YES YES
LESS THAN $1,500
LESS THAN $10,000
LESS THAN $50,00
LESS THAN $ 100,000
Principal Investigator
Approval
Grants Accounting Approval
Special Category Approval
Grant Purchases in PeopleSoft Approval Workflow
76
Agenda FMS Modules
Commitment Control General Ledger Purchasing Accounts Payable Grants Management Asset Management
Questions and Answers
77
What is Asset Management?
•What are Capital Assets?
•What tracking is required while maintaining asset records?
•Why are reports prepared annually?
•What types of regulations must be followed?
•What are the Policies and Procedures for Asset Management?
•How is PeopleSoft Asset Management different from AFIN?
78
What is Asset Management ?The management, monitoring, and reporting of financial, operational,
and construction projects including personal and/or real property.
What are Capital Assets?Defined as acquisitions having a cost equal to or greater than $3,500
and a useful life or more than one year. The amount of $3,500 is limited to an individual piece of equipment or the composite thereof.
Are recorded at their original cost (historical cost) during acquisition, or fair value at the date of donation in the case of gifts. “Acquisition” is no longer strictly regarded as a “purchase” but may include “leasing” in specific instances.
Include renovations that exceed 5% of cumulative building cost
Infrastructure whereby cost exceeds $100,000
79
Land and Easements
Buildings
Equipment, Machinery and Vehicles
Improvements Other than Buildings: a.k.a. Infrastructure (including such things as roads, lighting systems, sidewalk systems, utility systems, and others)
Construction in Progress
“Historical Treasures”
What are Types of Capital Assets?
82
What is Considered as State Owned Property?
Definition: “…and Section 125.16 of the Ohio Revised Code, the Department of
Administrative Services has defined “Property” as assets that are owned (purchased or donated), subject to ownership (e.g., leased asset), acquired under a grant or sub-grant, or held on behalf of the State of Ohio. Property has an initial estimated useful life of two years or more and is neither consumed nor expended during its useful life.”
Obligations: “As required by Section 125.16 of the Ohio Revised Code (ORC) and DAS Directive No. 04-27, all state agencies, boards and commissions have stewardship responsibilities with maintaining and reporting an inventory representing the activities of their state owned assets..”
Abstracted from: http://das.ohio.gov/Directives/directive_05-06/06-27.pdf
83
What is BGSU Owned Property? Purchase of Items for Personal Use No employee of Bowling Green State University shall utilize the
Purchasing Department, the name of the University, or University funds, to secure merchandise or to obtain a savings on the purchase of items for personal use or consumption. (Obsolete and in need of updating as we now have opportunity to take advantage of employee discounts based upon negotiated contracts by the Purchasing Department.)
**This includes the purchase of clothing with departmental/university logos, and the purchase of University event tickets. (Does not apply to required departmental uniforms which by IRS definition cannot be used as clothing outside the workplace.)
Abstracted from the Business Office Policy Manual (pg.9)
84
Asset Management Responsibilities within the Business Office:
Coordinate, collect and review annual physical inventories and maintain records.
Assist other departments on campus in their preparation of inventory report an annual basis.
Process all major equipment transfers, disposed, replaced and surplus property in order to make changes to assets in the system.
Assist other departments on campus in establishing procedures for maintaining and controlling their major assets.
85
Continued Asset Management Responsibilities:
Maintain the Asset Management Module within the PeopleSoft System for the University and report updated changes annually along with depreciation where applicable.
Ensure that all major equipment is tagged. This process includes the replacement of tags in the event of lost tags and the distribution of BGSU tags upon “ownership” or purchase.
Ascertain compliance with state and institutional regulations
86
•Affix BGSU Tags to the capital assets and provide information essential for maintaining records for the asset management system when requested by the Business Office.
•Complete the “Equipment Disposal” form (dispensation): http://www.bgsu.edu/offices/services/purchasing.html and report to AM any changes that occur related to transfers, retired, replaced, surplus, sold or stolen assets.
•If fabricating an item, discuss with the Business Office because a tag can be issued for an overall project as an accumulated value meeting the specifications of a capital asset.
•Perform annual inventories upon request from the Business Office and report results with validation.
Roles of University Departments
87
Equipment Disposal FormGeneral Disposal Information:
Disposal Method = Surplus, Scrapped, or Other
Stolen Property Information
Transferred to a different Department
Trade-in on New Equipment
http://www.bgsu.edu/offices/services/purchasing/EquipmentDisposalForm.pdf
88
Surplus Property Policy
SURPLUS PROPERTY REQUEST FORM >>
The materials handling department has been designated as the responsible agency for the processing and disposal of items which are no longer needed or usable by bowling green state university. This centralization is important to insure compliance with applicable state statutes, and also to match the surplus property of one university department with the needs of another. Our goal is to redistribute university property to other university departments where feasible. Departments should notify materials handling at 372-2121 whenever items become surplus for possible placement in other areas. If your department is seeking a surplus item, we hold periodic viewings of the surplus property in the reed street warehouse. Please call 372-2121 to find out when the next viewing is scheduled.
Abstracted from: http://www.bgsu.edu/offices/materials/page22565.html
89
Method of Depreciation:Capital Assets: “Depreciation is computed using the straight-line
method over the estimated lives of the assets, generally 40
years for buildings, 20 to 30 years for infrastructure and improvements, and 5 to 12 years for equipment.
Library materials are capitalized and written off over 10 years.”
Abstracted from Budget Book: Summary of Significant Policies
90
Shared Procedures: PeopleSoft AM and AFIN Fixed Assets
Tagging capital assets/replacing tags when lost
Annual inventory/validate & submit annual report
Complete “Equipment Disposal” form to change status of assets.
91
Benefits of Using PeopleSoft Asset Management
An integrated system that allows the capturing of information and data in an overall enterprise resource planning system; resulting in improved controls
▪Within Purchasing and Accounts Payable Modules there is opportunity to identify capital assets and interface with the Asset Management Module.
▪Physical information tracks to the “receiver document.”
▪Financial information tracks to the “voucher document.”
92
Continued-- Improved procedures for tracking capital assets;
▪Ability to track “leased” assets and recognize as “operational assets”
▪Ability to track components within a clustered asset
▪Ability to identify a custodian or physical “owner” of the asset
▪Ability to track related aspects to assets and prompted when associated licenses, registrations, etc. are due.
▪Ability to identify land with extensive descriptions including lot #, parcel #, block#, and legal description.
93
Data Flow:
Physical information tracksto the “receiver document.”
▪Financial information tracks to the “voucher document.”
Data Flow: