FM2 PPSR RCS Pressure Test Leak Check1 UCB, March 16, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW RCS MEOP TEST/LEAK CHECK Michael Sholl Berkeley RCS Lead Engineer University of California - Berkeley
10

FM2 PPSRRCS Pressure Test Leak Check 1 UCB, March 16, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW RCS MEOP TEST/LEAK CHECK Michael Sholl Berkeley RCS.

Jan 19, 2016

Download

Documents

Moses Lucas
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: FM2 PPSRRCS Pressure Test Leak Check 1 UCB, March 16, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW RCS MEOP TEST/LEAK CHECK Michael Sholl Berkeley RCS.

FM2 PPSR RCS Pressure Test Leak Check1 UCB, March 16, 2006

THEMIS PROBE

FM2 PRE-ENVIRONMENTAL REVIEW

RCS MEOP TEST/LEAK CHECKMichael Sholl

Berkeley RCS Lead Engineer

University of California - Berkeley

Page 2: FM2 PPSRRCS Pressure Test Leak Check 1 UCB, March 16, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW RCS MEOP TEST/LEAK CHECK Michael Sholl Berkeley RCS.

FM2 PPSR RCS Pressure Test Leak Check2 UCB, March 16, 2006

Overview

MEOP tests and leak checks are scheduled to verify RCS system survived environmental testing

Performed after thermal vacuum, vibration and shock testing

Tests to be performed in Building 179 (magnetics)

Test is identical to RCS MEOP/leak check performed March 6-7 2006 in Berkeley

Primary hazards during test are helium asphyxiation and tank pressurization

Page 3: FM2 PPSRRCS Pressure Test Leak Check 1 UCB, March 16, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW RCS MEOP TEST/LEAK CHECK Michael Sholl Berkeley RCS.

FM2 PPSR RCS Pressure Test Leak Check3 UCB, March 16, 2006

P

P

GHe

N2H4 N2H4

15 µm

40 µm 40 µm

15 µm

20 µm

20 µm

20 µm

20 µm

20 µm 20 µm 20 µm

SV2SV3

Pressurant P/V Valve SV4

Ullage P/V Valve SV1

COPV Pressurant Tank

High Side Pressure Transducer0 to 200psi

Pyro Valve

Filter

Dual Seat Solenoid Isolation Valve

low Side Pressure Transducer0 to 500psi

Propellant Tanks

F/D Valves

Filter

Latch OrificeLatch

Filter

Dual SeatThruster Valves

Test SequenceSV1 Manifold Tests

• Isolation Valve Cycle Test• (SV1 manifold to 400psia)• Forward Leakage Test (decay test)

using panel gauge• SV1 Leakage Test using pipette• (depressurize SV1 manifold))

Cycling tests on latch and thruster valves • LV Cycle Test• Thruster Valve Cycle Test

Low Pressure Transducer / Propellant Tank MEOP Test

• Low Pressure Transducer Output Test• (pressurize tanks to 400psia)• Propellant tank MEOP Test

Latch, thruster and SV2 & SV3 leak tests• Latch Valve Forward Leak Test • Thruster Valve Forward Leak Test • Low Pressure Service Valves (SV2 &

SV3) Leak Test• (depressurize tanks to 50psia)

High Pressure Transducer / Pressurant Tank MEOP Test

• High Pressure Transducer Output Test• (pressurize COPV to 1750psia)• Pressurant Tank MEOP Test 

High Pressure Service Valve Functional Test• High Pressure Service Valve Leak Test • (depressurize COPV to 50psia)

Page 4: FM2 PPSRRCS Pressure Test Leak Check 1 UCB, March 16, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW RCS MEOP TEST/LEAK CHECK Michael Sholl Berkeley RCS.

FM2 PPSR RCS Pressure Test Leak Check4 UCB, March 16, 2006

GSE

• 2TE35610-301 (Low Pressure Test Panel)

• TE35610-301 (High Pressure Test Panel)

• Thruster enable test set

• Pipettes (1ml) for valve leak checks• Service Valves

• Latch Valves

• Thruster Valves

• Interfaces to s/c via nozzle throat plugs and Tygon tubing

• Droplet of H2O injected with syringe

• Helium K-bottle

• Blast Shield• 1/2in thick polycarbonate

Page 5: FM2 PPSRRCS Pressure Test Leak Check 1 UCB, March 16, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW RCS MEOP TEST/LEAK CHECK Michael Sholl Berkeley RCS.

FM2 PPSR RCS Pressure Test Leak Check5 UCB, March 16, 2006

G13000 PSI 1000 PSI

G21000 PSI

G3

G1SHUTOFF

VALVE

G2SHUTOFF

VALVE

G3SHUTOFF

VALVE

R1

REGULATOR

TOVENT

V1 V2V3

RV2RV1

PORT 1

PORT1

PORT2

LOW PRESSURE TEST PANEL2TE35610-301

BOTTLEREGULATOR

SHUTOFF

BOTTLEISOLATION

VALVE

RB

GAUGEPRESSURE

BOTTLE

GAUGEREGULATOR

BOTTLE

2TE35610-301 (Low Pressure Test Panel)

Page 6: FM2 PPSRRCS Pressure Test Leak Check 1 UCB, March 16, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW RCS MEOP TEST/LEAK CHECK Michael Sholl Berkeley RCS.

FM2 PPSR RCS Pressure Test Leak Check6 UCB, March 16, 2006

TE35610-301 (High Pressure Test Panel)

VENT

G1SHUTOFF

VALVE

5000 PSI

SHUTOFF

RV1

TO

REGULATOR

VALVE

R1

V1

PORT1 2

PORT

RV2

V2

G13000 PSI

G2

G2

PORT 1

HIGH PRESSURE TEST PANELTE35610-301

REGULATOR

VALVESHUTOFF

BOTTLE

REGULATOR

VALVE

BOTTLESHUTOFF RB

BOTTLE

REGULATORPRESSUREGAUGE GAUGE

BOTTLE BOTTLE

Page 7: FM2 PPSRRCS Pressure Test Leak Check 1 UCB, March 16, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW RCS MEOP TEST/LEAK CHECK Michael Sholl Berkeley RCS.

FM2 PPSR RCS Pressure Test Leak Check7 UCB, March 16, 2006

Thruster Enable Test Set

•Allows actuation of thruster valves• Both seats simultaneously (cross-strapped)• Individual seats

•Low-current mode to hold thrusters open during test

•LEDs indicate thruster firing

SW1 SW2 SW3 SW4

PB1U PB1D PB2U PB2D PB3U PB3D PB4U PB4D

J1U J1D J2U J2D J3U J3D J4U J4D

REA 1 REA 2 REA 3 REA 4

L1U L1D L2U J2D L3U L3D L4U L4D

RCS J4 - THRUSTER ENABLE TEST SET

Page 8: FM2 PPSRRCS Pressure Test Leak Check 1 UCB, March 16, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW RCS MEOP TEST/LEAK CHECK Michael Sholl Berkeley RCS.

FM2 PPSR RCS Pressure Test Leak Check8 UCB, March 16, 2006

Nozzle Throat Plugs

Page 9: FM2 PPSRRCS Pressure Test Leak Check 1 UCB, March 16, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW RCS MEOP TEST/LEAK CHECK Michael Sholl Berkeley RCS.

FM2 PPSR RCS Pressure Test Leak Check9 UCB, March 16, 2006

Safety/MA Considerations

• 1.5x proof test on both panels and lines (tags will be in place by time of test)

• Only required personnel in test facility

• Blast shield and PPE (face shield/goggles) in use

• O2 alarm and placarding in place

• Temperature and humidity

• Safety signoff at beginning and end of haz. proc.

• ESD per THM-SYS-014 EDS Control Plan

• Temperature: 65-75ºF

• Humidity: 25-60%

Page 10: FM2 PPSRRCS Pressure Test Leak Check 1 UCB, March 16, 2006 THEMIS PROBE FM2 PRE-ENVIRONMENTAL REVIEW RCS MEOP TEST/LEAK CHECK Michael Sholl Berkeley RCS.

FM2 PPSR RCS Pressure Test Leak Check10 UCB, March 16, 2006

Summary

MEOP tests and leak checks are scheduled to verify RCS system survived environmental testing

Procedure has been run, and is well-understood

Safety precautions in place