Flue Gas Desulfurization (FGD) Basics.pptx [Read-Only] Gas Desulfurization (FGD...Plant Size Control Coal Owner Baldwin –3 Units 2032 MW Dry Lime FGD PRB Vistra Havana –1 Unit

Jan 18, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Flue Gas Desulfurization (FGD) Basics.pptx [Read-Only] Gas Desulfurization (FGD...Plant Size Control Coal Owner Baldwin –3 Units 2032 MW Dry Lime FGD PRB Vistra Havana –1 Unit
Page 2: Flue Gas Desulfurization (FGD) Basics.pptx [Read-Only] Gas Desulfurization (FGD...Plant Size Control Coal Owner Baldwin –3 Units 2032 MW Dry Lime FGD PRB Vistra Havana –1 Unit
Page 3: Flue Gas Desulfurization (FGD) Basics.pptx [Read-Only] Gas Desulfurization (FGD...Plant Size Control Coal Owner Baldwin –3 Units 2032 MW Dry Lime FGD PRB Vistra Havana –1 Unit

Plant  Size Control Coal Owner

Baldwin – 3 Units  2032 MW Dry Lime FGD PRB Vistra

Havana – 1 Unit 493 MW Dry Lime FGD PRB Vistra

Hennepin – 2 Units 326 MW Low Sulfur Coal PRB Vistra

Coffeen – 2 Units 984 MW Wet Limestone FGD PRB Vistra

Duck Creek – 1 Unit 484 MW Wet Limestone FGD PRB Vistra

ED Edwards – 2 Units 728 MW Low Sulfur Coal PRB Vistra

Joppa Steam – 6 Units 1364 MW Low Sulfur Coal PRB Vistra

Kincaid – 2 Units 1297 MW Dry Sorbent Injection PRB Vistra

Newton – 1 Unit 748 MW Low Sulfur Coal PRB Vistra

Powerton – 4 Units 1673 MW Dry Sorbent Injection PRB Midwest Generation

Waukegan – 2 Units 756 MW Low Sulfur Coal PRB Midwest Generation

Will County – 1 Unit 534 MW Low Sulfur Coal PRB Midwest Generation

CWLP – 4 Units 567 MW Wet Limestone FGD Illinois Municipal

Prairie State – 2 Units  1664 MW Wet Lime FGD Illinois Independent

SIPC Marion ‐ 2 Units 312 MW Fluidized Bed Limestone/Wet Lime FGD Illinois Independent

Page 4: Flue Gas Desulfurization (FGD) Basics.pptx [Read-Only] Gas Desulfurization (FGD...Plant Size Control Coal Owner Baldwin –3 Units 2032 MW Dry Lime FGD PRB Vistra Havana –1 Unit
Page 5: Flue Gas Desulfurization (FGD) Basics.pptx [Read-Only] Gas Desulfurization (FGD...Plant Size Control Coal Owner Baldwin –3 Units 2032 MW Dry Lime FGD PRB Vistra Havana –1 Unit
Page 6: Flue Gas Desulfurization (FGD) Basics.pptx [Read-Only] Gas Desulfurization (FGD...Plant Size Control Coal Owner Baldwin –3 Units 2032 MW Dry Lime FGD PRB Vistra Havana –1 Unit
Page 7: Flue Gas Desulfurization (FGD) Basics.pptx [Read-Only] Gas Desulfurization (FGD...Plant Size Control Coal Owner Baldwin –3 Units 2032 MW Dry Lime FGD PRB Vistra Havana –1 Unit
Page 8: Flue Gas Desulfurization (FGD) Basics.pptx [Read-Only] Gas Desulfurization (FGD...Plant Size Control Coal Owner Baldwin –3 Units 2032 MW Dry Lime FGD PRB Vistra Havana –1 Unit

Data from Energy Information Administration (EIA) – https://www.eia.gov/coal/data.php

Page 9: Flue Gas Desulfurization (FGD) Basics.pptx [Read-Only] Gas Desulfurization (FGD...Plant Size Control Coal Owner Baldwin –3 Units 2032 MW Dry Lime FGD PRB Vistra Havana –1 Unit
Page 10: Flue Gas Desulfurization (FGD) Basics.pptx [Read-Only] Gas Desulfurization (FGD...Plant Size Control Coal Owner Baldwin –3 Units 2032 MW Dry Lime FGD PRB Vistra Havana –1 Unit
Page 11: Flue Gas Desulfurization (FGD) Basics.pptx [Read-Only] Gas Desulfurization (FGD...Plant Size Control Coal Owner Baldwin –3 Units 2032 MW Dry Lime FGD PRB Vistra Havana –1 Unit
Page 12: Flue Gas Desulfurization (FGD) Basics.pptx [Read-Only] Gas Desulfurization (FGD...Plant Size Control Coal Owner Baldwin –3 Units 2032 MW Dry Lime FGD PRB Vistra Havana –1 Unit
Page 13: Flue Gas Desulfurization (FGD) Basics.pptx [Read-Only] Gas Desulfurization (FGD...Plant Size Control Coal Owner Baldwin –3 Units 2032 MW Dry Lime FGD PRB Vistra Havana –1 Unit
Page 14: Flue Gas Desulfurization (FGD) Basics.pptx [Read-Only] Gas Desulfurization (FGD...Plant Size Control Coal Owner Baldwin –3 Units 2032 MW Dry Lime FGD PRB Vistra Havana –1 Unit
Page 15: Flue Gas Desulfurization (FGD) Basics.pptx [Read-Only] Gas Desulfurization (FGD...Plant Size Control Coal Owner Baldwin –3 Units 2032 MW Dry Lime FGD PRB Vistra Havana –1 Unit
Page 16: Flue Gas Desulfurization (FGD) Basics.pptx [Read-Only] Gas Desulfurization (FGD...Plant Size Control Coal Owner Baldwin –3 Units 2032 MW Dry Lime FGD PRB Vistra Havana –1 Unit
Page 17: Flue Gas Desulfurization (FGD) Basics.pptx [Read-Only] Gas Desulfurization (FGD...Plant Size Control Coal Owner Baldwin –3 Units 2032 MW Dry Lime FGD PRB Vistra Havana –1 Unit
Page 18: Flue Gas Desulfurization (FGD) Basics.pptx [Read-Only] Gas Desulfurization (FGD...Plant Size Control Coal Owner Baldwin –3 Units 2032 MW Dry Lime FGD PRB Vistra Havana –1 Unit
Page 19: Flue Gas Desulfurization (FGD) Basics.pptx [Read-Only] Gas Desulfurization (FGD...Plant Size Control Coal Owner Baldwin –3 Units 2032 MW Dry Lime FGD PRB Vistra Havana –1 Unit
Page 20: Flue Gas Desulfurization (FGD) Basics.pptx [Read-Only] Gas Desulfurization (FGD...Plant Size Control Coal Owner Baldwin –3 Units 2032 MW Dry Lime FGD PRB Vistra Havana –1 Unit