Page 1
Florida Department of
TRANSPORTATION - DISTRICT ONEFlorida Department of
TRANSPORTATION - DISTRICT ONE
SOUTHWESTAREA OFFICE(FORT MYERS)
DISTRICT ONEHEADQUARTERS
(BARTOW)
TENTATIVE FIVE YEAR WORK PROGRAMFISCAL YEARS 2017-2021
TENTATIVE FIVE YEAR WORK PROGRAMFISCAL YEARS 2017-2021
SARASOTA COUNTY
DRAFT
Page 2
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
MISSION STATEMENT The Department will provide a safe, interconnected statewide transportation system for Florida's citizens and visitors that ensures the mobility of people and goods, while enhancing economic prosperity and sustaining the quality of our environment.
Robin StublenCommunications SpecialistDistrict One Headquarters801 North BroadwayP.O. Box 1249Bartow, FL 33831(863) 519-2362
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 29/21/2015Run Date: SnapShot Date: 9/17/2015
Zachary BurchGovernment Affairs &Communications ManagerSouthwest Area Office10041 Daniels ParkwayFort Myers, Fl. 33913(239) 225‐1950
DRAFT
knhntfr
Text Box
TENTATIVE WORK PROGRAM REPORT
knhntfr
Text Box
July 1, 2016 Through June 30, 2021
knhntfr
Text Box
SARASOTA COUNTY
Page 3
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1
COUNTYSARASOTA
July 1, 2016 Through June 30, 2021
CURRENTLY REPORTED ACTIVE FUND CODES
DRAFTTENTATIVE WORK PROGRAM REPORT
ACSA Advance Construction (SA)
ACSU Advance Construction (SU)
BRRP State Bridge Repair And Rehab
CIGP County Incentive Grant Program
DDR District Dedicated Revenue
DI State-Statewide Inter/Intrastate Highway
DIH State In-house Product Support
DPTO State PTO
DS State Primary Highways and PTO
DU State Primary/Federal Reimbursement
FTA Federal Transit Administration
GMR General Revenue for SIS
HSP Highway Safety Program
LF Local Funds
LFP Local Fund for Participating
PL Metro Plan (85% FA; 15% other)
SA STP, Any Area
SU STP, Urban Areas > 200k
ACNP
TALT
TALU
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 39/23/2015Run Date: SnapShot Date: 9/17/2015
knhntfr
Text Box
Transportation ALTS Any Area
knhntfr
Text Box
Transportation ALTS Any Area
knhntfr
Text Box
Transportation ALTS> 200K
Page 4
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYSARASOTA
DRAFT
HIGHWAYS
FPN: 4335481 Project/Location: CATTLEMEN ROAD AT VARIOUS
INTERSECTIONS
Project Length: 0.001Desc: ADD TURN LANE(S)
Comments: Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST CIGP $1,862,003
CST LFP $3,961,997
$5,824,000Project Total:
FPN: 4332161 Project/Location: CRANBERRY BLVD AT HILLSBOROUGH
AVENUE
Project Length: 0.001Desc: INTERSECTION IMPROVEMENT
Comments: Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SU $865,515
$865,515Project Total:
FPN: 4369871 Project/Location: EDMONDSON ROAD (CITY OF VENICE) FROM
PINEBROOK ROAD TO AUBURN ROAD
Project Length: 1.008Desc: SIDEWALK
Comments: Begin Mile Post: 1.592 End Mile Post: 2.600
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST SU $336,082
$336,082Project Total:
FPN: 4385861 Project/Location: I-75 (SR 93) AT SR 681 LANDSCAPING
Project Length: 0.001Desc: LANDSCAPING
Comments: Begin Mile Post: 28.780 End Mile Post: 28.781
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $10,000
CST DIH $11,100
CST DS $1,500,000
$10,000 $1,511,100Project Total:
FPN: 2012776 Project/Location: I-75 (SR 93) AT UNIVERSITY PARKWAY
(SARASOTA)
Project Length: 0.413Desc: LANDSCAPING
Comments: Begin Mile Post: 42.202 End Mile Post: 42.615
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST DIH $61,404
CST DS $541,000
$602,404Project Total:
FPN: 2012775 Project/Location: I-75 (SR93) AT BEE RIDGE ROAD
Project Length: 0.750Desc: INTERCHANGE IMPROVEMENT
Comments: Begin Mile Post: 35.955 End Mile Post: 36.705
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
ENV ACNP $350,000
ROW DI $2,464,880
ROW DIH $150,450
$350,000 $2,615,330Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 49/23/2015Run Date: SnapShot Date: 9/17/2015
Page 5
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYSARASOTA
DRAFT
FPN: 2012772 Project/Location: I-75 (SR93) AT UNIVERSITY
PARKWAY
Project Length: 0.413Desc: INTERCHANGE - ADD LANES
Comments: Begin Mile Post: 42.202 End Mile Post: 42.615
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
INC SA $2,500,000
$2,500,000Project Total:
FPN: 4130443 Project/Location: I-75 (SR93) FROM TOLEDO BLADE TO SUMTER
BLVD
Project Length: 3.505Desc: ADD LANES & RECONSTRUCT
Comments: Begin Mile Post: 7.465 End Mile Post: 10.970
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
INC GMR $900,000
$900,000Project Total:
FPN: 2012773 Project/Location: I-75 AT SR 72
Project Length: 0.729Desc: INTERCHANGE IMPROVEMENT
Comments: Begin Mile Post: 34.003 End Mile Post: 34.732
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
ENV DDR $600,000
$600,000Project Total:
FPN: 4136571 Project/Location: LONGBOAT KEY TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 2.117Desc: TRAFFIC SIGNALS
Comments: Begin Mile Post: 3.870 End Mile Post: 5.987
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $14,608 $12,528 $12,904 $13,291 $13,690
$14,608 $12,528 $12,904 $13,291 $13,690Project Total:
FPN: 4336081 Project/Location: MYRTLE STREET
Project Length: 0.001Desc: SIDEWALK
Comments: Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST TALT $243,149
$243,149Project Total:
FPN: 4336082 Project/Location: MYRTLE STREET
Project Length: 0.001Desc: SIDEWALK
Comments: Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
ENV TALT $10,000 $40,000
$10,000 $40,000Project Total:
FPN: 4136581 Project/Location: NORTH PORT TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 2.586Desc: TRAFFIC SIGNALS
Comments: Begin Mile Post: 0.214 End Mile Post: 2.800
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $32,640 $24,244 $24,971 $25,720 $26,492
$32,640 $24,244 $24,971 $25,720 $26,492Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 59/23/2015Run Date: SnapShot Date: 9/17/2015
Page 6
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYSARASOTA
DRAFT
FPN: 4354511 Project/Location: RINGLING BLVD AND ORANGE AVE
ROUNDABOUTS
Project Length: 0.001Desc: ROUNDABOUT
Comments: Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST SU $884,523
$884,523Project Total:
FPN: 4383411 Project/Location: RINGLING BLVD AT PINE PLACE
INTERSECTION
Project Length: 0.137Desc: INTERSECTION IMPROVEMENT
Comments: Begin Mile Post: 0.000 End Mile Post: 0.136
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SU $1,420,000
$1,420,000Project Total:
FPN: 4136591 Project/Location: SARASOTA CITY TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 5.289Desc: TRAFFIC SIGNALS
Comments: Begin Mile Post: 15.541 End Mile Post: 20.830
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $196,466 $204,304 $210,433 $216,746 $223,248
$196,466 $204,304 $210,433 $216,746 $223,248Project Total:
FPN: 4126761 Project/Location: SARASOTA COUNTY TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 9.210Desc: TRAFFIC SIGNALS
Comments: Begin Mile Post: 3.630 End Mile Post: 12.840
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $470,916 $482,421 $501,668 $516,718 $532,219
$470,916 $482,421 $501,668 $516,718 $532,219Project Total:
FPN: 1979861 Project/Location: SARASOTA MPO IDENTIFIED OPERATIONAL
IMPROVEMENTS - FUNDING
Project Length: 0.000Desc: TRAFFIC OPS IMPROVEMENT
Comments: Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST SU $3,011,651
$3,011,651Project Total:
FPN: 4382551 Project/Location: SARASOTA TRAIL COON KEY FROM N
WASHINGTON DR TO JOHN RINGLING
CAUSEWAY
Project Length: 0.001Desc: BIKE PATH/TRAIL
Comments: Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST LF $914,861
CST SA $846,823
$1,761,684Project Total:
FPN: 4335503 Project/Location: SR 45 (US 41) FROM BLACKBURN POINT ROAD TO
MCINTOSH ROAD
Project Length: 2.503Desc: BIKE LANE/SIDEWALK
Comments: Begin Mile Post: 6.134 End Mile Post: 8.637
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST DDR $57,661
CST SU $3,084,469
$3,142,130Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 69/23/2015Run Date: SnapShot Date: 9/17/2015
Page 7
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYSARASOTA
DRAFT
FPN: 4335502 Project/Location: SR 45 (US 41) FROM MCINTOSH ROAD TO BENEVA
ROAD
Project Length: 1.392Desc: BIKE LANE/SIDEWALK
Comments: Begin Mile Post: 8.637 End Mile Post: 10.029
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST DDR $53,804
CST SU $1,703,649
$1,757,453Project Total:
FPN: 4369791 Project/Location: SR 45 (US 41) FROM RIVER TO WOODMERE PARK
BLVD
Project Length: 5.523Desc: SIDEWALK
Comments: Begin Mile Post: 6.138 End Mile Post: 11.661
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SU $610,000
CST SU $2,124,028
$610,000 $2,124,028Project Total:
FPN: 4349611 Project/Location: SR 45 (US 41) TAMIAMI TRL FROM PALERMO
PLACE TO VENICE AVENUE
Project Length: 0.626Desc: RESURFACING
Comments: Begin Mile Post: 16.587 End Mile Post: 17.131
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
ENV ACSA $100,000
CST ACSA $78,677
CST DDR $1,453,006
$1,631,683Project Total:
FPN: 4348591 Project/Location: SR 45 (USB 41) OVER HATCHETT CREEK AT
BRIDGE 170169
Project Length: 0.205Desc: BRIDGE-REPAIR/REHABILITATION
Comments: Begin Mile Post: 0.147 End Mile Post: 0.352
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE BRRP $200,000
PE DIH $20,000
ENV BRRP $10,000 $100,000
CST BRRP $1,841,479
CST DIH $228,657
$230,000 $2,170,136Project Total:
FPN: 4348601 Project/Location: SR 45 (USB 41) OVER ICWW (CIRCUS BRIDGES
)
Project Length: 0.076Desc: BRIDGE-REPAIR/REHABILITATION
Comments: Begin Mile Post: 15.283 End Mile Post: 15.359
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
ENV BRRP $100,000
CST BRRP $2,671,367
CST DIH $219,130
$2,990,497Project Total:
FPN: 1980174 Project/Location: SR 45/US 41 (VENICE BYPASS) FROM GULF COAST
BLVD TO BIRD BAY DR WEST
Project Length: 1.138Desc: ADD LANES & RECONSTRUCT
Comments: Begin Mile Post: 1.630 End Mile Post: 2.768
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
INC DS $600,000
$600,000Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 79/23/2015Run Date: SnapShot Date: 9/17/2015
Page 8
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYSARASOTA
DRAFT
FPN: 4345041 Project/Location: SR 72 AT BEE RIDGE ROAD
Project Length: 0.500Desc: ROUNDABOUT
Comments: Begin Mile Post: 7.717 End Mile Post: 8.217
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST ACSA $10,250
CST DDR $13,077
CST HSP $1,372,103
$1,395,430Project Total:
FPN: 4365671 Project/Location: SR 758 (BEE RIDGE ROAD) FROM BOND PLACE TO
CATTLEMAN ROAD
Project Length: 1.499Desc: RESURFACING
Comments: Begin Mile Post: 3.368 End Mile Post: 4.867
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
ENV ACSA $55,000
CST SA $6,695,645
$55,000 $6,695,645Project Total:
FPN: 4344911 Project/Location: SR 758 AT BEACH ROAD
ROUNDABOUT
Project Length: 0.379Desc: INTERSECTION IMPROVEMENT
Comments: Begin Mile Post: 1.048 End Mile Post: 1.427
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST DDR $38,413
CST HSP $1,531,229
CST SA $10,530
INC DDR $50,000
$1,630,172Project Total:
FPN: 4313061 Project/Location: SR 758 FROM SIESTA DRIVE TO BOND
PL
Project Length: 3.821Desc: FLEXIBLE PAVEMENT RECONSTRUCT.
Comments: Begin Mile Post: 0.000 End Mile Post: 3.368
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
INC DS $750,000
$750,000Project Total:
FPN: 4366801 Project/Location: SR 789 (RINGLING) FROM BIRD KEY DRIVE TO
SARASOTA HARBOR WEST
Project Length: 0.741Desc: PD&E/EMO STUDY
Comments: Begin Mile Post: 1.206 End Mile Post: 1.947
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PDE SA $2,325,000
$2,325,000Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 89/23/2015Run Date: SnapShot Date: 9/17/2015
Page 9
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYSARASOTA
DRAFT
FPN: 4283831 Project/Location: SR45 (US 41) FROM 10TH STREET TO 14TH
STREET
Project Length: 0.486Desc: ROUNDABOUT
Comments: ROUNDABOUTBegin Mile Post: 19.183 End Mile Post: 19.669
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
ENV DDR $100,000
RRU LF $500,000
CST DDR $4,888,140
CST DIH $116,338
CST LFP $2,779,715
INC DDR $265,000
$8,384,193 $265,000Project Total:
FPN: 4354501 Project/Location: TRAIL BRIDGE OVER LAUREL RD LEGACY
TRAIL
Project Length: 0.217Desc: PEDESTRIAN/WILDLIFE OVERPASS
Comments: Begin Mile Post: 0.000 End Mile Post: 0.217
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
ENV TALT $40,000
CST ACSU $619,219
CST SU $1,240,853
CST TALU $725,914
$2,625,986Project Total:
FPN: 4383711 Project/Location: US 301 FROM FRUITVILLE RD TO 10TH
ST
Project Length: 1.398Desc: SAFETY PROJECT
Comments: Begin Mile Post: 0.000 End Mile Post: 1.398
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE DIH $10,000
PE HSP $175,000
CST DIH $21,640
CST DS $16,558
CST HSP $337,514
$185,000 $375,712Project Total:
FPN: 4227105 Project/Location: US 41 (SR 45) FROM SALFORD BLVD TO SUMTER
BLVD
Project Length: 0.996Desc: ADD LANES & RECONSTRUCT
Comments: Begin Mile Post: 0.209 End Mile Post: 1.205
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
ENV DS $25,000
CST DIH $303,021
CST DS $11,214,971
INC DDR $470,000
$11,542,992 $470,000Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 99/23/2015Run Date: SnapShot Date: 9/17/2015
Page 10
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYSARASOTA
DRAFT
FPN: 4347281 Project/Location: US 41 AT HANSEN BLVD
Project Length: 0.133Desc: INTERSECTION IMPROVEMENT
Comments: Begin Mile Post: 15.073 End Mile Post: 15.206
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST ACSA $13,165
CST DDR $2,887
CST HSP $215,635
$231,687Project Total:
FPN: 4332251 Project/Location: US 41 AT MAIN STREET
Project Length: 0.200Desc: ROUNDABOUT
Comments: Begin Mile Post: 7.369 End Mile Post: 7.569
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PE SU $200,000
$200,000Project Total:
FPN: 4332761 Project/Location: US 41 AT MYRTLE STREET & MARTIN LUTHER
KING JR WAY
Project Length: 0.524Desc: INTERSECTION IMPROVEMENT
Comments: Begin Mile Post: 20.322 End Mile Post: 20.846
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PDE DDR $1,200,000
PDE DIH $45,000
PE DDR $2,800,000
PE DIH $20,000
$1,245,000 $2,820,000Project Total:
FPN: 4332191 Project/Location: US 41 AT ORANGE AVE
Project Length: 0.200Desc: ROUNDABOUT
Comments: Begin Mile Post: 17.751 End Mile Post: 17.951
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PDE DDR $600,000
PDE DIH $45,000
PE DIH $20,000
PE DS $1,400,000
$645,000 $1,420,000Project Total:
FPN: 4335521 Project/Location: US 41 FROM SUMTER BLVD TO ORTIZ
BLVD
Project Length: 2.657Desc: BIKE PATH/TRAIL
Comments: Begin Mile Post: 0.974 End Mile Post: 3.631
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
ENV SU $100,000
CST DDR $55,054
CST SU $1,621,404
$100,000 $1,676,458Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 109/23/2015Run Date: SnapShot Date: 9/17/2015
Page 11
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYSARASOTA
DRAFT
FPN: 1980176 Project/Location: US 41 -VENICE BYPASS FROM CENTERROAD TO
GULF COAST BLVD
Project Length: 1.187Desc: ADD LANES & RECONSTRUCT
Comments: Begin Mile Post: 0.443 End Mile Post: 1.630
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
ENV DDR $30,000
ENV DS $150,000
RRU DS $1,576,250
RRU LF $1,930,000
ROW DDR $7,655,000 $6,769,455
ROW DIH $201,615
CST DS $632,012
CST LF $28,132
CST SA $4,903,767
CST SU $7,101,521
$7,856,615 $6,799,455 $16,321,682Project Total:
FPN: 4136601 Project/Location: VENICE TRAFFIC SIGNALS
REIMBURSEMENT
Project Length: 1.277Desc: TRAFFIC SIGNALS
Comments: Begin Mile Post: 15.854 End Mile Post: 17.131
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $46,449 $44,478 $45,812 $47,186 $48,602
$46,449 $44,478 $45,812 $47,186 $48,602Project Total:
FPN: 4350921 Project/Location: VENICE/MIA/TAMPA AVE FROM HARBOR DR TO
BUSINESS US 41
Project Length: 0.001Desc: SIDEWALK
Comments: Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST TALU $778,723
$778,723Project Total:
HIGHWAYS TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21
$48,954,767 $27,122,506 $22,464,445 $11,691,919 $9,291,232
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 119/23/2015Run Date: SnapShot Date: 9/17/2015
Page 12
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYSARASOTA
DRAFT
MISCELLANEOUS
FPN: 4369741 Project/Location: ATMS NEW CONTROLLERS & CCTV'S AT
VARIOUS LOCATIONS IN SARASOTA COUNTY
Project Length: 0.001Desc: ATMS - ARTERIAL TRAFFIC MGMT
Comments: Begin Mile Post: 0.000 End Mile Post: 0.001
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CST SU $2,751,053
$2,751,053Project Total:
MISCELLANEOUS TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21
$2,751,053
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 129/23/2015Run Date: SnapShot Date: 9/17/2015
Page 13
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYSARASOTA
DRAFT
TRANSPORTATION PLANNING
FPN: 4383631 Project/Location: SARASOTA/MANATEE COUNTY MPO 2020-
2021
Project Length: 0.000Desc: TRANSPORTATION PLANNING
Comments: Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PLN PL $732,072
$732,072Project Total:
FPN: 4348531 Project/Location: SARASOTA/MANATEE
Project Length: 0.000Desc: TRANSPORTATION PLANNING
Comments: Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PLN PL $732,072 $732,072
$732,072 $732,072Project Total:
FPN: 4318111 Project/Location: SARASOTA/MANATEE FY 2017/2018
UPWP
Project Length: 0.000Desc: TRANSPORTATION PLANNING
Comments: Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PLN PL $732,072 $732,072
$732,072 $732,072Project Total:
TRANSPORTATION PLANNING TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21
$732,072 $732,072 $732,072 $732,072 $732,072
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 139/23/2015Run Date: SnapShot Date: 9/17/2015
Page 14
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYSARASOTA
DRAFT
FLP: AVIATION
FPN: 4255111 Project/Location: SARASOTA/BRADENTON INTERNATIONAL
AIRPORT
Project Length: 0.000Desc: AVIATION SAFETY PROJECT
Comments: RELOCATE AIR TRAFFIC CONTROL TOWER (CONSTRUCT NEW FACILITY)Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP DDR $2,142,632 $463,974 $750,000 $1,000,000
CAP DPTO $857,368 $536,026
CAP LF $3,000,000 $1,000,000 $750,000 $1,000,000
$6,000,000 $2,000,000 $1,500,000 $2,000,000Project Total:
FPN: 4313611 Project/Location: SARASOTA/BRADENTON INT'L APT MIXED USE
PARKING STRUCTURE - GARAGE
Project Length: 0.000Desc: AVIATION CAPACITY PROJECT
Comments: Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP DDR $2,000,000
CAP LF $2,000,000
$4,000,000Project Total:
FPN: 4336471 Project/Location: SARASOTA/BRADENTON INTERNATIONAL
AIRPORT
Project Length: 0.000Desc: AVIATION PRESERVATION PROJECT
Comments: DESIGN TERMINAL ADMINISTRATIVE LEVEL RENO-PHASE 6Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP DDR $1,000,000
CAP LF $1,000,000
$2,000,000Project Total:
FPN: 4348261 Project/Location: SARASOTA/BRADENTON INT'L APT SECURITY
ENHANCEMENTS
Project Length: 0.000Desc: AVIATION SECURITY PROJECT
Comments: SECURITY ENHANCEMENTSBegin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP DDR $1,050,000
CAP LF $1,050,000
$2,100,000Project Total:
FPN: 4370611 Project/Location: SARASOTA-BRADENTON INT'L APT N QUAD
PUBLIC ASSESS RD-DESIGN AND CONST
Project Length: 0.000Desc: AVIATION CAPACITY PROJECT
Comments: NORTH QUAD PUBLIC ACCESS ROAD-DESIGN AND CONSTRUCTIONBegin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP DDR $225,000 $1,000,000 $1,000,000
CAP LF $225,000 $1,000,000 $1,000,000
$450,000 $2,000,000 $2,000,000Project Total:
FPN: 4370621 Project/Location: SARASOTA-BRADENTON INT'L APT AIR CENTER
UTILITIES
Project Length: 0.000Desc: AVIATION REVENUE/OPERATIONAL
Comments: AIR CENTER UTILITIES FOR MULTI-PURPOSE APRONS AND CENTERBegin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP DDR $1,000,000
CAP LF $1,000,000
$2,000,000Project Total:
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 149/23/2015Run Date: SnapShot Date: 9/17/2015
Page 15
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYSARASOTA
DRAFT
FPN: 4336301 Project/Location: VENICE MUNICIPAL AIRPORT AIRFIELD
MOWING EQUIPMENT
Project Length: 0.000Desc: AVIATION REVENUE/OPERATIONAL
Comments: Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP DDR $122,400
CAP LF $30,600
$153,000Project Total:
FPN: 4387501 Project/Location: VENICE MUNICIPAL AIRPORT
Project Length: 0.000Desc: AVIATION PRESERVATION PROJECT
Comments: Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP DPTO $980,000
CAP LF $245,000
$1,225,000Project Total:
FPN: 4318791 Project/Location: VENICE MUNICIPAL APT APRON
REHABILITATION
Project Length: 0.000Desc: AVIATION PRESERVATION PROJECT
Comments: FY 2016 DESIGN PHASEBegin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP DDR $800,000 $800,000
CAP LF $200,000 $200,000
$1,000,000 $1,000,000Project Total:
FPN: 4365071 Project/Location: VENICE MUNICIPAL APT AVE DRAINAGE
IMPROVEMENTS
Project Length: 0.000Desc: AVIATION ENVIRONMENTAL PROJECT
Comments: AIRPORT AVENUE DRAINAGE IMPROVEMENTSBegin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP DDR $680,000
CAP LF $170,000
$850,000Project Total:
FPN: 4369881 Project/Location: VENICE MUNICIPAL APT DESIGN AND CONST T-
HANGERS-MODIFIELD
Project Length: 0.000Desc: AVIATION REVENUE/OPERATIONAL
Comments: Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP DPTO $500,000
CAP LF $125,000
$625,000Project Total:
FLP: AVIATION TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21
$9,300,000 $7,153,000 $6,450,000 $8,000,000
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 159/23/2015Run Date: SnapShot Date: 9/17/2015
Page 16
FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT - 1TENTATIVE WORK PROGRAM REPORT
July 1, 2016 Through June 30, 2021 COUNTYSARASOTA
DRAFT
FLP: TRANSIT
FPN: 4345281 Project/Location: SARASOTA CO/SAR-BRADENTON UZA FTA
SECTION 5339 CAPITAL ASSISTANCE
Project Length: 0.000Desc: CAPITAL FOR FIXED ROUTE
Comments: DR/SARASOTA COUNTY TRANSPORTATION AUTHORITY/SCATBegin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP FTA $408,943 $408,943 $408,943 $408,943 $413,325
CAP LF $102,236 $102,236 $102,236 $102,236 $104,081
$511,179 $511,179 $511,179 $511,179 $517,406Project Total:
FPN: 4101521 Project/Location: SARASOTA COUNTY FTA SECTION 5307 CAPITAL
ASSISTANCE
Project Length: 0.000Desc: CAPITAL FOR FIXED ROUTE
Comments: SECTION 5307 CAPITALBegin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
CAP FTA $3,693,934 $3,693,934 $3,693,934 $3,752,710 $3,807,530
CAP LF $923,484 $923,484 $923,484 $938,178 $951,883
$4,617,418 $4,617,418 $4,617,418 $4,690,888 $4,759,413Project Total:
FPN: 4346101 Project/Location: SARASOTA COUNTY FTA SECTION 5307
OPERATING ASSISTANCE
Project Length: 0.000Desc: OPERATING FOR FIXED ROUTE
Comments: Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS FTA $313,000 $313,000 $313,000 $769,650 $791,165
OPS LF $313,000 $313,000 $313,000 $769,650 $791,165
$626,000 $626,000 $626,000 $1,539,300 $1,582,330Project Total:
FPN: 4101441 Project/Location: SARASOTA COUNTY-SCAT OPERATING
ASSISTANCE BLOCK GRANT
Project Length: 0.000Desc: OPERATING FOR FIXED ROUTE
Comments: Begin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
OPS DDR $1,368,562
OPS DPTO $1,403,942 $1,450,291 $1,522,805 $1,598,945
OPS LF $1,368,562 $1,403,942 $1,450,291 $1,522,805 $1,598,945
$2,737,124 $2,807,884 $2,900,582 $3,045,610 $3,197,890Project Total:
FPN: 4101171 Project/Location: SARASOTA-MANATEE MPO TRANSIT PLANNING -
5305(D)
Project Length: 0.000Desc: MODAL SYSTEMS PLANNING
Comments: SECTION 5305(D) METROPOLITAN PLANNINGBegin Mile Post: 0.000 End Mile Post: 0.000
Phase Fund 2016/17 2017/18 2018/19 2019/20 2020/21
PLN DPTO $21,787 $22,440 $22,440 $22,796 $21,925
PLN DU $174,293 $179,521 $179,521 $182,369 $175,404
PLN LF $21,787 $22,440 $22,440 $22,796 $21,925
$217,867 $224,401 $224,401 $227,961 $219,254Project Total:
FLP: TRANSIT TOTAL 2016/17 2017/18 2018/19 2019/20 2020/21
$8,709,588 $8,786,882 $8,879,580 $10,014,938 $10,276,293
COUNTY TOTALSSARASOTA
Phase Fund Total2016/17 2017/18 2018/19 2019/20 2020/21
$70,447,480 $43,794,460 $38,526,097 $30,438,929 $20,299,597COUNTY Total: $203,506,563
ADM – Administration ● CAP – Capitol Improvement ● CS – Construction ● DSB – Design Build ● ENV – Environmental ● INC – Contract Incentives ● LAR – Local Government Reimbursement ● MNT – Bridge/Rdway/Contract Maint ● MSC – Miscellaneous ● OPS – Operations ● PE – Prelim Engineering ● PDE – Project Dev and Enviro ● PLN – Planning ● RES – Research ● ROW – Right of Way ● RRU – Railroad Utilities
PHASE CODES
Page: 169/23/2015Run Date: SnapShot Date: 9/17/2015