P.O. BOX 685, Luqman Tower, Office # 16 & 17 4 th Floor, Abdul Aziz Road, Al-Khobar, KSA. Phone: +966-13-8944304 Fax: +966-13-8961712 Email:[email protected] Website:www.aurcontracting.com
P.O. BOX 685, Luqman Tower, Office # 16 & 17 4th Floor, Abdul Aziz Road, Al-Khobar, KSA.
Phone: +966-13-8944304 Fax: +966-13-8961712 Email:[email protected]
Website:www.aurcontracting.com
P a g e . 2
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
TABLE OF CONTENTS
CHAPTER DESCRIPTION PAGE NO.
1 CEO MESSAGE 03
2 COMPANY OVERVIEW 05
3 OUR CAPABILITIES 07
4 ROBUST MOBILIZATION 10
5 OUR RESOURCES 13
6 OUR CLIENTS 19
7 OUR PROJECTS 21
8 EXPERIENCE TO ACCOMPLISHMENTS OF SUCCESS STORIES 26
9 CORPORATE ORGANIZATION CHART 40
10 HEALTH, SAFETY & ENVIROMENT 42
11 QUALITY MANAGEMENT SYSTEM 50
12 PROCUREMENT PLAN 56
13 COMPANY LEGAL DOCUMENT 61
14 APPRECIATION CERTIFICATES & LETTERS 69
o f 7 7
P a g e . 3
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 7
P a g e . 4
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
CEO MESSAGE
It is my privilege and pleasure to state that since more than a
decade the incorporation of the Attiq Ur Rehman Contracting
Co. (AUR) in Al-Khobar, with the help of Almighty God, it was
an entirely fruitful period evidently governed by a clear
philosophy of work and close link with the community of
Kingdom of Saudi Arabia. The significant projects achieved by
AUR, which emerged from our clear-sighted vision and
ambitious goals, have profound impact and support in enhancing the national
development and providing the appropriate environment for the establishment
of many urban and industrial communities in the Kingdom. With the company’s
growth, development and expansion to every corner of the kingdom, AUR
contributed to Saudi Market with huge fleet of machinery and manpower. We
are well known and leading supporters for new Industrial Expansion by
rendering initial setup facilities with minimum possible time regardless any
geographical location in the Kingdom. This remarkable growth, overwhelming
success along with the wise leadership, absolute confidence of our customers,
partners, the industrial, commercial and residential market that always expects
us to complete our march in the single-aim road, have drawn the clear map of
our work. We are proud to be supportive to Saudi Arabia’s Vision 2030 by
contributing in diversified economy and serving in private sector industrial
construction. We excel through comprehensive future viewing, good planning;
adoption of development policy for all work systems and mechanisms. Added
to that, the provision of adequate and suitable jobs and training of national work
force in implementation of continuous training concept and the transfer of
expertise to the work team. Through these pillars, we ensure the achievement
of optimum use of resources for timely completion of projects with Safety and
Quality. We are professional, dedicated and transparent.
o f 7 7
P a g e . 5 o f 7 2
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
P a g e . 6
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
COMPANY OVERVIEW
Attiq Ur Rehman Contracting Co. (AUR) is a Civil, Mechanical and Electrical Construction
Company. AUR is one of the leading fast-growing companies operating in Kingdom of Saudi
Arabia.
AUR was established in 2009, as temporary facilities & infrastructural contracting business.
Over a short period of one decade, AUR has successfully diversified into other construction
sectors & related support businesses and within a short span of 10 years we are the main
contractor for the Saudi Arabia’s largest Sugar Refinery (Al-Reef Sugar Refinery) in Jizan. AUR
is now considered to be one of Saudi Arabia's fastest growing and trustable construction
company. At AUR, we take pride in offering our clients a strong, customer-focused approach,
applying best practices to offer world-class quality that the Kingdom expects from its quality
contracting firms. AUR has attained and sustained leadership in all its major lines of its
businesses.
It has its presence almost all over the Kingdom, with a national spread of offices. It has urge
to continue to grow its global footprint, with construction facilities in multiple countries.
In response to changing market dynamics, AUR has gone through a phased process of
redefining its organization model to facilitate growth through greater levels of
empowerment. The new structure is built around multiple businesses that serve the needs of
Construction Business and enable AUR to be self-sufficient in delivering its services to the
esteemed and valued clients.
AUR has major business lines in:
Highly sophisticated world class temporary facilities.
Site Preparation & Earth Works
Infrastructure Networks.
Building Construction.
Industrial Construction.
Electrical Network Construction and Installation.
Steel Erection.
Mechanical Works.
Fencing and fire-fighting works
Equipment rental business.
o f 7 7
P a g e . 7 o f 7 2
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
P a g e . 8
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
OUR CAPABILITIES
Over the last 10 years, AUR has grown to more than 350 employees, and owns over 300 pieces
of construction equipment, and has established 03 regional offices throughout the Kingdom.
AUR strengths, summarized below, demonstrate full-service capability:
Highly sophisticated world class temporary facilities.
Infrastructure Networks.
Site Preparation & Earth work
Building Construction.
Industrial Construction.
Electrical Network Construction and Installation.
Steel Erection.
Mechanical Works.
Fencing and fire-fighting works.
Equipment rental business.
Our Strengths
One of AUR's greatest strengths is derived from the support it receives from the related
companies within AUR, resources that can be relied upon include:
Human Resource from our strong market alliances.
Construction Equipment (AUR rental division)
Market trust that enables us to purchase quality construction materials on priority
basis.
In addition, AUR prides itself in self-performing most construction activities to maximize the
control of its workforce, and to be in a better position to control costs, maintain schedule
commitments, and ensure adherence to our Quality and Safety Programs. To ensure that we
have adequate resources, AUR enjoys the strength of having over 300 pieces of construction
equipment and a stable workforce of more than 350.
Our Vision
AUR is focused on creating innovative, entrepreneurial and empowered team to achieve
constantly values and culture of learning, caring, trust and customer satisfaction. AUR
believes that progress must be achieved in harmony with the environment. A commitment
to community welfare and environmental protection are an integral part of the corporate
vision.
o f 7 7
P a g e . 9
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
Our vision is safe accomplishment of challenges and task in stipulated time frame without
compromise on quality to meet the clients’ satisfaction.
Our Values:
AUR believes and earn customer satisfaction and trust by maintaining our strong values of:
Our Commitment to Prompt Mobilization and Early Completion of Projects.
Ensuring Customer Confidence through timely communications
Investing in Technical Expertise
Ensuring Quality Products & Services through adherence to International Quality
Standards, and a Robust Internal Training Program
Ensuring Environmental, Health & Safety requirements are consistently met, or
exceeded through Internal Surveillance.
Transparency with clients and stakeholders.
Our Presence:
Through its history of providing excellent service to the major clients in the Kingdom, AUR
has established a presence in almost all regions of the Kingdom. With this Kingdom-wide
presence, AUR is able to mobilize quickly for projects throughout the Kingdom. AUR therefore
specializes in emergency or quick turnaround projects, and we excel on project work in
remote areas.
o f 7 7
P a g e . 1 0
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 7
P a g e . 1 1
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
ROBUST MOBILIZATION CAPABILITY
Normally, upon receiving the “Notice to Proceed”, mobilization start which includes the
following key activities:
Development of site layout plan
Site detail survey & establishment of survey control points
Execution of construction site fence and temporary access roads
Temporary arrangements for water, electricity & septic tanks Attiq Ur Rehman Contracting Co. has robust capability to mobilize on site within 07 days
from NTP.
We have all essential facilities available including furnished porta cabins for offices, meeting halls, consultant and client offices, mosque, site stores, workshop, and all equipment. We are self-sufficient to establish our set-up with amazing short time frame.
We are not only self-sufficient in mobilization rather we are market leaders and have highly trustable reputation among numerous International Companies to whom we have supported for their quick mobilization in Saudi Arabia.
WE ARE READY!
o f 7 7
P a g e . 1 2
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
TCF Meeting Room
Temporary Office Facility
Temporary Office and Camp Facility
Porta Cabins Installation
Site preparation
Earth Works
o f 7 7
P a g e . 1 3
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 7
P a g e . 1 4
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
RESOURCES
S.NO CATEGORY NO.
1 Administration 4
2 Admin. / Secretary 4
3 Project Support & Control 6
4 Procurements 3
5 Professional Engineer 24
6 Auto CAD Draughtsman 4
7 Q/C Manager 1
8 Q/C Supervisor 2
9 Q/C Inspector 6
10 Safety Manager 1
11 Safety Supervisor 2
12 Safety Officer 8
13 Surveyor 4
14 Site Supervisor 8
15 Foremen 20
16 Driver 20
17 Equipment Operators 42
18 Skilled & Un Skilled Workers 300
TOTAL 459
o f 7 7
P a g e . 1 5
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
AUR`S EQUIPMENTS
o f 7 7
P a g e . 1 6
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
AUR`S EQUIPMENTS
o f 7 7
P a g e . 1 7
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
LIST OF EQUIPMENT & TOOLS
S. No. Description Quantity Owned
Supported by Our Sister Concerned
Quantity Total
1 Dozer 6 4 10
2 Excavator 15 1 16
3 Grader 6 2 7
4 Wheel Loaders 8 2 10
5 Back hoe Loader 14 1 15
6 Skid Loader 12 2 14
7 Fork Lift 4 1 5
8 Crane (50 ton) 2 0 2
9 Roller Compactor 7 2 9
10 Boom Truck 10 Ton 5 0 5
11 Dump Truck 20 30 50
12 Flat Bed Truck 2 3 5
13 Low Bed 3 1 4
14 Water Truck 5 3 8
15 Fuel Trucks (8,000 litres) 2 2 4
16 Bus (14-55 Seats) 8 2 10
17 Scaffolding Towers 600 600 1200
18 Air Compressor 6 1 7
19 Welding Equipment 4 8 12
20 Mobile Tower Lights 20 40 60
o f 7 7
P a g e . 1 8
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
LIST OF EQUIPMENT & TOOLS
S. No. Description Quantity Owned
Supported by Our Sister Concerned
Quantity Total
25 Crew Cab & Pick-ups 18 6 24
26 Chain Pulley Hoists (2-10 tons) 20 0 20
27 Sand Blasting M/C 1 2 3
28 Coating Air Less Spray M/C 1 1 2
29 Survey Instruments 8 2 9
30 Hydro Test Pumps 2 1 3
31 Concrete Mixer 4 1 5
32 Plate Compactor 12 2 14
33 Concrete Vibrators 8 0 8
34 Dewatering Pumps 2 3 5
35 Asphalt Cutter 6 2 8
36 Trolley 16 0 16
37 Cable Pullers 1 3 4
38 Drill Machines Different Sizes 40 8 48
39 Pipe Threading Machine 3 1 4
40 Pressure Gauges & Relief Valve 12 10 22
41 Pressure & Temperature Recorder
3 2 5
42 Tube Bender & Tuber Cutter 9 6 15
43 Hand Jack Hammers 2 3 5
44 Ladders 50 8 58
45 Sets of Hand Tools 20 8 28
o f 7 7
P a g e . 1 9
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 7
P a g e . 2 0
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
OUR CLIENTS
o f 7 7
P a g e . 2 1
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 7
P a g e . 2 2
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
ONGOING PROJECTS
Name & Address of Client
Project Description Contract Value
(SAR) Start Date
Completion Date
Al-Reef Sugar Refinery
Execution of all Civil, Electro-Mechanical works as per design, Underground Utilities, Infrastructure, Electrical Equipment Installation, Cable Laying & Termination and Erection of all Steel Structure
241,000,000.00 1-Aug-17 30-Sep-20
Red Sea International, Mansourah
Massarah Gold Project
Infrastructure of Camps & Offices 5,275,173.00 10-Nov-19 20-Apr-20
SSEM, Water Handling
Debottlenecking Project, Hawaiyah
Construction of Temporary Office Facilities for SSEM and SAPMT, Camp facility for 600 Occupants, Satellite offices
25,700,000.00 2-Nov-19 15-May-20
SAIPEM, Berri Development
Project, Pkg. 1, Jubail
Execution of Site Preparation, gates & fencing works for TCF
10,599,901.95 5-Sep-19 31-Apr-20
SAIPEM, Marjan Increment
Program, Package 10
Execution of Site Preparation, gates & fencing works for TCF
6,449,790.05 21-Nov-19 28-Sep-20
CIPD Office ARAMCO
Jazan Economic City
Operation and Maintenance, including building maintenance and repair, elctro-mechcanical maintenance, IT services, supply of Janitorial Service, Edible, Drinking Water, Refreshment, Cleaning and etc.
3,830,100.00 2-Apr-18 12-Oct-20
o f 7 7
P a g e . 2 3
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
COMPLETED PROJECTS
Name & Address of Client
Contract Number
Project Description Contract
Value (SAR)
Start Date Completion
Date
Saudi Aramco, Jazan Economic City
at Baish 6510681193
Jazan Economic City Fence Repair, Installation of Fence and Security Gate
10,900,000.00
16-Oct-14 15-May-15
Saudi Aramco, Jazan Economic City
at Baish 6510770606
Arrangement, placement, service and maintenance of 60 Tower Lights at every junction in JEC
4,830,000.00
1-Mar-16 30-Sep-17
Saudi Aramco, Al Darb Training
Center 6510714686
Repair/Renovation of Existing Al Darb Training Center
14,000,000.00
16-Mar-15 30-Nov-15
Saudi Aramco, Jazan Economic City
at Baish 6510723050
Construction of 60 men Industrial Support Facility (ISF) ARAMCO Office and O&M for 06 months
16,733,000.00
10-May-15 10-Nov-15
Saudi Aramco, Jazan Economic City
at Baish 6510730931
Earthwork and for crude oil pipe installation. grading prepares 100-meter-wide and 5-kilometre-long area
11,000,000.00
28-Aug-15 29-Feb-16
Saudi Aramco, Jazan Economic City
at Baish 6510764167
Construction and Maintenance of Temporary Office Facilities for CIPD Department ARAMCO 100 Employee Only.
18,750,000.00
14-Feb-16 30-Jul-18
YAMMAMA, Jazan Economic City
at Baish 4300001569
Temporary Camp Road Works,
1,000,000.00
3-Mar-16 3-Jun-16
SAIPEM / CCCO, Jazan Economic City
at Baish / Khurais Gas Plant Extension
001/7/2016-REV01
Erection of Warehouse Including Civil Work
1,000,000.00
16-Jul-16 16-Dec-16
CRISTAL, Jazan Economic City at Baish (SLAGGER
Plant)
4500902652 Supply & Installation of Security HCIS Fence Type IV
2,000,000.00
16-Sep-16 16-Dec-16
FADLI GAS PROGRAM PROJECT
10 # 101603013
Type V Fence Installation for Camp & Laydown Area
500,000.00
16-Nov-16 1-Jan-17
o f 7 7
P a g e . 2 4
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
HYUNDAI ARABIA, Jazan Economic City
at Baish JZRT-CV-288
Supply & Laying of Sub Base Class A (JEC)
3,500,000.00
15-Aug-16 1-Aug-17
China Harbour Engineering and
Construction Jazan Economic
City at Baish
CHEC 4.2-JECPI-B3-2017-007
CHEC 4.2-JECPI-B3-2017-009 CHEC-JIGCC-
PO-GWFB-018
Construction of 03 Warehouses (Welding Type) including all Civil and electrical work
1,200,000.00
12-Nov-17 30-Jan-18
Air Products Jazan Economic
City at Baish
4504290698 59831 00326
Fabrication and Installation of Container Office including complete finishing, colour, electric work and furniture.
450,000.00
7-Dec-17 6-Jan-18
National Contracting Company
Jazan Economic City at Baish
SA/UGC/SAJ-15-WO/004/01
Construction of RCC Duct Bank, Sand Duct Bank and Cable Pulling in open area and Under Substation
1,400,000.00
8-Oct-17 30-Apr-18
SSEM North Jeddah Bulk
Plant Jeddah
NOJ-BP/013/17
Construction and Maintenance of Office Facilities for SSEM & ARAMCO
8,000,000.00
15-Oct-17 5-May-18
SSEM Yanbu Distribution
Hub Yanbu
YDH/013/18
Construction and Maintenance of Office Facilities for SSEM & ARAMCO
8,000,000.00
26-Oct-17 12-May-18
TR, ACC/CEW/CSP & JIGCC Utilities-Common Area-
Package 5, 10 & 11
225040340 & 022208161C
Construction of Fence & Execution of Civil Work including application of Sealant & SAPMT Site Offices Maintenance Work
1,553, 546.00 1-Jul-18 31-Dec-18
Hanwha, JRTP Pkg. 14
JRTP-SC-GE-0 Execution of TCF, Construction of U-Ditch & Concrete Chipping Work
700,000.00
20-Oct-18 25-Dec-18
Site Services Related to No. 6
Perforation around Substations in
Jizan Refinery, JEC
1259822 & 1262551
Drilling of Boreholes for the installation of Earthing Rods near Substations and filling grout around the rod
300,000.00
25-Feb-19 6-Mar-19
Air Products Technology
Center, Phase 1 (Hydrogen Fuelling Station), Dhahran
EN-18-1992
Execution of all Civil, Electro-Mechanical works as per design, Erection of Steel Structure Canopies having Aluminium
4,501,324.00
12-Jan-19 10-May-19
o f 7 7
P a g e . 2 5
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
Techno Valley, Dhahran
Cladding and Installation of Fuel Dispensers
SAIPEM, South Gas
Compression Plants (SGCP)
Pipeline Project, Haradh
1239539
Execution of Common Works for TCF, South Gas Compression Plants (SGCP) pipeline project, Haradh
8,149,333.00
17-Sep-18 15-May-19
Construction of Fence Work,
Pan Asia Saudi Petrochemical & Chemical Fibre
Integrated Project, JEC
CHEC 4.2 -JECPI-B3-2019-004
Execution of HCIS Type III & Type IV Chain Link Fence around the premises of Pan Gulf Asia project in JEC
1,800, 000.00 28-Feb-19 20-May-19
Dismantling of TR & Aramco Offices from
inside Refinery in JEC and
Reinstallation TR Laydown area in JEC
225040400
Dismantling of offices including disconnection of Electrical & Mechanical Utilities and Reinstallation of Same offices in TR laydown area in JEC.
909,500.00
24-Jun-19 31-Aug-19
SAIPEM, Hawiyah Gas
Plant Expansion Project
1225922
Common Works for TCF, HAWAIYAH Gas Plant Expansion Project including roads, offices and warehouses.
16,427,300.00
10-Jun-18 30-Jun-20
o f 7 7
P a g e . 2 6
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 7
P a g e . 2 7
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
TEMPORARY OFFICE & CAMP FACILITIES
Project: Dismantling and Re-Installation of
Temporary Office
Client: SAIPEM Location: Rabigh
Contract#1203841
Project: Construction & Maintenance of
Temporary Office for CIPD Department.
Client: ARAMCO
Location: CIPD Armco Office, JEC
Contract # 6510764167
Project: Common Works for TCF, South Gas
Compression Plants (SGCP) pipeline project,
Haradh
Client: Saipem
Location: Haradh
Contract # 1239539
o f 7 7
P a g e . 2 8
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
Project: Construction and Maintenance Office
for TRG SAPMT
Client: TECNICAS REUNIDAS
Location: EPC 10 & 11, SAPMT Office, JEC
Contract # 0222024060
TEMPORARY OFFICE & CAMP FACILITIES
Project: Construction of Site Office and
Accommodation Camp for CRCC Employee inside
JEC Package 12 (250 people camp capacity)
Client: CRCC
Location: JEC
Contract #
7-SA-ZY-2017-JAZ-SA-002
7-SA-ZY-2017-JAZ-SA-001
Project: Common Works for TCF, HAWAIYAH
Gas Plant Expansion Project including roads ,
offices and warehouses. project, Haradh
Client: Saipem
Location: SAIPEM, Hawiyah Gas Plant
Expansion Project
o f 7 7
P a g e . 2 9
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
Project: Construction of 60 men Industrial
Support Facility (ISF) ARAMCO Office and
O&M
Client: ARAMCO
Location: JEC
Contract # 6510723050
TEMPORARY OFFICE & CAMP FACILITIES
Project: Construction and Maintenance of
Office Facilities for SSEM & ARAMCO
Client: SSEM
Location: Distribution Hub Yanbu
Contract #
YDH/013/18
Project: Construction and Maintenance of Office
Facilities for SSEM & ARAMCO
Client: SSEM
Location: SSEM
North Jeddah Bulk Plant Jeddah
Contract #
NOJ-BP/013/17
o f 7 7
P a g e . 3 0
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
Project: Construction and Maintenance of
Office Facilities for SSEM & ARAMCO
Package 3
Client: SSEM
Location: JEC
Contract # JAZ-ROS/001/17
TEMPORARY OFFICE & CAMP FACILITIES
Project: Construction and Maintenance of Site
Office Facility
Client: AZMEEL
Location: JEC
Contract # 589559
Project: Fabrication and Installation of Container Office. Client: AIR PRODUCTS Location: JEC Contract # 4504290698, 59831,00326
o f 7 7
P a g e . 3 1
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
WAREHOUSE CONSTRUCTION
Project: Design, Fabrication and Installation of Warehouse (1440m2) Client: HANWA Location: Package#14, JEC Contract # JRTP-SC-GE-026
Project: Construction of Al-Reef Sugar Refinery (Civil, Electro-Mechanical Works) Client: Al-Reef Sugar Refinery Location: JEC
Project: Fabrication and Erection of 3 Warehouses including civil works. Client: China Harbour Location: JEC Contract #
CHEC 4.2-JECPI-B3-2017-007
CHEC 4.2-JECPI-B3-2017-009
CHEC-JIGCC-PO-GWFB-018
o f 7 7
P a g e . 3 2
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
BUILDING WORKS
Project: Renovation of Al-Darb Training Centre. Client: ARAMCO Location: Al-Darb Contract # 6510714686
Project: Construction of Al-Reef Sugar Refinery (Electrical Room & Transformer Room) Client: Al-Reef Sugar Refinery Location: JEC
o f 7 7
P a g e . 3 3
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
INDUSTRIAL WORKS
Project: Construction of Al-Reef Sugar Refinery (Civil & Electro-Mechanical Works) Client: Al-Reef Sugar Refinery Location: JEC Contract # 9900022
Project: Construction of Al-Reef Sugar Refinery (Annual Lunch 2019) Client: Al-Reef Sugar Refinery Location: JEC Contract # 9900022
Project: Air Product Technology Center
Expansion Phase 1
(Hydrogen Fuelling Station)
Client: AIR PRODUCTS Location: Dharan
Techno Valley
Contract # EN-18-1992
o f 7 7
P a g e . 3 4
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
INDUSTRIAL WORKS
Project: Construction of Al-Reef Sugar Refinery (Civil & Electro-Mechanical Works) Client: Al-Reef Sugar Refinery Location: JEC Contract # 9900022
Project: Construction of Al-Reef Sugar Refinery (Civil & Electro-Mechanical Works) Client: Al-Reef Sugar Refinery Location: JEC Contract # 9900022
Project: Construction of Al-Reef Sugar Refinery (Civil & Electro-Mechanical Works) Client: Al-Reef Sugar Refinery Location: JEC Contract # 9900022
o f 7 7
P a g e . 3 5
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
EARTH WORKS
Project: Execution of site preparation for TCF Client: SAIPEM Location: SAIPEM, Berri Development Project, Pkg. 1, Jubail
Project: Temporary Camp Road Works Client: Yamama Construction Company Location: JEC Contract # 4300001569
Project: Execution of site Preparation, Gates & fencing Works for TCF Client: SAIPEM Location: Marjan
o f 7 7
P a g e . 3 6
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
FENCE & GUARD RAILS WORK
Project: JEC Perimeter Fence (33 Km) & Gates Installation Client: Aramco Location: JEC Contract # 6510681193
Project: ARAMCO Type V Fence Installation
and Supply (7000 Lm)
Client: SSEM
Location: JEC
Contract # JAZ-ROS/011/17
Project: Supply & Installation of Security HCIS Fence Type V Client: Cristal Plant Location: JEC Contract # 4500902652
o f 7 7
P a g e . 3 7
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
INFRASTRUCTURAL WORKS
Project: Renovation of Al-Darb Training Centre. Client: ARAMCO Location: Al-Darb Contract # 6510714686
Client: Tecnicas Reunidas Location: Fadhli Gas Plant
Project: Construction & Maintenance of Temporary Office for CIPD Department. Client: ARAMCO Location: CIPD Armco Office, JEC Contract # 6510764167
o f 7 7
P a g e . 3 8
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
ELECTRO-MECHANICAL ERECTION WORKS
Al-Reef Sugar Refinery, JEC.
o f 7 7
P a g e . 3 9
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
ROADS WORKS
Project: Site Facilities for Aramco & SSEM Jeddah Bulk Plant Project Client: SSEM Location: Jeddah Contract # 6600039526
Project: Roads, Camera Pole Foundations, O&M, Electrical & Plumbing Works for all security gates and Site Office. Client: Abaja Location: JEC Contract # 221010880
Project: Renovation of Al-Darb Training Centre. Client: ARAMCO Location: Al-Darb Contract # 6510714686
o f 7 7
P a g e . 4 0
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 7
AUR Organization Structure
Corporate Organizational Chart
CEO
Audit
Operational
Manager
Business &
Commercial
Manager
HR &
Administration
Manager
Finance &
Accounting
Manager
HSE
Manager
Quality
Manager
Projects
Manager
Project
Control
Manager
Planning
& Control
Engineer
Business
Development
HR /
Personnel Accountants HSE
Engineer
QA /QC
Engineer
Office
Engineer
Procurement
Engineer
Recruiting
/ Training
Legal
Information
Technology (IT)
Technical
Manager
Technical
Engineer
Tendering &
Estimation
Engineer Cashier
P a g e . 4 2
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 7
P a g e . 4 3
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
Attiq Ur Rehman Cont. Co.’s first moto is to implement the HSE Management system throughout its all projects. The philosophy is to conduct its activities in such a way as to take foremost account of the Health, Safety and Environment of its employees and other persons to give proper regard to the conservation of the environment by the utilization of a modern methodology approach in the attainment of its objectives, which are elimination, segregation and/or protection of hazards in line with the Attiq Ur Rehman Cont. Co.’s HSE Policy.
Attiq Ur Rehman Cont. Co. management follows the below principles of enhanced Safety Management at the project: -
- Strong Safety Policy
- Line Management Safety Accountability
- Management Commitment to Safety
- Motivation & Communication
- Realistic Safety Targets and Objectives
- Effective Policies and Procedures
- Thorough Accident Investigation & Follow-Up
- Effective Monitoring Techniques
- Competent Safety Personnel
o f 7 7
P a g e . 4 4
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 7
P a g e . 4 5
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 7
P a g e . 4 6
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 7
P a g e . 4 7
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 7
P a g e . 4 8
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 7
P a g e . 4 9
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 7
P a g e . 5 0
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 7
P a g e . 5 1
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
Attiq Ur Rehman Cont. Co. (AUR) is a Civil, Mechanical and Electrical Construction Company and is
one of the leading fast-growing companies operating in Kingdom of Saudi Arabia.
The scope of Attiq Ur Rehman quality initiative is focused on demonstrating its capability as a
Contractor and Developer Engineering, Procurement, Industrial Construction (Civil &
Electromechanical), Project Management, General Civil Works, Aramco Specialized Camp and Office
Facilitators and services as specified by the client, contractual requirements and regulatory
requirements.
At AUR, we take pride in offering our clients a strong, customer-focused approach, applying best
practices to offer world-class quality that the Kingdom expects from its quality contracting firms. AUR
has attained and sustained Quality Management System (QMS) leadership in all its major lines of its
businesses through a systematic approach defined elements of ISO 9001:2015 management
standard.
The QMS has been designed to prevent uncontrolled change; however, this QMS Manual and its
supporting operating procedures should not be considered to be static references. On the basis of
information generated by the QMS and objectives, the procedures should evolve, allowing the
Company QMS policy to be implemented more effectively and efficiently, and hence continual
improvement. Further, if beneficial to the Company, the scope of the system can be enlarged.
When we satisfy Client requirements, we achieve Quality.
When our product and services meet and satisfy the client’s contractual requirements and
applicable regulatory standards for our Engineering, Procurement and Construction
activities.
When we continuously meet time, cost, safety and environmental requirements.
Quality Management System DIRECTION:
Establishing policy and objectives
Ensuring provision of adequate resources
Reviewing effectiveness of processes and achievement of objectives
Facilitating improvement opportunities.
Quality Management is not a separate department which attempts to impose standards on the organization as most people believe. Quality Management System is depicting the systematic manner in which we manage our system and processes to lead and operate the company successfully. QMS comprises of Quality Manual, Quality System, Quality Plans, Procedures, Inspection & Test Plans, Work Instructions and Method Statements, etc. and is a tool for planning, control and management of our organizational characteristics and their collective implementation in what we believe to be our “System of Best Practices”. Quality does not describe the Management, but is itself the thing which is managed.
o f 7 7
P a g e . 5 2
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
In other words “Quality Management System” can be defined as the managing structure,
responsibilities, procedures, processes, and management of resources to implement the principle and
action lines needed to achieve the quality objectives of the organizations”.
The success of this initiative is in the development (by Attiq Ur Rehman staff) of a defined corporate
quality management system, its implementation and demonstration of compliance to internal and
external auditors.
An independent accredited certification company is used to assess the compliance to ISO 9001:2015
for Project Management and Engineering, Procurement and Construction activities. The ISO
9001:2015 certificate is used to visibly promote the capabilities of the company with our current &
potential clients and suppliers.
The QMS Manual describes the Company Quality Policy, Organization Structure and the policies &
objectives against the elements of ISO 9001:2015 management standard. This shall be a controlled
document for internal distribution.
The requirement of this manual is aimed at the prevention of management system failures and the
maintenance of a system that provides the most effective and efficient means of achieving the QMS
objectives, aligned with the business strategy.
Quality Policy
“We the management and employees of Attiq Ur Rehman Cont. Co. are fully committed to providing
our customers with the products and services they want. To achieve this, we require everyone to strive
constantly to improve the quality of the products and services we supply in a common quality
objective.” The Quality Management System is designed to ensure the execution of the services and
product quality & standard through the provision of evaluation and verification of process at all
stages are thoroughly kept and maintained.
It is the policy of the Attiq Ur Rehman Cont. Co. to apply effective quality management systems within
its overall business to satisfy all the requirements of its customers.
In order to achieve this Attiq Ur Rehman Cont. Co. shall consistently:
Meet the requirements of the contract specification within stated budget and time restraints.
Provide motivated and properly trained personnel necessary to perform all activities in
accordance with stated procedures.
Seek to improve the services and products by the Company by continued examination and
evaluation of the management systems.
Ensure that all personnel are fully aware of their individual and collective responsibilities in
order that the Quality Management System is carried out to the benefit of the Company and
its Clients.
o f 7 7
P a g e . 5 3
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
Provide competent staff and management with job security in a safe and healthy working
management.
o f 7 7
P a g e . 5 4
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 7
P a g e . 5 5
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 7
P a g e . 5 6
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 7
P a g e . 5 7
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
Procurement
Attiq Ur Rehman Contracting Co. (AUR) Management realizes that material constitutes -
The highest cost element in any construction project
The most likely cause of projects delays and/or cost overruns
The major source of quality problems
With these facts in mind, AUR has invested considerable time, efforts and expenses in
organizing and streamlining its material department. It has hired Programmers, Schedulers,
Engineers to design procedures, forms and control systems to effectively manage its material
requirements.
AUR Management has contacts with most reputed firms / vendors not only in the Kingdom
even outside the Kingdom with whom it has been dealing in the past for procurement of
various materials and equipment for its projects. This benefits the procurement department
in obtaining information, collecting catalogues, product data, shop drawings, specifications
etc.
o f 7 7
P a g e . 5 8
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
INVITATION TO TENDER PROCESS
RESPONSIBILITIES
1. Site Technical
Team
2. Procurement
Engineer /
Officer
3. Asset & Material
Controller
4. Procurement
Manager
5. CEO
Material Issued Through
Central Store Procedure Purchase Requisition Raised and
Issued to Procurement Department
Stock
Checks Material
in Stock
Procurement Engineer Officer
Assigned by Procurement Manager
Prepare Invitation to Tender
(ITT) Letters Include All
PR Information
Issue ITT and Obtain Responses
from Vendors and
Subcontractors
Carry out Technical Review to
Ensure Tenders Meet
Requirements
< 100,000 SAR 3 Quotes
(minimum)
> 100,000 SAR more
than 3 Quotes
ITT Issued to Vendors and Suppliers from Client or
AUR Approved Vendor List, IF Additional Vendors
or Suppliers Required Follow
(HO-AUR-QUA-PRO-003)
No
No
Yes
Yes
Acceptable Purchase Requisition Checked for
Completeness, PR Checklist
(HO-AUR-PLO-PRO-002)
Start
1
2
3
4
Carry out Commercial
Evaluation of All Tenders
No
Yes
Proceed to Purchase Order Issue
Requirement
Meet
Issue Tender
Clarification as
Required
Commercial Tender Evaluation to be made
by Procurement Manager & CEO as
required depending upon Value of
Contract
4
2
2
2
1
5
o f 7 7
P a g e . 5 9
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
PURCHASING ACTIVITY
Potential Vendors and
Subcontractors Shortlisted
Following Final Evaluation
(Saudi Aramco Vendor List)
Invitations for Final Clarification
and Negotiation Issued to
shortlisted vendors and
Subcontractors
Approved PO
Agree Final
Contract Price
PO Raised to Include All Relevant
Information Stated in the Project
Documents (requirements)
All HSEQ Requirements to be
stipulated along with Warranty or
Guarantee Requirements, Delivery
Schedule, Certification Import
Documents Etc.
PO Approved by Relevant Authority and PO
Issued to Successful Vendor or Subcontractor
and Acknowledgement Obtained of
Acceptance of PO
PO Accepted
Not Accepted by Vendor /
Subcontractor
Final Price Agreement by
Authorized Person Depending
Upon Contract or PO Value (AUR
Top Management)
Yes
File to Contain All Correspondence
Regarding PO Progress and Delivery
Schedule, Information from Vendor or
Subcontractor to be used to Updated
Procurement Schedule on a Weekly Basis
Working Files Set Up in Proc. Dept.
for Corresponded & Other
Contractual Details
Next Phase Expediting PO
2 2
4 5
2
4 5
2
RESPONSIBILITIES
1. Site Technical
Team
2. Procurement
Engineer /
Officer
3. Asset & Material
Controller
4. Procurement
Manager
5. CEO
2
o f 7 7
P a g e . 6 0
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
EXPIDITING PURCHASE ORDERS
Placed PO
Set up Communication with
Vendor and Subcontractor for
Regular Progress Updates
Status of PO to be monitored
against production program
requirements for Delivery &
Completion
Agree recovery program with
vendor to expedite
manufacture & completion
On Schedule
Agree dates with vendor &
subcontractor for required
Inspection Visits or Factory
Acceptance Tests (FAT)
Arrange with client any Third-
Party or Client Witness
Requirements prior to FAT
FAT Acceptable
Inspection visits and factory inspection
tests shall be as the agreed vendor or
subcontractor inspection and test plan
agreed by AUR & Client (where required)
FAT
Re-Test Required
Yes
No
To be done in conjunction with the Project
Quality Engineer to Agree Personnel or
Third-Party Inspection body to Witness
FAT
No
Yes
Vendor and Subcontractor to
Finalize Shipping and Delivery
According to ITP Requirements
Material delivered as per
AUR Requirements
1
1
2
RESPONSIBILITIES
1. Site Technical
Team
2. Procurement
Engineer /
Officer
3. Asset & Material
Controller
4. Procurement
Manager
5. CEO
1
1
o f 7 7
P a g e . 6 1
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 7
P a g e . 6 2
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
1. COMMERCIAL REGISTRATION
2. SAGIA LICENCE
3. ZAKAT CERTIFICATE
4. GOSI CERTIFICATE
5. CHAMBER OF COMMERCE MEMBERSHIP
6. SAUDI CERTIFICATE
7. VAT REGISTRATION CERTIFICATE
8. SAUDI ARAMCO PERFORMANCE EVALUATION
o f 7 7
P a g e . 6 3
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 7
P a g e . 6 4
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 7
P a g e . 6 5
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 7
P a g e .
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 766
P a g e .
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 76 7
P a g e . 6 8
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 7
P a g e .
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 769
P a g e . 7 0
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 7
P a g e . 7 1
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 7
P a g e . 7 2
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
o f 7 7
Page 73 of 77
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
Page 74 of 77
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
Page 75 of 77
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.
Page 76 of 77
Page 76 of 77
رحمن للمقاوالتلشركة عتيق ا
ATTIQ UR REHMAN CONT. CO.