Top Banner
Flood Management Certification Mark Hood, DECD Office of Brownfield Remediation and Development (OBRD)
5

Flood Management Certification Mark Hood, DECD Office of Brownfield Remediation and Development (OBRD)

Dec 23, 2015

Download

Documents

Madison Sparks
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Flood Management Certification Mark Hood, DECD Office of Brownfield Remediation and Development (OBRD)

Flood Management Certification

Mark Hood, DECD Office of Brownfield Remediation and Development (OBRD)

Page 2: Flood Management Certification Mark Hood, DECD Office of Brownfield Remediation and Development (OBRD)

Office of Brownfield Remediation and Development2

Is Your Project Within a FEMA Floodplain?

• Go to FEMA Website:http://msc.fema.gov/portal

Page 3: Flood Management Certification Mark Hood, DECD Office of Brownfield Remediation and Development (OBRD)

Office of Brownfield Remediation and Development3

Flood Management Certification (FMC)

• In connection with funding through DECD Flood Management Certification may be required if your project is within a FEMA Floodplain.

• FMC not required for: Planning Activities; Environmental Assessments or Abatement of Hazardous Building Materials.

• 500-year floodplain• If redevelopment plan includes a “Critical Activity” (Housing,

Hospital, or School) FMC will be required.

• 100-year floodplain• Most redevelopment, demolition and remediation activity funded by

DECD will require FMC.

• Statutory Reference: C.G.S. 25-68(b)-(h)

Page 4: Flood Management Certification Mark Hood, DECD Office of Brownfield Remediation and Development (OBRD)

Office of Brownfield Remediation and Development4

Flood Management Certification (FMC)• Three (3) options for Flood Management Certification:

1. DECD General Certification for Minor Activities (handout);2. Individual Permit (handout);3. Exemption (requires application to DEEP).

• DECD Applicant’s Professional Engineer completes FMC application.

• If redevelopment plan includes a “Critical Activity” within the 500-year floodplain, the applicant will eventually be required to obtain FMC for redevelopment regardless of funding source after the remedial activities are completed.

• Some projects can utilize the DECD Flood Management General Certification for Minor Activities.

Page 5: Flood Management Certification Mark Hood, DECD Office of Brownfield Remediation and Development (OBRD)

Office of Brownfield Remediation and Development5

General Certification for Minor Activities

• DECD has been granted a Flood Management General Certification for Minor Activities by DEEP.

• The General Certification covers 15 types of minor activity including:

• Streetscape Projects;

• Demolition of an Existing Structure;

• Housing & Public Building & Historic Building Rehabilitation Projects (minor activities):

• Limited to the existing structure.

• Square footage of the building will not be increased.

• Work should be limited to 50% of the market value.