Top Banner
POWAY TECH CENTER Flint Place, Paine Place & Dearborn Place Poway, CA 92064 Delivery Q4 2018 Construction Underway TED CUTHBERT SENIOR EXECUTIVE VICE PRESIDENT +1 858 636 7988 [email protected] Lic. No. 00964042 Colliers International 5901 Priestly Drive, Suite 100 Carlsbad, CA 92008 +1 760 438 8950 Main Lic. No. 01908588 colliers.com/sandiego SCRIPPS POWAY PKWY TECH CENTER DR GREGG ST FLINT PL PAINE PL DEARBORN PL View powaytechcenter.com
18

FLINT PL Delivery Q4 2018 Construction Underway...POWAY TECH CENTER Flint Place, Paine Place & Dearborn Place Poway, CA 92064 Delivery Q4 2018 Construction Underway TED CUTHBERT SENIOR

Jul 09, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: FLINT PL Delivery Q4 2018 Construction Underway...POWAY TECH CENTER Flint Place, Paine Place & Dearborn Place Poway, CA 92064 Delivery Q4 2018 Construction Underway TED CUTHBERT SENIOR

powaytechcenter.c

POWAY TECH CENTER Flint Place, Paine Place & Dearborn PlacePoway, CA 92064

Delivery Q4 2018 Construction Underway

TED CUTHBERTSENIOR EXECUTIVE VICE PRESIDENT+1 858 636 [email protected]. No. 00964042

Colliers International5901 Priestly Drive, Suite 100Carlsbad, CA 92008+1 760 438 8950 MainLic. No. 01908588colliers.com/sandiego

SCRIPPS POWAY PKW

Y

TECH CENTER DR

GREG

G ST

FLINT PL

PAINE PL

DEARBORN PL

View powaytechcenter.com

Page 2: FLINT PL Delivery Q4 2018 Construction Underway...POWAY TECH CENTER Flint Place, Paine Place & Dearborn Place Poway, CA 92064 Delivery Q4 2018 Construction Underway TED CUTHBERT SENIOR

Property Index

Address Total Square Footage Parking Clear Height Doors Power Status/

Delivery

12190 Flint Pl 15,376 SF (includes 1,025 SF mezz) 31 spaces 24’ 2- 9’ X 10’ DH

1- 12’ X 14’ GL 2,000A 120-208v PRE-LEASED

12195 Flint Pl 19,004 SF(includes 2,121 SF mezz) 71 spaces 22’ 2- 9’ X 10’ DH

2- 12’ X 14’ GL 2,000A 120-208v 4Q 2018

12170 Paine Pl 10,089 SF 22 spaces 22’ 2- 12’ X 14’ DH 2,000A 120-208v 4Q 2018

12175 Paine Pl 10,089 SF 22 spaces 22’ 2- 12’ X 14’ DH 2,000A 120-208v 4Q 2018

12195 Paine Pl 9,384 SF (opportunity to add 1,000 SF mezz) 22 spaces 22’ 1- 9’ X 10’ DH

1- 12’ X 14’ GL 2,000A 120-208v 1Q 2019

12190 Dearborn Pl 9,289 SF (opportunity to add 1,000 SF mezz) 24 spaces 22’ 1- 9’ X 10’ DH

1- 12’ X 14’ GL 2,000A 120-208v 1Q 2019

12195 Dearborn Pl 9,511 SF (opportunity to add 1,000 SF mezz) 24 spaces 22’ 2- 9’ X 10’ DH

1- 12’ X 14’ GL 2,000A 120-208v 4Q 2018

Seven new buildings for lease from 9,289 SF to 19,004 SF

Lease Rate: $1.15/SF Net of Operating Expenses(Operating Expenses estimated to be approximately $0.26/SF)

POWAY TECH CENTER

Page 3: FLINT PL Delivery Q4 2018 Construction Underway...POWAY TECH CENTER Flint Place, Paine Place & Dearborn Place Poway, CA 92064 Delivery Q4 2018 Construction Underway TED CUTHBERT SENIOR

Site Plan

Scripps Poway Parkway

Pain

e Pl

ace

Flin

t Pla

ce

Dear

born

Pla

ce

Gregg Street

• ESFR Sprinkers in each building• 2,000 Amp 120-208V Power in each building• Opportunities for mezzanine to be added at 12195 Paine Place and 12190 and 12195 Dearborn Place

Notable Project Features

12190 Flint Pl

12195 Flint Pl

12170 Paine

Pl

12175 Paine

Pl

12195 Paine

Pl

12195Dearborn

Pl

12190Dearborn

Pl

Page 4: FLINT PL Delivery Q4 2018 Construction Underway...POWAY TECH CENTER Flint Place, Paine Place & Dearborn Place Poway, CA 92064 Delivery Q4 2018 Construction Underway TED CUTHBERT SENIOR

POWAY TECH CENTER

East Elevation

North Elevation

Page 5: FLINT PL Delivery Q4 2018 Construction Underway...POWAY TECH CENTER Flint Place, Paine Place & Dearborn Place Poway, CA 92064 Delivery Q4 2018 Construction Underway TED CUTHBERT SENIOR

POWAY TECH CENTER

West Elevation12190 Flint Place - 15,376 SF - PRE-LEASED

2 - 9’ X 10’ dock-high loading doors1 - 12’ X 14’ grade-level loading door

31 Parking spaces

24’ Clear Height

2,000 Amp 120-208V

Page 6: FLINT PL Delivery Q4 2018 Construction Underway...POWAY TECH CENTER Flint Place, Paine Place & Dearborn Place Poway, CA 92064 Delivery Q4 2018 Construction Underway TED CUTHBERT SENIOR

POWAY TECH CENTER

West Elevation

North Elevation

Page 7: FLINT PL Delivery Q4 2018 Construction Underway...POWAY TECH CENTER Flint Place, Paine Place & Dearborn Place Poway, CA 92064 Delivery Q4 2018 Construction Underway TED CUTHBERT SENIOR

12195 Flint Place - 19,004 SF

POWAY TECH CENTER

2 - 9’ X 10’ dock-high loading doors

2 - 12’ X 14’ grade-level loading doors

71 Parking spaces

22’ Clear height

2,000 Amp 120-208V

Page 8: FLINT PL Delivery Q4 2018 Construction Underway...POWAY TECH CENTER Flint Place, Paine Place & Dearborn Place Poway, CA 92064 Delivery Q4 2018 Construction Underway TED CUTHBERT SENIOR

Side Elevation

Street Elevation

Rear Elevation

Side Elevation

POWAY TECH CENTER

Page 9: FLINT PL Delivery Q4 2018 Construction Underway...POWAY TECH CENTER Flint Place, Paine Place & Dearborn Place Poway, CA 92064 Delivery Q4 2018 Construction Underway TED CUTHBERT SENIOR

12170 Paine Pl

12175 Paine Pl

POWAY TECH CENTER

12170 Paine Place & 12175 Paine Place - 10,089 SF each

2 - 12’ X 14’ dock-high loading doors

22 Parking spaces each

22’ Clear height

2,000 Amp 120-208V

Page 10: FLINT PL Delivery Q4 2018 Construction Underway...POWAY TECH CENTER Flint Place, Paine Place & Dearborn Place Poway, CA 92064 Delivery Q4 2018 Construction Underway TED CUTHBERT SENIOR

West Elevation

South Elevation

POWAY TECH CENTER

Page 11: FLINT PL Delivery Q4 2018 Construction Underway...POWAY TECH CENTER Flint Place, Paine Place & Dearborn Place Poway, CA 92064 Delivery Q4 2018 Construction Underway TED CUTHBERT SENIOR

POWAY TECH CENTER

12195 Paine Place - 9,384 SF

22 Parking spaces

22’ Clear height

2,000 Amp 120-208V

1 - 9’ X 10’ dock-high loading door1 - 12’ X 14’ grade-level loading door

Page 12: FLINT PL Delivery Q4 2018 Construction Underway...POWAY TECH CENTER Flint Place, Paine Place & Dearborn Place Poway, CA 92064 Delivery Q4 2018 Construction Underway TED CUTHBERT SENIOR

East Elevation

North Elevation

POWAY TECH CENTER

Page 13: FLINT PL Delivery Q4 2018 Construction Underway...POWAY TECH CENTER Flint Place, Paine Place & Dearborn Place Poway, CA 92064 Delivery Q4 2018 Construction Underway TED CUTHBERT SENIOR

12190 Dearborn Place - 9,289 SF

POWAY TECH CENTER

24 Parking spaces

22’ Clear height

2,000 Amp 120-208V

1 - 9’ X 10’ dock-high loading door1 - 12’ X 14’ grade-level loading door

Page 14: FLINT PL Delivery Q4 2018 Construction Underway...POWAY TECH CENTER Flint Place, Paine Place & Dearborn Place Poway, CA 92064 Delivery Q4 2018 Construction Underway TED CUTHBERT SENIOR

East Elevation

North Elevation

POWAY TECH CENTER

Page 15: FLINT PL Delivery Q4 2018 Construction Underway...POWAY TECH CENTER Flint Place, Paine Place & Dearborn Place Poway, CA 92064 Delivery Q4 2018 Construction Underway TED CUTHBERT SENIOR

12195 Dearborn Place - 9,511 SF

POWAY TECH CENTER

24 Parking spaces

22’ Clear height

2,000 Amp 120-208V

2 - 9’ X 10’ dock-high loading doors1 - 12’ X 14’ grade-level loading door

Page 16: FLINT PL Delivery Q4 2018 Construction Underway...POWAY TECH CENTER Flint Place, Paine Place & Dearborn Place Poway, CA 92064 Delivery Q4 2018 Construction Underway TED CUTHBERT SENIOR

Local Neighbors and Amenities

67

Ted CuthbertSenior Executive Vice President

858 636 [email protected]

Lic# 00964042Colliers International | Accelerating success. | www.colliers.com

POWAY > 2018

SCRIPPS POWAY PKWY

STOWE DR

DANIELSON ST

KIRKHAM WAY

GREGG ST

KIRKHAM W

AY

PAKRWAY CENTRE DR TECH CENTER DR

COM

MUN

ITY

RD

SITE

POWAY TECH CENTER

Page 17: FLINT PL Delivery Q4 2018 Construction Underway...POWAY TECH CENTER Flint Place, Paine Place & Dearborn Place Poway, CA 92064 Delivery Q4 2018 Construction Underway TED CUTHBERT SENIOR
Page 18: FLINT PL Delivery Q4 2018 Construction Underway...POWAY TECH CENTER Flint Place, Paine Place & Dearborn Place Poway, CA 92064 Delivery Q4 2018 Construction Underway TED CUTHBERT SENIOR

SITE

DEL MAR

TORREY PINES

CARMEL VALLEY

SORRENTO VALLEY

MIRA MESA

POWAY

MIRAMAR

CARMEL MOUNTAIN

RANCH

RANCHOPENASQUITOS

TORREYHIGHLANDS

SOLANA BEACH

POWAY TECH CENTER

TED CUTHBERTSENIOR EXECUTIVE VICE PRESIDENT+1 760 930 7919+1 858 636 [email protected]. No. 00964042

Colliers International5901 Priestly Drive, Suite 100Carlsbad, CA 92008+1 760 438 8950 MainLic. No. 01908588colliers.com/sandiego