Top Banner
Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 1
22

Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.

Mar 27, 2015

Download

Documents

Jasmine Grant
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.

Flight Validation Process of RNP APCH Procedures:

Thailand Case Study

ICAO Asia-Pacific GNSS Seminar

Bangkok, Thailand

26 March 2012

Flight Validation Process of RNP APCH Procedures:

Thailand Case Study

ICAO Asia-Pacific GNSS Seminar

Bangkok, Thailand

26 March 2012

1

Page 2: Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.

• Background• Objectives of Flight Validation for RNP APCH• Requirements• Step-by-step process

– Pre-flight

– In-flight

– Post-flight

– Reporting

Presentation OutlinePresentation Outline

Page 3: Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.

• RNP APCH = RNAV (GNSS)

• Using GNSS for approach operation

• For aircraft with RNP 0.3 capability

• Utilize Aircraft-Based Augmentation System (ABAS)

• May include Baro-VNAV

BackgroundBackground

Page 4: Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.

4

Phuket PBN Implementation Phuket PBN Implementation

Page 5: Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.

Procedures for Phuket 09Procedures for Phuket 09

5

Yellow – Current VOR TrackGreen - PBN Track

Page 6: Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.

Proposes of Flight Validation of RNP APCH– Correctness of Procedure

• Correctness of Chart• Correctness of Navigation Database

– Reliability of Navigation System• Signal interference

– Important GNSS parameters will be automatically recorded• Conformity with ground based Navaids (VOR, DME) as

necessary– Environmental Conditions

• Obstacle Clearance thus FLC needs to be conducted during day-time

– Flyability

Objectives of Flight Validation Objectives of Flight Validation

Page 7: Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.

• Standards– ICAO Doc 9906 Vol 5 and 6 (Flight Validation)– ICAO Doc 8071 (as necessary)

• Qualification– Pilots and FIS technicians trained on RNAV flight

validation and GNSS (ICAO Doc 9906 Vol 6)

• Equipment– Flight Management System (FMS)

• Baro-VNAV capability for Baro-VNAV procedures

– Flight Inspection System (FIS)– Navigation Database

RequirementsRequirements

Page 8: Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.

FMS – HS-CNS equipped with Pro Line 21 avionics Certified GPS Receiver – TSO 129a is continuously

checking the integrity of the GPS position solution through RAIM Fault Detection Capability

Requirements: Flight Management SystemRequirements: Flight Management System

Page 9: Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.

Automatic Flight Inspection System (AFIS)

• Fully automated

• Record archives both as print-out and electronic database

Requirements: Flight Inspection SystemRequirements: Flight Inspection System

Page 10: Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.

Activities

• Initial Validation • ATC coordination• Weather forecast• GNSS service prediction

– Number of GPS satellite– Dilution of Precision (DOPs)– RAIM Outage

• Satellite image of expected flight path (recommended)

• Assessment of GNSS interference as needed

Pre-FlightPre-Flight

Page 11: Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.

Pre-flight: Initial ValidationPre-flight: Initial Validation

Simulation of Procedure– Using FMS simulator and FIS software to validate the design

• Reduce risks of error

• If no error detected, upload to aircraft FMS and FIS

Page 12: Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.

Pre-flight: GNSS Service PredictionPre-flight: GNSS Service Prediction

Page 13: Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.

Pre-flight: Satellite ImagePre-flight: Satellite Image

13

Yellow – Current VOR TrackGreen - PBN Track

Page 14: Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.

In-Flight In-Flight

For each RNAV(GNSS) Approach

- Fly all segments and holdings

- At least one FLC for each LNAV and LNAV/VNAV profiles

- At least one FLC for entire missed approach profile

- Preferably fly using auto-pilot

- Fly final approach segment as designed and at 100 ft below the designed altitude

- Identify controlling obstacles

- Check obstacle clearance

- Assess fly-ability and workloads

- Record GNSS data for all legs flown

Page 15: Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.

In-Flight: GNSS Interference In-Flight: GNSS Interference

• As necessary

• Under scope of flight inspection, not flight validation

• Look at impact on service interruption

• RAIM Alert

• Loss of GNSS Service

• Interference may not result in full loss of GNSS services

Page 16: Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.

In-Flight: GNSS Interference In-Flight: GNSS Interference

Importance Parameters

• Number of Satellites

• Signal to Noise Ration

• Dilution of Precision

Page 17: Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.

Activities

• Data Analysis and Interference Assessment

• Flight Validation Report

Post-FlightPost-Flight

Page 18: Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.

Post-flight: Automated Data RecordingPost-flight: Automated Data Recording

Page 19: Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.

Post-flight: GNSS Interference AssessmentPost-flight: GNSS Interference Assessment

Record and analysis of satellite availability, signal-to-noise ratio, and Dilution of Precision (DOPs).

Page 20: Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.

Post-flight: Flight Validation ReportPost-flight: Flight Validation Report

Page 21: Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.

• To ensure safety of flight operation, proper flight validation needs to be conducted using:– Proper equipments

– Qualified personal

– Proven process

SummarySummary