Top Banner
White Sands Missile Range’s Flight Termination System Modernization (FTSM) Shawna Pfeiffer, Project Lead Engineer TRAX International, LLC 25 January 2017
22

Flight Termination System Modernization (FTSM)€¦ · WSMR Range or beyond Mobile 1 Mobile 2 Unmanned Target 1 Unmanned Target 2 Missile 2 Range Control Node Test Bed Missile 1 Methods

Jul 06, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Flight Termination System Modernization (FTSM)€¦ · WSMR Range or beyond Mobile 1 Mobile 2 Unmanned Target 1 Unmanned Target 2 Missile 2 Range Control Node Test Bed Missile 1 Methods

White Sands Missile Range’sFlight Termination System Modernization

(FTSM)

Shawna Pfeiffer, Project Lead Engineer

TRAX International, LLC

25 January 2017

Page 2: Flight Termination System Modernization (FTSM)€¦ · WSMR Range or beyond Mobile 1 Mobile 2 Unmanned Target 1 Unmanned Target 2 Missile 2 Range Control Node Test Bed Missile 1 Methods

History: CC/FTS

Slide 1

• Command Control & Flight Termination (CC/FTS)

• In-flight vehicles

• Protect public and personnel

• Mandated – DoD 3200.11

• Initially: RCC (IRIG) Tones (RCC 208)

• Later: Enhanced Flight Termination System (RCC 319)

Page 3: Flight Termination System Modernization (FTSM)€¦ · WSMR Range or beyond Mobile 1 Mobile 2 Unmanned Target 1 Unmanned Target 2 Missile 2 Range Control Node Test Bed Missile 1 Methods

History: CC/FTS at WSMR

Slide 2

• OOPS! Juarez Cemetery

• Initially: RCC (IRIG) Tones (RCC 208)

• Recently: EFTS Messaging (RCC 319)

…but the Legacy System has a number of shortfalls…

Page 4: Flight Termination System Modernization (FTSM)€¦ · WSMR Range or beyond Mobile 1 Mobile 2 Unmanned Target 1 Unmanned Target 2 Missile 2 Range Control Node Test Bed Missile 1 Methods

Current (Legacy) WSMR FTS

• All equipment is nearly 20 years old!

• TIME, MONEY, MISSIONS

• Limited replacement parts availability

• Capable of RCC (IRIG) or EFTS, not both at same time

• Must be constantly manned to be reliable for missions

• SONET via TDM capability, only (no TSN connectivity)

• Limited, heavy frequency band use

Slide 4

Page 5: Flight Termination System Modernization (FTSM)€¦ · WSMR Range or beyond Mobile 1 Mobile 2 Unmanned Target 1 Unmanned Target 2 Missile 2 Range Control Node Test Bed Missile 1 Methods

Background: Scope

Slide 4

Work Assignment Order:

Provide complete, modernized WSMR Command Control and Flight Termination System (CC/FTS)

• 4 Fixed Sites

• 2 Mobile Vans

• Range Control Node

• Test Bed

• Range Control Node

• Fixed Site

Page 6: Flight Termination System Modernization (FTSM)€¦ · WSMR Range or beyond Mobile 1 Mobile 2 Unmanned Target 1 Unmanned Target 2 Missile 2 Range Control Node Test Bed Missile 1 Methods

Background: OV - 1

Slide 5

SITE 1

SITE 3

N

SITE 4

SITE 2Communications

link

Extended WSMR Range or beyond

Mobile 1

Mobile 2

UnmannedTarget 1

UnmannedTarget 2

Missile 2

RangeControl Node

Test Bed Missile 1

Methods of Communication:

SONET (TDM)

TSN (CoIP) - NEW

Page 7: Flight Termination System Modernization (FTSM)€¦ · WSMR Range or beyond Mobile 1 Mobile 2 Unmanned Target 1 Unmanned Target 2 Missile 2 Range Control Node Test Bed Missile 1 Methods

WSMR FTS Modernization Effects (Logistical)

• New equipment (warranties and replacement parts)

• IA Compliance

• Reducing Sustainment Footprint

• Transportable Equipment

• Follow-on Technical Support

Slide 8

Page 8: Flight Termination System Modernization (FTSM)€¦ · WSMR Range or beyond Mobile 1 Mobile 2 Unmanned Target 1 Unmanned Target 2 Missile 2 Range Control Node Test Bed Missile 1 Methods

WSMR FTS Modernization Effects (Technical)

• RCC tones and EFTS on concurrent mission

• CoIP on WSMR TSN, maintaining SONET via TDM

• Increased frequency bands, including those with less traffic

• Human Interface

• Old switches, but new “smarts” (PLDs, PoE and IP Networking)

• Full Remote Control of System

• Power Up, Cycling

• Centralized (Range Control Node) and

• Distributed (fixed sites, mobiles)

Slide 7

Page 9: Flight Termination System Modernization (FTSM)€¦ · WSMR Range or beyond Mobile 1 Mobile 2 Unmanned Target 1 Unmanned Target 2 Missile 2 Range Control Node Test Bed Missile 1 Methods

Background: Basic Infrastructure

Slide 8 SITE 4 – Fixed Site (Remote or Manual Operation)

SITE 3 – Fixed Site (Remote or Manual Operation)

SITE 2 – Fixed Site (Remote or Manual Operation)

Range Control

IM Operator

Flight SafetyOperators

Destruct Boxes

OCDF Cell

Flight SafetyOperator

Primary/RedundantFTS Computer

Range ControlInterface

OCDF TDC

FTS Command Monitor

SITE 1 – Fixed Site (Remote or Manual Operation)

EFTS/RCCReceivers

EFTS/RCC Receivers

FTS Command Monitor (OCDF)

Mobile 2

Mobile 1

FTS Command Monitor

Site Select

Communication Network

FTS

Primary/RedundantFTS Computers

Amplifier

Exciter

Command Transmitter

Amplifier

Exciter

RCC EFTS RCC EFTS

Power Supply

Power Supply

Same Configuration as Fixed Sites

Project Interface EFTS/RCCReceivers

FTS Command Monitor (TDC)

DestructBox

Primary/RedundantProject Interface

Computers

Project Interface

Page 10: Flight Termination System Modernization (FTSM)€¦ · WSMR Range or beyond Mobile 1 Mobile 2 Unmanned Target 1 Unmanned Target 2 Missile 2 Range Control Node Test Bed Missile 1 Methods

FTSM Planning and Design Timeline

Slide 9

Concept FTSM

No Spare Parts

Increased Failures

No TSN Connect

IA Non-Compliance

WAO to TRAX

Integrated Product

Team

Key Performance Parameters

Major System Requirements

Market Research

Range Site Visits

Industry Day

June

2014

July

2014

March-April

2015

June

2015

Page 11: Flight Termination System Modernization (FTSM)€¦ · WSMR Range or beyond Mobile 1 Mobile 2 Unmanned Target 1 Unmanned Target 2 Missile 2 Range Control Node Test Bed Missile 1 Methods

FTSM Planning and Design Timeline

Slide 10

Integrated Product

Team

Key Performance Parameters

Major System Requirements

Negotiations

System Requirements

Document

Requirements Verification

Matrix

Scope of WorkRequest

For Proposal

Vendor Selection

Base Delivery Award

March

2015

September

2015January

2016

November

2015

Page 12: Flight Termination System Modernization (FTSM)€¦ · WSMR Range or beyond Mobile 1 Mobile 2 Unmanned Target 1 Unmanned Target 2 Missile 2 Range Control Node Test Bed Missile 1 Methods

Logistical Coordination: Range Control Node

Slide 11

• Side-by-Side installation

• Real-estate availability

• Commo tray space

• Power availability

• Demo of existing equipment (eventually)

• Installation of New Equipment

• Connections

• Cabling

• Equipment

• Communications Connection to TSN

• Configuration of Human Interface components…

Page 13: Flight Termination System Modernization (FTSM)€¦ · WSMR Range or beyond Mobile 1 Mobile 2 Unmanned Target 1 Unmanned Target 2 Missile 2 Range Control Node Test Bed Missile 1 Methods

Human Interface: Smart Command Boxes

Slide 12

Page 14: Flight Termination System Modernization (FTSM)€¦ · WSMR Range or beyond Mobile 1 Mobile 2 Unmanned Target 1 Unmanned Target 2 Missile 2 Range Control Node Test Bed Missile 1 Methods

Human Interface: Smart Command Boxes

Slide 13

Page 15: Flight Termination System Modernization (FTSM)€¦ · WSMR Range or beyond Mobile 1 Mobile 2 Unmanned Target 1 Unmanned Target 2 Missile 2 Range Control Node Test Bed Missile 1 Methods

Logistical Coordination: Fixed Sites

Slide 14

• Side-by-Side installation (at first Fixed Site)

• Demo of existing equipment

• Installation of New Equipment

• Communications Upgrade to TSN Connectivity

• Power Upgrades, esp. for Side-by-Side

Page 16: Flight Termination System Modernization (FTSM)€¦ · WSMR Range or beyond Mobile 1 Mobile 2 Unmanned Target 1 Unmanned Target 2 Missile 2 Range Control Node Test Bed Missile 1 Methods

Human Interface: Software

Slide 15

Page 17: Flight Termination System Modernization (FTSM)€¦ · WSMR Range or beyond Mobile 1 Mobile 2 Unmanned Target 1 Unmanned Target 2 Missile 2 Range Control Node Test Bed Missile 1 Methods

Human Interface: Software

Slide 16

Page 18: Flight Termination System Modernization (FTSM)€¦ · WSMR Range or beyond Mobile 1 Mobile 2 Unmanned Target 1 Unmanned Target 2 Missile 2 Range Control Node Test Bed Missile 1 Methods

Slide 17

Logistical Coordination: Communications

TSN Connection

=

IA Compliance

=

Switch/Router access and upgrades

=

Re-certification

Page 19: Flight Termination System Modernization (FTSM)€¦ · WSMR Range or beyond Mobile 1 Mobile 2 Unmanned Target 1 Unmanned Target 2 Missile 2 Range Control Node Test Bed Missile 1 Methods

Logistical Coordination: Mobile

Slide 18

• Demo of existing equipment

• Installation of New Equipment

• Communications Upgrade to TSN Connectivity

Page 20: Flight Termination System Modernization (FTSM)€¦ · WSMR Range or beyond Mobile 1 Mobile 2 Unmanned Target 1 Unmanned Target 2 Missile 2 Range Control Node Test Bed Missile 1 Methods

FTSM Delivery Timeline

Slide 19

Factory Acceptance TestDay 375

IntegrationDay 425

Initial CertificationDay 450

FIN

AL S

YS

TE

M C

ER

TIF

ICA

TIO

N

early 2

019

Base Delivery

• Range Control Node

• 1 Fixed Site

Option 1 & 2

• IM Test Bed

• 3 Fixed Sites

Option 3 & 4

• 2 Mobiles

Critical Design ReviewDay 60

Site Acceptance TestDay 410

Factory Acceptance TestDay 300

IntegrationDay 345

Initial CertificationDay 370

Option ExerciseDay 0

Site Acceptance TestDay 330

Factory Acceptance TestDay 270

IntegrationDay 315

Initial CertificationDay 330

Option ExerciseDay 0

Site Acceptance TestDay 300

Subcontract AwardDay 0

Prelim Design ReviewDay 15

Page 21: Flight Termination System Modernization (FTSM)€¦ · WSMR Range or beyond Mobile 1 Mobile 2 Unmanned Target 1 Unmanned Target 2 Missile 2 Range Control Node Test Bed Missile 1 Methods

Current Project Support Efforts

Slide 20

• IM Commo Support – site infrastructure (TSN, Sonnet)

• WSMR TSN Working Group Support and Updates

• WSMR IA Concurrence – Tenant Security Plan

• Power Requirements – site infrastructure (side-by-side)

• Commo Rack configurations and cooperation

• RO, SE, IM, Command Group Participation

Page 22: Flight Termination System Modernization (FTSM)€¦ · WSMR Range or beyond Mobile 1 Mobile 2 Unmanned Target 1 Unmanned Target 2 Missile 2 Range Control Node Test Bed Missile 1 Methods

Flight Termination System Modernization (FTSM)

Slide 21

Questions?

For further information,

please contact me via phone or email:

575-678-8089

[email protected]

Thank you!