Flexible Scheduling of Software with Logical Execution Time Constraints* Stefan Resmerita and Patricia Derler University of Salzburg, Austria *UC Berkeley, USA
23

Flexible Scheduling of Software with Logical Execution Time Constraints* Stefan Resmerita and Patricia Derler University of Salzburg, Austria *UC Berkeley,

Dec 14, 2015

Download

Documents

Kelton Collison
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Flexible Scheduling of Software with Logical Execution Time Constraints* Stefan Resmerita and Patricia Derler University of Salzburg, Austria *UC Berkeley,

Flexible Scheduling of Software with Logical Execution Time Constraints*

Stefan Resmerita and Patricia DerlerUniversity of Salzburg, Austria

*UC Berkeley, USA

Page 2: Flexible Scheduling of Software with Logical Execution Time Constraints* Stefan Resmerita and Patricia Derler University of Salzburg, Austria *UC Berkeley,

October 14, 2009 2RePP: Flexible Scheduling of LET Software

Introduction

• Scope: Embedded software aplications– Set of periodic tasks with predictable timing behavior

– Preemptive scheduling

– Event-triggered tasks

• Problem: Predictability is achieved by restricting the set of feasible schedules

• Aim: Relax scheduling restrictions while preserving predictability

Page 3: Flexible Scheduling of Software with Logical Execution Time Constraints* Stefan Resmerita and Patricia Derler University of Salzburg, Austria *UC Berkeley,

October 14, 2009 3RePP: Flexible Scheduling of LET Software

The LET Programming Model

• Specification of logical execution times for tasks– Giotto, TDL, HTL, xGiotto, FTOS

• Implementation – Dedicated runtime system

Page 4: Flexible Scheduling of Software with Logical Execution Time Constraints* Stefan Resmerita and Patricia Derler University of Salzburg, Austria *UC Berkeley,

October 14, 2009 4RePP: Flexible Scheduling of LET Software

Main Runtime Operations

1. Update outputs at LET end

2. Invoke task at LET starta) Update inputs

b) Release task for execution

Page 5: Flexible Scheduling of Software with Logical Execution Time Constraints* Stefan Resmerita and Patricia Derler University of Salzburg, Austria *UC Berkeley,

October 14, 2009 5RePP: Flexible Scheduling of LET Software

Scheduling

• High-level: scheduling of operations– Static schedule compiled into a „timing program“

– Platform independent

• Low-level: scheduling of task executions– Platform dependent

– May use any policy (e.g., FPS, EDF)

– Schedulability test uses WCET information

• What if the system is not schedulable?

Page 6: Flexible Scheduling of Software with Logical Execution Time Constraints* Stefan Resmerita and Patricia Derler University of Salzburg, Austria *UC Berkeley,

October 14, 2009 6RePP: Flexible Scheduling of LET Software

Trade-offs

• Increased predictability– Separation of timing from functionality– Separation of reactivity from scheduling

• Platform independence– Portable timing program

• Performance costs– Application performance (response time)– Platform requirements (memory/time)– Processor utilization (idle time)

Page 7: Flexible Scheduling of Software with Logical Execution Time Constraints* Stefan Resmerita and Patricia Derler University of Salzburg, Austria *UC Berkeley,

October 14, 2009 7RePP: Flexible Scheduling of LET Software

This Work

• Provides a methodology for obtaining more flexible high-level schedules

• Keep predictability• Increase processor utilization

• Cost: Portability is reduced– Provide tool support

Page 8: Flexible Scheduling of Software with Logical Execution Time Constraints* Stefan Resmerita and Patricia Derler University of Salzburg, Austria *UC Berkeley,

October 14, 2009 8RePP: Flexible Scheduling of LET Software

Enlarging Scheduling Margins

• Use more information about– Execution times of tasks

– Predictability of inputs

– Low-level scheduling

Page 9: Flexible Scheduling of Software with Logical Execution Time Constraints* Stefan Resmerita and Patricia Derler University of Salzburg, Austria *UC Berkeley,

October 14, 2009 9RePP: Flexible Scheduling of LET Software

Common Task Structures

• Shared memory• Internal dispatching

• Offsets

• Example (Two tasks)– Periods: 4 and 8

– Offsets: 2 and 40 104 86 122

PowerOn 8ms_A 8ms_B 16ms4ms

Page 10: Flexible Scheduling of Software with Logical Execution Time Constraints* Stefan Resmerita and Patricia Derler University of Salzburg, Austria *UC Berkeley,

October 14, 2009 10RePP: Flexible Scheduling of LET Software

Case 1: Reading from Sensors

• Internal port p is connected to a sensor

• The variable p is updated at tLs(T)

• δ(T,p): minimun execution time of T

up to accessing p

• Task T can be started at timetr = tLs(T) – δ(T,p)

Page 11: Flexible Scheduling of Software with Logical Execution Time Constraints* Stefan Resmerita and Patricia Derler University of Salzburg, Austria *UC Berkeley,

October 14, 2009 11RePP: Flexible Scheduling of LET Software

Case 2: Reading from LET-Based Tasks

• Ports p1 and p2 are updated from tasks T1 and T2, respectively, at the end of their LETs

tr =max{tLe(T1) – δ(T,p1), tLe(T2) – δ(T,p2)}

Page 12: Flexible Scheduling of Software with Logical Execution Time Constraints* Stefan Resmerita and Patricia Derler University of Salzburg, Austria *UC Berkeley,

October 14, 2009 12RePP: Flexible Scheduling of LET Software

Modified Operational Requirements

(O1) Update task outputs at LET end

(O2) Update inputs connected to sensors at LET start

(O3) Update input ports connected to LET tasks at the end of the source task‘s LET

(O4) Release task T at time tr tLs(T) such that• No input port connected to a sensor is accessed before

tLs(T)

• Every port that is accessed before tLs(T) has a constant value between the moment of the access and tLs(T)

Page 13: Flexible Scheduling of Software with Logical Execution Time Constraints* Stefan Resmerita and Patricia Derler University of Salzburg, Austria *UC Berkeley,

October 14, 2009 13RePP: Flexible Scheduling of LET Software

Computation of Early Release Times

• Formally:

(1)

Page 14: Flexible Scheduling of Software with Logical Execution Time Constraints* Stefan Resmerita and Patricia Derler University of Salzburg, Austria *UC Berkeley,

October 14, 2009 14RePP: Flexible Scheduling of LET Software

Main Result

Page 15: Flexible Scheduling of Software with Logical Execution Time Constraints* Stefan Resmerita and Patricia Derler University of Salzburg, Austria *UC Berkeley,

October 14, 2009 15RePP: Flexible Scheduling of LET Software

Schedulability

• Assumption:

The system with classical release times is schedulable.

• Question:

Is the system with release margins schedulable?• Answer:

Depends on the underlying scheduling algorithm

Page 16: Flexible Scheduling of Software with Logical Execution Time Constraints* Stefan Resmerita and Patricia Derler University of Salzburg, Austria *UC Berkeley,

October 14, 2009 16RePP: Flexible Scheduling of LET Software

Scheduling with Earliest Deadline First

Page 17: Flexible Scheduling of Software with Logical Execution Time Constraints* Stefan Resmerita and Patricia Derler University of Salzburg, Austria *UC Berkeley,

October 14, 2009 17RePP: Flexible Scheduling of LET Software

Fixed-Priority Scheduling

• Counter-example (T1 has higher priority):

• Conservative solution: use only the minimum margin

Classical case: No missed deadline

Early release of T1 leads to a missed deadline for T2

Page 18: Flexible Scheduling of Software with Logical Execution Time Constraints* Stefan Resmerita and Patricia Derler University of Salzburg, Austria *UC Berkeley,

October 14, 2009 18RePP: Flexible Scheduling of LET Software

Our Approach: Dual-Priority Scheduling

• Assign a dual priority to each LET-based task– All dual priorities are lower than all nominal ones

• A task is scheduled by FPS:– With nominal priority inside its LET

– With dual priority outside its LET

• Effect: a task is executed outside its LET only if the CPU would be otherwise idle!

• DP scheduling is as predictable as FPS

Page 19: Flexible Scheduling of Software with Logical Execution Time Constraints* Stefan Resmerita and Patricia Derler University of Salzburg, Austria *UC Berkeley,

October 14, 2009 19RePP: Flexible Scheduling of LET Software

Mixing Events in

• DPS can be used in systems containing also event-triggered tasks

• Event-triggered tasks are always scheduled with nominal priorities

Theorem 3: If event triggered tasks have lower priorities than LET-based tasks, then their response times remain the same or decrease when using release margins with DPS instead of classical release times with FPS.

Page 20: Flexible Scheduling of Software with Logical Execution Time Constraints* Stefan Resmerita and Patricia Derler University of Salzburg, Austria *UC Berkeley,

October 14, 2009 20RePP: Flexible Scheduling of LET Software

Application Example

Inverted pendulum:

Page 21: Flexible Scheduling of Software with Logical Execution Time Constraints* Stefan Resmerita and Patricia Derler University of Salzburg, Austria *UC Berkeley,

October 14, 2009 21RePP: Flexible Scheduling of LET Software

Evaluation of DPS

Page 22: Flexible Scheduling of Software with Logical Execution Time Constraints* Stefan Resmerita and Patricia Derler University of Salzburg, Austria *UC Berkeley,

October 14, 2009 22RePP: Flexible Scheduling of LET Software

Conclusions

• Approach for relaxed scheduling contraints• Usage of execution time information beyond just

WCET• Employ timing predictability offered by LET to

improve scheduling of the application• Static scheduling, fully automatic• Further work: dynamic scheduling, evaluation

Page 23: Flexible Scheduling of Software with Logical Execution Time Constraints* Stefan Resmerita and Patricia Derler University of Salzburg, Austria *UC Berkeley,

Thank you!