Flagship Programme 30-9-09-GoI.doc 1
FLAGSHIP PROGRAMMES INCLUDING BHARAT NIRMAN PROGRAMME
11. Integrated Child Development Scheme - (ICDS) (50:50) 47-51
12. National Social Assistance Programme(NSAP) (100) 52-54 13. National Rural Health Mission - (NRHM) (85:15) 55-65
14. Jawahar Lal Nehru National Urban Renewal Mission(JNNURM) (50:20:30) 66-75
15. Total Sanitation Campaign - (TSC)(60:28:12) 76-79
16. National Rural Water Supply Programme (NRWSP) (100) 80-81
Flagship Programme 30-9-09-GoI.doc 2
1. PRADHAN MANTRI GRAM SADAK YOJANA
1. Scheme : Pradhan Mantri Gram Sadak Yojana (PMGSY) (100%) 2. Year of Start : 2000-01 3. Brief Write-up : Under this scheme, first link (connectivity) is to be provided to all connected habitations having population 500 or more in
the rural areas by the year. In 2004-05 upgradation of roads was also allowed. 4. Financial Achievement
1. Progress – Satisfactory. State Govt. meager amount of Rs 25.00 Cr per year in the first 5 years when funds were being provided mainly for new connectivity. Funds allocation thereafter increased when upgradation works were also allowed from 2004-05.
2. BADP Package - Border Area package (for 36 No. roads) proposals amounting Rs 235.36 Crore for the upgradation of rural roads through Border Districts has been submitted to MORD during May 2009. These proposals are lying pending for consideration of Empowered
Flagship Programme 30-9-09-GoI.doc 3
Committee of MORD due to non-supply of mandatory certificates by the State regarding provision of maintenance amount required for already completed PMGSY roads, expenditure on maintenance in last quarter and certificate regarding land availability.
3. Land Acquisition - To avail central grant fully for Phase VIII and Phase IX works, there is requirement of Rs 185.00 Crore to acquire 870 acres of land. PIDB has released Rs 50.00 Cr for land acquisition in the year 2008-09 and balance Rs.135.00 Crore are required during the year 2009-10.
4. Funds for Maintenance - State is required to maintain the roads completed under various Phases of PMGSY. During the year 2009-10, funds amounting to Rs 12.00 crore are required for routine maintenance of these roads. Further Rs 45-50 Crore are required for the laying of periodical renewal coat on these roads as the roads completed under Phase I & II are due for renewal coat. These funds should be provided either from state budget or Rural Development Fund.
5. State share - Rs 29.94 Crore state share is required for Phase VIII works as per the revised guidelines of GoI. 5. Physical Progress
Year Targets Achievements New Connectivity
(Nos.) Upgradation (km) New Connectivity
Upgradation (km)
Total Length (km)
No. km No. km 2009-10 0 500.00 0 0.00 43 432.50 432.50 2009-10
Total 12 4041.37 436 815.16 200 2641.03 3456.19 6. Problems faced by the State In the State of Punjab, 8.50 Mtr land width is available on most of the rural roads. Hence land width criteria is required to be relaxed from a minimum requirement of 10 Mtr to 8.50 Mtr. 7. Suggestions
Flagship Programme 30-9-09-GoI.doc 4
o As State has already achieved 100% connectivity, it is therefore, suggested that the 50% share of funds for land acquisition and forest clearance may be provided by the GoI.
Flagship Programme 30-9-09-GoI.doc 5
2. ACCELERATED IRRIGATION BENEFITS PROGRAMME
1. Scheme : Accelerated Irrigation Benefits Programme (AIBP) (50:50) 2. Year of Start : 2000-01 3. Brief Write-up : Sharing Pattern is 25:75 (CS: State) for major irrigation projects and 50:50 for CADA projects. 4. Financial Achievement
(As on 30/9/09) (Rs Cr)
Year Annual Allocation Receipt of funds Release of funds Expenditure CS SS Total CS SS Total CS SS Total CS SS Total 1 2 3 4 5 6 7 8 9 10 11 12 13
1 Ongoing projects - At present two projects are under implementation – (1) Kandi Canal Phase-II project started in 2006-07 and (2) First Patiala Feeder Kotla Branch started in 2008-09. During 2008-09, other projects – Shahpur Kandi, Dashmesh Canal, Bist Doab Canal, Abohar and Bathinda Branch were included in the plan but were not approved on account of 1-1 criteria. Out of 29 crore the State got 13.93 crore during 2007-08. The allocation for Major Irrigation Projects under AIBP is 17.50 Cr (GoI share) in 2009-10.
Flagship Programme 30-9-09-GoI.doc 6
2 CADA works – The entire amount of 40 crore earmarked during 2008-09 was received from GoI. There is some problems regarding GoI and State Share to Irrigation Department. The allocation under CADA is Rs. 50 Cr (GoI share) in 2009-10.
The final physical progress will be available after the completion of the projects.
6. Problems faced by the State
o The funding pattern under AIBP is now 50:50 for CADA schemes and 25 : 75 (CS : State ) for other major schemes. Less receipt of funds from GoI is due to non relaxation of one for one condition and late finalization of guidelines for CADA works.
o At present under AIBP two major projects namely Extension of Kandi Canal phase-II and Rehabilitation of Channels of First Patiala Feeder and Kotla Branch are being implemented in the State however, the State has submitted a project costing Rs 552 Cr for Extension, Renovation and Modernization (ERM) of branch canals of Sirhind Canal. The approval from GoI is awaited.
o The project providing Irrigation facilities to Himachal Area below Talwara is an inter-state project which is entirely meant for Himachal Pradesh. This project is covered under the guidelines of AIBP for Special Category States. Ministry of Water Resources is providing assistance to Punjab under norms for Non- Special Category States whereas share of HP is being provided under Special Category States. As all the benefits are going to HP, the Punjab share should also be considered under Special Category State.
7. Suggestions
o The stringent norms/conditions prescribed under the AIBP for funding of irrigation projects lead to denial/delay in allocation of funds. As the State is having a largest/oldest irrigation infrastructure, the classification of the States into ‘Special Category States’ and ‘Non Special Category States for funding under AIBP should be rationalized. Moreover, the relaxation for one for one condition as agreed in the bilateral
Flagship Programme 30-9-09-GoI.doc 7
discussions held in the Planning Commission at the time of finalization of Annual Plan 2008-09 is yet to be approved by the Ministry of Water Resources, GoI.
o Punjab needs the Renovation of the existing infrastructure to achieve the targeted agriculture growth rate. The work can be executed only during a canal closure which can be obtained for a period of not more than 2 months in a year. The Renovation Project needs to be taken up simultaneously so that maximum work can be executed. This project of Renovation of Canal Infrastructure of Punjab should be considered as one project and not as multiple projects.
o In view of the State’s contribution in terms of food grains in the Central Pool and also having a largest irrigation infrastructure, special funds may be provided to the State under Bharat Nirman Programme.
o As per financial norms under CAD & WM programme 10% contribution is to be made by the farmers. The financial condition of the farmers is not sound hence this condition must be relaxed or omitted.
Flagship Programme 30-9-09-GoI.doc 8
3. RAJIV GANDHI GRAMIN VIDYUTIKARAN YOJANA
1. Scheme : Rajiv Gandhi Gramin Vidyutikaran Yojana (RGGVY) (90:10) 2. Year of Start : 2005-06 3. Brief Write-up : The Government of India has approved the Rajiv Gandhi Gramin Vidhyutikaran Yojana (RGGVY) with the
aim to provide infrastructure for electrification of un-electrified villages and rural households including the electrification of Below Poverty Line (BPL) households. It is a Centrally Sponsored Scheme under which GoI provides 90% of the project cost in the form of grant to the Punjab State Electricity Board & balance 10% amount is funded by REC as a soft loan. The entire money including GoI share is released by REC.
4 Financial Achievement (As on 30/9/2009)
(Rs Cr)
Note : 1. Project for Rs. 165 Cr was submitted by the State to GoI in 2005-06. It was sanctioned by GoI in 2007-08. All villages in the State have
already been electrified. DPRs were framed for upgrading the electrical infrastructure which includes Erection of 3534.92 KM 11 KV and 2036.95 KM LT line, providing 7014 No.25 KVA Distribution Transformers in rural areas. Besides this 1.49 lac single point connections including their internal wiring free of cost will be provided to Below Poverty Line (BPL) households.
2. Contracts for all the projects have been awarded to M/s KLG Systel Ltd. Gurgaon on 100% Turn-key basis on 28/8/2008. The work of release of single point connections to BPL families alongwith infrastructure works are under progress and are likely to be completed by 27/02/2010.
Year Annual Allocation Receipt of Funds Release of Funds Expenditure Remarks CS SS Total CS SS Total CS SS Total CS SS Total 2009-10 165.52 18.39 183.91 0.00 0.00 0.00 0.00 0.00 0.00 7.97 0.89 8.86 2008-09 165.52 18.39 183.91 51.85 5.51 57.36 51.85 5.51 57.36 4.39 0.48 4.88 2007-08 139.12 15.46 154.58 - - - - - - - - -
Flagship Programme 30-9-09-GoI.doc 9
5. Physical Progress (As on 30/9/2009)
6. Problems faced by the State: No major problem.
TARGET
Year Name of the District
Revised Project Cost
Sanctioned as on 22/8/2008
by GoI
Digital Meters Proposed (Nos)
Length of 11KV line
(km)
Length of LT Line(km)
No of Connections to be released to Rural
Households including BPL
No of Connections to be released to BPL Households
o The State receives meager amount under this programme since it electrified its villages long back. o The provision of New 66,132 & 220 KV Grid Sub Stations, Feeding Transmission Lines and augmentation/ up gradations of the same in
rural areas should also be made in addition to 33 & 66 KV Sub Stations of adequate capacity and lines in blocks where these do not exist which will ensure quality & continued power supply to the consumers of rural areas.
o All the rural households and habitations located beyond the boundary of villages where the connectivity of electricity through distribution network is not cost effective may be allowed to be included in the scope of Decentralized Distributed Generation (DDG) under RGGVY Scheme.
Flagship Programme 30-9-09-GoI.doc 11
4. ACCELERATED POWER DEVELOPMENT REFORMS PROGRAMME
1. Scheme : Accelerated Power Development Reforms Progamme(APDRP) (25:75) 2. Year of Start : 2002-03 3. Brief Write up : Ministry of Power, Government of India, has sanctioned 26 schemes amounting Rs 715.57 Cr in 2002-03 to
2004-05 under. This programme was in operation during the period 2002-03 to 2008-09. Government of India has been providing 25% grant and the balance 75% funds (of the project cost) were contributed by PSEB from internal resources or through availing loans from PFC/REC. Due to launch of Restructured APDRP in 2009-10, all ongoing APDRP schemes have been closed as per directions of MoP/GoI. The status of funds & utilization upto the closure of APDRP schemes is as under.
4. Financial Achievement (As on 30/9/2009)
(Rs Cr)
Year Funds released by GoI to GoP
Funds received by PSEB from GoP
Funds received by PSEB from REC
Total funds received by PSEB
Total funds utilised
1 2 3 4 5 6 2008-09 0.00 0.00 5.06 5.06 54.16
2007-08 0.00 0.00 16.92 16.92 39.48
2006-07 23.93 0.00 14.36 14.36 63.05
2005-06 0.00 0.00 52.87 52.87 102.38
2004-05 0.00 124.76 60.94 185.70 83.30
2003-04 124.76 12.26 0.00 12.26 72.26
2002-03 53.98 41.72 83.43 125.15 48.11
Total 202.67 178.74 233.58 412.32 462.77
Flagship Programme 30-9-09-GoI.doc 12
RESTRUCTURED ACCELERATED POWER DEVELOPMENT REFORMS PROGAMME(R-APDRP) 1. Scheme : Restructured Accelerated Power Development Reforms Progamme(R-APDRP)
2. Year of Start : 2009-10 3. Brief Write up : Government of India has decided to continue APDRP in the restructured form during 11th plan (R-APDRP) as
Central Sector Scheme. The focus of the programme would be establishment of reliable/automated baseline & reduction of Aggregate Technical & Commercial losses. It will cover urban areas with population above 30,000. The activities would be taken up in two parts A and B. Part A would cover consumer indexing, GIS Mapping and Automatic Data Logging for all Distribution Transformer and feeders and establishment of IT enabled consumer service centres. Part B covers Renovation, Modernization and Strengthening of 11 KV level Substations and Reconditioning of lines at 11 KV level and below. The entire expenditure on Part A would be met through 100% grant, once establishment of baseline data is achieved & verified by independent agency. In Part B after achieving 15% AT & C losses, 50% loan would be converted into grant.
4. Financial Achievement : DPRs relating to Part-A for 47 schemes/works costing Rs 354.11 Cr. have been approved and a loan amount
of 272.83 Cr. has been sanctioned by Steering Committee of MoP/GoI. 5. Physical Progress
o 47 town a with population more than 30,000 have been identified and DPRs covering works relating to IT, metering and R & M distribution network/sub-transmission works have been prepared.
o The focus of the programme would be establishment of reliable/automated baseline & reduction of Aggregate Technical & Commercial losses.
6. Problems faced by the State Delay in transfer of funds from GoP to PSEB. 7. Suggestions : Funds should be released directly to PSEB.
Flagship Programme 30-9-09-GoI.doc 13
5. INDIRA AWAAS YOJANA
1. Scheme : Indira Awaas Yojana (IAY) (75:25) 2. Year of Start : 1/1/1996 3. Brief Write-up : Indira Awaas Yojana aims at providing houses to the members of SCs and non-SCs free of cost in the rural areas. Beneficiaries are
selected from the list of eligible BPL households. The scheme is being implemented on 75:25 basis between GoI and GoP. Funds are released by GoI on the basis of incidence of poverty in rural areas of the State. From the year 2004-05 upto the year 2007-08 a grant of Rs 25,000/- per unit was provided in the plain areas and Rs 27,500/- in hilly/difficult areas for construction of houses which has been enhanced to Rs 35,000/ and Rs.38,500/- respectively during the year 2008-09. For conversion of Kutcha houses into pucca/semi pucca, the maximum assistance is limited to Rs 15,000/- per unit. All the dwelling units are provided with smokeless chullas and sanitary latrines. The scheme is being implemented effectively in all the villages of the State.
4. Financial Achievement (As on 30/9/2009)
(Rs Cr)
*Annual allocation is as per GoI work-plan.
Annual Allocation* Release of Funds Expenditure Year CS SS Total CS SS Total CS SS Total
6. Problems faced by State Government – No major issue
7. Suggestions - Due to rising cost of building materials and to provide a small kitchen in every house, per unit cost needs to be enhanced to Rs 50,000/- in plain
areas and to Rs.55,000/- in the hilly/difficult areas of the State.
Flagship Programme 30-9-09-GoI.doc 15
6. NATIONAL RURAL EMPLOYMENT GUARANTEE SCHEME
1. Scheme : National Rural Employment Guarantee Scheme (NREGS) (90:10)
2. Year of Start : February, 2006
3. Brief Write-up : The aim of this scheme is to provide 100 days of manual work to rural unemployed. The scheme is being implemented on 90:10 basis
between GoI and GoP. It was launched in Punjab on 2nd February 2006 and initially only district Hoshiarpur was selected, the scheme was
extended to three more districts namely Amritsar, Nawanshehar and Jalandhar during 2007-08. All the districts of the State are being
covered wef 2008. Under this scheme wages @ Rs 123/- per day are being paid to the workers through PO savings accounts in Punjab.
Permissible works predominantly include water and soil conservation, aforestation and land development works. A 60:40 wage and
material ratio has to be maintained. No contractors and machinery is allowed. Funds are released by GoI as per actual demand of the State
Government.
4. Financial Achievement
(As on 30/9/2009) (Rs Cr)
Year Annual Allocation Release of funds Expenditure CS SS Total CS SS Total CS SS Total
o Initially there was little demand for manual work in the state and accordingly the utilizations of funds was not much. Now other departments like Irrigation and
Drainage, Forests and Agriculture have also been involved and utilization is picking up.
o Daily wage rate for unskilled labourers under NREGS in Punjab is Rs.123/- whereas in open market wage rate is higher than Rs.150/-, due to this workers are
reluctant to work under the scheme.
o At times the 60:40 ratio between wage and material component is also a problem.
7. Suggestions
o In the State like Punjab where few people come forward for manual work, the scope of the scheme needs to be widened to provide 100 days of employment to
each adult member of a family instead of total household.
o There is need to clarify the upper age limit of labourers under NREGS.
o The wage rate needs to be enhanced to Rs 150/- per day to attract additional work force under this programme.
Flagship Programme 30-9-09-GoI.doc 17
7. NATIONAL HORTICULTURE MISSION
1 Scheme: National Horticulture Mission (85:15) 2. Year of Start : 2005 3. Brief Write-up : Government of India has launched National Horticulture Mission (NHM) for the holistic development of horticulture
sector in all the states with an aim to double the horticulture produce by the year 2011-12. During 10th five year plan, it was 100 percent Centrally Sponsored Programme and from the 11th five year plan onwards, the pattern of assistance is 85% GoI and 15% State share .The NHM programmes will be implemented through the cluster area approach.
Cluster-1 comprises districts Ferozepur, Muktsar, Sangrur,Faridkot and Bathinda for the cultivation of Citrus, Grapes,
Guava. Pear, Peach, Anola and Ber. Cluster-II comprises districts Amritsar, Tarntaran, Gurdaspur,Nawanshehar,S.A.S Nagar and Hoshiarpur for the
cultivation of Citrus, Litchi, Guava, Mango, Anola, Peach and Pear. Cluster-III comprises district Kapurthala, Patiala, Ludhiana, Jalandhar and Fatehgarh Sahib for the cultivation of Flowers,
Spices & Aromatic plants and vegetables seed production. The new technology like green house, net house, low tunneling, mulching, organic farming, cultivation of spices and aromatics plants is available and for this purpose financial assistance is being provided to the farmers.
During the year 2007-08, out of the approved Annual Action Plan of Rs. 8063.16 lacs, the GOI had released an amount Rs. 2409.99 lacs. An expenditure of Rs. 1932.34 lacs had been incurred under different programmes/activities upto 31-3-2008. The GOI has in principle approved Annual Action Plan of Rs. 9166.28 lacs for the Year 2008-09. An expenditure of Rs. 29.42 crore was incurred upto 31-3-09.
GoI has approved Annual Action Plan of Rs. 45.33 crore for the Year 2009-10. An expenditure of Rs. 10.72 crore has been incurred upto 30-9-09. from the unspent balance of previous years.
3. Brief Write up: Concerned by the slow growth in the Agriculture and allied sectors, the National Development Council (NDC), in its meeting held on 29th May, 2007 resolved that a special Additional Central Assistance Scheme (RKVY) be launched. The NDC resolved that agricultural development strategies must be reoriented to meet the needs of the farmers and called upon the Central and State Governments to evolve a strategy to rejuvenate agriculture. The NDC reaffirmed its commitment to achieve 4 per cent annual growth in the agricultural sector during the 11th plan.
In compliance to above, the Department of Agriculture has started a new State Plan Scheme in consultation with the Planning Commission which is named as National Agriculture Development Plan (NADP)/Rastriya Krishi Vikas Yojana (RKVY) for ensuring the holistic development of Agriculture and allied sectors. The main objectives of the scheme are:
(i) To incentivies the states so as to increase public investment in Agriculture and allied sectors. (ii) To provide flexibility and autonomy to states in the process of planning and executing Agriculture and allied sector schemes. (iii) To ensure the preparation of agriculture plans for the districts and the states based on agro-climatic conditions, availability of technology
and natural resources. (iv) To ensure that the local needs/crops/priorities are better reflected in the agricultural plans of the states. (v) To achieve the goal of reducing the yield gaps in important crops, through focused interventions. (vi) To maximize returns to the farmers in Agriculture and allied sectors.
ha. area & 1000 farmers of all districts benefited.
b) Reclamation of degraded soil in Punjab 0.55 0.55 0.55 545 ha. reclaimed & 606 farmers of districts Mukatsar, Ferozepur, Hoshiarpur & Mohali.
c) Rainwater harvesting in Punjab 4.00 4.00 4.00 61 structures completed in 3566 Ha. area of Kandi districts of Hoshiarpur, Mohali, Ropar, Nawanshahar & Gurdaspur area of 2535 Ha benefited.
3. Punjab Mandi Board a) Strengthening of Marketing Infrastructure in
existing mandies 11.11 11.11 11.00 Work completed.
4. Deptt. of Dairy Development a) Establishment of Modern Diary Training and
Extension Centers 2.65 2.65 2.65 Building completed.
b) Provision of Mobile Laboratory for Feed and Milk
1.25 1.25 1.25 9 mobile labs established, 3353 samples of milk and 1624 samples of feed analyzed .
c) Incentive for Animal Insurance and Computer Chips
1.08 1.08 1.08 Chips fitted in 12000 animals.
5. Deptt. of Animal Husbandry a) Setting up of Residue Analysis laboratory 0.32 0.32 0.32 Laboratory set up. 182 Samples of feed, ingredients, animal
products and animal tissues were tested. b) Awareness Programme on Mastitis control 0.20 0.20 0.20 4500 Mastitis kits and 9000 refill packs purchased. Quality of
milk production improved and economic losses reduced.
c) Establishment of Fodder Seed Processing Units 0.43 0.43 0.43 2 seed grader at Amritsar & Faridkot installed,5000 minikits distributed, 25800 Urominlicks supllied,2000qtls. of graded
fodder seed supplied to the farmers & 240 Block Level Farmer's Awareness camps organized.
d) Processing of Turkey meat into value added meat products and popularization thereof
0.06 0.06 0.06 Money transferred to GADVASU for R&D. 14000 turkey birds supplied to the farmers during the last four years. To popularize Turkey Meet, suitable products/ recipes developed by GADVASU are being introduced at Kisan Melas.
e) Strengthening the FMD control programme 1.64 1.64 1.64 12.50 lac dosages of FMD vaccine, Syringes and other required equipments purchased. About 9 lac animals i.e cattle, buffalo, sheep and goat in Hoshiarpur, Ropar and Saheed Bhagat Singh Nagar districts vaccinated twice a year. No out-break of FMD has been reported in these districts.
6. Deptt. of Horticulture, Punjab a) Strengthening of Existing Nurseries in
Hoshiarpur and Ferozepur 0.66 0.66 0.66 Work completed.
GRAND TOTAL 37.95 37.95 37.95
Physical & Financial Progress 2008-09: The GoI allocated Rs. 87.52 crore under RKVY scheme during 2008-09 which were released in two installments i.e. Rs 43.76 crores each. Out of this amount Rs.3.8 crores (as 10% share of the ongoing projects of 2007-08) has been disbursed to the implementing agencies for completion of projects taken up during 2007-08 and Rs. 83.72 crores has also been released to the implementing agencies for implementation of projects sanctioned for 2008-09 and the expenditure up to September, 2009 is as under:
A Agriculture Department 0 i) Wheat Seed replacement 1000.0 726.00 724.43 About 1.5 lac quintal of wheat seed distributed. ii) Setting up of Residue Testing Lab. 570.00 400.00 0 iii) Setting up of Farmer's Training Centre 175.00 100.00 75.00 Required equipments were purchased. iv) Strengthening of infrastructure for
distribution of Quality Seed. 20.00 20.00 0
B Punjab Mandi Board 0 i) Agricultural Marketing Development Plan 1000.0 1000.00 800.00 Work on modernization of mandies is in progress. C Horticulture Department 0 i) Promotion of low cost Net House Technology 1000.00 600.00 56.40 141 Net Houses completed. work in progress. ii) Promotion of Citrus Estate In Punjab 884.00 884.00 884.00 Buildings completed, equipments is being purchased iii) Testing of Plant Materials From Govt./Private
Nurseries
103.00 103.00 103.00 Plant material tested from 65 nurseries.
iii) To provide the plastic crates to improve the marketability of fruits and vegetables
500.00 500.00 0 Tenders being finalized
D Soil Conservation Department
0
i) Conservation of Irrigation water 350.00 1000.00 908.00 3190 Ha. benefited, 1975 beneficiaries of Mukatsar, Ferozepur, Patiala, Sangrur, Bathinda, Ludhiana, Faridkot & Gurdaspur.
ii) Reclamation of Degraded Soils
100.00 100.00 0.71 591 Ha. reclaimed & 176 farmers of of Gurdaspur& Mohali
E Animal Husbandry Department 0 i) Processing of Turkey meat into value added
meat products and popularization thereof 0.75 0.75 0.75 On-going project. Funds being transferred to GADVASU,
research in progress. ii) Strengthening the FMD control Programme in
the State 103.75 103.75 55.84 On-going project, about 9.00 lac cattles, buffalo, sheep and
goat vaccinated twice a year in Hoshiarpur, Ropar and Nawan Shaher, vaccination work in progress.
iii) Organization of Animal Shows for promotion of Livestock Sector in Punjab State
100.00 100.00 100.00 Animal Show organized at Mukatsar from 8th Jan to 12th Jan, 2009. About 2500 Animal of various species participated. Prizes worth Rs.70.00 lacs were distributed. This show enhanced the awareness amongst livestock farmers and help in assessing the availability of high genetic breed and high yielding animals.
iv) Strengthening of Fodder seed /livestock farms for the production of certified fodder seed
98.50 98.50 86.70 2 Seed graders at Nabha and Mattewara installed, 2 harvestor, rotavators, 3 tractor trailer purchased & 12600 ft Fencing work at Mattewara Farm is in progress.
F Dairy Department 0 i) Improvement of animal housing 1000.0 884.0 410 80 animal sheds completed. ii) Strengthening of infrastructure for Quality
and Clean Milk Production 190.00 190.00 90.00 24 BMC have been provided.
iii) Incentive for Electronic Chip and Insurance 162.00 162.00.0 110.00 Chip inserted in 4000 animals, work in progress. G Fishery Department 0 i) Establishment of Model Fish Pond
70.00 30.00 0 Work in progress
ii) Extension & Training Programme
100.00 20.00 0 Training camps being organized.
H Strengthening of Agricultural Research-- 700.00 700.00 700.00 Funds transferred to Investigators.
500.00 500.00 500.00 Funds transferred to Investigators.
J Setting up of By-pass Protein Plant—Milkfed
150.00 150.00 150.00 Requisite machinery purchased, work in progress
Grand Total 8877.00 8372.00 * 5754.83
* Out of Rs.87.52 cr. released during 2008-09, 10% i.e. 3.80 cr. has been released for the works of 2007-08.
Physical & Financial Progress 2009-10: The GoI has allocated Rs. 43.23 crore under RKVY scheme during 2009-10. SLSC in its meeting held on 25-08-2008, sanctioned following projects worth Rs. 57.53 crores submitted by the line departments. Keeping in view the budget allocation, the projects have been prioritized. The GoI has released Rs. 10.81 crores to date and accordingly the department requested the State Government to release the amount. The GoI has also been requested to release the remaining amount of Rs. 35.07 crores vide letter No. 1060/RKVY-2009 dated 09-10-2009.
Sr. No.
Description of the Project Approved Outlay for 2009-10
PROJECTS APPROVED BY SLSC IN ITS EARLIER MEETINGS 1. Strengthening of Soil Testing Laboratories 200.00 2. Setting-up of Farmers Training Center 175.00 3. Conservation of irrigation water for sustainable production 1108.00 4. Processing of Turkey meat into value added meat products and popularization thereof 0.75 5. Establishment of Model Fish Pond 40.00 6. Extension & Training Programme 80.00 7. Strengthening of Agricultural Research 500.00
Description of the Project Approved Outlay for 2009-10
8. Development and dissemination of Technologies. 300.00 9. Strengthening of infrastructure for quality and clean milk production 350.00 10. Strengthening of Fodder and Live Stock Sector 50.00 NEW PROPOSALS FOR 2009-10
11. Wheat Seed Replacement 750.00 12. Creation of Seed Treatment Facilities at village level 160.00 13. Enhancing Income Level of Small Farmers and Rural Landless Workers in Punjab through Buffalo Breed
Improvement and Management Programme 300.00
14. Proposal for Strengthening and Up-gradation of Perishable Cargo Centre, Amritsar International Airport. 23.00 15. Improvement of Animal Housing 200.00 16. Incentive for Animal Insurance and Computer Chips 186.75 17. Promotion of Citrus Cultivation in the State 588.00 18. Subsidy on Milking Machines 14.00 19. Control of Brucellosis 51.00 20. Provision for veterinary care and medicines 477.00 21. Supply of Barseem Seed to farmers at subsidy 200.00 TOTAL 5753.50
6. Problem Faced by State : 1. The funds are released under RKVY in installments, with the result, the completion of projects is delayed.
2. The declining water table areas are considered as rain-fed area for the schemes implemented under RKVY, but these areas are not considered for allocation of funds under criteria No. 1 for RKVY.
7. Suggestions : 1. An independent cell/Agency for monitoring the implementation of RKVY projects should be set up under scheme and funds for the same should be provided under this programme.
2. The funds should be directly released to the Nodal Agency to reduce the time spent in getting these released.
3. Parameter-1 - “Un-irrigated area” should be changed and half the weightage may be given to maintenance and up-gradation of existing infrastructure of Irrigation and the remaining half to un-irrigated area.
4. Allocation under the project should be based on the percentage increase in GSDP achieved by individual states.
3 Brief Write-up : Sarva Shiksha Abhiyan started on 2000-01 with the funding pattern of 75:25 which now stands revised to 65:35 for the first two years of the
11th Five year plan i.e. 2007-08 & 2008-09, 60:40 for the third year i.e. 2009-10, 55:45 for the fourth year i.e. 2010-11 and thereafter 50:50
between Government of India and State Government. SSA is a comprehensive & integrated program to attain universalization of elementary
education and to achieve zero dropout rate by 2010.
4. Financial Achievement : (As on 30/9/2009) (Rs Cr)
Year Annual Work Plan (AWP) Receipt of Funds Release of Funds Expenditure %
Achievement against (AWP)
CS SS Total CS SS Total CS SS Total CS SS Total 1 2 3 4 5 6 7 8 9 10 11 12 13 14
1. Scheme : Mid Day Meal (MDM) Sharing pattern: 75:25 for primary classes 80:20 for upper primary classes 2. Year of Start : September 2004
3. Brief Write-up: Mid-Day-Meal Scheme is being implemented effectively w.e.f 1/4/2006. Students studying in all the Government Primary Schools (1-5
class)/Aided/EGS/AIE and PRIs are being provided Mid - Day - Meal for 245 days in a year. Conversion cost is Rs.2.08 (Rs.1.58 GOI and Rs.0.50
State Share) per child per day. PUNSUP supplies wheat/rice given by FCI, to schools (100 gms per day per child). A child is provided Nutrition-480
calories+ 12 gms protein per meal. Vegetables and Pulses are purchased from cooking charges by Mother Self Help Groups (MSHG). 13362
Government Primary Schools are being covered and about 13 lac students are provided cooked Mid-Day-Meal. GOI has extended the Nutritional
Programme of Mid-Day-Meals in schools to the upper primary stage of education (Classes VI-VIII) wef 1/10/2007 in 21 Educationally Backward
Blocks falling in seven districts. This scheme has further been extended to all the students in upper primary schools wef 2008-09. 8.68 lacs students
of upper primary schools are covered under the Scheme. The cooking cost of Mid-Day-Meal for Upper Primary students has been fixed at Rs. 2.60
per child/school/day with central assistance of Rs.2.10 per child and remaining share of Rs.0.50/- is borne by the State Government. The Upper
Primary Class students are provided foodgrains (wheat/rice) @ 150 gms per student/school/day with calorific value of the mid-day-meal at 700
calories and 20 grams of protein. Now GOI has further proposed to revise cooking cost norms for the students of Primary and Upper Primary classes
under Mid-Day-Meal Scheme wef. 1/1/.2009, which is as under:-
(Rupees/ Paise)
Primary Upper Primary At Present On revision At Present On revision CS SS Total CS SS Total CS SS Total CS SS Total Cooking Cost per Child per school day
11. INTEGRATED CHILD DEVELOPMENT SERVICES (SNP) 1. Scheme: Integrated Child Development Services (ICDS) (SNP) (50:50)
2. Year of start: 1975 3. Brief Write up Under this scheme, supplementary nutrition is provided to the children below 6 years of age and to nursing and expecting mothers from low income
group of families and special attention is paid to the delivery of supplementary nutrition to the severely malnourished children below 3 years of age. The rates for SNP have been revised from Rs.2.25 per child to Rs.4.00 per child and Rs.2.50 per mother to Rs .7.00 per pregnant /nursing mother per day for 300 days in a year. For severely malnourished children the rate has been revised from Rs.3.00 per child to Rs.8.00 per child. 50% share of actual expenditure incurred is reimbursed by GOI. 20169 Anganwadi Centres were operational in the State upto 31/3/09. 6 new ICDS projects and 6487 Anganwadi Centres have been sanctioned by GOI, out of which 1336 Anganwadi Centres have been taken over from Sarav Sikhiya Abhiyan and the remaining 5151 will be opened during the year 2009-10. At present, 21505 Anganwadi Centres are functioning in the State.
4. Financial Achievement
(As on 30/9/09) (Rs Cr)
S.No. Year Annual Allocation Receipt of Funds Release of Funds by Treasury Expenditure (Funds Utilized) CS SS Total CS SS Total CS SS Total CS SS Total 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1. 2009-10 50.00 50.00 100.00 17.48 18.55 36.03 8.55 8.55 17.10 8.55 8.55 17.10 2. 2008-09 27.83 27.83 55.66 22.83 32.83 55.66 22.83 30.12 52.95 22.80 22.80 45.60 3. 2007-08 27.83 27.83 55.66 27.83 27.83 55.66 27.83 27.83 55.66 21.56 21.55 43.11 4. 2006-07 27.83 27.83 55.66 27.83 27.83 55.66 27.83 27.83 55.66 19.20 19.20 38.40 5. 2005-06 23.53 23.53 47.06 23.53 23.53 47.06 23.53 23.53 47.06 11.77 11.76 23.53
o Delayed allocation of food grains (Wheat & Rice) under Wheat Based Nutrition Programme (WBNP) by GOI. o Staff position is not as per schematic pattern and the present existing staff is to perform duties other than ICDS.
7. Suggestions o SNP funds may be released in the first month of the financial year as the procurement of feed is to be planned in advance atleast for a quarter; o SNP may be handed over to Self Help Groups (SHGs)/Mothers’ Committees. A provision for administrative expenses made for SHGs/Mothers
Committee be paid @ Rs.1/- per beneficiary per day for procurement, preparation and distribution of SNP to the beneficiaries at village level.
OTHER DETAILS 1. Integrated Child Development Services (Non - Plan) (90:10 CSS): Honorarium to AWs. (Rs Cr)
* Against the available funds of Rs.54.44 Cr of 2007-08 (including unspent balance of Rs.1.27 Cr of 2006-07), excess expenditure (Rs.7.23 crore) incurred has been adjusted
against the grant received from GOI during 2008-09 (Rs.91.25-7.23=84.02 Cr). ** Excess expenditure (Rs.3.08 Cr) adjusted against grant received from GOI during 2009-10. o GOI has enhanced rates of honorarium of AWW and AWH from Rs.1000/- to Rs.1500/- per month and Rs.500-/-to Rs.750/- per month respectively w.e.f 1/4/2008. o State Govt. has also revised the rates of honorarium of AWW and AWH from Rs.400/- to Rs.600/-per month and Rs.200/- to Rs.300/- per month respectively w.e.f
6/10/2008. o At present, the total amount of honorarium of AWW and AWH is Rs.2100/- (Rs.1500/-+ Rs.600/-) and Rs.1050/-per month (Rs.750/-+Rs.300/-) o Scheme was 100% CSS upto 2008-09. From the financial year 2009-10, the cost sharing between the Centre and State is 90:10.
Year Funds released by GOI
Budget allocation by State Govt.
Expenditure
Balance of GOI funds
2007-08 53.17 67.79
61.67*
-
2008-09 91.25 108.53
87.10**
-
2009-10 37.23 CS : 117.17 SS : 13.02 Total: 130.19
12. NATIONAL SOCIAL ASSISTANCE PROGRAMME (NSAP)(Rs 200 pm per beneficiary)
1. Scheme : National Social Assistance Programme (NSAP) (100%) (1) Indira Gandhi National Old Age Pension (IGNOAPS) (ACA) (2) National Family Benefit Scheme (NFBS) (ACA) (3) Indira Gandhi National Widow Pension Scheme.(IGNWPS) (ACA) (4) Indira Gandhi National Disabled Pension Scheme (IGNDPS) (ACA).
2. Year of start : (1) IGNOAPS and NFBS- 15/8/1995 (2) IGNWPS and IGNDPS- 20/2/2009. 3. Brief Write up : (1) Indira Gandhi National Old Age Pension (ACA) This scheme was started on 15/8/1995 by Govt. of India and funds were directly sent to Chairman, District Level Committees (Deputy
Commissioners) upto 31/3/2002. Scheme transferred to State Govt. w.e.f.1/4/2002. Now the funds are released by District Planning Committees/Boards. Under this scheme disabled, issueless persons, widows and destitute old persons of 65 years and above having little or no source of income are given old age pension of Rs.200/- p.m. over & above the amount of pension paid under state level old age pension scheme.
The name of the scheme has been changed from “National Old Age Pension” to “Indira Gandhi National Old Age Pension” w.e.f 19/11/2007 and now persons of 65 years or above belonging to below poverty line families are granted pension under this scheme. As per the new eligibility criteria fixed by GOI for central assistance under this scheme, 1,66,689 beneficiaries shall be covered during 2009-10.
(2) National Family Benefit Scheme (ACA)
This scheme was started on 15/8/1995 by Govt. of India and funds were directly sent to Chairman, District Level Committees (Deputy Commissioners) upto 31/3/2002. Scheme transferred to State Govt. w.e.f.1/4/2002. Now the funds are released by District Planning Committees/Boards. Under this scheme, if the breadwinner of a family living below poverty line dies between the age 18-64 years, the financial help of Rs. 10,000/- per beneficiary is given to the widow of the deceased. Under this scheme, the no. of beneficiaries has been raised by GOI from 1290 to 2672 w.e.f.1/4/2008.
(3) Indira Gandhi National Widow Pension Scheme (ACA) This scheme has been started on 20/2/2009 by GOI. Widows who are in the age 40-64 years belonging to a household below the poverty line
according to the criteria prescribed by the GOI are eligible under this scheme for getting pension of Rs.200/-per month over & above the amount of pension paid under state level widow pension scheme. Under this scheme, 13672 beneficiaries shall be covered till January, 2010.
(4) Indira Gandhi National Disabled Pension Scheme (ACA) This scheme has been started on 20/2/2009 by GOI. Persons with severe or multiple disabilities in the age 18-64 years belonging to a household
below the poverty line according to the criteria prescribed by the GOI are eligible under this scheme for getting pension of Rs.200/-per month over & above the amount of pension paid under state level disabled pension scheme. Under this scheme, 3375 beneficiaries shall be covered till January, 2010.
4. Financial Achievement (As on 30/9/09) (Rs Cr)
SN Year Annual Allocation Receipt of Funds Release of Funds Expenditure (Funds Utilized) CS SS Total CS SS Total CS SS Total CS SS Total 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1. 2009-10 15.56 0 15.56 15.56 0 15.56 0 0 0 0 0 0 2.. 2008-09 47.92 0 47.92 47.92 0 47.92 45.79* 0 45.79 32.81** 0 32.81 3. 2007-08 16.02 0 16.02 12.29 0 12.29 12.29 0 12.29 12.29 0 12.29 4. 2006-07 16.02 0 16.02 12.89 0 12.89 12.89 0 12.89 12.77 0 12.77 5. 2005-06 16.02 0 16.02 15.71 0 15.71 15.71 0 15.71 15.66 0 15.66
* Rs.17.10 Cr. released by the State Government during 2009-10 against unspent balance of 2008-09. ** Rs.5.96 Cr utilised out of the amount released during 2009-10.
6. Suggestions for the better implementation of the scheme
To streamline the disbursement of financial assistance under National Social Assistance Programme (NSAP), funds may be directly released by GOI to Deputy
Commissioner as per old procedure for the timely distribution of pensions to the beneficiaries. o In order to comply with the objective of Govt. of India that the State Govt. should make an equal contribution from its own sources for the payment of pension, GOI
be requested to revise the no. of old age pensioners under Indira Gandhi National Old Age Pension from 1,66,689 to 13,43,541eligible beneficiaries to be covered under the state scheme of Old Age Pension so that the eligible beneficiaries can get atleast Rs.450/- pm as pension.
o GOI has launched Indira Gandhi National Widow Pension Scheme (IGNWPS) for the Widows between the age 40-64 years, whereas the age limit is below 60 years under the state level Widow Pension Scheme. In order to comply with the objective of Govt. of India that the State Govt.should make an equal contribution from its own resources for the payment of pension, GOI be requested that under IGNWPS, the age limit be fixed as per the state scheme so that all the eligible widows can get at least Rs.450/-per month as pension.
o Govt. of India has fixed 80% disability under Indira Gandhi National Disabled Pension Scheme (IGNDPS) whereas in the state scheme the percentage of disability is 50% or above. In order to comply with the objective of Govt. of India that the State Govt. should make an equal contribution from its own resources for the payment of pension, GOI be requested to fix the percentage of disability as per state scheme so that all the eligible disabled could get at lease Rs.450/-per month as pension.
1. Scheme National Rural Health Mission(NRHM) (85:15) 2. Year of Start April, 2005 i.e. FY 2005-06 3. Brief Write-up NRHM was launched in April 2005 to provide accessible, affordable, accountable and effective Primary Healthcare.
It was 100% Centrally Sponsored Scheme in 2005-06 & 2006-07 and the sharing pattern is 85:15 wef 2007-08. 4. Financial Achievement
1. Recruitment Under NRHM provision of manpower to improve the management capacity and service delivery of health sector is very important. Approximately Rs. 100 crore is
provided under PIP for manpower. State/District/Block Programme Management Unit were established in October/November 2007. Recruitment of different category is as under –
• 75 PHCs upgraded to 24x7 PHCs in 2007-08, 26 PHCs in 2008-09 and 110 PHCs/RH and 5 Satellite Hospitals in 2009-10 for providing 24 hours delivery services.
Total upgraded 216.
• Out of 216 Medical Officers (Female), 102 PHCs are without M O (F). 3 Staff Nurses provided in each centre.
• Generator set provided at 75 PHCs
CHCs as FRU
50 CHCs in 2007-08, 10 in 2008-09 and 54 in 2009-10 upgraded to First Referral Units (FRUs). Facility for a complicated delivery including blood transfusion. Total 114
So far 24 Gynecologist, 24 Pediatricians have been appointed under NRHM. Anesthetists on call in all the FRUs.
52 CHCs are without Gynaecologist and 81 CHCs are without Paediatrician.
5 Staff Nurses provided in each centre.
• Biometric based online attendance system for all upgraded centres
3. Accredited Social Health Activists (ASHAs)
• One ASHA for 1000 population. Total number of ASHAs required to be selected is 17756, out of which 17093 ASHAs have already been selected, remaining 359
ASHAs are under selection.
• ASHA Training for Module 1 completed.
4. Committees under NRHM
• Health Planning and Monitoring Committees at State, 20 Districts, 118 Blocks, 349 out of 351 PHCs level constituted.
• 13005 out of 13247 VHSCs constituted
5. Civil Work
Renovation of 20 District Hospitals and 128 CHCs at an estimated cost of Rs. 20.00 Lakh per unit till 2009-10.
For the FY 08/09 building of 50 Sub-Centres to be constructed and 77 SCs to be renovated. For the FY 09/10 building of 77 Sub-Centres to be constructed and 150 SCs to
be renovated-work under progress.
Category wise Civil Work and estimates -
Category Amount required
Provided in 2008-09
Provided in 2009-10
New PHC -Adampur and Ghuda 2.70 Cr. 2.70 Cr.
New CHC – Zirakpur 3.00 Cr. 1.00 Cr. 2.00 Cr.
New RH – Morinda 2.00 Cr. 2.00 Cr.
Upgradation of SDH - Batala, Patti and Pathankot. 7.15 Cr. 1.00 + 5.50 Cr.
The requirement has been finalized by PHSC and tenders were floated and received by PHSC.
Orders are being placed.
7. Untied Funds
• Untied funds for SCs @ Rs. 10,000/-, PHCs @ Rs. 25,000/- and CHCs @ Rs. 50,000/- provided.
• Annual maintenance grant to PHCs @ Rs. 50,000/- and CHCs @ Rs. 1,00,000/- provided.
• Rogi Kalyan Grant to DHs @ Rs. 5.00 lac, SDHs & CHCs @ Rs. 1.00 lac provided.
8. Mobile Medical Units (MMUs)
• 24 Mobile Medical Units (MMUs) purchased. The cost of one MMU is Rs. 36.00 Lakh and it has the facility of ECG, X-ray and Laboratory.
• The staff provided is one Medical Officer (Female), one Medical Officer (Male), one Radiographer, one Laboratory Technician, one Staff Nurse, one Pharmacist, one
Driver and one Helper.
• 6 positions of Medical Officer (Female) vacant.
9. School Health
• Out of 22706 schools which were to be covered in 2008-09, 20001 schools (89%) have been covered by Government Doctors.
• 32,64,926 of students are in Primary and Secondary level schools, 2697739 examined in 2008-09 and 1164044 examined till September 2009.
• IFA and Albendazole Tablets, Scabies Lotion distributed to School Children.
• Free treatment at Govt. hospitals to all school going children.
• Decision taken on 4/11/2008 for free treatment of students (up-to +2 level) studying in Govt. & Govt. aided schools suffering from Congenital Heart Disease (CHD)
and Rheumatic Heart Disease (RHD) in PGI Chandigarh. Their treatment would cost about Rs. 50,000 to 1,25,000. So far 72 students have been treated at PGI.
• Referral treatment of students in Govt. Hospitals made free w.e.f. July 2009.
10. NGOs
• A sum of Rs. 2.42 crore has been provided for NGOs in the PIP of 2008-09.
• MNGO/ FNGO scheme was launched in 6 districts – Ropar, SAS Nagar, Patiala, Nawanshehar, Fatehgarh Sahib and Ferozepur during 2007-08 and their second
installment of Rs. 15 lac per district has been released to 3 MNGOs in 6 districts.
• MNGO/ FNGO scheme has been extended to 8 more districts in the current year 2008-09. Applications were invited and 8 MNGOs have been selected. These MNGOs
has been given grant-in-aid of Rs. 15.00 lakh per district.
• Service NGOs : The 2 Service NGOs for Ludhiana and Amritsar have been given Rs. 15 lac each. SNGOs for 2 districts Bathinda and Gurdaspur State NGO
Committee has recommended for approval of GOI.
11. PPPs
Surakshit Janepa Yojna
• Rs. 2 crore provided in PIP 2008-09 for private health institutions for deliveries in BPL/ SC families.
• Rs. 4100 per delivery provided in the original guidelines.
• We have now vide letter dated 11/2/2009 revised the rates to Rs. 1700 per delivery and authorized the District Health Societies to empanel private health institutions.
• 169 deliveries conducted under SJY till September 2009.
14. JAWAHARLAL NEHRU NATIONAL URBAN RENEWAL MISSION (JNNURM)
1. Scheme: Jawaharlal Nehru National Urban Renewal Mission (JNNURM) (50:20:30) 2. Year of start: 2005-06 3. Brief Write up: The programme was launched on 3/12/2005 by Hon’ble Prime Minister of India. The mission period is upto 2012.The basic components of
mission are (i) Urban Infrastructure & Governance (UIG) (50:20:30::GoI:GoP:ULB) (ii) Basic Services to Urban Poor(BSUP) (50:20:30::GoI:GoP:ULB) (iii)Urban Infrastructure Development Scheme for Small & Medium Towns(UIDSSMT)(80:10:10::GoI:GoP:ULB) (iv) Integrated Housing & Slum Development Programme(IHSDP) (80:10:10::GoI:GoP:ULB). The objective of the mission is to have focused attention for integrated development of infrastructural services, effective linkage between asset creation and asset management and to scale up delivery of civic programme and re-development of inner (old) city areas to reduce congestion. Amritsar and Ludhiana have been selected as mission cities and SAS Nagar was added subsequently as part of Chandigarh. UIG and BSUP are applicable to mission cities of Amritsar, Ludhiana and SAS Nagar whereas UIDSSMT and IHSDP is applicable to all other towns. Amritsar – CDP approved for Rs. 3150 crore, Ludhiana – CDP approved for Rs. 2053.70 crore.
1. Amritsar – (UIG)- (i) DPR for water supply & sewerage for Rs. 239 crore approved. But now only Rs. 19.02 crore water supply project to be executed and the sewerage project to be executed under JBIC assistance.
(ii) DPR for Elevated Road Project for Rs. 149.49 crore approved. (iii) DPR for Rehabilitation/Augmentation of Sewerage System with in the walled city approved for Rs.36.90 Cr. (iv) DPR for Solid Waste Management Plant for Rs. 73.00 Cr. has been approved / sanctioned by GOI on 26.01.2009. (v) DPR for purchase of buses for Amritsar City for Rs.33.30 Cr. has been approved by GOI and GoI has released Rs 8.33 Cr. to the State
BSUP- DPRs of Slum Development Project approved for Rs.5.79 Cr. and GoI released Rs.0.72 Cr. to the State. 2. Ludhiana – UIG – (i) DPR for Sewerage & STP for Rs.241.39 Cr approved. (ii) DPR for purchase of buses for Ludhiana City for Rs.65.20 Cr. has been
approved by GOI and released Rs.16.30 Cr. to the State. BSUP- DPRs of Slum Development Project for Rs.66.64 Cr approved and released Rs. 8.32 Cr. to the State.
3. UIDSSMT- 25 DPRs of 14 towns amounting to Rs.574.62 Cr. have been approved out of which Rs. 158.30 Cr. have been released by GOI as 1st installment.
4. IHSDP- (i) DPR for Construction and upgradation of dwelling units (Phase-1) approved for Rs. 12.35 Cr in Jalandhar and released Rs. 3.58 Cr. to the State (ii) DPR for construction & upgradation of dwelling units (Phase-II) of Jalandhar approved for Rs. 30.05 Cr. and released Rs. 9.20 Cr. to the State
(iii) DPR for construction and up-gradation of dwelling units of Rajpura has been approved for Rs. 21.01 Cr. and 1st installment of Rs. 3.54 Cr. has been released by G.O.I.
Although the Transport Policy under JNNURM covers only Mission Cities i.e. Amritsar and Ludhiana so far as the State of Punjab is concerned, the Small and Medium Towns too should be taken up under Urban Transport Policy under UIDSSMT. Till date, 47 towns have been selected to be covered under UIDSSMT.
(Rs Cr)
Funds released Remarks Sector
Project Name
Year
DPR Approved
Date No. of
DPRs
GoI share
State share
ULB share
GoI share received
Date GoI share released by
FD
Date State share
Released by FD
Date Amount utilized
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 II BSUP
Amritsar 2007-08 5.79 26/9/07 1 2.89 1.16 1.74 0.72 7/11/07 0.72 29/8/08 0.29 11/9/08 1.04 Work on 80 Dwelling units in progress
Ludhiana 2007-08 66.64 26/9/07
1 33.32 13.33 19.99 8.32 7/11/07 8.32 29/8/08 3.33 11/9/08 29.20 Work on 3968 Dwelling units in progress
2 Elevated Road Project 2007-08 To be completed on 30.09.2009 75% work completed
3 BSUP - Slum Development Project Amritsar 2007-08 320 Dwelling units Work on 80 Dwelling Units is under progress
Ludhiana 2007-08 4832 Dwelling units Work on 3968 Dwelling Units is under progress
4 IHSDP
Jalandhar 2007-08 2183 Dwelling units Nil
Rajpura 2008-09 720 Dwelling units Nil Note: The above projects are being continued in 2009-10 as well and the indicated date of completion has been mentioned against each project.
6. Problems faced by the State
o Delay in concurrence by FD for release of funds by GOI and matching State share is major hurdle towards timely implementation of the schemes. The State was too late in accessing the funds under this programme.
7. Suggestions: (i) GoI may consider to continue of Central Assistance beyond Mission period as by the time the mission period is over, leftover areas may be covered and
to further sustain the momentum achieved during mission period. (ii) The guidelines under BSUP / IHSDP enunciate that maximum of Rs. 80,000/- per Dwelling Unit shall be admissible for funding, the escalated cost needs to
be taken into consideration by Government of India in as much as that the initial cost of Rs. 1.28 lacs per Dwelling Unit for slum dwellers arrived at while posing DPRs has now escalated to Rs. 2.20 lacs per Dwelling Unit. While keeping in view the financial crunch in almost all Urban Local Bodies who may not be able to contribute its own share, it would, therefore, be imperative that Government of India may enhance the Grant-in-aid from the existing ceiling of Rs. 80,000/- per Dwelling Unit to Rs. 1,50,000/- per Dwelling Unit or as it may deem fit.
(iii) The Govt. of Punjab has availed a loan of Rs. 500 Cr. from HUDCO for infrastructure development projects for which the rate of interest being charged is 13.5%. It is suggested that HUDCO loan for this purpose should attract interest at 5% only.
4. Reasons of less receipt of funds/ less utilisation The TSC was not popular among the people of State as a similar State funded Sanitation project 'Rajiv Gandhi Pendu Jan Sehat Kalyan Yojana (RGPJSKY) was under implementation, which is highly subsidized than TSC. Now, State Government has decided to dovetail both the projects.
All the remaining school toilets are targeted to be covered during 2009-10
IHHL-25, ST-17
IHHL-Individual Household Latrines (BPL), ST-School Toilets, SC-Sanitary Complexes, ANG-Anganwadi Toilets 6. Any bottlenecks in implementation
• The TSC is not popular among the people of State as a similar State funded Sanitation project 'Rajiv Gandhi Pendu Jan Sehat Kalyan Yojana (RGPJSKY) was under implementation, which is highly subsidized than TSC. Now, State Government has decided to dovetail both the projects.
• TSC project was periodically transferred from one department to another.
16. NATIONAL RURAL WATER SUPPLY PROGRAMME 1. Scheme: National Rural Water Supply Programme (NRWSP) (100%) 2. Year of Start: Continued Scheme 3. Brief Write-up: To expedite the coverage of problem villages and partially covered villages, Government of India provides funds on 100% basis under this
programme. 4. Financial Achievement:
(As on 30/9/2009) (Rs Cr)
Annual Allocation Receipt of funds Release of funds Expenditure
2005-06 41.35 0.00 41.35 41.35 0.00 41.35 51.66 0.00 51.66 37.55 0.00 37.55 Government of India has made a total allocation of Rs. 7764.00 lac for the year 2009-10 under all Centrally Sponsored Schemes NRWSP Coverage/ Quality Affected &
Swajaldhara. Out of this 20% i.e Rs. 1553.00 lac will be utilized for NRWSP (QA) and the balance Rs. 6211.00 lac will be used for other programmes. Against this allocation
Govt. of India has released a total of Rs. 2976.00 lac (Rs. 2380.80 lac under NRWSP (Coverage)+ Rs. 595.20 lac under NRWSP(QA) upto 30/9/2009.
o The State Government signed an agreement with World Bank for Rs. 1280.30 crore for water supply. It was proposed to cover 2124 (NC) not covered and 920 (PC)
partially covered villages under water supply schemes (now revised to 739 NC, 2422 PC), 100 villages are to be selected on pilot basis for provision of small bore
sewer system and ponds in 1000 villages would be cleaned and rejuvenated. The sharing pattern is (59:16:19:06:: World Bank : GOI : GOP : Community Share). The
contribution of beneficiary is 10 % in normal villages and 5 % in relatively backward areas like border villages (mountainous), Kandi villages (Riviera), Bet area and
Flood Affected Area and villages having 50 % or more SC population. This progress is slow in respect of World Bank scheme on account of reluctance of villagers to
pay their share. Now, World Bank has agreed to dilute the community contribution for Rs. 800/- per general gateway household and Rs. 400/- per SC category
household. This contribution is quite less than the 10% or 5% contribution mentioned above. With this the programs under World Bank assisted level Water Supply &
Sanitation project is likely to pick up.
o World Bank conditionality of beneficiary contribution to the schemes has been extended to NRWSP also, as result problems are being faced for expeditiously execution