1 First Reading City of Hollywood Staff Summary Request PO-2009-12 Title: An Ordinance Of The City Of Hollywood, Florida, Amending Chapter 52 Of The Code Of Ordinances Titled "Sewer Use" To Include Implementation Of A New Rate And Increased Sewer Reserve Capacity Charges ("Impact Fees") Critical To Providing Reliable Wastewater Services; Providing An October 1, 2009 Effective Date For The Increased Impact Fees And An Immediate Effective Date For The Remainder Of This Ordinance. Recommendation: Approval of the attached Resolution. Explanation: The City of Hollywood’s Department of Public Utilities provides the critical role of collecting, treating and disposing of wastewater within the City of Hollywood and for six (6) surrounding communities, through its Southern Regional Wastewater Treatment Plant, and it is essential for the proper planning to take place in order to provide reliable wastewater services to the community. The City of Hollywood has completed a comprehensive Wastewater Master Plan to serve as a primary planning tool to help meet regulatory requirements, identify critical asset renewal and replacement needs. The Wastewater Master Plan identified critical wastewater infrastructure assets that are well beyond their useful life which may pose public health and safety risks if not addressed promptly. The City of Hollywood will need to start various initiatives and projects for compliance with various regulatory requirements including, but not limited to, the reduction of nutrients in the ocean outfall, and on April 15, 2009, the City Hollywood City Commission formally adopted the Wastewater Master Plan. #34
107

First Reading - OrdinanceWatch

May 03, 2023

Download

Documents

Khang Minh
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: First Reading - OrdinanceWatch

1

First Reading

City of Hollywood Staff Summary Request

PO-2009-12

Title: An Ordinance Of The City Of Hollywood, Florida, Amending

Chapter 52 Of The Code Of Ordinances Titled "Sewer Use" To Include Implementation Of A New Rate And Increased Sewer Reserve Capacity Charges ("Impact Fees") Critical To Providing Reliable Wastewater Services; Providing An October 1, 2009 Effective Date For The Increased Impact Fees And An Immediate Effective Date For The Remainder Of This Ordinance.

Recommendation: Approval of the attached Resolution.

Explanation: The City of Hollywood’s Department of Public Utilities provides the critical role of collecting, treating and disposing of wastewater within the City of Hollywood and for six (6) surrounding communities, through its Southern Regional Wastewater Treatment Plant, and it is essential for the proper planning to take place in order to provide reliable wastewater services to the community. The City of Hollywood has completed a comprehensive Wastewater Master Plan to serve as a primary planning tool to help meet regulatory requirements, identify critical asset renewal and replacement needs. The Wastewater Master Plan identified critical wastewater infrastructure assets that are well beyond their useful life which may pose public health and safety risks if not addressed promptly. The City of Hollywood will need to start various initiatives and projects for compliance with various regulatory requirements including, but not limited to, the reduction of nutrients in the ocean outfall, and on April 15, 2009, the City Hollywood City Commission formally adopted the Wastewater Master Plan.

#34

Page 2: First Reading - OrdinanceWatch

2

Public Utilities staff recommends that the City Commission adopt a new wastewater rate base charge and Reserve Capacity Charge by amending Chapter 52 of the Code of Ordinances.

Submitted by: Albert L. Perez, P.E., Public Utilities Director

Recommended for inclusion on the

agenda by:

Cameron D. Benson, City Manager Albert L. Perez, P.E., Public Utilities Director

Director Signed Off:

5/11/2009 3:23:14 PM

Page 3: First Reading - OrdinanceWatch

(Coding: Words and figures underscored are additions to existing law; words and figures struck-through are deletions.)

1

ORDINANCE NO. __________________

AN ORDINANCE OF THE CITY OF HOLLYWOOD, FLORIDA, AMENDING CHAPTER 52 OF THE CODE OF ORDINANCES TITLED “SEWER USE” TO INCLUDE IMPLEMENTATION OF A NEW RATE AND INCREASED SEWER RESERVE CAPACITY CHARGES ("IMPACT FEES") CRITICAL TO PROVIDING RELIABLE WASTEWATER SERVICES; PROVIDING AN OCTOBER 1, 2009 EFFECTIVE DATE FOR THE INCREASED IMPACT FEES AND AN IMMEDIATE EFFECTIVE DATE FOR THE REMAINDER OF THIS ORDINANCE.

WHEREAS, the City of Hollywood’s Department of Public Utilities provides the critical role of collecting, treating and disposing of wastewater within the City of Hollywood and for six (6) surrounding communities, through its Southern Regional Wastewater Treatment Plant; and

WHEREAS, it is essential for the proper planning to take place in order to provide reliable wastewater services to the community; and

WHEREAS, the City of Hollywood has completed a comprehensive Wastewater Master Plan to serve as a primary planning tool to help meet regulatory requirements and identify critical asset renewal and replacement needs; and WHEREAS, the Wastewater Master Plan identified critical wastewater infrastructure assets that are well beyond their useful life which may pose public health and safety risks if not addressed promptly; and WHEREAS, the City of Hollywood will need to start various initiatives and projects for compliance with various regulatory requirements, including, but not limited to, the reduction of nutrients in the ocean outfall; and

WHEREAS, on April 15, 2009, the City Hollywood City Commission formally adopted the Wastewater Master Plan; and

WHEREAS, staff recommends that the City Commission adopt a new wastewater rate base charge, and reserve capacity charge by amending Chapter 52 of the Code of Ordinances;

Page 4: First Reading - OrdinanceWatch

2

NOW, THEREFORE, BE IT ORDAINED BY THE CITY COMMISSION OF THE CITY OF HOLLYWOOD, FLORIDA:

Section 1: That Chapter 52 of the Code of Ordinances is hereby amended to read as follows:

CHAPTER 52: SEWER USE

* * *

FEES AND CHARGES

* * *

§ 52.51 SEWER RESERVE CAPACITY CHARGE.

* * *

(B) (1) The following have the definitions referenced herein:

* * *

(4) The sewer reserve capacity charge shall be as indicated in the following tables:

Wastewater RCC Residential Per Unit Single Family $ 2,130.00 Duplex $ 2,130.00

Multi-Family 3 + Units $ 1,521.66

Mobile Home $ 608.34 Non Residential Per Meter Size Meter Size (Inches) 5/8 inch $ 2,130.00 1.00 inch $ 5,325.00 1.50 inch $ 10,650.00 2.00 inch $ 17,040.00 3.00 inch $ 34,080.00 4.00 inch $ 53,250.00 6.00 inch $ 106,500.00 8.00 inch $ 170,400.00

Page 5: First Reading - OrdinanceWatch

3

Table 1: Residential

Residential Type Charge

Single Family (per unit) $1,341/unit Effective October 1, 2005 $1,609.20/unit Effective October 1, 2007 $1,770.12/unit Duplex (per unit) $1,341/unit Effective October 1, 2005 $1,609.20/unit Effective October 1, 2007 $1,770.12/unit Multi-family (3 or more units) $958/unit Effective October 1, 2005 $1,149.60/unit Effective October 1, 2007 $1,264.56/unit Mobile home (per unit) $383/unit Effective October 1, 2005 $459.60/unit Effective October 1, 2007 $505.56/unit

Table 2: Non-residential

Meter Size Charge

5/8" $ 1,341 Effective October 1, 2005 $1,609.20 Effective October 1, 2007 $1,770.12 1" $3,352 Effective October 1, 2005 $4,022.40 Effective October 1, 2007 $4,424.64 1½" $6,705 Effective October 1, 2005 $8,046.00 Effective October 1, 2007 $8,850.60 2" $10,728 Effective October 1, 2005 $12,873.60 Effective October 1, 2007 $14,160.96 3" $21,456 Effective October 1, 2005 $25,747.20 Effective October 1, 2007 $28,321.92

Page 6: First Reading - OrdinanceWatch

4

4" $33,525 Effective October 1, 2005 $40,230.00 Effective October 1, 2007 $44,253.00 6" $67,050 Effective October 1, 2005 $80,460.00 Effective October 1, 2007 $88,506.00 8" $107,280 Effective October 1, 2005 $128,736.00 Effective October 1, 2007 $141,609.60

* * *

§ 52.53 RATES AND CHARGES FOR USE OF SYSTEM.

(A) A base charge shall be levied against each unit supplied by a connected service for each month of each applicable year in the amounts amount as follows:

Wastewater Rates and Charges 6/3/2009 10/1/2009 10/1/2010 10/1/2011 10/1/2012 10/1/2013 Monthly Base Charge: Residential - Charge Per Unit

Single Family $4.50 $5.30 $6.10 $6.90 $7.70 $8.50

Multi Family $3.20 $3.77 $4.34 $4.90 $5.47 $6.04 Non Residential - Charge by Meter Size

Meter Size Meter Equivalency

Base Charge

Base Charge

Base Charge

Base Charge

Base Charge

Base Charge

5/8 INCH 1.0 $4.50 $5.30 $6.10 $6.90 $7.70 $8.50 1 INCH 2.5 $11.25 $13.25 $15.25 $17.25 $19.25 $21.25 1-1/2 INCH 5.0 $22.50 $26.50 $30.50 $34.50 $38.50 $42.50 2 INCH 8.0 $36.00 $42.40 $48.80 $55.20 $61.60 $68.00 3 INCH 15.0 $67.50 $79.50 $91.50 103.50 $115.50 $127.50 4 INCH 25.0 $112.50 $132.50 $152.50 $172.50 $192.50 $212.50 6 INCH 50.0 $225.00 265.00 $305.00 $345.00 $385.00 425.00 8 INCH 80.0 $360.00 $424.00 $488.00 $552.00 $616.00 $680.00 * All rates shown are for Inside-City customers. Outside-City customer rates are 1.25 times rates shown.

Current Charge $1.27

Effective Date Applicable Base Charge

June 1, 2005 $2.50 October 1, 2005 $2.68

Page 7: First Reading - OrdinanceWatch

5

October 1, 2006 $2.86 October 1, 2007 $3.05 October 1, 2008 $3.23 October 1, 2009 $3.43

* * *

(C) In addition to the base charge, any sewer user who shall use water shall pay for sewer service at the applicable rate beginning upon the effective date of the applicable year per 133.7 cubic feet or 1,000 gallons of water used as follows:

Wastewater Rates and Charges 6/3/2009 10/1/2009 10/1/2010 10/1/2011 10/12012 10/1/2013 Flow (CCF): Single Family Residential

From: To:

Flow Rate per CCF

Flow Rate per CCF

Flow Rate per CCF

Flow Rate per CCF

Flow Rate per CCF

Flow Rate per CCF

0 4 $ 5.71 $ 5.76 $ 6.14 $ 6.55 $ 7.00 $ 7.50 5 9 $ 5.71 $ 5.76 $ 6.14 $ 6.55 $ 7.00 $ 7.50 10 14 $ 5.71 $ 5.76 $ 6.14 $ 6.55 $ 7.00 $ 7.50 15 19 $ 5.71 $ 5.76 $ 6.14 $ 6.55 $ 7.00 $ 7.50 20 And Over $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 Multi Family Residential Ranges Shall Be Adjusted By Unit Count

From: To:

Flow Rate per CCF

Flow Rate per CCF

Flow Rate per CCF

Flow Rate per CCF

Flow Rate per CCF

Flow Rate per CCF

0 3 $ 5.71 $ 5.76 $ 6.14 $ 6.55 $ 7.00 $ 7.50 4 6 $ 5.71 $ 5.76 $ 6.14 $ 6.55 $ 7.00 $ 7.50 7 10 $ 5.71 $ 5.76 $ 6.14 $ 6.55 $ 7.00 $ 7.50 11 13 $ 5.71 $ 5.76 $ 6.14 $ 6.55 $ 7.00 $ 7.50 14 And Over $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 Non Residential - All Meter Sizes

From: To:

Flow Rate per CCF

Flow Rate per CCF

Flow Rate per CCF

Flow Rate per CCF

Flow Rate per CCF

Flow Rate per CCF

All Flow $ 5.71 $ 5.76 $ 6.14 $ 6.55 $ 7.00 $ 7.50

* All rates shown are for Inside-City customers. Outside-City customer rates are 1.25 times rates shown. ** CCF = 100 cubic feet *** The flow rate for each range will apply to any amount of monthly flow that is equal to or greater than the minimum of the range and less than the minimum of the next higher range.

Page 8: First Reading - OrdinanceWatch

6

Current Charge $3.52

Effective Date Applicable Rate

October 1, 2005 $3.77 October 1, 2006 $4.03 October 1, 2007 $4.29 October 1, 2008 $4.55 October 1, 2009 $4.82

* * *

(K) Commencing on October 1, 2014 2008 and continuing on October 1 of each year thereafter, a utility price index adjustment, which corresponds to the price index established, on or before March 31 of each year, by the Florida Public Service Commission pursuant to F.S. § 367.081(4)(a), shall be applied to the base charge and gallonage rate then in effect. (L) A utility base surcharge shall be levied against each unit for each month for one year in the amount as follows: Effective Date Charge October 1, 2008 $0.03 (M) In addition to the utility base surcharge, a flow surcharge per 1,000 gallons shall be levied against each unit for each month for one year in the amount as follows: Effective Date Charge October 1, 2008 $0.04 Section 2: That it is the intention of the City Commission that the provisions of this ordinance shall become and be made a part of the Code of Ordinances of the City of Hollywood, Florida, and the provisions of this ordinance may be renumbered to accomplish such intention. Section 3: That if any word, phrase, clause, subsection or section of this ordinance is for any reason held unconstitutional or invalid, the invalidity thereof shall not affect the validity of any remaining portions of this ordinance.

Page 9: First Reading - OrdinanceWatch

7

Section 4: That all sections or parts of sections of the Code of Ordinances, all ordinances or parts of ordinances, and all resolutions or parts of resolutions in conflict herewith be and the same are hereby repealed to the extent of such conflict. Section 5: That the amendments to Section 52.51 contained in Section 1 of this ordinance shall be in full force and effect on October 1, 2009, and the remainder of this ordinance shall be in full force and effect immediately upon its passage and adoption.

ADVERTISED on , 2009.

PASSED on first reading this day of , 2009. PASSED AND ADOPTED on second reading this day of , 2009. PETER BOBER, MAYOR ATTEST: PATRICIA A. CERNY, MMC CITY CLERK APPROVED AS TO FORM & LEGALITY For the use and reliance of the City of Hollywood, Florida only: JEFFREY P. SHEFFEL CITY ATTORNEY

Page 10: First Reading - OrdinanceWatch
Page 11: First Reading - OrdinanceWatch

Priority Level 1 –Tiered

 Rates

Page 12: First Reading - OrdinanceWatch

2009

2010

2011

2012

2013

2014

Month

ly Ba

se C

harg

e:Re

siden

tial -

Charg

e Per

Unit

Single

Fami

ly4.2

5$

4.82

$

5.3

9$

5.96

$

6.5

3$

7.08

$

Mu

lti Fa

mily

3.02

$

3.4

3$

3.83

$

4.2

4$

4.64

$

5.0

3$

Non R

eside

ntial

- Cha

rge by

Mete

r Size

Meter

Eq

uivale

ncy

Base

Ch

arge

Base

Ch

arge

Base

Ch

arge

Base

Ch

arge

Base

Ch

arge

Base

Ch

arge

5/8 IN

CH1.0

4.25

$

4.8

2$

5.39

$

5.9

6$

6.53

$

7.0

8$

1 INC

H2.5

10.63

$

12

.05$

13.48

$

14

.90$

16.33

$

17

.70$

1 1/2

INCH

5.021

.25$

24.10

$

26

.95$

29.80

$

32

.65$

35.40

$

2 I

NCH

8.034

.00$

38.56

$

43

.12$

47.68

$

52

.24$

56.64

$

3 I

NCH

15.0

63.75

$

72

.30$

80.85

$

89

.40$

97.95

$

10

6.20

$

4 INC

H25

.010

6.25

$

120.5

0$

13

4.75

$

149.0

0$

16

3.25

$

177.0

0$

6 I

NCH

50.0

212.5

0$

24

1.00

$

269.5

0$

29

8.00

$

326.5

0$

35

4.00

$

8 INC

H80

.034

0.00

$

385.6

0$

43

1.20

$

476.8

0$

52

2.40

$

566.4

0$

Prop

osed

Rate

s -Wa

ter

Meter

Size

* All r

ates s

hown

are f

or Ins

ide-C

ity cu

stome

rs. O

utside

-City

custo

mer r

ates a

re 1.2

5 tim

es ra

tes sh

own.

Scen

ario 1

- Prio

rity 1

Proje

cts O

nly

Page 13: First Reading - OrdinanceWatch

2009

2010

2011

2012

2013

2014

Flow

Rat

e pe

r CC

F:

From

:To

:Fl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

F0

4

1.72

$

1.74

$

1.85

$

1.98

$

2.06

$

2.14

$

59

3.

45$

3.

47$

3.

70$

3.

95$

4.

11$

4.

28$

10

14

5.

17$

5.

20$

5.

55$

5.

92$

6.

16$

6.

42$

15

19

6.

04$

6.

07$

6.

47$

6.

91$

7.

19$

7.

49$

20

And

Ove

r6.

90$

6.

94$

7.

39$

7.

90$

8.

21$

8.

56$

From

:To

:Fl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

F0

3

1.72

$

1.74

$

1.85

$

1.98

$

2.06

$

2.14

$

46

3.

45$

3.

47$

3.

70$

3.

95$

4.

11$

4.

28$

7

10

5.

17$

5.

20$

5.

55$

5.

92$

6.

16$

6.

42$

11

13

6.

04$

6.

07$

6.

47$

6.

91$

7.

19$

7.

49$

14

And

Ove

r6.

90$

6.

94$

7.

39$

7.

90$

8.

21$

8.

56$

From

:To

:Fl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

F0

4

3.45

$

3.47

$

3.70

$

3.95

$

4.11

$

4.28

$

59

3.

45$

3.

47$

3.

70$

3.

95$

4.

11$

4.

28$

10

14

5.

17$

5.

20$

5.

55$

5.

92$

6.

16$

6.

42$

15

19

6.

04$

6.

07$

6.

47$

6.

91$

7.

19$

7.

49$

20

And

Ove

r6.

90$

6.

94$

7.

39$

7.

90$

8.

21$

8.

56$

Blo

ck R

ange

s A

djus

ted

By

Met

er E

quiv

alen

cy

* A

ll ra

tes

show

n ar

e fo

r Ins

ide-

City

cus

tom

ers.

Out

side

-City

cus

tom

er ra

tes

are

1.25

tim

es ra

tes

show

n.

Mul

ti Fa

mily

Res

iden

tial

Blo

ck R

ange

s A

djus

ted

By

Uni

t Cou

nt

Non

Res

iden

tial

Sing

le F

amily

Res

iden

tial

Prop

osed

Rat

es -W

ater

Sce

nario

1 -

Prio

rity

1 P

roje

cts

Onl

y

Page 14: First Reading - OrdinanceWatch

2009

2010

2011

2012

2013

2014

Month

ly Ba

se Ch

arge:

Resid

entia

l - Ch

arge P

er Un

itSin

gle Fa

mily

4.50

$

5.3

0$

6.1

0$

6.90

$

7.7

0$

8.50

$

Mu

lti Fam

ily3.2

0$

3.77

$

4.34

$

4.9

0$

5.47

$

6.0

4$

Non R

eside

ntial

- Cha

rge by

Mete

r Size

Meter

Eq

uivale

ncy

Base

Ch

arge

Base

Ch

arge

Base

Ch

arge

Base

Ch

arge

Base

Ch

arge

Base

Ch

arge

5/8 IN

CH1.0

4.50

$

5.3

0$

6.1

0$

6.90

$

7.7

0$

8.50

$

1 I

NCH

2.511

.25$

13.25

$

15

.25$

17.25

$

19

.25$

21.25

$

1 1/2

INCH

5.022

.50$

26.50

$

30

.50$

34.50

$

38

.50$

42.50

$

2 INC

H8.0

36.00

$

42

.40$

48.80

$

55

.20$

61.60

$

68

.00$

3 I

NCH

15.0

67.50

$

79

.50$

91.50

$

10

3.50

$

115.5

0$

12

7.50

$

4 INC

H25

.011

2.50

$

132.5

0$

152.5

0$

17

2.50

$

192.5

0$

21

2.50

$

6 INC

H50

.022

5.00

$

265.0

0$

305.0

0$

34

5.00

$

385.0

0$

42

5.00

$

8 INC

H80

.036

0.00

$

424.0

0$

488.0

0$

55

2.00

$

616.0

0$

68

0.00

$

Prop

osed

Rates

-Was

tewate

r

Meter

Size

* All r

ates s

hown

are f

or Ins

ide-C

ity cu

stome

rs. O

utside

-City

custo

mer ra

tes ar

e 1.25

times

rates

show

n.

Scen

ario 1

- Prio

rity 1

Projec

ts On

ly

Page 15: First Reading - OrdinanceWatch

2009

2010

2011

2012

2013

2014

Flow

Rat

e pe

r CC

F:

From

:To

:Fl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

F0

45.

09$

5.

13$

5.46

$

5.82

$

6.05

$

6.30

$

5

95.

09$

5.

13$

5.46

$

5.82

$

6.05

$

6.30

$

10

145.

09$

5.

13$

5.46

$

5.82

$

6.05

$

6.30

$

15

195.

09$

5.

13$

5.46

$

5.82

$

6.05

$

6.30

$

20

And

Ove

r-

$

-

$

-

$

-

$

-

$

-

$

From

:To

:Fl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

F0

35.

09$

5.

13$

5.46

$

5.82

$

6.05

$

6.30

$

4

65.

09$

5.

13$

5.46

$

5.82

$

6.05

$

6.30

$

7

105.

09$

5.

13$

5.46

$

5.82

$

6.05

$

6.30

$

11

135.

09$

5.

13$

5.46

$

5.82

$

6.05

$

6.30

$

14

And

Ove

r-

$

-

$

-

$

-

$

-

$

-

$

From

:To

:Fl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

F0

45.

09$

5.

13$

5.46

$

5.82

$

6.05

$

6.30

$

5

95.

09$

5.

13$

5.46

$

5.82

$

6.05

$

6.30

$

10

145.

09$

5.

13$

5.46

$

5.82

$

6.05

$

6.30

$

15

195.

09$

5.

13$

5.46

$

5.82

$

6.05

$

6.30

$

20

And

Ove

r5.

09$

5.

13$

5.46

$

5.82

$

6.05

$

6.30

$

* A

ll ra

tes

show

n ar

e fo

r Ins

ide-

City

cus

tom

ers.

Out

side

-City

cus

tom

er ra

tes

are

1.25

tim

es ra

tes

show

n.

Mul

ti Fa

mily

Res

iden

tial

Blo

ck R

ange

s A

djus

ted

By

Uni

t Cou

nt

Non

Res

iden

tial

Sing

le F

amily

Res

iden

tial

Prop

osed

Rat

es -W

aste

wat

erS

cena

rio 1

- P

riorit

y 1

Pro

ject

s O

nly

Page 16: First Reading - OrdinanceWatch

2009

- C

urre

nt

CC

FC

urre

nt B

illP

ropo

sed

Bill

$ C

hang

e%

Cha

nge

Prop

osed

Bill

$ C

hang

e%

Cha

nge

Prop

osed

B

ill$

Cha

nge

% C

hang

e0

3.34

$

4.25

$

0.91

$

27

%4.

82$

0.57

$

13%

5.39

$

0.57

$

12

%1

5.29

$

5.97

$

0.68

$

13

%6.

55$

0.58

$

10%

7.24

$

0.68

$

10

%2

7.24

$

7.70

$

0.46

$

6%

8.29

$

0.

59$

8%

9.08

$

0.80

$

10

%3

9.19

$

9.42

$

0.23

$

2%

10.0

2$

0.

60$

6%

10.9

3$

0.

91$

9%4

11.1

4$

11.1

4$

0.00

$

0%

11.7

5$

0.

61$

5%

12.7

8$

1.

03$

9%5

13.0

9$

14.5

9$

1.50

$

11

%15

.22

$

0.63

$

4%16

.47

$

1.26

$

8%

615

.04

$

18

.03

$

2.

99$

20%

18.6

8$

0.

65$

4%

20.1

7$

1.

49$

8%7

16.9

9$

21.4

8$

4.49

$

26

%22

.15

$

0.67

$

3%23

.86

$

1.

72$

8%

818

.94

$

24

.92

$

5.

98$

32%

25.6

1$

0.

69$

3%

27.5

5$

1.

94$

8%9

21.4

8$

28.3

7$

6.89

$

32

%29

.08

$

0.71

$

2%31

.25

$

2.17

$

7%

1024

.02

$

33

.54

$

9.

52$

40%

34.2

7$

0.

73$

2%

36.7

9$

2.

52$

7%11

26.5

6$

38.7

1$

12.1

5$

46

%39

.47

$

0.76

$

2%42

.33

$

2.86

$

7%

1229

.10

$

43

.88

$

14

.78

$

51%

44.6

7$

0.

79$

2%

47.8

7$

3.

20$

7%13

31.6

4$

49.0

5$

17.4

1$

55

%49

.87

$

0.82

$

2%53

.41

$

3.55

$

7%

CC

FP

ropo

sed

Bill

$ C

hang

e%

Cha

nge

Prop

osed

Bill

$ C

hang

e%

Cha

nge

Prop

osed

B

ill$

Cha

nge

% C

hang

e0

5.96

$

0.57

$

11

%6.

53$

0.57

$

10%

7.08

$

0.55

$

8%

17.

93$

0.

70$

10%

8.58

$

0.

65$

8%

9.22

$

0.64

$

7%

29.

91$

0.

82$

9%10

.63

$

0.73

$

7%11

.36

$

0.72

$

7%

311

.88

$

0.

95$

9%12

.69

$

0.81

$

7%13

.49

$

0.81

$

6%

413

.85

$

1.

07$

8%14

.74

$

0.88

$

6%15

.63

$

0.89

$

6%

517

.80

$

1.

33$

8%18

.84

$

1.04

$

6%19

.91

$

1.07

$

6%

621

.75

$

1.

58$

8%22

.94

$

1.20

$

6%24

.18

$

1.24

$

5%

725

.69

$

1.

83$

8%27

.05

$

1.35

$

5%28

.46

$

1.

41$

5%

829

.64

$

2.

08$

8%31

.15

$

1.51

$

5%32

.73

$

1.58

$

5%

933

.59

$

2.

34$

7%35

.25

$

1.67

$

5%37

.01

$

1.75

$

5%

1039

.51

$

2.

72$

7%41

.41

$

1.90

$

5%43

.42

$

2.01

$

5%

1145

.43

$

3.

09$

7%47

.56

$

2.14

$

5%49

.83

$

2.27

$

5%

1251

.35

$

3.

47$

7%53

.72

$

2.37

$

5%56

.25

$

2.53

$

5%

1357

.27

$

3.

85$

7%59

.88

$

2.61

$

5%62

.66

$

2.79

$

5%

2012

- Pr

opos

ed20

13 -

Prop

osed

2014

- Pr

opos

ed

Mon

thly

Bill

Com

paris

on -

Sing

le F

amily

Res

iden

tial

Sing

le F

amily

- W

ater

Onl

y

2009

- Pr

opos

ed20

10 -

Prop

osed

2011

- Pr

opos

ed

Page 17: First Reading - OrdinanceWatch

2009

- C

urre

nt

CC

FC

urre

nt B

illP

ropo

sed

Bill

$ C

hang

e%

Cha

nge

Pro

pose

d B

ill$

Cha

nge

% C

hang

eP

ropo

sed

Bill

$ C

hang

e%

Cha

nge

06.

68$

8.75

$

2.07

$

31

%10

.12

$

1.37

$

16

%11

.49

$

1.

37$

14%

112

.14

$

15.5

6$

3.42

$

28

%16

.98

$

1.42

$

9%

18.8

0$

1.81

$

11

%2

17.6

0$

22

.38

$

4.

78$

27%

23.8

5$

1.

47$

7%26

.10

$

2.

26$

9%3

23.0

6$

29

.19

$

6.

13$

27%

30.7

1$

1.

52$

5%33

.41

$

2.

70$

9%4

28.5

2$

36

.00

$

7.

48$

26%

37.5

7$

1.

57$

4%40

.72

$

3.

15$

8%5

33.9

8$

44

.54

$

10

.56

$

31%

46.1

7$

1.

63$

4%49

.87

$

3.

71$

8%6

39.4

4$

53

.07

$

13

.63

$

35%

54.7

6$

1.

69$

3%59

.03

$

4.

27$

8%7

44.9

0$

61

.61

$

16

.71

$

37%

63.3

6$

1.

75$

3%68

.18

$

4.

83$

8%8

50.3

6$

70

.14

$

19

.78

$

39%

71.9

5$

1.

81$

3%77

.33

$

5.

38$

7%9

56.4

1$

78

.68

$

22

.27

$

39%

80.5

5$

1.

87$

2%86

.49

$

5.

94$

7%10

62.4

6$

88

.94

$

26

.48

$

42%

90.8

7$

1.

93$

2%97

.49

$

6.

62$

7%11

68.5

1$

99

.20

$

30

.69

$

45%

101.

20$

2.00

$

2%

108.

49$

7.

29$

7%12

74.5

6$

10

9.46

$

34.9

0$

47

%11

1.53

$

2.

07$

2%11

9.49

$

7.96

$

7%

1380

.61

$

119.

72$

39

.11

$

49%

121.

86$

2.14

$

2%

130.

49$

8.

64$

7%

CC

FP

ropo

sed

Bill

$ C

hang

e%

Cha

nge

Pro

pose

d B

ill$

Cha

nge

% C

hang

eP

ropo

sed

Bill

$ C

hang

e%

Cha

nge

012

.86

$

1.

37$

12%

14.2

3$

1.

37$

11%

15.5

8$

1.35

$

9%

120

.65

$

1.

86$

10%

22.3

3$

1.

68$

8%24

.02

$

1.

69$

8%2

28.4

5$

2.34

$

9%

30.4

3$

1.

99$

7%32

.46

$

2.

02$

7%3

36.2

4$

2.83

$

8%

38.5

4$

2.

30$

6%40

.89

$

2.

36$

6%4

44.0

3$

3.31

$

8%

46.6

4$

2.

60$

6%49

.33

$

2.

69$

6%5

53.8

0$

3.93

$

8%

56.7

9$

2.

99$

6%59

.91

$

3.

12$

5%6

63.5

7$

4.54

$

8%

66.9

4$

3.

38$

5%70

.48

$

3.

54$

5%7

73.3

3$

5.15

$

8%

77.1

0$

3.

76$

5%81

.06

$

3.

96$

5%8

83.1

0$

5.76

$

7%

87.2

5$

4.

15$

5%91

.63

$

4.

38$

5%9

92.8

7$

6.38

$

7%

97.4

0$

4.

54$

5%10

2.21

$

4.80

$

5%

1010

4.61

$

7.12

$

7%

109.

61$

5.00

$

5%

114.

92$

5.

31$

5%11

116.

35$

7.

85$

7%12

1.81

$

5.

47$

5%12

7.63

$

5.82

$

5%

1212

8.09

$

8.59

$

7%

134.

02$

5.93

$

5%

140.

35$

6.

33$

5%13

139.

83$

9.

33$

7%14

6.23

$

6.

40$

5%15

3.06

$

6.84

$

5%

Mon

thly

Bill

Com

paris

on -

Sing

le F

amily

Res

iden

tial

Sing

le F

amily

- W

ater

and

Was

tew

ater

2009

- Pr

opos

ed20

10 -

Prop

osed

2011

- Pr

opos

ed

2012

- Pr

opos

ed20

13 -

Prop

osed

2014

- Pr

opos

ed

Page 18: First Reading - OrdinanceWatch

Cur

rent

-C

ity o

f H

olly

woo

d

CC

FC

urre

nt B

illC

urre

nt B

ill$

Diff

% D

iffPr

opos

ed

Bill

$ C

hang

e%

Cha

nge

03.

34$

15

4.27

$

150.

93$

44

19%

34.0

0$

30

.66

$

918%

15.

29$

15

7.23

$

151.

94$

27

72%

37.4

4$

32

.15

$

608%

27.

24$

16

0.19

$

152.

95$

20

12%

40.8

7$

33

.63

$

464%

39.

19$

16

3.15

$

153.

96$

15

75%

44.3

1$

35

.12

$

382%

411

.14

$

16

6.11

$

154.

97$

12

91%

47.7

5$

36

.60

$

328%

513

.09

$

16

9.07

$

155.

98$

10

91%

51.1

8$

38

.09

$

291%

615

.04

$

17

2.03

$

156.

99$

94

3%54

.62

$

39.5

8$

26

3%7

17.0

0$

174.

99$

15

7.99

$

830%

58.0

6$

41

.06

$

242%

818

.95

$

17

7.95

$

159.

00$

73

9%61

.49

$

42.5

5$

22

5%9

20.9

0$

180.

91$

16

0.01

$

666%

64.9

3$

44

.03

$

211%

1022

.85

$

18

3.87

$

161.

02$

60

5%68

.37

$

45.5

2$

19

9%11

24.8

0$

186.

83$

16

2.03

$

553%

71.8

0$

47

.00

$

190%

1226

.75

$

18

9.79

$

163.

04$

51

0%75

.24

$

48.4

9$

18

1%13

28.7

0$

192.

75$

16

4.05

$

472%

78.6

8$

49

.98

$

174%

1430

.65

$

19

5.71

$

165.

06$

43

9%82

.11

$

51.4

6$

16

8%15

32.6

0$

198.

67$

16

6.07

$

409%

85.5

5$

52

.95

$

162%

1634

.55

$

20

1.63

$

167.

08$

38

4%88

.99

$

54.4

3$

15

8%17

37.0

9$

204.

59$

16

7.50

$

352%

92.4

2$

55

.33

$

149%

1839

.63

$

20

7.55

$

167.

92$

32

4%95

.86

$

56.2

3$

14

2%19

42.1

7$

210.

51$

16

8.34

$

299%

99.2

9$

57

.12

$

135%

Avg

--->

2044

.71

$

21

3.47

$

168.

76$

27

7%10

2.73

$ 58

.02

$

130%

2147

.25

$

21

6.43

$

169.

18$

25

8%10

6.17

$ 58

.92

$

125%

2249

.79

$

21

9.39

$

169.

60$

24

1%10

9.60

$ 59

.81

$

120%

2352

.33

$

22

2.35

$

170.

02$

22

5%11

3.04

$ 60

.71

$

116%

2454

.87

$

22

5.31

$

170.

44$

21

1%11

6.48

$ 61

.61

$

112%

2557

.41

$

22

8.27

$

170.

86$

19

8%11

9.91

$ 62

.50

$

109%

Mon

thly

Bill

Com

paris

on -

Com

mer

cial

2"

Met

er

Com

mer

cial

-W

ater

Onl

y

Cur

rent

-B

row

ard

Cou

nty

Prop

osed

-C

ity o

f Hol

lyw

ood

Page 19: First Reading - OrdinanceWatch

Cur

rent

-C

ity o

f H

olly

woo

d

CC

FC

urre

nt B

illC

urre

nt B

ill$

Diff

% D

iffPr

opos

ed

Bill

$ C

hang

e%

Cha

nge

06.

68$

50

2.42

$

495.

74$

73

21%

70.0

0$

63

.32

$

948%

112

.14

$

50

8.19

$

496.

05$

39

86%

78.5

2$

66

.38

$

547%

217

.60

$

51

3.96

$

496.

36$

27

20%

87.0

5$

69

.45

$

395%

323

.06

$

51

9.73

$

496.

67$

20

54%

95.5

7$

72

.51

$

314%

428

.52

$

52

5.50

$

496.

98$

16

42%

104.

10$

75.5

7$

26

5%5

33.9

8$

531.

27$

49

7.29

$

1363

%11

2.62

$ 78

.64

$

231%

639

.44

$

53

7.04

$

497.

60$

11

62%

121.

15$

81.7

0$

20

7%7

44.9

1$

542.

81$

49

7.90

$

1009

%12

9.67

$ 84

.77

$

189%

850

.37

$

54

8.58

$

498.

21$

88

9%13

8.20

$ 87

.83

$

174%

955

.83

$

55

4.35

$

498.

52$

79

3%14

6.72

$ 90

.89

$

163%

1061

.29

$

56

0.12

$

498.

83$

71

4%15

5.24

$ 93

.96

$

153%

1166

.75

$

56

5.89

$

499.

14$

64

8%16

3.77

$ 97

.02

$

145%

1272

.21

$

57

1.66

$

499.

45$

59

2%17

2.29

$ 10

0.08

$ 13

9%13

77.6

7$

577.

43$

49

9.76

$

543%

180.

82$

103.

15$

133%

1483

.13

$

58

3.20

$

500.

07$

50

2%18

9.34

$ 10

6.21

$ 12

8%15

88.5

9$

588.

97$

50

0.38

$

465%

197.

87$

109.

28$

123%

1694

.05

$

59

4.74

$

500.

69$

43

2%20

6.39

$ 11

2.34

$ 11

9%17

100.

10$

600.

51$

50

0.41

$

400%

214.

92$

114.

81$

115%

1810

6.15

$

60

6.28

$

500.

13$

37

1%22

3.44

$ 11

7.29

$ 11

0%19

112.

20$

612.

05$

49

9.85

$

345%

231.

96$

119.

76$

107%

2011

8.25

$

61

7.82

$

499.

57$

32

2%24

0.49

$ 12

2.24

$ 10

3%21

124.

30$

623.

59$

49

9.29

$

302%

249.

01$

124.

71$

100%

Avg

--->

2213

0.35

$

62

9.36

$

499.

01$

28

3%25

7.54

$ 12

7.19

$ 98

%23

136.

40$

635.

13$

49

8.73

$

266%

266.

06$

129.

66$

95%

2414

2.45

$

64

0.90

$

498.

45$

25

0%27

4.59

$ 13

2.14

$ 93

%25

148.

50$

646.

67$

49

8.17

$

235%

283.

11$

134.

61$

91%

Mon

thly

Bill

Com

paris

on -

Com

mer

cial

2"

Met

er

Com

mer

cial

-W

ater

and

Was

tew

ater

Cur

rent

-B

row

ard

Cou

nty

Prop

osed

-C

ity o

f Hol

lyw

ood

Page 20: First Reading - OrdinanceWatch

$‐

$10.00

 

$20.00

 

$30.00

 

$40.00

 

$50.00

 

$60.00

 

$70.00

 

$80.00

 

COH ‐Current

COH ‐Proposed

Boca Raton

Boynton Beach

Broward County

Coral Springs (City)

Dania Beach

Davie

Deerfield Beach

Delray Beach

Fort Lauderdale

Miramar (East)

North Miami Beach

Oakland Park

Palm Beach County

Tamarac

Rate Su

rvey ‐Av

erage Water and

 Sew

er Bills @

 7 CCF

Page 21: First Reading - OrdinanceWatch

Priority Level 2 –Tiered

 Rates

Page 22: First Reading - OrdinanceWatch

2009

2010

2011

2012

2013

2014

Month

ly Ba

se Ch

arge:

Resid

entia

l - Ch

arge P

er Un

itSin

gle Fa

mily

4.25

$

4.8

2$

5.39

$

5.9

6$

6.53

$

7.0

8$

Multi

Fami

ly3.0

2$

3.43

$

3.8

3$

4.24

$

4.6

4$

5.03

$

Non R

eside

ntial

- Cha

rge by

Mete

r Size

Meter

Eq

uivale

ncy

Base

Ch

arge

Base

Ch

arge

Base

Ch

arge

Base

Ch

arge

Base

Ch

arge

Base

Ch

arge

5/8 IN

CH1.0

4.25

$

4.8

2$

5.39

$

5.9

6$

6.53

$

7.0

8$

1 INC

H2.5

10.63

$

12

.05$

13.48

$

14

.90$

16.33

$

17

.70$

1 1/2

INCH

5.021

.25$

24.10

$

26

.95$

29.80

$

32

.65$

35.40

$

2 I

NCH

8.034

.00$

38.56

$

43

.12$

47.68

$

52

.24$

56.64

$

3 I

NCH

15.0

63.75

$

72

.30$

80.85

$

89

.40$

97.95

$

10

6.20

$

4 INC

H25

.010

6.25

$

120.5

0$

13

4.75

$

149.0

0$

16

3.25

$

177.0

0$

6 I

NCH

50.0

212.5

0$

24

1.00

$

269.5

0$

29

8.00

$

326.5

0$

35

4.00

$

8 INC

H80

.034

0.00

$

385.6

0$

43

1.20

$

476.8

0$

52

2.40

$

566.4

0$

Scen

ario 2

- Prio

rity 1

and 2

Proje

cts

* All r

ates s

hown

are f

or Ins

ide-C

ity cu

stome

rs. O

utside

-City

custo

mer ra

tes ar

e 1.25

times

rates

show

n.

Meter

Size

Prop

osed

Rates

-Wate

r

Page 23: First Reading - OrdinanceWatch

2009

2010

2011

2012

2013

2014

Flow

Rat

e pe

r CC

F:

From

:To

:Fl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

F0

4

1.76

$

1.78

$

1.89

$

2.02

$

2.16

$

2.32

$

59

3.

52$

3.

55$

3.

78$

4.

04$

4.

32$

4.

64$

10

14

5.

28$

5.

32$

5.

67$

6.

06$

6.

48$

6.

95$

15

19

6.

16$

6.

20$

6.

61$

7.

06$

7.

56$

8.

11$

20

And

Ove

r7.

04$

7.

09$

7.

56$

8.

07$

8.

64$

9.

27$

From

:To

:Fl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

F0

3

1.76

$

1.78

$

1.89

$

2.02

$

2.16

$

2.32

$

46

3.

52$

3.

55$

3.

78$

4.

04$

4.

32$

4.

64$

7

10

5.

28$

5.

32$

5.

67$

6.

06$

6.

48$

6.

95$

11

13

6.

16$

6.

20$

6.

61$

7.

06$

7.

56$

8.

11$

14

And

Ove

r7.

04$

7.

09$

7.

56$

8.

07$

8.

64$

9.

27$

From

:To

:Fl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

F0

4

3.52

$

3.55

$

3.78

$

4.04

$

4.32

$

4.64

$

59

3.

52$

3.

55$

3.

78$

4.

04$

4.

32$

4.

64$

10

14

5.

28$

5.

32$

5.

67$

6.

06$

6.

48$

6.

95$

15

19

6.

16$

6.

20$

6.

61$

7.

06$

7.

56$

8.

11$

20

And

Ove

r7.

04$

7.

09$

7.

56$

8.

07$

8.

64$

9.

27$

Sce

nario

2 -

Prio

rity

1 an

d 2

Pro

ject

s

* A

ll ra

tes

show

n ar

e fo

r Ins

ide-

City

cus

tom

ers.

Out

side

-City

cus

tom

er ra

tes

are

1.25

tim

es ra

tes

show

n.

Blo

ck R

ange

s A

djus

ted

By

Uni

t Cou

nt

Non

Res

iden

tial

Blo

ck R

ange

s A

djus

ted

By

Met

er E

quiv

alen

cy

Sing

le F

amily

Res

iden

tial

Mul

ti Fa

mily

Res

iden

tial

Prop

osed

Rat

es -W

ater

Page 24: First Reading - OrdinanceWatch

2009

2010

2011

2012

2013

2014

Month

ly Ba

se Ch

arge:

Resid

entia

l - Ch

arge P

er Un

itSin

gle Fa

mily

4.50

$

5.3

0$

6.1

0$

6.90

$

7.7

0$

8.50

$

Mu

lti Fam

ily3.2

0$

3.77

$

4.34

$

4.9

0$

5.47

$

6.0

4$

Non R

eside

ntial

- Cha

rge by

Mete

r Size

Meter

Eq

uivale

ncy

Base

Ch

arge

Base

Ch

arge

Base

Ch

arge

Base

Ch

arge

Base

Ch

arge

Base

Ch

arge

5/8 IN

CH1.0

4.50

$

5.3

0$

6.1

0$

6.90

$

7.7

0$

8.50

$

1 I

NCH

2.511

.25$

13.25

$

15

.25$

17.25

$

19

.25$

21.25

$

1 1/2

INCH

5.022

.50$

26.50

$

30

.50$

34.50

$

38

.50$

42.50

$

2 INC

H8.0

36.00

$

42

.40$

48.80

$

55

.20$

61.60

$

68

.00$

3 I

NCH

15.0

67.50

$

79

.50$

91.50

$

10

3.50

$

115.5

0$

12

7.50

$

4 INC

H25

.011

2.50

$

132.5

0$

152.5

0$

17

2.50

$

192.5

0$

21

2.50

$

6 INC

H50

.022

5.00

$

265.0

0$

305.0

0$

34

5.00

$

385.0

0$

42

5.00

$

8 INC

H80

.036

0.00

$

424.0

0$

488.0

0$

55

2.00

$

616.0

0$

68

0.00

$

Scen

ario 2

- Prio

rity 1

and 2

Proje

cts

* All r

ates s

hown

are f

or Ins

ide-C

ity cu

stome

rs. O

utside

-City

custo

mer ra

tes ar

e 1.25

times

rates

show

n.

Meter

Size

Propo

sed R

ates -

Waste

water

Page 25: First Reading - OrdinanceWatch

2009

2010

2011

2012

2013

2014

Flow

Rat

e pe

r CC

F:

From

:To

:Fl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

F0

45.

71$

5.

76$

6.14

$

6.55

$

7.00

$

7.50

$

5

95.

71$

5.

76$

6.14

$

6.55

$

7.00

$

7.50

$

10

145.

71$

5.

76$

6.14

$

6.55

$

7.00

$

7.50

$

15

195.

71$

5.

76$

6.14

$

6.55

$

7.00

$

7.50

$

20

And

Ove

r-

$

-

$

-

$

-

$

-

$

-

$

From

:To

:Fl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

F0

35.

71$

5.

76$

6.14

$

6.55

$

7.00

$

7.50

$

4

65.

71$

5.

76$

6.14

$

6.55

$

7.00

$

7.50

$

7

105.

71$

5.

76$

6.14

$

6.55

$

7.00

$

7.50

$

11

135.

71$

5.

76$

6.14

$

6.55

$

7.00

$

7.50

$

14

And

Ove

r-

$

-

$

-

$

-

$

-

$

-

$

From

:To

:Fl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

F0

45.

71$

5.

76$

6.14

$

6.55

$

7.00

$

7.50

$

5

95.

71$

5.

76$

6.14

$

6.55

$

7.00

$

7.50

$

10

145.

71$

5.

76$

6.14

$

6.55

$

7.00

$

7.50

$

15

195.

71$

5.

76$

6.14

$

6.55

$

7.00

$

7.50

$

20

And

Ove

r5.

71$

5.

76$

6.14

$

6.55

$

7.00

$

7.50

$

Sce

nario

2 -

Prio

rity

1 an

d 2

Pro

ject

s

* A

ll ra

tes

show

n ar

e fo

r Ins

ide-

City

cus

tom

ers.

Out

side

-City

cus

tom

er ra

tes

are

1.25

tim

es ra

tes

show

n.

Blo

ck R

ange

s A

djus

ted

By

Uni

t Cou

nt

Non

Res

iden

tial

Sing

le F

amily

Res

iden

tial

Mul

ti Fa

mily

Res

iden

tial

Prop

osed

Rat

es -W

aste

wat

er

Page 26: First Reading - OrdinanceWatch

2009

- C

urre

nt

CC

FC

urre

nt B

illP

ropo

sed

Bill

$ C

hang

e%

Cha

nge

Prop

osed

Bill

$ C

hang

e%

Cha

nge

Pro

pose

d Bi

ll$

Cha

nge

% C

hang

e0

3.34

$

4.25

$

0.91

$

27

%4.

82$

0.57

$

13%

5.39

$

0.57

$

12

%1

5.29

$

6.01

$

0.72

$

14

%6.

59$

0.58

$

10%

7.28

$

0.69

$

10

%2

7.24

$

7.77

$

0.53

$

7%

8.36

$

0.

59$

8%

9.17

$

0.80

$

10

%3

9.19

$

9.53

$

0.34

$

4%

10.1

3$

0.

60$

6%

11.0

5$

0.

92$

9%4

11.1

4$

11.2

9$

0.15

$

1%

11.9

0$

0.

61$

5%

12.9

4$

1.

04$

9%5

13.0

9$

14.8

1$

1.72

$

13

%15

.44

$

0.63

$

4%16

.72

$

1.27

$

8%

615

.04

$

18

.33

$

3.

29$

22%

18.9

8$

0.

65$

4%

20.4

9$

1.

51$

8%7

16.9

9$

21.8

5$

4.86

$

29

%22

.52

$

0.68

$

3%24

.27

$

1.

74$

8%

818

.94

$

25

.37

$

6.

43$

34%

26.0

7$

0.

70$

3%

28.0

4$

1.

98$

8%9

21.4

8$

28.8

9$

7.41

$

34

%29

.61

$

0.72

$

2%31

.82

$

2.21

$

7%

1024

.02

$

34

.17

$

10

.15

$

42%

34.9

2$

0.

75$

2%

37.4

8$

2.

56$

7%11

26.5

6$

39.4

5$

12.8

9$

49

%40

.23

$

0.78

$

2%43

.14

$

2.92

$

7%

1229

.10

$

44

.73

$

15

.63

$

54%

45.5

4$

0.

81$

2%

48.8

1$

3.

27$

7%13

31.6

4$

50.0

1$

18.3

7$

58

%50

.85

$

0.85

$

2%54

.47

$

3.62

$

7%

CC

FP

ropo

sed

Bill

$ C

hang

e%

Cha

nge

Prop

osed

Bill

$ C

hang

e%

Cha

nge

Pro

pose

d Bi

ll$

Cha

nge

% C

hang

e0

5.96

$

0.57

$

11

%6.

53$

0.57

$

10%

7.08

$

0.55

$

8%

17.

98$

0.

70$

10%

8.69

$

0.

71$

9%

9.40

$

0.71

$

8%

29.

99$

0.

83$

9%10

.85

$

0.85

$

9%11

.71

$

0.86

$

8%

312

.01

$

0.

96$

9%13

.01

$

1.00

$

8%14

.03

$

1.02

$

8%

414

.03

$

1.

09$

8%15

.17

$

1.14

$

8%16

.35

$

1.18

$

8%

518

.06

$

1.

35$

8%19

.49

$

1.42

$

8%20

.98

$

1.49

$

8%

622

.10

$

1.

60$

8%23

.80

$

1.71

$

8%25

.61

$

1.81

$

8%

726

.13

$

1.

86$

8%28

.12

$

1.99

$

8%30

.25

$

2.

12$

8%

830

.16

$

2.

12$

8%32

.44

$

2.28

$

8%34

.88

$

2.44

$

8%

934

.20

$

2.

38$

7%36

.76

$

2.56

$

7%39

.51

$

2.75

$

7%

1040

.25

$

2.

77$

7%43

.24

$

2.99

$

7%46

.46

$

3.23

$

7%

1146

.30

$

3.

16$

7%49

.71

$

3.41

$

7%53

.41

$

3.70

$

7%

1252

.35

$

3.

54$

7%56

.19

$

3.84

$

7%60

.36

$

4.17

$

7%

1358

.40

$

3.

93$

7%62

.67

$

4.27

$

7%67

.31

$

4.64

$

7%

Mon

thly

Bill

Com

paris

on -

Sing

le F

amily

Res

iden

tial

Sing

le F

amily

- W

ater

Onl

y

2009

- Pr

opos

ed20

10 -

Prop

osed

2011

- Pr

opos

ed

2012

- Pr

opos

ed20

13 -

Prop

osed

2014

- Pr

opos

ed

Page 27: First Reading - OrdinanceWatch

2009

- C

urre

nt

CC

FC

urre

nt B

illPr

opos

ed

Bill

$ C

hang

e%

Cha

nge

Prop

osed

Bill

$ C

hang

e%

Cha

nge

Prop

osed

Bi

ll$

Cha

nge

% C

hang

e0

6.68

$

8.

75$

2.

07$

31%

10.1

2$

1.

37$

16%

11.4

9$

1.37

$

14

%1

12.1

4$

16

.22

$

4.

08$

34%

17.6

5$

1.

43$

9%19

.52

$

1.

87$

11%

217

.60

$

23.6

9$

6.09

$

35

%25

.18

$

1.49

$

6%

27.5

5$

2.36

$

9%

323

.06

$

31.1

6$

8.10

$

35

%32

.71

$

1.55

$

5%

35.5

7$

2.86

$

9%

428

.52

$

38.6

3$

10.1

1$

35

%40

.24

$

1.61

$

4%

43.6

0$

3.36

$

8%

533

.98

$

47.8

6$

13.8

8$

41

%49

.54

$

1.68

$

4%

53.5

2$

3.97

$

8%

639

.44

$

57.0

9$

17.6

5$

45

%58

.84

$

1.75

$

3%

63.4

3$

4.59

$

8%

744

.90

$

66.3

2$

21.4

2$

48

%68

.14

$

1.83

$

3%

73.3

5$

5.20

$

8%

850

.36

$

75.5

5$

25.1

9$

50

%77

.45

$

1.90

$

3%

83.2

6$

5.82

$

8%

956

.41

$

84.7

8$

28.3

7$

50

%86

.75

$

1.97

$

2%

93.1

8$

6.43

$

7%

1062

.46

$

95.7

7$

33.3

1$

53

%97

.82

$

2.05

$

2%

104.

98$

7.

16$

7%11

68.5

1$

10

6.76

$

38.2

5$

56

%10

8.89

$

2.

13$

2%11

6.78

$

7.90

$

7%

1274

.56

$

117.

75$

43

.19

$

58%

119.

96$

2.21

$

2%

128.

59$

8.

63$

7%13

80.6

1$

12

8.74

$

48.1

3$

60

%13

1.03

$

2.

30$

2%14

0.39

$

9.36

$

7%

CC

FPr

opos

ed

Bill

$ C

hang

e%

Cha

nge

Prop

osed

Bill

$ C

hang

e%

Cha

nge

Prop

osed

Bi

ll$

Cha

nge

% C

hang

e0

12.8

6$

1.37

$

12

%14

.23

$

1.37

$

11

%15

.58

$

1.

35$

9%1

21.4

3$

1.91

$

10

%23

.39

$

1.96

$

9%

25.4

0$

2.01

$

9%

229

.99

$

2.

45$

9%32

.55

$

2.55

$

9%

35.2

1$

2.66

$

8%

338

.56

$

2.

99$

8%41

.71

$

3.15

$

8%

45.0

3$

3.32

$

8%

447

.13

$

3.

53$

8%50

.87

$

3.74

$

8%

54.8

5$

3.98

$

8%

557

.71

$

4.

20$

8%62

.19

$

4.47

$

8%

66.9

8$

4.79

$

8%

668

.30

$

4.

86$

8%73

.50

$

5.21

$

8%

79.1

1$

5.61

$

8%

778

.88

$

5.

53$

8%84

.82

$

5.94

$

8%

91.2

5$

6.42

$

8%

889

.46

$

6.

20$

7%96

.14

$

6.68

$

7%

103.

38$

7.

24$

8%9

100.

05$

6.

87$

7%10

7.46

$

7.

41$

7%11

5.51

$

8.05

$

7%

1011

2.65

$

7.67

$

7%

120.

94$

8.29

$

7%

129.

96$

9.

03$

7%11

125.

25$

8.

47$

7%13

4.41

$

9.

16$

7%14

4.41

$

10.0

0$

7%

1213

7.85

$

9.26

$

7%

147.

89$

10.0

4$

7%

158.

86$

10

.97

$

7%13

150.

45$

10

.06

$

7%16

1.37

$

10

.92

$

7%17

3.31

$

11.9

4$

7%

2011

- Pr

opos

ed

2012

- Pr

opos

ed20

13 -

Prop

osed

2014

- Pr

opos

ed

Mon

thly

Bill

Com

paris

on -

Sing

le F

amily

Res

iden

tial

Sing

le F

amily

- W

ater

and

Was

tew

ater

2009

- Pr

opos

ed20

10 -

Prop

osed

Page 28: First Reading - OrdinanceWatch

Cur

rent

-C

ity o

f H

olly

woo

d

CC

FC

urre

nt B

illC

urre

nt B

ill$

Diff

% D

iffPr

opos

ed

Bill

$ C

hang

e%

Cha

nge

03.

34$

15

4.27

$

150.

93$

44

19%

34.0

0$

30

.66

$

918%

15.

29$

15

7.23

$

151.

94$

27

72%

37.5

1$

32

.22

$

609%

27.

24$

16

0.19

$

152.

95$

20

12%

41.0

2$

33

.78

$

466%

39.

19$

16

3.15

$

153.

96$

15

75%

44.5

3$

35

.34

$

384%

411

.14

$

16

6.11

$

154.

97$

12

91%

48.0

4$

36

.90

$

331%

513

.09

$

16

9.07

$

155.

98$

10

91%

51.5

5$

38

.46

$

294%

615

.04

$

17

2.03

$

156.

99$

94

3%55

.06

$

40.0

2$

26

6%7

17.0

0$

174.

99$

15

7.99

$

830%

58.5

7$

41

.57

$

245%

818

.95

$

17

7.95

$

159.

00$

73

9%62

.08

$

43.1

3$

22

8%9

20.9

0$

180.

91$

16

0.01

$

666%

65.5

9$

44

.69

$

214%

1022

.85

$

18

3.87

$

161.

02$

60

5%69

.10

$

46.2

5$

20

2%11

24.8

0$

186.

83$

16

2.03

$

553%

72.6

1$

47

.81

$

193%

1226

.75

$

18

9.79

$

163.

04$

51

0%76

.12

$

49.3

7$

18

5%13

28.7

0$

192.

75$

16

4.05

$

472%

79.6

3$

50

.93

$

177%

1430

.65

$

19

5.71

$

165.

06$

43

9%83

.14

$

52.4

9$

17

1%15

32.6

0$

198.

67$

16

6.07

$

409%

86.6

5$

54

.05

$

166%

1634

.55

$

20

1.63

$

167.

08$

38

4%90

.16

$

55.6

1$

16

1%17

37.0

9$

204.

59$

16

7.50

$

352%

93.6

7$

56

.58

$

153%

1839

.63

$

20

7.55

$

167.

92$

32

4%97

.18

$

57.5

5$

14

5%19

42.1

7$

210.

51$

16

8.34

$

299%

100.

69$

58.5

2$

13

9%A

vg--

->20

44.7

1$

213.

47$

16

8.76

$

277%

104.

20$

59.4

9$

13

3%21

47.2

5$

216.

43$

16

9.18

$

258%

107.

71$

60.4

6$

12

8%22

49.7

9$

219.

39$

16

9.60

$

241%

111.

22$

61.4

3$

12

3%23

52.3

3$

222.

35$

17

0.02

$

225%

114.

73$

62.4

0$

11

9%24

54.8

7$

225.

31$

17

0.44

$

211%

118.

24$

63.3

7$

11

5%25

57.4

1$

228.

27$

17

0.86

$

198%

121.

75$

64.3

4$

11

2%

Mon

thly

Bill

Com

paris

on -

Com

mer

cial

2"

Met

er

Cur

rent

-B

row

ard

Cou

nty

Prop

osed

-C

ity o

f Hol

lyw

ood

Com

mer

cial

-W

ater

Onl

y

Page 29: First Reading - OrdinanceWatch

Cur

rent

-C

ity o

f H

olly

woo

d

CC

FC

urre

nt B

illC

urre

nt B

ill$

Diff

% D

iffP

ropo

sed

Bill

$ C

hang

e%

Cha

nge

06.

68$

50

2.42

$

495.

74$

73

21%

70.0

0$

63

.32

$

948%

112

.14

$

50

8.19

$

496.

05$

39

86%

79.2

1$

67

.07

$

552%

217

.60

$

51

3.96

$

496.

36$

27

20%

88.4

3$

70

.83

$

402%

323

.06

$

51

9.73

$

496.

67$

20

54%

97.6

4$

74

.58

$

323%

428

.52

$

52

5.50

$

496.

98$

16

42%

106.

86$

78.3

3$

27

5%5

33.9

8$

531.

27$

49

7.29

$

1363

%11

6.07

$ 82

.09

$

242%

639

.44

$

53

7.04

$

497.

60$

11

62%

125.

28$

85.8

4$

21

8%7

44.9

1$

542.

81$

49

7.90

$

1009

%13

4.50

$ 89

.59

$

200%

850

.37

$

54

8.58

$

498.

21$

88

9%14

3.71

$ 93

.35

$

185%

955

.83

$

55

4.35

$

498.

52$

79

3%15

2.92

$ 97

.10

$

174%

1061

.29

$

56

0.12

$

498.

83$

71

4%16

2.14

$ 10

0.85

$ 16

5%11

66.7

5$

565.

89$

49

9.14

$

648%

171.

35$

104.

60$

157%

1272

.21

$

57

1.66

$

499.

45$

59

2%18

0.57

$ 10

8.36

$ 15

0%13

77.6

7$

577.

43$

49

9.76

$

543%

189.

78$

112.

11$

144%

1483

.13

$

58

3.20

$

500.

07$

50

2%19

8.99

$ 11

5.86

$ 13

9%15

88.5

9$

588.

97$

50

0.38

$

465%

208.

21$

119.

62$

135%

1694

.05

$

59

4.74

$

500.

69$

43

2%21

7.42

$ 12

3.37

$ 13

1%17

100.

10$

600.

51$

50

0.41

$

400%

226.

64$

126.

53$

126%

1810

6.15

$

60

6.28

$

500.

13$

37

1%23

5.85

$ 12

9.70

$ 12

2%19

112.

20$

612.

05$

49

9.85

$

345%

245.

06$

132.

86$

118%

2011

8.25

$

61

7.82

$

499.

57$

32

2%25

4.28

$ 13

6.03

$ 11

5%21

124.

30$

623.

59$

49

9.29

$

302%

263.

49$

139.

19$

112%

Avg

--->

2213

0.35

$

62

9.36

$

499.

01$

28

3%27

2.70

$ 14

2.35

$ 10

9%23

136.

40$

635.

13$

49

8.73

$

266%

281.

92$

145.

52$

107%

2414

2.45

$

64

0.90

$

498.

45$

25

0%29

1.13

$ 14

8.68

$ 10

4%25

148.

50$

646.

67$

49

8.17

$

235%

300.

35$

151.

84$

102%

Mon

thly

Bill

Com

paris

on -

Com

mer

cial

2"

Met

er

Com

mer

cial

-W

ater

and

Was

tew

ater

Cur

rent

-B

row

ard

Cou

nty

Prop

osed

-C

ity o

f Hol

lyw

ood

Page 30: First Reading - OrdinanceWatch

$‐

$10.00

 

$20.00

 

$30.00

 

$40.00

 

$50.00

 

$60.00

 

$70.00

 

$80.00

 

COH ‐Current

COH ‐Proposed

Boca Raton

Boynton Beach

Broward County

Coral Springs (City)

Dania Beach

Davie

Deerfield Beach

Delray Beach

Fort Lauderdale

Miramar (East)

North Miami Beach

Oakland Park

Palm Beach County

Tamarac

Rate Su

rvey ‐Av

erage Water and

 Sew

er Bills @

 7 CCF

Page 31: First Reading - OrdinanceWatch

Priority Level 3 –Tiered

 Rates

Page 32: First Reading - OrdinanceWatch

2009

2010

2011

2012

2013

2014

Month

ly Ba

se Ch

arge:

Resid

entia

l - Ch

arge P

er Un

itSin

gle Fa

mily

4.25

$

4.8

2$

5.39

$

5.9

6$

6.53

$

7.0

8$

Multi F

amily

3.02

$

3.4

3$

3.83

$

4.2

4$

4.64

$

5.0

3$

Non R

eside

ntial

- Cha

rge by

Mete

r Size

Meter

Eq

uivale

ncy

Base

Ch

arge

Base

Ch

arge

Base

Ch

arge

Base

Ch

arge

Base

Ch

arge

Base

Ch

arge

5/8 IN

CH1.0

4.25

$

4.8

2$

5.39

$

5.9

6$

6.53

$

7.0

8$

1 INC

H2.5

10.63

$

12

.05$

13.48

$

14

.90$

16.33

$

17

.70$

1 1/2

INCH

5.021

.25$

24.10

$

26

.95$

29.80

$

32

.65$

35.40

$

2 I

NCH

8.034

.00$

38.56

$

43

.12$

47.68

$

52

.24$

56.64

$

3 I

NCH

15.0

63.75

$

72

.30$

80.85

$

89

.40$

97.95

$

10

6.20

$

4 INC

H25

.010

6.25

$

120.5

0$

13

4.75

$

149.0

0$

16

3.25

$

177.0

0$

6 I

NCH

50.0

212.5

0$

24

1.00

$

269.5

0$

29

8.00

$

326.5

0$

35

4.00

$

8 INC

H80

.034

0.00

$

385.6

0$

43

1.20

$

476.8

0$

52

2.40

$

566.4

0$

Scen

ario 3

- Prio

rity 1,

2 an

d 3 Pr

ojects

* All r

ates s

hown

are f

or Ins

ide-C

ity cu

stome

rs. O

utside

-City

custo

mer ra

tes ar

e 1.25

times

rates

show

n.

Propo

sed R

ates -

Water

Meter

Size

Page 33: First Reading - OrdinanceWatch

2009

2010

2011

2012

2013

2014

Flow

Rat

e pe

r CC

F:

From

:To

:Fl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

F0

4

1.79

$

1.80

$

1.98

$

2.17

$

2.33

$

2.50

$

59

3.

58$

3.

60$

3.

95$

4.

34$

4.

65$

4.

99$

10

14

5.

37$

5.

40$

5.

92$

6.

51$

6.

97$

7.

48$

15

19

6.

26$

6.

30$

6.

91$

7.

59$

8.

13$

8.

72$

20

And

Ove

r7.

16$

7.

20$

7.

90$

8.

68$

9.

29$

9.

97$

From

:To

:Fl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

F0

3

1.79

$

1.80

$

1.98

$

2.17

$

2.33

$

2.50

$

46

3.

58$

3.

60$

3.

95$

4.

34$

4.

65$

4.

99$

7

10

5.

37$

5.

40$

5.

92$

6.

51$

6.

97$

7.

48$

11

13

6.

26$

6.

30$

6.

91$

7.

59$

8.

13$

8.

72$

14

And

Ove

r7.

16$

7.

20$

7.

90$

8.

68$

9.

29$

9.

97$

From

:To

:Fl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

F0

4

3.58

$

3.60

$

3.95

$

4.34

$

4.65

$

4.99

$

59

3.

58$

3.

60$

3.

95$

4.

34$

4.

65$

4.

99$

10

14

5.

37$

5.

40$

5.

92$

6.

51$

6.

97$

7.

48$

15

19

6.

26$

6.

30$

6.

91$

7.

59$

8.

13$

8.

72$

20

And

Ove

r7.

16$

7.

20$

7.

90$

8.

68$

9.

29$

9.

97$

Sce

nario

3 -

Prio

rity

1, 2

and

3 P

roje

cts

Prop

osed

Rat

es -W

ater

Non

Res

iden

tial

Blo

ck R

ange

s A

djus

ted

By

Met

er E

quiv

alen

cy

* A

ll ra

tes

show

n ar

e fo

r Ins

ide-

City

cus

tom

ers.

Out

side

-City

cus

tom

er ra

tes

are

1.25

tim

es ra

tes

show

n.

Sing

le F

amily

Res

iden

tial

Mul

ti Fa

mily

Res

iden

tial

Blo

ck R

ange

s A

djus

ted

By

Uni

t Cou

nt

Page 34: First Reading - OrdinanceWatch

2009

2010

2011

2012

2013

2014

Month

ly Ba

se Ch

arge:

Resid

entia

l - Ch

arge P

er Un

itSin

gle Fa

mily

4.50

$

5.3

0$

6.1

0$

6.90

$

7.7

0$

8.50

$

Mu

lti Fam

ily3.2

0$

3.77

$

4.34

$

4.9

0$

5.47

$

6.0

4$

Non R

eside

ntial

- Cha

rge by

Mete

r Size

Meter

Eq

uivale

ncy

Base

Ch

arge

Base

Ch

arge

Base

Ch

arge

Base

Ch

arge

Base

Ch

arge

Base

Ch

arge

5/8 IN

CH1.0

4.50

$

5.3

0$

6.1

0$

6.90

$

7.7

0$

8.50

$

1 I

NCH

2.511

.25$

13.25

$

15

.25$

17.25

$

19

.25$

21.25

$

1 1/2

INCH

5.022

.50$

26.50

$

30

.50$

34.50

$

38

.50$

42.50

$

2 INC

H8.0

36.00

$

42

.40$

48.80

$

55

.20$

61.60

$

68

.00$

3 I

NCH

15.0

67.50

$

79

.50$

91.50

$

10

3.50

$

115.5

0$

12

7.50

$

4 INC

H25

.011

2.50

$

132.5

0$

152.5

0$

17

2.50

$

192.5

0$

21

2.50

$

6 INC

H50

.022

5.00

$

265.0

0$

305.0

0$

34

5.00

$

385.0

0$

42

5.00

$

8 INC

H80

.036

0.00

$

424.0

0$

488.0

0$

55

2.00

$

616.0

0$

68

0.00

$

Scen

ario 3

- Prio

rity 1,

2 an

d 3 Pr

ojects

* All r

ates s

hown

are f

or Ins

ide-C

ity cu

stome

rs. O

utside

-City

custo

mer ra

tes ar

e 1.25

times

rates

show

n.

Propo

sed R

ates -

Waste

water

Meter

Size

Page 35: First Reading - OrdinanceWatch

2009

2010

2011

2012

2013

2014

Flow

Rat

e pe

r CC

F:

From

:To

:Fl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

F0

45.

99$

6.

05$

6.62

$

7.25

$

7.76

$

8.31

$

5

95.

99$

6.

05$

6.62

$

7.25

$

7.76

$

8.31

$

10

145.

99$

6.

05$

6.62

$

7.25

$

7.76

$

8.31

$

15

195.

99$

6.

05$

6.62

$

7.25

$

7.76

$

8.31

$

20

And

Ove

r-

$

-

$

-

$

-

$

-

$

-

$

From

:To

:Fl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

F0

35.

99$

6.

05$

6.62

$

7.25

$

7.76

$

8.31

$

4

65.

99$

6.

05$

6.62

$

7.25

$

7.76

$

8.31

$

7

105.

99$

6.

05$

6.62

$

7.25

$

7.76

$

8.31

$

11

135.

99$

6.

05$

6.62

$

7.25

$

7.76

$

8.31

$

14

And

Ove

r-

$

-

$

-

$

-

$

-

$

-

$

From

:To

:Fl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

FFl

ow R

ate

per C

CF

Flow

Rat

e pe

r CC

F0

45.

99$

6.

05$

6.62

$

7.25

$

7.76

$

8.31

$

5

95.

99$

6.

05$

6.62

$

7.25

$

7.76

$

8.31

$

10

145.

99$

6.

05$

6.62

$

7.25

$

7.76

$

8.31

$

15

195.

99$

6.

05$

6.62

$

7.25

$

7.76

$

8.31

$

20

And

Ove

r5.

99$

6.

05$

6.62

$

7.25

$

7.76

$

8.31

$

Scen

ario

3 -

Prio

rity

1, 2

and

3 P

roje

cts

Prop

osed

Rat

es -W

aste

wat

er

Non

Res

iden

tial

* All

rate

s sh

own

are

for I

nsid

e-C

ity c

usto

mer

s. O

utsi

de-C

ity c

usto

mer

rate

s ar

e 1.

25 ti

mes

rate

s sh

own.

Sing

le F

amily

Res

iden

tial

Mul

ti Fa

mily

Res

iden

tial

Blo

ck R

ange

s A

djus

ted

By

Uni

t Cou

nt

Page 36: First Reading - OrdinanceWatch

2009

- C

urre

nt

CC

FC

urre

nt B

illP

ropo

sed

Bill

$ C

hang

e%

Cha

nge

Prop

osed

Bill

$ C

hang

e%

Cha

nge

Pro

pose

d Bi

ll$

Cha

nge

% C

hang

e0

3.34

$

4.25

$

0.91

$

27

%4.

82$

0.57

$

13%

5.39

$

0.57

$

12

%1

5.29

$

6.04

$

0.75

$

14

%6.

62$

0.58

$

10%

7.36

$

0.74

$

11

%2

7.24

$

7.83

$

0.59

$

8%

8.42

$

0.

59$

8%

9.34

$

0.92

$

11

%3

9.19

$

9.61

$

0.42

$

5%

10.2

2$

0.

60$

6%

11.3

1$

1.

09$

11%

411

.14

$

11

.40

$

0.

26$

2%12

.02

$

0.62

$

5%13

.28

$

1.26

$

11

%5

13.0

9$

14.9

8$

1.89

$

14

%15

.62

$

0.64

$

4%17

.23

$

1.61

$

10

%6

15.0

4$

18.5

6$

3.52

$

23

%19

.22

$

0.66

$

4%21

.17

$

1.96

$

10

%7

16.9

9$

22.1

3$

5.14

$

30

%22

.81

$

0.68

$

3%25

.12

$

2.

30$

10

%8

18.9

4$

25.7

1$

6.77

$

36

%26

.41

$

0.71

$

3%29

.07

$

2.65

$

10

%9

21.4

8$

29.2

8$

7.80

$

36

%30

.01

$

0.73

$

2%33

.01

$

3.00

$

10

%10

24.0

2$

34.6

5$

10.6

3$

44

%35

.41

$

0.76

$

2%38

.93

$

3.52

$

10

%11

26.5

6$

40.0

1$

13.4

5$

51

%40

.81

$

0.80

$

2%44

.85

$

4.04

$

10

%12

29.1

0$

45.3

8$

16.2

8$

56

%46

.21

$

0.83

$

2%50

.77

$

4.56

$

10

%13

31.6

4$

50.7

4$

19.1

0$

60

%51

.61

$

0.86

$

2%56

.69

$

5.08

$

10

%

CC

FP

ropo

sed

Bill

$ C

hang

e%

Cha

nge

Prop

osed

Bill

$ C

hang

e%

Cha

nge

Pro

pose

d Bi

ll$

Cha

nge

% C

hang

e0

5.96

$

0.57

$

11

%6.

53$

0.57

$

10%

7.08

$

0.55

$

8%

18.

13$

0.

77$

10%

8.85

$

0.

72$

9%

9.57

$

0.72

$

8%

210

.30

$

0.

96$

10%

11.1

7$

0.

88$

9%

12.0

6$

0.

89$

8%3

12.4

6$

1.16

$

10

%13

.49

$

1.03

$

8%14

.55

$

1.06

$

8%

414

.63

$

1.

35$

10%

15.8

2$

1.

18$

8%

17.0

4$

1.

23$

8%5

18.9

7$

1.74

$

10

%20

.46

$

1.49

$

8%22

.03

$

1.57

$

8%

623

.30

$

2.

13$

10%

25.1

0$

1.

80$

8%

27.0

1$

1.

91$

8%7

27.6

4$

2.52

$

10

%29

.74

$

2.10

$

8%31

.99

$

2.

25$

8%

831

.98

$

2.

91$

10%

34.3

9$

2.

41$

8%

36.9

7$

2.

59$

8%9

36.3

1$

3.30

$

10

%39

.03

$

2.72

$

7%41

.95

$

2.93

$

7%

1042

.82

$

3.

89$

10%

45.9

9$

3.

18$

7%

49.4

3$

3.

43$

7%11

49.3

2$

4.47

$

10

%52

.96

$

3.64

$

7%56

.90

$

3.94

$

7%

1255

.82

$

5.

06$

10%

59.9

2$

4.

10$

7%

64.3

7$

4.

45$

7%13

62.3

3$

5.64

$

10

%66

.89

$

4.56

$

7%71

.85

$

4.96

$

7%

2012

- Pr

opos

ed20

13 -

Prop

osed

2014

- Pr

opos

ed

Mon

thly

Bill

Com

paris

on -

Sing

le F

amily

Res

iden

tial

Sing

le F

amily

- W

ater

Onl

y

2009

- Pr

opos

ed20

10 -

Prop

osed

2011

- Pr

opos

ed

Page 37: First Reading - OrdinanceWatch

2009

- C

urre

nt

CC

FC

urre

nt B

illP

ropo

sed

Bill

$ C

hang

e%

Cha

nge

Pro

pose

d B

ill$

Cha

nge

% C

hang

eP

ropo

sed

Bill

$ C

hang

e%

Cha

nge

06.

68$

8.75

$

2.07

$

31

%10

.12

$

1.37

$

16

%11

.49

$

1.

37$

14%

112

.14

$

16.5

3$

4.39

$

36

%17

.97

$

1.44

$

9%

20.0

8$

2.11

$

12

%2

17.6

0$

24

.31

$

6.

71$

38%

25.8

2$

1.

51$

6%28

.68

$

2.

86$

11%

323

.06

$

32.0

8$

9.02

$

39

%33

.67

$

1.58

$

5%

37.2

7$

3.60

$

11

%4

28.5

2$

39

.86

$

11

.34

$

40%

41.5

2$

1.

66$

4%45

.86

$

4.

34$

10%

533

.98

$

49.4

3$

15.4

5$

45

%51

.17

$

1.74

$

4%

56.4

3$

5.26

$

10

%6

39.4

4$

59

.00

$

19

.56

$

50%

60.8

2$

1.

82$

3%66

.99

$

6.

18$

10%

744

.90

$

68.5

6$

23.6

6$

53

%70

.46

$

1.90

$

3%

77.5

6$

7.09

$

10

%8

50.3

6$

78

.13

$

27

.77

$

55%

80.1

1$

1.

99$

3%88

.13

$

8.

01$

10%

956

.41

$

87.6

9$

31.2

8$

55

%89

.76

$

2.07

$

2%

98.6

9$

8.93

$

10

%10

62.4

6$

99

.05

$

36

.59

$

59%

101.

21$

2.16

$

2%

111.

23$

10

.02

$

10%

1168

.51

$

110.

40$

41

.89

$

61%

112.

66$

2.26

$

2%

123.

77$

11

.11

$

10%

1274

.56

$

121.

76$

47

.20

$

63%

124.

11$

2.35

$

2%

136.

31$

12

.20

$

10%

1380

.61

$

133.

11$

52

.50

$

65%

135.

56$

2.44

$

2%

148.

85$

13

.29

$

10%

CC

FP

ropo

sed

Bill

$ C

hang

e%

Cha

nge

Pro

pose

d B

ill$

Cha

nge

% C

hang

eP

ropo

sed

Bill

$ C

hang

e%

Cha

nge

012

.86

$

1.

37$

12%

14.2

3$

1.

37$

11%

15.5

8$

1.35

$

9%

122

.28

$

2.

20$

11%

24.3

1$

2.

03$

9%26

.38

$

2.

07$

9%2

31.7

0$

3.02

$

11

%34

.39

$

2.70

$

9%

37.1

8$

2.79

$

8%

341

.11

$

3.

85$

10%

44.4

7$

3.

36$

8%47

.98

$

3.

51$

8%4

50.5

3$

4.67

$

10

%54

.56

$

4.02

$

8%

58.7

8$

4.23

$

8%

562

.12

$

5.

69$

10%

66.9

6$

4.

84$

8%72

.08

$

5.

12$

8%6

73.7

0$

6.71

$

10

%79

.36

$

5.66

$

8%

85.3

7$

6.01

$

8%

785

.29

$

7.

73$

10%

91.7

6$

6.

47$

8%98

.66

$

6.

90$

8%8

96.8

8$

8.75

$

10

%10

4.17

$

7.

29$

8%11

1.95

$

7.79

$

7%

910

8.46

$

9.77

$

10

%11

6.57

$

8.

11$

7%12

5.24

$

8.68

$

7%

1012

2.22

$

10.9

9$

10

%13

1.29

$

9.

08$

7%14

1.03

$

9.73

$

7%

1113

5.97

$

12.2

0$

10

%14

6.02

$

10

.05

$

7%15

6.81

$

10.7

9$

7%

1214

9.72

$

13.4

2$

10

%16

0.74

$

11

.02

$

7%17

2.59

$

11.8

5$

7%

1316

3.48

$

14.6

3$

10

%17

5.47

$

11

.99

$

7%18

8.38

$

12.9

1$

7%

Mon

thly

Bill

Com

paris

on -

Sing

le F

amily

Res

iden

tial

Sing

le F

amily

- W

ater

and

Was

tew

ater

2009

- Pr

opos

ed20

10 -

Prop

osed

2011

- Pr

opos

ed

2012

- Pr

opos

ed20

13 -

Prop

osed

2014

- Pr

opos

ed

Page 38: First Reading - OrdinanceWatch

Cur

rent

-C

ity o

f H

olly

woo

d

CC

FC

urre

nt B

illC

urre

nt B

ill$

Diff

% D

iffPr

opos

ed

Bill

$ C

hang

e%

Cha

nge

03.

34$

15

4.27

$

150.

93$

44

19%

34.0

0$

30

.66

$

918%

15.

29$

15

7.23

$

151.

94$

27

72%

37.5

7$

32

.28

$

610%

27.

24$

16

0.19

$

152.

95$

20

12%

41.1

3$

33

.89

$

468%

39.

19$

16

3.15

$

153.

96$

15

75%

44.7

0$

35

.51

$

386%

411

.14

$

16

6.11

$

154.

97$

12

91%

48.2

7$

37

.12

$

333%

513

.09

$

16

9.07

$

155.

98$

10

91%

51.8

3$

38

.74

$

296%

615

.04

$

17

2.03

$

156.

99$

94

3%55

.40

$

40.3

5$

26

8%7

17.0

0$

174.

99$

15

7.99

$

830%

58.9

6$

41

.97

$

247%

818

.95

$

17

7.95

$

159.

00$

73

9%62

.53

$

43.5

8$

23

0%9

20.9

0$

180.

91$

16

0.01

$

666%

66.1

0$

45

.20

$

216%

1022

.85

$

18

3.87

$

161.

02$

60

5%69

.66

$

46.8

2$

20

5%11

24.8

0$

186.

83$

16

2.03

$

553%

73.2

3$

48

.43

$

195%

1226

.75

$

18

9.79

$

163.

04$

51

0%76

.80

$

50.0

5$

18

7%13

28.7

0$

192.

75$

16

4.05

$

472%

80.3

6$

51

.66

$

180%

1430

.65

$

19

5.71

$

165.

06$

43

9%83

.93

$

53.2

8$

17

4%15

32.6

0$

198.

67$

16

6.07

$

409%

87.5

0$

54

.89

$

168%

1634

.55

$

20

1.63

$

167.

08$

38

4%91

.06

$

56.5

1$

16

4%17

37.0

9$

204.

59$

16

7.50

$

352%

94.6

3$

57

.54

$

155%

1839

.63

$

20

7.55

$

167.

92$

32

4%98

.19

$

58.5

6$

14

8%19

42.1

7$

210.

51$

16

8.34

$

299%

101.

76$

59.5

9$

14

1%A

vg--

->20

44.7

1$

213.

47$

16

8.76

$

277%

105.

33$

60.6

2$

13

6%21

47.2

5$

216.

43$

16

9.18

$

258%

108.

89$

61.6

4$

13

0%22

49.7

9$

219.

39$

16

9.60

$

241%

112.

46$

62.6

7$

12

6%23

52.3

3$

222.

35$

17

0.02

$

225%

116.

03$

63.6

9$

12

2%24

54.8

7$

225.

31$

17

0.44

$

211%

119.

59$

64.7

2$

11

8%25

57.4

1$

228.

27$

17

0.86

$

198%

123.

16$

65.7

5$

11

5%

Mon

thly

Bill

Com

paris

on -

Com

mer

cial

2"

Met

er

Com

mer

cial

-W

ater

Onl

y

Cur

rent

-B

row

ard

Cou

nty

Prop

osed

-C

ity o

f Hol

lyw

ood

Page 39: First Reading - OrdinanceWatch

Cur

rent

-C

ity o

f H

olly

woo

d

CC

FC

urre

nt B

illC

urre

nt B

ill$

Diff

% D

iffPr

opos

ed

Bill

$ C

hang

e%

Cha

nge

06.

68$

50

2.42

$

495.

74$

73

21%

70.0

0$

63

.32

$

948%

112

.14

$

50

8.19

$

496.

05$

39

86%

79.5

5$

67

.41

$

555%

217

.60

$

51

3.96

$

496.

36$

27

20%

89.1

0$

71

.50

$

406%

323

.06

$

51

9.73

$

496.

67$

20

54%

98.6

5$

75

.59

$

328%

428

.52

$

52

5.50

$

496.

98$

16

42%

108.

20$

79.6

7$

27

9%5

33.9

8$

531.

27$

49

7.29

$

1363

%11

7.75

$ 83

.76

$

246%

639

.44

$

53

7.04

$

497.

60$

11

62%

127.

30$

87.8

5$

22

3%7

44.9

1$

542.

81$

49

7.90

$

1009

%13

6.85

$ 91

.94

$

205%

850

.37

$

54

8.58

$

498.

21$

88

9%14

6.39

$ 96

.03

$

191%

955

.83

$

55

4.35

$

498.

52$

79

3%15

5.94

$ 10

0.12

$ 17

9%10

61.2

9$

560.

12$

49

8.83

$

714%

165.

49$

104.

21$

170%

1166

.75

$

56

5.89

$

499.

14$

64

8%17

5.04

$ 10

8.29

$ 16

2%12

72.2

1$

571.

66$

49

9.45

$

592%

184.

59$

112.

38$

156%

1377

.67

$

57

7.43

$

499.

76$

54

3%19

4.14

$ 11

6.47

$ 15

0%14

83.1

3$

583.

20$

50

0.07

$

502%

203.

69$

120.

56$

145%

1588

.59

$

58

8.97

$

500.

38$

46

5%21

3.24

$ 12

4.65

$ 14

1%16

94.0

5$

594.

74$

50

0.69

$

432%

222.

79$

128.

74$

137%

1710

0.10

$

60

0.51

$

500.

41$

40

0%23

2.34

$ 13

2.24

$ 13

2%18

106.

15$

606.

28$

50

0.13

$

371%

241.

89$

135.

74$

128%

1911

2.20

$

61

2.05

$

499.

85$

34

5%25

1.44

$ 13

9.24

$ 12

4%20

118.

25$

617.

82$

49

9.57

$

322%

260.

99$

142.

73$

121%

2112

4.30

$

62

3.59

$

499.

29$

30

2%27

0.54

$ 14

6.23

$ 11

8%A

vg--

->22

130.

35$

629.

36$

49

9.01

$

283%

280.

08$

149.

73$

115%

2313

6.40

$

63

5.13

$

498.

73$

26

6%28

9.63

$ 15

3.23

$ 11

2%24

142.

45$

640.

90$

49

8.45

$

250%

299.

18$

156.

73$

110%

2514

8.50

$

64

6.67

$

498.

17$

23

5%30

8.73

$ 16

0.23

$ 10

8%

Com

mer

cial

-W

ater

and

Was

tew

ater

Cur

rent

-B

row

ard

Cou

nty

Prop

osed

-C

ity o

f Hol

lyw

ood

Mon

thly

Bill

Com

paris

on -

Com

mer

cial

2"

Met

er

Page 40: First Reading - OrdinanceWatch

$‐

$10.00

 

$20.00

 

$30.00

 

$40.00

 

$50.00

 

$60.00

 

$70.00

 

$80.00

 

COH ‐Current

COH ‐Proposed

Boca Raton

Boynton Beach

Broward County

Coral Springs (City)

Dania Beach

Davie

Deerfield Beach

Delray Beach

Fort Lauderdale

Miramar (East)

North Miami Beach

Oakland Park

Palm Beach County

Tamarac

Rate Su

rvey ‐Av

erage Water and

 Sew

er Bills @

 7 CCF

Page 41: First Reading - OrdinanceWatch

Environm

ental Protection Agency (EPA

) Guide

lines fo

r Utility Services Afforda

bility

Avg

SFR

Cus

tom

er

Med

ian

Hou

seho

ld

Inco

me

Scen

ario

1

Bill

% o

f MH

IS

cena

rio

2 B

ill%

of M

HI

Scen

ario

3

Bill

% o

f MH

I

MH

I G

uide

lines

- M

axim

umW

ater

Bill

44,8

70$

21

.48

$

0.

57%

21.8

5$

0.

58%

22.1

3$

0.

59%

2.0%

Wat

er a

nd W

aste

wat

er B

ill44

,870

$

61.6

1$

1.65

%66

.32

$

1.77

%68

.56

$

1.83

%4.

0%

2009

Pro

pose

d

Com

paris

on o

f Alte

rnat

ive

Mon

thly

Bill

s to

Med

ian

Hou

seho

ld In

com

e

Med

ian Hou

seho

ld Income (M

HI) = $4

4,87

0 for Hollywoo

d

Page 42: First Reading - OrdinanceWatch

Summary

Estim

ated

 Impact on Re

side

ntial W

ater 

Custom

er M

onthly Bill

Page 43: First Reading - OrdinanceWatch

Summary

Estim

ated

 Impact on Re

side

ntial 

Water/W

astewater Customer M

onthly Bill

Page 44: First Reading - OrdinanceWatch

RESERVE CAPACITY CHARGE STUDY

Prepared for

City of Hollywood, Florida

April 2009

850 Trafalgar Court, Suite 300

Maitland, Florida 32751

Page 45: First Reading - OrdinanceWatch

850 Trafalgar Court Suite 300 Maitland, Florida 32751 Tel: (407) 661-9500 Fax: (407) 661-9599 www.brownandcaldwell.com

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

April 27, 2009

Mr. Albert L. Perez Utility Director City of Hollywood 3441 Hollywood Blvd. Hollywood, FL 33022-9245

Subject: Water and Wastewater Reserve Capacity Charge Study

Dear Mr. Perez: Pursuant to our agreement with the City of Hollywood (the “City”), Brown and Caldwell conducted a study to update the reserve capacity charges, as presented and documented in this Report. The City’s reserve capacity charge provides a mechanism to recovery Water and Wastewater Utility (the “Utility) capital costs that benefit new connections. The reserve capacity charges presented herein were updated pursuant to current statutory requirements based on data, assumptions and estimates that reasonably represent the current costs of providing potable water and wastewater services to new connections within the Utility’s service areas. The updated reserve capacity charges represent the maximum amounts supported by the data, assumptions and estimates. The City can elect to establish policies regarding the amounts, implementation and application of the reserve capacity charges that do not exceed the findings and conclusion identified in this study. It should be noted that capital costs not recovered through reserve capacity charges will for the most part be recovered through existing and future user rate and charge revenues. As a final note, our thanks and appreciation to you and other City staff members that provided data and assisted in the development of this update. Very truly yours, BROWN AND CALDWELL Marco H. Rocca, CMC

Page 46: First Reading - OrdinanceWatch

Reserve Capacity Charge Study

i

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

TABLE OF CONTENTS

EXECUTIVE SUMMARY....................................................................................................................... ES-1

Reserve Capacity Charge Update ........................................................................................................ ES-2

Comparison with Other Utilities......................................................................................................... ES-2

General Basis and Considerations....................................................................................................... ES-3

Findings................................................................................................................................................... ES-4

Conclusions ............................................................................................................................................ ES-4

INTRODUCTION...........................................................................................................................................1

General...........................................................................................................................................................1

Reserve Capacity Charge Overview...........................................................................................................1

Other Considerations...................................................................................................................................3

METHODOLOGY AND APPROACH......................................................................................................4

General...........................................................................................................................................................4

Background ...................................................................................................................................................4

Reserve Capacity Charge Methodology and Approach ..........................................................................5

EXPANSION FACILITY CAPITAL COSTS AND CAPACITIES ......................................................7

General...........................................................................................................................................................7

Water Treatment and Transmission ..................................................................................................7

Wastewater Treatment and Transmission ........................................................................................8

Treatment and Transmission Cost and Capacity Summary...........................................................8

TOTAL COSTS WITH CAPITAL FINANCING COSTS LESS CREDITS .....................................10

General.........................................................................................................................................................10

Financing Assumptions .............................................................................................................................10

Financing Costs and Credits .....................................................................................................................11

LEVEL OF SERVICE...................................................................................................................................12

General.........................................................................................................................................................12

Level of Service Standards ........................................................................................................................12

Existing Water ....................................................................................................................................12

Appropriateness of the Level of Service Standards ..............................................................................13

CALCULATION OF RESERVE CAPACITY CHARGES...................................................................14

General.........................................................................................................................................................14

Cost Per Unit of Service............................................................................................................................14

Water Reserve Capacity Charge .......................................................................................................15

Wastewater Reserve Capacity Charge .............................................................................................16

Summary ......................................................................................................................................................17

Comparison with Other Utilities..............................................................................................................17

GENERAL ASSUMPTIONS, FINDINGS AND CONCLUSIONS...................................................19

Page 47: First Reading - OrdinanceWatch

Reserve Capacity Charge Study

ii

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

Findings........................................................................................................................................................19

Conclusions .................................................................................................................................................19

LIST OF TABLES

TABLE ES-1 Updated and Existing Reserve Capacity Charges .................................................. ES-2

TABLE ES-2 Neighboring Communities Comparison................................................................. ES-3

TABLE 1 Water Facility Summary....................................................................................................7

TABLE 2 Wastewater Facility Summary..........................................................................................8

TABLE 3 Current Cost Summary for Reserve Capacity Charge Calculation Purposes............9

TABLE 4 Financing Assumptions ..................................................................................................11

TABLE 5 LOS Equivalency Factors...............................................................................................12

TABLE 6 Calculation of Water Reserve Capacity Charge...........................................................15

TABLE 7 Calculation of Wastewater Reserve Capacity Charge.................................................16

TABLE 8 Updated and Existing Reserve Capacity Charges .......................................................17

TABLE 9 Neighboring Communities Comparison......................................................................18

LIST OF SCHEDULES

SCHEDULE 1 Summary of Appendix A Fixed Assets ...................................................................22

SCHEDULE 2 Existing Water Transmission Facilities ...................................................................23

SCHEDULE 3 Water CIP Summary ..................................................................................................24

SCHEDULE 4 Existing Wastewater Transmission Facilities .........................................................25

SCHEDULE 5 Wastewater CIP Summary ........................................................................................26

SCHEDULE 6 Existing and Updated Reserve Capacity Charges..................................................27

APPENDICES

APPENDIX A Water and Wastewater Utility System Asset List as of September 30, 2008 .. A-1

APPENDIX B Water and Wastewater CIP.....................................................................................B-1

Page 48: First Reading - OrdinanceWatch

R E S E R V E C A P A C I T Y C H A R G E S T U D Y

ES-1

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

EXECUTIVE SUMMARY

The City of Hollywood (the “City”) requested that Brown and Caldwell (BC) update the existing water and wastewater reserve capacity charges. The current reserve capacity charges for the Water and Wastewater Utility (the “Utility) were established through Ordinance No. 2005-04 and No. 2005-05 on May 4, 2005. Since the establishment of the existing reserve capacity charges, significant events have occurred relative to recovery of utility facility costs through reserve capacity charges including the addition of Section 163.31801 to the Florida Statutes in 2006. Most significantly, this statute allows the recovery of the current cost of facilities providing service for new connections as compared to average facility costs commonly used prior to the statute.

A reserve capacity charge, sometimes referred to as an impact fee, is a mechanism to recover the costs of capacity related treatment and major transmission facilities that benefit new service connections; thereby, eliminating or reducing the financial burden on existing connections to pay for such facilities. The localized water distribution and wastewater collection facilities (such as water mains eight inches and less in diameter and gravity sewers) with appurtenances and soft costs are generally required to be contributed by the landowner/developer or funded through assessments and therefore, are not included for cost recovery through reserve capacity charges.

Facilities for cost recovery through reserve capacity charges include potable water and wastewater improvements associated with Treatment and Transmission (major backbone facilities) that are generally funded through resources of the Utility (reserve funds, bond proceeds, grants and contribution through agreements). Treatment and Transmission activities for the major utility services of potable water and wastewater are considered as the primary functional services for reserve capacity charge purposes.

This study utilizes a “Consumption” based methodology, which assumes that new service connections benefit from portions of both existing and new facilities; as compared to an “Improvements” based methodology that assumes a new set of service facilities is provided for each new service connections. The approach to determining the reserve capacity charge amount for each functional service consists of dividing facility costs by average day capacity of such facilities resulting in a cost per gallon per day (gpd) of capacity. Average day capacity was determined from engineering design documents and permits as adjusted to account for unaccounted for water, inflow and infiltration were appropriate.

The process to determine the facility costs consists of indexing original asset cost by the appropriated Engineering News Record (ENR) Construction Cost Index, adding near term capital improvements, adjusting for financing costs and reducing by credits associated with revenues provided from sources other than reserve capacity charges. The process also involves the identification of appropriate level of services (LOS) for equivalent connections to each of these functions services.

Page 49: First Reading - OrdinanceWatch

Executive Summary Reserve Capacity Charge Study

ES-2

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

Reserve Capacity Charge Update

A summary of the existing and updated reserve capacity charges based on the existing LOS criteria per equivalent residential unit (ERU) for residential connections and equivalent meter connection (EMC) for non residential connections in Table ES-1.

Table ES-1. Updated and Existing Reserve Capacity Charges

Updated

Amount

LOS Treatment Transmission Total

Water 350 gpd/ERU or EMC $ 840.00 $ 290.00 $ 1,130.00 Wastewater 315 gpd/ERU or EMC 1,250.00 880.00 2,130.00

Total $ 2,090.00 $ 1,170.00 $ 3,260.00

Updated To Existing Comparisons

Treatment Transmission Total

Water Updated 350 gpd/ERU or EMC $ 840.00 $ 290.00 $ 1,130.00 Existing 350 gpd/ERU or EMC 406.14 218.22 624.36 Amount Difference $ 433.86 $ 71.78 $ 505.64 Percent Difference 107% 33% 81%

Wastewater Updated 315 gpd/ERU or EMC $ 1,250.00 $ 880.00 $ 2,130.00 Existing 315 gpd/ERU or EMC 991.12 779.00 1,770.12 Amount Difference $ 258.88 $ 101.00 $ 359.88 Percent Difference 26% 13% 20%

Total Updated $ 2,090.00 $ 1,170.00 $ 3,260.00 Existing 1,397.26 997.22 2,394.48 Amount Difference $ 692.74 $ 172.78 $ 865.52 Percent Difference 50% 17% 36%

Comparison with Other Utilities

Comparisons of the existing and updated reserve capacity charges of the City and Other Utilities for a standard 5/8 x 3/4-inch residential water and wastewater connection (1 ERU, or 1 EMC) are provided in Table ES-2. The amounts shown for Other Utilities are based on the schedules in effect as of March 25, 2009 and are exclusive of taxes or other customer service related fees applied to new system connections (i.e. tap fees, application fees, inspection fees, etc.) Caution should be taken when comparing reserve capacity charges/impact fees for many reasons including the following:

1. Cost used by others may not be representative of “Current Costs;” 2. The LOS criteria may not be the same; may be either higher or lower; 3. Cost recovery from contributions, grants or other sources may be applicable;

Page 50: First Reading - OrdinanceWatch

Executive Summary Reserve Capacity Charge Study

ES-3

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

4. Local government may elect to phase-in or not implement total recovery amounts; and 5. Treatment processes and availability of resources may be different.

Table ES-2. Neighboring Communities Comparison 1 Water Wastewater Total

City of Hollywood Existing $ 624.36 $ 1,770.12 $ 2,394.48 Updated $ 1,130.00 $ 2,130.00 $ 3,260.00

Neighboring Communities Wilton Manors $ 390.00 $ 2,075.00 $ 2,465.00 Coral Springs (CSID) 2 $ 1,382.50 $ 1,382.50 $ 2,765.00 Coral Springs (NSID) 2 $ 1,512.50 $ 1,512.50 $ 3,025.00 Coral Springs (City) $ 1,000.00 $ 700.00 $ 1,700.00 Oakland Park N/A N/A N/A Miramar (East) $ 4,564.00 $ 2,760.00 $ 7,324.00 Tamarac $ 1,700.00 $ 2,200.00 $ 3,900.00 Sunrise $ 1,500.00 $ 1,350.00 $ 2,850.00 Davie $ 3,050.00 $ 2,920.00 $ 5,970.00 Dania Beach $ 1,557.00 $ 725.00 $ 2,282.00 Plantation $ 1,585.00 $ 1,260.00 $ 2,845.00 Lauderhill $ 1,629.00 $ 1,190.00 $ 2,819.00 Pompano Beach $ 700.00 $ 700.00 $ 1,400.00 Fort Lauderdale $ 651.00 $ 1,386.00 $ 2,037.00 Palm Beach County $ 1,500.00 $ 2,500.00 $ 4,000.00 Boyton Beach $ 1,122.00 $ 665.00 $ 1,787.00 Delray Beach $ 788.00 $ 1,084.00 $ 1,872.00 Broward County $ 1,185.00 $ 2,140.00 $ 3,325.00 Pembroke Pines $ 2,202.95 $ 2,058.13 $ 4,261.08 Boca Raton $ 5,195.00 $ 4,168.00 $ 9,363.00 Deerfield Beach $ 2,500.00 $ 560.00 $ 3,060.00 Hallandale Beach $ 1,318.00 $ 572.00 $ 1,890.00 North Miami Beach $ 1,827.00 $ 420.00 $ 2,247.00 Miami Dade WASD $ 486.50 $ 1,960.00 $ 2,446.50 Orlando $ 2,130.00 $ 2,950.00 $ 5,080.00

Neighboring Communities Average $ 1,728.14 $ 1,634.92 $ 3,363.07 1. As of March 25, 2009 2. Charge is a combination of water and wastewater, which is split herein 50 percent water and 50 percent wastewater.

General Basis and Considerations

In the preparation of this Report, certain information has been used and relied upon that was provided by other entities. Such information includes, but is not limited to, the Utility’s capital improvements, master plan reports, periodic reports, listing of existing facilities, capacity and cost data, fee schedules for the City and other utilities, and other information provided by or through the Utility. Additionally, reasonably conservative assumptions where developed to establish the basis

Page 51: First Reading - OrdinanceWatch

Executive Summary Reserve Capacity Charge Study

ES-4

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

for certain required study elements that are not, have not or can not be specifically defined through existing data. To the extent that actual or future conditions differ from those assumed and utilized in the Report, the results of the analyses may vary from those developed herein.

Findings

1. The Utility service areas for the most part have similar customer characteristics, utilize uniform service standards and are subject to similar costs.

2. Including reasonable assumptions relative to funding considerations is necessary to define the function services, establish a cost basis, develop appropriate credit criteria and determine cost recovery amounts.

3. Credit criteria and capital improvements funding require consideration of leveraging the reserve capacity charges to diminish the financial burden on existing connections.

4. A significant amount of the capital improvements address upgrades for existing facilities that directly benefit new connections and should be included for cost recovery through reserve capacity charges.

Conclusions

Based on the reviews, analyses and assumptions provided herein, it is concluded that: 1. To address redevelopment and growth it is prudent to establish mechanisms that

adequately recover capital costs incurred for providing service availability for new customers. The reserve capacity charges of the City serve as a funding mechanism for such purposes.

2. The reserve capacity charge updates developed herein are based on current capital improvement costs that reasonably reflect the costs for facilities providing services and benefits to new connections of the Utility.

3. The reserve capacity charge updates developed herein reflect net amounts that are equitable and provide for reasonable recovery without exceeding current cost of the capital improvements associated with providing utility capacity to new customers.

4. The facility cost data, engineering design criteria and assumptions used for this study reasonably reflect conditions. Minor near term future cost variances or other assumptions should not materially increase or reduce the updated reserve capacity charges.

5. The Utility’s current LOS standards reasonably reflect engineering design criteria and customer characteristics.

6. The Utility should establish a policy to annually utilize a portion of the reserve capacity charge reserves for amortization of existing and proposed debt service related to capital facilities included to establish the updated reserve capacity charges.

7. The Utility currently requires meter connection charges, deposits and other fees for new connections. Such fees are related to recovery of operating costs associated with establishing a new customer rather than capacity to serve the customer. As such, these other connection related charges are not recovered through reserve capacity charges.

8. Use of the updated reserve capacity charges will reduce the burden on user rates and operating reserves to fund and/or amortize existing and future expansion facility and related debt.

Page 52: First Reading - OrdinanceWatch

R E S E R V E C A P A C I T Y C H A R G E S T U D Y

1

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

INTRODUCTION

General

The City, (the “City”) requested Brown and Caldwell (BC) to identify the appropriate level of cost recovery, through reserve capacity charges for facilities that provide potable water and wastewater utility services to new or increased redevelopment service connections. The current reserve capacity charges, established through Ordinance No. 2005-04 and No. 2005-05 on May 4, 2005, may not adequately reflect the current cost for facilities required to address the current and near future service requirements. Reserve capacity charges paid by new and increased service connections are a mechanism to recover the facility costs for such services; thereby, reducing or eliminating the burden on existing connections to subsidize improvements for the benefit of new service connections. Localized service facilities with appurtenances and soft costs, (such as water mains eight inches and less in diameter, gravity sewers and other facilities), specifically limited to direct connection services are generally required to be contributed by the landowner/developer or funded through assessments and are not included for cost recovery through reserve capacity charges.

The purpose of the reserve capacity charge is to assign, to the extent practical, growth-related capital costs to those customers responsible for such additional costs. Sound financial and equitable cost recovery practice promotes the assignment of the identifiable additional growth related capital costs for utility services to connections responsible for such costs rather than existing connections. Generally, this practice has been labeled as “growth paying for growth” without burden on existing customers.

Reserve Capacity Charge Overview

Reserve capacity charges are referred to by a number of different terms including impact fees, facility fees, connection fees, capacity reservation charges, system development charges, capital connection charges or other similar terminology. In general, these are one-time charges established as a means to recover, in whole or in part, but not to exceed the costs associated with system capacity. Such capital costs generally include the construction of facilities together with general plant, engineering, administration, surveying, land, legal and financing costs. Reserve capacity charges in Florida were a result of home rule powers with the requirements associated with the development, administration, accounting and expenditure governed by case law. However, in 2006, Section 163.31801 was added to the Florida Statues, which reinforced, enhanced, clarified and added to the provisions of case law. Section 163.31801 F.S. is as follows:

163.31801 Impact Fees; short title; intent; definitions; ordinances levying Impact Fees.

(1) This section may be cited as the “Florida Impact Fee Act.” (2) The Legislature finds that impact fees are an important source of revenue for a local

government to use in funding the infrastructure necessitated by new growth. The Legislature further finds that impact fees are an outgrowth of the home rule power of a local government to provide certain services within its jurisdiction. Due to the growth of impact fee collections and local governments’ reliance on impact fees, it is the intent of the Legislature to ensure that, when a county or municipality adopts an impact fee by ordinance or a special district adopts an impact fee by resolution, the governing City complies with this section.

Page 53: First Reading - OrdinanceWatch

Introduction Reserve Capacity Charge Study

2

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

(3) An impact fee adopted by ordinance of a county or municipality or by resolution of a special district must, at minimum:

(a) Require that the calculation of the impact fee be based on the most recent and localized data.

(b) Provide for accounting and reporting of impact fee collections and expenditures. If a local governmental entity imposes an impact fee to address its infrastructure needs, the entity shall account for the revenues and expenditures of such impact fee in a separate accounting fund.

(c) Limit administrative charges for the collection of impact fees to actual costs. (d) Require that notice be provided no less than 90 days before the effective date of an

ordinance or resolution imposing a new or amended impact fee. (4) Audits of financial statements of local governmental entities and district school boards

which are performed by a certified public accountant pursuant to s. 218.39 and submitted to the Auditor General must include an affidavit signed by the chief financial officer of the local governmental entity or district school board stating that the local governmental entity or district school board has complied with this section.

Although the statute provides criteria, certain precedents originally set by common law need to be addressed to meet the legal requirements associated with impact fees. Common law precedent for impact fees in Florida was originally set in the landmark Florida Supreme Court decision, Contractors and Builders Association of Pinellas County vs. City of Dunedin, Florida. The litigation and judgment regarding the validity of capital-related fees provides that an equitable cost recovery mechanism, such as impact fees, can be levied for a specific purpose by a Florida municipality as a capital fee for services. In the ruling, the court identified certain conditions as necessarily present in order to have a valid fee. In general, the court decision addressed the following:

1. The impact fee should be reasonably equitable to all parties; that is, the amount of the fee must bear a relationship to the amount of services requested;

2. The system of fees and charges should be set up so that there is not an intentional windfall to existing users;

3. The impact fee should, to the extent practical, only cover the capital cost of construction and related costs thereto (engineering, legal, financing, administrative, etc.) for increases in or expansions of capacity or capital requirements that are required solely due to growth. Therefore, expenses due to normal renewal and replacement of a facility (e.g., replacement of a capital asset) should be borne by all users of the facility or municipality. Similarly, increased expenses due to operation and maintenance of that facility should be borne by all users of the facility; and

4. The local government must adopt a revenue-producing ordinance that explicitly sets forth restrictions on revenues (uses thereof) that the imposition of the impact fee generates. Therefore, the funds collected from the impact fees should be retained in a separate account, and separate accounting must be made for those funds to ensure that they are used only for the lawful purposes described.

Based on the criteria provided above, the development of impact fees herein will: 1) include current costs of facilities associated with the capacities to serve new customers; 2) not reflect costs of improvements associated with the renewal and replacement (R&R) of existing capital assets that are allocable to existing users of the system; and 3) not include any costs of operation and maintenance of the facilities associated with the system.

Page 54: First Reading - OrdinanceWatch

Introduction Reserve Capacity Charge Study

3

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

Other Considerations

In addition to the Dunedin decision, there have been several other landmark cases dealing with the levying of impact fees in Florida. In the Hollywood, Inc. vs. Broward County case, a challenge was made regarding the applicability of levying an impact fee for parks and recreation. Essentially, the Broward County ordinance provides for a park contribution agreement between the developer and the County and that a fee per residential unit be collected. The court upheld the imposition of the fee and addressed the more difficult question of whether the ordinance was constitutional. The major criteria associated with this case dealt with whether the fee was correlated to the benefit received (the “Rational Nexus Test”). As stated in the decision, the government must show a reasonable connection or correlation between the expenditures of the funds collected and the benefits that accrue to the payee. In order to satisfy this requirement, the ordinance must specifically earmark impact fee funds for acquiring capital facilities that benefit new residents.

Palm Beach County adopted a “Fair Share Contribution for Road Improvements” ordinance requiring payment of a transportation impact fee prior to the issuance of a building permit to address a degrading level of service resulting from growth. The impact fee based on estimated trip generation rates for particular customer classes survived a challenge by the Home Builders and Contractors Association of Palm Beach County per the findings that the fee was not a tax having met the Rational Nexus Test.

The courts in Florida determined and affirmed that impact fees are valid to fund increased capital cost associated with the incremental facilities for growth. Specifically, impact fees must represent the incremental cost of the capital facilities to provide services for increased growth of the jurisdiction and some reasonable basis must exist between the amount of the fee and the benefits accrued to the new or incremental customer. Furthermore, impact fees are not considered special assessments or additional taxes. A special assessment is predicated upon an estimated increment in value to the property assessed by virtue of the improvement being constructed in the vicinity of the property and the assessment must be directly and reasonably related to the benefit the property receives. Impact fees are not directly related to the value of the improvement to the property but rather to the level of service required by the property. With respect to a comparison to taxes, impact fees are distinguishable primarily in the direct relationship between the amount and the measurable quantity of public facilities required. In the case of taxation, there are no requirements that the payment be in proportion to the quantity of public services consumed and funds received by a local government from taxes can be expended for any legitimate public purpose.

The above represents a very limited non-legal overview of impact fee legal criteria for general information purposes only. No legal assurances are given nor should any be interpreted by the reader on the summary provided herein. Actual legal opinion should be obtained from the City’s legal counsel on such matters.

Page 55: First Reading - OrdinanceWatch

R E S E R V E C A P A C I T Y C H A R G E S T U D Y

4

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

METHODOLOGY AND APPROACH

General

The selection and use of a methodology and approach are vital in development of reserve capacity charges that fully comply with applicable statutes and case law.

Background

Properties within the Utility’s service area are provided water and wastewater benefits/services through six distinguishable utility functional service facilities consisting of: 1) Potable Water Treatment; 2) Potable Water Transmission; 3) Localized Water Distribution; 4) Localized Wastewater Collection; 5) Wastewater Transmission; and 6) Wastewater Treatment. These functional service facilities are further described below along with an additional category of Physical Connection.

• Potable Water Treatment facilities generally consist of source of supply, raw water transmission piping, treatment equipment and buildings, storage tanks and high service pumping.

• Potable Water Transmission facilities consist of selected water mains serving as the backbone piping together with associated remote storage and high service pumping equipment providing potable water at suitable quantities and pressure to the localized potable water distribution facilities.

• Wastewater Treatment facilities generally consist of treatment equipment and buildings, and sludge management equipment and buildings.

• Wastewater Disposal related facilities consist of certain filtration, disinfection, storage tanks or ponds, buildings, effluent disposal equipment, piping, pumping and ocean outfall facilities.

• Wastewater Transmission facilities consist of interceptor (trunk) gravity lines, master-pumping stations, and selected force mains serving as the backbone piping transferring wastewater from localized wastewater collection facilities to the wastewater treatment facilities.

• Localized Water Distribution and Wastewater Collection facilities consist of localized piping and equipment that serve as the conduit for Water and Wastewater services between the Water and Wastewater Transmission facilities and the customer’s point of Physical Connection.

• Physical Connection facilities are those items associated with the customer’s point of connection, such as water meters, laterals, meter boxes, etc.

The facilities included for cost recovery through reserve capacity charges consist of potable water and wastewater improvements associated with Treatment and Transmission (major backbone

Page 56: First Reading - OrdinanceWatch

Methodology and Approach Reserve Capacity Charge Study

5

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

facilities) that are generally funded through resources of the Utility (bond proceeds, loans, grants, agreements, and restricted and unrestricted reserves). Treatment and Transmission activities for the major utility services of potable water and wastewater are considered as the primary functional services for reserve capacity charge purposes. The remaining Localized Distribution and Collection, and Physical Connection facilities are site specific with costs that generally vary from location to location within the service area. Therefore, the Utility’s uniform extension policy should required that such Localized Distribution and Collection, and Physical Connection costs be paid through developer contributions, assessments programs or other methods that do not involve subsidies by properties that do not benefit.

Reserve Capacity Charge Methodology and Approach

This study utilizes a “Consumption” based methodology, which assumes that new service connections will utilize portions of both existing and new facilities; as compared to an “Improvements” based methodology that assumes a new set of service facilities is provided for each new service connections. The approach to determining the reserve capacity charges for each functional service consisted of dividing the adjusted facility costs by the average day capacity of such facilities resulting in an adjusted cost per gallon per day (gpd) of capacity.

The reserve capacity charge methodology provides that the amount to be recovered adequately and reasonably represents the current costs of expansion facilities consistent with the LOS provided by the Utility. More specifically, the methodology uses current costs, plus financing and interest expenses, less any related cost recovery from other sources.

The approach to address the methodology is predicated on establishing a uniform cost per unit of capacity for each area of functional service. These uniform costs per unit of capacity are then related to the LOS capacity associated for each customer class, size of connection or other criteria relative to the connection’s request for service. Identification of current expansion facility cost and related capacities for the utility functional services along with the LOS criteria for potable water and wastewater service provides the basis for the cost per unit of capacity relationship. A total current facility cost on a benefit and consistent capacity basis, as allocated and apportioned utilizing the appropriate utility functional services and LOS criteria, is identified for each functional service area. The total current facility cost is adjusted to consider financing costs, less credit for contributions, grants, or any related cost recovery from other sources including user fees that are used to amortize debt related to the capital facilities. This process results in the net current cost basis for each of the four primary functional services facilities (Water Treatment, Water Transmission, Wastewater Treatment and Wastewater Transmission) to be recovered from reserve capacity charges. Capacities for the functional service facilities are adjusted to consider maximum day and unaccounted for water for potable water and infiltration and inflow (I&I) for wastewater. The costs per unit of capacity for each of the primary functional services are determined utilizing the net current cost basis and adjusted LOS capacities.

The tasks associated with this approach consist of identifying: 1. Current costs for each functional service element based on information provided by the

Utility. This information consists of recently completed, ongoing and master plan improvements that either represent or are adjusted to reflect facility costs associated with complete functional services, including land, general plant, engineering, permitting and all other relative soft costs.

Page 57: First Reading - OrdinanceWatch

Methodology and Approach Reserve Capacity Charge Study

6

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

2. Functional service component capacity based on permitted, actual or engineering design criteria.

3. Historic and current policies on funding capital cost for Treatment and Transmission functional service facilities.

4. Relative financing costs and interest expense associated with current funding policies of the Utility.

5. Credits attributed to cost recovery provide through other sources. 6. Relative cost per unit of capacity.

Data for the identification of current expansion facility costs and related capacities were obtained from one or more of three primary sources of the Utility, consisting of: 1) property, plant and equipment asset records and capital improvement budgets, 2) debt, grant and other funding documents, and/or 3) engineering criteria, planning documents and operating records of the Utility. As previously discussed, credits or adjustments to address the potential of double payment or over recovery of facility costs are based on assumptions relative to the Utility’s financing policies, capital structure and current market conditions.

Capacities associated with the Treatment and Transmission facilities are developed utilizing several sources including design standards, permitted criteria, engineering estimates and actual system experiences. Capacity analysis associated with the potable water Treatment and Transmission facilities include consideration of maximum day demand, fire flow and unaccounted for water. Wastewater capacity analyses are generally based on the average day design capacity of the wastewater treatment plant. Wastewater Transmission facility capacities are rated with consideration of I&I.

Page 58: First Reading - OrdinanceWatch

C A P I T A L C H A R G E S T U D Y

7

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

EXPANSION FACILITY CAPITAL COSTS AND CAPACITIES

General

The process of establishing current facility costs that reasonably reflect the costs associated with the relative capacities of such facilities consists of: (i) indexing the original costs of the facilities by a nationally recognized index representative of utility type construction activities; (ii) including approved capital improvement program (CIP) costs; and (iii) indexing the approved CIP costs that are not current. The Engineering New Record (ENR) Construction Cost Index for the Atlanta region was selected as an appropriate index for this study. Data for existing facilities were obtained from the asset records maintained by the City. Associated capacities for the facilities were provided by City staff and/or obtained from master or facility plans.

Water Treatment and Transmission

Water Treatment facilities consist of Biscayne and Floridan aquifer supply wells, lime softening, membrane softening and reverse osmosis treatment plants located within the Utility’s service area. Water Transmission facilities, consisting of piping ranging from 10-inches to 30-inches in diameter, together with appurtenances, are located throughout the service area. Localized piping generally consisting of potable water lines 8.0-inches and less in diameter are not included as water Transmission facilities. The current cost for both the existing facilities and those anticipated to be constructed through the CIP in the near future are shown in Table 1. The existing water Treatment facilities including supply wells, land, and general plant facilities, as summarized in Schedule 1, are based on: (i) asset records provided by the Utility, detailed in Appendix A, as indexed to current costs pursuant to the ENR Construction Costs Indices; and (ii) costing of Land pursuant to County records. Existing Transmission facility costs, detailed in Schedule 2, utilizes a cost per linear foot approach based actual piping length, size, material and current engineering cost estimates. Amounts for CIP projects were obtained from the City’s current CIP, as provided in Schedule 3 and detailed in Appendix B.

Table 1. Water Facility Summary

CIP

Item Existing Basis Jan 2009 Combined

Treatment Source of Supply $ 26,159,840 $ 1,800,000 $ 27,959,840 Treatment Plant 118,161,027 32,937,000 151,098,027 Land 2,264,788 - 2,264,788 General Plant. 3,192,719 - 3,192,719

Total Treatment $ 149,778,373 $ 34,737,000 $ 184,515,373 Transmission 42,789,492 15,052,221 57,841,713 Total Water $ 192,567,865 $ 49,789,221 $ 242,357,086

Page 59: First Reading - OrdinanceWatch

Expansion Facility Reserve Capital Costs and Capacities Reserve Capacity Charge Study

8

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

Wastewater Treatment and Transmission

Wastewater Treatment a utility functional service consists of activated sludge treatment with disposal through ocean outfall, deep well injection and reuse of reclaimed water. The proposed CIP provides for upgrading of existing facilities and additional/alternative disposal. Transmission is provided from interceptor gravity sewers, force mains and master pumping stations located throughout the Utility’s service area. Localized collection facilities, consisting of gravity sewers and small lift stations, are not included as wastewater Transmission facilities. Wastewater Treatment and Transmission facility costs including land and a portion of general plant facilities are shown on Table 2, as summarized from Schedule 1. Current cost for existing facilities are based on: (i) asset records provided by the Utility, detailed in Appendix A, as indexed pursuant to the ENR Construction Costs Indices; (ii) Land pursuant to County records; and (iii) separate identification and costing of the ocean outfall line. Existing Transmission facility costs, detailed in Schedule 4, utilizes a cost per linear foot approach based actual piping length, size, material and current engineering cost estimates. Amounts for CIP projects were obtained from the City’s current CIP, as provided in Schedule 5 and detailed in Appendix B.

Table 2. Wastewater Facility Summary

CIP

Item Existing Basis Jan 2009 Combined

Transmission $ 117,785,909 $ 43,026,397 $ 160,812,306 Treatment

Plant $ 286,940,951 $ 32,570,000 $ 319,510,951 Land 2,934,030 - 2,934,030 General Plant 4,650,277 - 4,650,277 Disposal 54,995,607 14,828,000 69,823,607

Subtotal Treatment $ 349,520,866 $ 47,398,000 $ 396,918,866 Total Wastewater $ 467,306,775 $ 90,424,397 $ 557,731,172

Treatment and Transmission Cost and Capacity Summary

A current cost summary for reserve capacity charge calculation purposes is presented in Table 3. There are two sections to Table 3, the first section reflects the identified costs together with each element’s capacity; the second section reflects the element costs adjusted to be on a consistent capacity basis. Costs identified in the second section (consistent capacity basis) together with the associated capacities are used for determination of the reserve capacity charges.

Page 60: First Reading - OrdinanceWatch

Expansion Facility Reserve Capital Costs and Capacities Reserve Capacity Charge Study

9

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

Table 3. Current Cost Summary for Reserve Capacity Charge Calculation Purposes

Water Wastewater

Item Amount Capacity Amount Capacity

Section 1. Costs and Capacities

Treatment

Source of Supply $ 27,959,840 55.85 $ -

Plant 151,098,027 36.50 319,510,951 48.75

Land 2,264,788 36.50 2,934,030 48.75

Disposal - 36.50 69,823,607 48.75

General Plant 3,192,719 36.50 4,650,277 48.75

Subtotal Treatment $ 184,515,373 $ 396,918,866

Transmission 57,841,713 36.50 160,812,306 28.00

Total $ 242,357,086 $ 557,731,172

Section 2. Cost On a Consistent Capacity Basis

Treatment

Source of Supply $ 18,273,000 $ -

Plant 151,098,000 183,514,000

Land 2,265,000 1,685,000

Disposal - 40,104,000

General Plant 3,193,000 2,671,000

Total $ 174,829,000 36.50 $ 227,974,000 28.00

Transmission 57,842,000 36.50 160,812,000 28.00

Total $ 232,671,000 $ 388,786,000

Page 61: First Reading - OrdinanceWatch

R E S E R V E C A P A C I T Y C H A R G E S T U D Y

10

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

TOTAL COSTS WITH CAPITAL FINANCING COSTS LESS CREDITS

General

Both the inclusion of financing costs and exclusion (credits) of amounts anticipated to be recovered from other sources of revenues are important in the development of appropriated reserve capacity changes. The Utility’s capital structure historically has utilized long-term debt, existing reserves and contributions to acquire facilities and fund system upgrades and expansions. As a result, in addition to facility costs such long-term debt includes costs for both financing and accumulated interest over the life of the debt. These costs directly relate to the benefits provided by system facilities and are required to be addressed for full cost recovery. Pursuant to a review of the existing bond documents and City’s reserve capacity charge ordinance, reserve capacity charges can and are recommended to be utilized to pay for expansion related debt service pursuant to requirements of the rate covenant. Since annual cash flows provided by reserve capacity charges do not coincide with the timing of project funding and debt service payment requirements, it is necessary to utilize other sources of revenues, such as reserves and user fees, to address these cash flow requirements. Therefore, consideration of credits to address the amounts provided by other revenue sources are incorporated in the reserve capacity charge updates to eliminate over recovery or payments above the identified amounts by any connection.

Financing Assumptions

The process to determine the level and costs of financing consist of developing assumptions associated with: (i) the relative portion expansion improvements funded through debt (the Expansion Percentage); (ii) the financing terms associated with the capital funding program; (iii) the portion of the expansion debt anticipated to be paid from reserve capacity charges; and (iv) the relative portion of debt service paid by other revenue sources.

Expansion Percentage A review of the historical funding activities of the City’s water and wastewater Treatment and Transmission facilities suggests that a significant portion of the existing facilities were funded from debt and that nearly 100 percent of all future expansion/upgrade improvements may also be funded from debt. Based on these findings the expansion percentage for reserve capacity charge use for debt service is assumed at 95 percent.

Financing Terms For the purpose of this study, financing terms for long-term debt consist of: (i) a weighted average number of years based on existing and proposed debt years; (ii) interest of 5.5 percent; (iii) issuance cost at 2.0 percent; and (iv) a debt service reserve fully funded from the proceeds of debt.

Amortized From User Fees Full recovery through reserve capacity charges are not practical at this time due to the anticipated lag time between the funding/construction of improvements and potential for new connections. Future water and wastewater reserve capacity charges are assumed to provide 15 percent and 20 percent respectively of the debt service for existing and anticipated future debt. The higher level of assumed reserve connection charges is based on the potential of connections that are currently on septic tanks. The portion of the debt service not paid from reserve capacity charges will be

Page 62: First Reading - OrdinanceWatch

Total Costs with Capital Financing Costs Less Credits Reserve Capacity Charge Study

11

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

provided from user fees and constitute the basis for credits in the determination of reserve capacity charges.

Financing Costs and Credits

An important element in the development the reserve capacity charge is the consideration of: (i) debt financing costs; (ii) debt interest expense; and (iii) credits arising from (a) debt funding of expansion improvements, and (b) cost recovery for expansion facilities costs derived from sources other than reserve capacity charges. The Utility’s historic and current capital funding program utilizes two primary sources of funding for the expansion related facilities: 1) reserve capacity charge reserve funds that are directly used to construct facilities, (this also includes expansion facility contributions in lieu of reserve capacity charge); and 2) proceeds derived from debt. Reserve capacity charges can be used to pay all or a portion of expansion related debt service provided all rate covenant are fully addressed. Table 4 provides a summary of the salient items used in calculating and the factors to adjust total facility costs for financing costs and credits.

Table 4. Financing Assumptions

Item Water Wastewater

Debt Funded 95.00% 95.00% Amortized by Reserve Capacity Charges 15.00% 20.00% Debt Service Assumptions

Years 19 19 Interest Rate 5.50% 5.50% Expense 2.00% 2.00% Debt Service Reserve yes 0.0862 yes 0.0862

Primary Financing Assumption Factors

Direct Debt Total Direct Debt Total

Project $ 0.0500 $ 0.9500 $ 1.0000 $ 0.0500 $ 0.9500 $ 1.0000 Debt Financing Costs - 0.1188 0.1188 - 0.1188 0.1188 Total Interest Expense - 0.7125 0.7125 - 0.7125 0.7125 Subtotal $ 0.0500 $ 1.7812 $ 1.8312 $ 0.0500 $ 1.7812 $ 1.8312 Provided by User Fees 1.4383 1.4383 1.3537 1.3537 RCC Recovery $ 0.3929 $ 0.4775

Page 63: First Reading - OrdinanceWatch

R E S E R V E C A P A C I T Y C H A R G E S T U D Y

12

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

LEVEL OF SERVICE

General

The approach to developing reserve capacity charges takes into consideration City policy regarding LOS for each of the functional services.

Level of Service Standards

Existing Water

The amount of reserve capacity charge required from all new and some renovated service connections are determined on an equivalency basis utilizing an equivalent residential unit (ERU) for residential connections and equivalent meter connections (EMC) for non residential connections. An ERU is based the average daily demand characteristics of a single family dwelling unit. An EMC is based on the American Water Works Association cold water meter standards with a 5/8 x ¾ -inch meter being equal to one EMC. Article IX of the Broward County code of ordinances specifies that 350 gallons per day (gpd) Average Daily Flow (ADF) for water and 315 gpd ADF are the LOSs where Broward County is not the provider.

Equivalencies for Residential are categorized to address single family, duplex, multi-family and mobile home dwellings. The equivalency factors for each of these residential dwelling unit categories together with the EMC factors for each water meter size are provided in Table 5.

Table 5. LOS Equivalency Factors

Factor

Residential Per Unit Single Family 1.00 Duplex 1.00 Multi-Family 3 + Units 0.71 Mobile Home 0.29

Non Residential Per Meter Size

Meter Size 5/8" x 3/4" 1.00 1.0" 2.50 1.5" 5.00 2.0" 8.00 3.0" 16.00 4.0" 25.00 6.0" 50.00 8.0" 80.00

Page 64: First Reading - OrdinanceWatch

Level of Service Reserve Capacity Charge Study

13

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

Appropriateness of the Level of Service Standards

A review of recent customer usage was conducted utilizing billing information provided by the Utility for the purpose of understanding the relationship between the actual usage per equivalency and those stated by Broward County. Based on the review and discussions with Utility staff the existing basis of 350 gpd and 315 gpd ADF per equivalency, respectively for water and wastewater continue to be representative of the LOS required for the health, safety and welfare of those receiving services. These LOSs are also relatively consistent with design criteria and LOS used by other utilities in Florida.

Page 65: First Reading - OrdinanceWatch

R E S E R V E C A P A C I T Y C H A R G E S T U D Y

14

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

CALCULATION OF RESERVE CAPACITY CHARGES

General

The critical elements required for development of the reserve capacity charges consist of identifying the current cost per unit of service and extending the amount by the LOS for the four functional services. Current costs identified on a consistent capacity basis, including provisions for financing costs and credits, are divided by the reconciled capacity of such facilities of address system and engineering design criteria such as average daily demand (ADD), unaccounted water losses and inflow and infiltration (I&I).

Cost Per Unit of Service

The total cost basis for each water and wastewater Treatment and Transmission functional services is calculated by adding an amount to account for financing considerations and subtracting credits. These amounts are then divided by the service capacity, identified as the facility’s ADD capacity, less adjustments for unaccounted water and I&I. The cost per unit of capacity reflects the full costs recovery amount from reserve capacity charges at the point of connection as shown in the following tables.

Page 66: First Reading - OrdinanceWatch

Calculation of Reserve Capacity Charges Reserve Capacity Charge Study

15

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

Water Reserve Capacity Charge

The reserve capacity charges for potable water service are shown in Table 6.

Table 6. Calculation of Water Reserve Capacity Charge

Item Treatment Transmission Total

Current Cost Basis $ 174,829,000 $ 57,842,000 $ 232,671,000 Less Grants 2,734,000 - 2,734,000 Net Facility Costs $ 172,095,000 $ 57,842,000 $ 229,937,000 Financing Cost 19,415,000 6,526,000 25,941,000 Interest Cost 116,484,000 39,151,000 155,635,000 Subtotal $ 307,994,000 $ 103,519,000 $ 411,513,000 User Fee Credit 247,533,000 83,197,000 330,730,000 Total Current Cost Basis $ 60,461,000 $ 20,322,000 $ 80,783,000

Facility Capacity: Total Capacity in MGD 36.50 36.50 Maximum Day Factor 1 1.31 1.31 Average Day Capacity in MGD 27.86 27.86

Unaccounted-For-Water 2 8.00% 8.00% Level of Service Capacity MGD 25.63 25.63

Capital Charge Determinants: Unit Cost Per Gallon of Capacity $ 2.36 $ 0.79 $ 3.15 Level of Service (gpd) 3 350 350 Reserve Capacity Charge Calculated Charge $ 826.00 $ 277.00 $ 1,103.00

Administration Fee 10.00 10.00 20.00 Total Fee $ 836.00 $ 287.00 $ 1,123.00 Rounding Adjustment (to nearest $10) 4.00 3.00 7.00 Updated Reserve Capacity Charge $ 840.00 $ 290.00 $ 1,130.00 1. 2007 Water Master Plan page 5-6

2. Per City references 3. Broward County Code Article IX

Page 67: First Reading - OrdinanceWatch

Calculation of Reserve Capacity Charges Reserve Capacity Charge Study

16

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

Wastewater Reserve Capacity Charge

The reserve capacity charge for wastewater is shown in Table 7.

Table 7. Calculation of Wastewater Reserve Capacity Charge

Description Treatment Transmission Total

Current Cost Basis $ 227,974,000 $ 160,812,000 $ 388,786,000 Less Grants - - - Net Facility Costs $ 227,974,000 $ 160,812,000 $ 388,786,000 Financing Cost 25,720,000 18,143,000 43,863,000 Interest Cost 154,306,000 108,847,000 263,153,000 Subtotal $ 408,000,000 $ 287,802,000 $ 695,802,000 User Fee Credit 308,618,000 217,698,000 526,316,000 Total Current Cost Basis $ 99,382,000 $ 70,104,000 $ 169,486,000

System Capacity: Average Day Capacity in MGD 1 28.00 28.00 Allowance for Infiltration and Inflow 2 10.00% 10.00% Level of Service Capacity in MGD 25.20 25.20 Capital Charge Determinants: Unit Cost Per Gallon of Capacity $ 3.94 $ 2.78 $ 6.72 Level of Service (gpd) 3 315 315 Reserve Capacity Charge Calculated Charge $ 1,241.00 $ 876.00 $ 2,117.00

Administration Fee 10.00 10.00 20.00 Total Fee $ 1,251.00 $ 886.00 $ 2,137.00 Rounding Adjustment (to nearest $10) (1.00) (6.00) (7.00) Updated Reserve Capacity Charge $ 1,250.00 $ 880.00 $ 2,130.00 1. Total Capacity of 48.75 less 20.75 for large users. 2. National Standard 3. Broward County Code Article IX

Page 68: First Reading - OrdinanceWatch

Calculation of Reserve Capacity Charges Reserve Capacity Charge Study

17

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

Summary

A summary of the existing and updated reserve capacity charges are shown below in Table 8 with a complete listing provided in Schedule 6.

Table 8. Updated and Existing Reserve Capacity Charges

Updated

Amount

LOS Treatment Transmission Total

Water 350 gpd/ERU or EMC $ 840.00 $ 290.00 $ 1,130.00 Wastewater 315 gpd/ERU or EMC 1,250.00 880.00 2,130.00

Total $ 2,090.00 $ 1,170.00 $ 3,260.00

Updated To Existing Comparisons

Treatment Transmission Total

Water Updated 350 gpd/ERU or EMC $ 840.00 $ 290.00 $ 1,130.00 Existing 350 gpd/ERU or EMC 406.14 218.22 624.36 Amount Difference $ 433.86 $ 71.78 $ 505.64 Percent Difference 107% 33% 81%

Wastewater Updated 315 gpd/ERU or EMC $ 1,250.00 $ 880.00 $ 2,130.00 Existing 315 gpd/ERU or EMC 991.12 779.00 1,770.12 Amount Difference $ 258.88 $ 101.00 $ 359.88 Percent Difference 26% 13% 20%

Total Updated $ 2,090.00 $ 1,170.00 $ 3,260.00 Existing 1,397.26 997.22 2,394.48 Amount Difference $ 692.74 $ 172.78 $ 865.52 Percent Difference 50% 17% 36%

Comparison with Other Utilities

Comparisons of the existing and updated reserve capacity charges of the City and Other Utilities for a standard 5/8 x 3/4-inch residential water and wastewater connection (1 ERU, or 1 EMC) are provided in Table ES-2. The amounts shown for Other Utilities are based on the schedules in effect as of March 25, 2009 and are exclusive of taxes or other customer service related fees applied to new system connections (i.e. tap fees, application fees, inspection fees, etc.) Caution should be taken when comparing reserve capacity charges/impact fees for many reasons including the following:

1. Cost used by others may not be representative of “Current Costs;” 2. The LOS criteria may not be the same; may be either higher or lower; 3. Cost recovery from contributions, grants or other sources may be applicable; 4. Local government may elect to phase-in or not implement total recovery amounts; and 5. Treatment processes and availability of resources may be different.

Page 69: First Reading - OrdinanceWatch

Calculation of Reserve Capacity Charges Reserve Capacity Charge Study

18

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

Table 9. Neighboring Communities Comparison 1 Water Wastewater Total

City of Hollywood Existing $ 624.36 $ 1,770.12 $ 2,394.48 Updated $ 1,130.00 $ 2,130.00 $ 3,260.00

Neighboring Communities Wilton Manors $ 390.00 $ 2,075.00 $ 2,465.00 Coral Springs (CSID) 2 $ 1,382.50 $ 1,382.50 $ 2,765.00 Coral Springs (NSID) 2 $ 1,512.50 $ 1,512.50 $ 3,025.00 Coral Springs (City) $ 1,000.00 $ 700.00 $ 1,700.00 Oakland Park N/A N/A N/A Miramar (East) $ 4,564.00 $ 2,760.00 $ 7,324.00 Tamarac $ 1,700.00 $ 2,200.00 $ 3,900.00 Sunrise $ 1,500.00 $ 1,350.00 $ 2,850.00 Davie $ 3,050.00 $ 2,920.00 $ 5,970.00 Dania Beach $ 1,557.00 $ 725.00 $ 2,282.00 Plantation $ 1,585.00 $ 1,260.00 $ 2,845.00 Lauderhill $ 1,629.00 $ 1,190.00 $ 2,819.00 Pompano Beach $ 700.00 $ 700.00 $ 1,400.00 Fort Lauderdale $ 651.00 $ 1,386.00 $ 2,037.00 Palm Beach County $ 1,500.00 $ 2,500.00 $ 4,000.00 Boyton Beach $ 1,122.00 $ 665.00 $ 1,787.00 Delray Beach $ 788.00 $ 1,084.00 $ 1,872.00 Broward County $ 1,185.00 $ 2,140.00 $ 3,325.00 Pembroke Pines $ 2,202.95 $ 2,058.13 $ 4,261.08 Boca Raton $ 5,195.00 $ 4,168.00 $ 9,363.00 Deerfield Beach $ 2,500.00 $ 560.00 $ 3,060.00 Hallandale Beach $ 1,318.00 $ 572.00 $ 1,890.00 North Miami Beach $ 1,827.00 $ 420.00 $ 2,247.00 Miami Dade WASD $ 486.50 $ 1,960.00 $ 2,446.50 Orlando $ 2,130.00 $ 2,950.00 $ 5,080.00

Neighboring Communities Average $ 1,728.14 $ 1,634.92 $ 3,363.07 1. As of March 25, 2009 2. Charge is a combination of water and wastewater, which is split herein 50 percent water and 50 percent wastewater.

Page 70: First Reading - OrdinanceWatch

R E S E R V E C A P A C I T Y C H A R G E S T U D Y

19

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

GENERAL ASSUMPTIONS, FINDINGS AND CONCLUSIONS

In the preparation of this Report, certain information has been used and relied upon that was provided by other entities. Such information includes, but is not limited to, the Utility’s capital improvements, master plan reports, periodic reports, listing of existing facilities, capacity and cost data, fee schedules for the City and other utilities, and other information provided by or through the Utility. Additionally, reasonably conservative assumptions where developed to establish the basis for certain required study elements that are not, have not or can not be specifically defined through existing data. To the extent that actual or future conditions differ from those assumed and utilized in the Report, the results of the analyses may vary from those developed herein.

Findings

1. The Utility service areas for the most part have similar customer characteristics, utilize uniform service standards and are subject to similar costs.

2. Including reasonable assumptions relative to funding considerations is necessary to define the function services, establish a cost basis, develop appropriate credit criteria and determine cost recovery amounts.

3. Credit criteria and capital improvements funding require consideration of leveraging the reserve capacity charges to diminish the financial burden on existing connections.

4. A significant amount of the capital improvements address upgrades for existing facilities that directly benefit new connections and should be included for cost recovery through reserve capacity charges.

Conclusions

Based on the reviews, analyses and assumptions provided herein, it is concluded that: 1. To address redevelopment and growth it is prudent to establish mechanisms that

adequately recover capital costs incurred for providing service availability for new customers. The reserve capacity charges of the City serve as a funding mechanism for such purposes.

2. The reserve capacity charge updates developed herein are based on current capital improvement costs that reasonably reflect the costs for facilities providing services and benefits to new connections of the Utility.

3. The reserve capacity charge updates developed herein reflect net amounts that are equitable and provide for reasonable recovery without exceeding current cost of the capital improvements associated with providing utility capacity to new customers.

4. The facility cost data, engineering design criteria and assumptions used for this study reasonably reflect conditions. Minor near term future cost variances or other assumptions should not materially increase or reduce the updated reserve capacity charges.

5. The Utility’s current LOS standards reasonably reflect engineering design criteria and customer characteristics.

6. The Utility should establish a policy to annually utilize a portion of the reserve capacity charge reserves for amortization of existing and proposed debt service related to capital facilities included to establish the updated reserve capacity charges.

Page 71: First Reading - OrdinanceWatch

General Assumptions, Findings, and Conclusions Reserve Capacity Charge Study

20

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

7. The Utility currently requires meter connection charges, deposits and other fees for new connections. Such fees are related to recovery of operating costs associated with establishing a new customer rather than capacity to serve the customer. As such, these other connection related charges are not recovered through reserve capacity charges.

8. Use of the updated reserve capacity charges will reduce the burden on user rates and operating reserves to fund and/or amortize existing and future expansion facility and related debt.

Page 72: First Reading - OrdinanceWatch

Reserve Capacity Charge Study

21

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

SCHEDULES

Page 73: First Reading - OrdinanceWatch

Schedule 1 Reserve Capacity Charge Study

22

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

Schedule 1. Summary of Appendix A Fixed Assets

Original Cost Current Cost

Existing Asset Listing (Appendix A) Water

Treatment Source of Supply SOS $ 18,279,979.46 $ 26,159,839.62 Treatment Plant WTP 62,142,723.68 118,161,026.65 Land WL 111,035.54 645,209.43 General Plant Direct WGP 598,824.87 1,997,574.17 General Plant Allocated 1 GP 443,145.81 1,195,144.71

Subtotal $ 81,575,709.36 $ 148,158,794.58 Transmission WTD 26,040,472.14 98,544,924.02

Total Water $ 107,616,181.50 $ 246,703,718.60 Wastewater

Transmission WWTC $ - $ - Treatment

Plant WWTP $ 174,972,423.00 $ 286,940,951.46 Land WWL 3,522,119.95 10,682,881.78 General Plant Direct WWGP 2,222,129.75 3,455,132.47 General Plant Allocated 1 GP 443,145.81 1,195,144.71 Disposal WWD 23,458,154.65 42,455,607.46

Total $ 204,617,973.16 $ 344,729,717.88

Total Water and Wastewater $ 312,234,154.66 $ 591,433,436.49 Adjustments Water Wastewater

Land Acres 8.13 31.38 Cost per acre $ 278,500 $ 93,500 Land Cost $ 2,264,788 $ 2,934,030

Ocean Outfall line $ 12,540,000 Elevated Storage Tanks $ 2,500,000 Master Pump Stations $ 35,000,000 1. Allocated 50 percent water and 50 percent wastewater.

Page 74: First Reading - OrdinanceWatch

Schedule 2 Reserve Capacity Charge Study

23

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

Schedule 2. Existing Water Transmission Facilities Cost

Size Length Per Foot 1 Total

30" 7,746 $ 195.00 $ 1,510,470 24" 82,680 $ 150.00 12,402,000 18" 4,340 $ 112.50 488,250 16" 78,336 $ 100.00 7,833,600 14" 519 $ 84.00 43,596 12" 269,183 $ 72.00 19,381,176 10" 18,840 $ 60.00 1,130,400

Subtotal 461,644 $ 42,789,492 Two - 1.0 MGD Elevated Storage Tanks 2,500,000 Total $ 45,289,492 1. Engineering estimates based on current construction costs.

Page 75: First Reading - OrdinanceWatch

Schedule 3 Reserve Capacity Charge Study

24

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

Schedule 3. Water CIP Summary 1 Total 2009 2010 2011 2012 2013 2014

Water Source of Supply $1,800,000 $1,800,000 $ - $ - $ - $ - $ - Treatment 32,937,000 5,322,000 4,900,000 18,400,000 2,215,000 1,100,000 1,000,000 Transmission 15,052,221 500,000 3,266,006 2,541,200 4,936,800 3,058,215 750,000

Total Water $49,789,221 $7,622,000 $8,166,006 $20,941,200 $7,151,800 $4,158,215 $1,750,000 1. Source: CIP provided for rate study purpose. Details can be found in Appendix B.

Page 76: First Reading - OrdinanceWatch

Schedule 4 Reserve Capacity Charge Study

25

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

Schedule 4. Existing Wastewater Transmission Facilities Cost

Size Length Per Foot 1 Total

Interceptor Sewers 72" 74 $ 792.00 $ 58,608 60" 2 6,891 $ 660.00 4,548,060 48" 15,615 $ 528.00 8,244,720 42" 3,138 $ 462.00 1,449,756 36" 7,061 $ 396.00 2,796,156 30" 15,434 $ 330.00 5,093,220 24" 8,138 $ 264.00 2,148,432 21" 3,053 $ 231.00 705,243 20" 3,346 $ 220.00 736,120 18" 12,289 $ 198.00 2,433,222 16" 1,151 $ 176.00 202,576 15" 30,313 $ 176.00 5,335,088

Subtotal 106,503 $ 33,751,201 Force Mains

54" 951 $ 351.00 $ 333,801 48" 19,418 $ 300.00 5,825,400 38" 635 $ 237.50 150,813 36" 77,191 $ 225.00 17,367,975 30" 25,924 $ 187.50 4,860,750 24" 38,923 $ 150.00 5,838,450 20" 25,015 $ 125.00 3,126,875 18" 36,069 $ 108.00 3,895,452 16" 15,033 $ 96.00 1,443,168 14" 1,550 $ 84.00 130,200 12" 43,242 $ 72.00 3,113,424 10" 49,140 $ 60.00 2,948,400

Subtotal 333,091 $ 49,034,708 Master Pump Stations 35,000,000 Total $ 117,785,909 1. Engineering estimates based on current construction costs. 2. Does not include ocean outfall of $12,540,000.

Page 77: First Reading - OrdinanceWatch

Schedule 5 Reserve Capacity Charge Study

26

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

Schedule 5. Wastewater CIP Summary 1

Total 2009 2010 2011 2012 2013 2014

Wastewater Disposal $14,828,000 $745,000 $750,000 $4,200,000 $3,000,000 $3,066,500 $3,066,500 Treatment 32,570,000 3,420,000 11,250,000 4,500,000 13,400,000 - - Common Transmission 29,820,250 278,300 5,250,000 8,736,850 10,115,850 5,365,300 73,950 Dixie Transmission 6,000,000 - - - - 705,000 5,295,000 SR 7 Transmission 7,206,147 - 2,505,204 2,481,570 - 822,341 1,397,032

Total Wastewater $90,424,397 $4,443,300 $19,755,204 $19,918,420 $26,515,850 $9,959,141 $9,832,482 1. Source: CIP provided for rate study purpose. Details can be found in Appendix B.

Page 78: First Reading - OrdinanceWatch

Schedule 6 Reserve Capacity Charge Study

27

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

Schedule 6 Existing and Updated Reserve Capacity Charges

Water Wastewater

Factor Existing Updated Factor Existing Updated

Residential Per Unit Single Family 1.00 $ 624.36 $ 1,130.00 1.00 $ 1,770.12 $ 2,130.00 Duplex 1.00 $ 624.36 $ 1,130.00 1.00 $ 1,770.12 $ 2,130.00 Multi-Family 3 + Units 0.71 $ 446.16 $ 807.48 0.71 $ 1,264.56 $ 1,521.66 Mobile Home 0.29 $ 178.20 $ 322.52 0.29 $ 505.56 $ 608.34 Non Residential Per Meter Size Meter Size 5/8 x 3/4 1.00 $ 624.36 $ 1,130.00 1.00 $ 1,770.12 $ 2,130.00 1.00 2.50 $ 1,560.24 $ 2,825.00 2.50 $ 4,424.64 $ 5,325.00 1.50 5.00 $ 3,121.80 $ 5,650.00 5.00 $ 8,850.60 $ 10,650.00 2.00 8.00 $ 4,994.88 $ 9,040.00 8.00 $ 14,160.96 $ 17,040.00 3.00 16.00 $ 9,989.76 $ 18,080.00 16.00 $ 28,321.92 $ 34,080.00 4.00 25.00 $ 15,609.00 $ 28,250.00 25.00 $ 44,253.00 $ 53,250.00 6.00 50.00 $ 31,218.00 $ 56,500.00 50.00 $ 88,506.00 $ 106,500.00 8.00 80.00 $ 49,948.80 $ 90,400.00 80.00 $ 141,609.60 $ 170,400.00

Page 79: First Reading - OrdinanceWatch

Appendices Reserve Capacity Charge Study

28

P:\Gen\Hollywood, City\136993 - Impact Fee Update\Report\Report - Final.doc 04/27/2009

APPENDICES

Page 80: First Reading - OrdinanceWatch

Year

Original

Escalation

Current

Dept.

Div.

Asset Type

Cat.

Asset Description

Acquired

Cost

Factor

Cost

4010

4011

OSOS

WELL FIELD EXPLORATION AND REHAB- ILITATION RESEARCH

1971

15,000.00

$

3.66

54,926.00

$

4010

4011

OSOS

SURVEY WELL FIELD EXPLORATION AND REHABILITATION RESEARCH

1972

15,000.00

3.30

49,536.79

4010

4011

OSOS

U S GEOLOGICAL SURVEY WELL FIELD EXPLORATION-3RD INSTALLMENT

1972

15,000.00

3.30

49,536.79

4010

4011

OSOS

U.S. GEOLOGICAL SURVEY-WELL FIELD EXPLORATION

1974

15,000.00

3.63

54,496.85

4010

4011

OSOS

EXPLORATION FOR TEST WELL SITES ON N. E. 35TH AV

1970

30,322.65

4.19

127,113.60

4010

4011

OSOS

EXPLORATION FOR TEST WELL SITES ON N. E. 35TH AV - PROFESSIONAL SERVICES

1970

1,548.51

4.19

6,491.41

4010

4011

OSOS

WATER TREATMENT PLANT-MONITORING WELL SYSTEM (WAID-$8680)

1985

9,831.89

1.99

19,561.67

4010

4011

OSOS

FLORIDAN 8" TEST WELL

1990

147,700.00

1.81

267,915.23

4010

4011

OSOS

BISCAYNE AQUIFER WELLS-#28 & #29- CONSULTANT SERVICE-$60,885;ENGINEERDESIGN (UCIP)-$20,778;PERMIT-$2,297

1992

83,959.71

1.73

145,160.87

4010

4011

OSOS

BISCAYNE AQUIFER PRODUCTION WELLS- #28 &#29 (ORANGEBROOK ELEMENTARY SCHOOL)

1992

59,062.00

1.73

102,114.35

4010

4011

OSOS

FLORIDAN PRODUCTION WELL F2- ENGINEERING DESIGN (UCIP)-$35,915; ENGINEERING DESIGN(LAKADAS/YOHALEM)$1,500;PHYSICAL LOGGING-$4,300

1992

41,714.91

1.73

72,122.36

4010

4011

OSOS

FLORIDIAN PRODUCTION WELL (F2)- CONSTRUCTION-$142,534; GEOPHYSICAL LOGGING-$2,500

1993

145,033.77

1.71

247,686.36

4010

4011

OSOS

WTP-BRINE DISPOSAL WELLS & BRINE FIELD STUDY/ENGINEERING SERVICES

1994

195,441.34

1.69

329,775.25

4010

4011

OSOS

RAW WATER MAIN, PUMP & WELLS 28/29 (3121-$7,357.00; 6301-$384,906.34)

1995

392,281.34

1.71

671,611.88

4010

4011

OSOS

FLORIDIA WELLFIELDS/PUMPS (.6203- $1,847,817;.3121-$333,435.88;.6204-$187,981.68;.13121-$90,143.63;91144.3130-$132,447.30;.6204-$2,091.97

1996

2,593,917.46

1.61

4,169,790.15

4010

4011

OSOS

FLORIDIAN AQUIFER PRODUCTION WELL (.6203-$756,744.02;.3117-$76,385.03.3121-$142,901.09;.6204-$80,563.58;.13121-$38,632.99)

1996

1,095,226.71

1.61

1,760,605.58

4010

4011

OSOS

FLORIDA WELL F1 PLANT CONNECTION (.003121 - $9,569.14; .006301 - $15,073.79)

1997

24,642.93

1.57

38,659.19

4010

4011

OSOS

ADDITIONAL ENGINEERING - FLORIDAN WELLFIELDS/PUMP (3121 - $1,905.13; 3130 - $8,677.69; 13121 - $85,318.34)

2000

95,901.16

1.41

135,219.17

4010

4011

OSOS

Wester Biscayne Aquifer - Raw Water Main

2001

2,787,954.15

1.43

3,990,590.77

4010

4011

OSOS

WESTERN BISCAYNE AQUIFER

2001

212,196.05

1.43

303,730.82

4010

4011

OSOS

NEW WESTERN BISCAYNE WELL FIELD (6204 - $114,864.38; 9997 - $315,636.91; 16301 - $3,176,707.21)

2003

3,607,208.50

1.32

4,773,561.43

4010

4011

OSOS

NEW WATER SUPPLY & WELL REHABILITIATION (6204 - $76,576.26; 9997 - $210,424.60; 36301 - $2,308,470.39)

2003

2,595,471.25

1.32

3,434,689.58

4010

4011

OSOS

FLORIDAN WELLS PHASE I

2008

558,675.44

1.00

557,526.53

4010

4011

OSOS

REHAB FLORIDA WELL F4 (6204-532.45; 6301-172,881.59; 9997-16,662.81)

2008

189,662.81

1.00

189,272.77

4010

4012

OSOS

WATER DISTRIBUTION SYSTEM-WELLS- MAINS,AND STANDPIPES

1964

3,324.71

6.19

20,563.47

4010

4012

OSOS

WATER DISTRIBUTION SYSTEM-WELLS- MAINS,AND STANDPIPES

1960

2,307.24

7.03

16,210.04

4010

4012

OSOS

WATER DISTRIBUTION SYSTEM-WELLS- MAINS,AND STANDPIPES

1962

3,445.76

6.64

22,876.37

4010

4012

OSOS

WATER DISTRIBUTION SYSTEM-WELLS- MAINS,AND STANDPIPES

1966

2,248.86

5.68

12,776.35

4010

4012

OSOS

WATER DISTRIBUTION SYSTEM-WELLS- MAINS,AND STANDPIPES

1956

5,944.75

8.37

49,733.16

4010

4012

OSOS

WATER DISTRIBUTION SYSTEM-WELLS- MAINS,AND STANDPIPES

1958

8,600.35

7.63

65,598.35

4010

4012

OSOS

WATER DISTRIBUTION SYSTEM-WELLS- MAINS,AND STANDPIPES

1957

5,166.38

8.00

41,311.06

4010

4012

OSOS

WATER DISTRIBUTION SYSTEM-WELLS- MAINS,AND STANDPIPE-MISC ITEMS PROJECT # 1002-Y-7

1960

60,151.44

7.03

422,607.67

4010

4012

OSOS

WATER DISTRIBUTION SYSTEM-WELLS- MAINS,AND STANDPIPES

1972

3,804.58

3.30

12,564.45

4010

4012

OSOS

WATER DISTRIBUTION-STANDPIPES,WELLSAND MAINS

1974

6,022.41

3.63

21,880.16

4010

4012

OSOS

WATER DISTRIBUTION-STANDPIPES,WELLSAND MAINS

1971

6,614.35

3.66

24,219.98

4010

4012

OSOS

STANDPIPES, WELLS AND MAINS

1973

2,267.45

3.77

8,554.56

4010

4012

OSOS

WATER UTILITY OPERATING FUND-WATER DISTRIBUTION-STANDPIPES,WELLS AND MAINS

1975

1,705.06

3.35

5,715.52

4010

4012

OSOS

WATER DISTRIBUTION-STANDPIPES,WELLSAND MAINS

1976

555.41

3.07

1,706.05

4010

4012

OSOS

WATER DISTRIBUTION-STANDPIPES,WELLSAND MAINS

1978

40.25

2.66

107.25

4010

4012

OSOS

WATER DISTRIBUTION-STANDPIPES,WELLSAND MAINS

1979

430.88

2.45

1,057.67

4010

4012

OSOS

WATER DISTRIBUTION-STANDPIPES,WELLSAND MAINS

1980

1,033.49

2.28

2,359.52

4010

4012

OSOS

WATER DISTRIBUTION-STANDPIPES,WELLSAND MAINS

1981

417.98

2.07

863.80

4010

4012

OSOS

STANDPIPE WELLS/MAIN

1982

1,484.94

1.91

2,832.99

4010

4012

OSOS

RAW WATER SUPPLY WELLS & TRANSMISS ION MAIN TO WATER PLANT

1983

647,078.98

1.99

1,287,751.68

4010

4012

OSOS

STANDPIPES/WELLS/MAINS

1983

1,414.23

1.99

2,814.46

4010

4012

OSOS

STANDPIPES/WELLS/MAINS

1984

227.34

2.00

454.06

4010

4012

OSOS

STANDPIPES/WELLS/MAINS

1985

975.79

1.99

1,941.45

4010

4012

OSOS

FLORIDAN WELL PHASE I (3121 288,153.92; 6301 976,732.11; 9997 173,126.03)

2008

1,438,012.06

1.00

1,435,054.79

4010

4012

OSOS

FLORIDAN WELL VAULT (3121-101,516.72; 6204-636.36; 6301-842,066.89; 9997-204,732.23)

2008

1,148,952.19

1.00

1,146,589.37

Subtotal

18,279,979.46

$

26,159,839.62

$

4010

4011

BWTP

EXPANSION OF WATER SOFTENING AND PRODUCTION FACILITIES: HARDWARE, DOORS, STRUCTURAL & REINFORCING STEEL, ROOFING & METAL WORK,MASONRY

1953

51,393.49

$

9.65

495,878.65

$

4010

4011

BWTP

WATER PLANT: ADDITIONAL RAW WATER FACILITIES CONSISTING OF 2 GROUND STORAGE TANKS, PAINTING, BAFFLE WALLS AND MECHANICAL INSTALLATION&

1961

171,555.45

6.83

1,172,572.39

4010

4011

BWTP

WATER STORAGE TANKS-IMPROVEMENTS- CONSTRUCTION

1974

1,272,859.84

3.63

4,624,456.48

4010

4011

BWTP

WATER TREATMENT PLANT EXPANSION CONSTRUCTION-R-74-112

1976

6,759,299.37

3.07

20,762,531.72

4010

4011

BWTP

WATER TREATMENT PLANT EXPANSION- ENGINEERING SERVICES

1976

674.95

3.07

2,073.24

Appendix A. W

ater and W

astewater Utility System Asset List as of September 30, 2008

A-1

Page 81: First Reading - OrdinanceWatch

Year

Original

Escalation

Current

Dept.

Div.

Asset Type

Cat.

Asset Description

Acquired

Cost

Factor

Cost

Appendix A. W

ater and W

astewater Utility System Asset List as of September 30, 2008

4010

4011

BWTP

WATER TREATMENT PLANT EXPANSION- ENGINEERING DESIGN

1976

355,894.19

3.07

1,093,199.75

4010

4011

BWTP

WATER TREATMENT PLANT EXPANSION- ENGINEERING INSPECTION

1976

168,630.25

3.07

517,981.34

4010

4011

BWTP

WATER TREATMENT PLANT EXPANSION- OTHER TECHNICAL SERVICES

1976

2,115.00

3.07

6,496.64

4010

4011

BWTP

WATER TREATMENT PLANT EXPANSION- UTILITIES RELOCATION

1976

1,140.46

3.07

3,503.15

4010

4011

BWTP

WTP-PHASE I CONVERSION-MEMBRANE FILTERS (20MGD)-ENGINEERING DESIGN

1992

399,741.00

1.73

691,126.14

4010

4011

BWTP

WTP-MEMBRANE PROCESS/EQUIPMENT- PRE-ENGINEERING SERVICES (CONT #1)

1994

1,438,323.23

1.69

2,426,934.90

4010

4011

BWTP

WTP-MEMBRANCE PROCESS/EQUIPMENT- ENGINEERING SERVICES

1993

38,361.84

1.71

65,513.74

4010

4011

BWTP

WTP-BRINE DISPOSAL-CONCENTRATE TRANSMISSION/DISPOSAL LINE- ENGINEERING SERVICES

1994

123,255.00

1.69

207,972.63

4010

4011

BWTP

WTP: 2,000 GALLON TANK 20,000 LB OF HYPERSPERSE AF 200

1996

24,000.00

1.61

38,580.63

4010

4012

BWTP

CONSTRUCTION OF SEVEN ELEVATED WATER TANKS

1960

453,608.48

7.03

3,186,929.87

4010

4011

OWTP

PROFESSIONAL SERVICES FOR PUMP AND PIPING PLANS & SPECS

1970

2,032.80

4.19

8,521.57

4010

4011

OWTP

TRANSMISSION PIPE, FITTINGS, VALVESMETERS AND ENCLOSURES

1971

63,617.72

3.66

232,951.11

4010

4011

OWTP

TRANSMISSION PIPE, FITTINGS, VALVES, METERS AND ENCLOSURES: 4 PUMP ENCLOSURES, ASPHALT, CONCRETE

1971

56,560.00

3.66

207,107.62

4010

4011

OWTP

TRANSMISSION PIPE, FITTINGS, VALVES, METERS AND ENCLOSURES: FLOWMETER AND PIT

1971

4,380.00

3.66

16,038.39

4010

4011

OWTP

TRANSMISSION PIPE, FITTINGS, VALVESMETERS AND ENCLOSURES: MODIFICATIONOF EXISTING FACILITIES

1971

16,040.00

3.66

58,734.20

4010

4011

OWTP

TRANSMISSION PIPE, FITTINGS, VALVES, METERS AND ENCLOSURES: PROFESSIONAL SERVICES

1970

8,643.92

4.19

36,235.61

4010

4011

OWTP

WATER PLANT MODIFICATIONS: CONCRETEEXCAVATION, STRUCTURAL STEEL, CRANEHOIST, ELECTRICAL, CHLORINE SCALE, INSIDE & OUTSIDE CAST IRON PIPE,

1958

335,207.33

7.63

2,556,761.89

4010

4011

OWTP

WATER PLANT: 1600 AMP CIRCUIT BREAKER AND INSTALLATION

1958

3,492.00

7.63

26,634.90

4010

4011

OWTP

1967 WATER TREATMENT EXPANSION PROGRAM-NEW SPIRACTOR PLANT-MODIFY EXISTING PLANT, EXCAVATION AND FILLCONCRETE, EXTEND DRIVEWAY, CORRECT

1970

286,771.50

4.19

1,202,156.10

4010

4011

OWTP

1967 WATER TREATMENT EXPANSION PROGRAM-NEW SPIRACTOR PLANT-OUTSIDEPIPING, INSIDE PIPING, SMALL PIPING

1970

171,960.00

4.19

720,862.30

4010

4011

OWTP

1967 WATER TREATMENT EXPANSION PROGRAM-NEW SPIRACTOR PLANT- MECHANICAL EQUIP & ELECTRICAL WORK

1970

942,914.00

4.19

3,952,728.26

4010

4011

OWTP

1967 WATER TREATMENT EXPANSION PROGRAM-NEW SPIRACTOR PLANT- PAINTING AND MARBLECRETE IN LIEU OFPAINTING1970

64,019.00

4.19

268,369.87

4010

4011

OWTP

1967 WATER TREATMENT EXPANSION PROGRAM-NEW SPIRACTOR PLANT- PROFESSIONAL SERVICES

1970

112,768.54

4.19

472,729.64

4010

4011

OWTP

1967 WATER TREATMENT EXPANSION PROGRAM-NEW SPIRACTOR PLANT-CHECK VALVES

1970

1,882.98

4.19

7,893.52

4010

4011

OWTP

PROFESSIONAL SERVICES FOR BOND ISSUE COSTS $1,895,000

1970

3,255.43

4.19

13,646.88

4010

4011

OWTP

PROFESSIONAL SERVICES FOR BOND ISSUE COSTS

1968

1,000.00

5.01

5,012.29

4010

4011

OWTP

PROFESSIONAL SERVICES FOR $1,895,000 WATER REV CERTIFICATES- NEW SPIRACTOR PLANT

1970

2,447.50

4.19

10,260.01

4010

4011

OWTP

WATER STORAGE TANKS-IMPROVEMENTS- ENGINEERING DESIGN SERVICES, INSPECTION

1974

107,792.52

3.63

391,623.49

4010

4011

OWTP

PASTE LIME SLAKERS FOR ADAPTION TO EXISTING FEEDERS

1971

9,650.11

3.66

35,336.13

4010

4011

OWTP

BLACK PIPES 8'LONG, 8" COUPLINGS & LABOR FOR INSTALLING PIPES

1983

1,234.15

1.99

2,456.08

4010

4011

OWTP

WATER TREATMENT PLANT EXPANSION & MODIFICATION

1983

2,098,486.17

1.99

4,176,196.68

4010

4011

OWTP

WATER PLANT-ADDITIONAL TREATMENT CAPACITY

1983

401,635.84

1.99

799,295.36

4010

4011

OWTP

WTP-ADDITIONAL TREATMENT (SEE FIXEDASSET #31554-$401,635.84 -FY 1982- 1983

1984

30,663.89

2.00

61,244.63

4010

4011

OWTP

WATER TREATMENT PLANT-DIESEL TANK (CONSTRUCTION & ENGINEERING DESIGN-UCIP)

1985

53,594.02

1.99

106,631.42

4010

4011

OWTP

WATER TREATMENT PLANT - PHASE II: CONSTRUCTION -WIDELL-$643281; ENGINEERING DESIGN-PIRNIE & UCIP- $73470;ENGINEERING CONSTRUCTION-

1986

733,311.23

1.92

1,406,342.98

4010

4011

OWTP

WATER TREATMENT PLANT-ENTRANCE GATES & SECURITY SYSTEM

1989

18,042.58

1.84

33,248.59

4010

4011

OWTP

WTP-BRINE DISPOSAL-TREATABILITY STUDY/ENGINEERING SERVICES

1993

21,420.49

1.71

36,581.57

4010

4011

OWTP

WTP-BRINE DISPOSAL PERMITS- ENGINEERING SERVICES

1994

141,190.32

1.69

238,235.54

4010

4011

OWTP

BRINE DISPOSAL - BRINE CONCENTRATE (6301-$859,420.19;6204-$102,944.06;33121-$15,439.15; 63121-$37,889.63;73121-$2,226.07)

1996

1,017,919.10

1.61

1,636,331.57

4010

4011

OWTP

BRINE DISPOSAL-PIPING & CONNECTIONS(.26301-$579,113;.36301-$237,839.49.6204-$102,944.07;.33121-$15,439.15.63121-$37,889.63;.73121-$2,226.07)1996

975,451.41

1.61

1,568,063.65

4010

4011

OWTP

WTP REMOTE CONTROL-TELEMETRY (.006301 - $10,563.74; .004991 - $170.00; .013121 - $10,906.81; .023121 - $5,639.97)

1997

27,280.52

1.57

42,796.97

4010

4011

OWTP

WTP UPGRADE-MEMBRANE EQPMT (.016203-18272972.11;6204-2311446.55;13117-1675458.16;23121-766449.64;36301- 223691.32;46301-78100;63130-8764.98

1997

23,650,380.58

1.57

37,102,104.52

4010

4011

OWTP

WTP IMPROVEMENTS - SECURITY FENCE, SECURITY WALL & IRRIGATION SYSTEM .003121-$61,425;.006304-$356,771.88

1999

418,196.88

1.50

628,937.41

4010

4011

OWTP

WTP UPGRADES - (.003130-$9,497.82; .013117-$662.34; .023121-$22,543.67; .026203-$4,322.51)

1999

37,026.34

1.50

55,684.90

4010

4011

OWTP

NEW ROOF AT WTP

1999

200,297.18

1.50

301,232.26

4010

4011

OWTP

LIME SLAKERS & PUMPS (3121-$42,478.39; 6301-$166,675.72)

1999

209,154.11

1.50

314,552.43

4010

4011

OWTP

SPIRACTORS/PIPES MODIFICATION

1999

48,555.48

1.50

73,023.88

4010

4011

OWTP

DIESEL GENERATORS 4 & 5 (5224 $42,469; 6204 $1,370.82; 9997 $7,535.26)

2002

51,375.08

1.38

70,998.35

4010

4011

OWTP

FENCE - CHLORINE BLDG 2 W/M DOUBLE SWING DOORS

2002

1,997.36

1.38

2,760.27

4010

4011

OWTP

FENCE - EAST & WEST TANK ENCLOSURES

2002

5,492.89

1.38

7,590.96

4010

4011

OWTP

FENCE - AMMONIA TANK ENCLOSURE

2002

3,193.59

1.38

4,413.42

4010

4011

OWTP

FENCE - EAST PERIMETER

2002

3,798.98

1.38

5,250.04

4010

4011

OWTP

REPLACEMENT OF STEEL FILTERS 7-18 (3121 $73,872.80; 6204 $3,491.38; 6301 $448,779.60; 9997 $31,661.06)

2003

557,804.84

1.32

738,165.17

4010

4011

OWTP

ELECTRICAL POWER GENERATORS (3121 - $458,011; 6204 - $98,228.71; 6301 - $3,966,223.70; 75377.3121 - $328,290.44)

2003

5,131,420.84

1.32

6,790,611.80

4010

4011

OWTP

ADDTN'L CAPITAL REPLACEMENT OF STEEL FILTERS 7-18 (3121 - $27,071.83; 6204 - $8,959.80; 9997 - $34,475.19)

2003

70,506.82

1.32

93,304.46

4010

4011

OWTP

REVERSE OSMOSIS & MEMBRANE REPLACEMENT (6204 - $11,519.25; 6301 - $1,132,660; 9997 - $12,000)

2004

1,156,179.25

1.26

1,451,507.90

A-2

Page 82: First Reading - OrdinanceWatch

Year

Original

Escalation

Current

Dept.

Div.

Asset Type

Cat.

Asset Description

Acquired

Cost

Factor

Cost

Appendix A. W

ater and W

astewater Utility System Asset List as of September 30, 2008

4010

4011

OWTP

STEEL FILTERS REHABILITATION (6204 - $2,595.24; 6301 - $456,796; 9997 - $43,161.38)

2003

502,552.62

1.32

665,047.72

4010

4011

OWTP

REVERSE OSMOSIS & MEMBRANE REPLACEMENT (ADDTNL)

2004

143,910.72

1.26

180,670.56

4010

4011

OWTP

SURF RD UTILITY IMPROV- 3,266 L.F. OF NEW WATER LINES, 45 NEW WATER SVCS., 20 NEW FIRE HYDRANTS

2005

759,878.96

1.20

910,833.97

4010

4011

OWTP

EAST-WEST SIDE WATER IMPROV- 2,740 L.F. OF NEW WATER LINES, 35 NEW WATER SVCS & 12 NEW FIRE HYDRANTS

2005

406,000.00

1.20

486,654.60

4010

4011

OWTP

Filter Gallery Rehab(3121-172,245.22;6204-18,881.55;6301-1,870,262.83;75394-3121-127,131.90;6204-3,449.48;9997-22,544.99;19997-137,011.87)

2005

2,463,265.03

1.20

2,952,609.02

4010

4011

OWTP

ON-SITE GENERATION SODIUM HYPOCHLORITE (6204-$18,611.46; 6301-$2,668,613.49;9997-$69,662.82;75400.9997-$299,817.15)

2005

3,056,704.92

1.20

3,663,939.70

4010

4011

OWTP

MS PLANT DEGASIFIER BYPASS PIPING (6204-$620.27; 6301-$103,930.75; 9997-$14,475.52)

2005

119,026.54

1.20

142,671.95

4010

4011

OWTP

TRANE 12.5 TON CONDENSING UNIT

2007

7,640.00

1.10

8,409.66

4010

4011

OWTP

TRANE 3 TON CONDENSING UNIT - GENERATOR BLDG

2007

2,250.00

1.10

2,476.67

4010

4011

OWTP

DRIER REPLACEMENT AT WTP (6204 $5393.02; 6301 $250,355;9997 $96,156.69)

2006

351,904.71

1.18

416,329.66

4010

4011

OWTP

RHEEM 5 TON 13 SEER A/C UNIT

2008

3,436.00

1.00

3,428.93

4010

4011

OWTP

A/C FOR MSRO SWITCHGEAR (3121-143,401.87; 6204-3,370.41; 6301-621,238.60; 9997-104,465.73)

2007

872,476.61

1.10

960,370.08

4010

4011

OWTP

WTP-OPERATIONS CENTER

1998

116,543.00

1.53

178,847.78

4010

4011

OWTP

WTP REHABILITATION

1998

1,086,602.00

1.53

1,667,507.76

4010

4011

OWTP

FLOW CONTROL VALVES REPLACEMENT AT THE WTP

1998

281,622.00

1.53

432,179.28

4010

4011

OWTP

SPIRACTOR PIPING MODIFICATIONS

1998

779,184.00

1.53

1,195,741.74

4010

4011

OWTP

WATER FLUORIDATION SYSTEM (.004991 - $356.40; .006301 - $40,262.95)

1998

40,619.35

1.53

62,334.77

4010

4011

OWTP

INTERIM UPGRADE (.3130-$8,999.97; .4991-$3,245.14;.6302-$336,902.68; .13121-$16,980.63;.33121-$67,359.08;.43121-$60,675.73)

1998

494,163.23

1.53

758,346.68

4010

4011

OWTP

INSTALL WATER METERS & HYDRANTS (.3121-$14,053.24; .4991-$384.50; .6301-$47,064.80)

1998

61,502.54

1.53

94,382.27

4010

4011

OWTP

WTP REHABILITATION - PERMITS

1998

14,049.75

1.53

21,560.85

4010

4011

OWTP

SPIRACTOR PIPING MODIFICATIONS

1998

16,965.41

1.53

26,035.25

4010

4011

OWTP

FLOW CONTROL VALVES (.003121 - $3,875.00; .006302 - $4,397.52)

1998

8,272.52

1.53

12,695.07

4010

4011

OWTP

WTP OPERATIONS CENTER (.003121 - $10,167.71; .006302 - $6,803.36)

1998

16,971.07

1.53

26,043.93

4010

4011

OWTP

MEMBRANE EQUIPMENT (.013121- $7,842.82; .013130-$5,226.04; .033121 - $3,216.00)

1998

16,284.86

1.53

24,990.87

Subtotal

62,142,723.68

$

118,161,026.65

$

4010

4011

LWL

SURFACE TANK SITE FOR WATER STORAGELOTS 1 & 2 OF HOLLYWOOD GOLF ESTATES SECTION ONE

1963

10,000.00

$

6.43

64,253.05

$

4010

4011

LWL

WESTERN WATER PLANT

1966

80,000.00

5.68

454,500.49

4010

4012

LWL

LAND PURCHASE FOR RIGHT OF WAY AND CONSTRUCTION OF WATER TANK-3LOTS BLOCK 11 HOLLYWOOD CENTRAL BEACH & OTHER LAND DESCRIBED IN ORDINANCES

1970

9,894.33

4.19

41,477.38

4010

4012

LWL

LAND ACQUISITION-TANK SITE

1958

3,141.21

7.63

23,959.28

4010

4012

LWL

LAND ACQUISITION-TANK SITE-APPROVEDBY COMMISSION MARCH 25,1958

1958

8,000.00

7.63

61,019.24

Subtotal

111,035.54

$

645,209.43

$

4010

4011

EWGP

MILLER WELDER-ELECTRIC START -W-30

1979

1,675.00

$

2.45

4,111.60

$

4010

4011

EWGP

PORTABLE AIR COMPRESSOR WITH ATTACHMENTS-EQUIPMENT PURCHASE

1979

5,808.89

2.45

14,258.99

4010

4011

EWGP

AUXILIARY POWER GENERATOR-ALLIS CHAMBERS (#5 GENERATOR)

1980

5,123.96

2.28

11,698.31

4010

4011

EWGP

CATERPILLAR D398 DIESEL ELECTRIC GENERATOR, 500 KW, 480 VOLT, 1200 RPM

1965

37,970.00

5.96

226,380.97

4010

4011

EWGP

INSTALLATION OF DIESEL GENERATOR AND RELATED ELECTRICAL EQUIPMENT, INCLUDES 4000 GAL FUEL TANK AND 1/4 HP VIKING PUMP MOTOR

1966

41,488.91

5.68

235,709.12

4010

4011

EWGP

PROFESSIONAL SERVICES-GENERATOR SPECS (SEE FA#30812)

1966

4,273.49

5.68

24,278.79

4010

4011

EWGP

INGERSOL RAND AIR COOLED DRY VACUUM

1979

1,324.00

2.45

3,250.00

4010

4011

EWGP

WENCO TORQUE-FLOW PUMP

1979

2,567.00

2.45

6,301.17

4010

4011

EWGP

HYDRAULIC PRESS

1979

1,195.00

2.45

2,933.35

4010

4011

EWGP

GAS ENGINE WELDING MACHINE

1980

1,832.00

2.28

4,182.57

4010

4011

EWGP

OPTICAL MICROSCOPE & ELECTRIC LAMP

1980

2,195.50

2.28

5,012.46

4010

4011

EWGP

AUTOCLAVE STERILIZER

1981

2,230.50

2.07

4,609.56

4010

4011

EWGP

WATER DISTRIBUTION SYSTEM EXPANSION30" BUILDER VENTURI TUBE(IN GROUND)

1953

3,000.00

9.65

28,946.00

4010

4011

EWGP

PORTABLE PNEUMATIC CALIBRATOR (PIPE GALLERY)

1983

1,597.49

1.99

3,179.16

4010

4011

EWGP

POWER DRIVE VALVE OPERATOR WRENCH

1983

2,740.00

1.99

5,452.87

4010

4011

EWGP

RATIO TURBIDIMETER

1986

1,299.11

1.92

2,491.43

4010

4011

EWGP

WTP-FUEL TANK OVERFLOW PREVENTION SYSTEM

1986

8,167.05

1.92

15,662.75

4010

4011

EWGP

M41 SILENCERS FOR 500KW GENERATOR

1988

871.00

1.86

1,622.58

4010

4011

EWGP

M41 SILENCER FOR 500KW GENERATOR

1988

871.00

1.86

1,622.58

4010

4011

EWGP

M41 SILENCER FOR 500KW GENERATOR

1988

871.00

1.86

1,622.58

4010

4011

EWGP

SQUAREROOT FLOW TRANSMITTER W/ 3-VALVE MANIFOLD (PLANT)

1990

1,358.75

1.81

2,464.66

4010

4011

EWGP

SQUAREROOT FLOW TRANSMITTER W/3-VALVE MANIFOLD (NORTH)

1990

1,358.75

1.81

2,464.66

4010

4011

EWGP

SQUARE ROOT FLOW TRANSMITTER

1990

1,186.70

1.81

2,152.57

A-3

Page 83: First Reading - OrdinanceWatch

Year

Original

Escalation

Current

Dept.

Div.

Asset Type

Cat.

Asset Description

Acquired

Cost

Factor

Cost

Appendix A. W

ater and W

astewater Utility System Asset List as of September 30, 2008

4010

4011

EWGP

HONDA PRESSURE WASHER W/50 FT HOSE

1990

1,409.99

1.81

2,557.60

4010

4011

EWGP

FLUORIDE DIGITAL METER

1992

1,183.74

1.73

2,046.61

4010

4011

EWGP

CH&E 3" DIAPHRAGM TRASH PUMP

1992

1,200.00

1.73

2,074.72

4010

4011

EWGP

HONDA 3" TRASH/WATER PUMP W/HOSE

1992

1,154.26

1.73

1,995.64

4010

4011

EWGP

VICON SECURITY CHIP CAMERA W/ZOOM LENS, CONTROLLER, HOUSING & WALL MOUNTS

1992

4,223.00

1.73

7,301.29

4010

4011

EWGP

VICON SECURITY CHIP CAMERA W/ZOOM LENS, CONTROLLER, HOUSING & WALL MOUNTS

1992

4,223.00

1.73

7,301.29

4010

4011

EWGP

COMFORTMAKER 5-TON AC UNIT

1993

875.00

1.71

1,494.31

4010

4011

EWGP

SOLARALL 1 1/2" ROLL FORMED SHUTTERALUMINUM SLAT W/ FOAM CORE (88"X98")

1993

1,921.00

1.71

3,280.65

4010

4011

EWGP

RHEEM 11.25 SEER, 3 TON SPLIT TYPE A/C

1993

2,253.00

1.71

3,847.64

4010

4011

EWGP

GAS DETECTOR W/BATTERY CHARGER PACK

1994

2,022.50

1.69

3,412.64

4010

4011

EWGP

GAS DETECTOR W/BATTERY CHARGER PACKPACK

1994

2,022.50

1.69

3,412.64

4010

4011

EWGP

FIREKING INSULATED FILE CABINET 4 DRAWER LEGAL BLACK

1995

952.00

1.71

1,629.89

4010

4011

EWGP

TURBIDITY ANALYZER W/SENSOR

1996

1,895.00

1.61

3,046.26

4010

4011

EWGP

INGERSOLL VACUUM PUMP W/115V MOTOR,STARTER & 30 GALLON TANK

1997

2,995.00

1.57

4,698.48

4010

4011

EWGP

NETCOM3 DELUXE 25" WORKSTATION

1997

1,578.00

1.57

2,475.53

4010

4011

EWGP

PH METER

1997

1,040.00

1.57

1,631.53

4010

4011

EWGP

TURBIDITY ANALYZER W/SENSOR

1998

1,916.43

1.53

2,940.97

4010

4011

EWGP

TURBIDITY ANALYZER W/SENSOR

1998

1,916.43

1.53

2,940.97

4010

4011

EWGP

GREAT LAKES TURBIDITY ANALYZER

1998

961.44

1.53

1,475.43

4010

4011

EWGP

GREAT LAKES TURBIDITY ANALYZER

1998

961.44

1.53

1,475.43

4010

4011

EWGP

GREAT LAKES TURBIDITY ANALYZER

1998

961.44

1.53

1,475.43

4010

4011

EWGP

GREAT LAKES TURBIDITY SENSORS

1998

1,062.38

1.53

1,630.34

4010

4011

EWGP

GREAT LAKES TURBIDITY SENSORS

1998

1,062.39

1.53

1,630.35

4010

4011

EWGP

4 X 3 WEMCO SLURRY PUMP

1998

8,926.00

1.53

13,697.91

4010

4011

EWGP

SERIES 'B' VERTICAL PUMP CPVC 4' 1 1/2" 2HP

1998

3,611.19

1.53

5,541.76

4010

4011

EWGP

2-WIRE PH TRANSMITTER & PROBE (RO PLANT)

1999

1,413.82

1.50

2,126.28

4010

4011

EWGP

2-WIRE ORP TRANSMITTER & SENSOR (RO PLANT)

1999

1,464.38

1.50

2,202.32

4010

4011

EWGP

GREAT LAKES TURBIDITY METER

1999

761.96

1.50

1,145.93

4010

4011

EWGP

GREAT LAKES TURBIDITY SENSOR

1999

857.95

1.50

1,290.29

4010

4011

EWGP

GREAT LAKES TURBIDITY SENSOR

1999

857.95

1.50

1,290.29

4010

4011

EWGP

GREAT LAKES TURBIDITY METER

1999

761.42

1.50

1,145.12

4010

4011

EWGP

GREAT LAKES TURBIDITY METER

1999

761.42

1.50

1,145.12

4010

4011

EWGP

GREAT LAKES TURBIDITY SENSOR

1999

857.37

1.50

1,289.42

4010

4011

EWGP

GREAT LAKES TURBIDITY SENSOR

1999

857.37

1.50

1,289.42

4010

4011

EWGP

CUNO MODEL DC FILTER CATRIDGE HOUS-ING 304 L SS, 105 GPM MAX. FLOW, NITRILE COVER GASKET, HOLDS 5 40" DOUBLE OPEN-ENDED CATRIDGES

1999

955.30

1.50

1,436.70

4010

4011

EWGP

TRANE 5 TON A/C

1999

4,044.00

1.50

6,081.88

4010

4011

EWGP

DUST BLOWER (GARAGE SILOS 5 & 6)

1999

1,770.00

1.50

2,661.95

4010

4011

EWGP

DUST BLOWER (GARAGE SILOS 5 & 6)

1999

1,770.00

1.50

2,661.95

4010

4011

EWGP

LOOP POWER PROBE

2000

858.50

1.41

1,210.47

4010

4011

EWGP

LOOP POWER PROBE

2000

858.50

1.41

1,210.47

4010

4011

EWGP

MILTON ROY PUMP 6GPH PVC CONSTRUCTION W/4 FUNCTION VALVE

2000

1,140.00

1.41

1,607.38

4010

4011

EWGP

MILTON ROY PUMP 6GPH PVC CONSTRUCTION W/4 VALVE

2000

1,140.00

1.41

1,607.38

4010

4011

EWGP

AMMONIA GAS MONITOR

2001

2,703.39

1.43

3,869.55

4010

4011

EWGP

MOYNO PUMP

2001

1,678.00

1.43

2,401.84

4010

4011

EWGP

MOYNO PUMP

2001

1,678.00

1.43

2,401.84

4010

4011

EWGP

CAPITAL CONTROLS DIFFERENTIAL PRESSURE REGULATOR 2000PPD

2001

1,848.23

1.43

2,645.50

4010

4011

EWGP

RIGID 300 - ELECTRIC PIPE CUTTER

2002

3,000.00

1.38

4,145.88

4010

4011

EWGP

ECONOMY ELECTRIC MANLIFT

2002

2,500.00

1.38

3,454.90

4010

4011

EWGP

PANASONIC WEATHERPROOF CAMERA

2002

1,978.00

1.38

2,733.52

4010

4011

EWGP

PANASONIC WEATHERPROOF CAMERA

2002

1,978.00

1.38

2,733.52

4010

4011

EWGP

PANASONIC WEATHERPROOF CAMERA

2002

1,978.00

1.38

2,733.52

4010

4011

EWGP

PANASONIC WEATHERPROOF CAMERA

2002

1,978.00

1.38

2,733.52

4010

4011

EWGP

PANASONIC EXPANSION UNIT W/BUILTIN DVD RAM DRIVE

2002

3,100.00

1.38

4,284.08

4010

4011

EWGP

PANASONIC MATRIX SWITCHER W/16 CAMERA INPUTS

2002

777.00

1.38

1,073.78

4010

4011

EWGP

HONDA EM 5000 500W GENERATOR (R. BOYCE)

2003

2,045.00

1.32

2,706.23

4010

4011

EWGP

CISCO 2620XM ETHERNET ROUTER

2003

2,240.00

1.32

2,964.28

A-4

Page 84: First Reading - OrdinanceWatch

Year

Original

Escalation

Current

Dept.

Div.

Asset Type

Cat.

Asset Description

Acquired

Cost

Factor

Cost

Appendix A. W

ater and W

astewater Utility System Asset List as of September 30, 2008

4010

4011

EWGP

UPS - MGE 1500 VA MS/RO SWITCHGEAR @ WTP (J. MUNRO)

2003

2,450.00

1.32

3,242.18

4010

4011

EWGP

MICRO 2000 RESIDUAL ANALYZER

2003

7,708.28

1.32

10,200.67

4010

4011

EWGP

PANASONIC DIGITAL DISK RECORDER

2003

4,711.01

1.32

6,234.27

4010

4011

EWGP

PANASONIC WEATHERPROOF CAMERA

2003

2,367.50

1.32

3,133.01

4010

4011

EWGP

PANASONIC WEATHERPROOF CAMERA

2003

2,367.50

1.32

3,133.01

4010

4011

EWGP

PANASONIC WEATHERPROOF CAMERA

2003

2,367.50

1.32

3,133.01

4010

4011

EWGP

INSTALLATION OF SECURITY MOTION SENSORS

2003

2,864.00

1.32

3,790.04

4010

4011

EWGP

REMOTE VIDEO

2004

7,850.00

1.26

9,855.16

4010

4011

EWGP

DIGITAL KEYPAD

2004

2,275.00

1.26

2,856.11

4010

4011

EWGP

SIEMENS 120 VAC POWER SUPPLY (WTP PLC FOR SCADA SYSTEM)

2004

1,446.00

1.26

1,815.36

4010

4011

EWGP

NLD1T, NETLINK W/1 INCOM PORT, MOD BUS & ETHERNET 10BASE T (WTP GEN. CONTROL RM)

2004

4,200.00

1.26

5,272.83

4010

4011

EWGP

CTI ETHERNET MODULE

2004

1,954.00

1.26

2,453.12

4010

4011

EWGP

CTI ETHERNET MODULE

2004

1,954.00

1.26

2,453.12

4010

4011

EWGP

LIGHTNIN MIXER (J. FEASTER)

2005

1,546.51

1.20

1,853.73

4010

4011

EWGP

LIGHTNIN MIXER (J. FEASTER)

2005

1,546.51

1.20

1,853.73

4010

4011

EWGP

LIGHTIN MIXER (J. FEASTER)

2005

831.04

1.20

996.13

4010

4011

EWGP

LIGHTNIN MIXER (J. FEASTER)

2005

831.05

1.20

996.14

4010

4011

EWGP

REMOTE VIDEO SYSTEM AT EAST ELEVATED STORAGE TANK

2004

6,375.00

1.26

8,003.40

4010

4011

EWGP

7500 GALLON POLETHYLENE HDPE CONE BOTTOM STORAGE TANK 141"D X 148"H W/16" MANWAY (NEW FLUORIDE TANK)

2005

7,410.00

1.20

8,882.05

4010

4011

EWGP

INSTALLATION OF SECURITY CARD SYSTEM

2005

9,475.00

1.20

11,357.27

4010

4011

EWGP

INSTALLATION OF SECURITY SYSTEM & CARD READER SYSTEM

2005

9,625.00

1.20

11,537.07

4010

4011

EWGP

HOSHISAKI ICE MACHINE W/BIN

2006

3,244.00

1.18

3,837.90

4010

4011

EWGP

AMMONIA/MONOCHLORAMINE ANALYZER

2006

10,367.50

1.18

12,265.53

4010

4011

EWGP

400 AMP GENERATOR PLUG

2006

2,225.84

1.18

2,633.34

4010

4011

EWGP

INFOCUS LP600 2000 PROJECTOR

2006

1,398.00

1.18

1,653.94

4010

4011

EWGP

400 AMP GENERATOR PLUG

2006

2,225.84

1.18

2,633.34

4010

4011

EWGP

TRANE SPLIT A/C SYSTEM - PIPE GALLERY 1ST FL

2006

5,550.00

1.18

6,566.07

4010

4011

EWGP

YORK SPLIT A/C SYSTEM 12000 BTU - NEW BREAK RM

2006

2,785.00

1.18

3,294.86

4010

4011

EWGP

HOSHIZAKI ICE MAKER W/BIN

2006

3,150.90

1.18

3,727.75

4010

4011

EWGP

20' STORAGE SHIPPING CONTAINER

2006

2,540.00

1.18

3,005.01

4010

4011

EWGP

OVEN ISOTEMP GRAVITY 2.5 CU/FT

2007

1,424.49

1.10

1,567.99

4010

4011

EWGP

TEST SKID MODIFICATION-HYDRANAUTICS TEST UNIT-SS HIGH PRESSURE FEED PUMP TRAIN, CHEM METERING PUMPS;PERMEATE TRAIN & CONCENTRATE TRAIN

2008

24,995.00

1.00

24,943.60

4010

4011

EWGP

HP LASERJET 5M PRINTER

1997

1,619.24

1.57

2,540.22

4010

4011

EWGP

TOSHIBA DESK STATION PA12380-T2C

1998

800.00

1.53

1,227.69

4010

4011

EWGP

HP DESKJET 2500CM PRINTER

2000

1,197.00

1.41

1,687.75

4010

4012

BWGP

TO FURNISH ALL LABOR,MATERIALS AND EQUIPMENT TO CONSTRUCT A WATER DEPTBUILDING AT WILSON STREET AND 21ST AVENUE

1955

9,138.92

8.77

80,162.18

4010

4012

BWGP

SHOWER FACILITY ADDITION TO WATER WAREHOUSE INCLUDING: FOOTING FLOOR SLAB,WALLS,ELECTRIC,PLUMBING,STUCCOROOFING,MILLWORK,ETC-WATER BUILDING

1959

8,084.45

7.26

58,723.33

4010

4012

BWGP

WATER SYSTEMS SHARE IN CONSTRUCTIONCOST OF NEW CITY HALL

1969

200,000.00

4.56

912,403.47

4010

4012

EWGP

3" WATER METER FIELD TEST UNIT (#8132)

1983

1,980.00

1.99

3,940.40

Subtotal

598,824.87

$

1,997,574.17

$

4000

1202

EGP

COUNTER TOP

1995

1,194.00

$

1.71

2,044.21

$

4000

1202

EGP

MODULAR PARTITION

1995

2,049.91

1.71

3,509.58

4000

1202

EGP

MODULAR PARTITION

1995

2,049.91

1.71

3,509.58

4000

1202

EGP

MODUALR PARTITION - ALVA

1995

2,049.92

1.71

3,509.60

4000

1202

EGP

MODULAR PARTITION

1995

2,049.92

1.71

3,509.60

4000

1202

EGP

MODULAR PARTITION

1995

2,049.92

1.71

3,509.60

4000

1202

EGP

MODULAR PARTITION

1995

2,049.92

1.71

3,509.60

4000

1202

EGP

MULTIPLE UNITS OF MODULAR FURNITURE(ALSO PO #022277)

1996

9,173.84

1.61

14,747.19

4000

1202

EGP

SINGLE PEDESTAL CREDENZA W/72" CLOSED HUTCH, 49" BLACK TASK LIGHT,TACKBOARD & CENTER DRAWER

1997

1,090.81

1.57

1,711.23

4000

1202

EGP

SINGLE PEDESTAL CREDENZA W/72" CLOSED HUTCH, 49" BLACK TASK LIGHT,TACKBOARD & CENTER DRAWER

1997

1,090.81

1.57

1,711.23

4000

1202

EGP

MODULAR FURNITURE - JOANNE

1997

11,183.65

1.57

17,544.62

4000

1202

EGP

MODULAR WORKSTATION (6451-1,198.80;5215-829.09) - JIM J.

1997

2,027.89

1.57

3,181.30

4000

1202

EGP

MODULAR FURNITURE - GABE

2000

3,154.93

1.41

4,448.40

4000

1202

EGP

MODULAR UNIT - MICHAEL

2002

1,128.37

1.38

1,559.36

4000

1202

EGP

HP LASERJET 5P PRINTER

1996

1,000.91

1.61

1,608.99

A-5

Page 85: First Reading - OrdinanceWatch

Year

Original

Escalation

Current

Dept.

Div.

Asset Type

Cat.

Asset Description

Acquired

Cost

Factor

Cost

Appendix A. W

ater and W

astewater Utility System Asset List as of September 30, 2008

4000

1202

EGP

HP LASERJET 4100TN PRINTER (DMA)

2002

1,617.37

1.38

2,235.14

4000

1202

EGP

HP LASERJET 4200N PRINTER - CASHIER

2003

1,397.37

1.32

1,849.19

4000

1202

EGP

HP LASERJET 4200N PRINTER (DAN KIRIAZIS)

2003

1,349.00

1.32

1,785.18

4000

1202

EGP

LEXMARK PRINTER (LEASE# 2825)

2005

1,628.50

1.20

1,952.01

4000

1202

EGP

LEXMARK PRINTER (LEASE# 2826)

2005

1,628.50

1.20

1,952.01

4000

1202

EGP

LEXMARK 2000 SHEET DRAWER

2005

765.17

1.20

917.18

4000

1202

EGP

LEXMARK 2000 SHEET DRAWER

2005

765.17

1.20

917.18

4000

1202

OGP

PURCHASE & INSTALLATION OF CABINETRY & COUNTER - DMA LUNCHROOM

2000

2,736.00

1.41

3,857.72

4000

4001

EGP

CAMCORDER, CCD, HQ W/CASE (VIN 8118)

1989

900.00

1.84

1,658.51

4000

4001

EGP

ISCO PORTABLE PERISTALTIC PUMP

1996

1,420.00

1.61

2,282.69

4000

4001

EGP

PORTABLE PH/MV/TEMP METER

1997

1,535.00

1.57

2,408.07

4000

4001

EGP

ISCO PORTABLE SAMPLER COMPACT

1997

2,695.00

1.57

4,227.85

4000

4001

EGP

ISCO PORTABLE SAMPLER COMPACT

1997

2,695.00

1.57

4,227.85

4000

4001

EGP

ISCO PORTABLE SAMPLER FULL SIZE

1997

2,695.00

1.57

4,227.85

4000

4001

EGP

ISCO PORTABLE PERISTALTIC PUMP

1997

950.00

1.57

1,490.34

4000

4001

EGP

LEFT PEDESTAL CREDENZA W/72" RACETRACK TOP

1998

963.54

1.53

1,478.66

4000

4001

EGP

EDL SYSTEM 2 POWER SUPPLY

1998

2,500.00

1.53

3,836.52

4000

4001

EGP

CHILLER RECIRCULATOR

1998

2,920.20

1.53

4,481.36

4000

4001

EGP

17" DELL COLOR MONITOR

1998

865.00

1.53

1,327.44

4000

4001

EGP

MODULAR FURNITURE

1998

1,403.75

1.53

2,154.21

4000

4001

EGP

ISE/PH METER W/ELECTRODE

1999

939.00

1.50

1,412.19

4000

4001

EGP

MAGELLAN PROMARK X-CM GPS RECEIVER

1999

2,574.98

1.50

3,872.58

4000

4001

EGP

MAGELLAN PROMARK X-CM GPS RECEIVER

1999

2,574.98

1.50

3,872.58

4000

4001

EGP

ISCO PORTABLE STORMWATER SAMPLER & ENCLOSURE

1999

5,073.36

1.50

7,629.96

4000

4001

EGP

ISCO PORTABLE STORMWATER SAMPLER & ENCLOSURE

1999

5,073.36

1.50

7,629.96

4000

4001

EGP

ISCO PORTABLE STORMWATER SAMPLER & ENCLOSURE

1999

5,073.36

1.50

7,629.96

4000

4001

EGP

ISCO PORTABLE STORMWATER SAMPLER & ENCLOSURE

1999

5,073.36

1.50

7,629.96

4000

4001

EGP

ISCO PORTABLE STORMWATER SAMPLER & ENCLOSURE

1999

5,073.36

1.50

7,629.96

4000

4001

EGP

FRUNDFOS REDI-FLO2 PUMP W/VARIABLE FREQUENCY DRIVE CONVERTER & HONDA GENERATOR 3500 (PRETREATMENT)

1999

5,947.54

1.50

8,944.66

4000

4001

EGP

CREDENZA W/HUTCH & TABLE

1999

998.42

1.50

1,501.55

4000

4001

EGP

BARNSTEAD, NANOPURE DIAMOND UV (LAB)

2001

3,363.99

1.43

4,815.11

4000

4001

EGP

BALANCE ANAYLTICAL EXPLORER

2001

1,904.77

1.43

2,726.43

4000

4001

EGP

LPE-50 EDACS 800MHZ PORTABLE SCAN RADIO

2001

1,259.50

1.43

1,802.81

4000

4001

EGP

TORPEDO 2500 SCOOTER

2002

946.56

1.38

1,308.11

4000

4001

EGP

TORPEDO 2500 SCOOTER

2002

946.56

1.38

1,308.11

4000

4001

EGP

SONY COURT CONFERENCE TRANSCRIBER/RECORDER SYSTEM (K. LURIA)

2004

810.00

1.26

1,016.90

4000

4001

EGP

MOTOROLA RADIO 48 CHANNEL (D. HULTGREN)

2006

1,096.50

1.18

1,297.24

4000

4001

EGP

MOTOROLA RADIO 48 CHANNEL (R. PATEL)

2006

1,096.50

1.18

1,297.24

4000

4001

EGP

AUTOCLAVE STME 208/240V 60HZ 150

2007

7,335.76

1.10

8,074.77

4000

4001

EGP

HP LASERJET 4+ PRINTER (5215 - $138.80)

1996

1,303.80

1.61

2,095.89

4000

4001

EGP

HP LASERJET 4M+, 4MB RAM, CABLE & SURGE SUPPRESS

1995

2,120.73

1.71

3,630.83

4000

4001

EGP

DSD 486DX2/66 PC W/16MB RAM, 540MB IDE HARD DRIVE, DUAL FLOPPY DRIVES (1.44MB 3.5"), TAPE BACKUP & KEYBOARD

1995

1,452.50

1.71

2,486.78

4000

4001

EGP

HP DESKJET 1600C INKJET PRINTER (5215 - $274.61)

1998

1,509.77

1.53

2,316.90

4000

4001

EGP

HP 4000TN PRINTER

1999

1,345.79

1.50

2,023.97

4000

4001

EGP

SONY MAVICA FD97 DIGITAL CAMERA (GLEN SUPERVILLE)

2001

816.73

1.43

1,169.04

4000

4001

EGP

FUJITSU SCANNER - (GAIL KASHA - LEASE# 2328)

2003

1,444.00

1.32

1,910.90

4000

4001

EGP

TOSHIBA LAPTOP PC (DONAVIN HULTGREN) -LEASE#2761

2004

1,299.81

1.26

1,631.83

4000

4001

EGP

TOSHIBA LAPTOP PC (DONAVIN HULTGREN) - LEASE#2762

2004

1,299.82

1.26

1,631.84

4000

4001

EGP

TOSHIBA TECRA LAPTOP PC (J. WASSERMAN)

2006

1,131.99

1.18

1,339.23

4000

4001

EGP

IBM THINKPAD LAPTOP T60

2006

1,895.00

1.18

2,241.93

4000

4001

EGP

MOTOROLA RADIO - STEVE JOSEPH

2008

1,000.00

1.00

997.94

4000

4001

OGP

INTEREST CAPITALIZED

1960

8,423.16

7.03

59,178.83

4000

4001

OGP

INTEREST CAPITALIZED

1961

20,636.77

6.83

141,051.23

4000

4001

OGP

INTEREST CAPITALIZED

1962

1,262.89

6.64

8,384.32

4000

4001

OGP

INTEREST CAPITALIZED

1963

17,214.32

6.43

110,607.26

4000

4001

OGP

INTEREST CAPITALIZED

1964

819.22

6.19

5,066.91

A-6

Page 86: First Reading - OrdinanceWatch

Year

Original

Escalation

Current

Dept.

Div.

Asset Type

Cat.

Asset Description

Acquired

Cost

Factor

Cost

Appendix A. W

ater and W

astewater Utility System Asset List as of September 30, 2008

4000

4001

OGP

INTEREST CAPITALIZED

1965

39,045.97

5.96

232,796.01

4000

4001

OGP

INTEREST CAPITALIZED

1966

36,332.33

5.68

206,413.27

4000

4001

OGP

INTEREST CAPITALIZED

1967

29,418.77

5.39

158,576.48

4000

4001

OGP

INTEREST CAPITALIZED

1968

25,033.00

5.01

125,472.77

4000

4001

OGP

INTEREST CAPITALIZED

1969

49,539.40

4.56

225,999.60

4000

4001

OGP

INTEREST CAPITALIZED

1964

23,407.44

6.19

144,776.02

4000

4001

OGP

WATER UTILITY ADMINISTRATION COMPOUND-SECURITY LIGHTING

1979

628.46

2.45

1,542.67

4000

4001

OGP

BARD A/C UNIT (5 TON) W/HEAT

1989

3,340.00

1.84

6,154.90

4000

4001

OGP

LAN COMPUTER SYSTEM

1997

150,011.00

1.57

235,333.37

4000

4004

EGP

STEEL ART DRAFTING FILE BEIGE

2002

750.00

1.38

1,036.47

4000

4004

EGP

FILE CABINET FIREPROOF LEGAL 4 DRAWERS SAND

1993

835.00

1.71

1,426.00

4000

4004

EGP

STEEL ART DRAFTING FILE GRAY

2002

750.00

1.38

1,036.47

4000

4004

EGP

STEEL ART DRAFTING FILE - BEIGE

2004

775.00

1.26

972.96

4000

4004

EGP

HP DESIGNJET 650C PRINTER W/ROLL FEED, AUTO-CUT, MEMORY UPGRADE (2 X32MB) & JET DIRECT CARD

1995

9,577.00

1.71

16,396.46

4000

4004

EGP

HP LASERJET 4M+ PRINTER (VACANT - BLDG A 2ND FL)

2004

1,000.00

1.26

1,255.44

4000

4004

EGP

STEEL ART DRAFTING FLAT FILE

1997

775.00

1.57

1,215.80

4000

4004

EGP

STEEL ART DRAFTING FLAT FILE

1997

775.00

1.57

1,215.80

4000

4004

EGP

STEEL ART DRAFTING FLAT FILE

1997

775.00

1.57

1,215.80

4000

4004

EGP

STEEL ART DRAFTING FLAT FILE

1997

775.00

1.57

1,215.80

4000

4004

EGP

MAGELLAN PROMARK X-CM GPS RECEIVER

1999

2,574.98

1.50

3,872.58

4000

4004

EGP

LARGE FORMAT PRINTER

2000

10,063.92

1.41

14,189.97

4000

4004

EGP

GPS PATHFINDER PROX R FIELD KIT (MIKE ZASKE)

2004

9,290.00

1.26

11,662.99

4000

4004

EGP

HPR KIT II W/CARRYING CASE (ZASKE'S CLOSET)

2005

2,044.27

1.20

2,450.38

4000

4004

EGP

HPR KIT II W/CARRYING CASE (ZASKE'S CLOSET)

2005

2,044.27

1.20

2,450.38

4000

4004

EGP

HPR KIT II W/CARRYING CASE (ZASKE'S CLOSET)

2005

2,044.27

1.20

2,450.38

4000

4004

EGP

HP LASERJET 4500N PRINTER (DENISE)

2000

2,426.00

1.41

3,420.62

4000

4004

EGP

HP COLOR 5500DTN LASERJET PRINTER

2004

4,209.00

1.26

5,284.13

4000

4004

EGP

HP SCANJET 8250 FLATBED SCANNER (CARDOSO)

2006

1,028.82

1.18

1,217.17

4010

4012

EGP

AIR COMPRESSOR-METER SHOP

1980

1,892.58

2.28

4,320.87

4010

4012

EGP

TRAV-L-CUTTER WITH 2 AIR MOTORS, FILTER HOSE TOOLS & CHAIN FOR 6" ODPIPE-SET BEVEL CUTTERS-6"&7" CAR- BIDE TIPPED CUTTER ADDNL CHAIN TO

1974

4,869.00

3.63

17,689.68

4010

4012

EGP

PIPE THREADING MACHINE(WITH ALLOY DIES)

1976

759.20

3.07

2,332.03

4010

4012

EGP

ZERO BLAST-N-PLEEN & DRY BLAST CABINET WITH B-N-P GUN AND TURN- TABLE

1979

2,635.00

2.45

6,468.09

4010

4012

EGP

NEW EM 3000 HONDA ELECTRIC GENERATOR WITH 7HP

1983

875.00

1.99

1,741.34

4010

4012

EGP

INGERSOLL-RAND PNUMATIC PAVING BREAKER

1988

835.00

1.86

1,555.52

4010

4012

EGP

RTC TRIPOD SYSTEM W/ACCESSORIES (TV TRUCK)

1988

1,960.50

1.86

3,652.21

4010

4012

EGP

MUELLER DRILLING MACHINE W/1" ADAPTER NIPPLES (VIN8109)

1988

792.00

1.86

1,475.42

4010

4012

EGP

MUELLER DRILLING MACHINE W/1" ADAPTER NIPPLES (VIN8116)

1988

792.00

1.86

1,475.42

4010

4012

EGP

MUELLER DRILLING MACHINE W/1" ADAPTER NIPPLES (VIN8113)

1988

792.00

1.86

1,475.42

4010

4012

EGP

MUELLER DRILLING MACHINE W/1" ADAPTER NIPPLES (VIN8106)

1988

792.00

1.86

1,475.42

4010

4012

EGP

MUELLER DRILLING MACHINE W/1" ADAPTER NIPPLES (VIN8128)

1988

792.00

1.86

1,475.42

4010

4012

EGP

MUELLER DRILLING MACHINE W/BITS - VEH 8116

1988

1,597.00

1.86

2,975.05

4010

4012

EGP

REED UNIVERSAL PIPE CUTTER W/BLADES

1990

3,946.00

1.81

7,157.71

4010

4012

EGP

POW-R-DRIVE VALVE OPERATOR W/ACCESSORIES

1990

3,684.83

1.81

6,683.97

4010

4012

EGP

HONDA PORTABLE 5HP GENERATOR

1991

916.00

1.80

1,644.48

4010

4012

EGP

CUES TELEVISION INSPECTION SYSTEM (MINI-SCOUT ASSEMBLY)

1991

9,960.00

1.80

17,881.03

4010

4012

EGP

WALKER 34 DIAPHRAM TRASH PUMP (VIN8117)

1992

1,200.00

1.73

2,074.72

4010

4012

EGP

GAS DETECTOR (LEL,H2S, CO) W/CASE &BATTERY PACKS - STOCK RM

1992

1,695.00

1.73

2,930.54

4010

4012

EGP

VIBRATORY PLATE COMPACT WACKER (TAMPER)

1992

1,310.00

1.73

2,264.90

4010

4012

EGP

SHORING EQUIPMENT (SHORES(6), HAND PUMP & EXTENSIONS(8))

1992

3,325.14

1.73

5,748.95

4010

4012

EGP

ROMAC TAP-MATE, ACCESSORIES & STORAGE BOX

1992

6,099.53

1.73

10,545.69

4010

4012

EGP

HYDRAULIC DRIVE UNIT

1992

1,895.00

1.73

3,276.33

4010

4012

EGP

GROBAU/VANGUARD 16HP PORTABLE GENERATOR (800 WATTS)

1992

1,820.00

1.73

3,146.66

4010

4012

EGP

FISHER LEAK DETECTOR KIT

1992

1,265.00

1.73

2,187.10

4010

4012

EGP

MOUNTED FORK SET

1993

1,250.14

1.71

2,134.97

4010

4012

EGP

SHORING EQUIPMENT-2 CYLINDERS/8', MANIFOLD, WALE TOOL & 4 SHORE BOARDS

1992

2,467.00

1.73

4,265.28

4010

4012

EGP

MUELLER AIR POWER OPERATOR

1994

3,435.00

1.69

5,796.00

A-7

Page 87: First Reading - OrdinanceWatch

Year

Original

Escalation

Current

Dept.

Div.

Asset Type

Cat.

Asset Description

Acquired

Cost

Factor

Cost

Appendix A. W

ater and W

astewater Utility System Asset List as of September 30, 2008

4010

4012

EGP

MUELLER AIR POWER OPERATOR

1994

3,435.00

1.69

5,796.00

4010

4012

EGP

GAS DETECTOR W/BATTERY CHARGER PACK

1994

1,724.00

1.69

2,908.97

4010

4012

EGP

GAS DETECTOR W/BATTERY CHARGER PACK

1994

1,724.00

1.69

2,908.97

4010

4012

EGP

GAS DETECTOR W/BATTERY CHARGER PACK

1994

1,724.00

1.69

2,908.97

4010

4012

EGP

GAS DETECTOR W/BATTERY CHARGER PACK - STOCK RM

1994

1,724.00

1.69

2,908.97

4010

4012

EGP

MULTI-CONDUCTOR INSPECTION SYSTEM- POWER CONTROL UNIT, 450 LINE MONITOR, CVC 460 CAMERA , DATAVIEW III, HPL 6 LIGHT HEAD, & SKID SET

1994

9,860.00

1.69

16,637.14

4010

4012

EGP

SENSUS METER TESTER W-1250 W/RESETTABLE ELECTRONIC REGISTER METER SHOP 8132

1994

5,519.93

1.69

9,313.98

4010

4012

EGP

RIDGID KOLLMAN DRAIN CLEANING MACHINE

1995

1,207.00

1.71

2,066.46

4010

4012

EGP

WACHS MODEL P/2 VALVE OPERATOR W/ AIR DRIVE, TORQUE GAUGE, LCD REVOLUTION COUNTER, TORQUE ARM EXTENSION, STEEL STORGE CASE

1996

4,247.00

1.61

6,827.16

4010

4012

EGP

PROSCOUT PORTABLE TELEVISION INSPECTION SYSTEM - COLOR CAMERA, TV CABLE/PUSH ROD ON A WHEELED COILER & TRANSLATOR

1996

9,700.00

1.61

15,593.00

4010

4012

EGP

RIDGID 141 GEARED THREADER

1996

1,265.00

1.61

2,033.52

4010

4012

EGP

TWO MAN STEEL BASKET

1998

4,180.00

1.53

6,414.66

4010

4012

EGP

ISCO PORTABLE SAMPLER

1998

2,710.50

1.53

4,159.55

4010

4012

EGP

ARIES TAURUS TRACTOR CAMERA CARRIAGE - VEH 8206

1998

5,016.00

1.53

7,697.59

4010

4012

EGP

SCHONSTEDT LOCATOR W/CARRYING CASE VISUAL AND AUDIO SIGNALING DIGITAL READOUT PLUS AUDIO SIGNALING (8111)

1998

819.63

1.53

1,257.81

4010

4012

EGP

SAWTEC AIRSAW 3300 RPM 7.5 HP 7" MAX CUT & 14" BLADE CAPACITY

1998

2,488.00

1.53

3,818.10

4010

4012

EGP

SAWTEC AIRSAW 3300 RPM 7.5 HP 5" MAX BLADE & 14" BLADE CAPACITY

1998

1,728.00

1.53

2,651.80

4010

4012

EGP

SCHONSTEDT GA 72-CD LOCATOR W/CARRYING CASE (8013)

1998

819.63

1.53

1,257.81

4010

4012

EGP

2' X 6' MODULAR ALUMINUM SHORING

1998

8,572.50

1.53

13,155.42

4010

4012

EGP

TRANSMITTER RECEIVER (ROY CUTHBERTSON)

1998

1,910.00

1.53

2,931.10

4010

4012

EGP

TRANSMITTER RECEIVER (DON STOUT)

1998

1,910.00

1.53

2,931.10

4010

4012

EGP

BENDI SOUNDS (DON STOUT)

1998

815.00

1.53

1,250.71

4010

4012

EGP

8-12 RIDGID HINGED CUTTER

1999

795.00

1.50

1,195.62

4010

4012

EGP

SCHONSTEDT GA 72-CD LOCATOR

1999

796.50

1.50

1,197.88

4010

4012

EGP

WEBER 19" W VIBRATORY PLATE COMPACTOR

1999

1,790.00

1.50

2,692.03

4010

4012

EGP

18" PLATE COMPACTOR

1999

1,480.00

1.50

2,225.81

4010

4012

EGP

BILLY GOAT VACUUM CLEANER

1999

960.00

1.50

1,443.77

4010

4012

EGP

CANTILEVER RACK SYSTEM

1999

5,785.78

1.50

8,701.39

4010

4012

EGP

MODULAR FURNITURE

2000

1,788.48

1.41

2,521.73

4010

4012

EGP

SENSUS METER TESTER W/ACCESSORIES (METER SHOP 8132)

2001

5,820.00

1.43

8,330.57

4010

4012

EGP

3" HONDA TRASH PUMP W/OIL ALERT

2001

1,105.90

1.43

1,582.95

4010

4012

EGP

3" HONDA TRASH PUMP W/OIL ALERT

2001

1,105.90

1.43

1,582.95

4010

4012

EGP

3" HONDA TRASH PUMP W/OIL ALERT

2001

1,105.90

1.43

1,582.95

4010

4012

EGP

3" HONDA TRASH PUMP W/OIL ALERT

2001

1,105.90

1.43

1,582.95

4010

4012

EGP

Aries TR3000 Wheeled Camera Transporter

2001

6,877.00

1.43

9,843.52

4010

4012

EGP

Aries Pan & Tilt Camera with Lighting P/N PE 1111

2001

14,700.00

1.43

21,041.12

4010

4012

EGP

Logiball Carrier Tool 5" X 10" X 120" w/pulling heads

2001

1,300.00

1.43

1,860.78

4010

4012

EGP

MUELLER DRILLING MACHINE D-5

2002

1,101.53

1.38

1,522.27

4010

4012

EGP

MUELLER DRILLING MACHINE D-5 (772 $550.77; 773 $550.76)

2002

1,101.53

1.38

1,522.27

4010

4012

EGP

MUELLER DRILLING MACHINE D-5

2002

1,101.53

1.38

1,522.27

4010

4012

EGP

14" CUTQUICK SAW TS 460 (PAPER RM)

2002

750.00

1.38

1,036.47

4010

4012

EGP

14" CUTQUICK SAW TS 760

2002

840.00

1.38

1,160.85

4010

4012

EGP

CISCO 2620XM ETHERNET ROUTER

2003

2,240.00

1.32

2,964.28

4010

4012

EGP

WACKER RAMMER

2003

2,263.00

1.32

2,994.72

4010

4012

EGP

HONDA HI PERFORMANCE PRESSURE WASHER (LEO AMODEI)

2003

750.00

1.32

992.50

4010

4012

EGP

INDECO BREAKER

2004

8,765.26

1.26

11,004.21

4010

4012

EGP

BOB 1001 TOPPER ALUMINUM W/ACCESS DOORS ON EACH SIDE

2004

850.00

1.26

1,067.12

4010

4012

EGP

SECURITY CAMERA

2005

1,475.00

1.20

1,768.02

4010

4012

EGP

EMPIRE P650 SUPER BLASTER

2005

2,900.00

1.20

3,476.10

4010

4012

EGP

ICE-O-MATIC ICE MAKER

2005

1,306.14

1.20

1,565.61

4010

4012

EGP

3" HONDA TRASH PUMP W/8HP MOTOR

2005

978.00

1.20

1,172.29

4010

4012

EGP

3" HONDA TRASH PUMP W/8HP MOTOR

2005

978.00

1.20

1,172.29

4010

4012

EGP

3" HONDA TRASH PUMP W/8HP MOTOR

2005

978.00

1.20

1,172.29

4010

4012

EGP

3" HONDA TRASH PUMP W/8HP MOTOR

2005

978.00

1.20

1,172.29

4010

4012

EGP

3" HONDA TRASH PUMP W/8HP MOTOR

2005

978.00

1.20

1,172.29

4010

4012

EGP

CERAMIC FLOOR JET CLEANER FOR AQUATECH TRUCK

2006

2,375.14

1.18

2,809.97

A-8

Page 88: First Reading - OrdinanceWatch

Year

Original

Escalation

Current

Dept.

Div.

Asset Type

Cat.

Asset Description

Acquired

Cost

Factor

Cost

Appendix A. W

ater and W

astewater Utility System Asset List as of September 30, 2008

4010

4012

EGP

CERAMIC TURPEDO NOZZLE

2006

1,239.20

1.18

1,466.07

4010

4012

EGP

SUPER CUTER PLUS 200

2006

4,543.74

1.18

5,375.59

4010

4012

EGP

WACKER 5HP VIBRATORY PLATE COMPACTOR

2006

1,590.00

1.18

1,881.09

4010

4012

EGP

PROCUT 18-20 HP 18" GAS STREET SAW - WAREHOUSE

2006

4,250.00

1.18

5,028.07

4010

4012

EGP

AUTOMATIC ICE MAKING MACHINE W/STORAGE BINS - WAREHOUSE

2006

3,414.66

1.18

4,039.80

4010

4012

EGP

BARD 5 TON A/C UNIT

2006

4,926.00

1.18

5,827.83

4010

4012

EGP

PORTABLE GENERATOR

2006

1,999.00

1.18

2,364.97

4010

4012

EGP

MUN 1 UTILITY SERVICE ANALYZER

2006

767.04

1.18

907.47

4010

4012

EGP

MUN 1 UTILITY SERVICE ANALYZER

2006

767.04

1.18

907.47

4010

4012

EGP

16" STIHL CUT-OFF SAW

2007

1,087.96

1.10

1,197.56

4010

4012

EGP

SUBSURFACE "PROFESSIONAL'S PLUS" WATER LEAK DETECTOR

2007

3,012.00

1.10

3,315.43

4010

4012

EGP

STIHL 16" CUTQUICK SAW W/CART & WATER TANK

2007

1,737.86

1.10

1,912.93

4010

4012

EGP

ICE-O-MATIC S/S ICE MACHINE W/BINS

2007

3,580.21

1.10

3,940.88

4010

4012

EGP

STIHL 16" CUTQUICK SAW

2007

1,015.96

1.10

1,118.31

4010

4012

EGP

STIHL 16" CUTQUICK SAW

2007

1,015.96

1.10

1,118.31

4010

4012

EGP

PANASONIC WEATHERPROOF COLOR DOME CAMERA

2008

2,201.16

1.00

2,196.63

4010

4012

EGP

UNISYS PW2 386SX PC W/1.4MB 3.5" FLOPPY,1.2MB 5.25" FLOPPY, 40MB HARD DISK, KEYBOARD

1991

1,842.00

1.80

3,306.91

4010

4012

EGP

ICS 80386/33 PC, 2MB RAM, 100MB SCSI HARD DRIVE, 80387 COMPRESSOR, 5.25" 1.2MB FLOPPY, 3.5" 1.4MB FLOPPY, KEYBOARD & MOUSE

1992

1,246.00

1.73

2,154.25

4010

4012

EGP

HP FAX MACHINE

1993

1,198.00

1.71

2,045.93

4010

4012

EGP

HP LASERJET 5N PRINTER - METER SHOP

1997

1,401.30

1.57

2,198.32

4010

4012

EGP

TOSHIBA TECRA 730XCDT LAPTOP PC

1998

7,200.00

1.53

11,049.18

4010

4012

EGP

HP LASERJET 4050N PRINTER - STOCK RM

1999

1,192.75

1.50

1,793.81

4010

4012

EGP

TOSHIBA 4280X DVD LAPTOP PC (TV INSPECTION TRUCK)

2000

2,370.58

1.41

3,342.48

4010

4012

EGP

HP DESIGNJET COLOR PLOTTER

2000

2,964.00

1.41

4,179.19

4010

4012

EGP

TOSHIBA LAPTOP PC (GREG BENIGNO - LEASE# 2767)

2004

2,959.65

1.26

3,715.65

4010

4012

EGP

HP COLOR LASERJET 5550N PRINTER

2007

2,611.61

1.10

2,874.70

Subtotal

886,291.62

$

2,390,289.42

$

4010

4012

OWTD

WATERLINE

1981

8,321.00

$

2.07

17,196.22

$

4010

4012

OWTD

WATER DISTRIBUTION SYSTEM EXPANSIONINCLUDING C1 PIPE, CEMENT,ASBESTOS PIPE,PRESTRESSED CONCRETE PRESSURE PIPE,GATE VALVES,HYDRANTS,ROADWAY

1953

584,029.82

9.65

5,635,109.06

4010

4012

OWTD

WATER DISTRIBUTION SYSTEM EXPANSIONPROFESSIONAL SERVICES

1952

9,000.00

10.17

91,569.07

4010

4012

OWTD

WATER LINE #1 WHITE DEVELOPMENT

1955

19,027.50

8.77

166,900.00

4010

4012

OWTD

WATER LINE-LOOK HOMES

1955

5,311.12

8.77

46,586.57

4010

4012

OWTD

WATER LINE #2-WHITE DEVELOPMENT

1956

5,175.54

8.37

43,298.03

4010

4012

OWTD

WATER LINE-N POSITION ORANGEBROOK GOLF ESTATES

1956

41,142.58

8.37

344,194.54

4010

4012

OWTD

WATER LINE-LAKEVIEW HEIGHTS

1956

1,937.42

8.37

16,208.25

4010

4012

OWTD

WATER LINE #2-LOOK HOMES DEVELOP- MENT

1955

6,896.17

8.77

60,489.86

4010

4012

OWTD

WATER LINE-SCHOOL HOMESITES

1956

9,385.70

8.37

78,519.79

4010

4012

OWTD

WATER LINE-LAKE SECTION

1956

7,587.32

8.37

63,474.73

4010

4012

OWTD

WATER LINE-LOOK HOMES # 3

1956

5,500.00

8.37

46,012.43

4010

4012

OWTD

WATER LINE-WHITE DEVELOPMENT #3 (LAWN ACRES)

1956

5,857.16

8.37

49,000.39

4010

4012

OWTD

WATER LINE-33RD COURT AT BOULEVARD PARK

1956

2,283.59

8.37

19,104.28

4010

4012

OWTD

WATER LINE-MISC PROJECTS

1957

6,304.24

8.00

50,409.54

4010

4012

OWTD

WATER LINE-HOLLYWOOD HOMESITES 2ND UNIT

1956

784.16

8.37

6,560.20

4010

4012

OWTD

WATER LINE-BIEGELSON PROJECT

1957

2,152.65

8.00

17,212.87

4010

4012

OWTD

WATER LINE ORANGEBROOK GOLF ESTATESSOUTH PORTION #17

1956

19,546.65

8.37

163,525.24

4010

4012

OWTD

WATER LINE-PROJECT #402

1956

13,063.00

8.37

109,283.70

4010

4012

OWTD

WATER LINE-ORANGEBROOK GOLF ESTATESSOUTH PORTION # 22

1956

21,580.43

8.37

180,539.63

4010

4012

OWTD

WATERLINE-PROJECT #404.0

1956

1,920.00

8.37

16,062.52

4010

4012

OWTD

WATER LINE-PROJECT # 405.0

1956

6,183.05

8.37

51,726.75

4010

4012

OWTD

WATER LINE PROJECT #406.0

1955

2,188.76

8.77

19,198.74

4010

4012

OWTD

CYCLONE FENCE AT WATER DISTRIBUTIONSTORAGE YARD

1955

1,683.29

8.77

14,765.00

4010

4012

OWTD

WATERLINE PROJECT-#408.0

1957

12,000.00

8.00

95,953.59

4010

4012

OWTD

WATER LINE-PROJECT #408.0

1955

5,099.90

8.77

44,733.85

4010

4012

OWTD

PROFESSIONAL SERVICES-RELOCATION OFWATER MAIN INCIDENT TO SHERIDAN ST BRIDGE CONSTRUCTION

1962

3,160.17

6.64

20,980.34

4010

4012

OWTD

RELOCATION OF WATER MAIN INCIDENT TO SHERIDAN ST BRIDGE CONSTRUCTION

1962

2,428.31

6.64

16,121.53

A-9

Page 89: First Reading - OrdinanceWatch

Year

Original

Escalation

Current

Dept.

Div.

Asset Type

Cat.

Asset Description

Acquired

Cost

Factor

Cost

Appendix A. W

ater and W

astewater Utility System Asset List as of September 30, 2008

4010

4012

OWTD

RELOCATION OF WATER MAIN INCIDENT TO SHERIDAN ST BRIDGE CONSTRUCTION

1962

34,980.00

6.64

232,231.90

4010

4012

OWTD

RELOCATION OF WATER MAIN INCIDENT TO SHERIDAN ST BRIDGE CONSTRUCTION-MISC

1963

13,612.90

6.43

87,467.04

4010

4012

OWTD

EXTENSION OF DISTRIBUTION SYSTEM INSOUTH BROWARD HIGH SCHOOL

1963

6,129.17

6.43

39,381.79

4010

4012

OWTD

RELOCATION OF MAINS INCIDENT TO STATE ROAD #9 CONSTRUCTION (TAFT STTO SHERIDAN ST)

1963

15,353.40

6.43

98,650.28

4010

4012

OWTD

WATER LINES-MOFFETT ST.FROM 24TH- 29TH AVE

1965

26,990.45

5.96

160,919.79

4010

4012

OWTD

WATER LINES-SOUTH LAKE DRIVE

1966

12,957.58

5.68

73,615.33

4010

4012

OWTD

PROFESSIONAL SERVICES: DESIGN,PLANSAND SPECS FOR REPLACEMENT OF 12" MAIN UNDER INTRACOASTAL CANAL AT WASHINGTON STREET

1962

1,580.08

6.64

10,490.14

4010

4012

OWTD

REPLACEMENT OF 12" MAIN UNDER INTRACOASTAL CANAL AT WASHINGTON ST

1962

20,394.03

6.64

135,395.78

4010

4012

OWTD

REPLACEMENT OF 12" MAIN UNDER INTRACOASTAL CANAL AT WASHINGTON ST

1963

41,638.22

6.43

267,538.27

4010

4012

OWTD

EXTENSION OF WATER SYSTEM AIA SOUTH

1957

80,456.18

8.00

643,338.28

4010

4012

OWTD

WATER LINE LAKE SECTION

1957

6,334.30

8.00

50,649.90

4010

4012

OWTD

WATER LINE-LAKEVIEW HEIGHTS

1957

864.40

8.00

6,911.86

4010

4012

OWTD

WATER LINE-PROJECT #27.00

1957

1,053.68

8.00

8,425.36

4010

4012

OWTD

WATER LINE-LAKEVIEW HEIGHT

1957

628.35

8.00

5,024.37

4010

4012

OWTD

WATER MAIN EXTENSION CONSTRUCTION- SUNSET ISLES

1958

17,354.57

7.63

132,370.32

4010

4012

OWTD

DISTRIBUTION MAINS-PROJECT 31.00

1968

1,022.74

5.01

5,126.27

4010

4012

OWTD

DISTRIBUTION MAINS-33COURT @ BLVD PARK

1957

12,626.25

8.00

100,961.17

4010

4012

OWTD

4" WATER MAIN-ORANGEBROOK GOLF COURSE TO PEMBROKE RD

1961

6,918.57

6.83

47,288.06

4010

4012

OWTD

2" WATER MAIN-SHERIDAN STREET TO DANIA BRIDGE-HOLLYWOOD HOMESITES 2ND UNIT

1961

5,826.46

6.83

39,823.54

4010

4012

OWTD

BIEGELSON PROJECT MAINS

1959

2,324.40

7.26

16,883.83

4010

4012

OWTD

CATHODIC PROTECTION,TWO-ONE MILLIONGALLON ELEVATED TANKS

1964

22,572.20

6.19

139,610.02

4010

4012

OWTD

8" MAIN-FIRE HYDRANTS

1962

6,127.03

6.64

40,677.30

4010

4012

OWTD

WATER MAINS TO HOLLYWOOD HEIGHTS ADDITION NO.2

1962

9,000.60

6.64

59,754.90

4010

4012

OWTD

RELOCATION & REVISION OF MAINS TO ALLEYS AND STREETS PRIOR TO CONSTRUCTION OF OTHER PROJECTS- PAYROLL AND INVENTORY TRANSFER

1969

83,991.02

4.56

383,168.49

4010

4012

OWTD

6" MAINS AND HYDRANTS-HOLLYWOOD GOLF ESTATES

1963

2,285.48

6.43

14,684.91

4010

4012

OWTD

6" AND 8" MAINS & FIRE HYDRANTS FORCIRCLE SHOPPING CENTER (OPERATING PAYROLL)

1962

5,301.81

6.64

35,198.67

4010

4012

OWTD

REPLACEMENT OF DETERIORATED MAINS COUNTRY CLUB HOMES

1963

5,105.79

6.43

32,806.26

4010

4012

OWTD

MISCELLANEOUS ADDITIONS TO THE WATER DISTRIBUTION BUILDING, OFFICEAND YARD

1963

33,526.00

6.43

215,414.78

4010

4012

OWTD

PROFESSIONAL SERVICES 16" MAIN- JOHNSON & 56TH AVE TO 59TH AVE DELCREST MANOR SUB-DIVISION

1963

1,175.55

6.43

7,553.27

4010

4012

OWTD

16" MAIN-JOHNSON ST & 56TH AVE TO 59TH AVE DELCREST MANOR SUB-DIV.

1963

23,681.35

6.43

152,159.90

4010

4012

OWTD

GALVANIZED STEEL PIPE GATE VALVES SERVICES AND INSTALLATION CHARGES HOLLYWOOD HEIGHTS ADDITION

1963

3,911.11

6.43

25,130.08

4010

4012

OWTD

EXTENSION OF WATER SYSTEM TO AREAS ANNEXED EAST OF STATE ROAD #7- PROFESSIONAL SERVICES

1964

35,043.51

6.19

216,745.61

4010

4012

OWTD

EXTENSION OF WATER SYSTEM TO AREAS ANNEXED EAST OF STATE ROAD #7- CONSTRUCTION

1964

485,360.18

6.19

3,001,973.46

4010

4012

OWTD

6" MAIN-28TH AVENUE TAFT TO HARDINGSTREET

1964

2,346.83

6.19

14,515.24

4010

4012

OWTD

4" MAIN-ALLEY NORTH OF HOLLYWOOD BLVD.STATE ROAD #7 TO 56TH AVENUE

1964

4,505.21

6.19

27,864.92

4010

4012

OWTD

12" MAIN AIA & DANIA BEACH BLVD TO PORT ENTRANCE

1965

106,408.76

5.96

634,419.77

4010

4012

OWTD

12" MAIN-AIA & DANIA BEACH BLVD TO PORT ENTRANCE

1966

18,616.88

5.68

105,767.26

4010

4012

OWTD

36" CASING FOR 24" MAIN ACROSS STATE RD #9 AT WASHINGTON STREET

1965

7,319.64

5.96

43,640.43

4010

4012

OWTD

8" MAIN-WEST OF SEABOARD R.R. NORTHOF TAFT STREET

1965

8,902.87

5.96

53,079.81

4010

4012

OWTD

6" MAIN EXTENSION FOR GRANDWAY STORE FIRE HYDRANT- MADISON STREET-59TH AVENUE TO 60TH AVENUE

1965

1,653.13

5.96

9,856.13

4010

4012

OWTD

PROFESSIONAL SERVICES,DISTRIBUTION SYSTEM-HOLLYWOOD HILLS STAGE #7

1966

13,321.20

5.68

75,681.15

4010

4012

OWTD

DISTRIBUTION SYSTEM-HOLLYWOOD HILLS-STAGE #7

1966

186,152.25

5.68

1,057,578.61

4010

4012

OWTD

WATER METER REPLACEMENT AT WESTERN WATER COMPANY

1967

99,397.53

5.39

535,784.15

4010

4012

OWTD

6" MAIN-BEVERLY HILLS SUB DIVISION

1966

1,200.09

5.68

6,818.02

4010

4012

OWTD

4" MAIN 7TH TO 10TH AVE-WASHINGTON TO ADAMS STREET

1966

4,291.33

5.68

24,380.14

4010

4012

OWTD

8" MAIN US 441-CHARLESTON ST TO STERLING ROAD-SEMINOLE INDIAN RESERVATION

1966

13,940.00

5.68

79,196.71

4010

4012

OWTD

6" MAIN-FILLMORE ST AND DIXIE HWY TO 550' WEST

1966

1,656.00

5.68

9,408.16

4010

4012

OWTD

NEW METER INSTALLATIONS-PROJECT- 96.00

1966

41,402.18

5.68

235,216.39

4010

4012

OWTD

MAINS-HOLLYWOOD HEIGHTS

1966

5,441.05

5.68

30,912.00

4010

4012

OWTD

6" MAIN- BLOCK 59, HOLLYWOOD HILLS

1966

2,517.74

5.68

14,303.93

4010

4012

OWTD

MAINS,VALVES,HYDRANTS,FITTINGS AND REPAIRS-17TH AVENUE-JOHNSON TO POLKSTREET

1966

12,839.71

5.68

72,945.68

4010

4012

OWTD

PURCHASE OF 24 FIRE HYDRANTS PROJECT 103.00

1967

3,167.28

5.39

17,072.64

4010

4012

OWTD

MAINS-HILLWOOD SUBDIVISION

1966

2,714.20

5.68

15,420.07

4010

4012

OWTD

6" MAINS & FIRE HYDRANT-JACKSON ST AND DIXIE HWY TO 22ND AVENUE

1967

1,530.97

5.39

8,252.41

4010

4012

OWTD

8" MAIN-PIPES,VALVES,HYDRANTS AND REPAIRS-56TH AVENUE & DOUGLAS ST TO STIRLING ROAD-WEST TO US 441

1967

24,743.15

5.39

133,373.41

4010

4012

OWTD

GARAGE ADDITION TO WATER DISTRIBU- TION BUILDING

1967

5,393.57

5.39

29,073.05

A-10

Page 90: First Reading - OrdinanceWatch

Year

Original

Escalation

Current

Dept.

Div.

Asset Type

Cat.

Asset Description

Acquired

Cost

Factor

Cost

Appendix A. W

ater and W

astewater Utility System Asset List as of September 30, 2008

4010

4012

OWTD

6" WATER METER CONNECTION AND CONSTRUCTION-PEMBROKE PINES UTILITYSYSTEM-64TH AVENUE AND TAFT ST

1968

7,471.01

5.01

37,446.90

4010

4012

OWTD

6" WATER METER CONNECTION MISC ITEMS-PROJECT #110 ITEMS

1968

542.62

5.01

2,719.77

4010

4012

OWTD

6" MAIN EXTENSION-STERLING LAKE ESTATE

1967

1,998.85

5.39

10,774.43

4010

4012

OWTD

6" MAIN EXTENSION-SUNSHINE PARK ESTATE

1967

3,240.05

5.39

17,464.90

4010

4012

OWTD

12" MAIN AND 6" MAIN-AIA-JOHNSON STTO TAFT STREET

1969

19,102.54

4.56

87,146.12

4010

4012

OWTD

12" MAIN AND 6" MAIN-AIA-JOHNSON STTO SHERIDAN STREET

1969

5,742.18

4.56

26,195.92

4010

4012

OWTD

12" MAIN AND 6" MAIN-AIA-JOHNSON STTO SHERIDAN STREET

1968

178,822.51

5.01

896,311.06

4010

4012

OWTD

CRUSHED ROCK-AIA-JOHNSON ST TO SHERIDAN STREET

1968

1,846.85

5.01

9,256.96

4010

4012

OWTD

12"MAIN& 6"MAIN-AIA-JOHNSON-TO SHERIDAN STREET-JUNCTION BOX CONST-RUCTION,7@ $185.00EA-STA 138+45- MCKINLEY,ARTHUR,TYLER,POLK,ARIZONA,

1969

1,295.00

4.56

5,907.81

4010

4012

OWTD

12" MAIN-PEMBROKE RD.-42 AVE TO INCINERATOR PROPERTY

1968

13,554.99

5.01

67,941.60

4010

4012

OWTD

6" MAIN-JOHNSON STREET & SOUTH TO THE KNIGHTS OF COLUMBUS PROPERTY PROJECT # 116.00

1968

1,741.89

5.01

8,730.87

4010

4012

OWTD

CONNECTION BETWEEN TANKS & 20" MAINAT WATER PLANT

1969

27,580.00

4.56

125,820.44

4010

4012

OWTD

CONNECTION BETWEEN TANKS-INSIDE PIPE MODIFICATION-WATER PLANT

1969

4,000.00

4.56

18,248.07

4010

4012

OWTD

CONNECTION BETWEEN TANKS-MISC ELECTRICAL,PAINT,SITE WORK-WATER PLANT

1969

2,300.00

4.56

10,492.64

4010

4012

OWTD

CONNECTION BETWEEN TANKS-WATER PLANT-PROFESSIONAL SERVICES: PLANS SPECS & SUPERVISION

1970

2,032.80

4.19

8,521.57

4010

4012

OWTD

CONNECTION BETWEEN TANKS-MISC ITEMSWATER PLANT

1969

769.89

4.56

3,512.25

4010

4012

OWTD

6" MAIN AND FIRE HYDRANT-15TH AVE- ARTHUR TO MCKINLEY STREETS

1968

2,657.84

5.01

13,321.88

4010

4012

OWTD

8" METER & VAULT-HOLLYWOOD HILLS NORTH

1968

4,053.62

5.01

20,317.94

4010

4012

OWTD

FIRELINE TO K-MART-WASHINGTON ST AND STATE RD # 7

1968

2,557.56

5.01

12,819.24

4010

4012

OWTD

MOVE 12" AND 6" LINES-TAFT ST TO CAROLINA ST ON SURF ROAD

1969

4,613.74

4.56

21,047.96

4010

4012

OWTD

4" C.I. MAIN- LEE ST-33RD-34TH AVE.

1969

2,122.82

4.56

9,684.34

4010

4012

OWTD

12" MAIN TO HILLWOOD SUBDIVISION #2

1969

17,274.80

4.56

78,807.94

4010

4012

OWTD

12" MAIN TO HILLWOOD-SUBDIVISION #2INSTALLATION OF PIPE AND VALVES ETC

1969

15,708.70

4.56

71,663.36

4010

4012

OWTD

12" MAIN TO HILLWOOD SUBDIVISION #2SLEEVES,VALVES,& JOINTS

1969

1,803.86

4.56

8,229.24

4010

4012

OWTD

12" MAIN TO HILLWOOD SUBDIVISION #2MISC ITEMS-PROJECT #123.00

1969

2,184.13

4.56

9,964.04

4010

4012

OWTD

6" MAIN EXTENSION-23RD AVE-24TH AVE@ CHARLESTON STREET

1969

2,818.36

4.56

12,857.41

4010

4012

OWTD

6" METER AND VAULT INSTALLATION-56 AVE AND NORTH HILLS DR

1970

5,562.00

4.19

23,316.10

4010

4012

OWTD

6" MAIN AND FIRE LANE-MISC-PROJECT # 137.00

1970

3,618.76

4.19

15,169.97

4010

4012

OWTD

RELOCATE & ELEVATE WATER MAINS EXCAVATE OVER EXISTING WATER MAIN BACKFILL AND PROVIDE 12" OF

1971

21,675.81

3.66

79,371.03

4010

4012

OWTD

8" MAIN-CONSTRUCTION IN LIBERIA SUBDIVISION-24TH AVE & SHERIDAN TO GREENE STREET

1971

20,459.75

3.66

74,918.14

4010

4012

OWTD

8" METER & VAULT INSTALLATION-56TH AVE & SHERIDAN STREET

1970

7,151.21

4.19

29,978.12

4010

4012

OWTD

12" MAIN EXTENTION-34TH AVE DUMP SITE TO WASHINGTON STREET

1970

6,917.94

4.19

29,000.24

4010

4012

OWTD

6" METER & VAULT INSTALLATION FOR PENN INDUSTRIES-68TH ST & STIRLING ROAD

1971

7,507.54

3.66

27,490.61

4010

4012

OWTD

PIPE& CONSTRUCTION FOR NEW WATER SUPPLY TO SEWAGE TREATMENT PLANT-

1971

9,802.13

3.66

35,892.78

4010

4012

OWTD

INSTALLATION OF SIX FIRE HYDRANTS AND CI PIPE-SHENANDOAH & LEE STS BETWEEN 15TH & 18TH AVENUES

1971

14,410.12

3.66

52,766.01

4010

4012

OWTD

6" WATER MAIN EXTENSION-28TH AVE & 530' WEST ON FILLMORE STREET

1971

1,541.13

3.66

5,643.21

4010

4012

OWTD

6" MAIN EXTENSION 17TH AVE & 400' WEST ON CLEVELAND STREET- WATER UTILITY OPERATING FUND

1972

2,681.42

3.30

8,855.26

4010

4012

OWTD

8" MAIN & 6" EXTENSION-56TH AVE TO 57TH AVENUE BETWEEN 37TH & 38TH STSWATER REV FUND & WATER UTILITY OPERFUND1972

11,969.62

3.30

39,529.11

4010

4012

OWTD

6" MAIN EXTENSION-PROJECT 161.00 WATER REV FUND & WATER UTILITY FUND

1972

2,498.24

3.30

8,250.32

4010

4012

OWTD

UTILITY RELOCATION-HOLLYWOOD BLVD- I-95 TO 64TH AVENUE

1972

2,326.03

3.30

7,681.60

4010

4012

OWTD

4" MAIN EXTENSION-26TH AVE-310' EAST ON CLEVELAND STREET

1972

1,200.00

3.30

3,962.94

4010

4012

OWTD

MAIN- 44TH AVE.TO S.W. ELEMENTARY SCHOOL

1960

7,004.00

7.03

49,208.20

4010

4012

OWTD

WATER PLANT # 1-WASHROOM

1972

1,348.46

3.30

4,453.23

4010

4012

OWTD

12" WATER MAIN INSTALLATION-14TH AVE - WASHINGTON TO WILEY STREET

1960

9,979.95

7.03

70,116.42

4010

4012

OWTD

ADDITIONAL FIRE PROTECTION PARK RD MANOR,BREEZY MANOR- STATE RD #9 & SEABOARD RAILROAD

1961

12,324.65

6.83

84,238.33

4010

4012

OWTD

ADDITIONAL FIRE PROTECTION,PARK RD MANOR,BREEZY MANOR- STATE RD #9 & SEABOARD RAILROAD

1961

9,737.00

6.83

66,551.88

4010

4012

OWTD

ADDITIONAL FIRE PROTECTION PARK RD MANOR, BREEZY MANOR & STATE ROAD #9& SEABOARD RAILROAD

1961

4,384.65

6.83

29,968.85

4010

4012

OWTD

EXCAVATION,PAVING AND DRAINAGE AT WATER STORAGE YARD

1960

5,720.90

7.03

40,193.49

4010

4012

OWTD

MAINS TO HOLLYWOOD HEIGHTS ADDITIONALSO WATER REVENUE FUND

1961

12,289.03

6.83

83,994.87

4010

4012

OWTD

6" MAIN EXTENSION TO ATTUCKS SCHOOL

1961

1,789.39

6.83

12,230.39

4010

4012

OWTD

FURNISH & INSTALL MAINS-JOHNSON ST-46TH AVE TO 51ST AVE

1961

15,101.22

6.83

103,216.04

4010

4012

OWTD

MAINS TO DIPLOMAT GOLF ESTATES

1961

11,482.43

6.83

78,481.80

4010

4012

OWTD

INSTALLATION OF MAINS-TAFT ST & STATE ROAD #9 TO 27TH AVE

1958

6,006.40

7.63

45,813.24

4010

4012

OWTD

8" MAIN DAVIE RD EXTENSION & SIMMS STREET 300' NORTH ON SHERIDAN ST

1972

11,000.00

3.30

36,326.98

4010

4012

OWTD

12" MAIN- AIA & IRIS TO MAGNOLIA STPAYROLL COSTS INCLUDED

1972

8,404.93

3.30

27,756.89

4010

4012

OWTD

INSTALLATION OF METER SERVICE 5/8" WATER METERS TO BE LOCATED OUTSIDE CITY LIMITS-77TH & 78TH AVE-41ST- 42ND STREETS

1972

3,532.99

3.30

11,667.53

A-11

Page 91: First Reading - OrdinanceWatch

Year

Original

Escalation

Current

Dept.

Div.

Asset Type

Cat.

Asset Description

Acquired

Cost

Factor

Cost

Appendix A. W

ater and W

astewater Utility System Asset List as of September 30, 2008

4010

4012

OWTD

12" MAIN EXTENSIONS-SOUTH SIDE STERLING RD-I95-TO 33RD AVENUE COST INCLUDES-PAYROLL-INVENTORY TRANSFERS & CITY UTILITIES CONSTRUC

1972

68,584.53

3.30

226,497.18

4010

4012

OWTD

WATER MAIN 12"-SOUTH AIA-TO-HOLIDAYINN-COST ALSO INCLUDES PAYROLL

1973

20,000.00

3.77

75,455.37

4010

4012

OWTD

WATER LINE INSTALLATION

1979

51,152.38

2.45

125,562.92

4010

4012

OWTD

WATER MAIN ADJUSTMENTS CONSTRUCTION

1979

301,902.00

2.45

741,073.96

4010

4012

OWTD

WATER MAIN CONSTRUCTION-ADJUSTMENTS

1979

13,751.60

2.45

33,755.83

4010

4012

OWTD

RAISING (15) SOUTH BEACH METERS- CONSTRUCTION

1980

13,106.07

2.28

29,921.94

4010

4012

OWTD

CARRIAGE HILL PROJECT-WATER MAIN INSTALLATION

1980

7,000.00

2.28

15,981.42

4010

4012

OWTD

BEVERLY PARK SYSTEM-PROFESSIONAL SERVICES

1981

7,687.92

2.07

15,887.89

4010

4012

OWTD

BEVERLY PARK SYSTEM-PROFESSIONAL SERVICES

1981

660.00

2.07

1,363.96

4010

4012

OWTD

BEVERLY PARK SYSTEM-PROFESSIONAL SERVICES

1981

134.37

2.07

277.69

4010

4012

OWTD

DISTRIBUTION SYSTEM INDUSTRIAL PARKSHERIDAN ST TO STERLING RD INCLUDING FIRE HYDRANTS AND SERVICE LINES1969

104,477.75

4.56

476,629.31

4010

4012

OWTD

DISTRIBUTION SYSTEM,INDUSTRIAL PARKSHERIDAN ST - STIRLING ROAD PROFESSIONAL SERVICES

1969

1,659.24

4.56

7,569.48

4010

4012

OWTD

DISTRIBUTION SYSTEM,INDUSTRIAL PARKSHERIDAN ST TO STIRLING RD- INCLUDING FIRE HYDRANTS AND SERVICELINES

1969

2,264.54

4.56

10,330.87

4010

4012

OWTD

BOND ISSUE COSTS -WATER REVENUE CERTIFICATE CONSTRUCTION FUND

1969

3,255.43

4.56

14,851.33

4010

4012

OWTD

24" WATER MAIN-SHERIDAN ST FROM I95TO 56TH AVE AND FROM 60TH TO 64TH AVENUE

1966

298,002.75

5.68

1,693,029.95

4010

4012

OWTD

24" WATER MAIN-SHERIDAN STREET FROMI95 TO 56TH AVENUE AND FROM 60TH AVE TO 64TH AVE

1966

1,093.60

5.68

6,213.02

4010

4012

OWTD

PROFESSIONAL SERVICES- 24" MAIN SHERIDAN ST -- I95 TO 56TH AVENUE AND FROM 60TH AVENUE TO 64TH AVENUE

1966

12,999.35

5.68

73,852.64

4010

4012

OWTD

PROFESSIONAL SERVICES-WATER DISTRIBUTION SYSTEM-ANNEXED AREAS HLWD BLVD TO TAFT BETWEEN 441 AND TURNPIKE-HLWD BLVD TO PEMBROKE RD

1966

17,439.96

5.68

99,080.88

4010

4012

OWTD

WATER DISTRIBUTION SYSTEM-ANNEXED AREAS-HLWD BLVD TO TAFT ST BETWEEN 441 AND TURNPIKE-HLWD BLVD TO PEMBROKE RD BETWEEN 441 AND 52ND

1966

378,653.12

5.68

2,151,225.36

4010

4012

OWTD

PROFESSIONAL SERVICES-IN CONJUNC- TION WITH THE SOUTHSIDE &SOUTHBEACHFEEDER MAINS & MISC. IMPROVEMENTS IN OLDER SECTIONS OF THE DISTRIBU-

1966

35,551.54

5.68

201,977.40

4010

4012

OWTD

SOUTHSIDE & SOUTHBEACH FEEDER MAINSAND MISC. IMPROVEMENTS IN OLDER SECTIONS OF THE DISTRIBUTION SYSTEM

1966

643,436.34

5.68

3,655,526.65

4010

4012

OWTD

REENFORCEMENT OF WESTERN WATER CO. DISTRIBUTION SYSTEM & AREA SOUTH OFTAFT ST.-EAST OF 64TH AVE.-NORTH OFHLWD BLVD.-WEST OF TURNPIKE

1966

1,020.00

5.68

5,794.88

4010

4012

OWTD

REENFORCEMENT OF WESTERN WATER CO. DISTRIBUTION SYSTEM & AREA-SOUTH OFTAFT ST-EAST OF 64TH AVE-NORTH OF HLWD BLVD & WEST OF TURNPIKE

1966

528,324.15

5.68

3,001,544.82

4010

4012

OWTD

PROFESSIONAL SERVICES-WATER MASTER PLAN,& SUPERVISION-WESTERN WATER CO DISTRIBUTION SYSTEM REENFORCE- MENT1966

40,324.29

5.68

229,092.62

4010

4012

OWTD

PROFESSIONAL SERVICES- HOLLYWOOD HILLS WATER DISTRIBUTION SYSTEM- STAGE 3

1961

3,835.18

6.83

26,213.25

4010

4012

OWTD

HOLLYWOOD HILLS WATER DISTRIBUTION SYSTEM-STAGE 3

1962

74,959.20

6.64

497,653.44

4010

4012

OWTD

PROFESSIONAL SERVICES-HOLLYWOOD HILLS WATER DISTRIBUTION SYSTEM STAGE 4

1962

1,513.72

6.64

10,049.57

4010

4012

OWTD

HOLLYWOOD HILLS WATER DISTRIBUTION SYSTEM-STAGE 4

1962

29,333.39

6.64

194,744.11

4010

4012

OWTD

HOLLYWOOD HILLS WATER DISTRIBUTION SYSTEM STAGE 5

1964

1,986.66

6.19

12,287.58

4010

4012

OWTD

HOLLYWOOD HILLS WATER DISTRIBUTION SYSTEM-STAGE-5

1964

300,753.10

6.19

1,860,170.78

4010

4012

OWTD

PROFESSIONAL SERVICES-HOLLYWOOD HILLS WATER DISTRIBUTION SYSTEM STAGE 5

1964

17,918.06

6.19

110,823.97

4010

4012

OWTD

HOLLYWOOD HILLS WATER DISTRIBUTION SYSTEM-STAGE #6

1963

63,332.53

6.43

406,930.84

4010

4012

OWTD

PROFESSIONAL SERVICES- HOLLYWOOD HILLS WATER DISTRIBUTION SYSTEM STAGE #6

1963

3,759.96

6.43

24,158.89

4010

4012

OWTD

PURCHASE OF WESTERN WATER COMPANY DISTRIBUTION SYSTEM

1965

406,979.17

5.96

2,426,450.89

4010

4012

OWTD

PURCHASE OF WESTERN WATER COMPANY DISTRIBUTION SYSTEM FUTURES

1965

600,000.00

5.96

3,577,260.56

4010

4012

OWTD

PURCHASE OF WESTERN WATER CENTRAL BROWARD DRAINAGE DISTRICT ASSESS- MENTS

1966

4,458.71

5.68

25,331.07

4010

4012

OWTD

UTILITIES IMPROVEMENT,INSTALLATION OF SHERIDAN STREET WATER MAINS 18",24",30"

1958

549,923.06

7.63

4,194,485.61

4010

4012

OWTD

UTILITIES IMPROVEMENT INSTALLATION OF SHERIDAN ST WATER MAIN 18",24", AND 30"

1957

1,329.63

8.00

10,631.90

4010

4012

OWTD

UTILITIES IMPROVEMENT, INSTALLATIONOF SHERIDAN ST WATER MAINS 18",24" AND 30"

1958

130,163.75

7.63

992,811.57

4010

4012

OWTD

PROFESSIONAL SERVICES-1957 SHERIDANSTREET WATER MAINS-1957 WATER PLANTMODIFICATION-1957 SANITARY SEWER EXTENSION-1958 WATER SYSTEM EXTEN-

1959

79,152.78

7.26

574,945.14

4010

4012

OWTD

ENGINEERING SERVICES FOR DESIGN SERVICES ON EXPANSION OF MUNICIPAL WATER DISTRIBUTION SYSTEM TO SERVE HOLLYWOOD HILLS SUBDIVISION, 2ND

1960

14,564.27

7.03

102,324.60

4010

4012

OWTD

TO REIMBURSE SSSAR FUND FOR ENGINEERING FEES PAID SMITH AND GILLESPIE ON THE NOLAN CONTRACT WHICH WERE IN EXCESS OF THE AMOUNT

1959

1,267.64

7.26

9,207.81

4010

4012

OWTD

MISC ITEMS-EXPANSION OF MUNICIPAL WATER DISTRIBUTION SYSTEM TO SERVE HOLLYWOOD HILLS SUBDIVISION,2ND ADD

1959

5,088.16

7.26

36,959.07

4010

4012

OWTD

RELOCATION OF A SINGLE FAMILY STRUCTURE-WATER SYSTEM EXPANSION

1958

4,590.00

7.63

35,009.79

4010

4012

OWTD

PROFESSIONAL SERVICES FOR WATER SYSTEM EXPANSION

1958

8,015.40

7.63

61,136.70

4010

4012

OWTD

DISTRIBUTION SYSTEM-HOLLYWOOD HILLS

1960

175,757.09

7.03

1,234,821.54

4010

4012

OWTD

DISTRIBUTION SYSTEM HOLLYWOOD HILLSINSTALLATION OF 8" WATER LINE N. CIRCLE DRIVE-56TH AVENUE

1960

19,411.63

7.03

136,380.84

4010

4012

OWTD

DISTRIBUTION SYSTEM HOLLYWOOD HILLSGALVANIZED PIPE-PURCHASE

1960

21,618.19

7.03

151,883.53

4010

4012

OWTD

DISTRIBUTION SYSTEM HOLLYWOOD HILLS

1960

1,165.52

7.03

8,188.63

4010

4012

OWTD

DISTRIBUTION SYSTEM-HOLLYWOOD HILLSCONTRACT MATERIAL FOR WATER LINE HOLLYWOOD HILLS

1960

208,525.79

7.03

1,465,045.51

4010

4012

OWTD

PROFESSIONAL SERVICES-DISTRIBUTION SYSTEM HOLLYWOOD HILLS

1960

2,579.37

7.03

18,121.95

4010

4012

OWTD

DISTRIBUTION SYSTEM-HOLLYWOOD HILLSMATERIALS & INSTALLATION WATERLINES

1960

13,629.18

7.03

95,754.91

4010

4012

OWTD

DISTRIBUTION SYSTEM-HOLLYWOOD HILLSCONSTRUCTION

1960

51,911.92

7.03

364,719.04

4010

4012

OWTD

WATER DISTRIBUTION METERS & SETTINGS-VARIOUS YEARS

1964

99,725.47

6.19

616,806.29

4010

4012

OWTD

WATER DISTRIBUTION-METERS & SETTINGS-VARIOUS VOUCHERS

1968

68,160.84

5.01

341,642.19

4010

4012

OWTD

WATER DISTRIBUTION-METERS &SETTINGS

1966

3,584.23

5.68

20,362.93

A-12

Page 92: First Reading - OrdinanceWatch

Year

Original

Escalation

Current

Dept.

Div.

Asset Type

Cat.

Asset Description

Acquired

Cost

Factor

Cost

Appendix A. W

ater and W

astewater Utility System Asset List as of September 30, 2008

4010

4012

OWTD

WATER DISTRIBUTION-METERS AND SETTINGS

1967

59,559.59

5.39

321,045.05

4010

4012

OWTD

WATER DISTRIBUTION-METERS AND SETTINGS

1962

31,647.03

6.64

210,104.34

4010

4012

OWTD

WATER DISTRIBUTION-METERS AND SETTINGS

1963

29,517.90

6.43

189,661.52

4010

4012

OWTD

WATER DISTRIBUTION-METERS AND SETTINGS

1968

4,235.22

5.01

21,228.17

4010

4012

OWTD

WATER DISTRIBUTION-METERS AND SETTINGS

1969

67,257.14

4.56

306,828.24

4010

4012

OWTD

WATER DISTRIBUTION-METERS AND SETTINGS

1964

5,257.16

6.19

32,515.76

4010

4012

OWTD

WATER DISTRIBUTION-METERS AND SETTINGS

1965

56,087.30

5.96

334,398.14

4010

4012

OWTD

WATER DISTRIBUTION- METERS AND SETTINGS

1965

9,358.12

5.96

55,794.06

4010

4012

OWTD

WATER DISTRIBUTION-METERS AND SETTINGS

1959

75,553.45

7.26

548,800.54

4010

4012

OWTD

WATER DISTRIBUTION-METERS AND SETTINGS

1957

28,271.00

8.00

226,058.66

4010

4012

OWTD

WATER DISTRIBUTION-METERS AND SETTINGS

1970

52,333.33

4.19

219,383.14

4010

4012

OWTD

WATER DISTRIBUTION-METERS AND SETTINGS

1972

55,251.62

3.30

182,465.87

4010

4012

OWTD

WATER DISTRIBUTION-SERVICE CONNECTIONS

1964

4,008.07

6.19

24,790.08

4010

4012

OWTD

WATER DISTRIBUTION-SERVICE CONNECTIONS

1968

3,088.89

5.01

15,482.43

4010

4012

OWTD

WATER DISTRIBUTION-SERVICE CONNECTIONS

1967

162,384.70

5.39

875,304.94

4010

4012

OWTD

WATER DISTRIBUTION-SERVICE CONNECTIONS

1969

19,116.64

4.56

87,210.44

4010

4012

OWTD

WATER DISTRIBUTION FIRE HYDRANTS PROJECT # 1002 Z-11

1970

14,338.49

4.19

60,107.45

4010

4012

OWTD

WATER DISTRIBUTION-SERVICE CONNECTIONS

1972

29,409.58

3.30

97,123.75

4010

4012

OWTD

WATER DISTRIBUTION SERVICE CONNEC- TIONS

1974

10,566.41

3.63

38,389.07

4010

4012

OWTD

WATER DISTRIBUTION-HYDRANTS

1974

23,800.83

3.63

86,471.35

4010

4012

OWTD

WATER DISTRIBUTION-METERS AND SETTINGS

1974

22,865.01

3.63

83,071.40

4010

4012

OWTD

WATER DISTRIBUTION-METERS AND SETTINGS-PROJECT # 0912-26-0700

1971

33,322.13

3.66

122,016.75

4010

4012

OWTD

METERS & SETTINGS

1973

54,488.69

3.77

205,573.21

4010

4012

OWTD

HYDRANTS

1973

5,049.02

3.77

19,048.78

4010

4012

OWTD

SERVICE CONNECTIONS

1973

21,941.72

3.77

82,781.03

4010

4012

OWTD

TAPPING SLEEVES FOR FIRE HYDRANT 77TH AVE & 32ND &31ST STREETS

1973

410.00

3.77

1,546.84

4010

4012

OWTD

WATER UTILITY OPERATING FUND-WATER DISTRIBUTION-SERVICE CONNECTION

1975

12,752.74

3.35

42,748.38

4010

4012

OWTD

WATER UTILITY OPERATING FUND-WATER DISTRIBUTION-HYDRANTS

1975

20,273.95

3.35

67,960.18

4010

4012

OWTD

WATER UTILITY OPERATING FUND-WATER DISTRIBUTION-METERS AND SETTINGS

1975

20,783.69

3.35

69,668.88

4010

4012

OWTD

WATER MAIN ADJUSTMENTS US1 AND PEMBROKE RD TO YOUNG CIRCLE

1975

190,000.00

3.35

636,897.81

4010

4012

OWTD

ENGINEERING FEES-PBSJ-REYNOLDS- FISCAL AGENT-WALTON,LANTAFF-LEGAL FEES-PURCHASE OF EMERALD HILLS WATER & SEWER SYSTEM- 26-90-012

1975

761,570.84

3.35

2,552,856.86

4010

4012

OWTD

WATER SYSTEM-HOLLYWOOD GARDENS SUBDIVISION

1975

46,000.00

3.35

154,196.31

4010

4012

OWTD

VALVE VAULTS-HOLLYWOOD BLVD & 28TH AVE

1975

4,143.33

3.35

13,888.83

4010

4012

OWTD

WATER DISTRIBUTION-METERS AND SETTINGS

1976

23,357.41

3.07

71,746.93

4010

4012

OWTD

WATER DISTRIBUTION-SERVICE CONNECTIONS

1976

13,487.33

3.07

41,429.02

4010

4012

OWTD

WATER DISTRIBUTION HYDRANTS

1976

19,484.14

3.07

59,849.41

4010

4012

OWTD

WATER DISTRIBUTION-METERS AND SETTINGS

1977

35,204.30

2.90

102,136.77

4010

4012

OWTD

WATER DISTRIBUTION-SERVICE CONNEC- TION

1977

23,422.70

2.90

67,955.30

4010

4012

OWTD

WATER DISTRIBUTION-HYDRANTS

1977

32,639.89

2.90

94,696.75

4010

4012

OWTD

WATER DISTRIBUTION-METERS & SETTING

1978

32,273.49

2.66

85,997.28

4010

4012

OWTD

WATER DISTRIBUTION-SERVICE CONNECTIONS

1978

22,961.68

2.66

61,184.64

4010

4012

OWTD

WATER DISTRIBUTION-HYDRANTS

1978

28,566.51

2.66

76,119.51

4010

4012

OWTD

SHERIDAN HILLS-WATER SYSTEM (R77158

1978

15,500.00

2.66

41,301.94

4010

4012

OWTD

WATER DISTRIBUTION-METERS,SETTINGS

1979

33,715.71

2.45

82,761.41

4010

4012

OWTD

WATER DISTRIBUTION-SERVICE CONNECTIONS

1979

17,271.89

2.45

42,397.03

4010

4012

OWTD

WATER DISTRIBUTION-HYDRANTS

1979

39,138.71

2.45

96,073.16

4010

4012

OWTD

WATER DISTRIBUTION-METERS,SETTINGS

1980

27,135.77

2.28

61,952.58

4010

4012

OWTD

WATER DISTRIBUTION-SERVICE CONNEC- TIONS

1980

17,070.24

2.28

38,972.38

4010

4012

OWTD

WATER DISTRIBUTION-HYDRANTS

1980

2,044.99

2.28

4,668.83

4010

4012

OWTD

WATER DISTRIBUTION-METERS,SETTINGS

1981

29,850.66

2.07

61,689.51

4010

4012

OWTD

WATER DISTRIBUTION-SERVICE CONNECTIONS

1981

21,681.80

2.07

44,807.71

4010

4012

OWTD

WATER DISTRIBUTION-HYDRANTS

1981

5,787.97

2.07

11,961.45

4010

4012

OWTD

EXISTING DISTRIBUTION SYSTEM AS OF SEPTEMBER 30,1953

1953

1,568,772.64

9.65

15,136,564.28

4010

4012

OWTD

SERVICE CONNECTIONS

1982

13,695.98

1.91

26,129.36

4010

4012

OWTD

WATER DISTRIBUTION

1982

2,667.15

1.91

5,088.42

4010

4012

OWTD

METER SETTING

1982

22,421.00

1.91

42,775.07

A-13

Page 93: First Reading - OrdinanceWatch

Year

Original

Escalation

Current

Dept.

Div.

Asset Type

Cat.

Asset Description

Acquired

Cost

Factor

Cost

Appendix A. W

ater and W

astewater Utility System Asset List as of September 30, 2008

4010

4012

OWTD

WATER SERVICE CONST 40TH AVE FARRAGUT TO ATLANTA ST SIMMS ST 40TH AVE TO 38TH AVE SIMMS TO ATLANTA

1982

32,866.65

1.91

62,703.41

4010

4012

OWTD

WATER SYSTEM STUDY-ANALYSIS

1982

73,686.53

1.91

140,580.09

4010

4012

OWTD

WATER MAINS AT SHERIDAN ST

1983

81,879.22

1.99

162,947.81

4010

4012

OWTD

BOULEVARD HEIGHTS UTILITY SYSTEM- WATER DISTRIBUTION

1983

1,377,067.05

1.99

2,740,500.71

4010

4012

OWTD

CARRIAGE HILLS SYSTEM-WATER DISTRIBUTION

1983

353,073.33

1.99

702,651.12

4010

4012

OWTD

HYDRANTS

1983

727.16

1.99

1,447.12

4010

4012

OWTD

SERVICE CONNECTIONS

1983

13,451.53

1.99

26,769.89

4010

4012

OWTD

METER SETTING

1983

14,872.61

1.99

29,597.98

4010

4012

OWTD

METERS/SETTINGS

1984

23,319.74

2.00

46,576.24

4010

4012

OWTD

SERVICE CONNECTIONS

1984

21,444.43

2.00

42,830.71

4010

4012

OWTD

METERS/SETTINGS

1985

22,859.43

1.99

45,481.44

4010

4012

OWTD

SERVICE CONNECTIONS

1985

19,145.64

1.99

38,092.44

4010

4012

OWTD

HYDRANTS

1985

1,487.09

1.99

2,958.74

4010

4012

OWTD

TAFT STREET WATERMAIN (CONSTRUCTION& ENGINEERING DESIGN FEES)

1985

252,647.21

1.99

502,670.45

4010

4012

OWTD

BOULEVARD HEIGHTS UTILITY SYSTEM- SYSTEM CONNECTION-PHASE B HIGGINS- $433,064;ENGINEERING DESIGN-$83,103SYSTEM ISOLATION-$61,912)

1985

570,415.13

1.99

1,134,905.98

4010

4012

OWTD

18" KENNEDY FIRE HYDRANT EXTENSION

1985

212.85

1.99

423.49

4010

4012

OWTD

CONFLICT MANHOLE - SHERIDAN 12" WATERPIPE

1986

3,200.00

1.92

6,136.95

4010

4012

OWTD

SERVICE CONNECTIONS

1986

29,381.33

1.92

56,347.46

4010

4012

OWTD

METERS/SETTINGS

1986

30,925.93

1.92

59,309.69

4010

4012

OWTD

HYDRANTS

1987

184.59

1.87

345.28

4010

4012

OWTD

SERVICE CONNECTIONS

1987

18,957.91

1.87

35,461.70

4010

4012

OWTD

METER/SETTINGS

1987

27,202.65

1.87

50,883.89

4010

4012

OWTD

WATER METER - BETWEEN BOUGAINVILLEA& SURF RD. TO SERVICE SHOWERS BTWN BOUGAINVILLEA & IRIS TERRACE

1987

579.00

1.87

1,083.05

4010

4012

OWTD

METERS/SETTINGS

1988

22,813.83

1.86

42,499.86

4010

4012

OWTD

SERVICE CONNECTIONS

1988

12,691.17

1.86

23,642.36

4010

4012

OWTD

HYDRANTS

1988

2,481.81

1.86

4,623.36

4010

4012

OWTD

CENTRAL AREA WATER SYSTEM UPGRADE- WATER MAIN-NORTH SIDE OF SOUTH LAKE(SEE 33-01-021)

1988

109,960.00

1.86

204,844.35

4010

4012

OWTD

CENTRAL AREA WATER SYSTEM UPGRADE- 2" TO 6" SERVICE (WATER MAIN - SHERMAN/ARTHUR & DIXIE/N. 26TH AVE)(SEE 33-01-021)

1988

202,824.37

1.86

377,841.26

4010

4012

OWTD

METERS/SETTINGS

1989

13,938.77

1.84

25,686.15

4010

4012

OWTD

HYDRANTS

1989

500.68

1.84

922.65

4010

4012

OWTD

SERVICE CONNECTIONS

1989

8,049.51

1.84

14,833.51

4010

4012

OWTD

WATER MAIN-STIRLING ROAD(65-77 AVE)

1989

115,092.98

1.84

212,091.57

4010

4012

OWTD

METERS/SETTINGS

1990

36,784.03

1.81

66,723.10

4010

4012

OWTD

SERVICE CONNECTIONS

1990

6,730.64

1.81

12,208.81

4010

4012

OWTD

HYDRANTS

1990

1,764.73

1.81

3,201.07

4010

4012

OWTD

8" DIP WATER MAIN (7,700 L.F.) ON 21ST AVE BETWEEN SHERIDAN ST. & HOLLYWOOD BLVD

1990

343,026.44

1.81

622,220.76

4010

4012

OWTD

6" WATER MAIN-HARDING/SCOTT/DIXIE HWY/N 22ND AVE

1990

20,812.14

1.81

37,751.45

4010

4012

OWTD

HERSEY 8" X 4 CUBIC FT. WATER METER& TWO 8" GATE VALVES (MEMORIAL HOSPITAL

1991

6,165.00

1.80

11,067.93

4010

4012

OWTD

HYDRANTS

1991

590.00

1.80

1,059.22

4010

4012

OWTD

SERVICE CONNECTIONS

1991

8,739.20

1.80

15,689.35

4010

4012

OWTD

METERS/SETTINGS

1991

32,005.28

1.80

57,458.58

4010

4012

OWTD

WATER DISRIBUTION SYSTEM-9,800 L.F.12" PVC PIPE

1991

199,766.00

1.80

358,636.80

4010

4012

OWTD

WATER DISTRIBUTION SYSTEM-4,045 L.F8" PVC PIPE

1991

56,366.00

1.80

101,193.00

4010

4012

OWTD

WATER DISTRIBUTION SYSTEM-256 L.F. 6" PVC PIPE

1991

2,988.00

1.80

5,364.31

4010

4012

OWTD

WATER DISTRIBUTION SYSTEM-255 L.F./UNITS OF 16" DIP-FLANGED

1991

23,890.00

1.80

42,889.35

4010

4012

OWTD

WATER DISTRIBUTION SYSTEM-324 L.F./UNITS OF 16" DIP-RESTR. JOINT

1991

20,134.00

1.80

36,146.26

4010

4012

OWTD

WATER DISTRIBUTION SYSTEM-1,985 L.F/UNITS 16" PUSH-ON JOINTS

1991

69,619.00

1.80

124,985.91

4010

4012

OWTD

WATER DISTRIBUTION SYSTEM-13 UNITS 12" GATE VALVES W/BOX

1991

10,796.00

1.80

19,381.89

4010

4012

OWTD

WATER DISTRIBUTION SYSTEM-35 UNITS OF 8" GATE VALVES W/BOX

1991

17,235.00

1.80

30,941.73

4010

4012

OWTD

WATER DISTRIBUTION SYSTEM-27 FIRE HYDRANTS

1991

40,421.00

1.80

72,567.19

4010

4012

OWTD

WATER DISTRIBUTION SYSTEM-31 UNITS 2" BLOW OFF ASSEMBLY

1991

15,149.00

1.80

27,196.76

4010

4012

OWTD

WATER DISTRIBUTION SYSTEM-18.1 L.F.OF FITTINGS

1991

49,022.00

1.80

88,008.44

4010

4012

OWTD

WATER DISTRIBUTION SYSTEM-AIR RELEASE VALVE

1991

2,354.00

1.80

4,226.10

4010

4012

OWTD

WATER DISTRIBUTION SYSTEM-SAMPLING POINTS

1991

4,136.00

1.80

7,425.30

4010

4012

OWTD

WATER DISTRIBUTION CONNECTIONS- 40 L.F. 6" PVC PIPE/15 L.F. 16" DIP

1991

891.00

1.80

1,599.60

4010

4012

OWTD

WATER DISTRIBUTION CONNECTIONS- 135 L.F. 12" DIP WATER MAIN

1991

5,720.00

1.80

10,269.03

A-14

Page 94: First Reading - OrdinanceWatch

Year

Original

Escalation

Current

Dept.

Div.

Asset Type

Cat.

Asset Description

Acquired

Cost

Factor

Cost

Appendix A. W

ater and W

astewater Utility System Asset List as of September 30, 2008

4010

4012

OWTD

WATER DISTRIBUTION CONNECTIONS- 35 L.F. 10" DIP FORCE MAIN

1991

1,450.00

1.80

2,603.16

4010

4012

OWTD

WATER DISTRIBUTION CONNECTIONS- VARIOUS GATE VALVES W/BOX & 2" BLOWOFF ASSEMBLY

1991

4,587.00

1.80

8,234.97

4010

4012

OWTD

WATER DISTRIBUTION CONNECTIONS- FITTINGS

1991

3,372.00

1.80

6,053.70

4010

4012

OWTD

WATER DISTRIBUTION CONNECTIONS- 20" X 12" TAPPING SLEEVE & VALVE

1991

7,867.00

1.80

14,123.50

4010

4012

OWTD

WATER DISTRIBUTION CONNECTIONS- 8" X 6" TAPPING SLEEVE & VALVE

1991

3,272.00

1.80

5,874.17

4010

4012

OWTD

WATER DISTRIBUTION CONNECTION- CONNECTION TO EXISTING 6" WATER MAIN

1991

1,455.00

1.80

2,612.14

4010

4012

OWTD

WATER DISTRIBUTION CONNECTIONS- 10" X 6" METER ASSEMBLY W/VAULT & ASSEMBLY COMPLETE

1991

55,288.00

1.80

99,257.69

4010

4012

OWTD

WATER DISTRIBUTION CONNECTIONS- 6" X 3" METER ASSEMBLY W/VAULT COMPLETE

1991

64,645.00

1.80

116,056.17

4010

4012

OWTD

WATER DISTRIBUTION CONNECTIONS- OPEN CUT WATER MAIN

1991

31,633.00

1.80

56,790.23

4010

4012

OWTD

METERS/SETTINGS

1992

14,948.94

1.73

25,845.74

4010

4012

OWTD

SERVICE CONNECTIONS

1992

7,167.05

1.73

12,391.36

4010

4012

OWTD

HYDRANTS

1992

1,710.72

1.73

2,957.72

4010

4012

OWTD

6" WATER MAIN-PEMBROKE RD & S 26TH AVE AREA-INSTALLED BY CITY FORCES

1992

3,304.22

1.73

5,712.78

4010

4012

OWTD

3" BADGER TURBO II FIRE HYDRANT METER

1992

510.00

1.73

881.76

4010

4012

OWTD

3" BADGER TURBO II FIRE HYDRANT METER

1992

510.00

1.73

881.76

4010

4012

OWTD

3" BADGER TURBO II FIRE HYDRANT METER

1992

510.00

1.73

881.76

4010

4012

OWTD

3" BADGER TURBO II FIRE HYDRANT METER

1992

510.00

1.73

881.76

4010

4012

OWTD

SERVICE CONNECTIONS

1993

4,578.59

1.71

7,819.24

4010

4012

OWTD

METER/SETTINGS

1993

13,090.09

1.71

22,355.05

4010

4012

OWTD

CENTRAL AREA WATER SYSTEM UPGRADE- WATER LINE IMPROVEMENTS

1993

266,641.20

1.71

455,365.58

4010

4012

OWTD

SERVICE CONNECTIONS

1994

6,422.79

1.69

10,837.41

4010

4012

OWTD

METERS & SETTINGS

1994

21,668.55

1.69

36,562.13

4010

4012

OWTD

WATER MAIN & FIRE HYDRANT SYSTEM UPGRADE-SEMINOLE RESERVATION- CONSTRUCTION & PERMIT COSTS

1994

47,139.44

1.69

79,540.09

4010

4012

OWTD

OAK STREET WATER MAIN EXTENSION

1995

30,179.35

1.71

51,669.06

4010

4012

OWTD

WATER MAIN - DIXIE CORRIDOR .006301-$410,824.46;.003121-115.20

1997

410,939.66

1.57

644,671.50

4010

4012

OWTD

WATER MAIN IMPROVEMENTS - VARIOUS LOCATIONS

1997

351,482.37

1.57

551,396.44

4010

4012

OWTD

WATER MAIN IMPROVEMENTS POK-TYLER STS. (.003121 - $99,861.35; .006302- $582,185.12)

1999

682,046.47

1.50

1,025,747.83

4010

4012

OWTD

AIA WATER LINES REHABILITATION (76657.536.003121 - $70,832.02)

1999

280,546.46

1.50

421,921.28

4010

4012

OWTD

WATER MAIN IMPROVEMENT - FLETCHER ST & MOFFET ST/S 19TH TO S 20TH AVE

1999

20,555.54

1.50

30,914.02

4010

4012

OWTD

WATER MAIN IMPROVEMENT - WILEY ST &MAYO ST/ S 20TH AVE TO S 20TH CT

1999

20,555.50

1.50

30,913.96

4010

4012

OWTD

WATER MAIN IMPROVEMENT - TYLER ST &FILLMORE ST/N 32ND AVE TO N 31ST CT

1999

20,555.50

1.50

30,913.96

4010

4012

OWTD

WATER MAIN IMPROVEMENT - PIERCE ST & FILLMORE ST/N 32ND AVE TO N 31ST AVE

1999

20,555.50

1.50

30,913.96

4010

4012

OWTD

WATER MAIN IMPROVEMENT - PIERCE ST & JOHNSON ST/N 31ST AVE TO N 31ST CT

1999

20,555.50

1.50

30,913.96

4010

4012

OWTD

WATER MAIN IMPROVEMENT - PIERCE ST & JOHNSON ST/N 31ST RD TO N 31ST CT

1999

20,555.50

1.50

30,913.96

4010

4012

OWTD

WATER MAIN IMPROVEMENT - PIERCE ST & JOHNSON ST/N 31ST RD TO N 32ND AVE

1999

20,555.50

1.50

30,913.96

4010

4012

OWTD

WATER MAIN IMPROVEMENT - PIERCE ST & JOHNSON ST/N. 32ND AVE TO N 32ND CT

1999

20,555.50

1.50

30,913.96

4010

4012

OWTD

WATER MAIN IMPROVEMENT - HAYES ST &JOHNSON ST/N 31ST RD TO N 31ST CT

1999

20,555.50

1.50

30,913.96

4010

4012

OWTD

WATER MAIN IMPROVEMENT - HAYES ST &JOHNSON ST/N GOLF DR TO N 32ND AVE

1999

20,555.50

1.50

30,913.96

4010

4012

OWTD

WATER MAIN IMPROVEMENT - HAYES ST &ARTHUR ST/N 31ST CT TO N 31ST AVE

1999

20,555.50

1.50

30,913.96

4010

4012

OWTD

WATER MAIN IMPROVEMENT - HAYES ST & ARTHUR ST/N 32ND AVE TO N 31ST RD

1999

20,555.50

1.50

30,913.96

4010

4012

OWTD

WATER MAIN IMPROVEMENT - BUCHANAN ST & PIERCE ST/N PARK RD TO N GOLF DR

1999

20,555.50

1.50

30,913.96

4010

4012

OWTD

WATER MAIN IMPROVEMENT - LINCOLN ST& BUCHANAN ST/N PARK RD TO N GOLF DR

1999

20,555.50

1.50

30,913.96

4010

4012

OWTD

WATER MAIN IMPROVEMENT - GRANT ST &JOHNSON ST/N PARK RD TO N GOLF DR

1999

20,555.50

1.50

30,913.96

4010

4012

OWTD

WATER MAIN IMPROVEMENT - HAYES ST &GRANT ST/N PARK RD TO N GOLF DR

1999

20,555.50

1.50

30,913.96

4010

4012

OWTD

WATER MAIN IMPROVEMENT - GARFIELD ST & HAYES ST/N PARK RD TO N GOLF DR

1999

20,555.50

1.50

30,913.96

4010

4012

OWTD

WATER MAIN IMPROVEMENT - TAFT ST & ROOSEVELT ST/PARK RD TO N 31ST AVE

1999

20,555.50

1.50

30,913.96

4010

4012

OWTD

WATER MAIN IMPROVEMENT - WASHINGTONST & DEWEY ST/S 29TH AVE TO I-95

1999

20,555.50

1.50

30,913.96

4010

4012

OWTD

WATER MAIN IMPROVEMENT - CALLE LARGO & VAN BUREN ST/ENTRADA TO CALLE GRANDE

1999

20,555.50

1.50

30,913.96

4010

4012

OWTD

WATER MAIN IMPROVEMENT - HARRISON ST & VAN BUREN ST/CALLE LARGO TO CALLE GRANDE

1999

20,555.50

1.50

30,913.96

4010

4012

OWTD

WATER MAIN IMPROVEMENT - DEWEY ST &FUNSTON ST/S 13TH TO S 14TH AVE

1999

20,555.50

1.50

30,913.96

4010

4012

OWTD

WATER MAIN IMPROVEMENT - GRANT ST &HAYES ST/N 15TH TO 16TH AVE

1999

20,555.50

1.50

30,913.96

4010

4012

OWTD

WATER MAIN IMPROVEMENT - BUCHANAN ST & LINCOLN ST/N 56TH AVE TO COLUMBUS PKWY

1999

20,555.50

1.50

30,913.96

4010

4012

OWTD

WATER MAIN IMPROVEMENTS POLK-TYLER ST - ADDTNL CHGS

1999

6,344.98

1.50

9,542.38

4010

4012

OWTD

WATER MAIN A1A SHERIDAN-JOHNSON STS

2000

239,014.92

1.41

337,007.39

4010

4012

OWTD

A1A SERVICE IMPROVEMENTS

2000

38,220.00

1.41

53,889.62

4010

4012

OWTD

LARGE USERS METER UPGRADES

2000

210,519.00

1.41

296,828.58

A-15

Page 95: First Reading - OrdinanceWatch

Year

Original

Escalation

Current

Dept.

Div.

Asset Type

Cat.

Asset Description

Acquired

Cost

Factor

Cost

Appendix A. W

ater and W

astewater Utility System Asset List as of September 30, 2008

4010

4012

OWTD

WATER MAIN A1A B/W SHERIDAN & JOHNSON STS. (6204 - $11,554.26; 9997 - $22,035.89)

2000

33,590.15

1.41

47,361.60

4010

4012

OWTD

3A WATER MAIN - SHERIDAN ST TO MAPLE ST (3121 $61,307.10, 6204 $38,680.51, 6301 $1,409,315.30, 9997 $95784.12)

2001

1,762,484.17

1.43

2,522,764.97

4010

4012

OWTD

A-423 4-0 5 1/4 HYDRANT W/GREEN CAP

2002

886.00

1.38

1,224.42

4010

4012

OWTD

A-423 4-0 5 1/4 HYDRANT W/GREEN CAP

2002

886.00

1.38

1,224.42

4010

4012

OWTD

A-423 4-0 5 1/4 HYDRANT W/GREEN CAP

2002

886.00

1.38

1,224.42

4010

4012

OWTD

A-423 4-0 5 1/4 HYDRANT W/GREEN CAP

2002

886.00

1.38

1,224.42

4010

4012

OWTD

A-423 4-0 5 1/4 HYDRANT W/GREEN CAP

2002

886.00

1.38

1,224.42

4010

4012

OWTD

A-423 4-0 5 1/4 HYDRANT W/GREEN CAP

2002

886.00

1.38

1,224.42

4010

4012

OWTD

A-423 4-0 5 1/4 HYDRANT W/GREEN CAP

2002

886.00

1.38

1,224.42

4010

4012

OWTD

A-423 4-0 5 1/4 HYDRANT W/GREEN CAP

2002

886.00

1.38

1,224.42

4010

4012

OWTD

A-423 4-0 5 1/4 HYDRANT W/GREEN CAP

2002

886.00

1.38

1,224.42

4010

4012

OWTD

WESTBROOK - MAPLE RIDGE (6204 $12,082.91; 6301 $120,292.15; 9997 $15,607.65)

2002

147,982.71

1.38

204,506.32

4010

4012

OWTD

ELEVATED STORAGE TANKS (6204 $4,469.60; 6301 $77,600; 9997 $11,913.98)

2001

93,983.58

1.43

134,525.17

4010

4012

OWTD

WATER MAIN REPLACEMENT & ALLEY PAVING (6204 $30,564.81; 6303 #359,295.81; 9997 $47,347.83)

2001

437,208.45

1.43

625,806.56

4010

4012

OWTD

WATER MAIN REPLACEMENT & ALLEY PAVING (3121 $15,915; 6204 $426.14; 9997 $2,823.79)

2001

19,164.93

1.43

27,432.08

4010

4012

OWTD

WATER MAIN REPLACEMENT & ALLEY PAVING (6204 - $1,994.03; 6301 - $118,516.42; 9997 - $12,673.70)

2004

133,184.15

1.26

167,204.04

4010

4012

OWTD

JOHNSON ST/FEC WATER MAIN REPLACEMENT (3121 - $44,284.55; 6204 - $5,645.48; 6302 - $156,028.95; 9997 - $22,116.38)

2004

228,075.36

1.26

286,333.79

4010

4012

OWTD

WATER MAIN REPLACEMENT - HOLLYWOOD BLVD (6204 - $1,258.13; 6301 - $275,000; 9997 - $37,853.76)

2004

314,111.89

1.26

394,347.06

4010

4012

OWTD

35TH AVE VALVE REPLACEMENT (6204-$6,556.87; 6301-$353,426.38; 9997-$108,538.74)

2005

468,521.99

1.20

561,597.00

4010

4012

OWTD

F6/F7 WELLHEAD & VAULT

2008

170,600.33

1.00

170,249.49

4010

4012

OWTD

RAW WATERLINE PIPING (3121 $67,219.77; 6301 $189,336.67; 9997 $34,766.44)

2007

291,322.88

1.10

320,670.81

4010

4012

OWTD

RAW WATERLINE PIPING (6301-66,165; 9997-13,115.34)

2007

79,280.34

1.10

87,267.06

4010

4012

OWTD

LEE ST. DISTRIBUTION UPGRADE (3121-150; 6301-98,435.19; 6204-14,898.10; 9997-3,618.05)

2008

117,101.34

1.00

116,860.52

4010

4012

OWTD

RESTORATION OF ELEVATED WATER TANKS

1998

1,201,846.10

1.53

1,844,362.24

4010

4012

OWTD

RESTORATION OF ELEVATED WATER TANKS(.003121-$39,572.08;.005224- $14,936.83;.013121-$264,907.58)

1998

319,416.49

1.53

490,178.99

Subtotal

26,040,472.14

$

98,544,924.02

$

4040

4041

BWWTP

PROFESSIONAL SERVICES FOR ENGI- NEERING DESIGN OF SECONDARY SEWER TREATMENT PLANT

1971

5,598.70

$

3.66

20,500.94

$

4040

4041

OWWTP

INFLUENT PUMP STATION (6204 - $101,759.77; 6301 - $4,250,000; 9997 - $613,027.70)

2003

4,964,787.47

1.32

6,570,099.28

4040

4041

OWWTP

INFLUENT PUMP STATION (3121 - $404,885.36; 6204 - $21,900.81; 9997 - $157.77)

2003

426,943.94

1.32

564,991.77

4040

4041

OWWTP

INFLUENT PUMP STATION - 1999 UPGRADES (3121 - $1,865,829.48; 6204 - $320,530.10; 6301 - $2,938,979.75; 9997 - $505,010.06)

2003

5,630,349.39

1.32

7,450,863.65

4040

4041

OWWTP

INFLUENT PUMP STATION (3121 3,041.49; 9997 602.88)

2007

3,644.37

1.10

4,011.50

4040

4041

OWWTP

INFLUENT PUMP STATION (3121 $2,012.47; 9997 $828.53)

2006

2,841.00

1.18

3,361.12

4040

4041

OWWTP

SINGLE 18" LINE STOP ON DIP SEWAGE MAIN - LIFT STATION W-15 (784. - $11,020.00)

2001

22,490.00

1.43

32,191.49

4040

4041

BWWTP

PROFESSIONAL SERVICES,SEWER PLANT STUDY

1971

11,734.02

3.66

42,966.85

4040

4041

BWWTP

PROFESSIONAL SERVICES,SEWER PLANT STUDY

1972

35,202.06

3.30

116,253.15

4040

4041

BWWTP

SEWER TREATMENT PLANT-PROFESSIONAL SERVICES,DESIGN AND GENERAL SUPER- VISION

1971

247,164.66

3.66

905,051.01

4040

4041

BWWTP

SEWER TREATMENT PLANT 1968-MODIFI- CATION-EFFLUENT PUMP STATION

1970

106,916.00

4.19

448,195.59

4040

4041

BWWTP

SEWER TREATMENT PLANT-1968 MODIFI- CATION -SCREENING FACILITY

1970

113,880.00

4.19

477,388.92

4040

4041

BWWTP

SEWER TREATMENT PLANT-1968 MODIFI- CATION-INFLUENT LIFT STATION

1970

303,972.00

4.19

1,274,261.19

4040

4041

BWWTP

SEWER TREATMENT PLANT-1968 MODIFI CATION-GRIT REMOVAL FACILITIES

1970

248,492.00

4.19

1,041,687.10

4040

4041

BWWTP

SEWER TREATMENT PLANT-1968 MODIFI- CATION-CENTRIFUGE BUILDING

1970

99,572.00

4.19

417,409.28

4040

4041

BWWTP

SEWER TREATMENT PLANT-1968 MODIFI- CATION-TRANSFORMER BUILDING

1970

13,140.00

4.19

55,083.34

4040

4041

BWWTP

SEWER TREATMENT PLANT-1968 MODIFI- CATION- BUILDING SPECIALITIES

1970

93,148.00

4.19

390,479.65

4040

4041

BWWTP

WASTEWATER TREATMENT PLANT-MODIFI- CATION-CONSTRUCTION

1976

19,797,601.15

3.07

60,812,267.58

4040

4041

BWWTP

WASTEWATER TREATMENT PLANT MODIFI- CATION- ENGINEERING SERVICES

1976

22,301.70

3.07

68,504.10

4040

4041

BWWTP

WASTEWATER TREATMENT PLANT MODIFI- CATION- ENGINEERING DESIGN.

1976

1,091,250.11

3.07

3,351,991.65

4040

4041

BWWTP

WASTEWATER TREATMENT PLANT MODIFI- CATION-ENGINEERING INSPECTION

1976

331,467.63

3.07

1,018,168.72

4040

4041

BWWTP

WASTEWATER TREATMENT PLANT MODIFI- CATION-OPERATIONS & MAINTENANCE MANUAL

1976

46,670.95

3.07

143,359.10

4040

4041

BWWTP

WASTEWATER TREATMENT PLANT-MODIFI- CATION-OTHER TECHNICAL SERVICES

1976

19,367.50

3.07

59,491.13

4040

4041

BWWTP

WASTEWATER TREATMENT PLANT MODIFI- CATION-LAND ACQUISITION-APPRAISAL COSTS

1976

14,805.75

3.07

45,478.80

4040

4041

BWWTP

WASTEWATER TREATMENT PLANT MODIFI- CATION-PRELIMINARY EXPENSES

1976

5,333.42

3.07

16,382.66

4040

4041

BWWTP

WASTEWATER TREATMENT PLANT MODIFI- CATION-ENGINEERING STUDY

1976

57,500.00

3.07

176,622.68

4040

4041

BWWTP

WASTEWATER TREATMENT PLANT UPGRADE -SCREEN BUILDING

1988

466,000.00

1.86

868,110.81

4040

4041

BWWTP

WASTEWATER TREATMENT PLANT UPGRADE-CONSTRUCTION-GRIT CHAMBER #3 (PRIORYEAR DEPRECIATION-$36,886 RECORDED IN FY1985 & 1986)DER GRANT-$831,189

1988

1,100,000.00

1.86

2,049,188.61

4040

4041

BWWTP

WASTEWATER TREATMENT PLANT UPGRADE-DEGRITTING FACILITY

1988

363,000.00

1.86

676,232.24

A-16

Page 96: First Reading - OrdinanceWatch

Year

Original

Escalation

Current

Dept.

Div.

Asset Type

Cat.

Asset Description

Acquired

Cost

Factor

Cost

Appendix A. W

ater and W

astewater Utility System Asset List as of September 30, 2008

4040

4041

BWWTP

WASTEWATER TREATMENT PLANT- LUNCHROOM/LOCKER ROOM BUILDING (46' X 28')

1988

29,970.80

1.86

55,832.57

4040

4041

BWWTP

CLARIFIER (#__)

1990

2,406,659.15

1.81

4,365,474.82

4040

4041

BWWTP

CLARIFIER (#__)

1990

2,406,659.15

1.81

4,365,474.82

4040

4041

BWWTP

STEEL PIPES & FITTING FOR FLOW DISTRIBUTION STATION & SECONDARY CLARIFIERS

1989

63,366.27

1.84

116,770.39

4040

4041

BWWTP

SECONDARY CLARIFIERS-PUMPS, MOTORS & DRIVES

1989

615,608.98

1.84

1,134,434.76

4040

4041

BWWTP

A/C BUILDING FOR DRY POLYMER

1991

9,244.86

1.80

16,597.15

4040

4041

BWWTP

WWTP UPGRADE -RETURN SLUDGE SYSTEM

1991

467,326.93

1.80

838,984.78

4040

4041

BWWTP

WWTP-EFFLUENT PUMP UPGRADE- STRUCTURAL & MECHANICAL COSTS

1991

369,310.48

1.80

663,017.37

4040

4041

BWWTP

WWTP UPGRADE-FLOW DISTRIBUTION STATION-SITE PREPARATION,STRUCTURAL& MECHANICAL COSTS

1991

210,829.15

1.80

378,498.30

4040

4041

BWWTP

WWTP-FOUR CLARIFIERS REHABILITATIONCONSTRUCTION COSTS

1991

931,799.19

1.80

1,672,844.62

4040

4041

BWWTP

WWTP-FOUR CLARIFIERS REHABILITATIONENGINEERING DESIGN & ENGINEERING INSPECTION COSTS

1991

14,617.13

1.80

26,241.91

4040

4041

BWWTP

WWTP-RETURN ACTIVATED SLUDGE SYSTEM(SEE FA#32452 FOR OTHER COSTS)

1992

21,959.77

1.73

37,967.01

4040

4041

BWWTP

WWTP UPGRADE-FLOW DISTRIBUTION STATION (SEE FA#32454 FOR OTHER COSTS)

1992

14,725.45

1.73

25,459.34

4040

4041

BWWTP

WWTP-SLUDGE THICKENING BUILDING- ENGINEERING DESIGN

1993

5,000.00

1.71

8,538.92

4040

4041

BWWTP

WWTP-LIME SLUDGE STABILIZATION FACILITY-ENGINEERING DESIGN-UCIP

1993

960.69

1.71

1,640.65

4040

4041

BWWTP

WTTP-RECLAIMED WATER SYSTEM INFRASTRUCTURE-ENGINEERING/DESIGN SERVICES

1994

201,517.03

1.69

340,026.99

4040

4041

BWWTP

WWTP-ECO GRANDE GOLF COURSE RELOCATION/REUSE AREA & FACILITY- ENGINEERING SERVICES

1994

66,910.64

1.69

112,900.75

4040

4041

BWWTP

WWTP-ECO GRANDE GOLF COURSE RELOCATION/REUSE AREA & FACILITY- CONSTRUCTION

1994

954,910.90

1.69

1,611,255.76

4040

4041

BWWTP

REUSE STORAGE & PUMPING STATION (46301-$2,153,906.09; 6204-$661.08;$1,943.64; 23121-$252,566.82)

1995

2,409,077.63

1.71

4,124,501.97

4040

4041

EWWTP

SEWER TREATMENT PLANT-1968 MODIFI- CATION-SQUARE X CLARIFIERS

1970

116,216.00

4.19

487,181.51

4040

4041

EWWTP

SEWER TREATMENT PLANT-1968 MODIFI- CATION-RECIRCULATION BOX (NOT IN SERVICE)

1970

41,782.56

4.19

175,153.94

4040

4041

EWWTP

SEWER TREATMENT PLANT-1968 MODIFI- CATION-EFFLUENT METER

1970

11,972.00

4.19

50,187.04

4040

4041

EWWTP

SEWER TREATMENT PLANT-50 TON SHOP PRESS WITH ACCESSORIES

1978

1,306.72

2.66

3,481.94

4040

4041

EWWTP

SEWER TREATMENT PLANT- GALEN PROFESSIONAL MICROSCOPE

1978

935.00

2.66

2,491.44

4040

4041

EWWTP

SEWER TREATMENT PLANT-DOUBLE WING PICK RACKS WITH BINS

1978

1,136.05

2.66

3,027.17

4040

4041

EWWTP

SEWER TREATMENT PLANT-FLEXIBLE SAFETY STRIP FOR WELDING SHOP

1978

1,585.00

2.66

4,223.46

4040

4041

EWWTP

SEWER TREATMENT PLANT-SHELVES,POSTS& HOOKS

1978

1,330.31

2.66

3,544.80

4040

4041

EWWTP

SEWER TREATMENT PLANT-MECHANICS TOOL SET

1979

997.50

2.45

2,448.55

4040

4041

EWWTP

WASTEWATER TREATMENT PLANT- PIPE & BOLT THREADING MACHINE

1979

1,560.00

2.45

3,829.31

4040

4041

EWWTP

WASTEWATER TREATMENT PLANT- WALL CABINET ASSEMBLY CURTIS MATHESON SCIENTIFIC

1978

2,340.00

2.66

6,235.26

4040

4041

EWWTP

WASTEWATER TREATMENT PLANT-STARTER LATHE BASE

1979

12,399.00

2.45

30,435.62

4040

4041

EWWTP

WASTEWATER TREATMENT PLANT UPGRADE-SCREEN BLDG.-VARIOUS EQUIPMENT

1988

420,000.00

1.86

782,417.47

4040

4041

EWWTP

WASTEWATER TREATMENT PLANT UPGRADE-GRIT CHAMBER #3-VARIOUS EQUIPMENT

1988

332,000.00

1.86

618,482.38

4040

4041

EWWTP

WASTEWATER TREATMENT PLANT UPGRADE-DEGRITTING FACILITY-VARIOUS EQUIPMENT

1988

250,000.00

1.86

465,724.68

4040

4041

EWWTP

WASTEWATER TREATMENT PLANT UPGRADE-DEGRITTING FACILITY-INSTRUMENTATION& CONTROLS

1988

303,296.00

1.86

565,009.74

4040

4041

OWWTP

SEWER TREATMENT PLANT-1968 MODIFI- CATION-PLANT PIPING OUTSIDE

1970

117,731.00

4.19

493,532.44

4040

4041

OWWTP

SEWER TREATMENT PLANT-1968 MODIFI- CATION-SITE WORK

1970

31,828.00

4.19

133,424.08

4040

4041

OWWTP

SEWER TREATMENT PLANT-1968 MODIFI- CATION-MISCELLANEOUS METALS

1970

133,444.00

4.19

559,401.89

4040

4041

OWWTP

SEWER TREATMENT PLANT-1968 MODIFI- CATION-VENTILATION,AIR CONDITIONING& PLUMBING

1970

34,426.80

4.19

144,318.34

4040

4041

OWWTP

SEWER TREATMENT PLANT-1968 MODIFI- CATION-PRINTING

1970

122,932.00

4.19

515,335.22

4040

4041

OWWTP

WASTEWATER TREATMENT PLANT MODIFI- CATION-CONSULTANTS-CLARIFIER-TANKS

1979

2,810.51

2.45

6,898.91

4040

4041

OWWTP

WASTEWATER TREATMENT PLANT MODIFI- CATION INDUSTRIAL COST RECOVERY SYSTEM

1979

11,492.34

2.45

28,210.06

4040

4041

OWWTP

ACCESS CATWALK SEWER TREATMENT PLANT-WET WELL

1973

1,224.14

3.77

4,618.40

4040

4041

OWWTP

SEWER TREATMENT PLANT-LAND IMPROVE-MENTS

1971

4,974.64

3.66

18,215.80

4040

4041

OWWTP

WASTEWATER TREATMENT PLANT-FLOATING AERATOR PLATFORM-SLUDGE STORAGE- REMOVAL, RENOVATION & REPLACEMENT1979

26,951.72

2.45

66,157.95

4040

4041

OWWTP

WASTEWATER TREATMENT PLANT SLUDGE LINE AND STORAGE TANK PIPE MODIFIED

1980

6,640.74

2.28

15,161.21

4040

4041

OWWTP

SEWER PLANT SLUDGE TREATMENT BOILERS-CONVERSION TO GAS FIRED

1980

11,217.41

2.28

25,610.02

4040

4041

OWWTP

WASTEWATER TREATMENT PROGRAM-PRE- TREATMENT PROGRAM-PREPARATION OF STUDY

1981

2,495.71

2.07

5,157.65

4040

4041

OWWTP

WASTEWATER TREATMENT PLANT-REROUTE BACKWASH-DAVID LAKE TO TREATMENT PLANT

1981

4,395.93

2.07

9,084.65

4040

4041

OWWTP

DESIGN CONFORMANCE CORRECTION RELOCATE GATES ON FOUR CLARIFIERS

1981

51,789.09

2.07

107,027.57

4040

4041

OWWTP

CONSULTANT-OXYGENATION TANK

1981

10,956.93

2.07

22,643.64

4040

4041

OWWTP

INSTALLATION-FRESH WATER SUPPLY LINE 3" METER

1982

3,316.77

1.91

6,327.78

4040

4041

OWWTP

CRYOGENIC OXYGEN PLANT

1982

7,802.50

1.91

14,885.71

4040

4041

OWWTP

WINDOWS INSTALLED IN MINI BLINDS COLOR IN RESTROOM & MAIN CONTROL BLDG

1983

300.00

1.99

597.03

4040

4041

OWWTP

ODOR CONTROL PLANNING/INSTALLATION COSTS (ALSO SEE FA #31504 FOR OTHERCOSTS)

1983

530,171.90

1.99

1,055,094.93

4040

4041

OWWTP

VERTICAL PUMP WITH BASE, COUPLING AND GUARD

1983

10,644.11

1.99

21,182.84

A-17

Page 97: First Reading - OrdinanceWatch

Year

Original

Escalation

Current

Dept.

Div.

Asset Type

Cat.

Asset Description

Acquired

Cost

Factor

Cost

Appendix A. W

ater and W

astewater Utility System Asset List as of September 30, 2008

4040

4041

OWWTP

WASTEWATER ODOR CONTROL FACILITIES-CONSTRUCTION (SEE FA#31504-$67,775;FA#31548-$530,171.90).

1984

5,916.42

2.00

11,816.80

4040

4041

OWWTP

WASTEWATER PLANT MODIFICATIONS-OXY-GEN COMPRESSOR-INTER $646,893; LIT-IGATION FEES (FRATES, FLOYD, ETC.) $176,938; BACKUP OXYGEN GENERATOR

1984

879,958.28

2.00

1,757,530.36

4040

4041

OWWTP

WASTEWATER TREATMENT PLANT-UPGRADE PROJECT (ENGINEERING DESIGN)

1985

145,281.30

1.99

289,053.72

4040

4041

OWWTP

WASTEWATER TREATMENT PLANT EXPANSION DESIGN-EPA GRANT 120594 070;ENGINEERING DESIGN FEES) &(201 AMENDMENT-CAMP, DRESSER & MCKEE)

1985

268,439.17

1.99

534,090.35

4040

4041

OWWTP

WASTEWATER TREATMENT PLANT- CENTRFUGAL PRIMING PUMP(BARNEY PUMP-$6520) & SELF-PRIMING PUMP(POWER &PUMPS-$4449)

1985

10,970.20

1.99

21,826.46

4040

4041

OWWTP

LUXAIRE 15 TON ROOF-TOP A/C

1987

8,980.00

1.87

16,797.53

4040

4041

OWWTP

WASTEWATER TREATMENT PLANT-BY-PASS INFLUENT PUMP STATIONS - ENGINEERING DESIGN (UCIP)

1987

45,941.76

1.87

85,936.32

4040

4041

OWWTP

WASTEWATER TREATMENT PLANT UPGRADE-SCRUBBER SYSTEM

1988

989,000.00

1.86

1,842,406.85

4040

4041

OWWTP

GRIT CHAMBERS #1 & 2 - RENOVATION

1988

600,000.00

1.86

1,117,739.24

4040

4041

OWWTP

WASTEWATER TREATMENT PLANT UPGRADE-RENOVATION OF PUMP STATION

1988

40,000.00

1.86

74,515.95

4040

4041

OWWTP

WASTEWATER TREATMENT PLANT UPGRADE-YARD WORK (PIPING, PARKING LOT, FENCING, ETC.)

1988

651,133.74

1.86

1,212,996.22

4040

4041

OWWTP

WASTEWATER TREATMENT PLANT BY-PASS-PUMP & FORCE MAIN- CONSTRUCTION (SEE FA#31876 FOR PRIOR COSTS) (FY88-$64.20)1989

2,169,707.48

1.84

3,998,303.56

4040

4041

OWWTP

WASTEWATER TREATMENT PLANT UPGRADE-HEADWORKS-GENERAL IMPROVEMENTS

1989

43,568.29

1.84

80,286.97

4040

4041

OWWTP

FENCE & ELECTRIC GATE OPERATOR

1991

7,816.68

1.80

14,033.16

4040

4041

OWWTP

WWTP-CENTRAL PLANT DRAIN-STRUCTURALSITE PREPARATION & MECHANICAL COSTS

1991

110,767.22

1.80

198,858.67

4040

4041

OWWTP

WWTP EXPANSION (PHASE I)ENGINEERING & DESIGN SERVICES-$911,626;VALUE ENGINEERING STUDY-$44,473;DESIGN & CONSTRUCTION-$1,007,945;ENGINEERING

1991

2,021,376.11

1.80

3,628,945.16

4040

4041

OWWTP

WWTP LIME STABILIZATION-ENGINEERINGDESIGN & INSPECTION

1991

14,469.78

1.80

25,977.37

4040

4041

OWWTP

WWTP UPGRADE RETURN ACTIVATED SLUDGE SYSTEM-ENGINEERING DESIGN

1991

41,553.98

1.80

74,601.22

4040

4041

OWWTP

WWTP EXPANSION SLUDGE PROCESSING- ENGINEERING DESIGN, ENGINEERING SERVICE, INSPECTION SERVICES & GEOTECHNICAL SERVICES

1991

358,226.58

1.80

643,118.62

4040

4041

OWWTP

WWTP EXPANSION-PHASE I-CONSULTING SERVICES/PROJECT MANAGEMENT (SEE FA#32456/#32580 FOR OTHER COSTS)

1992

28,622.73

1.73

49,486.84

4040

4041

OWWTP

WWTP-INTERIM UPGRADE (CONTRACT #5)-ENGINEERING DESIGN (UCIP) (SEE FA#32458/#32578 FOR OTHER COSTS)

1992

95,832.27

1.73

165,687.75

4040

4041

OWWTP

WWTP UPGRADE-CENTRAL PLANT DRAIN (SEE FA#32455 FOR OTHER COSTS)

1992

733,525.03

1.73

1,268,216.98

4040

4041

OWWTP

WWTP-SLUDGE PROCESSING EXPANSION- CONSTRUCTION/INSPECTION SERVICES (SEE FA#32459/32581 FOR OTHER COSTS

1992

20,755.07

1.73

35,884.16

4040

4041

OWWTP

WWTP INTERIM UPGRADE (CONTRACT #5)-CAPITALIZED INTEREST COSTS

1992

151,001.61

1.73

261,071.94

4040

4041

OWWTP

WWTP EXPANSION PHASE I-CAPITALIZED INTEREST COSTS RELATED TO ENGINEER INSPECTION

1992

4,731.92

1.73

8,181.18

4040

4041

OWWTP

WWTP EXPANSION PHASE I-CAPITALIZED INTEREST COSTS RELATED - CONSULTINGSERVICES

1992

680.15

1.73

1,175.94

4040

4041

OWWTP

WWTP SLUDGE PROCESSING-CAPITALIZED INTEREST RELATED TO CONSTRUCTION INSPECTION

1992

1,874.04

1.73

3,240.09

4040

4041

OWWTP

WWTP-EXPANSION-PHASE I-VALUE ENGINEERING STUDY (SEE FA#32456 FOR OTHER RELATED COSTS)

1993

59,940.00

1.71

102,364.57

4040

4041

OWWTP

WWTP-INTERIM UPGRADE-RETURN ACTIVATED SLUDGE (SEE FA#32572 FOR OTHER COSTS)

1993

6,470.00

1.71

11,049.36

4040

4041

OWWTP

WWTP-INTERIM UPGRADE (CONTRACT #5) ENGINEERING SERVICES-(SEE FA#32573 FOR OTHER COSTS)

1993

49,738.23

1.71

84,942.15

4040

4041

OWWTP

WWTP-LIME SLUDGE STABILIZATION FACILITY-CAPITALIZED INTEREST RELATED TO PROJECT

1993

6,742.89

1.71

11,515.40

4040

4041

OWWTP

WWTP EXPANSION PHASE 1-PRELIMINARY ENGINEERING DESIGN SERVICES

1993

45,780.00

1.71

78,182.35

4040

4041

OWWTP

WTTP EXPANSION PHASE 1-ENGINEERING SERVICES

1994

166,130.27

1.69

280,317.62

4040

4041

OWWTP

WWTP INTERIM UPGRADE-CONTRACT #5- CAPITALIZED INTEREST

1993

1,120.88

1.71

1,914.22

4040

4041

OWWTP

WWTP-CHLORINATION UPGRADE- ENGINEERING SERVICES (R92-415)

1993

52,986.22

1.71

90,489.02

4040

4041

OWWTP

WWTP-CHLORINATION UPGRADE- ENGINEERING SERVICES (R93-491)

1994

21,906.27

1.69

36,963.24

4040

4041

OWWTP

WWTP-RECLAIMED WATER SYSTEM/REUSE INFRASTRUCTURE-CAPITALIZED INTEREST

1994

8,400.35

1.69

14,174.21

4040

4041

OWWTP

WWTP-ECO GRANDE GOLF COURSE RELOCATION/REUSE FACILITY- CAPITALIZED INTEREST

1994

23,599.00

1.69

39,819.45

4040

4041

OWWTP

CHLORINATION UPGRADE - .6301- UPDATE ASSET TRANSACTION 13121-$66,391.48;23117-$986,242.65;23121-$620,728.23;43121-$83,565.33;

1996

12,218,927.84

1.61

19,642,246.03

4040

4041

OWWTP

WWTP EXPANSION - PHASE I (.063121- $565,649.89; .006204 - 4274,487.48;.053121- $90.00; .083121- $9,175.08

1997

849,402.45

1.57

1,332,520.56

4040

4041

OWWTP

SWITCHGEAR BUILDING RENOVATION - .003121-$25,916;.004635-$106,193.88;.013121-$9,970)

1997

142,079.88

1.57

222,891.24

4040

4041

OWWTP

WWTP RELIABILITY UPGRADE-CONTRACT 66301-11371703.65;3117-955729.65; 6204-1930915.57;13117-622669.19; 13121-923769.05;23121-904272.35;

1997

17,718,693.15

1.57

27,796,626.91

4040

4041

OWWTP

WWTP OPERATIONS CENTER UPGRADE (16201-5053417.25;3117-495900.74; 3121-364093.80;6201-79541.60;6204- 196138.21;13121-33873.60)

1997

6,222,965.20

1.57

9,762,426.63

4040

4041

OWWTP

CON.12 WWTP POST LIME STABILIZATION3117-1307426.05;3121-550839.67;6204-601710.28;6301-7491756.91;13121-1758983;16453-77037.3;23121-6330.49;2

1999

14,071,395.16

1.50

21,162,345.43

4040

4041

OWWTP

POST LIME STATBILIZATION (ADDTNL CHGS) CONTRACT 12 (3117-$11,159.42;3121-$4,346.68)

1999

15,506.10

1.50

23,320.04

4040

4041

OWWTP

WWTP PAVING, DRAINAGE & LIGHTING (3121 - $290,939.00)

2000

2,142,634.82

1.41

3,021,082.43

4040

4041

OWWTP

ROOF REPLACEMENT (3121 - $2,160; 6302 - $82,240.15)

2000

84,400.15

1.41

119,002.92

4040

4041

OWWTP

WWTP PAVING, DRAINAGE & LIGHTING (3121 - $1,268.88; 6204 - $106,829.50; 9997 - $26,539.98)

2000

134,638.36

1.41

189,838.03

4040

4041

OWWTP

ADDITIONAL ENGINEERING - CHLORINATION UPGRADE

2000

199,116.45

1.41

280,751.16

4040

4041

OWWTP

ADDITIONAL ENGINEERING - WWTP RELIABILITY UPGRADE (3117 - $976.53; 13117 - $67,357.45)

2000

68,333.98

1.41

96,349.87

4040

4041

OWWTP

ADDITIONAL ENGINEERING - REUSE SYSTEM - 201 FACILITY PLAN

2000

44,962.50

1.41

63,396.44

4040

4041

OWWTP

WWTP REMOTE TELEMETRY (3121 - $7,169.52; 4991 - $170; 6204 - $15,752.39; 6301 - $78,317.56; 13121 - $54,616.86; 23121 - $613,250)

2000

769,276.33

1.41

1,084,667.90

4040

4041

OWWTP

ADDITIONAL ENGINEERING - POST LIME STABILIZATION (3121 - $14,358.42; 9997 - $1,148.59)

2000

15,507.01

1.41

21,864.65

4040

4041

OWWTP

SOUTH ELECTRIC SERVICE UPGRADE (3121 $69,106.55; 6204 $38,448.93; 6302 $937,254.86; 9997 $32,957.08)

2001

1,163,204.07

1.43

1,664,974.09

4040

4041

OWWTP

Computer Control System

2001

70,782.99

1.43

101,316.57

4040

4041

OWWTP

Waste Water Treatment Plant Landscaping

2001

66,963.55

1.43

95,849.54

A-18

Page 98: First Reading - OrdinanceWatch

Year

Original

Escalation

Current

Dept.

Div.

Asset Type

Cat.

Asset Description

Acquired

Cost

Factor

Cost

Appendix A. W

ater and W

astewater Utility System Asset List as of September 30, 2008

4040

4041

OWWTP

ACCESS BARRIER GATE

2002

9,995.00

1.38

13,812.70

4040

4041

OWWTP

REPLACEMENT OF CLARIFIER #7 (3121 $430,000; 6204 $23,301.15; 9997 $100.34)

2001

453,401.49

1.43

648,984.78

4040

4041

OWWTP

REPLACEMENT OF CLARIFIER #7 (3121 $87,896.37; 6204 $79,977.42; 6301 $3,374330; 9997 $442,543.35)

2001

3,984,747.14

1.43

5,703,642.99

4040

4041

OWWTP

FUEL FILTERING SYSTEM ON 3 15,000 GALLON FUEL STORAGE TANKS (110 S OCEAN DR)

2003

19,193.00

1.32

25,398.85

4040

4041

OWWTP

DIESEL TANK REPLACEMENT

2003

165,816.47

1.32

219,431.48

4040

4041

OWWTP

ADDTNL CAPITAL DIESEL TANK REPLACEMENT (6204 - $1,655.96; 9997 - $15,667.54)

2003

17,323.50

1.32

22,924.87

4040

4041

OWWTP

EFFLUENT METER REHABILITATION (6204 - $6,791.75; 6302 - $750,000; 9997 - $97,223.80)

2003

854,015.55

1.32

1,130,152.50

4040

4041

OWWTP

DEEP WELL INJECTION (3121 - $839,871.24; 6204 - $145,708.31; 6301 - $7,055,428.63; 9997 - $1,123,977.37)

2004

9,164,985.55

1.26

11,506,043.69

4040

4041

OWWTP

ADDTNL CAPITAL - EFFLUENT DISPOSAL METER

2003

50,261.28

1.32

66,512.74

4040

4041

OWWTP

BIOSET PROCESS FACILITY (6204-$260,973.82; 6301-$3,636,464; 9997-$699,043.70)

2005

4,596,481.52

1.20

5,509,603.17

4040

4041

OWWTP

ODOR CONTROL/GRIT CAPITAL IMPROVEMENT

2006

497,892.65

1.18

589,044.34

4040

4041

OWWTP

OXYGEN PLANT UPGRADE (3121 409,369.14; 6204 64,733.78; 9997 62,915.63)

2008

537,018.55

1.00

535,914.17

4040

4041

OWWTP

6 TON CONDENSING UNIT - 2ND FLOOR A/C REUSE BLDG

2007

2,950.00

1.10

3,247.18

4040

4041

OWWTP

25 TON TRANE CONDENSING UNIT FOR EFFLUENT PUMP ST. CONTROL RM

2007

20,175.00

1.10

22,207.43

4040

4041

OWWTP

TRAIN 6 TON AC UNIT (MAIN CONTROL)

2007

8,500.00

1.10

9,356.29

4040

4041

OWWTP

ODOR CONTROL GRIT (3121 $167,518.48; 6204 $1,755.64; 9997 $16,233.75)

2007

185,507.87

1.10

204,195.97

4040

4041

OWWTP

DIESEL TANK REPLACEMENT (6204 $952.27; 6301 $89,997.25; 9997 $36,325.54)

2006

127,275.06

1.18

150,575.94

4040

4041

OWWTP

WWTP OXYGENATION SYSTEM (3121 30,875.48; 6204 970.65; 9997 3,404.82)

2008

35,250.95

1.00

35,178.46

4040

4041

OWWTP

OXYGEN TRAIN #5

2008

9,294,247.75

1.00

9,275,134.17

4040

4041

OWWTP

CLARIFIER 8

2008

7,403,892.31

1.00

7,388,666.24

4040

4041

OWWTP

OXYGEN TRAIN #1 & CLARIFIER #4

2008

7,006,821.57

1.00

6,992,412.07

4040

4041

OWWTP

OXYGEN TRAIN #2 & CLARIFIER #3

2008

7,009,857.17

1.00

6,995,441.43

4040

4041

OWWTP

OXYGEN TRAIN #3 & CLARIFIER #5

2008

740,693.26

1.00

739,170.03

4040

4041

OWWTP

OXYGEN TRAIN #4 & CLARIFIER #6

2008

740,693.26

1.00

739,170.03

4040

4041

OWWTP

CLARIFIER # 1 & # 2

2008

4,002,129.88

1.00

3,993,899.52

4040

4041

OWWTP

WWTP CONTAMINATION REMEDIATION

1998

74,461.07

1.53

114,268.53

4040

4041

OWWTP

OXYGEN SYSTEM COMPRESSORS

1998

116,340.00

1.53

178,536.26

4040

4041

OWWTP

OXYGEN SYSTEM COMPRESSOR - PERMITS

1998

1,555.00

1.53

2,386.31

4040

4041

OWWTP

WWTP COMPUTER CONTROL SYSTEM (.003121 - $96,231.75; .006301 - $1,526,590.11)

1998

1,622,821.86

1.53

2,490,394.87

4040

4041

OWWTP

DEEP WELL INJECTION

1998

864,354.98

1.53

1,326,445.78

Subtotal

174,972,423.00

$

286,940,951.46

$

4040

4041

LWWL

LAND-ORIGINAL PLANT

1931

1,942.73

$

31.98

62,137.31

$

4040

4041

LWWL

W1/2-E1/2-NW1/4-SW1/4-11/51/42 RESOLUTION R-72-103

1976

364,184.93

3.07

1,118,666.41

4040

4041

LWWL

E1/2-SE1/4-NE1/4-SE1/4-11-51-42 RESOLUTION R-72-153

1976

206,483.00

3.07

634,253.58

4040

4041

LWWL

W1/2-W1/2-E1/2-SW1/4-NW1/4-11/51/42RESOLUTION R-74-14

1976

341,429.71

3.07

1,048,769.23

4040

4041

LWWL

E1/2-NE1/4-NE1/4-SE1/4-11/51/42 RESOLUTION R-73-2

1976

193,865.89

3.07

595,497.62

4040

4041

LWWL

LOTS1,4-14,16-19 BLOCK 5 HOLLYWOOD BEACH EXTENSION-RESOLUTION R-73-2

1976

67,775.00

3.07

208,184.39

4040

4041

LWWL

LOT2,3 BLOCK 5, BLOCK 6 HOLLYWOOD BEACH EXTENTION-RESOLUTION R-73-2

1976

213,340.29

3.07

655,317.11

4040

4041

LWWL

LOT 15,BLOCK 5 HOLLYWOOD BEACH EXTENSION-R-73-2

1976

1,389.40

3.07

4,267.82

4040

4041

LWWL

BLOCKS 1,2,3,4-HOLLYWOOD BEACH EXTENSION-R-72-37

1976

951,496.31

3.07

2,922,710.07

4040

4041

LWWL

LAND ACQUISITION APPRAISAL

1972

3,025.00

3.30

9,989.92

4040

4041

LWWL

MILLER TRACT

1978

870,000.00

2.66

2,318,238.06

4040

4041

LWWL

SEWER TREATMENT PLANT EXP NO 2

1961

93,391.69

6.83

638,327.24

4040

4041

LWWL

LOTS 1,4-14,16-19 BLOCKS 5 HOLLYWOOD BEACH EXTENSION-RESOLUTION R-73-2SEE ASSET 30427 FOR ADDITIONAL COST

1981

99,725.00

2.07

206,092.14

4040

4041

LWWL

HOLLYWOOD BCH FIRST ADD 1-31 B LOT 20 LESS E 12.81 FOR ST RD BLK A - 2100 N OCEAN DRIVE

1980

31,238.00

2.28

71,318.22

4040

4041

LWWL

HLWD BCH SECOND ADD 4-6 N LOT 40 LESS E 12.61 FOR ST RD, 55 LESS ST RD R/W BLK B - 3210 N OCEAN DR - PUMP STATION WWTP1980

24,618.00

2.28

56,204.36

4040

4041

LWWL

HLWD BCH 1-27 B LOT 63 & 64 LESS PT DESC IN OR 7294/281 BLK B - PUMP STATION

1980

55,200.00

2.28

126,024.89

4040

4041

LWWL

BEVERLY BCH NO 2 40-24 B PT DESC IN OR 672/485 LESS POR DESC IN OR 30631/978 - 3800 S OCEAN DR - LIFT ST #7

1980

3,015.00

2.28

6,883.42

Subtotal

3,522,119.95

$

10,682,881.78

$

4010

4012

EWWGPSEWER DRAIN MACHINE W/ACCESSORIES

1978

990.00

$

2.66

2,638.00

$

4040

4041

EWWGPTEKTRONIX OSCILLOSCOPE

1976

903.15

3.07

2,774.20

4040

4041

EWWGPSELF PRIMING CENTRIFUGAL PUMP- DIESEL ENGINE

1977

4,982.94

2.90

14,456.80

4040

4041

EWWGPPORTABLE OSCILLOSCOPE FOUR TRACE 150 MHZ W/ACCESSORIES

1984

4,105.00

2.00

8,198.87

4040

4041

EWWGPESTERLINE DIRECT WRITING PRESSURE RECORDER

1985

2,318.00

1.99

4,611.93

A-19

Page 99: First Reading - OrdinanceWatch

Year

Original

Escalation

Current

Dept.

Div.

Asset Type

Cat.

Asset Description

Acquired

Cost

Factor

Cost

Appendix A. W

ater and W

astewater Utility System Asset List as of September 30, 2008

4040

4041

EWWGPSIMPSON PRESSURE WASHER(TO CLEAN CLARIFIERS & SLUDGE AREA)

1987

2,749.00

1.87

5,142.14

4040

4041

EWWGPTEPC ELECTRONIC AIR CLEANER

1988

790.00

1.86

1,471.69

4040

4041

EWWGPPRESSURE RECORDER(CYRO CONTROL PANEL-BOTTOM)

1989

2,519.83

1.84

4,643.50

4040

4041

EWWGPUNIVERSAL TOTALIZER (FLETCHER ST. & 22TH AVE.)

1989

800.00

1.84

1,474.23

4040

4041

EWWGP3COM 2MB MEMORY EXPANSION S/NY04395AST FOUR PORT 1AT PLUSBOARD S/N:3827219 - INSTALLED IN 3COM FILESERVER

1989

1,653.00

1.84

3,046.12

4040

4041

EWWGPCOMMAND CENTER PLUS W/ETHERNET MODULES, TERMINATORS & DUPLEX FIBERCABLE

1989

1,656.60

1.84

3,052.76

4040

4041

EWWGPDELTA BAND SAW & STAND (W-30 SIDE SHOP)

1990

1,450.00

1.81

2,630.18

4040

4041

EWWGPVERTICAL COUCH LINESHAFT WATER PUMPSECONDARY CLARIFIER

1990

19,809.00

1.81

35,931.84

4040

4041

EWWGPVERTICAL COUCH LINESHAFT WATER PUMPSECONDARY CLARIFIER

1990

19,809.00

1.81

35,931.84

4040

4041

EWWGPVERTICAL COUCH LINESHAFT WATER PUMPSECONDARY CLARIFIER

1990

19,809.00

1.81

35,931.84

4040

4041

EWWGPGOULDS SUBMERSIBLE PUMP 1.5 HP- SEWER COLLECTION SYSTEM (ROTARY PK)

1990

1,100.00

1.81

1,995.31

4040

4041

EWWGPLIME STABILIZATION FACILITY & LIME SILO FOUNDATION-$4,226.75 (42-85- 325-6305)

1990

343,317.12

1.81

622,748.03

4040

4041

EWWGPSECONDARY CLARIFIERS-PUMPS, MOTORS,& DRIVES

1990

51,600.00

1.81

93,598.01

4040

4041

EWWGPCLARIFIER-HORIZONTAL NONCLOY SEWAGEPUMP (14 X 14 X 17.5, 30HP, 695 RPM460 VOLTS, 3 PHASE)

1990

22,206.50

1.81

40,280.70

4040

4041

EWWGPCLARIFIER-HORIZONTAL NONCLOY SEWAGEPUMP-(14 X 14 X 17.5, 30HP, 695 RPM460 VOLTS, 3 PHASES)

1990

22,206.50

1.81

40,280.70

4040

4041

EWWGPCLARIFIER-HORIZONTAL NONCLOY SEWAGEPUMP-(14 X 14 X 17.5, 30HP, 695RPM 460 VOLTS, 3 PHASES)

1990

22,206.50

1.81

40,280.70

4040

4041

EWWGPCLARIFIER-HORIZONTAL NONCLOY SEWAGEPUMP-(14 X 14 X 17.5, 30 HP, 695RPM460 VOLTS, 3 PHASES)

1990

22,206.50

1.81

40,280.70

4040

4041

EWWGP12' BOOM CRANE ATTACHMENT (VEHICLE 8222)

1991

902.13

1.80

1,619.58

4040

4041

EWWGPOTC HYDRAULIC PULLER

1991

3,156.00

1.80

5,665.92

4040

4041

EWWGPWACKER 3" DIAPHRAM TRASH PUMP

1991

1,230.00

1.80

2,208.20

4040

4041

EWWGPAISLE SAVER SHELVING SYSTEM, WHITE

1991

15,670.06

1.80

28,132.22

4040

4041

EWWGPLEROL 125 HP BASE MOUNT AIR COMPRESSOR

1991

5,637.00

1.80

10,120.02

4040

4041

EWWGP18" MAGNETIC FLOW METER W/REMOTE CONVERTER

1991

10,691.00

1.80

19,193.39

4040

4041

EWWGP18" MAGNETIC FLOW METER W/REMOTE CONVERTER (EAST SIDE OF TRAINS)

1991

10,691.00

1.80

19,193.39

4040

4041

EWWGPPARAMAGNETIC OXYGEN ANALYZER (O2 PANEL)

1991

6,222.71

1.80

11,171.53

4040

4041

EWWGPDENVER ANALYTICAL BALANCE

1991

2,287.00

1.80

4,105.82

4040

4041

EWWGPGENIE PERSONNEL LIFT

1992

4,700.00

1.73

8,125.99

4040

4041

EWWGPLIMITORQUE ACTUATOR VALVE

1992

15,115.00

1.73

26,132.85

4040

4041

EWWGPGORMAN-RUPP AUTOMATIC SEWAGE PUMPING SYSTEM

1992

35,246.00

1.73

60,938.04

4040

4041

EWWGPPRECISION REFRIGERATED INCUBATOR (18 CU/FT)

1992

2,658.58

1.73

4,596.51

4040

4041

EWWGPDIESEL POWERED WASTEWATER PUMP (#1)

1991

174,250.00

1.80

312,828.32

4040

4041

EWWGPDIESEL POWERED WASTEWATER PUMP (#2)

1991

174,250.00

1.80

312,828.32

4040

4041

EWWGPDIGITAL DISSOLVED OXYGEN METER

1993

1,165.00

1.71

1,989.57

4040

4041

EWWGPMILWAUKEE 1/2" DRILL W/ STAND

1993

986.04

1.71

1,683.94

4040

4041

EWWGPADCOR RECEIVER ALARM W/LINE MONITORDIGITAL COMMUNICATOR & PROGRAMMER

1993

4,437.00

1.71

7,577.44

4040

4041

EWWGP6" 10HP FLYGT PUMP W/40' CABLE & QUANTUM COATING

1993

3,950.00

1.71

6,745.75

4040

4041

EWWGPPEERLESS HORIZONTAL SPLIT CASE BOOSTER PUMP 600GPM

1993

4,749.81

1.71

8,111.65

4040

4041

EWWGP4" DAVIS EMU 3.2HP PUMP

1993

2,812.67

1.71

4,803.43

4040

4041

EWWGP4" DAVIS EMU 3.2HP PUMP

1993

2,812.67

1.71

4,803.43

4040

4041

EWWGP4" DAVIS EMU 3.2HP PUMP (LIFT STAT-ION PS)

1993

2,812.67

1.71

4,803.43

4040

4041

EWWGPPORTABLE TRIPOD ROSE

1993

1,947.00

1.71

3,325.06

4040

4041

EWWGP8" FLANGED CHECK VALVE, SWING CHECK316 SS BODY, DISC SHAFT W/BUNA SEAT

1995

2,496.00

1.71

4,273.32

4040

4041

EWWGPCHROMALOX HEATER

1995

4,680.00

1.71

8,012.47

4040

4041

EWWGPPH/ISE/MV METER

1995

1,895.92

1.71

3,245.94

4040

4041

EWWGPDAVIS EMU HP20 PUMP RPM 1740 - W-29

1996

1,900.00

1.61

3,054.30

4040

4041

EWWGPSUBMERSIBLE PUMP EMU 25HP (LIFT STATION N-9, N-2 OR A-12) BACKUP

1996

7,377.00

1.61

11,858.72

4040

4041

EWWGPAIR VELOCITY METER

1996

900.00

1.61

1,446.77

4040

4041

EWWGPSTERILIZER STERILMATIC

1996

5,349.00

1.61

8,598.66

4040

4041

EWWGPMEGA-PURE CSA 6 LITER STILL (LABORATORY)

1996

2,689.00

1.61

4,322.64

4040

4041

EWWGPWAGNER AIRLESS SPRAY MACHINE

1996

2,295.00

1.61

3,689.27

4040

4041

EWWGPGRAY WORKSTATION

1997

3,387.23

1.57

5,313.80

4040

4041

EWWGPDIGITAL DISSOLVED OXYGEN METER

1996

1,175.00

1.61

1,888.84

4040

4041

EWWGPCOLIFORM WATER BATH

1996

1,150.00

1.61

1,848.66

4040

4041

EWWGPBT PRIME MOVER ELECTRIC WALKIE ADJUSTABLE STRADDLE STACKER

1997

6,361.50

1.57

9,979.76

4040

4041

EWWGPDELTA 20" DRILL PRESS

1997

809.00

1.57

1,269.14

4040

4041

EWWGPSIMATIC T1560T PROCESSOR W/FIBRE OPTIC COMMUNICATION, SIEMANS POWER SUPPLY & PIER LINK COMMUNICATION

1997

4,802.00

1.57

7,533.25

A-20

Page 100: First Reading - OrdinanceWatch

Year

Original

Escalation

Current

Dept.

Div.

Asset Type

Cat.

Asset Description

Acquired

Cost

Factor

Cost

Appendix A. W

ater and W

astewater Utility System Asset List as of September 30, 2008

4040

4041

EWWGPWORKSTATION

1997

2,740.54

1.57

4,299.29

4040

4041

EWWGPJET BANDSAW

1997

2,926.50

1.57

4,591.02

4040

4041

EWWGP10" CONTRACTOR TABLESAW 2 HP

1997

984.00

1.57

1,543.67

4040

4041

EWWGPMIILERMATIC 250 WELDING MACHINE

1997

2,053.00

1.57

3,220.69

4040

4041

EWWGPGAS DETECTOR INDUSTRIAL SCIENTIFIC

1997

895.00

1.57

1,404.05

4040

4041

EWWGP2100N IS TURBIDMETER

1997

1,690.00

1.57

2,651.23

4040

4041

EWWGPGRAVITY CONVECTION OVEN

1998

1,356.52

1.53

2,081.73

4040

4041

EWWGPAURORA BOILER FEED TURBINE PUMP

1998

1,078.00

1.53

1,654.31

4040

4041

EWWGP48 X 30 X 74 LAN STATION 4TH FLOOR PLC ROOM

1998

1,053.07

1.53

1,616.05

4040

4041

EWWGPHURRI-CLEAN PRESSURE CLEANER

1998

1,475.00

1.53

2,263.55

4040

4041

EWWGP12" MAGNETIC FLOW METER (DANIA)

1998

4,523.15

1.53

6,941.26

4040

4041

EWWGP14" MAGNETIC FLOWMETER - E-6 LARGE USER (E HALLANDALE)

1997

7,309.00

1.57

11,466.17

4040

4041

EWWGP8' MAGNETIC FLOW METER W/SIMULATOR - CITY OF HALLANDALE - PEMBROKE RD & US1

1997

6,675.90

1.57

10,472.98

4040

4041

EWWGP8' MAGNETIC FLOW METER, CONTINUOUS SUBMERGENCE W/REMOTE SIGNAL CONVERTER & TOTALIZER - PEMBROKE PARK LARGE USER METER

1997

4,867.00

1.57

7,635.22

4040

4041

EWWGPFLOW METER - DAVIE LARGE USER METER

1997

7,624.13

1.57

11,960.54

4040

4041

EWWGPPRECISION MANOMETER/CALIBRATOR ELECTRIC SHOP

1998

1,083.27

1.53

1,662.39

4040

4041

EWWGP10" MAGNETIC FLOWMETER (LARGE USER - HALLANDALE) FLETCHER STREET

1998

4,482.60

1.53

6,879.03

4040

4041

EWWGPPUMP W/SUCTION & DISCHARGE SPOOL FLANGE

1999

3,228.02

1.50

4,854.71

4040

4041

EWWGPLAN CABLEMETER

1999

2,420.76

1.50

3,640.65

4040

4041

EWWGPHEAVY DUTY LAN STATION

1999

1,129.00

1.50

1,697.93

4040

4041

EWWGPYEOMANS VORTEX GRIT PUMP (GRIT CHAMBER #1)

1999

8,780.00

1.50

13,204.48

4040

4041

EWWGPPH METER W/ELECTRODE

1999

939.00

1.50

1,412.19

4040

4041

EWWGPDAVIS EMU (LS N-4)

1999

4,174.50

1.50

6,278.14

4040

4041

EWWGPDAVIS EMU (LS N-4)

1999

4,174.50

1.50

6,278.14

4040

4041

EWWGPFOXBORO PNEUMATIC ANALOG CONTROLLER

1999

1,635.27

1.50

2,459.33

4040

4041

EWWGPFOXBORO PNEUMATIC CONSOTROL RATIO CONTROLLER (6TH ONE IN)

1999

4,341.99

1.50

6,530.03

4040

4041

EWWGPFOXBORO PNEUMATIC INDICATING CONTROLLER (INSIDE ELECTRIC BOX DR)

1999

1,020.04

1.50

1,534.07

4040

4041

EWWGPTRAILBLAZER 3000NT

1999

6,713.46

1.50

10,096.55

4040

4041

EWWGPSPECTRUM 2050 PLASMA CUTTER

1999

2,209.31

1.50

3,322.64

4040

4041

EWWGPCABINET W/STAINLESS STEEL ENCLOSURE, BACK PANEL & HOFFMAN FLOOR STAND (BRWD CTY 3B METER)

1999

1,152.00

1.50

1,732.52

4040

4041

EWWGPYEOMAN COMPLETE BARE PUMP STANDARD CONSTRUCTION W/11.5" IMPELLER

2000

8,780.00

1.41

12,379.67

4040

4041

EWWGP8" FAIRBANKS MORSE PUMP W/13" IMPELLER - LSW 27) #2

2000

7,996.00

1.41

11,274.24

4040

4041

EWWGPIMPELLER 297

2000

3,990.00

1.41

5,625.84

4040

4041

EWWGPAMMONIA GAS MONITOR W/CALIBRATION KIT

2000

3,067.22

1.41

4,324.73

4040

4041

EWWGPWALLACE & TIERNAN MICRO 2000 WALL MOUNTED RESIDUAL ANALYZER (CL2 RESIDUAL METERS)

2000

6,659.24

1.41

9,389.43

4040

4041

EWWGPGREAT LAKES TURBIDITY ANALYZER (RE-USE FILTER LOW SALINE)

2000

1,066.13

1.41

1,503.23

4040

4041

EWWGPGREAT LAKES LOW-RANGE TURBIDITY ANALYZER (RE-USE FILTER LOW SALINE)

2000

959.30

1.41

1,352.60

4040

4041

EWWGPCHLORINE DETECTOR (EVAPORATOR RM)

2001

886.44

1.43

1,268.82

4040

4041

EWWGPPORTABLE CLAMP-ON DOPPLER FLOW METER W/DUAL-HEAD TRANSDUCER & SERIAL THERMAL PRINTER FOR LARGE USER METER TESTING

2001

2,976.00

1.43

4,259.75

4040

4041

EWWGP150 HP VFD FOR RAS PUMP #4

2001

5,178.00

1.43

7,411.63

4040

4041

EWWGPMDS 9810 DSP SPREAD SPECTRUM RADIO - LIFT STATION RTU - F2

2001

1,150.00

1.43

1,646.07

4040

4041

EWWGPMDS 9810 DSP SPREAD SPECTRUM RADIO - LIFT STATION RTU - F3

2001

1,150.00

1.43

1,646.07

4040

4041

EWWGPMDS 9810 DSP SPREAD SPECTRUM RADIO - LIFT STATION RTU - F4

2001

1,150.00

1.43

1,646.07

4040

4041

EWWGPMDS 9810 DSP SPREAD SPECTRUM RADIO - LIFT STATION RTU - BISCAYNE WELL 29

2001

1,150.00

1.43

1,646.07

4040

4041

EWWGPMDS9810 DSP SPREAD SPECTRUM RADIO - LIFT STATION RTU - BISCAYNE WELL 28

2001

1,150.00

1.43

1,646.07

4040

4041

EWWGPEMU PUMP 15HP, 1740 RPM, 6" DISCHARGE

2001

4,760.00

1.43

6,813.32

4040

4041

EWWGPSINGLE LINE DIGITAL RECEIVER

2001

1,450.00

1.43

2,075.48

4040

4041

EWWGPCHART RECORDER (EFFLUENT FLOW TREAD) - ICE

2001

1,300.02

1.43

1,860.81

4040

4041

EWWGP72" LAN STATION W/CASTER BASE - GRAY - ICE

2001

1,480.87

1.43

2,119.67

4040

4041

EWWGPYORK 2.5 TON, 12.0 SEER A/C SYSTEM - CONDENSING UNIT & AIR HANDLING UNIT (HEADWORKS SCRUBBER SWITCHGEAR)

2001

2,186.00

1.43

3,128.97

4040

4041

EWWGP20 YD ROLLOFF CONTAINER (BEHIND MAINT BLUE DUMPSTER)

2001

2,079.00

1.43

2,975.82

4040

4041

EWWGPGORMAN RUPP PUMP

2002

4,641.95

1.38

6,414.99

4040

4041

EWWGPMOYNO PUMP (REPLACEMENT FOR WAS PUMP#1)

2002

9,694.00

1.38

13,396.73

4040

4041

EWWGPPOWER CIRCUIT MONITOR

2002

3,482.10

1.38

4,812.13

4040

4041

EWWGPPOWERLOGIC ETHERNET GATEWAY MODULE

2002

1,275.00

1.38

1,762.00

4040

4041

EWWGPTOP ENTERING MIXER

2002

8,560.00

1.38

11,829.59

A-21

Page 101: First Reading - OrdinanceWatch

Year

Original

Escalation

Current

Dept.

Div.

Asset Type

Cat.

Asset Description

Acquired

Cost

Factor

Cost

Appendix A. W

ater and W

astewater Utility System Asset List as of September 30, 2008

4040

4041

EWWGPPORTABLE MIXER

2002

5,441.00

1.38

7,519.25

4040

4041

EWWGPPORTABLE MIXER

2002

5,441.00

1.38

7,519.25

4040

4041

EWWGPHEIL CLASS II IMPELLER

2002

9,551.25

1.38

13,199.45

4040

4041

EWWGPISCO 3710 REFRIGERATED SAMPLER

2002

4,125.91

1.38

5,701.85

4040

4041

EWWGPISCO 3710 REFRIGERATED SAMPLER

2002

4,125.92

1.38

5,701.86

4040

4041

EWWGPISCO 3710 REFRIGERATED SAMPLER (784.6453 $305.17)

2002

4,125.92

1.38

5,701.86

4040

4041

EWWGPPANASONIC DIGITAL DISK RECORDER

2002

4,400.00

1.38

6,080.63

4040

4041

EWWGPPANASONIC WEATHERPROOF CAMERA

2002

1,978.00

1.38

2,733.52

4040

4041

EWWGPPANASONIC WEATHERPROOF CAMERA

2002

1,978.00

1.38

2,733.52

4040

4041

EWWGPPANASONIC WEATHERPROOF CAMERA

2002

1,978.00

1.38

2,733.52

4040

4041

EWWGPPANASONIC WEATHERPROOF CAMERA

2002

1,978.00

1.38

2,733.52

4040

4041

EWWGPPANASONIC EXPANSION UNIT

2002

3,100.00

1.38

4,284.08

4040

4041

EWWGPPANASONIC DIGITAL DISK RECORDER

2002

4,400.00

1.38

6,080.63

4040

4041

EWWGPPANASONIC MATRIX SWITCHER

2002

777.00

1.38

1,073.78

4040

4041

EWWGPCONFERENCE RECORDER 4 CHANNEL W/6 O/H MICROPHONES

2003

4,404.00

1.32

5,827.99

4040

4041

EWWGPCISCO 2620XM ETHERNET ROUTER

2003

2,240.00

1.32

2,964.28

4040

4041

EWWGPEDWARDS JAWS IV 55 TON HYDRAULIC IRONWORKER W/STD ACCESS.

2003

6,096.00

1.32

8,067.08

4040

4041

EWWGPBETTIS PM V POSITIONER P-1200 W/BETTIS ACTUATOR

2003

1,610.28

1.32

2,130.95

4040

4041

EWWGPMF-50 MOISTURE ANALYZER

2003

1,482.50

1.32

1,961.85

4040

4041

EWWGPDELTA TOX TEST SYSTEM

2003

7,431.48

1.32

9,834.37

4040

4041

EWWGPHACH SC100 CONTROLLER

2003

1,059.45

1.32

1,402.01

4040

4041

EWWGPFIBER OPTIC TRANSMITTER

2003

825.00

1.32

1,091.76

4040

4041

EWWGPFIBER OPTIC TRANSMITTER

2003

825.00

1.32

1,091.76

4040

4041

EWWGPFIBER OPTIC TRANSMITTER

2003

825.00

1.32

1,091.76

4040

4041

EWWGPFIBER OPTIC RECEIVER

2003

825.00

1.32

1,091.76

4040

4041

EWWGPFIBER OPTIC RECEIVER

2003

825.00

1.32

1,091.76

4040

4041

EWWGPSECURITY CAMERA

2003

1,475.00

1.32

1,951.93

4040

4041

EWWGPSECURITY CAMERA

2003

1,475.00

1.32

1,951.93

4040

4041

EWWGPSECURITY CAMERA

2003

1,475.00

1.32

1,951.93

4040

4041

EWWGPSECURITY CAMERA

2003

1,475.00

1.32

1,951.93

4040

4041

EWWGPPANASONIC SECURITY CAMERA

2003

872.00

1.32

1,153.95

4040

4041

EWWGPPANASONIC SECURITY CAMERA

2003

872.00

1.32

1,153.95

4040

4041

EWWGPPANASONIC VANDAL RESISTANT OUTDOOR CAMERA

2004

2,303.00

1.26

2,891.27

4040

4041

EWWGPPANASONIC VANDAL RESISTANT OUTDOR CAMERA

2004

2,303.00

1.26

2,891.27

4040

4041

EWWGPPANASONIC VANDAL RESISTANT OUTDOOR CAMERA

2004

2,303.00

1.26

2,891.27

4040

4041

EWWGPPANASONIC VANDAL RESISTANT OUTDOOR CAMERA

2004

2,303.00

1.26

2,891.27

4040

4041

EWWGPPANASONIC VANDAL RESISTANT OUTDOOR CAMERA

2004

2,303.00

1.26

2,891.27

4040

4041

EWWGPPANASONIC 320G HARD DISK RECORDER

2004

4,584.00

1.26

5,754.91

4040

4041

EWWGPPALLET RACK STORAGE SYSTEM (SLUDEGE SITE STORAGE AREA)

2004

3,750.02

1.26

4,707.91

4040

4041

EWWGPGAS DETECTOR

2004

1,595.00

1.26

2,002.42

4040

4041

EWWGPGAS DETECTOR

2004

1,595.00

1.26

2,002.42

4040

4041

EWWGPGAS DETECTOR

2004

1,595.00

1.26

2,002.42

4040

4041

EWWGPGAS DETECTOR

2004

1,595.00

1.26

2,002.42

4040

4041

EWWGPGAS DETECTOR

2004

1,447.75

1.26

1,817.56

4040

4041

EWWGP6000 WATT DEWALT HONDA GENERATOR (SLUDGE GARAGE)

2004

1,995.95

1.26

2,505.79

4040

4041

EWWGPPANASONIC WEATHERPROOF DOME CAMERA (SECURITY) CL2 BLDG

2004

2,205.00

1.26

2,768.23

4040

4041

EWWGPPANASONIC WEATHERPROOF DOME CAMERA (SECURITY)

2004

2,205.00

1.26

2,768.23

4040

4041

EWWGPLASER ALIGNMENT TOOL

2004

3,899.00

1.26

4,894.94

4040

4041

EWWGPMODICON QUANTUM PLC SYSTEM

2004

2,503.59

1.26

3,143.09

4040

4041

EWWGPMODICON QUANTUM PLC SYSTEM

2005

2,503.59

1.20

3,000.94

4040

4041

EWWGPDSP REDUNDANT MASTER RADIO

2005

7,505.00

1.20

8,995.92

4040

4041

EWWGPICE-O-MATIC ICE MACHINE W/STORAGE BIN

2005

2,331.84

1.20

2,795.08

4040

4041

EWWGPHACH 2100N LABORATORY TURBIDMITER

2005

1,748.00

1.20

2,095.25

4040

4041

EWWGPLDO/PH INSTRUMENT HQ 20 W/15M & ELECTRODE

2005

1,413.00

1.20

1,693.70

4040

4041

EWWGPWHEELED PALLET LIFTER

2005

2,541.50

1.20

3,046.39

4040

4041

EWWGPPORTABLE A/C 13,200 BTU

2005

2,695.50

1.20

3,230.98

A-22

Page 102: First Reading - OrdinanceWatch

Year

Original

Escalation

Current

Dept.

Div.

Asset Type

Cat.

Asset Description

Acquired

Cost

Factor

Cost

Appendix A. W

ater and W

astewater Utility System Asset List as of September 30, 2008

4040

4041

EWWGPMITSUBISHI PLC INTERFACE MODULE (ALKALINE SYSTEM COMMUNICATION)

2005

1,098.84

1.20

1,317.13

4040

4041

EWWGPMODULAR FURNITURE (OPS SUPERINTENDENT - MAIN CONTROL RM)

2005

2,886.26

1.20

3,459.63

4040

4041

EWWGPQUANTUM CONTROLLER CPU W/ACCESS.

2005

6,249.65

1.20

7,491.18

4040

4041

EWWGPABB MULTIPORT VIDEOGRAPHIC RECORDER

2006

4,770.75

1.18

5,644.16

4040

4041

EWWGPPROTECTED DSP MASTER STATION

2006

7,528.40

1.18

8,906.66

4040

4041

EWWGPSLC5/05 PROCESSOR/CONTROLLER (ETHERNET) - SLUDGE SITE BIOSET PLCS

2006

6,631.56

1.18

7,845.63

4040

4041

EWWGP386 BASED COMPACT CONTROLLER 512K MEMORY-SCADA REMOTE STATION TELEMTRY CONTROL

2006

850.00

1.18

1,005.61

4040

4041

EWWGP386 BASED COMPACT CONTROLLER 512K MEMORY - SCADA REMOTE STATION TELEMETRY CONTROL

2006

850.00

1.18

1,005.61

4040

4041

EWWGP386 BASED COMPACT CONTROLLER 512K MEMORY - SCADA REMOTE STATION TELEMTRY CONTROL

2006

850.00

1.18

1,005.61

4040

4041

EWWGP386 BASED COMPACT CONTROLLER 512K MEMORY - SCADA REMOTE STATION TELEMETRY CONTROL

2006

850.00

1.18

1,005.61

4040

4041

EWWGPIBM SERVERAID 6M CONTROLLER (USE W/IBM SCADA SERVER)

2006

791.10

1.18

935.93

4040

4041

EWWGPPH/ISE METER MOD 920A 110V

2006

2,044.56

1.18

2,418.87

4040

4041

EWWGPCROUSE HINDS 400 AMP GENERATOR RECEPTACLES

2006

1,700.00

1.18

2,011.23

4040

4041

EWWGPCROUSE HINDS 400 AMP GENERATOR RECEPTACLES

2006

1,700.00

1.18

2,011.23

4040

4041

EWWGPCROUSE HINDS 400 AMP GENERATOR RECEPTACLE

2006

1,700.00

1.18

2,011.23

4040

4041

EWWGPCROUSE HINDS 400 AMP GENERATOR RECEPTACLE

2006

1,700.00

1.18

2,011.23

4040

4041

EWWGPCROUSE HINDS 400 AMP GENERATOR RECEPTACLE

2006

1,700.00

1.18

2,011.23

4040

4041

EWWGP800-960 MHZ TRANSCEIVER DSP/AUDIO

2006

1,240.51

1.18

1,467.62

4040

4041

EWWGP800-960 MHZ TRANSCEIVER DSP/AUDIO

2006

1,240.51

1.18

1,467.62

4040

4041

EWWGP800-960 MHZ TRANSCEIVER DSP/AUDIO

2006

1,240.51

1.18

1,467.62

4040

4041

EWWGP800-960 MHZ TRANSCEIVER DSP/AUDIO

2006

1,240.51

1.18

1,467.62

4040

4041

EWWGPCUSTOM-BUILT PRESSURE CONTROL SYSTEM FOR CRYOGENIC PLANT DRIOX TANK

2006

18,613.00

1.18

22,020.57

4040

4041

EWWGP800-960 MHZ TRANSCEIVER DSP/AUDIO

2006

1,240.51

1.18

1,467.62

4040

4041

EWWGP800-960 MHZ TRANSCEIVER DSP/AUDIO

2006

1,240.51

1.18

1,467.62

4040

4041

EWWGP800-960 MHZ TRANSCEIVER DSP/AUDIO

2006

1,240.51

1.18

1,467.62

4040

4041

EWWGP800-960 MHZ TRANSCEIVER DSP/AUDIO

2006

1,240.51

1.18

1,467.62

4040

4041

EWWGPHOSHISAKI ICE-MAKER W/BIN

2006

3,150.90

1.18

3,727.75

4040

4041

EWWGPSECURITY RECEPTION DESK

2008

2,024.24

1.00

2,020.08

4040

4041

EWWGP806-870 MHZ CHANNEL PORTABLE RADIO - VACANT

2008

1,060.50

1.00

1,058.32

4040

4041

EWWGP806-870 MHZ CHANNEL PORTABLE RADIO - ROBERT FURSLEW

2008

1,060.50

1.00

1,058.32

4040

4041

EWWGP806-870 MHZ CHANNEL PORTABLE RADIO - VACANT

2008

1,060.50

1.00

1,058.32

4040

4041

EWWGPUNISYS 400CPS 24PIN DOT MATRIX PRINTER

1991

849.00

1.80

1,524.20

4040

4041

EWWGPACT 486DX/33 PC W/8MB RAM, 250MB IDE HARD DRIVE, DUAL FLOPPY DRIVES (1.44MB 3.5" & 1.2MB 5.25") & KEYBOARD

1994

1,920.00

1.69

3,239.69

4040

4041

EWWGPHP LASERJET 5M PRINTER

1997

1,619.24

1.57

2,540.22

4040

4041

EWWGPHP LASERJET 5M PRINTER

1997

1,619.24

1.57

2,540.22

4040

4041

EWWGPHP LASERJET 5M PRINTER (ADMIN COMP-UTER RM)

1997

1,619.24

1.57

2,540.22

4040

4041

EWWGPHP 5M LASERJET PRINTER

1997

1,619.24

1.57

2,540.22

4040

4041

EWWGPHP LASERJET 5N PRINTER

1998

1,400.00

1.53

2,148.45

4040

4041

EWWGPTOSHIBA TECRA 730XCDT LAPTOP PC

1998

7,200.00

1.53

11,049.18

4040

4041

EWWGPTOSHIBA TECRA 730XCDT LAPTOP PC

1998

7,200.00

1.53

11,049.18

4040

4041

EWWGPSONY MAVICA FD88 DIGITAL CAMERA 1.3

1999

834.00

1.50

1,254.27

4040

4041

EWWGPTOSHIBA 4280 2DVD LAPTOP PC

2000

2,330.00

1.41

3,285.26

4040

4041

EWWGPTOSHIBA LAPTOP PC 4300 7/700 12GB HARD DRIVE; 64MB RAM

2001

2,086.90

1.43

2,987.12

4040

4041

EWWGPHP BUSINESS INKJET 2250TN PRINTER (DAVID WILLIAMS)

2001

797.00

1.43

1,140.80

4040

4041

EWWGPHP 2250TN COLOR PRINTER

2002

797.00

1.38

1,101.42

4040

4041

EWWGPMITSUBISHI XL1U PROJECTOR (DAVID WILLIAMS)

2002

3,149.00

1.38

4,351.79

4040

4041

EWWGPHP LASERJET 4600DN PRINTER

2002

2,219.76

1.38

3,067.62

4040

4041

EWWGPSCADA X SERIES 335 SERVER

2003

3,585.20

1.32

4,744.44

4040

4041

EWWGPSCADA X SERIES 335 SERVER

2003

3,585.20

1.32

4,744.44

4040

4041

EWWGPIBM X335 SERIES SCADA SERVER

2004

3,340.50

1.26

4,193.78

4040

4041

EWWGPIBM X335 SERIES SCADA SERVER

2004

3,340.50

1.26

4,193.78

4040

4041

EWWGPTOSHIBA LAPTOP PC (JUAN REYES - LEASE# 2721)

2004

2,591.65

1.26

3,253.65

4040

4041

EWWGPTOSHIBA LAPTOP PC (RAMON LUGO) - LEASE# 2768 - 4633-$277.45

2004

2,977.74

1.26

3,738.36

4040

4041

EWWGPINFOCUS LP600 PROJECTOR (JUAN REYES)

2004

1,479.00

1.26

1,856.79

4040

4041

EWWGPTOSHIBA TECRA LAPTOP PC (JUAN REYES - LEASE#2916)

2005

1,384.67

1.20

1,659.74

4040

4041

EWWGPTOSHIBA A4-S313 LAPTOP PC (J. REYES - LEASE #3200)

2006

1,401.29

1.18

1,657.83

A-23

Page 103: First Reading - OrdinanceWatch

Year

Original

Escalation

Current

Dept.

Div.

Asset Type

Cat.

Asset Description

Acquired

Cost

Factor

Cost

Appendix A. W

ater and W

astewater Utility System Asset List as of September 30, 2008

4040

4041

EWWGPIOMEGA 1TH STORCENTER NAS (R. LUGO)

2006

793.09

1.18

938.28

4040

4041

EWWGPIOMEGA ITB STORCENTER NAS (R. LUGO)

2006

793.09

1.18

938.28

4040

4041

OWWGP4-24" A-26661 CIRCULAR FLANGE SPIGOT FRAME SLUICE GATE FOR 1 3/4"DIAMETER STEM

1963

10,277.01

6.43

66,032.93

4040

4041

OWWGP1000 SCFM TEC TURBOMIX AFTERBURNER WITH INSTALLATION #1

1982

115,225.00

1.91

219,827.70

4040

4041

OWWGPSLUDGE TANK 31 MIXER (6453 $33,687; 9997 $5,977.07)

2001

39,664.07

1.43

56,773.91

4040

4041

OWWGPFLOW DISTRIBUTION BOX

2008

475,135.40

1.00

474,158.29

Subtotal

2,222,129.75

$

3,455,132.47

$

4040

4041

OWWD

PROFESSIONAL SERVICES OUTFALL STUDY

1970

34,851.82

$

4.19

146,100.04

$

4040

4041

OWWD

EFFLUENT PUMPING INTERIM UPGRADE STRUCTURAL COSTS-(SEE FA#32453 FOR OTHER COSTS)

1992

274,195.36

1.73

474,065.91

4040

4041

OWWD

RECLAIMED WATER SYSTEM-ENGINEERING DESIGN SERVICES

1992

92,007.83

1.73

159,075.54

4040

4041

OWWD

EFFLUENT REUSE PIPELINE PARK RD RTE(6301-$645,178.77; 3132-$582.19; 6204-$198.02; 23121-$75,653.60)

1995

721,612.58

1.71

1,235,448.98

4040

4041

OWWD

EFFLUENT REUSE PIPELINE CENTRAL RTE(16301-$1,093,287.25; 3122-$986.56;6204-$335.55; 23121-$128,198.76)

1995

1,222,808.12

1.71

2,093,529.26

4040

4041

OWWD

ECO GRANDE GOLF COURSE MODIFICATION

1994

67,138.48

1.69

113,285.19

4040

4041

OWWD

EFFLUENT REUSE PIPELINE-WEST ROUTE

1996

1,115,773.90

1.61

1,793,635.72

4040

4041

OWWD

EFFLUENT REUSE PIPELINE-SOUTH ROUTE

1996

1,581,371.10

1.61

2,542,095.40

4040

4041

OWWD

EFFLUENT REUSE PIPELINE-PARK RD RTE

1996

6,927.50

1.61

11,136.14

4040

4041

OWWD

REUSE SYSTEM-PUMP STATION IRRIGA- TION (56301-597427.62;6204-75640.923117-198232.44;13121-870;33121- 81125.57;43121-8691.22)

1997

961,987.77

1.57

1,509,141.50

4040

4041

OWWD

GOLF COURSE MODIF-ACCEPTAMCE OF REUSE WATER PHASE I -6301-727416.48;3121-293720.27;3130-68980;6204- 84957.06;3117-9579.61;33121-9064)

1997

1,193,717.42

1.57

1,872,672.97

4040

4041

OWWD

GOLF COURSE MODIF-RECLAIMED WATER PHASE II (16301-537353.96;13121- 68001;43121-9960)

1997

615,314.96

1.57

965,290.17

4040

4041

OWWD

ECO GRANDE IRRIGATION SYSTEM (3121 - $2,000; 6204 - $837.28; 6301 - $40,078.15; 9997 - $4,000.67)

2004

46,916.10

1.26

58,900.11

4040

4041

OWWD

60" OCEAN OUTFALL

1969

2,067,740.03

4.56

9,433,065.86

4040

4041

OWWD

60" OCEAN OUTFALL

1970

712,578.43

4.19

2,987,153.55

4040

4041

OWWD

OUTFALL EXTENSION-ENGINEERING DESIGN

1979

40,004.40

2.45

98,198.15

4040

4041

OWWD

OUTFALL EXTENSION-ADMINISTRATIVE

1979

171.36

2.45

420.63

4040

4041

OWWD

OCEAN OUTFALL MODIFICATIONS-ENGI- NEERING DESIGN

1978

966.41

2.66

2,575.14

4040

4041

OWWD

OCEAN OUTFALL MODIFICATIONS- CONSTRUCTION

1978

19,442.09

2.66

51,806.20

4040

4041

OWWD

OCEAN OUTFALL LINE CLOSURE PIECE

1978

4,804.00

2.66

12,800.94

4040

4041

OWWD

PROFESSIONAL SERVICES (OUTFALL OCEANOGRAPHY)

1968

4,012.62

5.01

20,112.43

4040

4041

OWWD

WWTP EFFLUENT OUTFALL PIPELINE

1995

1,462,624.00

1.71

2,504,110.08

4040

4041

OWWD

OCEAN OUTFALL REMEDIATION (3121 $57,772.23; 6301 $761,590; 9997 $9,819.44)

2003

829,181.67

1.32

1,097,288.84

4040

4041

OWWD

ADDTNL CAPITAL OCEAN OUTFALL REMEDIATION (3121 - $21,532.30; 6204 - $14,964.07; 9997 - $6,720.77)

2003

43,217.14

1.32

57,190.95

4040

4041

OWWD

EFFLUENT DISPOSAL METER (3121 - $109,072.86; 6204 - $59,109.37; 6301 - $2,514,710.14; 9997 - $331,795.66)

2003

3,014,688.03

1.32

3,989,455.70

4040

4041

OWWD

DEEP INJECTION WELL-EFFLUENT DISPOSAL (3121 - $411,436.69; 6204 - $9,443.24; 9997 - $52,116.91)

2003

472,996.84

1.32

625,935.39

4040

4041

OWWD

EFFLUENT DISPOSAL PUMPING STATION (3121 - $893,682.78; 6204 -$256,862.53; 6301 -$5,061,458.32; 9997 - $639,101.06)

2004

6,851,104.69

1.26

8,601,116.66

Subtotal

23,458,154.65

$

42,455,607.46

$

Total

312,234,154.66

$

591,433,436.49

$

A-24

Page 104: First Reading - OrdinanceWatch

Desc

ription

Total

2009

2010

2011

2012

2013

2014

Water

Treatmen

t

Source of Supply

Fl Wells F10

& F13

Wellhead Piping, Pumps an

d V

aults

1,80

0,00

0$

1,80

0,00

0$

Subtotal Source of Supply

1,80

0,00

0$

1,80

0,00

0$

-$

-$

-$

-$

-$

Treatmen

t Plant

Installation of RO Train D

2,20

0,00

0$

2,20

0,00

0$

Installation of RO Train E

-

DIW

for MS/RO concentrate disposal

17,500

,000

1,35

0,00

0

1,15

0,00

0

15,000

,000

New

14,00

0 gp

m high service distribution pump-1

500,00

0

200,00

0

300,00

0

Installation of ch

emical feed system flow m

eters

50,000

50,000

Pretreatm

ent an

d post treatmen

t piping upgrad

es2,40

0,00

0

2,40

0,00

0

HSP upgrad

es related

to V

FDs

2,00

0,00

0

1,00

0,00

0

1,00

0,00

0

Ammonia system upgrad

es (from gas to liquid)

160,00

0

160,00

0

MS feed pump upgrad

es to V

FDs

650,00

0

250,00

0

400,00

0

Addition of tw

o new

sodium hyp

och

lorite gen

eration cells and related

storage tan

ks805

,000

805,00

0

Emergency G

enerator #3 15

00 K

W back-up gen

erator

1,00

0,00

0

1,00

0,00

0

Exp

and blend tan

k1,00

0,00

0

500,00

0

500,00

0

Rem

ote telem

tery site PLCs an

d in-plant PLCs upgrad

es20

0,00

0

200,00

0

Retrofit Train A

1,60

0,00

0

1,60

0,00

0

RO Train C

1,77

2,00

0

1,77

2,00

0

Computer Control System U

pgrad

e (PLCs) W

WTP

1,10

0,00

0

1,10

0,00

0

Subtotal Treatmen

t Plant

32,937

,000

$

5,32

2,00

0$

4,90

0,00

0$

18,400

,000

$

2,21

5,00

0$

1,10

0,00

0$

1,00

0,00

0$

Subtotal Treatmen

t34

,737

,000

$

7,12

2,00

0$

4,90

0,00

0$

18,400

,000

$

2,21

5,00

0$

1,10

0,00

0$

1,00

0,00

0$

Transm

ission

Water D

istribution U

pgrad

es at the North E

nd of A1A

1,00

0,00

0$

500,00

0$

500,00

0$

West Hollywood Pumping an

d Storage Facility

4,00

0,00

0

1,00

0,00

0

3,00

0,00

0

Distribution piping upgrad

es for existing co

ndition

2,69

0,00

0

269,00

0

538,00

0

807,00

0

1,07

6,00

0

Distribution piping upgrad

es for short-term scenario

1,26

6,00

0

126,60

0

253,20

0

379,80

0

506,40

0

Water M

ain Rep

lacemen

t Program

(level 1)

12,75

0,00

0

500,00

0

250,00

0

250,00

0

250,00

0

750,00

0

750,00

0

Install US 441

/St Rd 7 Corridor Water M

ain

3,34

6,22

1

2,62

0,40

6

725,81

5

Subtotal Transm

ission

15,052

,221

$

500,00

0$

3,26

6,00

6$

2,54

1,20

0$

4,93

6,80

0$

3,05

8,21

5$

750,00

0$

Total Water

49,789

,221

$

7,62

2,00

0$

8,16

6,00

6$

20,941

,200

$

7,15

1,80

0$

4,15

8,21

5$

1,75

0,00

0$

Wastewater

Transm

ission

Install Dixie H

ighway Corridor sewer

6,00

0,00

0$

705,00

0$

5,29

5,00

0$

Install US 441

/State Road

7 Corridor sewer

7,20

6,14

7

2,50

5,20

4

2,48

1,57

0

822,34

1

1,39

7,03

2

Construct M

cKinley Street parallel intercep

tor

14,000

,000

2,10

0,00

0

5,95

0,00

0

5,95

0,00

0

Rep

lace PS E

-02 an

d E

-03 force main and ICW crossing 1

5,25

0,00

0

50,000

2,20

0,00

0

3,00

0,00

0

Rep

lace PS E

-02 pumps 1

73,950

73,950

Rep

lace PS N

-04 pumps, force main and gravity piping 1

1,15

8,00

0

86,850

86,850

984,30

0

Appendix B

. W

ater and W

astewater Expansion and U

pgra

de C

IP

B-1

Page 105: First Reading - OrdinanceWatch

Desc

ription

Total

2009

2010

2011

2012

2013

2014

Appendix B

. W

ater and W

astewater Expansion and U

pgra

de C

IP

Rep

lace PS W

-03 pumps, force main and gravity piping 1

700,00

0

700,00

0

Rep

lace PS N

-02 pumps 1

448,00

0

67,000

381,00

0

PS N

-3 Pumps, Force Main and G

ravity Piping Rep

l 190

0,00

0

900,00

0

3rd Pump for No. 1

527

8,30

0

278,30

0

Lift Station Conversion/Upgrad

e7,01

2,00

0

1,50

0,00

0

500,00

0

1,01

2,00

0

4,00

0,00

0

Subtotal Transm

ission

43,026

,397

$

278,30

0$

7,75

5,20

4$

11,218

,420

$

10,115

,850

$

6,89

2,64

1$

6,76

5,98

2$

Treatmen

t

Treatmen

t Plant

Grit removal system

reh

abilitation and rep

lacemen

t 119

,500

,000

$

2,25

0,00

0$

4,50

0,00

0$

12,750

,000

$

I.W. S

ystem U

pgrad

es1,07

0,00

0

420,00

0

650,00

0

Oxygenation gen

eration system upgrad

e12

,000

,000

3,00

0,00

0

9,00

0,00

0

Subtotal Treatmen

t Plant

32,570

,000

$

3,42

0,00

0$

11,250

,000

$

4,50

0,00

0$

13,400

,000

$

-$

-$

Disposal

Regulatory Review &

Discu

ssions

100,00

0$

50,000

$

50,000

$

Pilo

t Test Pre-D

esign

300,00

0

300,00

0

Pilo

t Test Design

2,00

0,00

0

2,00

0,00

0

Pilo

t Test Permit

200,00

0

200,00

0

Pilo

t Testing

2,00

0,00

0

2,00

0,00

0

Rep

air, rep

lacemen

ts and/or expan

sion of reuse facilities

173

3,00

0

200,00

0

400,00

0

66,500

66,500

Reu

se Study

195,00

0

195,00

0

Vacuum Truck D

isch

arge System

300,00

0

300,00

0

Reu

se System Infrastructure E

xpan

sion

9,00

0,00

0

3,00

0,00

0

3,00

0,00

0

3,00

0,00

0

Subtotal Disposal

14,828

,000

$

745,00

0$

750,00

0$

4,20

0,00

0$

3,00

0,00

0$

3,06

6,50

0$

3,06

6,50

0$

Subtotal Treatmen

t47

,398

,000

$

4,16

5,00

0$

12,000

,000

$

8,70

0,00

0$

16,400

,000

$

3,06

6,50

0$

3,06

6,50

0$

Total Wastewater

90,424

,397

$

4,44

3,30

0$

19,755

,204

$

19,918

,420

$

26,515

,850

$

9,95

9,14

1$

9,83

2,48

2$

Total CIP

140,21

3,61

8$

12,065

,300

$

27,921

,210

$

40,859

,620

$

33,667

,650

$

14,117

,356

$

11,582

,482

$

1. Pursuan

t to City staff, improvemen

ts noted as "R

eplace" or "R

eplacemen

t" invo

lve replacemen

t with an upgrad

ed facility w

ith additional cap

acity.

B-2

Page 106: First Reading - OrdinanceWatch

STATEMENT OF BUDGET IMPACT (Policy Number 94-45)

Budgetary Review of Proposed Resolution & Ordinances with Financial Implication.

Date: May 12, 2009 BIS 09 – 159

Proposed Legislation: AN ORDINANCE OF THE CITY OF HOLLYWOOD, FLORIDA, AMENDING CHAPTER 52 OF THE CODE OF ORDINANCES TITLED “SEWER USE” TO INCLUDE IMPLEMENTATION OF A NEW RATE AND INCREASED SEWER RESERVE CAPACITY CHARGES (“IMPACT FEES”) CRITICAL TO PROVIDING RELIABLE WASTEWATER SERVICES; PROVIDING AN OCTOBER 1, 2009 EFFECTIVE DATE FOR THE INCREASED IMPACT FEES AND AN IMMEDIATE EFFECTIVE DATE FOR THE REMAINDER OF THIS ORDINANCE. Statement of Budget Impact: 1. No Budget Impact associated with this action; 2. Sufficient resources are identified/available; 3. Budgetary resources not identified; 4. Potential Revenue is possible with this action; 5. Will not increase the cost of Housing; 6. May increase the cost of Housing; (CDAB review required) Explanation: The City of Hollywood Department of Public Utilities provides for critical public health and safety needs by collecting, treating and disposing of wastewater within the City of Hollywood and for six (6) surrounding communities, through its Southern Regional Wastewater Treatment Plant. On April 15, 2009, the City Commission formally adopted the comprehensive Wastewater Master Plan, which serves as a primary planning tool to help meet regulatory requirements, identify critical asset renewal and replacement needs, and to ensure that the City will be able to continue to provide reliable wastewater services to the community. The Wastewater Master Plan identified critical wastewater infrastructure assets that are well beyond their useful life which may pose public health and safety risks if not addressed promptly. In addition, various initiatives and projects for compliance with regulatory requirements will need to begin soon, including projects relating to the reduction of nutrients in the ocean outfall.

Page 107: First Reading - OrdinanceWatch

Page 2 BIS 09-159 A comprehensive revenue analysis and rate study has recently been completed which identifies revenue requirements for the implementation of critical capital projects. The proposed amendments to the City Ordinances will change the rates charged for wastewater reserve capacity (“impact fees”), the wastewater monthly base charge, and the wastewater monthly use charge. The new rate schedule incorporates stepped increases for the monthly charge from 2009 through 2014; retains the yearly utility price index adjustment; and eliminates the utility base surcharge. According to the rate study performed under the direction of the Department of Public Utilities, the proposed rate structure (identified as “Scenario 2” in the presentation) will allow adequate coverage of costs relating to Priority 1 and Priority 2 regulatory, asset renewal and replacement, and facility requirement projects. PREPARED BY: Robin O. Sloan

Senior Management/Budget Analyst APPROVED BY: Cynthia E. Forrester

Director, Office of Budget and Procurement Services