FIRST QUANTUM MINERALS LTD. ANNUAL GENERAL MEETING
33

FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

Apr 23, 2018

Download

Documents

buinhu
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

FIRST QUANTUMMINERALS LTD.

ANNUAL GENERAL MEETING

Page 2: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

PHILIP PASCALL

CHAIRMAN & CHIEF EXECUTIVE OFFICER

Page 3: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

CLIVE NEWALL

PRESIDENT & DIRECTOR

Page 4: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

AN EVENTFUL AND SUCCESSFUL PAST 12 MONTHS

STRENGTHENED OUR OPERATING BASE

+REINFORCED THE BALANCE SHEET

+ADVANCED OUR COBRE PANAMA PROJECT

Page 5: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

Brought the new Sentinel mine into commercial production

Long-life mine

Ramping up & transitioning to terrace layout

Capacity to produce over 250,000 tonnes of copper in concentrate annually

AN EVENTFUL AND SUCCESSFUL PAST 12 MONTHS

STRENGTHENED OUR OPERATING BASE

Page 6: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

Strong operations at Kansanshi complex

Mine performance benefitting from process & margin improvement work

Smelter set sequential records for throughput and copper production

New 3-year labour agreement signed and effective January 2017

AN EVENTFUL AND SUCCESSFUL PAST 12 MONTHS

STRENGTHENED OUR OPERATING BASE

Page 7: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

Las Cruces mine hits its stride

Most consistent operations since start-up

Maintaining a low unit cost profile

Researching potential for mine life extension

AN EVENTFUL AND SUCCESSFUL PAST 12 MONTHS

STRENGTHENED OUR OPERATING BASE

Page 8: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

Smaller, more mature mines

Good contributors to earnings & cash flow

Guelb Moghrein

AN EVENTFUL AND SUCCESSFUL PAST 12 MONTHS

STRENGTHENED OUR OPERATING BASE

Page 9: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

Smaller, more mature mines

Good contributors to earnings & cash flow

Çayeli

AN EVENTFUL AND SUCCESSFUL PAST 12 MONTHS

STRENGTHENED OUR OPERATING BASE

Page 10: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

Smaller, more mature mines

Good contributors to earnings & cash flow

Pyhäsalmi

AN EVENTFUL AND SUCCESSFUL PAST 12 MONTHS

STRENGTHENED OUR OPERATING BASE

Page 11: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

Smaller, more mature mines

Together Guelb Moghrein, Çayeli and Pyhäsalmi contributed:

$125 million in operating profit in 2016

AN EVENTFUL AND SUCCESSFUL PAST 12 MONTHS

STRENGTHENED OUR OPERATING BASE

Page 12: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

Ravensthorpe

Low-cost nickel producer

Long-life mine

Challenging nickel price environment

AN EVENTFUL AND SUCCESSFUL 12 MONTHS

STRENGTHENED OUR OPERATING BASE

Page 13: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

A STRONG START TO 2017

131140

Q1 2016 Q1 2017

Copper Sales 000’s tonnes

119

132

Q1 2016 Q1 2017

Copper Production 000’s tonnes

Higher year-over-year copper production & sales

Generated $265 million comparative EBITDA & $239 million of cash flow

Page 14: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

AN EVENTFUL AND SUCCESSFUL 12 MONTHS

Sold the Kevitsa operation

Restructured the balance sheet

Implemented & maintaining a focused sales hedge program

Total proceeds of $732 million

Improved debt maturity profile

No senior debt due until 2021 when Cobre Panama is expected to be well in production and generating cash flow

Reduced revolving & senior term debt

Protecting cash flows, in a low metal price environment, ahead of the completion of Cobre Panama

REINFORCED THE BALANCE SHEET

Outlook for First Quantum upgraded to STABLE by S&P Ratings Agency

Page 15: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

• Total project over 50% complete

• Mining concession extended for a 2nd 20-year term to

February 2037

• Heading for peak construction activity

• Power station and associated infrastructure

prioritized for early completion

• Power production expected in Q4 2017 from the 1st

150MW generating set

• The 2nd 150MW set expected to follow in the 1st half of

2018

AN EVENTFUL AND SUCCESSFUL 12 MONTHS

ADVANCING OUR COBRE PANAMA PROJECT

Page 16: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

• At mine site, 6 of the 7 mills installed

• Installing the large gearless mill drives, with 3 mill

drives fully complete and a further 3 installed and well

progressed to completion

• Other areas of the project well underway in

construction

• Cobre Panama will benefit from learnings from our

Sentinel mine

• Targeting a phased commissioning in 2018 followed by

continued ramp up in 2019

AN EVENTFUL AND SUCCESSFUL 12 MONTHS

ADVANCING OUR COBRE PANAMA PROJECT

Page 17: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

COBRE PANAMA PROGRESS – PORT & POWER STATION OVERVIEW

Page 18: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

COBRE PANAMA PROGRESS – PORT SUBSTATION

Page 19: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

COBRE PANAMA PROGRESS – POWER STATION OVERVIEW

Set 1 Set 2

Page 20: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

COBRE PANAMA PROGRESS – POWER STATION

Page 21: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

COBRE PANAMA PROGRESS – POWER STATION

Set 1

Set 2

Page 22: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

COBRE PANAMA PROGRESS – POWER STATION

Set 1Set 2

Page 23: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

COBRE PANAMA PROGRESS – 230KV SWITCHYARD

Page 24: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

COBRE PANAMA PROGRESS – PLANT AREA OVERVIEW

Page 25: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

COBRE PANAMA PROGRESS – BOXCUTS & PRE-STRIP

Page 26: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

COBRE PANAMA PROGRESS – TAILINGS MANAGEMENT FACILITY DECANT TUNNEL

Page 27: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

COBRE PANAMA PROGRESS – TAILINGS MANAGEMENT FACILITY NORTH WALL

Page 28: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

Acquired in August 2014

Located in the Puna region of Salta Province

An outstanding copper deposit

Conducting environmental impact assessment studies; expected to conclude in 2nd quarter 2017

Commercial & logistics aspects being addressed

A ROBUST PROJECT PIPELINE

TACA TACA PROJECT, ARGENTINA

Page 29: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

Acquired in December 2010

Located in the Apurimac Department of southern Peru

One of the world’s major undeveloped copper deposits

Focused on the community and environmental aspects of the project

A ROBUST PROJECT PIPELINE

HAQUIRA PROJECT, PERU

Page 30: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

FIRST QUANTUM MINERALS

PLATFORM OF HIGH-QUALITY, EFFICIENT OPERATIONS

+

HEALTHY BALANCE SHEET

+

ROBUST COPPER PROJECT PIPELINE

+

INDUSTRY LEADING PROJECT DEVELOPMENT EXPERTISE

Page 31: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

FIRST QUANTUMMINERALS LTD.

ANNUAL GENERAL MEETING

Page 32: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

PHILIP PASCALL

CHAIRMAN & CHIEF EXECUTIVE OFFICER

Page 33: FIRST QUANTUM MINERALS LTD. - s1.q4cdn.coms1.q4cdn.com/857957299/files/doc_presentations/2017/apr/...an eventful and successful past 12 months strengthened our operating base + reinforced

FIRST QUANTUMMINERALS LTD.

ANNUAL GENERAL MEETING