1 2 3 4 5 6 7 A B C D E 1 2 3 4 5 6 7 A B C D E SHEET TITLE LOT NUMBER: DRAWN BY: CHECKED BY: COPYRIGHT: CLIENT U.S. DEPARTMENT OF ENERGY SOLAR DECATHLON 2011 WWW.SOLARDECATHLON.GOV TEAM NAME: ADDRESS: CONTACT: TENNENT + BROWN ARCHITECTS CONSULTANTS DUNNING THORNTON CONSULTANTS LTD LEAP AUSTRALASIA LTD SOUTHERN PERSPECTIVES / SOLAR CITY FIRST LIGHT [email protected] WWW.FIRSTLIGHTHOUSE.AC.NZ 22/02/2011 5:35:52 p.m. 139 VIVIAN STREET TE ARO, WELLINGTON NEWZEALAND Z103 3D VIEW LOT NUMBER Author Checker MARK DATE DESCRIPTION 1 3D VIEW TIMBER CANOPY SOLAR PANELS MOUNTED ON CANOPY TIMBER DECKING SYSTEM MODULES 1 THROUGH 6 CRANED ONTO FOUNDATION SYSTEM. CLADDING ATTACHED AFTER MODULES ASSEMBLED PLANTER BOXES
105

First Light Assembly Overview

Mar 24, 2016

Download

Documents

 
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: First Light Assembly Overview

1 2 3 4 5 6 7

A

B

C

D

E

1 2 3 4 5 6 7

A

B

C

D

E

SHEET TITLE

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CLIENT

U.S. DEPARTMENT OF ENERGY

SOLAR DECATHLON 2011

WWW.SOLARDECATHLON.GOV

TEAM NAME:

ADDRESS:

CONTACT:

TENNENT + BROWN ARCHITECTS

CONSULTANTS

DUNNING THORNTON CONSULTANTS LTD

LEAP AUSTRALASIA LTD

SOUTHERN PERSPECTIVES / SOLAR CITY

FIRST LIGHT

[email protected]

22/0

2/20

11 5

:35:

52 p

.m.

139 VIVIAN STREETTE ARO, WELLINGTON

NEWZEALAND

Z103

3D VIEW

LOT NUMBER

Author

Checker

MARK DATE DESCRIPTION

1 3D VIEW

TIMBER CANOPY

SOLAR PANELS MOUNTED ON CANOPY

TIMBER DECKING SYSTEM

MODULES 1 THROUGH 6 CRANEDONTO FOUNDATION SYSTEM.CLADDING ATTACHED AFTERMODULES ASSEMBLED

PLANTER BOXES

Page 2: First Light Assembly Overview

5472

3357

2200

2200

3357

2200

3357

2200

3357

3357

2272

5472

1 2 3 4 5 6 7

A

B

C

D

E

1 2 3 4 5 6 7

A

B

C

D

E

SHEET TITLE

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CLIENT

U.S. DEPARTMENT OF ENERGY

SOLAR DECATHLON 2011

WWW.SOLARDECATHLON.GOV

TEAM NAME:

ADDRESS:

CONTACT:

TENNENT + BROWN ARCHITECTS

CONSULTANTS

DUNNING THORNTON CONSULTANTS LTD

LEAP AUSTRALASIA LTD

SOUTHERN PERSPECTIVES / SOLAR CITY

VICTORIA UNIVERSITY

CN 11-01-11 FOR CONSTRUCTION

22/0

2/20

11 5

:11:

54 p

.m.

139 VIVIAN STREETTE ARO, WELLINGTON

NEWZEALAND

A-401

EXPLODED MODULESSCHEMATIC

LOT NUMBER

AUTHOR

CHECKER

FIRSTLIGHT NZ

[email protected]

A1 EXPLODED MODULES ISOMETRIC

GENERAL SHEET NOTES

MARK DATE DESCRIPTION

M6

M5

M4

M3

M2

M1

1. 1. ALL PV SYSTEMS WILL BE DESIGNED ANDINSTALLED IN FULL COMPLIANCE WITH THE 2008NATIONAL ELECTRICAL CODE (NEC) AND THE 2010SD RULES AND REGULATIONS

2. PV MODULES, SOURCE-CIRCUIT COMBINERS, ANDUTILITY - INTERACTIVE INVERTERS MUST BE SAFETYCERTIFIED (LISTED) TO THE APPROPRIATEUNDERWRITES LABORATORIES (UL) STANDARD (UL1741 FOR INVERTERS AND COMBINERS, UL 1703 FORPV MODULES) AND MUST BE TESTED ANDCERTIFIED BY ONE OF THE FOLLOWING USNATIONALLY RECOGNIZED TESTING LABORATORIES(NRTL); UL,CSA, ETL, OR TUV RHEINLAND OF NORTHAMERICA.THE EUROPEAN CE DESIGNATION ANDTESTS BYLABORATORIES IN OTHER COUNTRIES ARENOT ACCEPTABLE. (690.4)

3. DC CIRCUITS FROM THE PV MODULES TO THE DC PVDISCONNECT MUST BE IN METAL CONDUIT(RACEWAYS) WHERE INSIDE THE STRUCTURE.(NEC690.31 (E))

4. ALL PV STRINGS TO USE MANUFACTUREDPROVIDED CABLE.

1. 1. ALL PV SYSTEMS WILL BE DESIGNED ANDINSTALLED IN FULL COMPLIANCE WITH THE 2008NATIONAL ELECTRICAL CODE (NEC) AND THE 2010SD RULES AND REGULATIONS

2. PV MODULES, SOURCE-CIRCUIT COMBINERS, ANDUTILITY - INTERACTIVE INVERTERS MUST BE SAFETYCERTIFIED (LISTED) TO THE APPROPRIATEUNDERWRITES LABORATORIES (UL) STANDARD (UL1741 FOR INVERTERS AND COMBINERS, UL 1703 FORPV MODULES) AND MUST BE TESTED ANDCERTIFIED BY ONE OF THE FOLLOWING USNATIONALLY RECOGNIZED TESTING LABORATORIES(NRTL); UL,CSA, ETL, OR TUV RHEINLAND OF NORTHAMERICA.THE EUROPEAN CE DESIGNATION ANDTESTS BYLABORATORIES IN OTHER COUNTRIES ARENOT ACCEPTABLE. (690.4)

3. DC CIRCUITS FROM THE PV MODULES TO THE DC PVDISCONNECT MUST BE IN METAL CONDUIT(RACEWAYS) WHERE INSIDE THE STRUCTURE.(NEC690.31 (E))

4. ALL PV STRINGS TO USE MANUFACTUREDPROVIDED CABLE.

MODULE 3 WILL BE DISASSEMBLED ANDPACKED INTO THE 40 FOOT SHIPPINGCONTAINERS

Page 3: First Light Assembly Overview

A1

A-211

C1

A-211

C1

A-212A1

A-212

1 2 3 4 5 6 7

A

C

B

C1A-301

C1A-302

C4A-302

KITCHEN

DININGLIVING STUDY

LAUNDRYBATHROOM

2200 2200 3000 2200 2200 2200

3418

1934

A4A-302

B2A-303

D08A-511

ID02-5

WI05-5

WI0

1-1

M1 M2 M3 M4 M5

M6

A-501D01

A-501D02 A-501

D03

A-501D04

A-533D30

A-531D42

SHED

UTILITIES

JN06

-5

A1

G-201

A1

G-202

C1

G-202

C1

G-201

BUNK

JN05

-4

-

--

-

-

D44A-513

A-513D45

836

A-531D19

A1A-302

A-532D22

A-533D25

A-533D31

1280 895 1305 895 896

1575

713 1442 852 13037702732635

WI02-2 WI04-4 WI06-6

WI03-4

ID01-4

DO

04-6

DO

03-6

DO01-3

DO02-3

C1S-301

SEE DRAWINGS I-110TO I-523 FOR INTERIORFINISHING DETAILS

1 2 3 4 5 6 7

A

B

C

D

E

1 2 3 4 5 6 7

A

B

C

D

E

SHEET TITLE

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CLIENT

U.S. DEPARTMENT OF ENERGY

SOLAR DECATHLON 2011

WWW.SOLARDECATHLON.GOV

TEAM NAME:

ADDRESS:

CONTACT:

TENNENT + BROWN ARCHITECTS

CONSULTANTS

DUNNING THORNTON CONSULTANTS LTD

LEAP AUSTRALASIA LTD

SOUTHERN PERSPECTIVES / SOLAR CITY

VICTORIA UNIVERSITY

CN 11-01-11 FOR CONSTRUCTION

14/0

1/20

11 6

:33:

51 p

.m.

139 VIVIAN STREETTE ARO, WELLINGTON

NEWZEALAND

A-111

FLOOR PLAN

LOT NUMBER

AUTHOR

CHECKER

FIRSTLIGHT NZ

[email protected]

GENERAL SHEET NOTES

1 : 50A1 FLOOR PLAN

MARK DATE DESCRIPTION

DOORS DO03-6 AND DO04-6 TO BE RESOLVED

Page 4: First Light Assembly Overview

GROUND FLOOR0

GRADE LEVEL-550

1 2 3 4 5 6 7

WI02-2 WI04-4

WI06-6

TOP OF PARAPET2985

SOLAR ENVELOPESHOWN DASHED

EXTERIOR SOLAR SHADINGINSTALLED ON ALL SOUTHFACING WINDOWS.CONSTRUCTION DETAILSTO BE CONFIRMED

PANELIZED HORIZONTALSHIPLAP HERMAN PACIFICCEDAR WEATHERBOARDSYSTEM. SEE DRAWINGS A-591 TO A598 FORCONSTRUCTION DETAILS

METALCRAFT CORRUGATEDPROFILED AWNING. SEEDRAWING A-533 FORCONSTRUCTION DETAILS

GROUND FLOOR0

GRADE LEVEL-550

1234567

WI05-5

75X19MM CEDAR SLATS @100MMCENTRES

GLUE-LAMINATED COLUMNS

6713 4513

1352

1387

220022003000220022002200

OUTDOOR SHOWER

SOLAR ENVELOPE FORWASHINGTON SITE SHOWNDASHED

WI03-4

SOLAR WATER HEATING PANELS

PHOTOVOLTAIC PANELS ON ALUMINIUMSUPPORT STRUCTURE. SUPPORTSTRUCTURE CONSTRUCTION DETAILS TOBE CONFIRMED, SEE DRAWINGS E-101 TOE-902 FOR ELECTRICAL DETAILS

TOP OF PARAPET2985

DO01-3

PANELIZED HORIZONTALSHIPLAP HERMAN PACIFICCEDAR WEATHERBOARDSYSTEM. SEE DRAWINGS A-591TO A598 FOR CONSTRUCTIONDETAILS

TIMBER CANOPY STRUCTURE.CONSTRUCTION DETAILS TO BECONFIRMED

1 2 3 4 5 6 7

A

B

C

D

E

1 2 3 4 5 6 7

A

B

C

D

E

SHEET TITLE

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CLIENT

U.S. DEPARTMENT OF ENERGY

SOLAR DECATHLON 2011

WWW.SOLARDECATHLON.GOV

TEAM NAME:

ADDRESS:

CONTACT:

TENNENT + BROWN ARCHITECTS

CONSULTANTS

DUNNING THORNTON CONSULTANTS LTD

LEAP AUSTRALASIA LTD

SOUTHERN PERSPECTIVES / SOLAR CITY

VICTORIA UNIVERSITY

CN 11-01-11 FOR CONSTRUCTION

14/0

1/20

11 6

:34:

03 p

.m.

139 VIVIAN STREETTE ARO, WELLINGTON

NEWZEALAND

A-211

ELEVATIONS

LOT NUMBER

AUTHOR

CHECKER

FIRSTLIGHT NZ

[email protected]

1 : 50A1 SOUTH ELEVATION

1 : 50C1 NORTH ELEVATION

GENERAL SHEET NOTES1. MAXIMUM ELEVATION OF SITE COMPONENTS

FROM HIGHEST GRADE POINT ON SITE MUST NOTEXTEND BEYOND THE SOLAR ENVELOPE. IF APOTENTIAL VIOLATION OF THIS REQUIREMENTEXISTS, CONTACT ARCHITECT PRIOR TOCONSTRUCTION

MARK DATE DESCRIPTION

DO02-3

Page 5: First Light Assembly Overview

GROUND FLOOR0

GRADE LEVEL-550

AC B

GLUE-LAMINATED COLUMNS

DO04-6 DO03-6

PANELIZED HORIZONTALSHIPLAP HERMAN PACIFICCEDAR WEATHERBOARDSYSTEM

OUTDOOR SHOWER

CUSTOM FABRICATED STEELFOUNDATION SYSTEM. SEEDRAWING S-101 FOR FURTHERDETAILS

75X19MM VERTICAL CEDARSLATS @100MM CRS FIXED TO65X45MM HORIZONTALBATTENS

75X19MM CEDAR SLATS @100MM CRSFIXED TO 65X35MM BATTENS.CONSTRUCTED IN PANELIZED SYSTEMFOR ONSITE ASSEMBLY

TOP OF PARAPET2985

METER HOUSING BOXES

DETAILS FOR DOORS DO03-6& DO04-6 TO BE CONFIRMED

SOLAR ENVELOPE FORWASHINGTON SITESHOWN DASHED

GROUND FLOOR0

GRADE LEVEL-550

A CB

GLUE-LAMINATED COLUMNS

75X19MM CEDAR SLATS @100MMCENTRES

WI01-1

75X19MM CEDAR SLATS @100MMCENTRES

TOP OF PARAPET2985

PANELIZED HORIZONTAL SHIPLAPHERMAN PACIFIC CEDARWEATHERBOARD SYSTEM.REFER TO DRAWINGS A591 TOA-598 FOR CONSTRUCTIONDETAILS

SOLAR ENVELOPE FORWASHINGTON SITESHOWN DASHED

PHOTOVOLTAIC PANELS ON ALUMINIUMSUPPORT STRUCTURE. SUPPORTSTRUCTURE CONSTRUCTION DETAILS TOBE CONFIRMED, SEE DRAWINGS E-101 TOE-902 FOR ELECTRICAL DETAILS

TIMBER CANOPY. CONSTRUCTIONDETAILS TO BE CONFIRMED

1 2 3 4 5 6 7

A

B

C

D

E

1 2 3 4 5 6 7

A

B

C

D

E

SHEET TITLE

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CLIENT

U.S. DEPARTMENT OF ENERGY

SOLAR DECATHLON 2011

WWW.SOLARDECATHLON.GOV

TEAM NAME:

ADDRESS:

CONTACT:

TENNENT + BROWN ARCHITECTS

CONSULTANTS

DUNNING THORNTON CONSULTANTS LTD

LEAP AUSTRALASIA LTD

SOUTHERN PERSPECTIVES / SOLAR CITY

VICTORIA UNIVERSITY

CN 11-01-11 FOR CONSTRUCTION

14/0

1/20

11 6

:34:

12 p

.m.

139 VIVIAN STREETTE ARO, WELLINGTON

NEWZEALAND

A-212

ELEVATIONS

LOT NUMBER

AUTHOR

CHECKER

FIRSTLIGHT NZ

[email protected]

1 : 50C1 EAST ELEVATION

1 : 50A1 WEST ELEVATION

GENERAL SHEET NOTES1. MAXIMUM ELEVATION OF SITE COMPONENTS

FROM HIGHEST GRADE POINT ON SITE MUST NOTEXTEND BEYOND THE SOLAR ENVELOPE. IF APOTENTIAL VIOLATION OF THIS REQUIREMENTEXISTS, CONTACT ARCHITECT PRIOR TOCONSTRUCTION

MARK DATE DESCRIPTION

Page 6: First Light Assembly Overview
Page 7: First Light Assembly Overview
Page 8: First Light Assembly Overview
Page 9: First Light Assembly Overview
Page 10: First Light Assembly Overview
Page 11: First Light Assembly Overview
Page 12: First Light Assembly Overview
Page 13: First Light Assembly Overview
Page 14: First Light Assembly Overview
Page 15: First Light Assembly Overview
Page 16: First Light Assembly Overview
Page 17: First Light Assembly Overview
Page 18: First Light Assembly Overview
Page 19: First Light Assembly Overview
Page 20: First Light Assembly Overview
Page 21: First Light Assembly Overview
Page 22: First Light Assembly Overview
Page 23: First Light Assembly Overview
Page 24: First Light Assembly Overview
Page 25: First Light Assembly Overview
Page 26: First Light Assembly Overview
Page 27: First Light Assembly Overview
Page 28: First Light Assembly Overview
Page 29: First Light Assembly Overview
Page 30: First Light Assembly Overview
Page 31: First Light Assembly Overview
Page 32: First Light Assembly Overview
Page 33: First Light Assembly Overview
Page 34: First Light Assembly Overview
Page 35: First Light Assembly Overview
Page 36: First Light Assembly Overview
Page 37: First Light Assembly Overview
Page 38: First Light Assembly Overview
Page 39: First Light Assembly Overview
Page 40: First Light Assembly Overview
Page 41: First Light Assembly Overview
Page 42: First Light Assembly Overview
Page 43: First Light Assembly Overview
Page 44: First Light Assembly Overview
Page 45: First Light Assembly Overview
Page 46: First Light Assembly Overview
Page 47: First Light Assembly Overview
Page 48: First Light Assembly Overview
Page 49: First Light Assembly Overview
Page 50: First Light Assembly Overview
Page 51: First Light Assembly Overview
Page 52: First Light Assembly Overview
Page 53: First Light Assembly Overview
Page 54: First Light Assembly Overview
Page 55: First Light Assembly Overview
Page 56: First Light Assembly Overview
Page 57: First Light Assembly Overview
Page 58: First Light Assembly Overview
Page 59: First Light Assembly Overview
Page 60: First Light Assembly Overview
Page 61: First Light Assembly Overview
Page 62: First Light Assembly Overview
Page 63: First Light Assembly Overview
Page 64: First Light Assembly Overview
Page 65: First Light Assembly Overview
Page 66: First Light Assembly Overview
Page 67: First Light Assembly Overview
Page 68: First Light Assembly Overview
Page 69: First Light Assembly Overview
Page 70: First Light Assembly Overview
Page 71: First Light Assembly Overview
Page 72: First Light Assembly Overview
Page 73: First Light Assembly Overview
Page 74: First Light Assembly Overview
Page 75: First Light Assembly Overview
Page 76: First Light Assembly Overview
Page 77: First Light Assembly Overview
Page 78: First Light Assembly Overview
Page 79: First Light Assembly Overview
Page 80: First Light Assembly Overview
Page 81: First Light Assembly Overview
Page 82: First Light Assembly Overview
Page 83: First Light Assembly Overview
Page 84: First Light Assembly Overview
Page 85: First Light Assembly Overview
Page 86: First Light Assembly Overview
Page 87: First Light Assembly Overview
Page 88: First Light Assembly Overview
Page 89: First Light Assembly Overview
Page 90: First Light Assembly Overview
Page 91: First Light Assembly Overview
Page 92: First Light Assembly Overview
Page 93: First Light Assembly Overview
Page 94: First Light Assembly Overview
Page 95: First Light Assembly Overview
Page 96: First Light Assembly Overview
Page 97: First Light Assembly Overview
Page 98: First Light Assembly Overview
Page 99: First Light Assembly Overview
Page 100: First Light Assembly Overview
Page 101: First Light Assembly Overview
Page 102: First Light Assembly Overview
Page 103: First Light Assembly Overview
Page 104: First Light Assembly Overview
Page 105: First Light Assembly Overview