1 2 3 4 5 6 7 A B C D E 1 2 3 4 5 6 7 A B C D E SHEET TITLE LOT NUMBER: DRAWN BY: CHECKED BY: COPYRIGHT: CLIENT U.S. DEPARTMENT OF ENERGY SOLAR DECATHLON 2011 WWW.SOLARDECATHLON.GOV TEAM NAME: ADDRESS: CONTACT: TENNENT + BROWN ARCHITECTS CONSULTANTS DUNNING THORNTON CONSULTANTS LTD LEAP AUSTRALASIA LTD SOUTHERN PERSPECTIVES / SOLAR CITY FIRST LIGHT [email protected]WWW.FIRSTLIGHTHOUSE.AC.NZ 22/02/2011 5:35:52 p.m. 139 VIVIAN STREET TE ARO, WELLINGTON NEWZEALAND Z103 3D VIEW LOT NUMBER Author Checker MARK DATE DESCRIPTION 1 3D VIEW TIMBER CANOPY SOLAR PANELS MOUNTED ON CANOPY TIMBER DECKING SYSTEM MODULES 1 THROUGH 6 CRANED ONTO FOUNDATION SYSTEM. CLADDING ATTACHED AFTER MODULES ASSEMBLED PLANTER BOXES
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
1. 1. ALL PV SYSTEMS WILL BE DESIGNED ANDINSTALLED IN FULL COMPLIANCE WITH THE 2008NATIONAL ELECTRICAL CODE (NEC) AND THE 2010SD RULES AND REGULATIONS
2. PV MODULES, SOURCE-CIRCUIT COMBINERS, ANDUTILITY - INTERACTIVE INVERTERS MUST BE SAFETYCERTIFIED (LISTED) TO THE APPROPRIATEUNDERWRITES LABORATORIES (UL) STANDARD (UL1741 FOR INVERTERS AND COMBINERS, UL 1703 FORPV MODULES) AND MUST BE TESTED ANDCERTIFIED BY ONE OF THE FOLLOWING USNATIONALLY RECOGNIZED TESTING LABORATORIES(NRTL); UL,CSA, ETL, OR TUV RHEINLAND OF NORTHAMERICA.THE EUROPEAN CE DESIGNATION ANDTESTS BYLABORATORIES IN OTHER COUNTRIES ARENOT ACCEPTABLE. (690.4)
3. DC CIRCUITS FROM THE PV MODULES TO THE DC PVDISCONNECT MUST BE IN METAL CONDUIT(RACEWAYS) WHERE INSIDE THE STRUCTURE.(NEC690.31 (E))
4. ALL PV STRINGS TO USE MANUFACTUREDPROVIDED CABLE.
1. 1. ALL PV SYSTEMS WILL BE DESIGNED ANDINSTALLED IN FULL COMPLIANCE WITH THE 2008NATIONAL ELECTRICAL CODE (NEC) AND THE 2010SD RULES AND REGULATIONS
2. PV MODULES, SOURCE-CIRCUIT COMBINERS, ANDUTILITY - INTERACTIVE INVERTERS MUST BE SAFETYCERTIFIED (LISTED) TO THE APPROPRIATEUNDERWRITES LABORATORIES (UL) STANDARD (UL1741 FOR INVERTERS AND COMBINERS, UL 1703 FORPV MODULES) AND MUST BE TESTED ANDCERTIFIED BY ONE OF THE FOLLOWING USNATIONALLY RECOGNIZED TESTING LABORATORIES(NRTL); UL,CSA, ETL, OR TUV RHEINLAND OF NORTHAMERICA.THE EUROPEAN CE DESIGNATION ANDTESTS BYLABORATORIES IN OTHER COUNTRIES ARENOT ACCEPTABLE. (690.4)
3. DC CIRCUITS FROM THE PV MODULES TO THE DC PVDISCONNECT MUST BE IN METAL CONDUIT(RACEWAYS) WHERE INSIDE THE STRUCTURE.(NEC690.31 (E))
4. ALL PV STRINGS TO USE MANUFACTUREDPROVIDED CABLE.
MODULE 3 WILL BE DISASSEMBLED ANDPACKED INTO THE 40 FOOT SHIPPINGCONTAINERS
A1
A-211
C1
A-211
C1
A-212A1
A-212
1 2 3 4 5 6 7
A
C
B
C1A-301
C1A-302
C4A-302
KITCHEN
DININGLIVING STUDY
LAUNDRYBATHROOM
2200 2200 3000 2200 2200 2200
3418
1934
A4A-302
B2A-303
D08A-511
ID02-5
WI05-5
WI0
1-1
M1 M2 M3 M4 M5
M6
A-501D01
A-501D02 A-501
D03
A-501D04
A-533D30
A-531D42
SHED
UTILITIES
JN06
-5
A1
G-201
A1
G-202
C1
G-202
C1
G-201
BUNK
JN05
-4
-
--
-
-
D44A-513
A-513D45
836
A-531D19
A1A-302
A-532D22
A-533D25
A-533D31
1280 895 1305 895 896
1575
713 1442 852 13037702732635
WI02-2 WI04-4 WI06-6
WI03-4
ID01-4
DO
04-6
DO
03-6
DO01-3
DO02-3
C1S-301
SEE DRAWINGS I-110TO I-523 FOR INTERIORFINISHING DETAILS
PHOTOVOLTAIC PANELS ON ALUMINIUMSUPPORT STRUCTURE. SUPPORTSTRUCTURE CONSTRUCTION DETAILS TOBE CONFIRMED, SEE DRAWINGS E-101 TOE-902 FOR ELECTRICAL DETAILS
TOP OF PARAPET2985
DO01-3
PANELIZED HORIZONTALSHIPLAP HERMAN PACIFICCEDAR WEATHERBOARDSYSTEM. SEE DRAWINGS A-591TO A598 FOR CONSTRUCTIONDETAILS
TIMBER CANOPY STRUCTURE.CONSTRUCTION DETAILS TO BECONFIRMED
GENERAL SHEET NOTES1. MAXIMUM ELEVATION OF SITE COMPONENTS
FROM HIGHEST GRADE POINT ON SITE MUST NOTEXTEND BEYOND THE SOLAR ENVELOPE. IF APOTENTIAL VIOLATION OF THIS REQUIREMENTEXISTS, CONTACT ARCHITECT PRIOR TOCONSTRUCTION
MARK DATE DESCRIPTION
DO02-3
GROUND FLOOR0
GRADE LEVEL-550
AC B
GLUE-LAMINATED COLUMNS
DO04-6 DO03-6
PANELIZED HORIZONTALSHIPLAP HERMAN PACIFICCEDAR WEATHERBOARDSYSTEM
OUTDOOR SHOWER
CUSTOM FABRICATED STEELFOUNDATION SYSTEM. SEEDRAWING S-101 FOR FURTHERDETAILS
75X19MM CEDAR SLATS @100MM CRSFIXED TO 65X35MM BATTENS.CONSTRUCTED IN PANELIZED SYSTEMFOR ONSITE ASSEMBLY
TOP OF PARAPET2985
METER HOUSING BOXES
DETAILS FOR DOORS DO03-6& DO04-6 TO BE CONFIRMED
SOLAR ENVELOPE FORWASHINGTON SITESHOWN DASHED
GROUND FLOOR0
GRADE LEVEL-550
A CB
GLUE-LAMINATED COLUMNS
75X19MM CEDAR SLATS @100MMCENTRES
WI01-1
75X19MM CEDAR SLATS @100MMCENTRES
TOP OF PARAPET2985
PANELIZED HORIZONTAL SHIPLAPHERMAN PACIFIC CEDARWEATHERBOARD SYSTEM.REFER TO DRAWINGS A591 TOA-598 FOR CONSTRUCTIONDETAILS
SOLAR ENVELOPE FORWASHINGTON SITESHOWN DASHED
PHOTOVOLTAIC PANELS ON ALUMINIUMSUPPORT STRUCTURE. SUPPORTSTRUCTURE CONSTRUCTION DETAILS TOBE CONFIRMED, SEE DRAWINGS E-101 TOE-902 FOR ELECTRICAL DETAILS
TIMBER CANOPY. CONSTRUCTIONDETAILS TO BE CONFIRMED
GENERAL SHEET NOTES1. MAXIMUM ELEVATION OF SITE COMPONENTS
FROM HIGHEST GRADE POINT ON SITE MUST NOTEXTEND BEYOND THE SOLAR ENVELOPE. IF APOTENTIAL VIOLATION OF THIS REQUIREMENTEXISTS, CONTACT ARCHITECT PRIOR TOCONSTRUCTION