Page 1: First Commercial CLT Project in the USA

Case Study:First Commercial Project

Opens Doors for CLT in US

Presented by

Darryl Byle, PE,

WoodWorksDesign Considerations for Innovative Wood Buildings

Page 2: First Commercial CLT Project in the USA

2

“The Wood Products Council” is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this program will be reported to AIA/CES for AIA members. Certificates of Completion for both AIA members and non-AIA members are available upon request.

This program is registered with AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product.

Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.

Page 3: First Commercial CLT Project in the USA

Copyright Materials

This presentation is protected by US and International Copyright laws. Reproduction,

distribution, display and use of the presentation without written permission of the speaker is

prohibited.

© The Wood Products Council 2012

Page 4: First Commercial CLT Project in the USA

4

Learning ObjectivesAt the end of this program, participants will be able to:

2. Identify the advantages of using cross laminated timber (CLT) for an infill

project.

3. Describe building official concerns related to the first use of CLT in a

commercial building in Montana and how they were satisfied.

4. Explain how CLT reduced the building’ s carbon footprint.

5. Describe how the use of CLT contributed to energy efficiency of the

completed building.

Page 5: First Commercial CLT Project in the USA

5

Project Team

• The Long Hall Owner:– Andy Hamer

• Designer:– Datum Drafting Design/Jason Hatten

• CLT Supplier/Installation:– Innovative Timber Systems/SmartWoods– Pete McCrone/Pat Clark

• Raising Crew: Compass Construction• 3D SketchUp Modeling: OTB Design Works

• Professional of Record/Project Mgr:– DSB Engineering & Consulting, PC (ITS)

Page 6: First Commercial CLT Project in the USA

6

Introduction

Page 7: First Commercial CLT Project in the USA

7

Introduction

Page 8: First Commercial CLT Project in the USA

8

Introduction

Page 9: First Commercial CLT Project in the USA

9

Introduction

Page 10: First Commercial CLT Project in the USA

10

Introduction• Well insulated but…• Fire resistance• Inefficient use of

footprint and…

• Moisture management

• Interior environment• Not too healthy

– Old wet socks…

Page 11: First Commercial CLT Project in the USA

11

Conceptual Design

• Originally 5950 sf• CMU Perimeter Walls to address fire rating• Upper level clad with Barn Wood board/batten + accent panels• Do Jang martial arts studio upstairs• Retail/business downstairs

Page 12: First Commercial CLT Project in the USA

12

Why CLT

• Owner had an affinity for wood and sustainable design

• Datum Drafting invited DSB to present CLT as an alternative to CMU1st – What is CLT?

2nd – Why use it for this project?

3rd – What challenges do we need to over come?

Page 13: First Commercial CLT Project in the USA

13

What is CLT

• A solid pre-fabricated, monolithic engineered wood material used to construct the entire building envelope including floors, walls, and roofs.

Page 14: First Commercial CLT Project in the USA

14

What is CLT

Page 15: First Commercial CLT Project in the USA

What is CLT

Page 16: First Commercial CLT Project in the USA

What is CLT

Page 17: First Commercial CLT Project in the USA

What is CLT

Page 18: First Commercial CLT Project in the USA

18

What is CLT

Page 19: First Commercial CLT Project in the USA

• Axial load transmitted on laminations parallel to grain

• Perpendicular lamination area is ignored

What is CLT

Page 20: First Commercial CLT Project in the USA

20

Why CLT

• Why CLT?– Structural– Acoustic

– Fire– Environmental/Carbon– Speed of build

– Thermal Mass– Interior Environment

Page 21: First Commercial CLT Project in the USA

21

• Structural– Dimensional stability– High stiffness

• in-plane• out-of-plane

– Biaxial loading• Bidirectional cantilever

– Increased splitting resistance

– NEW ways to design– NEW solutions

Why CLT

Page 22: First Commercial CLT Project in the USA

22

Structural• Out of Plane Loading

– Load distributed– Dissipates quickly– Panel/corbel/beam

assy acts as moment frame

Page 23: First Commercial CLT Project in the USA

23

Structural• Conducted at E-Defense in

Japan– Building weight 270t (120t +

150t)– Wall panel thickness

• 140 mm floors 1 and 2• 125 mm floors 3 and 4• 85 mm top 3 floors• All floor panels 142 mm

– Wall panels length 2.5 m– Two 3-axial records used

• Kashiwazaki Kariwa Quake– X (0.3g) Y (0.68g) Z (0.4g)

• Kobe JMA Quake– X (0.6g) Y (0.82g) Z (0.34g)

– Total of 14 tests• 10 tests were ≥ 0.3g

• http://www.youtube.com/watch?v=T08KRyVhyeo

• The building showed very good seismic behavior under all severe earthquake motions– Max top displacement of

287 mm (X) and 175 mm (Y)

• Max storey drifts approx 2.4% (X) and 1.6% (Y)

– The damage after all tests was negligible

Page 24: First Commercial CLT Project in the USA

24

Why CLT

• Acoustic– Solid panels effective against airborne sound– Flanking paths limited

• Simple sealing around perimeter• Minimal penetrations

– CLT alone = 39 STC• One element vs 3-5

Page 25: First Commercial CLT Project in the USA

25

Why CLT

• Fire– Similar to heavy timber

• Charring well established

– Existing standards• NDS• IBC

– Single side exposure• Load distribution via diaphragmatic action

– Elaborate later…

Page 26: First Commercial CLT Project in the USA

26

Why CLT• Environment/Carbon

– Completely renewable• 148 cu m of wood for this building would grow in NA in 26

seconds

– Carbon Store• 104 metric tons

– Avoid Greenhouse Gas generated from concrete and steel production

• 59 metric tons

– Total estimated Carbon benefit:• 143 metric tons CO2

(Post-project statistics from WoodWorks Case Study: CLT Milestone in Montana)

Page 27: First Commercial CLT Project in the USA

27

Why CLT• Speed of build

– Pre-cut panels– Controlled construction environment– CNC accuracy– Site costs reduced

• Fewer people• Less time

– Structure available sooner = cash flow(Sneak peek…)

Page 28: First Commercial CLT Project in the USA

28

Speed of Build

Page 29: First Commercial CLT Project in the USA

29

Speed of Build

Page 30: First Commercial CLT Project in the USA

30

Speed of Build

Page 31: First Commercial CLT Project in the USA

31

Speed of Build

Page 32: First Commercial CLT Project in the USA

32

Speed of Build

Page 33: First Commercial CLT Project in the USA

33

Speed of Build

Page 34: First Commercial CLT Project in the USA

34

Speed of Build

Page 35: First Commercial CLT Project in the USA

35

Why CLT• Thermal

– Thermal mass• Thermal buffering• Inside thermal envelope

– Vs CMU exterior

– Provides additional insulation value– Allows nearly uniform thermal blanket– Tight envelope

• All joints caulked & taped• Fire caulk on rated walls• CNC joints tight

Page 36: First Commercial CLT Project in the USA

36

Why CLT

• Interior Environment– Food grade glues– Unsung benefit of CLT

• Structure self-regulates its moisture– Gortex type of function– No moisture trapped in cavities– Hygro-thermal balance

• WUFI– Wärme und Feuchte instationär (Transient Heat and

Moisture)– Building Envelope Thermal & Moisture Analysis

Page 37: First Commercial CLT Project in the USA

37

Why CLT

Page 38: First Commercial CLT Project in the USA

38

Why CLT

Page 39: First Commercial CLT Project in the USA

39

Why CLT

Page 40: First Commercial CLT Project in the USA

40

Why CLT

• So the owner is interested…

• 1st question:

• What does it cost?

Page 41: First Commercial CLT Project in the USA

41

Conceptual Costing

Page 42: First Commercial CLT Project in the USA

42

Conceptual Parameters• Shipping dimensional constraints

– 39’ x 7’4”• Maximize interior space

– Minimize wall thickness– Minimize cross-walls downstairs

• Maximize interior exposure of CLT– No sheet rock or fire protection

• Wants interior exposed beams• Exterior appearance fixed by ARC approval• Must have Code Official approval

– No wall penetrations– Non-combustible wall cladding/insulation

• Liquidated damages will be assessed for delays/missed milestones

Page 43: First Commercial CLT Project in the USA

43

Code Considerations

Game is on if…

the Building Official will ‘buy in’…

OR

Page 44: First Commercial CLT Project in the USA

44

Code Considerations• 104.11 Alternative

materials, design and methods of construction and equipment.

• Chapter 3 Use and Occupancy Classification

• Table 503 Allowable Height and Building Areas

• Section 504.2 Automatic Sprinkler System Increase

• Section 602 Construction Classification

• Chapter 7 Fire-Resistance-Rated Construction

• Chapter 8 Interior Finishes

• Chapter 14 Exterior Walls• Chapter 15 Roof

Assemblies and Rooftop Structures

• Chapter 16 Structural Design

• Section 2304.11 Protection Against Decay and Termites

Page 45: First Commercial CLT Project in the USA

45

Code Considerations• 104.11 Alternative materials, design and methods of

construction and equipment.– The provisions of this code are not intended to prevent the

installation of any material or to prohibit any design or method of construction not specifically prescribed by this code, provided that any such alternative has been approved. An alternative material, design or method of construction shall be approved where the building official finds that the proposed design is satisfactory and complies with the intent of the provisions of this code, and that the material, method or work offered is, for the purpose intended, at least the equivalent of that prescribed in this code in quality, strength, effectiveness, fire resistance , durability and safety.

– Translation…

Page 46: First Commercial CLT Project in the USA

46

• New technology requires “buy-in” from the regulatory community

– “Buy-in” = acceptable to the “Authority Having Jurisdiction” (AHJ).

• Provide sufficient information to the AHJ for them to find CLT

– …is a satisfactory solution– …complies with the intent of the building code– …is at least equivalent to code prescribed solutions in

• Quality• Strength• Effectiveness• Fire-resistance• Durability• Safety

Code Considerations

Page 47: First Commercial CLT Project in the USA

47

• Section 602 Construction Classification– Type V Construction

• Limited area

• Direct implementation

– Type IV Construction• Based on post & beam construction• Doesn’t account for panelized benefits

– Single side fire access

– Monolithic structural stability

• Element sizing based on 3 exposed sides

• CLT exposed on one side

Code Considerations

Page 48: First Commercial CLT Project in the USA

48

Code Considerations

• Chapter 7 Fire-Resistance-Rated Construction

– Insulation Failure• Temperature rise of 140 °C

average or 180 °C at any point on unexposed side.

– Est temp of 98 mm at 1 hr = 30 °C (86 °F)

– Integrity Failure• Passage of flame or gases hot

enough to ignite cotton pads.– 2+ layers remain

– Structural Failure• Inability to sustain the applied

load at some point during the test.– 1 vert layer = > 5k bearing– Freespan load = < 1475 plf– Surrounding structure transfers

load

– Protection of metal connection devices DSB extrapolation

Graph from Experimental Analysis of Cross-laminated Timber Panels in Fire, Andrea frangi, Mario Fontana, Erich Hugi, Rober Jubstlin, Fire Saftey Journal (2009)

Page 49: First Commercial CLT Project in the USA

49

Code Considerations• Wood performs well ‘under fire’

– Well known characteristics– Large wood members

• Burn slowly

• Form char layer– Isolates/insulates remaining fiber

• Non-charred wood– Retains strength

– Dimensional stability

• No concealed spaces• NDS Part 16

– Fire Design of Wood Members

Page 50: First Commercial CLT Project in the USA

50

Code Considerations

• Objectives of Fire Resistance– Safe evacuation of occupants

• Contain fire and smoke in compartment of origin

– Prevent spread of fire from compartment• Fire fighters safety• Property protection

– Structural integrity

Page 51: First Commercial CLT Project in the USA

51

• Heavy Timber Design for Fire Resistance– Multi-sided charring– Single axis loading– Cannot redistribute load

• CLT Design for Fire Resistance– Single-sided charring– Multi-axis loading– Can redistribute load

Code Considerations

Page 52: First Commercial CLT Project in the USA

52

Code Considerations• Chapter 8 Interior Finishes

– TABLE 803.9 – INTERIOR WALL AND CEILING FINISH REQUIREMENTS BY OCCUPANCY

• Sprinklered Rooms and enclosed spaces in A, B, E, F, H, M, R, S = C– 803.1.1 Interior wall and ceiling finish materials

• Class A:– Flame spread index 0-25– smoke-developed index 0-450.

• Class B:– Flame spread index 26-75– smoke-developed index 0-450.

• Class C:– Flame spread index 76-200– smoke-developed index 0-450.

– Spruce and Douglas fir• Flame-spread index of 60-100.

– No wood product exceeds smoke-developed index of 450

Page 53: First Commercial CLT Project in the USA

53

Code Considerations

• Chapter 14 Exterior Walls &

• Chapter 15 Roof Assemblies and Rooftop Structures– Moisture management

• Flashing• No moisture accumulation

– Convective sweeping of in-wall condensation– Roof venting

– Wall cladding structural issues

Page 54: First Commercial CLT Project in the USA

54

Code Considerations

Page 55: First Commercial CLT Project in the USA

55

Code Considerations

– Wall cladding structural issues

Page 56: First Commercial CLT Project in the USA

56

Code Considerations

The Long and short of it…

the Building Official will ‘buy in’…

Page 57: First Commercial CLT Project in the USA

57

Transition to CLT• Tight lot constraints

– Maximize preassembly– Wall cladding

configuration– Fastener installation

• Soils report– Light footprint a benefit

• Wall 1/3 the weight = 9” less footing

Page 58: First Commercial CLT Project in the USA

58

Transition to CLT• Sub Coordination

– Concrete• Flat +/- 1/8”• Square +/- ¼”• Drill in Anchor bolts – rebar

placement can’t interfere

• Sub Coordination– Plumbing/Mechanical

• No floor/ceiling cavity• Aesthetic routing or chase• Roof and plumbing drains• Rooftop Mini-split units

www.OTBDesignworks.com

Page 59: First Commercial CLT Project in the USA

59

Panel Configuration• Foundation to CLT Connection

– Anchor bolt offset from panel connection– Flex connection

Page 60: First Commercial CLT Project in the USA

60

• Lateral Loading– Distributes thru panel– Tongue and groove

distributes load to base

Panel Configuration

Page 61: First Commercial CLT Project in the USA

61

Panel Configuration

• Vertical vs Horizontal (7’4” max width)• Logistics

Page 62: First Commercial CLT Project in the USA

62

Panel Configuration

Page 63: First Commercial CLT Project in the USA

63

• Fun design features of CLT– Cantilevered floors– Live walls– Shear– In-plane bending

Panel Configuration

Page 64: First Commercial CLT Project in the USA

64

Panel Configuration• Shop Drawings … 130+

Page 65: First Commercial CLT Project in the USA

65

Shipping

• 4 containers• Logistically organize

each panel• Consolidate highest

needs in 1st container for RUSH

• 1st container comes in 2nd – 2 weeks late – Long story…

– US Production should alleviate this…

Page 66: First Commercial CLT Project in the USA

66

Preassembly

• Panels assembled and loaded in reverse order

• Custom strong-back for stability and load distribution

• A-frame on flatbed to site

Page 67: First Commercial CLT Project in the USA

67

Raising

• Sill plate in place• Sheathing covering finished concrete• Walls braced off floor mounted ledger boards• Trailers in front and back - Crane moves• Classic timing for street repair…

Page 68: First Commercial CLT Project in the USA

68

Raising

• Glulams rest in pockets – top plate provides lateral• CLT beams rest on CLT walls – screw through walls• Curved beams connect part way down wall

– Concealed connector

Page 69: First Commercial CLT Project in the USA

69

Raising

• Adjustments are easy with the right tools

• CNC’d panels go together tightly with nice clean joints

• (Unlike precast concrete )

Page 70: First Commercial CLT Project in the USA

70

Sealing

• Fire Caulk at all north & south ext wall joints

• Vapor permeable tapes on all joints• Polymer foam tapes (sound)

Page 71: First Commercial CLT Project in the USA

71

Insulation

• Solid blanket – minimal thermal shorts• Quick, non-combustible, moisture neutral• Easy to place in tight space

Page 72: First Commercial CLT Project in the USA

72

Cladding

• Metal Hat channel N/S• Wood battens E/W• Diagonal load bearing

screws

Page 73: First Commercial CLT Project in the USA

73

Blower Door Test

• Montana Dept of Env Quality conducted an on-site educational training test– Visual inspection– Blower door analysis– Infrared camera scan

• Relative coloration

Page 74: First Commercial CLT Project in the USA

74

Blower Door Test

Page 75: First Commercial CLT Project in the USA

75

Blower Door Test

Page 76: First Commercial CLT Project in the USA

76

Blower Door Test

Page 77: First Commercial CLT Project in the USA

77

• Test Day Conditions:– External temp: 35 degrees F– Internal temp: 65 degrees F– Partly Cloudy

• Air changes/hour at 50 Pascal (ACH 50)– Lower floor: 1.65 ACH 50– Upper floor: 1.41 ACH 50

• Max acceptable is 4 ACH 50• < 10% tested buildings are tighter than 2 ACH 50

• US Army Corp. of Engineers blower door test– Lower floor: .122 CFM/sq ft (at -75 PA)– Upper floor: .126 CFM/sq ft (at -75 PA)– Upper floor: .175 CFM/sq ft (at +75 PA)

• Max allowed: .25 CFM/sq ft (ASTM E-779)

Blower Door Test

Page 78: First Commercial CLT Project in the USA

78

The Long Hall

Thanks for hanging

with me for

THE LONG

HALLConcept

to

Reality

Page 79: First Commercial CLT Project in the USA

Questions?

This concludes The American Institute of Architects Continuing Education Systems Course

Darryl Byle

CLT Solutions/DSB Eng & Consulting

[email protected]

[email protected]