Cable support excellence. R FIRE RESISTANT CABLE SUPPORT SYSTEMS
10

FIRE RESISTANT CABLE SUPPORT SYSTEMS · the wall support tip to the ceiling, the wall support must be one step larger than the cable ladder. The wall supports’ VKZ and VKZ-N tips

Aug 06, 2020

Download

Documents

dariahiddleston
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: FIRE RESISTANT CABLE SUPPORT SYSTEMS · the wall support tip to the ceiling, the wall support must be one step larger than the cable ladder. The wall supports’ VKZ and VKZ-N tips

1

Cable support excellence.

R

Cable support excellence.

R

FIRE RESISTANT CABLE SUPPORT SYSTEMS

Page 2: FIRE RESISTANT CABLE SUPPORT SYSTEMS · the wall support tip to the ceiling, the wall support must be one step larger than the cable ladder. The wall supports’ VKZ and VKZ-N tips

1

Cable support excellence.

R

MEKA® products in the fire test chamber before tests. Patter 60 minutes from the beginning of test the temperature in the chamber is about 950˚C.

KS80-400 cable ladder after 60 minutes of test period. KRA cable tray after 90 minutes of test period.

Meka cable support systems’ fire resistance

Meka Pro Oy tests its products regularly to ensure quality and safe cable support systems. The products have been tested as widely and with as several different installation ways as possible. The lat-est fire resistance tests have been made at SertPromTest test facili-ty in Moscow 2016 and at VTT in Finland during 2013 and 2014.

Used fire resistance test environments and methods have been complied according to the following standards:

• EN 1363-1• DIN 4102-12• GOST-R 30247.1• prTR 50658:2016

Standards include details regarding fire resistance test science and methodology. Common principles can be used within several test methods; however more precise details vary according to the test-ed element.

Fire resistant cable support systems

Most common cable support systems in fire resistant installations are cable trays, cable ladders and wire mesh trays.

Fire resistant cables must be installed separately from other ca-bles using distance or protection. Protection can be made for ex-ample with separation panels.

All fastenings in fire resistant cable support system installations must be made with fireproof components.

Fire resistant cables are marked with FRHF prefix, meaning Fire Resistant Halogen Free. Fire resistant cables can be recognized from orange or red jacket. The difference between fire resistant and normal construction cables is their minimized smoke for-mation and performance maintenance during fire circumstances.

FIRE RESISTANCE

v1.0/2017

Page 3: FIRE RESISTANT CABLE SUPPORT SYSTEMS · the wall support tip to the ceiling, the wall support must be one step larger than the cable ladder. The wall supports’ VKZ and VKZ-N tips

2

Cable support excellence.

RCABLE LADDERS FIRE RESISTANCE CLASS E60 / E90

CABLE LADDER KS20

Maximum support interval 1,5 m

Cable ladder maximum width 400 mm

Maximum load per meter 15 kg

Suitable products

All lengths and surface treatments up to 400 mm width.

KS20

KS80

KSF80

CABLE LADDERS KS80, KSR80 AND KSF80

Maximum support interval 1,5 m

Cable ladder maximum width 500 mm

Maximum load per meter 20 kg

Suitable products

All lengths and surface treatments up to 500 mm width.

E90 fire resistance class is achieved by using low voltage chute SR or bottom plate POL between cable and cleat.

OTHER SUITABLE PARTS FOR FIRE RESISTANT INSTALLATIONS

Corners

KS90 All products up to 500 mm width. Corners KS90 and KSF90 must be supported from the middle of the angle, also maximum with 300 mm distance from both corner piece and cable ladder joint.

KSF90

T- and X-pieces

KST All products up to 500 mm width. T- and X-pieces KST and KSX must be supported from the middle, also maximum with 300 mm distance from each piece and cable ladder joint.

KSX

Extension pieces

SSR All products.

SSU

Cable clips

CCA All products. Vertical fire resistant installation requires fastening the cable with cable clips at least every 300 mm. CCB

Ceiling brackets

RTF-10 All products. Ceiling brackets must be used with fire classified fas-tenings.RTF-16

RTF-Z

Threaded rod, nuts and screw kits

GT-6, GT-10, GT-16 All products. Threaded rod must be used with fire classified fas-tenings. MU 6, MU 10, MU 16

RS 1, RS 2, RS 3, RS 4

RS KSF, RS SSU, RS VK2

RS MEK J 10

Covers

SK All products upt to 500 mm width.

PSK

KRL-KS

Bottom plates

POL All products upt to 500 mm width. E90 fire resistance class is achieved by installing the bottom plate POL between cable and cleat.PPU

Separation plates

AP All products. E90 fire resistance class is achieved by installing low voltage chute SR between cable and cleat. SR

Anchor- and installation rails

AS All products. Anchor- or installation rail must be fastened to the wall. Anchor- and installation rails must be used with fire classified fastenings.

AS-WALL

Ceiling support

TP1 All products. Ceiling support must be used with fire classified fas-tenings.TP2

TP2-L

TP2-P

Wall support

VK All products up to 600 mm width. If the threaded rod is fastened with the wall support tip to the ceiling, the wall support must be one step larger than the cable ladder. The wall supports’ VKZ and VKZ-N tips must always be supported with the M6 threaded rod to the ceiling. If the wall support VK or VKF is fastened directly to the wall with the fire classified fastening, tip mounting (=gate support) is not needed.

VKF

VKZ

VKZ-N

Intermediate support

HK13 All products up to 500 mm width. The ceiling support TP1 to be used.

Gate support

MK The gate supports MK and PRT must be fastened with two threaded rods to the ceiling. TPK can be fastened also with two ceiling sup-ports TP1 to the ceiling.

TPK

PRT

Brackets

KK All products.

Sliding nuts

SMT All products.

Page 4: FIRE RESISTANT CABLE SUPPORT SYSTEMS · the wall support tip to the ceiling, the wall support must be one step larger than the cable ladder. The wall supports’ VKZ and VKZ-N tips

3

Cable support excellence.

RINSTALLATION EXAMPLESTIP MOUNTING

INTERMEDIATE SUPPORT

VERTICAL INSTALLATION

Installation instructions

In case the wall support VK or VKF is fastened with the sliding nut SMT to the ceiling sup-port TP2 or the anchor rail AS, tip mounting must be used. In this case, one step larger support than the cable ladder is required, so that the M6 threaded rod can be fastened to the outermost hole.

When wall support VK or VKF is fastened together with the bolt through the ceilingsupport TP2, tip mounting is not needed.

TP2 attached to the ceilingor AS attached to the wall

GT-6

M6 nut+ spacer VK / VKF

KS80

SMT

KK

TP2 attached to the ceiling

VK / VKF

KS80

M10x90 bolt+ spacer

KK

M10 nut+ spacer

The ceiling support TP1 is fastened to the intermediate support HK13 with the screw kit RS3. Cable ladder is fastened to the intermediate support HK13 with the bracket KK.

TP1

HK13

KK

KS80

RS3

Installation instructions

Maximum support interval (VK2): 1,5 mMaximum load per meter KS20: 15 kgMaximum load per meter KS80: 20 kgKS20 cable ladder maximum width: 400 mmKS80 cable ladder maximum width: 500 mm

The cable ladder is attached to the wall with the wall support VK2. The wall supports are installed so, that they are attached to the cable ladder cleat. The cables are attached to the cable ladder cleat with the cable clip CCA at most every 300 mm. The cable clips must be covered from the fire at least every 3,5 m. This can be made for example insinde fire breaks between layers or by building fire break around cable ladders, cables and cable brackets with fire break material.

KS80

VK2

ÄFRS 2

Installation instructions

The intermediate support MK is used for the gate support of the cable ladder KS20. The cable ladder KS20 is attached to the intermediate support MK with the bracket KK-MK.

Page 5: FIRE RESISTANT CABLE SUPPORT SYSTEMS · the wall support tip to the ceiling, the wall support must be one step larger than the cable ladder. The wall supports’ VKZ and VKZ-N tips

4

Cable support excellence.

RCABLE TRAYS KRA FIRE RESISTANCE CLASS E90

CABLE TRAY KRA

Maximum support interval 1,5 m

Cable tray maximum width 500 mm

Maximum load per meter 10 kg

Suitable products

All lengths and surface treatments up to 500 mm width.

OTHER SUITABLE PARTS FOR FIRE RESISTANT INSTALLATIONS

Corner

RS90 All products up to 500 mm width. Corner must be supported with maximum 300 mm distance from both corner piece and cable tray joint.

T-piece

RT All products up to 500 mm width. T-piece RT pmust be supported with maximum 300 mm distance from each t-piece and cable tray joint.

Extension piece

RSS All products up to 500 mm width.

Ceiling brackets

RTF-10 All products. Ceiling brackets must be used with fire classified fastenings.RTF-16

RTF-Z

Threaded rod, nut and screw kits

GT-6, GT-10, GT-16 All products. Threded rod to be used with fire classified fastenings.

MU 6, MU 10, MU 16

RS 1, RS 2, RS 3, RS 4

RS KSF, RS SSU, RS VK2

RS MEK J 10

Covers

KRL All products up to 500 mm width.

KRL-KS90

KRL-RT

End piece

P-KRA All products up to 500 mm width.

Separation plates

AP All products.

SR

Anchor- and installation rails

AS All products. Anchor- or installation rail must be fastened to thewall. Anchor- and installation rails must be used with fire classifiedfastenings.

AS-WALL

Ceiling support

TP1 All products. Ceiling support must be used with fire classified fas-tenings.TP2

TP2-L

TP2-P

Wall support

VK All products up to 600 mm width. If the threaded rod is fastened with the wall support tip to the ceiling, the wall support must be one step wider than the cable ladder. The wall supports’ VKZ and VKZ-N tips must always be supported with the M6 threaded rod to the ceiling. If the wall support VK or VKF is fastened directly to the wall with the fire classified fastening, tip mounting (=gate support) is not needed.

VKF

VKZ

VKZ-N

Intermediate support

RMK All products up to 500 mm width. Intermediate support RMK must be fastened with two threaded rods to the ceiling.

Gate support

MK Gate supports MK and PRT must be fastened with two threaded rods to the ceiling. TPK can also be fastened with two TP1 ceiling supports to the ceiling.

TPK

PRT

Sliding nuts

SMT All products.

Page 6: FIRE RESISTANT CABLE SUPPORT SYSTEMS · the wall support tip to the ceiling, the wall support must be one step larger than the cable ladder. The wall supports’ VKZ and VKZ-N tips

5

Cable support excellence.

RINSTALLATION EXAMPLESTIP MOUNTING

GATE SUPPORT

Installation instructions

In case the wall support VK or VKF is fastened with the SMT sliding nut to the ceilingsupport TP2 or the anchor rail AS, tip mounting must be used. In this case, one step largersupport than the cable tray, jso that the M6 threaded rod can be fastened to theoutermost hole.

When wall support VK or VKF is fastened together with the bolt through the ceilingsupport TP2, tip mounting is not needed.

TP2 attached to the ceilingor AS attached to the wall

GT-6

M6 nut+ spacer VK / VKF

KRA

SMT

RS 1

TP2 attached to the ceiling

VK / VKF

KRA

M10x90 bolt+ spacer

RS 1

M10 nut+ spacer

Installation instructions

Gate support must be made with the intermediate support RMK using two threaded rods. Threaded rod GT-10 is attached to the intermediate support with two MU M10 nuts.

TP2 attached to the ceilingor AS attached to the wall

GT-6

M6 nut+ spacer VK / VKF

KRA

SMT

RS 1

Page 7: FIRE RESISTANT CABLE SUPPORT SYSTEMS · the wall support tip to the ceiling, the wall support must be one step larger than the cable ladder. The wall supports’ VKZ and VKZ-N tips

6

Cable support excellence.

RWIRE MESH TRAYS WMT FIRE RESISTANCE CLASS E60

WIRE MESH TRAY WMT

Maximum support interval 1,25 m

Wire mesh tray maximum width 200 mm

Maximum load per meter 10 kg

Suitable products

Heights 50-150 mm, all lengths and surface treatments up to 200 mm width.

OTHER SUITABLE PARTS FOR FIRE RESISTANT INSTALLATIONS

Extension piece

WMT CL Angle is made according to the installation instruction using the exten-sion pieces WMT CL. Angle must be supported from the middle of the turn, before the turn, also from maximum 300 mm distance after the turn.

Fastenings

WMT UC1 All products.

WMT UC1D

WMT CL1

Extension pieces

WMT CL All products.

WMT UC

Ceiling brackets

RTF-10 All products. Ceiling brackets must be used with fire classified fas-tenings.§RTF-16

RTF-Z

Threaded rod, nut and screw kits

GT-6, GT-10, GT-16 All products. Threaded rod must be used with fire classified fas-tenings.MU 6, MU 10, MU 16

RS 1, RS 2, RS 3, RS 4

RS KSF, RS SSU, RS VK2

RS MEK J 10

Separation plates

AP All products.

SR

Anchor- and installation rails

AS All products. Anchor- or installation rail must be fastened to thewall. Anchor- and installation rails must be used with fire classifiedfastenings.

AS-WALL

Ceiling support

HK1 All products. Ceiling support must be used with fire classified fas-tenings.TP1

TP2

TP2-L

TP2-P

Wall support

VK All products up to 600 mm width. If the threaded rod is fastened with the wall support tip to the ceiling, the wall support must be one step larger than the wire mesh tray. The wall supports’ VKZ and VKZ-N tips must always be supported with the M6 threaded rod to the ceiling. If the wall support VK or VKF is fastened directly to the wall with the fire classified fastening, tip mounting (=gate support) is not needed.

VKF

VKZ

VKZ-N

Fastenings

WMT UC1 All products. Intermediate support is arranged using fastening WMT UC1, threaded rod and nuts, according to the installation example.

Gate support

MK The gate supports MK and PRT must be fastened with two threadedrods to the ceiling. TPK can be fastened also with two ceiling sup-ports TP1 to the ceiling.

TPK

PRT

Sliding nuts

SMT All products.

Page 8: FIRE RESISTANT CABLE SUPPORT SYSTEMS · the wall support tip to the ceiling, the wall support must be one step larger than the cable ladder. The wall supports’ VKZ and VKZ-N tips

7

Cable support excellence.

RINSTALLATION EXAMPLESTIP MOUNTING

INTERMEDIATE SUPPORT

ANGLE

TP2

VKZVKZ-NSMT

WMT-CLWMT

GT 6

MU 6DIN9021 M6

Installation instructions

The ceiling support can be arranged using two fastenings WMT UC1, threaded rod, and MU M6 nuts according to the installation example.

The intermediate support in the example is for a wire mesh tray with 100 mm width maximum.

Installation instructions

A 90-degree turn can be made by cutting the wire tray accorging to the picture and closing the edges together with the extension pieces WMT CL. Angle must be supported from the middle of the turn, before the turn, also from maximum 300 mm distance after the turn.

GT-6

MU M6UC1

Installation instructions

In case the wall support VK, VKF or VKZ is fastened with SMT sliding nut to the ceiling support TP2 or anchor rail tai AS, tip mounting must be used. In this case, one step largersupport than wire mesh tray is required, so that the M6 threaded rod can be fastened to theoutermost hole.

When wall support VK or VKF is fastened together with the bolt through the ceiling support TP2, tip mounting is not needed. VKZ and VKZ-N must always be attached to the ceiling with the threaded rod.

Page 9: FIRE RESISTANT CABLE SUPPORT SYSTEMS · the wall support tip to the ceiling, the wall support must be one step larger than the cable ladder. The wall supports’ VKZ and VKZ-N tips

8

Cable support excellence.

RLIGHTING TRACKS MEK FIRE RESISTANCE CLASS E60

LIGHTING TRACK MEK

Maximum support interval 1,25 m

Lighting track maximum width 110 mm

Maximum load per meter 5 kg

Suitable products

All MEK 70 and MEK 110 products.

CEILING SUPPORT

OTHER SUITABLE PARTS FOR FIRE RESISTANT INSTALLATIONS

Corner

MEK KR All products. Corner must be supported with maximum 300 mm distance from each corner piece and lighting track joint.

Extension piece

MEK J All products.

Ceiling brackets

RTF-10 All products. Ceiling brackets ust be used with fire classified fastenings.

Threaded rod, nut and screw kits

GT-10 All products. Ceiling brackets must be used with fire classified fastenings.MU 10

MEK J 10

Ceiling suspension

MEK RK All products. Ceiling suspensions must be used with fire classified fastenings.

Installation instructions

The intermediate support for the lighting track MEK is done with the ceiling suspension MEK-RK. The maximum width for the lighting track is 110 mm.

GT-10

MEK RK-70

MEK 70

MU M10

Page 10: FIRE RESISTANT CABLE SUPPORT SYSTEMS · the wall support tip to the ceiling, the wall support must be one step larger than the cable ladder. The wall supports’ VKZ and VKZ-N tips

9

Cable support excellence.

R

Meka Pro Oy Ltd

Konetie 25, 90620 OuluFinland

+358 207 450 800www.meka.eu