Top Banner
Nimi Työ Osasto Defence Command 12/05/2016 1 UNCLASSIFIED Finnish Capability Development and Procurement Plans Nordic Defence Industry Seminar 2016
13

Finnish Capability Development and Procurement Plans

Dec 31, 2016

Download

Documents

vonhan
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Finnish Capability Development and Procurement Plans

Nimi

Työ

Osasto

Defence Command

12/05/2016 1 UNCLASSIFIED

Finnish Capability Development

and Procurement Plans

Nordic Defence Industry Seminar 2016

Page 3: Finnish Capability Development and Procurement Plans

Defence Command Finland

DCOS Logistics and Armaments

LTG Kyösti Halonen

Capability Development Programme 2017-2028 - Schedule and Focus

2017 2021 2025 2029

Joint Capabilities

Readiness capabilities and Cyber

IOC FOC

Page 4: Finnish Capability Development and Procurement Plans

Defence Command Finland

DCOS Logistics and Armaments

LTG Kyösti Halonen

STRATEGIC CAPABILITY PROGRAMS

12.5.2016 4

2015 2016 2017 2020 2023 2026

RFI RFQ CONT

RACT IOC FOC

ML Pohjanmaa (2013)

2xML Hämeenmaa cl. (2025)

4xPBG Rauma cl. (2025)

New Fighter Programme-HX SQUADRON-2020

Page 5: Finnish Capability Development and Procurement Plans

Defence Command Finland

DCOS Logistics and Armaments

LTG Kyösti Halonen

Replacing the capabilities of

the Hornet aircraft - HX

• According to the current life cycle plan, the Finnish Air Force F/A-

18 fighters become obsolete by 2030

• Phasing out of the aircraft is scheduled to start in 2025; the last

aircraft would be disposed of in 2030

12.5.2016 5

Page 6: Finnish Capability Development and Procurement Plans

Defence Command Finland

DCOS Logistics and Armaments

LTG Kyösti Halonen

Program execution schedule

12.5.2016 6

Page 7: Finnish Capability Development and Procurement Plans

Defence Command Finland

DCOS Logistics and Armaments

LTG Kyösti Halonen 12.5.2016 7

Replacing ships scheduled for

retirement - Squadron 2020

Squadron 2020

FNS Pohjanmaa (2013)

2 Hämeenmaa class minelayers (approx. 2025)

4 Rauma class fast attack

missile craft (approx. 2025)

Page 8: Finnish Capability Development and Procurement Plans

Defence Command Finland

DCOS Logistics and Armaments

LTG Kyösti Halonen 12.5.2016 8

2015 2016 2017 2018 2019 2020

Comparing quotes Planning

Contract negotiations

RFI RFQ

Construction

Contract

Naval engineering study

Operational-tactical study

Planning and construction 2015-2024

Page 9: Finnish Capability Development and Procurement Plans

Defence Command Finland

DCOS Logistics and Armaments

LTG Kyösti Halonen

Main Procurement programmes - Services

Page 10: Finnish Capability Development and Procurement Plans

Defence Command Finland

DCOS Logistics and Armaments

LTG Kyösti Halonen

155 mm SPG -program

Development of Army striking power with long range and

mobile artillery system

Main goals

• Weapon system capable of independent action

• 155 mm artillery system single caliber in the future

• Allready in operational use (no time for development)

• Modern, "shoot&scoot" –capability

• Logistic support will be created into Finland

• Contract in 2017

Replacing aging artillery systems

152mm 2S5 122mm 2S1

122mm RM-70/85

122mm D-30

130mm M-46

12.5.2016 10

Page 11: Finnish Capability Development and Procurement Plans

Defence Command Finland

DCOS Logistics and Armaments

LTG Kyösti Halonen

Sensorit

Main Procurement programmes - Joint Capabilities

Page 12: Finnish Capability Development and Procurement Plans

Defence Command Finland

DCOS Logistics and Armaments

LTG Kyösti Halonen

Industry Partners

12

−Establish security of supply and support military

component

Page 13: Finnish Capability Development and Procurement Plans

Defence Command Finland

DCOS Logistics and Armaments

LTG Kyösti Halonen

Thank you for your attention.

Any questions?