Financial Management Liliya N. Zhilina, World Economy and Inrernational Relations Department, Vladivostok State University of Economic and Services (VSUES). [email protected]8. Corporate Valuation and Value- Based Management. 9. Capital budgeting. Risks Analysis.
Financial Management. 8 . Corporate Valuation and Value-Based Management . 9. Capital budgeting. Risks Analysis. Liliya N. Zhilina , World Economy and Inrernational Relations Department, Vladivostok State University of Economic and Services (VSUES). [email protected]. - PowerPoint PPT Presentation
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Financial Management
Liliya N. Zhilina, World Economy and Inrernational Relations Department, Vladivostok State University of Economic and Services (VSUES).
8. Corporate Valuation and Value-Based Management.9. Capital budgeting. Risks Analysis.
8. Corporate Valuation and Value-Based Management
Corporate Valuation: List the two types of assets that a
company owns.
• Assets-in-place
• Financial, or nonoperating, assets
Assets-in-Place
• Assets-in-place are tangible, such as buildings, machines, inventory.
• Usually they are expected to grow.
• They generate free cash flows.
• The PV of their expected future free cash flows, discounted at the WACC, is the value of operations.
Value of Operations
1tt
tOp )WACC1(
FCFV
Nonoperating Assets
• Marketable securities
• Ownership of non-controlling interest in another company
• Value of nonoperating assets usually is very close to figure that is reported on balance sheets.
Total Corporate Value
Total corporate value is sum of:
Value of operations
Value of nonoperating assets
Claims on Corporate Value
• Debtholders have first claim.
• Preferred stockholders have the next claim.
• Any remaining value belongs to stockholders.
Applying the Corporate Valuation Model
• Forecast the financial statements.
• Calculate the projected free cash flows.
• Model can be applied to a company that does not pay dividends, a privately held company, or a division of a company, since FCF can be calculated for each of these situations.
Value of operations for MicroDrive
Step 1. Free cash flow 2001Forecast
2002 2003 2004
1. Net operating working capital (NOWC) $800 $839 $769 $7022. Net fix capital $1 000 $1 100 $1 188 $1 2713. Total operational capital (TOC) $1 800 $1 939 $1 957 $1 9734. Investments to TOC (Invest.) $345 $139 $17 $165. Net operational profit after tax(NOPAT) $170 $211 $228 $2446. Free cash flow (FCF = NOPAT - Invest.) -$175 $72 $211 $228
Step 2. Value of operations 2001Forecast
2002 2003 2004
Long-term growth rate, g (from 2004) 5%
WACC11,0
%
FCF $72 $211 $228
Vop at 3
Calculation of value of operations
0
65
171
167
2 928
1 2 3 4kc=11%
3 330 = Vop
g = 5%
FCF= 72 211 228 239
239
. . 4 001.
11 0 05
0
Value-Based Management (VBM)
• VBM is the systematic application of the corporate valuation model to all corporate decisions and strategic initiatives.
• The objective of VBM is to increase Market Value Added (MVA)
MVA and the Four Value Drivers
MVA is determined by four drivers:
Sales growth
Operating profitability (OP=NOPAT/Sales)
Capital requirements (CR=Operating capital / Sales)
Weighted average cost of capital
9. Capital budgeting. Cash Flow Estimation. Risk Analysis.
What is capital budgeting?
• Analysis of potential additions to fixed assets.
• Long-term decisions; involve large expenditures.
• Very important to firm’s future.
Steps of Capital Budgeting Analysis
1. Estimate CFs (inflows & outflows).
2. Assess riskiness of CFs.
3. Determine k = WACC for project.
4. Find NPV and/or IRR.
5. Accept if NPV > 0 and/or IRR > WACC.
Mutually exclusive projects vs Independent projects
• Mutually exclusive projects cannot be performed at the same time. We can choose either Project 1 or Project 2, or we can reject both. • Independent projects can be accepted or rejected individually.
Payback period, PbP
• The number of years it takes a firm to recover its project investment. • May be calculated with either raw cash flows (regular payback) or discounted cash flows (discounted payback).
PbP of a long project
10 8060
0 1 2 3
-100
=
CFt
-100 -90 -30 50
PaybackL 2 + 30/80 = 2.375 years
0100
2.4
Accumulated CFt
PbP of a shot project
70 2050
0 1 2 3
-100CFt
-100 -30 20 40
1 + 30/50 = 1.6 year
100
0
1.6
=
Accumulated CFt
Paybacks
Projects evaluation techniques
• Discounted Payback Period (DPbP).
• Net Present Value (NPV).
• Profitability Index (PI).
• Internal Rate of Return (IRR).
• Modified Internal Rate of Return (MIRR).
DCF methods because they explicitly recognize the time value of money.
10 8060
0 1 2 3
CFt
Accumulated PVCFt
-100 -90.91 -41.32 18.79
DPbP 2 + 41.32/60.11 = 2.7 years
Discounted Payback Period (DPbP)
PVCFt -100
-100
10%
9.09 49.59 60.11
=
NPV
CF
kt
nt
t 0 1
.
NPV is a direct measure of the value of the project to shareholders.
NPV: Sum of present (discounted) values of cash inflows and outflows
Investment costs – negative cash flow in a zero period – CF0
.CF
k1
CFNPV 0t
tn
1t
Net Present Value (NPV)
NPV of projects L (long) and S (short)
1080
8010
6060
0 1 2 310%
-100.00 9.09 72.73
49.5949.59
60.11 7.51
18.78 = NPVLNPVS = $29.83
LS
Profitability Index, PI
PI – income at a unit of costs доход наPI = sum of PV inflows / sum of PV outflowsPI = sum of PV net profit / I0A profitability index greater than 1 is equivalent to a positive NPV project.
I0 - investment in the 0-period, I0 = 100
PI L = 118,78/100 = 1,19
PI S = 129,98/100 = 1,20
Internal Rate of Return, IRR
0 1 2 3
CF0 CF1 CF2 CF3
Costs Cash Inflows
The discount rate that equates the present value of the expected future cash inflows and outflows.
IRR measures the rate of return on a project, but it assumes that all cash flows can be reinvested at the IRR rate.
IRR проектов L и S
10 8060
0 1 2 3IRR = ?
-100.00
PV3
PV2
PV1
0 = NPV
IRRL = 18,1 % IRRS = 31,4 %
80 60 10L
S
Decision by IRR on S and L projects
• If S and L are independent projects they can be accepted (IRR > WACC).
• If S и L mutually exclusive projects we can choose Project S (IRRS > IRRL).
WACC = 10%
The hurdle rate
• The hurdle rate is the project cost of capital, or discount rate. • It is the rate used in discounting future cash flows in the NPV method, and it is the rate that is compared to the IRR.
Mutually exclusive projects
8.7%
NPV
IRRS
IRRL
k < 8.7: NPVL> NPVS , IRRS > IRRL
k > 8.7: NPVS> NPVL , IRRS > IRRL
18.13% 23.56%
Modified Internal Rate of Return (MIRR)
• The modified internal rate of return (MIRR) assumes that cash flows from all projects are reinvested at the cost of capital as opposed to the project's own IRR.
• This makes the modified internal rate of return a better indicator of a project's true profitability.
MIRR = 16.5%
10.0 80.060.0
0 1 2 310%
66.0 12.1
158.1
MIRR of project L (i = 10%)
-100.010%
10%
TV of inflows
-100.0
PV of outflowsMIRR = 16.5%
$100 = $158.1(1+MIRR)3
Normal and nonnormal cash flows
• A project has normal cash flows if one or more cash outflows (costs) are followed by a series of cash inflows.• Capital projects with nonnormal cash flows have a large cash outflow either sometime during or at the end of their lives. • A common problem encountered when evaluating projects with nonnormal cash flows is multiple IRRs.
• Relevant cash flows
• Working capital treatment
• Inflation
• Risk Analysis: Sensitivity Analysis, Scenario Analysis, and Simulation Analysis
Cash Flow Estimation and Risk Analysis
Set up without numbers a time line for the project CFs.
0 1 2 3 4
InitialOutlay
OCF1 OCF2 OCF3 OCF4
+ Terminal CF
NCF0 NCF1 NCF2 NCF3 NCF4
= Corporate cash flow with project
minus
Corporate cash flow
without project
Incremental Cash Flow
• No. This is a sunk cost. Focus on incremental investment and operating cash flows.
Suppose $100,000 had been spent last year to improve the production line site.
Should this cost be included in the analysis?
• Yes. Accepting the project means we will not receive the $25,000. This is an opportunity cost and it should be charged to the project.
• Assumes that inputs are perfectly correlated--all “bad” values occur together and all “good” values occur together.
• Focuses on stand-alone risk, although subjective adjustments can be made.
Are there any problems with scenario analysis?
• A computerized version of scenario analysis which uses continuous probability distributions.
• Computer selects values for each variable based on given probability distributions.
• NPV and IRR are calculated.• Process is repeated many times (1,000 or
more).• End result: Probability distribution of NPV and
IRR based on sample of simulated values.• Generally shown graphically.
Simulation analysis
Distribution models for a project variables in Monte Carlo simulation
Probability Density (NPV)
Also gives NPV, CVNPV, probability of NPV > 0.
0 E(NPV) NPV
• Reflects the probability distributions of each input.
• Shows range of NPVs, the expected NPV, NPV, and CVNPV.
• Gives an intuitive graph of the risk situation.
Advantages of simulation analysis
• Difficult to specify probability distributions and correlations.
• If inputs are bad, output will be bad:“Garbage in, garbage out.”
• Sensitivity, scenario, and simulation analyses do not provide a decision rule. They do not indicate whether a project’s expected return is sufficient to compensate for its risk.
• Sensitivity, scenario, and simulation analyses all ignore diversification. Thus they measure only stand-alone risk, which may not be the most relevant risk in capital budgeting.