Page 1: Final_Project_ISPAT

Ispat’s Integrated Steel Complex

Page 2: Final_Project_ISPAT

A

Project Report on Performance Management System & Employee Satisfaction

SUBMITTED TO

PILLAI’S INSTITUTE OF MANAGEMENT STUDIES AND RESEARCH

AS A PART OF SUMMER PROJECT AT

ISPAT INDUSTRIES LTD,GEETAPURAM,DOLVI

PREPARED BYVINEET MURLI

MMS-2,Div-B,Roll No.94

ISPAT

Page 3: Final_Project_ISPAT

ISPAT INDUSTRIES LIMITED GEETAPURAM, DOLVI – 402 107, TALUKA - PEN, DIST. RAIGAD, MAHARASHTRA (INDIA) PHONE: (+91-2143) 277501 TO 277510 Η FAX: (+91-2143) 277533, 277528, 277542

CERTIFICATE OF SUMMER INTERNSHIP

This is to certify that Mr. VINEET MURLI of Pillai's Institute of Management Studies and Research has successfully completed his summer internship with us from May 2008 to June 2008. During the summer internship Mr. VINEET MURLI was found to be punctual, positive and performance oriented.

Mr. VINEET MURLI has completed his project on. Performance Management System and Employee Satisfaction We wish him success in his career.

Rajesh Mhatre (Sr. Manager-Human Resource) Seal of Company

Contact Details Tel: (+91-22) 27582500/2600/2700 Mobile (+91)9923209259Email [email protected] Fax (+91-22)27562280

Page 4: Final_Project_ISPAT

ACKNOWLEDGEMENT

A quote says: The effectiveness and efficiency of a work will display in the result”So I am in process of presenting you my summer project titled Performance Management System and Employee Satisfaction effectively and efficiently with the help and guidance of many professionals and corporate people as apart of two years Masters in Management Studies.

I thank Mr. Hemant Shahastrabuddhe, (Sr. Officer HR) who opened the way of my corporate career and to learn the culture of industry and to mould myself personally and professionally in my future career.

Doing work may be the skill of an individual but making it effective will only be with help of a guide, so I thank Mr. Mr. Rajesh Mhatre, Sr.Manager HR for helping me to do the project effectively and efficiently with his valuable guidance and support regarding my project and also to shape up my career. I offer my sincere gratitude towards Samir Kumar (Asst. General Manager), Mr.Soumen Choudhury, Sameer More from Eyeglobal, Sagar Jadhav from recruitment at Casablanca, CBD Belapur for giving me necessary information suggestion in spite of their busy schedule.

I owe special thanks to all the employees of ISPAT Industries Ltd, Dolvi who took great pain in filling up my Employee Satisfaction- Questionnaire by sparing their precious time to discuss and answer my questions, besides their heavy work load. Without their help the project would not have been fructified.

I am indebted towards our institute and my Institute Director Dr.CR Chandran for giving me opportunity to carry out Summer Training at Ispat Industries Ltd.,Dolvi.

I also take this opportunity to thank all the people who have directly or indirectly helped me in completing the report successfully.

Page 5: Final_Project_ISPAT

CONTENTS

Sr.No PARTICULARS PAGE

No.

1 SCOPE OF THE PROJECT

2 PROFILE OF THE COMPANY

3 MISSION & VISION

4 PRODUCT

5 IMPORTANT CONCEPTS FOR PROPER

UNDERSTANDING OF PERFORMANCE

MANAGEMENT SYSTEM (PMS) AT ISPAT

6 PMS FLOW CHARTS, DIAGRAM

7 STEPS INVOLVED IN PERFORMANCE MANAGEMENT

SYSTEM

8 EMPLOYEE SATISFACTION SURVEY QUESTIONNAIRE

9 DATA INTERPRETATION AND ANALYSIS

10 SUGGESTIONS & RECOMMENDATIONS

11 CONCLUSION

Page 6: Final_Project_ISPAT

1. SCOPE OF THE PROJECT

The Project Report is divided into two parts First Part is about Performance Management System (PMS) how it is done here at ISPAT, what are the process involved, to understand what is the role of Appaisee, Reporting Officer, Reviewer Officer, how the feed back is given, how is the Appaisee rewarded by the Reporting Officer in form of variable pay or promotion and other benefits.

The second part of the project consists of Employee Satisfaction Survey, where a questionnaire consisting of 12 questions was prepared and circulated in various part of the plant and corporate office , questions regarding various problem which an employee can have were asked in the questionnaire, the company is facing crises as lot of talented pool of individual and other people were leaving the organization in large number to understand the reason for that and to help the management to prevent more people from leaving the organization a sincere effort was taken in preparing the questionnaire and personally distributing it to the employees of the company

In plant the questionnaire was distributed in HSM, IT Department, Purchase, Accounts, Central Stores etc. while in the corporate office at CASABLANCA, CBD Bhelapur it was distributed to General Services (GS), Shipping and Logistics, Technical Audit, Recruitment which is a part of Human Resource Department.

People gave their honest feedback in spite of their busy schedule and was a good experience interacting with them.

Page 7: Final_Project_ISPAT

OBJECTIVES

• To understand the problems faced by the employees.• To help the management to better understand their colleagues better.• Assessment of the integral support, recognition, and involvement of

employees in the Employee Satisfaction.• To study overall impact of Performance Management System (PMS)

on the organization.

METHODOLOGY USED

• The research was based on primary data• A survey questionnaire was given to 110 employees from all the

departments in ISPAT. The employees have been taken from the Dolvi-manufacturing plant as well as 20 from the Casablanca-corporate office also.

• The audit instrument was questionnaire.• Various Documents was studied.• Data Analysis technique and tools- pie chart and bar graphs

LIMITATIONS

• Time Shortage-It was done as apart of my course so I had limited time. This shortage of time was a constraint for detail study.

• Limitation of respondents - Some of the employees were reluctant and apprehensive in answering my questionnaire. I had to convince them a lot. Also due to their busy schedule they were unable to answer the questionnaire within the reasonable time.

• Cost Limitation - Due to limited availability of money a full detailed study could not be made.

• Limitation of the researcher-I had taken full care not to let any biases enter in my analysis and interpretation but there is the possibility that some bias might have crept in.

Page 8: Final_Project_ISPAT
Page 9: Final_Project_ISPAT

2. PROFILE OF THE COMPANY

Ispat Industries Limited

Ispat industries limited (IIL) is one of the leading integrated steel makers and the largest private sector producer of hot rolled coils in India. Set up as Nippon Denro Ispat Limited in 1985 by founding Chairman Mr. M L Mittal, IIL has steadily grown into a Rs. 4,000-crore Company, assuming its position as flagship of the reputed Ispat Group. A corporate powerhouse with operation in iron, steel, mining, energy and infrastructure, the group today figures among the top 20 business houses in the company.Headquartered at Mumbai, IIL employee a total of 2000 people and is the leader in the national specialty steel market. The company’s competency is the production of high quality steel for which it employs cutting edge technologies and stringent quality standards. It produces world-class sponge Iron, galvanized sheets and cold rolled coils, in addition to hot rolled coils,

Integrated Steel Complex – Bird’s Eye View

Blast FurnaceJetty

Lime Plant

Captive Power Sponge Iron Plant Plant

Oxygen Plants

IS

PA

T

IS

P

A

T

Page 10: Final_Project_ISPAT

through its two state-of-the art integrated steel plants, located at Dolvi and Kamleshwar in the state of Maharashtra.

The sprawling 1,200 acre Dolvi complex houses the 3 million tonne per annum hot rolled coils plant, that technologies-the Conarc process for steel making and the compact strip process(CSP)-introduced for the first time in Asia.The complex also has a 1.4 million tonne per annum sponge iron(DRI) plant, which was commissioned in 1994 as the world’s largest and most efficient gas-based single mega module plant. Moreover, the dolvi complex is the home to 2 million tonne Blast furnace and also boasts a mechanized multi-functional jetty situated nearby, that facilitates the automation of raw material handling.Ispat is the only steel maker in India and few in world to have total flexibility in the choice of the steel making route, be it the convectional blast furnace route or the electric arc furnace route. Its dual technology allows Ispat the freedom to choose its raw material feed, be it Pig iron, sponge iron, scrap ore any combination of the various feeds. It also has total flexibility in choosing its energy source, be it electricity, coal or gas.The Kamleshwar complex houses Ispat 0.5 million tones cold rolling complex, which also includes the galvanized plain/galvanized corrugated (GP/GC) lines and India’s first colour coating mill.Technology and innovation have always been the corner stones of IIL’s quest for excellence and these state-of-the-art plants facilitate the company’s mission to attain and sustain market leadership, through technological and product superiority.

The company’s strengths lie in its integrated process management, knowledge management and controls systems. And its seamless supply chain management systems further the efficient use of raw materials, while its staff of highly skilled engineers, technicians and managers with specialized domain knowledge, ensure the choice of the relevant technology and the abilities to produce international quality products at a competitive price.

Page 11: Final_Project_ISPAT

In line with its vision for the future, IIL is expanding its HRC capacity to 3.6 million tones and its CRC capacity to 1 million tones. Moreover, it aims to complete its vertical integration process, increase the proportion of high-grade and value-added steel products in its products mix and leverage the advantage modern design and the size of the facilities offers.With investment of over US $2billion, IIL is the seventh largest Indian private sector company in terms of fixed assets. It aims to consolidate its market leadership in the national specialty steel market by capitalizing on the proximity of its manufacturing facilities to major consumers of flat steel products in Maharashtra, while increasing its presence in international markets by using convenient port location.

In the short span of time since its imception,Ispat Industries has steadily raised the bar –in the terms of its relentless pursuit of technological advancement, unwavering focus on innovation, strident emphasis on quality products,IIL has successfully reinforced its position as market leader, while simultaneously making technological breakthroughs and setting even higher standards for itself.

HSM PLANT WHEN IT (ACTIVITIES) IS IN FULL BLOOM

HR COILS

3. VISION

Ispat would like to be a knowledge-based organization that continuously

achieves economic valve for stakeholders by optimizing resources

Page 12: Final_Project_ISPAT

through operational excellence, enabled by continues innovation to meet customer satisfaction.

MISSION

To attain and maintain market leadership through technological and product superiority, at a competitive cost, to maximize value-addition.

HRD VISIONIspat sees its employees as the most vital resource in delivering superior business results to enhancing shareholder value

HRD MISSIONTo locate, attract, retain, motivate and constantly revitalize employees of Ispat through Benchmark policies and practices. Our talent pool to be reckoned as the industries benchmark.

The Above Mission Will Be Achieved By:

• Lowest delivered cost to customer through enhanced productivity and continuous reduction in

1. Conversion Cost

Page 13: Final_Project_ISPAT

2. cost of inputs through strategic and improved logistic3. PMT cost of capital and cost of financing

• Continuous technological up gradation and R$D base• Seamless integration of all business processes through a strong

enterprise resources IT backbone• Achieve economies of scale by timely completion of balance

projects and infrastructure facilities• Maintain transport business practices• Maintain an environment dedicated to high employee’s sense of

pride, morale and team work• Promote an eco-friendly environment• Implement and integrate initiatives for organizational

transformation.

SIDE VIEW of the HSM Plant

An Overview-ISPAT GROUP OF COMPANIES

Page 14: Final_Project_ISPAT

• One of the Top industrials houses in corporate India.• 8th largest company in terms of fixed assets(over US$2billion)• Turnover US$ 650 million approx.• Projected turnover in 2005-06 US$1.5 billion approx.• Six manufacturing facilities spread over four states in India.• Technology-intensive conglomerate.• 3200 employees.• Set up the world’s largest & most efficient single module sponge iron

(DRI) plant operating at 110% capacity in the first year of operation itself.

• First Indian company to set up a continuous galvanizing plant for thin gauge sheets and a colour coating line for manufacture of colour coated (steel) sheets.

• Unique global distinction of marring latest technologies in steel-making (thin slab casting technology with the CONARC process).

• Increased sales turnover by 57% from Rs.US$303.29 million to US$476.35 million.

4. PRODUCTSponge IronIspat’s sponge iron is manufactured at one of the most efficient Sponge Iron Plants in the world. The plant has been certified for ISO 9002(1994) and ISO 14001(1996).

Hot Rolled CoilsIspat Industries Limited manufactures international standard hot rolled (HR) coils at its Hot Strip Mill (HSM), situated at Dolvi in the state of Maharashtra; India.The production of these coils involves the use of state-of-art equipment and manufacturing processes that ensure products of the highest quality.Ispat’s HSM uses a combination of the advanced Conarc Process and Thin Slab Casting technology, which facilitates the rolling of coil that are as thin as 1.2 mm with a width of 1250mm.These are superior to commercial grade cold rolled (CR) coils, and are quite often a substitute for Cr products in certain applications, due to their thinner gauges and finer surface quality.

Applications• Automobile applications

Page 15: Final_Project_ISPAT

• Boiler quality plates• Cold gas cylinder• Welded steel tubes and pipes• Different types of steel.

JETTY -A Port Place from where raw material come to the plant by sea route.

Unique feature of Ispat’s HR coils Superb surface quality

Enhanced by a 400 bar pressure water jet descaler, currently the highest in the world.

Superior width to thickness ratioEnsured by a roll separating force of 40 Unmaking Ispat’s HSM the most powerful in the world.

Ease in cold roll ingFacilitated through close control of the finished coil temperature, which in turns regulates the grain size and other physical parameters .This is achieved through computer controlled laminar cooling.

Accurate coil geometryA crown within 30 microns and flatness of within 20 IUs is achieved through work roll bending with a continuously variable crown.

Thickness toleranceLaser enabled automatic thickness and width control produces a thickness tolerance of 30 microns and a width of tolerance +8mm/0m

Page 16: Final_Project_ISPAT

SPONGE IRON PLANT

BLAST FURNACE

Page 17: Final_Project_ISPAT

PART 1

PERFORMANCE MANAGEMENT SYSTEM

Page 18: Final_Project_ISPAT

5. IMPORTANT CONCEPTS FOR PROPER UNDERSTANDING OF PERFORMANCE MANAGEMENT

SYSTEM (PMS) AT ISPAT

1. Performance Performance at Ispat will be defined in terms of Performance at Ispat will be defined in terms of Task FactorsTask Factors, measured in , measured in quantitative quantitative terms.terms.

2. Task factors2. Task factors Task factors are the key performance parameters for a role. These are definedTask factors are the key performance parameters for a role. These are defined as “Critical outcomes towards which effort is directed to support achievementas “Critical outcomes towards which effort is directed to support achievement of desired business of desired business resultsresults.”.” Will be used for assessment of performance

3.3. M Measurement Criteriaeasurement Criteria is the expected performance on each Task Factor in is the expected performance on each Task Factor in quantifiable termsquantifiable terms

4.4. “Parivartan” •It is the name of Ispat’s new Performance Management System •It covers the executive cadre spanning grades E08 to E19 (Management cadre)

5. Competency/CompetenciesCompetencies are skills and abilities described in behavioral terms that areCompetencies are skills and abilities described in behavioral terms that are coachable, observable, measurable, and critical to successful individual orcoachable, observable, measurable, and critical to successful individual or organization performance.organization performance.

6. KEY RESULT AREA an in-depth overview These are the target that is to be achieved through this Performance Management System. These are the area that need careful attention for the Success of achieving the KRA’s and in the end the success of the Organization. In this case ISPAT depends on how efficiently are the KRA’s achieved

KRA’s are also the parameter or and yardstick of measurement to give Variable pay to a better performing employee,

Page 19: Final_Project_ISPAT

A KRA Should Be SMART

A SMART Goal describes and quantifies an outcome and specifies Accountability; the resulting objective should be:

Attainable Within your control and limited enough that, with a reasonable or stretch effort, it can be accomplished

Original Goal Without SMART An Attainable Goal Become a better presenter In order to determine whether or not my objective is attainable, I’ll ask myself: Do I have the skills and knowledge needed? For example, do I know how to appropriately answer questions during a presentation? If not, I may want to seek coaching on this skill or take a presentation skills class.

When presenting, I will ensure that my audience understands PARIVARTAN features and benefits by pacing the presentation to the listener(s) and handling questions appropriately. I will ask other employees present at the meetings to provide feedback on these behaviors.

Specific Focused on a key outcome

A Goal Without SMART A Specific Goal Become a better presenter When presenting, I will ensure that my audience

understands PARIVARTAN features and benefits.

Measurable Quantifiable or verifiable; so that it’s clear whether or not the goal has been accomplished

Original Objective Without SMART A Measurable Goal Become a better presenter When presenting, I will ensure that my audience understands

PARIVARTAN features and benefits, by pacing the presentation to the listener(s) and handling questions appropriately. I will ask other employees present at the meetings to provide feedback on these behaviors: productivity, costs, time and quality

Page 20: Final_Project_ISPAT

Relevant Important to your role and to the function or department

Original Goal Without SMART A Relevant Goal Become a better presenter In order to determine whether or not my objective is attainable, I’ll ask myself: Do I have the skills and knowledge needed? For example, do I know how to appropriately answer questions during a presentation? If not, I may want to seek coaching on this skill or take a presentation skills class.

To improve my communication with clients, I will ensure that my audience understands PARIVARTAN features and benefits by pacing the presentation to the listener(s) and handling questions appropriately. To ascertain the need of the presentation, I will check with my audience beforehand. I will ask other employees present at the meetings to provide feedback on these behaviors.

Time Limited Achievable within a certain time period

Original Goal Without SMART A Time-Limited Goal Become a better presenter In order to determine whether or not my objective is attainable, I’ll ask myself: Do I have the skills and knowledge needed? For example, do I know how to appropriately answer questions during a presentation? If not, I may want to seek coaching on this skill or take a presentation skills class.

To improve my communication with clients, I will ensure that my audience understands PARIVARTAN features and benefits by pacing the presentation to the listener(s) and handling questions appropriately. To ascertain the need of the presentation , I will check with my audience beforehand. I will ask other employees present at the meetings to provide feedback on these behaviors. I will make a similar presentation once a quarter.

Page 21: Final_Project_ISPAT

7. Classification of Grades The following is the hierarchy level at ISPAT Industries Ltd,

E00 to E07-Union Cadre, E08 to E19- Management Cadre

GRADE DESIGNATION

E19 Executive Director

E18 President / Director

E17 Senior Vice President

E16 Vice President

E15 General Manager

E14 Deputy General Manager

E13 Assistant General Manager

E12A Senior Manager

E12 Manager

E11 Deputy Manager

E10 Assistant Manager

E09 Junior Manager

E08 Senior Engineer /Senior Officer

Page 22: Final_Project_ISPAT

T001 Graduate Engineer / Management / Diploma Engineer Trainees

E07 Engineer / Officer

E06 Assistant Engineer / Assistant Officer

E05 Junior Engineer / Junior Officer

E04 Senior Assistant / Senior Technician / Senior Operator

E03 Assistant Technician / Assistant Operator

E02 Assistant Technician / Assistant Operator

E01 Junior Assistant / Junior Technician

E00 Junior Assistant / Junior Technician

T002 Advisors / Consultants

Note: Performance Appraisal (PMS) only takes place at the Management Cadre

8. Key players involved in Performance Management System

1 Appraisee Every employee whose performance willEvery employee whose performance will

be assessed. All employees in levels E-be assessed. All employees in levels E-

08 and above08 and above

•• It’s about your PerformanceIt’s about your Performance

•• You are the key driver of the You are the key driver of the

processprocess

3 Your Reporting officer’s reportingYour Reporting officer’s reporting

officer- is responsible for reviewingofficer- is responsible for reviewing

the entire performancethe entire performance processprocess

Reviewer •• Will ensure Objectivity, Will ensure Objectivity,

Transparency & ConsistencyTransparency & Consistency

Page 23: Final_Project_ISPAT

6. PERFORMANCE MANAGEMENT SYSTEM PROCESS FLOWCHART

4 HR This is the H.R - PMS groupThis is the H.R - PMS group •• The PMS process ownerThe PMS process owner

•• Manage performanceManage performance data data

Corporate Performance

Planning Session

Division Target Setting

Session

Individual Performance

Planning Session

End February

Mid-to-end March

Page 24: Final_Project_ISPAT

Overall Performance Planning Cycle

According to Hewitt Consultancy Group

7. STEPS INVOLVED IN PERFORMANCE

MANAGEMENT

Q1: Appraisal review &

feedback

Q2: Appraisal review &

feedback

Q3: Appraisal review &

feedback

Q4: Final Performance

Appraisal

Mid-July

Mid-April

1st week April

Mid-January

Mid-October

Ongoing monthly review and feedback

Form

Page 25: Final_Project_ISPAT

Getting started step 1 After the all the procedures are over, when you log in ,in the ispat portal a web

page will appear ,you must log in the an employee form will appear as above

You need to enter your Employee number only; the other information will be

populated automatically

Page 26: Final_Project_ISPAT

Getting started step 2In this step Task factors are decided with consultation of the reporting boss, it

should be SMART as explained above, the task given to employee or

allotted to him is strictly according to the competencies of the

employee, It is a general practice that 10 Task factor are usually give,

but it can be changed according to the grade of the employee, targets

that are to be achieved.

Page 27: Final_Project_ISPAT

Getting started step 3After deciding the annual Task factors it divided or broken into Quarterly KRA

(Key Result Area) it is in accordance with the annual task factor, It should not

deviate fro the annual targets. Task Factors are broken down because it easy or

convenient to achieve, it help in correcting the Error at an early Stage.

After the targets are reached or if time has lapsed then employee first rates

himself, then he is rated by the immediate reporting boss

Similar step is followed in all other 3 quarter and employee is finally rated by

superior’s superior i.e. Reviewer ,and then it is decided that weather he is Non

performer. Partial performer, Contributor, Significant contributor or Exceptional

Contributor.

If in case if the rating given by the immediate boss is having significant difference

with the Reviewer, then in a meeting between the employee,

Reporting Superior and reviewer is held where they clear the difference.

The Performance Management System: Quarter Appraisal-Page 3

Page 28: Final_Project_ISPAT

Depending on this the Employee is give increment, promotion or other reward etc

The whole process is done in the following Manner (refer the Following

Diagrams)

Getting started step 4The above diagram gives an Idea about how the feedback process is done

First the reporting officer gives his feedback and gives suggestion to his

employer regarding where the improvement to be made for better performance in

the future is

After this Reviewing Officer gives his feedback regarding the performance of the

employee (reviewee) she can also give his/her opinion regarding improvement

area.

The new Performance Management System: feedback-Page 4

Feedback formForm

Flow diagram

RO enters his

feedback after

discussion with

the appraisee

RO forwards

his feedback

to reviewer

Reviewer

validates

Appraisee

accesses

feedback

Page 29: Final_Project_ISPAT

The above flow chart gives exactly the idea of the entire PMS process

It starts from self rating to becoming a contributor/non contributor etc.

And in later part of the diagram it says that is there is a difference between the

rating between reviewer and reporting officer then the score are sent to

Flow diagram

Self rating by

appraisee

RO’s enters

rating post

discussion with

the appraisee

Reviewers

rating

Moderation

committee rat ing

Composition

Final rating on each Task Factor Overall

Score

Difference

>2

NO

YES

Performance

CategoryExceptional

Contributor

Signif icant Contributor

Contributor

Partial Contributor

Non Performer

Page 30: Final_Project_ISPAT

moderation committee where they discuss as to why there is a difference, the

reporting officer should explain the reason, after their the scores are revised and

re-entered in the system.

Annual performance rating

Getting started step 5

On the basis of performance by the employee ,he may be given a rise in his

salary i.e. variable pay, or continuous demonstration of good performance for a

Details

Compensatio

n (Cost to

company)

Promotion

Linked to Overall Rating

Linked to Overall

Rating and Career aspirations

Compensation depends on Market alignment, Specialty of job, extent of Experience, and Overall performance

Continuous demonstration of good overall performance for a defined period of time, fitment into role based on skills and abilities, consideration of career aspirations and opportunities available in the organization

• The annual rating is generated automatically by the system

• It is the average of the ratings of all the quarters

• It is this rating that is linked to the other HR systems - increase in compensation, career movement ( depending on the opportunities available in the organization

Page 31: Final_Project_ISPAT

definite period of time, fitment into role based on skills he can be promoted to

next level , this entire process is described in the above diagram

The Performance Management System:

FEEDBACK

Role of the Reporting Officer

Flow diagram

Preparing for feedback

Decide time & venue

Deliver feedback

Summarize feedback

• Enough time should be given to Appraisee prepare for the session

• Venue should not be the work area of either appraisee or RO - The

discussion should preferably be held off-site

• RO should read the Performance appraisal form & identify examples of

performance & non-performance

• RO, to independently identify areas for discussion & chart possible

developmental paths

• Begin with positive feedback

• Listen to appraisee’s point of view

• Create a developmental & amicable atmosphere

• Summarize the discussion

• List out 3-4 developmental areas, and corresponding activities

• Set a status review schedule

Page 32: Final_Project_ISPAT

FEEDBACK Last step 6

The above diagram clearly shows the process for preparation for feedback , it is

not an easy task , the feedback should be very clear it should have no

ambiguity , it should motivate his junior in performing better in his future and if he

is good performer it should help him to continue the good work.

The process is done through four stages described in above diagram

The process ends with the summary feedback.

The Performance Management System:

FEEDBACK TIPS FOR REPORTING OFFICERS

Tips for giving feedback

Why feedback

Good feedback

Wrong feedback

Informal and formal opportunities for Reporting Officers to connect or

“touch base” with you to:

• Provide support and direction

• Keep performance on track

Coaching and feedback can include:

• Positive feedback and recognition

• Corrective feedback

• Identifying obstacles to performance

• Sharing information

• Personal insults

• Conflicting information or too much, all at once

• Unclear messages causing the other person to guess

Giving

positive

• Cite specific accomplishments

• Show appreciation

• Ask employees how they can leverage performance in a particular

area to enhance their overall performance

• Encourage employees to continue high level of performance

Giving negative

feedback

• Describe the observed behavior and provide specific examples

• Focus on behavior that can be changed, not the person

• Define the impact on you and other members

• Get a reaction from the employee

• Share your expectations for future behavior

• Together explore options for solving the problem

• Describe consequences of improved/not improved performance

• Agree on a time table to review progress

• Offer support to help or remove obstacles

Page 33: Final_Project_ISPAT
Page 34: Final_Project_ISPAT

The above figures shows the linkages between various components, it tells what

one can achieve if performance in the PMS is good it gives clear Idea as

to how one is rewarded

Take for example the second box shows that if you consistently perform i.e. if

your cumulative score in the PMS system is good it results you getting a

fixed Increment in Salary or Promotion depending on the situation under

which the performance was effected.

This condition changes from time to time depending on the circumstances.

Score on KRA’s

Cumulative Score on

KRA’s and Routine

Responsibi l i t ies

Rating on

Competencies

Development Plan

Variable Pay

component

Fixed Pay Increments

Promotion Decisions

Training Plan

The Linkages

Page 35: Final_Project_ISPAT
Page 36: Final_Project_ISPAT

PART-2

EMPLOYEE SATISFACTIONSURVEY

Page 37: Final_Project_ISPAT

8. Job Evaluation cum Employee Satisfaction Questionnaire I Mr. Vineet Murli, student of Pillai’s Institute of Management Studies & Research, PANVEL. As a part of my academic course curriculum of MMS, I am doing this project.

It is observed that the attrition rate at ISPAT is too high In order to assess the exact reasons and to help the management to curb this crisis; we have made an attempt by designing the following survey questionnaire.

This survey should take approximately 10 minutes of your time to complete. Please respond candidly to the questions. Confidentiality of your opinions / views would be maintained.

Thank you, in advance, for your time and participation. Inspite of your busy schedule.

Please Fill in the Following Details

Dept. Expr. at ISPAT

Age Emp Grade

Gender Status

Please( ) In the boxes below. Write Comments for your response so that corrective action can be taken.

1. The amount of work I am expected to do on job is reasonable.(too much pressure/ worklife balance)

Strongly Disagree Disagree Agree Strongly AgreeComment :

2. I am satisfied with the priorities and direction of work.(Leadership of your boss,etc) Strongly Disagree Disagree Agree Strongly Agree

Comment :

3. I have adequate information available which enable me to do my job well.(transparency)

Strongly Disagree Disagree Agree Strongly Agree Comment :

4. We operate in a cost-Effective way in my department.(with respect to delay,Efficiency,etc)

Strongly Disagree Disagree Agree Strongly Agree Comment :

E

Married Unmarried M F

Page 38: Final_Project_ISPAT

5. I understand day- to- day goal of my department.(Clear Vision) Strongly Disagree Disagree Agree Strongly Agree

Comment :

6. Diverse perspective are valued and encouraged within the department.(Rewards/recognition) Strongly Disagree Disagree Agree Strongly Agree

Comment :

7. Considering everything, how satisfied are you with your job?(Compensation/Benefits) Strongly Disagree Disagree Agree Strongly Agree

Comment :

8. My work group has a climate in which diverse perspective are valued.(Working Environment) Strongly Disagree Disagree Agree Strongly Agree

9. COMPANY policies and procedures make sense to me.(Career growth/Development Opportunity) Strongly Disagree Disagree Agree Strongly Agree

10. The physical working conditions(e.g., ventilation, space, cleanliness) are very good. Strongly Disagree Disagree Agree Strongly Agree

11.Individual differences are respected here (e.g., gender, race, educational background,etc.) Strongly Disagree Disagree Agree Strongly Agree

12. Any other suggestion and remarks ,views and opinion (Mandatory to write)For Example-career opportunity, compensation , Reward, leadership, communication gap etc.

Date___________ Location_______________

Comment :

Comment :

Comment :

Comment :

Page 39: Final_Project_ISPAT

9. DATA INTERPRETATION AND ANALYSIS

Q1. The amount of work Iam expected to do is reasonable

59%20%

11%

10% 0%

Agree

Disagree

Strongly Agree

StronglyDisagree

No Response

We can see from the above graph that 59% of the employees have agreed to the fact that the amount of work expected from them is reasonable while 20% Disagree, 11% Strongly Agree, 10% Strongly Disagree.This tells us the general picture that most of the employees feel that the amount of work expected from them are reasonable there is no work pressure, while some people feel that there is too much pressure, they complain that a single person has been given too much work.

Q5. I understand day to day goal of my department.

59%18%

5%

18%0%

Agree

Disagree

Strongly Agree

StronglyDisagree

No Response

In the above pie-chart 59% of the employees agree that they understand the day to day goal of their organization, while 18% Disagree they complain that the goal is not clear 5% Strongly Agree and 18% strongly Disagree with the above question.

Page 40: Final_Project_ISPAT

Q6. Diverse Perspective are valued and encouraged within the Depatment

55%

23%

10%

9%3%

Agree

Disagree

Strongly Agree

StronglyDisagree

No Response

In the above Pie chart 55% employees feel that Diverse Perspective are valued and encouraged within the department in which they work. While a significant number of employees 23% Disagree with above Question ,they feel that their opinion are not considered while taking decision, some of them feel that the amount of respect and recognition that they are getting is below satisfactory level. 10% Strongly Agree and 9% people Strongly Disagree with the fact.

Q7. Considering everything, how satisfied are you with your job

59%25%

11%5%0%

Agree

Disagree

Strongly Agree

StronglyDisagree

No Response

When asked the above Question 59% Agree to the fact that they are satisfied with their job that they are doing, while 25% Disagree with the very fact that some are not happy about the leadership of their boss, there is no proper direction, company doesn’t provide growth opportunity and 11% people Strongly Agree and 5% Strongly Disagree with the above question.

Page 41: Final_Project_ISPAT

Q8. COMPANY Policies and Procedures make sense to me.

56%

24%

11%

8% 1%

Agree

Disagree

Strongly Agree

StronglyDisagree

No Response

56% respondents agree that Company Policies and Procedure make sense to them ,while 24% Disagree by saying that the company doesn’t give adequate training, policies are not favorable for career growth in some Department, some say that it should be revised and should be made simpler in line with the other procedures11% of the respondents Strongly Agree that Development Opportunity is there in ISPAT.8% of the respondents Strongly Disagree they say that ‘it (the company policy) doesn’t make sense to them’ and they feel that they are not clear about the top management’s vision regarding them (i.e. for employees).

Q10.The physical working condition (e.g.,ventilation, space, cleanliness)

are very good.

68%1%

17%

13%1%

Agree

Disagree

Strongly Agree

StronglyDisagree

No Response

In the above pie chart a good 68% of the people Agree and 13% Strongly Agree that working condition in the office is very good so the company deserves a pat on its backfor such a good response. 13% of the persons Strongly Disagree they complain that the safety in some area of the plant is not adequate and not up to the mark, some responded by saying that floor space is less and some of them complain that there is no enough. chairs for the visitors ok sit and they complain that they do not have conference room for meetings.

Page 42: Final_Project_ISPAT
Page 43: Final_Project_ISPAT

Q11. Individual Differences are respected in here(e.g.gender,race,educational background)

84

37

12

2

0

0 10 20 30 40 50 60 70 80 90

Agree

Disagree

Strongly Agree

StronglyDisagree

No Response

OP

TIO

NS

Numerical Units

In the above bar chart we see that 84% of the respondents Agree to the fact that Individual differences like gender, race, educational background that is there is no inequality, everybody is given fair and equal opportunity to grow which is a good sign with future in perspective37% of the respondents disagree with the above fact some people say that Educational background is respected but during allocation of department it (educational qualification) is completely ignored

Q2. Iam satisfied with the priorities and direction of the work

(Leadership of you boss)

75

30

19

11

0

0 10 20 30 40 50 60 70 80

Agree

Disagree

Strongly Agree

StronglyDisagree

No Response

OP

TIO

NS

Numerical Units

In the above bar chart 75% of the respondents say they are satisfied with the priority and the leadership of their immediate reporting superior. Some people also say that “My superior are diresting us well but some times thing goes out of control and some are also of the opinion that “my previous experience was excellent but my boss is not using me properly means they are not satisfied with the leadership ability of their own superior they include 30% in the above case.

Note: The Numerical Units in the Bar Chart are in percentages (100%)

Page 44: Final_Project_ISPAT

Q3. I have adequate information available which enable me to do my job well(transparency)

86

20

19

10

0

0 20 40 60 80 100

Agree

Disagree

Strongly Agree

StronglyDisagree

No Response

OP

TIO

NS

Numerical Units

When asked the above question 86% of the people Agree that they have adequate information that enables them to do their work well on time. Where as 19% of the Strongly Agree, 20% Disagree ,are not happy with the information passed on, there is lot of information loss when the news or information, or instruction come from the top causing delay in taking action.Some say that “it is not always (information) ,sometimes it takes time to collect the information, other side top management people Agree to the fact that there is transparency in their functioning of each department.

Q4. We operate in a Cost-effective way in my department. (with resprct to delay & efficiency)

87

15

25

4

4

0 20 40 60 80 100

Agree

Disagree

Strongly Agree

StronglyDisagree

No Response

OP

TIO

NS

Numerical Units

Cost-effectiveness in the above question refer to the delay or how efficiently the work is disposed off are there and wastage of time etc.87%, 25% Agree and Strongly Agree respectively with the above question that there is no such thing happening in our department and yes being such a big organization some delay in decision or accomplishing of task can happen and it is understandable, some respondents also said that whatever work we do, we try our best to save cost in the area where cost can be saved.15% disagree with above question they say that “too much time is wated in identifying the problem rather than solving it ,some feel that there is lot of scope for improvement if proper steps are taken.

Page 45: Final_Project_ISPAT

9. SUGGESTIONS & RECOMMENDATIONS The following table shows the Problem how it can be solved

Sr.No. Problem Remedy How it can be done

1 Much PressureNeed to be removed

1.Analyse attendance of staff staying after 05.00 p.m and study be done by Six Sigma etc to know as to why staff stays long2.Either they are over loaded /inefficient /short of man power resources 3.Tedious traveling of almost 3 hrs a day 4.Remote area 5.All to punch at min 5 pm (Leaving from work)

2

Lack of Systems & Procedures

To be developed

With only Top management support

3

Many /Unplanned Meetings Surprise meetings

To be avoided

With management support only

4

Too much complex procedures

To be simplified With management support

5

Too much line authorities

To be simplified

with management support

6Perks, monetary benefits

To be reviewed

1. HR needs to work on it and make in line with other reputed organizations to retain people because in view of the current problem.2. Too much pressure, tedious traveling and remote area, retaining qualified. 3. Professional staff is very difficult in current scenario of opportunities.

Page 46: Final_Project_ISPAT

10. CONCLUSION

Performance Management System refers to the tool of assessment of an employee’s actual performance, behavior on jobs and his potential for future performance .PMS has several objectives but the main objectives are to assess training needs ,motivate the employees maintain good performance level, effect promotions and to give pay increases

Performance appraisal is the main part of PMS. Appraisal of performance proceeds in asset pattern. Job Description and standard goals setting are essential factors related to this process. Once the standard goals are set and the Key Result Area of individual are defined, the appraisal interviews are conducted. The appraisal data is used for various HR activities, especially for scheduling training and development programmes.

However, it is difficult to the subjectivity in the appraisal, as it takes place especially while evaluating the “Behavioral Aspect” and not the performance related aspects.

And regarding Employee Satisfaction is concerned it is the fundamental job of Human Resource management, and authorities at top of the hierarchy that employees are respected, keep them satisfied all the time so they feel comfortable working at ISPAT but not an easy one.

Page 47: Final_Project_ISPAT

Bibliography

1. SIX SIGMA MANUAL Monthly Review

2. HR POLICY MANUAL

3. Research Methodology – Khotari

4. ISPAT Journals/Magazines

5. WEBSITE www.ispat.com

Page 48: Final_Project_ISPAT
Page 49: Final_Project_ISPAT

SPONGE IRON PLANT

Page 50: Final_Project_ISPAT