a Harpreet Singh | Roll Number: 11235 |4th Year |Mechanical Engineering | Group M2 2009 Intra Semester Training Report Report: Report contains an overview of the Quality Engineering Department at Swaraj Tractors Division, Mahindra and Mahindra, Phase IV, Mohali, Punjab. It gives detailed information of the tests performed at Pre-Dispatch Inspection check post and problems faced by the warranty section, pooled in from all the dealers of Swaraj Tractors from all over India. Swaraj Tractor Division Mahindra and Mahindra Limited, Mohali, Punjab
13

Final Training Report - Punjab tractors Limited (PTL)

Apr 10, 2015

Download

Documents

Intra Semester training report done in quality Engineering department, Swaraj tractor Division, mahindra and mahindra limited
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
Page 1: Final Training Report - Punjab tractors Limited (PTL)

a

Har

pre

et S

ingh

| R

oll

Nu

mb

er: 1

12

35

|4

th Y

ear

|Mec

han

ical

En

gin

eeri

ng

| G

rou

p M

2

20

09

Intr

a S

em

est

er

Tra

inin

g R

ep

ort

Report: Report contains an overview of the Quality Engineering Department at Swaraj Tractors Division, Mahindra and Mahindra, Phase IV, Mohali, Punjab. It gives detailed information of the tests performed at Pre-Dispatch Inspection check post and problems faced by the warranty section, pooled in from all the dealers of Swaraj Tractors from

all over India.

Swaraj Tractor Division Mahindra and Mahindra Limited, Mohali,

Punjab

Page 2: Final Training Report - Punjab tractors Limited (PTL)

Quality Engineering Department Trainee number: T-055 I have been doing training under Mr. Rajendra Singh, Senior Manager (In House quality).

Page 3: Final Training Report - Punjab tractors Limited (PTL)

QUALITY ENGINEERING DEPARTMENTMENT

Discipline that deals with the analysis of a manufacturing system at all stages, to improve the quality of the production process and of its output.

Quality engineering receipt (formally known as Quality Engineering Department) is divided into

two fields at Swaraj division of Mahindra and Mahindra Ltd.

1. Suppliers Quality

2. In-House Quality

SUPPLIERS QUALITY

Suppliers section consists of maintaining the quality of products that are being supplied by

suppliers. It contains inspection of the raw materials being supplied by suppliers. It also includes

discussion regarding delay of raw material and defective parts supplied. Subsequent actions are

taken if the supplied products being supplied are found defective and inspectors from the

industry are sent regularly to avoid such defects. This inspection is regularly done by the

industry so maintain good quality supply and sound relationship with suppliers.

IN – HOUSE QUALITY

In house quality is embedded into every department of the industry. As such there are five

dept. that are:

– Q.E.L.M.S (Light Machine Shop) – Q.E.H.M.S (Heavy Machine Shop ) – Q.E.H.T (Heat Treatment) – Q.E.P.M (Plant maintenance) – Q.E.A (Assembly)

Quality Engineering Assembly

Quality Engineering Assembly consists of five quality posts. Each Quality Posts are situated at

every intervals of the assembly line. Each Quality post has a certain responsibility of

maintaining the quality of the Product being manufactured in the industry. And the final quality

post is known as P.D.I (Pre Dispatch Inspection).

Page 4: Final Training Report - Punjab tractors Limited (PTL)

P.D.I. (Pre Dispatch Inspection)

P.D.I (Pre Dispatch Inspection) is the final quality post which carries a major responsibility of

dispatching the tractors as manufactured by the assembly line of phase IV. This is similar to

giving final touches to the jewellery being sold. This department carries rigorous checks as per

the pre-designed checklist prior to dispatch of machinery.

HOW DOES IT HOLDS GOOD?

P.D.I acts as one of the major diagnosing center for every daily to daily outgoing failure and

scrutinizing them and hopefully trying to remove these failures. This way forthcoming problems

reported by dealers are reduced. This helps to maintain a healthy relationship with dealers and

customers.

MEASURES UNDER P.D.I

1. TRANSMISSION FLUID LEVEL 2. ENGINE OIL LEVEL

3. F.I.P OIL LEVEL 4. WATER LEVEL IN RADIATOR

5. ELECTRICAL FUCTIONING 6. COMPONENT STORAGE

7. CHECKING OF AIR LEAKAGE FROM THE AIR INTAKE FILTER 8. PAINT DEFECTS AND OTHER VISUAL INSPECTIONS

9. WATER MIX IN ENGINE AND TRANSMISSION FLUID

TRANSMISSION FLUID LEVEL

To check the transmission fluid

level, the dipstick from tractor is

removed using D/E spanner (24*27). The oil level is checked by using the gauge. If the oil is over or under the required quantity, oil is added or drained respectively to adjust

the oil level and it is brought up to the

required level.

Page 5: Final Training Report - Punjab tractors Limited (PTL)

ENGINE OIL LEVEL

To check the engine oil level, a pull out dipstick is used which is pulled out from the eng ine

block by hand. To check the oil level correctly, the oil is wiped off the dip-stick with a clean

cloth. The dip-stick is reinserted and then again taken out. The oil level is again checked using

the mark built on the dip-stick. If the oil is above or below the required level, it is added or

drained respectively.

F.I.P OIL LEVEL

To check the oil level of the Fuel Injection Pump oil level, we loosen the inspection screw by D/E spanner (14*17) and check the oil in

the F.I.P(Fuel Injection Pump). Oil is added in case the oil is not coming out.

WATER LEVEL IN RADIATOR

The water level in the radiator has a very essential role. Without the water the radiator cannot

work efficiently. Before the tractors are dispatched, the water/coolant level is checked and

filled if the level is not upto the full mark. To check it, radiator cap is opened and so is the cap of

the water/ reservoir tank. The level of water/coolant in the reservoir tank can be checked by

visual inspection. To check the water levels in the radiator, finger is immersed inside it after

removing the cap. If the water level is not fine it is filled up to the required level. This test also

checks the seals on the radiator cap.

Page 6: Final Training Report - Punjab tractors Limited (PTL)

Level of water in the Reservoir tank

The open lid of the radiator

ELECTRICAL FUCTIONING

1) Operation of Brake Switch

Brake switch is a small, brake pedal operated spring loaded switch used to light up the rear stop

light (red light) on the application of the brakes. It can have very serious affects if the tractor is

on a heavy traffic road. To check if its working properly or not, the electrical switch of the

Page 7: Final Training Report - Punjab tractors Limited (PTL)

battery is put on the “on” level and then the brakes are applied. If the stop lights, light up , then

the switch is working fine otherwise it is replaced.

2) Battery

The battery of the tractor is a very costly and an essential part. The customer should not get

a de-charged battery. The battery of the Swaraj 735 FE and above models have a battery

with a magic eye. The magic eye has a colour indicator for the indication of the condition of

the battery.

If the battery is OK - then the colour shows Green If the battery needs charging– then it shows a white indicator

If distilled water needs to be added to the battery – It shows a red indicator

3) Fuse box

The fuse box of the tractor is also checked before it is rolled out. To check if any fuse has been broken, the tractor is started and all the electrical functions like the head and the rear

lamps, the turn-indicators and the horn is checked. If any component does not seem to work, the first check is to check the fuse connections in the fuse box.

COMPONENT STORAGE

Visually inspect the tractor is done. All the nuts and bolts are checked, the logos and stickers

are observed and checked so that they are correctly placed and are appropriate to the product. If the components are missing, deteriorated or wrongly fitted, the needful is done. For example, all the 4 tyres of the tractor are required to be of the same brand. This helps in the proper control of the tractor while in motion.

CHECKING OF AIR LEAKAGE FROM THE AIR INTAKE FILTER

The air intake by the engine is done through the air filter. If the air does not goes through the

air filter the engine will choke destroying the piston linings and hence causing a massive

damage to the engine. The intake of air through the air filter is even more important in case of

tractors as they work in dusty environments full of sand and other materials.

The air filter is located above the level of the engine on the left side, as seen by the driver. To

check if there is any air leakage in the suction tube, the air filter cap is removed and the tractor

is started. Hand is placed on top of the air inlet pipe, properly covering it. If the engine stops on

doing this, the tractor passes the test.

Page 8: Final Training Report - Punjab tractors Limited (PTL)

When the hand is placed and the entry of the air is blocked, the engine stops

The air enters through this air filter

PAINT DEFECTS AND OTHER VISUAL INSPECTIONS

A variety of paint defects occur while the tractor is being assembled. These defects are

inspected at the IQS (Internal quality study). The IQS area at Swaraj tractors plant has been

set up by Mahindra and Mahindra Limited. It involves a thorough check on tractors finish

i.e. Buff marks, etc. It involves a very thorough check in very good illumination from each

side. They select five random tractors from the assembly line and inspect them thoroughly.

Various paint defects that are found at IQS are:

1. Dust in paint

2. Excessive buff marks 3. Metal scratches 4. Paint scratches 5. Paint run-down

6. Poor touch up/ overspray 7. Dent / ding 8. Paint chip off 9. Pettling marks over the engine

Page 9: Final Training Report - Punjab tractors Limited (PTL)

10. Improper sticker application 11. Engine (pettling marks / seapage ) 12. Others, etc

WATER MIX IN ENGINE AND TRANSMISSION FLUID

Due to various leakage points, water seepage occurs and water seeps into the engine oil and

transmission fluid compartments. The water mix levels of engine oil and transmission fluid is checked by

two methods:

1. Visual inspection of the Dip-sticks of both the engine oil and the transmission fluid

compartments can easily tell if water is present or not. If water is not mixed , both the engine oil and the transmission fluid are transparent. If water is present in the engine oil

compartment, the drop of the oil which comes out with the dip-stick will be hazy. The same is the case of transmission fluid. If water is present it will turn translucent.

2. Water mix paste is used to check if water is present in the engine oil or transmission fluid. The Water mix paste ( green in colour ) is put on the tip of the dip-stick and

inserted back into the respective compartments. If water is present, it reacts with the green coloured water mix paste and turns it pink in colour. This gives a proof of the

presence of water.

Various others tests are performed before the tractors are finally dispatched, which are performed as

the need arises.

Tests Performed and Performance data

A number of tractors are dispatched daily and all have to pass through all the above and many

other tests at the PDI check post before they are finally allowed to move out. No tractor is

allowed to move out of the premises with the PDI OK sticker.

Although we perform all those tests and carry out research on other warranty related issues,

we were called upon to record and submit few reports regarding some tests by inspecting a

number of tractors in dispatch. Here I like to present few reports:

1st report containing the Chassis Number, Details about water mix in Engine oil, transmission

fluid, radiator coolant level and the colour of the magic eye

Sr. No. Chassis No. of the tractor

Engine oil purity

Transmission Fluid purity

Radiator coolant level

Battery Magic Eye

1 8819 Not ok not ok ok Green

2 10709 ok Ok ok Green

3 10740 ok not ok ok Green

4 21589 Not ok Ok ok Green

5 21703 not ok Ok ok Green

Page 10: Final Training Report - Punjab tractors Limited (PTL)

6 21736 ok Ok ok Green

7 78595 ok Ok ok Green

8 78935 ok Ok ok White

9 78944 ok Ok ok Green

10 79095 ok Ok ok Green

11 79268 Not ok Ok ok Green

12 79406 ok Ok ok Green

13 79528 ok not ok ok Green

14 79529 Not ok Ok ok Green

15 79530 Not ok not ok ok Green

16 79533 Not ok Ok ok Green

17 79535 ok Ok ok Green

18 79537 ok Ok ok Green

19 79538 Not ok Ok ok Green

20 79665 ok Ok ok Green

21 79722 ok Ok ok Green

22 79725 Not ok Ok ok Green

23 79742 Not ok Ok ok Green

24 79753 Not ok Ok ok Green

25 79760 Not ok Ok ok Green

26 79769 ok Ok ok Green

27 79822 ok Ok not ok Green

28 79823 ok Ok not ok Green

29 79831 ok ok not ok Green

30 79837 Not ok ok ok Green

31 79842 ok ok ok Green

32 79906 ok ok ok Green

33 79907 Not ok ok ok Green

34 79908 Not ok ok ok Green

35 79918 ok ok ok Green

36 79919 Not ok ok ok Green

37 79924 Not ok ok ok Green

38 80009 ok ok ok Green

39 80010 Not ok not ok ok Green

40 80023 ok ok ok Green

41 80024 ok ok not ok Green

42 80025 ok ok not ok Green

43 80029 Not ok ok ok White

44 80033 ok ok ok White

45 80038 ok ok not ok White

46 80044 Not ok ok ok Green

47 80054 ok ok ok Green

48 80088 ok not ok ok Green

49 80089 ok ok ok Green

50 80090 not ok ok ok Green

Page 11: Final Training Report - Punjab tractors Limited (PTL)

51 80097 ok low level ok Green

52 80101 Not ok ok ok Green

53 80104 Not ok ok ok Green

54 80105 ok ok not ok Green

55 80111 not ok ok ok White

56 80127 ok ok not ok White

57 80129 ok ok not ok Green

58 80130 ok ok not ok Green

59 80131 ok ok not ok Green

60 80133 ok ok not ok Green

61 80135 Not ok ok ok Green

62 80137 ok ok ok Green

63 80138 ok ok ok Green

64 80142 ok ok ok Green

65 80143 ok ok ok Green

66 80145 ok ok ok Green

67 80146 ok ok ok Green

68 80150 ok ok ok Green

69 80151 ok ok ok Green

70 80154 Not ok not ok ok Green

71 80164 ok ok ok Green

72 80166 ok ok ok Green

73 80169 ok ok ok Green

74 80177 ok not ok ok Green

75 80179 ok ok not ok Green

76 80182 ok ok ok White

77 80191 ok ok not ok Green

78 80192 ok ok not ok Green

79 80193 ok ok ok Green

80 80202 not ok ok ok Green

81 80205 ok ok ok Green

82 80235 ok ok ok Green

83 80259 ok ok ok Green

84 80263 ok ok not ok Green

85 84842 Not ok ok ok White

86 84846 Not ok ok ok White

87 85976 ok not ok ok White

88 85978 ok ok not ok Green

89 85980 ok ok not ok Green

90 85981 ok ok not ok Green

91 85982 ok ok not ok Green

92 85983 ok ok not ok Green

93 85985 ok ok not ok Green

94 85990 ok ok not ok Green

95 86003 ok ok not ok Green

Page 12: Final Training Report - Punjab tractors Limited (PTL)

96 86018 ok ok ok White

97 86021 ok not ok ok White

98 86024 ok ok not ok Green

99 86030 ok ok not ok Green

100 86033 Not ok ok ok White

101 96035 ok ok ok White

Checked by Harpreet Singh

ok means that the inspected parameter is found ok

not ok

means that the value of the inspected parameter is either found doubtful or is not ok

2nd report:

Swaraj Tractors Evaluation Sheet

Number Chassis Number Model Number Battery Magic Eye Colour Situation of horn

1 QUTA22705010542 834 FE GREEN OK

2 QUTA30405078926 735 FE GREEN OK

3 QUTA30405078933 735 FE WHITE OK

4 QUTA30405078934 735 FE GREEN OK

5 QUTA30405078936 735 FE GREEN OK

6 QUTA30405079456 735 FE GREEN OK

7 QUTA30605078941 735 FE GREEN OK

8 QUTA30605078943 735 FE GREEN OK

9 QUTA30705079597 735 FE WHITE OK

10 QUTA30705079636 735 FE GREEN OK

11 QUTA30705079649 735 FE WHITE OK

12 QUTA30705079680 735 FE GREEN OK

13 QUTB22705010647 735 FE GREEN OK

14 QUTB22705010717 834 FE GREEN OK

15 QUTB30705079666 735 FE GREEN OK

16 QUTB30705079681 735 FE WHITE OK

17 QUTB30705079683 735 FE GREEN OK

18 QUTB30705079967 735 FE GREEN OK

19 QUTB30705079999 735 FE GREEN OK

20 QUTB30705080002 735 FE GREEN OK

21 QUTB30705080003 735 FE GREEN OK

22 QUTB30705080004 735 FE GREEN OK

23 QUTB30705080008 735 FE GREEN NOT OK

24 QUTB30705085951 735 FE GREEN OK

25 QUTB30705085952 735 FE GREEN OK

26 QUTB30705085954 735 FE GREEN OK

27 QUTB30705179745 735 FE GREEN OK

Page 13: Final Training Report - Punjab tractors Limited (PTL)

28 QUTB30705179747 735 FE GREEN OK

29 QUTB31619079903 735 FE GREEN OK

3rd report

The third report was for the leakage of the air-filters

Sr. No. Chassis Number Air filter check

1 80131 ok

2 80133 ok

3 80135 ok

4 80137 ok

5 80138 ok

6 80142 ok

7 80143 ok

8 80145 ok

9 80146 ok

10 80177 ok

11 80179 ok

12 80182 ok

13 80191 ok

14 80192 ok

15 80193 ok

These reports were submitted to Mr. Rajendra Singh, Senior Manager (In House Quality )