CERTIFICATE This is to certify that the samples are collected from the proposed site CONSTRUCTION OF FLYOVER AT LAXMI TALKIES SQUARE AT SAMBALPUR IN THE STATE OF ODISHA by CADD CONSULTING ENGINEERS PVT LTD, BHUBANESWAR. The laboratory tests have been performed under the supervision of qualified personal, as per the Indian standards and that this report is prepared on the basis of these tests results and expert experience. FOR: CADD CONSULTING ENGINEERS PVT. LTD 1
105

Final Reports of Laxmi Talkis

Sep 05, 2015

Download

Documents

Jugal Sunar

It is intended to investigate the sub soil strata at the proposed site of CONSTRUCTION OF
FLYOVER AT LAXMI TALKIES SQUARE AT SAMBALPUR IN THE STATE OF ODISHA. The general soil profiles and the geological stratification have been determined
FOR CONSTRUCTION OF FLYOVER AT LAXMI TAKIES SQUARE AT SAMBALPUR (ODISHA).
The objective of this investigation is to ascertain the characteristics of Sub-soil to
present necessary information for sub-surface. It was endeavored to study in detail the
sub-surface conditions at the project site.
Welcome message from author
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
  • CERTIFICATE

    This is to certify that the samples are collected from the proposed site CONSTRUCTION OF FLYOVER AT LAXMI TALKIES SQUARE AT SAMBALPUR IN THE STATE OF ODISHA by CADD CONSULTING ENGINEERS PVT LTD, BHUBANESWAR. The laboratory tests have been performed under the supervision of qualified personal, as per the Indian

    standards and that this report is prepared on the basis of these tests results and expert experience.

    FOR: CADD CONSULTING ENGINEERS PVT. LTD

    1

  • INTRODUCTION

    It is intended to investigate the sub soil strata at the proposed site of CONSTRUCTION OF FLYOVER AT LAXMI TALKIES SQUARE AT SAMBALPUR IN THE STATE OF ODISHA OBJECT

    The object of the Geo technical investigation is to:-

    Optimize the foundation system, assuring the safe bearing capacity of the soil.

    Determination of type, size and depth of foundation.

    Analyzing the soil properties.

    Suggesting an economically viable of foundation system to be adopted for the proposed

    structures. SCOPE OF WORK It consists of the following:-

    Visual reconnaissance of the site.

    Field and laboratory investigation.

    Engineering judgment based on the current practice.

    LIMITATIONS OF INVESTIGATION

    The scope of Geo- technical Sub soil investigation is confined within the framework of

    agreement and Technical specification with the client. However all the field and laboratory experiments will be carried out as per the relevant Indian standard code of practice?

    2

  • THE DETAILED GEO-TECHNICAL INVESTIGATION WORK TO BE CARRIED OUT CONSISTS OF TWO PARTS.

    1. FIELD INVESTIGATION

    Location of bore holes.

    Boring /drilling up to specified depth below G.L.

    Conducting standard penetration test.

    Collection UDS samples.

    Collecting DS samples.

    Determining the depth of water table.

    Study of site condition and surroundings.

    Taking observation of surrounding structure.

    Transportation of all soil samples to laboratory.

    2. LABORATORY INVESTIGATION :- Grain size analysis.

    Determination of moisture content.

    Unconfined compressive strength.

    Determination of Bulk density.

    Determination of dry density.

    Determination of Void ratio.

    Determination of liquid limit.

    Determination of plastic limit & plastic index.

    Determination of specific gravity.

    Determination of shear parameters & settlement calculation.

    Determination of DFS test.

    LOCATION The proposed site of construction OF CONSTRUCTION OF FLYOVER AT LAXMI TALKIES SQUARE AT SAMBALPUR IN THE STATE OF ODISHA

    3

  • FIELD WORK

    1. SELECTION OF BORE HOLES :-

    1) 4,Nos number of bore holes ware selected by the Engineer In Charge in order to

    obtain comprehensive sub-soil data for this site up to specified depth in BH No-1 to BH No-4 , below G.L. For detailed laboratory investigation SPT is conducted in suitable intervals and Disturbed /undisturbed soil samples from the above bore hole were collected at different levels from as per the instruction of the client with

    observation of the ground water level during investigation.

    2. BORING :- 2) The sub-soil exploration work at the proposed site was carried out using 150mm

    diameter rotary calyx rig boring equipments.

    3. STANDARD PENETRATION TESTS :-

    3) Standard penetration tests we are conducted in different levels in a continuous manner

    using a spilt spoon sampler. The SPT sampler was lower inside the bore hole after drilling the required level and is driven by a 63.6 kg. Hammer with a free fall of

    750mm. In three stages 150mm each and the numbers of blows for each 150mm penetration was recorded. The details of location and SPT value [N] is shown in bore log data.

    4. GROUND WATER TABLE :- 4) During the field work ground water level was observation in bore hole and the level of

    ground water table are shown in bore log data sheet.

    4

  • LABORATORY TESTS The laboratory tests were conducted on selected SPT / disturbed / undisturbed soil samples collected from the bore holes drilled at the proposed site. The tests include grain size analysis, natural moisture content, D.F.S specific Gravity, liquid limit, plastic limit, plasticity index test and shear test. Particles size distribution tests on representative soil sample were also carried out. The laboratory test confirming to the requirement of I.S and specification were conducted on the soil, sample. The results of all these tests are given in test result sheet separately.

    GRAIN SIZE ANALYSIS: The grain size analysis of different soil samples were done as per the requirement of IS: 2720(Pt- IV) 1975 method of test for soil, Grain size analysis. The details of the test results are shown test result sheet separately in tabular as well as graphically. The result of grain size analysis is used to classify the soil in various depths of bore holes.

    NATURAL MOISTURE CONTENT: The natural moisture content were determined as per IS: 2720(Pt II) 1973 Method of test for soil, determination of water content.

    DETERMINATION OF BULK DENSITY: The Bulk densities were determined in the laboratory from the UDS samples at different levels and the result are shown separately in tabular form.

    DETERMINATION OF DRY DENSITY: The dry density of the UDS/DS samples was determined at the known moisture content and bulk density.

    DETERMINATION OF SPECIFIC GRAVITY: The specific gravity of the UDS/DS sample was determined at different levels and the results are shown separately.

    DETERMINATION OF VOID RATIO: The void ratios of the UDS/DS samples were determined at different levels and the results are shown separately.

    LIQUID LIMIT & PLASTIC LIMIT: [AS PER IS : 2720 Pt IV] : The liquid and plastic limit of soils were other index properties of soil have also been determined as per the relevant IS code of practice. The liquid and plastic limits of soil samples have been determined in the laboratory and results are shown separately.

    DETERMINATION OF SHEAR PARAMETERS: Un consolidated and un drained Tri-axial shear tests were carried out from soil samples collected as per IS : 2720 Pt IX 1971 with three different cell pressures of 1,2,3kg/sq.cm using Tri axial shear testing machine and result are shown separately in tabular and graphical manner.

    5

  • P R E F A C E

    The general soil profiles and the geological stratification have been determined FOR CONSTRUCTION OF FLYOVER AT LAXMI TAKIES SQUARE AT SAMBALPUR (ODISHA).

    The objective of this investigation is to ascertain the characteristics of Sub-soil to present necessary information for sub-surface. It was endeavored to study in detail the sub-surface conditions at the project site.

    .

    The field and laboratory works have been conducted as per relevant Bureau of Indian standards (BIS).

    6

  • FIELD OPERATIONS

    In an attempt for optimization in the design of foundation for the proposed building to be constructed at this site, Geo-technical investigation was done. The entire investigation work had been divided mainly into two parts (I) Field Work & (ii) Laboratory tests Field work determines the types of sub- soil deposit and their characteristics. Laboratory tests help in determining the relevant geo-technical properties of the sub-surface deposited leading to finalization of foundation depth of the structure basing on Bearing capacities of the foundation strata as well as Influence zone

    GROUND WATER TABLE & TERMINATION DEPTH

    BORE HOLE

    NO GROUND

    LEVEL LOCATION CHANAGE (M)

    TERMINATION DEPTH IN MTR.

    WATER TABLE FROM

    THE G.L IN MTR.

    01 (P 23) 90.938 Gole Bazer Square 1.000 Km 12.5 3.6

    02 (P 10) 90.827 Gole Bazer Square 0.650 Km 10.4 1.9

    03 (P 36) 92.111 Near Arbind School 1.400 Km 15.0 1.3

    04 (A 1) 95.477 In front of new Mahila Thana 0.330 Km 10.5 0.5

    BORING & SITU TESTS

    Wash boring method was adapted to bores in the soil up to specified depth as mentioned above below the G.L for BH -01 to BH -04. The SPT were conducted at regular intervals and the samples were brought to the laboratory with proper identification and labeling standard split spoon sampler was used for conducting standard penetration test. The number of blows required to drive the sampler for the 1st, 2nd and 3rd 15cm depths were recorded. The total number of blows required to drive the split spoon sampler due to the free fall of a 63.5kg. Hammer trough distance of 75cm for the 2nd, and 3rd 15cm penetration were taken together as the field N-value (penetration resistance) of the soil.

    7

  • NOTATIONS C Cohesion Angle of internal fraction of soil DS Disturbed Sample UDS Undisturbed Sample NMC Natural Moisture Content NP Non plastic soil G Special gravity G Gravel Content M Slit Content C Clay Content LL Liquid Limit PL Plastic Limit Pl Plasticity index Cc Compression index K Coefficient of permeability UCS Unconfined Compression N SPT Value BH Bore Hole Suffix The Number of Bore Holes Nc,Nq,N Bearing Capacity Factor Sc,Sq,S S hape factors Density of soil D Depth of foundation FS Factor of safety Cv Coefficient of consolidation UU Unconsolidated untrained triaxial test CU Consolidated drained triaxial test GC Clayey Gravels GP Poorly Graded Gravels GW Well Graded Gravels SC Clayey Sand SM Silty Sand SW Wel Graded Sand SP Poorly Graded Sand CH Clays of High Plasticity Cl Clays of Intermediate Plasticity CL Clays of Low Plasticity MH Slits of High Plasticity MI Silts of intermediate Plasticity ML Silts of Low Plasticity

    8

  • PROPERTIES OF BORE HOLE 01

  • ENGINEERING PROPERTIES OF SOIL PROJECT: GOLE BAZAR CHHAK (BH NO- 1 )

    \

    Sl. N

    o.

    soil

    sam

    ple

    colle

    cted

    at

    Type

    of s

    ampl

    e co

    llecte

    d at

    Grain size analysis Atterbergs Limits in %

    Field

    Moi

    sture

    Co

    nten

    t in

    % Bu

    lk De

    nsity

    in

    gm/cc

    . Dr

    y De

    nsity

    in

    gm/cc

    . Co

    hesio

    n (C

    ) Kg

    f/cm

    Angl

    e of s

    hear

    ing

    resis

    tance

    ()

    In d

    egre

    e Sp

    ecifi

    c Gra

    vity

    Void

    Rati

    o

    D.F.

    S. in

    %

    Field

    S.P

    .T. v

    alue

    Grou

    p of

    soil

    Fine

    Gra

    vel in

    %

    (10m

    m to

    4.75

    mm

    )

    Coar

    se sa

    nd in

    %

    (4.75

    mm

    to

    2.00m

    m)

    Medi

    um sa

    nd in

    %

    (2m

    m to

    0.42

    5mm

    ) Fi

    ne sa

    nd in

    %

    (0.42

    5mm

    to

    0.075

    mm

    ) Si

    lt & C

    lay in

    %

    (0.07

    5mm

    to

    0.001

    mm

    )

    Liqu

    id L

    imit i

    n %

    Plas

    tic L

    imit i

    n %

    Plas

    ticity

    Inde

    x in

    %

    1 0.5 DS - 8 12 74 6 NP NP NP 8 1.88 - - - 2.59 - - - SP

    2 1.5 SPT - 6 18 58 18 18 NP NP 9 - - - - 2.62 - - >100 SP-SM

    3 3.0 SPT 85 6 3 4 2 NP NP NP 7 - - - - 2.56 - - >100 GW 4.0M TO 5.0M CORE RECOVERY =20% & RQD =NIL 5.0M TO 6.0M CORE RECOVERY = 22% & RQD =NIL

    6.0M TO 7.0M CORE RECOVERY = 25% & RQD = 14%

    7.0M TO 8.0M CORE RECOVERY = 28% & RQD =18%

    8.0M TO 9.0M CORE RECOVERY =30% & RQD = 24%

    9.0M TO 10.0M CORE RECOVERY = 35% & RQD = 26%

    10.0M TO 11.0M CORE RECOVERY = 40% & RQD = 32%

    11.00M TO 12.0M CORE RECOVERY = 50% & RQD = 41%

    12..0M TO 12.5M CORE RECOVERY = 87% & RQD = 73%

    10

  • 12

    SUMMARY OF FOUNDATION DETAILS OF ROCK SAMPLES

    SOAK

    ED

    UNSO

    AKED

    4.0m to 5.0m 20% NIL 0.28% 12.1% 4.1 - - - 82 2.68 2.68 42.9 1

    5.0m to 6.0m 22% NIL 0.27% 10.6% 4.2 - - - 84 2.67 2.66 42.0 2

    6.0m to 7.0m 25% 14% 0.26% 10.2% 4.4 4.5 112 122 87 2.67 2.66 41.1 3

    7.0m to 8.0m 28% 18% 0.29% 11.4% 4.7 5.1 122 129 88 2.69 2.66 43.8 4

    8.0m to9.0m 30% 24% 0.31% 11.4% 5.2 5.5 131 137 87 2.67 2.66 45.5 5

    9.0m to 10.0m 35% 26% 0.31% 11.0% 5.5 5.7 137 143 88 2.67 2.66 45.5 6

    10.0m to 11.0m 40% 32% 0.31% 11.0% 5.8 6.3 152 159 88 2.67 2.66 45.5 7

    11.0m to 12.0m 50% 41% 0.31% 11.0% 6.1 6.6 159 170 88 2.67 2.66 45.5 8

    12.0m to 12.5m 87% 73% 0.31% 11.0% 6.5 10.5 252 270 88 2.67 2.66 45.5 9

    NOTE:- Nj = 0.1

    qs= S.B.C OF ROCK IN T/M2

    qs (qu) X NjSBC is conservatively Restricted to 80 T / M2 for designed purposed.

    1 BH-1

    SPEC

    IFIC

    GRA

    VITY

    RQD

    %

    CORE

    REC

    OVER

    Y %

    SL. N

    O

    SLAK

    E UD

    RABI

    LITY

    INDE

    X (1

    0 m

    nts c

    ycle)

    MOIS

    TER

    CONT

    ENT

    (%)

    SOUN

    DNES

    S

    LOCATION:-GOLE BAZAR CHHAK

    CADD CONSULTING ENGINEERS PVT.LTD.GEO - TECHNICAL INVESTIGATION &

    FOUNDATION ENGINEERING.

    UNIT

    WEI

    GHT

    OF R

    OCK

    (g/cc

    )

    HARD

    NESS

    (H,S

    CALE

    MOH

    S)

    BORE HOLE NO -01

    SAMP

    LES

    REF:

    NO

    BORE

    HOL

    E

    DEPT

    H OF

    FOU

    NDAT

    ION

    BGL

    (m)

    UNCO

    NFIN

    ED

    COMP

    RESS

    ION

    ST

    RENG

    TH O

    F RO

    CK

    IN T

    /M2

    (qs =

    qu

    * NJ)

    POIN

    T LO

    AD S

    TREN

    GTH

    INDE

    X

    PORO

    SITY

    (MG/

    (1+M

    G)X1

    00

  • 13

    6.0M TO 7.0M

    qs = qc x Nj

    From laboratory test data qc = 112 = 1120 T / M2

    qs = 1120 x 0.1 = 112 T / M2

    Where : qs = Safe Bearing Pressure (gross)qc = Average UCS of rock coresNj = Empirical coefficient

    Including FOS 3

    GEO - TECHNICAL INVESTIGATION & FOUNDATION ENGINEERING.

    LOCATION:- GOL BAZER CHHAK, SAMBALPUR

    DEPTH OF FOUNDATION -

    CADD CONSULTING ENGINEERS PVT.LTD.

    SBC is conservatively Restricted to 80 T / M2 for designed purposed.

    Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) = Thickness of discontinues (cm)S = Spacing of discontinues (cm)Bf = Footing Width

    From table 4 of IS :12070 For spacing of discontinues from 30 cm to 100 cm Nj = 0.1

    kg / cm2

    AS PER CI .6 OF IS:12070

  • 14

    7.0M TO 8.0 M

    qs = qc x Nj

    From laboratory test data qc = 122 = 1220 T / M2

    qs = 1220 x 0.1 = 122 T / M2

    SBC is conservatively Restricted to 80 T / M2 for designed purposed.

    Where : qs = Safe Bearing Pressure (gross)qc = Average UCS of rock coresNj = Empirical coefficient

    Including FOS 3Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) = Thickness of discontinues (cm)S = Spacing of discontinues (cm)Bf = Footing Width

    CADD CONSULTING ENGINEERS PVT.LTD.

    From table 4 of IS :12070 For spacing of discontinues from 30 cm to 100 cm Nj = 0.1

    kg / cm2

    GEO - TECHNICAL INVESTIGATION & FOUNDATION ENGINEERING.

    LOCATION:- GOL BAZER CHHAK, SAMBALPUR

    DEPTH OF FOUNDATION -

    AS PER CI .6 OF IS:12070

  • 15

    8.0 M TO 9.0M

    qs = qc x Nj

    From laboratory test data qc = 131 = 1310 T / M2

    qs = 1310 x 0.1 = 131 T / M2

    SBC is conservatively Restricted to 80 T / M2 for designed purposed.

    Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) = Thickness of discontinues (cm)S = Spacing of discontinues (cm)Bf = Footing Width

    From table 4 of IS :12070 For spacing of discontinues from 30 cm to 100 cm Nj = 0.1

    kg / cm2

    AS PER CI .6 OF IS:12070

    Where : qs = Safe Bearing Pressure (gross)qc = Average UCS of rock coresNj = Empirical coefficient

    Including FOS 3

    GEO - TECHNICAL INVESTIGATION & FOUNDATION ENGINEERING.

    LOCATION:- GOL BAZER CHHAK, SAMBALPUR

    DEPTH OF FOUNDATION -

    CADD CONSULTING ENGINEERS PVT.LTD.

  • 16

    9.0 M TO 10.0 M

    qs = qc x Nj

    From laboratory test data qc = 137 = 1370 T / M2

    qs = 1370 x 0.1 = 137 T / M2

    SBC is conservatively Restricted to 80 T / M2 for designed purposed.

    Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) = Thickness of discontinues (cm)S = Spacing of discontinues (cm)Bf = Footing Width

    From table 4 of IS :12070 For spacing of discontinues from 30 cm to 100 cm Nj = 0.1

    kg / cm2

    AS PER CI .6 OF IS:12070

    Where : qs = Safe Bearing Pressure (gross)qc = Average UCS of rock coresNj = Empirical coefficient

    Including FOS 3

    GEO - TECHNICAL INVESTIGATION & FOUNDATION ENGINEERING.

    LOCATION:- GOL BAZER CHHAK, SAMBALPUR

    DEPTH OF FOUNDATION -

    CADD CONSULTING ENGINEERS PVT.LTD.

  • 17

    10.0 M TO 11.0 M

    qs = qc x Nj

    From laboratory test data qc = 152 = 1520 T / M2

    qs = 1520 x 0.1 = 152 T / M2

    SBC is conservatively Restricted to 80 T / M2 for designed purposed.

    Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) = Thickness of discontinues (cm)S = Spacing of discontinues (cm)Bf = Footing Width

    From table 4 of IS :12070 For spacing of discontinues from 30 cm to 100 cm Nj = 0.1

    kg / cm2

    AS PER CI .6 OF IS:12070

    Where : qs = Safe Bearing Pressure (gross)qc = Average UCS of rock coresNj = Empirical coefficient

    Including FOS 3

    CADD CONSULTING ENGINEERS PVT.LTD.GEO - TECHNICAL INVESTIGATION &

    FOUNDATION ENGINEERING.

    LOCATION:- GOL BAZER CHHAK, SAMBALPUR

    DEPTH OF FOUNDATION -

  • 18

    10.0 M TO 11.0 M

    qs = qc x Nj

    From laboratory test data qc = 159 = 1590 T / M2

    qs = 1590 x 0.1 = 159 T / M2

    SBC is conservatively Restricted to 80 T / M2 for designed purposed.

    Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) = Thickness of discontinues (cm)S = Spacing of discontinues (cm)Bf = Footing Width

    From table 4 of IS :12070 For spacing of discontinues from 30 cm to 100 cm Nj = 0.1

    kg / cm2

    AS PER CI .6 OF IS:12070

    Where : qs = Safe Bearing Pressure (gross)qc = Average UCS of rock coresNj = Empirical coefficient

    Including FOS 3

    CADD CONSULTING ENGINEERS PVT.LTD.GEO - TECHNICAL INVESTIGATION &

    FOUNDATION ENGINEERING.

    LOCATION:- GOL BAZER CHHAK, SAMBALPUR

    DEPTH OF FOUNDATION -

  • 19

    11.5M TO 12.5M

    qs = qc x Nj

    From laboratory test data qc = 252 = 2520 T / M2

    qs = 2520 x 0.1 = 252 T / M2

    SBC is conservatively Restricted to 80 T / M2 for designed purposed.

    Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) = Thickness of discontinues (cm)S = Spacing of discontinues (cm)Bf = Footing Width

    From table 4 of IS :12070 For spacing of discontinues from 30 cm to 100 cm Nj = 0.1

    kg / cm2

    AS PER CI .6 OF IS:12070

    Where : qs = Safe Bearing Pressure (gross)qc = Average UCS of rock coresNj = Empirical coefficient

    Including FOS 3

    CADD CONSULTING ENGINEERS PVT.LTD.GEO - TECHNICAL INVESTIGATION &

    FOUNDATION ENGINEERING.

    LOCATION:- GOL BAZER CHHAK, SAMBALPUR

    DEPTH OF FOUNDATION -

  • 20

    = 2.0 m = 200 cm= 1.5 m = 150 cm= 1.0 m

    SPT 'N' VALUE OBSERVED = 100

    = 58Due to over burden pressureAs per IS 8009 part I 1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976 Figure - 9 , P.P-17

    = 0.0045 m d = ( WT - D)= 4.50 mm (After applying W') d/b= 4.5 mm Adopted water table correction (W')

    Premissable settlement = 25 mm

    Therefore Allowable Bearing pressure

    = 25 / 4.5= 5.556 kg/cm2

    = 55.56 T/m2

    CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE

    CADD CONSULTING ENGINEERS (P) LTD BORE HOLE:-1GEO - TECHNICAL INVESTIGATION & Sheet No : 1

    FOUNDATION ENGINEERING.

    Water table correction(W')

    Corrected N value

    NAME OF THE WORK: SOIL INVESTIGATION WORKS FOR GOLE BAZAR CHHAK

    ALLOWABLE BEARING PRESSURE FOR 25MM SETTLEMENT

    Width of footing (B)Depth of footing (D)

  • 21

    = 2.0 m = 200 cm= 1.5 m = 150 cm= 1.0 m

    SPT 'N' VALUE OBSERVED = 100

    = 58Due to over burden pressureAs per IS 8009 part I 1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976 Figure - 9 , P.P-17

    = 0.0045 m d = ( WT - D)= 4.50 mm (After applying W') d/b= 4.5 mm Adopted water table correction (W')

    Premissable settlement = 40 mm

    Therefore Allowable Bearing pressure

    = 40 / 4.5= 8.889 kg/cm2

    = 88.89 T/m2

    CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE

    CADD CONSULTING ENGINEERS (P) LTD BORE HOLE:-1GEO - TECHNICAL INVESTIGATION & Sheet No : 1

    FOUNDATION ENGINEERING.

    Water table correction(W')

    Corrected N value

    NAME OF THE WORK: SOIL INVESTIGATION WORKS FOR GOLE BAZAR CHHAK

    ALLOWABLE BEARING PRESSURE FOR 40MM SETTLEMENT

    Width of footing (B)Depth of footing (D)

  • 22

    = 2.0 m = 200 cm= 3.0 m = 300 cm= 1.0 m

    SPT 'N' VALUE OBSERVED = 100

    = 58Due to over burden pressureAs per IS 8009 part I 1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976 Figure - 9 , P.P-17

    = 0.0045 m d = ( WT - D)= 4.50 mm (After applying W') d/b= 4.5 mm Adopted water table correction (W')

    Premissable settlement = 25 mm

    Therefore Allowable Bearing pressure

    = 25 / 4.5= 5.556 kg/cm2

    = 55.56 T/m2

    CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE

    CADD CONSULTING ENGINEERS (P) LTD BORE HOLE:-1GEO - TECHNICAL INVESTIGATION & Sheet No : 1

    FOUNDATION ENGINEERING.

    Water table correction(W')

    Corrected N value

    NAME OF THE WORK: SOIL INVESTIGATION WORKS FOR GOLE BAZAR CHHAK

    ALLOWABLE BEARING PRESSURE FOR 25MM SETTLEMENT

    Width of footing (B)Depth of footing (D)

  • 23

    = 2.0 m = 200 cm= 3.0 m = 300 cm= 1.0 m

    SPT 'N' VALUE OBSERVED = 100

    = 58Due to over burden pressureAs per IS 8009 part I 1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976 Figure - 9 , P.P-17

    = 0.0045 m d = ( WT - D)= 4.50 mm (After applying W') d/b= 4.5 mm Adopted water table correction (W')

    Premissable settlement = 40 mm

    Therefore Allowable Bearing pressure

    = 40 / 4.5= 8.889 kg/cm2

    = 88.89 T/m2

    CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE

    CADD CONSULTING ENGINEERS (P) LTD BORE HOLE:-1GEO - TECHNICAL INVESTIGATION & Sheet No : 1

    FOUNDATION ENGINEERING.

    Water table correction(W')

    Corrected N value

    NAME OF THE WORK: SOIL INVESTIGATION WORKS FOR GOLE BAZAR CHHAK

    ALLOWABLE BEARING PRESSURE FOR 40MM SETTLEMENT

    Width of footing (B)Depth of footing (D)

  • 24

    NAME OF THE WORK : SOIL INVESTIGATION WORKS FOR GOLE BAZAR CHHAKData for the safe Bearing capacity calculation:

    (NonCohesive Soil)SPT 'N' = 100 unconfined compressive strength qu = N/7.5 kg/cm2

    = 58 C = qu/2 = 0.00 T/sq.mDepth = 1.5 M = 42 degreeWidth = 2.0 M yt = 1.72 gm/cc

    If the 36 General shear failure condition is to be considered.

    LOCAL SHEAR FAILURE CONDITION' = tan^ (-1)(0.67x tan) = 31.0 DegreeC' = 0.67C = 0.00 T/sq.m

    AS PER IS :6403-1981,TABLE-1 = 2.59 (from lab test)Nc' = 33.336 G = 2.59Nq' = 21.380 q = Yt X Df

    N' = 27.526 = 1.72 X 1.50 = 2.58 T/M `By = Width X Yt

    2.0 X 1.72 = 3.4 T/M AS PER IS :6403-1981,TABLE-2 Sc = 1.0 Sq = 1.0 Sy = 1.0 AS PER IS :6403-1981,5.1.2.2dc = 1.25 dq = 1.12 d = 1.12 (Since > 10)

    AS PER IS :6403-1981,5.1.2.3ic = 1 iq = 1 i = 1 W = 1.0

    1.0Qult = (C NcSc dc ic)+y.d.(Nq-1)Sq dq iq+1/2 By NySy dy Iy W'

    = x 33.34 x 1.0 x 1.25 x 1+ 2.58 x 20.38 x 1.0 x 1.12 x 1+ 0.5 x 3.4 x 27.53 x 1.0 x 1.12 x 1.0 x 1.0

    = 0.0 + 58.89 + 53.026= 111.916 T/M

    Qult = 111.92 T/sq.M3

    SBC = 37.31 T/sq.m

    0.000

    Assuming the Factor of Safety as =

    Based on the above 'N' value the following ' ' values are obtained from the fig.1 of the IS: 6403-1981 less soils (C=0). And for cohesive soils ( =0) the 'c' value is considered from the relation "Note:- Where ever the test results are not available the same was assumed based on the available values.

    Specific gravity of soil at 1.5 m depth (G)

    Assuming the depth factor, shape factor and load inclination factors as unity.Assuming the water table correction factor (W') as the ultimate bearing capacity is calculated as below:

    CADD CONSULTING ENGINEERS (P) LTD Bore hole no:-1GEO - TECHNICAL INVESTIGATION & Sheet No :- 1

    FOUNDATION ENGINEERING.

    Corrected '

  • 25

    NAME OF THE WORK : SOIL INVESTIGATION WORKS FOR GOLE BAZAR CHHAKData for the safe Bearing capacity calculation:

    (NonCohesive Soil)SPT 'N' = 100 (ASSUMED) unconfined compressive strength qu = N/7.5 kg/cm2

    = 58 C = qu/2 = 0.00 T/sq.mDepth = 3.0 M = 42 degreeWidth = 2.0 M yt = 1.72 gm/cc

    If the 36 General shear failure condition is to be considered.

    LOCAL SHEAR FAILURE CONDITION' = tan^ (-1)(0.67x tan) = 31.0 DegreeC' = 0.67C = 0.00 T/sq.m

    AS PER IS :6403-1981,TABLE-1 = 2.62 (from lab test)Nc' = 33.336 G = 2.62Nq' = 21.380 q = Yt X Df

    N' = 27.526 = 1.72 X 3.00 = 5.16 T/M `By = Width X Yt

    2.0 X 1.72 = 3.4 T/M AS PER IS :6403-1981,TABLE-2

    Sc = 1.0 Sq = 1.0 Sy = 1.0 AS PER IS :6403-1981,5.1.2.2

    dc = 1.50 dq = 1.25 d = 1.25 (Since > 10) AS PER IS :6403-1981,5.1.2.3

    ic = 1 iq = 1 i = 1 W = 1.0

    1.0Qult = (C NcSc dc ic)+y.d.(Nq-1)Sq dq iq+1/2 By NySy dy Iy W'

    = x 33.34 x 1.0 x 1.50 x 1+ 5.16 x 20.38 x 1.0 x 1.25 x 1+ 0.5 x 3.4 x 27.53 x 1.0 x 1.25 x 1.0 x 1.0

    = 0.0 + 131.451 + 59.18= 190.632 T/M

    Qult = 190.63 T/sq.M3

    SBC = 63.54 T/sq.m

    CADD CONSULTING ENGINEERS (P) LTD Bore hole no:-1GEO - TECHNICAL INVESTIGATION & Sheet No :- 1

    FOUNDATION ENGINEERING.

    Corrected 'N'

    0.000

    Assuming the Factor of Safety as =

    Based on the above 'N' value the following ' ' values are obtained from the fig.1 of the IS: 6403-1981 for cohesion less soils (C=0). And for cohesive soils ( =0) the 'c' value is considered from the relation "Note:- Where ever the test results are not available the same was assumed based on the available values.

    Specific gravity of soil at 3.0 m depth (G)

    Assuming the depth factor, shape factor and load inclination factors as unity.Assuming the water table correction factor (W') as the ultimate bearing capacity is calculated as below:

  • 26

    SUMMARY OF GEOTECHNICAL PARAMETERS & SAFE BEARING CAPACITY

    BH DEPTH

    BGLTYPE OF BULK DENSITY, SPT-N

    N CORRECTI

    ON ARRIVED ALLOWABLE BERING PRESSURE

    ALLOWABLE BERING PRESSURE

    NO (M) SAMPLE gm/cc VALUE VALUEC

    KG/CM2

    DEGREE SBC T/MFOR 25mm

    SETTELEMENT T/MFOR 40mm

    SETTELEMENT T/M

    -0.5

    - -

    -

    CADD CONSULTING ENGINEERS (P) LTD.GEO - TECHNICAL INVESTIGATION &

    FOUNDATION ENGINEERING.

    1.5

    -DS

    FOOTING IN M

    SHEAR PARAMETER

    1

    2X2 - -

    (2X2)

    BH NO :- 1 SHEET NO : 1

    63.54 55.6

    -

    88.9SPT N>100

    58

    58

    -

    -

    NAME OF WORK:- SOIL INVESTIGATION WORKS FOR GOLE BAZAR CHHAK.

    -

    SPT N>100(2X2) 37.31 88.955.6

    -

    3.0

  • 27

    CADD CONSULTING ENGINEERS PVT.LTD GEO-TECHNICAL INVESTIGATION &

    FOUNDATION ENGINEERING.

    Sheet No:1

    ANALYSIS OF THE SUB SOIL INVESTIGATION TEST RESULT

    LOCATION: -GOLE BAZAR CHHAK(390 MT).

    BOREHOLE NO- 1

    Borehole no- -1, was sunk up to an average depth of 12.5m the sub soil strata of the Borehole is given in

    litho logical form and summarized as follows.

    STRATUM

    The top layer up to an average depth up to 0.5 m consists of sand and from 0.5m to 1.5m depth is compacted fine sand mixed with gravel. And from 1.5m to 3.0m depth is boulders.

    The stratum below an average depth from 3.0 m to 11.5 m is consists soft rock and from 11.5m to 12.5m depth is hard granite rock,

    The strata are moderately medium to very dense compact and low to medium plasticity. The SPT value tabulated in bore log data sheet.

    The core recovery was observed during investigation and tabulated in bore log data sheet. The ground water table was encountered at 3.6m within boring depth.

  • PROPERTIES OF BORE HOLE 02

  • ENGINEERING PROPERTIES OF SOIL PROJECT: GOLE BAZAR CHHAK (BH NO - 02 )

    \

    Sl. N

    o.

    soil

    sam

    ple c

    ollec

    ted at

    Type

    of s

    ampl

    e co

    llecte

    d at

    Grain size analysis Atterbergs Limits in %

    Field

    Moi

    sture

    Con

    tent

    in %

    Bu

    lk De

    nsity

    in g

    m/cc

    .

    Dry

    Dens

    ity in

    gm/cc

    .

    Cohe

    sion

    (C) K

    gf/cm

    Angl

    e of s

    hear

    ing

    resis

    tance

    ()

    In d

    egre

    e Sp

    ecifi

    c Gra

    vity

    Void

    Rati

    o

    D.F.

    S. in

    %

    Field

    S.P

    .T. v

    alue

    Grou

    p of

    soil

    Fine

    Gra

    vel in

    %

    (10m

    m to

    4.75

    mm

    )

    Coar

    se sa

    nd in

    %

    (4.75

    mm

    to 2.

    00m

    m)

    Medi

    um sa

    nd in

    %

    (2m

    m to

    0.42

    5mm

    )

    Fine

    sand

    in %

    (0

    .425m

    m to

    0.07

    5mm

    )

    Silt &

    Clay

    in %

    (0

    .075m

    m to

    0.00

    1mm

    )

    Liqu

    id L

    imit i

    n %

    Plas

    tic L

    imit i

    n %

    Plas

    ticity

    Inde

    x in

    %

    1 1.5 SPT - 2 4 12 82 34 15 19 14 - - - - 2.67 - 27 20 CL

    2 3.0 UDS - 2 3 15 80 33 15 18 18 1.90 1.61 0.38 3 2.67 0.65 29 - CL

    3 4.5 SPT - 3 4 18 75 33 16 17 18 - - - - 2.67 - 27 31 CL

    4 6.0 SPT - 3 5 17 75 33 17 16 18 - - - - 2.67 - 26 38 CL

    7.2M TO 8.2M CORE RECOVERY =30% & RQD =18%

    8.2M TO 9.2M CORE RECOVERY = 82% & RQD =62%

    9.2M TO 10.2M CORE RECOVERY = 85% & RQD =66%

    29

  • 32

    SOAK

    ED

    UNSO

    AKED

    7.2m to 8.2m

    30% 18% 0.28% 12.1% 4.1 5.4 130 135 82 2.68 2.68 42.9 1

    8.2m to 9.2m

    82% 62% 0.27% 10.6% 5.4 7.5 179 188 84 2.67 2.66 42.0 2

    9.2m to 10.2m 85% 66% 0.26% 10.2% 5.9 9.1 218 222 92 2.67 2.66 41.1 3

    NOTE:- Nj = 0.1qs= S.B.C OF ROCK IN T/M2qs (qu) X NjSBC is conservatively Restricted to 80 T / M2 for designed purposed.

    1 BH-2SP

    ECIF

    IC G

    RAVI

    TY

    RQD

    %

    CORE

    REC

    OVER

    Y %

    SL. N

    O

    UNCO

    NFIN

    ED

    COMP

    RESS

    ION

    ST

    RENG

    TH O

    F RO

    CK

    IN T

    /M2

    (qs =

    qu

    * NJ)

    POIN

    T LO

    AD S

    TREN

    GTH

    INDE

    X

    MOIS

    TER

    CONT

    ENT

    (%)

    SLAK

    E UD

    RABI

    LITY

    INDE

    X (1

    0 m

    nts c

    ycle)

    UNIT

    WEI

    GHT

    OF R

    OCK

    (g/cc

    )

    HARD

    NESS

    (H,S

    CALE

    MOH

    S)

    SOUN

    DNES

    S

    FOUNDATION ENGINEERING.SUMMARY OF FOUNDATION DETAILS OF ROCK SAMPLES

    LOCATION:-GOLE BAZAR CHHAK.

    SAMP

    LES

    REF:

    NO

    BORE

    HOL

    E

    DEPT

    H OF

    FOU

    NDAT

    ION

    BGL

    (m)

    PORO

    SITY

    (MG/

    (1+M

    G)X1

    00

    BORE HOLE NO -02

    CADD CONSULTING ENGINEERS PVT.LTD.GEO - TECHNICAL INVESTIGATION &

  • 33

    LOCATION:-GOLE BAZER CHHAK

    7.2M TO 8.2M

    qs = qc x Nj

    From laboratory test data qc = 130 = 1300 T / M2

    qs = 1300 x 0.1 = 130 T / M2

    CADD CONSULTING ENGINEERS PVT.LTD.

    Where :

    BH NO -02

    qc = Average UCS of rock coresNj = Empirical coefficient

    Including FOS 3

    GEO - TECHNICAL INVESTIGATION & FOUNDATION ENGINEERING.

    DEPTH OF FOUNDATION -

    AS PER CI .6 OF IS:12070

    qs = Safe Bearing Pressure (gross)

    SBC is conservatively Restricted to 80 T / M2 for designed purposed.

    Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) = Thickness of discontinues (cm)S = Spacing of discontinues (cm)Bf = Footing Width

    From table 4 of IS :12070 For spacing of discontinues from 30 cm to 100 cm Nj = 0.1

    kg / cm2

  • 34

    LOCATION:-GOLE BAZER CHHAK

    8.2M TO 9.2M

    qs = qc x Nj

    From laboratory test data qc = 179 = 1790 T / M2

    qs = 1790 x 0.1 = 179 T / M2

    CADD CONSULTING ENGINEERS PVT.LTD.GEO - TECHNICAL INVESTIGATION &

    FOUNDATION ENGINEERING.BH NO -02

    DEPTH OF FOUNDATION -

    AS PER CI .6 OF IS:12070

    Where : qs = Safe Bearing Pressure (gross)qc = Average UCS of rock cores

    From table 4 of IS :12070 For spacing of discontinues from 30 cm to 100 cm Nj = 0.1

    kg / cm2

    SBC is conservatively Restricted to 80 T / M2 for designed purposed.

    Nj = Empirical coefficient

    Including FOS 3Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) = Thickness of discontinues (cm)S = Spacing of discontinues (cm)Bf = Footing Width

  • 35

    LOCATION:-GOLE BAZER CHHAK

    9.2M TO 10.2M

    qs = qc x Nj

    From laboratory test data qc = 218 = 2180 T / M2

    qs = 2180 x 0.1 = 218 T / M2

    CADD CONSULTING ENGINEERS PVT.LTD.GEO - TECHNICAL INVESTIGATION &

    FOUNDATION ENGINEERING.BH NO -02

    DEPTH OF FOUNDATION -

    AS PER CI .6 OF IS:12070

    Where : qs = Safe Bearing Pressure (gross)qc = Average UCS of rock cores

    From table 4 of IS :12070 For spacing of discontinues from 30 cm to 100 cm Nj = 0.1

    kg / cm2

    SBC is conservatively Restricted to 80 T / M2 for designed purposed.

    Nj = Empirical coefficient

    Including FOS 3Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) = Thickness of discontinues (cm)S = Spacing of discontinues (cm)Bf = Footing Width

  • 36

    = 2.0 m = 200 cm= 1.5 m = 150 cm= 0.5 m

    SPT 'N' VALUE OBSERVED = 20

    = 18Due to over burden pressureAs per IS 8009 part I 1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976 Figure - 9 , P.P-17

    = 0.015 m d = ( WT - D)= 15.00 mm (After applying W') d/b= 30 mm Adopted water table correction (W')

    Premissable settlement = 25 mm

    Therefore Allowable Bearing pressure

    = 25 / 30= 0.833 kg/cm2

    = 8.33 T/m2

    Corrected N value

    CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-02Sheet No : 1

    ALLOWABLE BEARING PRESSURE FOR 25 MM SETTLEMENT

    Width of footing (B)Depth of footing (D)Water table correction(W')

    NAME OF PROJECT:-SOIL INVESTIGATION FOR GOLE BAZAR CHHAK. CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE

    GEOTECHNICAL INVESTIGATIONS &FOUNDATION ENGINEERING

  • 37

    = 2.0 m = 200 cm= 4.5 m = 450 cm= 0.5 m

    SPT 'N' VALUE OBSERVED = 31

    = 23Due to over burden pressureAs per IS 8009 part I 1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976 Figure - 9 , P.P-17

    = 0.012 m d = ( WT - D)= 12.00 mm (After applying W') d/b= 24 mm Adopted water table correction (W')

    Premissable settlement = 25 mm

    Therefore Allowable Bearing pressure

    = 25 / 24= 1.042 kg/cm2

    = 10.42 T/m2

    Corrected N value

    CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-02Sheet No : 1

    FOUNDATION ENGINEERING

    CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE NAME OF PROJECT:-SOIL INVESTIGATION FOR GOLE BAZAR CHHAK.

    ALLOWABLE BEARING PRESSURE FOR 25 MM SETTLEMENT

    Width of footing (B)Depth of footing (D)Water table correction(W')

    GEOTECHNICAL INVESTIGATIONS &

  • 38

    = 2.0 m = 200 cm= 6.0 m = 600 cm= 0.5 m

    SPT 'N' VALUE OBSERVED = 38

    = 27Due to over burden pressureAs per IS 8009 part I 1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976 Figure - 9 , P.P-17

    = 0.009 m d = ( WT - D)= 9.00 mm (After applying W') d/b= 18 mm Adopted water table correction (W')

    Premissable settlement = 25 mm

    Therefore Allowable Bearing pressure

    = 25 / 18= 1.389 kg/cm2

    = 13.89 T/m2

    Corrected N value

    CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-02Sheet No : 1

    FOUNDATION ENGINEERING

    CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE NAME OF PROJECT:-SOIL INVESTIGATION FOR GOLE BAZAR CHHAK.

    ALLOWABLE BEARING PRESSURE FOR 25 MM SETTLEMENT

    Width of footing (B)Depth of footing (D)Water table correction(W')

    GEOTECHNICAL INVESTIGATIONS &

  • 39

    = 2.0 m = 200 cm= 1.5 m = 150 cm= 0.5 m

    SPT 'N' VALUE OBSERVED = 20

    = 18Due to over burden pressureAs per IS 8009 part I 1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976 Figure - 9 , P.P-17

    = 0.015 m d = ( WT - D)= 15.00 mm (After applying W') d/b= 30 mm Adopted water table correction (W')

    Premissable settlement = 40 mm

    Therefore Allowable Bearing pressure

    = 40 / 30= 1.333 kg/cm2

    = 13.33 T/m2

    Corrected N value

    CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-02Sheet No : 1

    ALLOWABLE BEARING PRESSURE FOR 40 MM SETTLEMENT

    Width of footing (B)Depth of footing (D)Water table correction(W')

    NAME OF PROJECT:-SOIL INVESTIGATION FOR GOLE BAZAR CHHAK. CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE

    GEOTECHNICAL INVESTIGATIONS &FOUNDATION ENGINEERING

  • 40

    = 2.0 m = 200 cm= 4.5 m = 450 cm= 0.5 m

    SPT 'N' VALUE OBSERVED = 31

    = 23Due to over burden pressureAs per IS 8009 part I 1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976 Figure - 9 , P.P-17

    = 0.012 m d = ( WT - D)= 12.00 mm (After applying W') d/b= 24 mm Adopted water table correction (W')

    Premissable settlement = 40 mm

    Therefore Allowable Bearing pressure

    = 40 / 24= 1.667 kg/cm2

    = 16.67 T/m2

    Corrected N value

    CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-02Sheet No : 1

    FOUNDATION ENGINEERING

    CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE NAME OF PROJECT:-SOIL INVESTIGATION FOR GOLE BAZAR CHHAK.

    ALLOWABLE BEARING PRESSURE FOR 40 MM SETTLEMENT

    Width of footing (B)Depth of footing (D)Water table correction(W')

    GEOTECHNICAL INVESTIGATIONS &

  • 41

    = 2.0 m = 200 cm= 6.0 m = 600 cm= 0.5 m

    SPT 'N' VALUE OBSERVED = 38

    = 27Due to over burden pressureAs per IS 8009 part I 1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976 Figure - 9 , P.P-17

    = 0.009 m d = ( WT - D)= 9.00 mm (After applying W') d/b= 18 mm Adopted water table correction (W')

    Premissable settlement = 40 mm

    Therefore Allowable Bearing pressure

    = 40 / 18= 2.222 kg/cm2

    = 22.22 T/m2

    Corrected N value

    CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-02Sheet No : 1

    FOUNDATION ENGINEERING

    CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE NAME OF PROJECT:-SOIL INVESTIGATION FOR GOLE BAZAR CHHAK.

    ALLOWABLE BEARING PRESSURE FOR 40 MM SETTLEMENT

    Width of footing (B)Depth of footing (D)Water table correction(W')

    GEOTECHNICAL INVESTIGATIONS &

  • 42

    NAME OF THE WORK : SOIL INVESTIGATION WORKS FOR GOLE BAZAR CHHAK.Data for the safe Bearing capacity calculation:

    (NonCohesive Soil)SPT 'N' = 20 unconfined compressive strength qu = N/7.5 kg/cm2

    = 18 C = qu/2 = 0.00 T/sq.mDepth = 1.5 M = 33 degreeWidth = 2.0 M yt = 1.72 gm/cc

    If the 36 General shear failure condition is to be considered.

    LOCAL SHEAR FAILURE CONDITION' = tan^ (-1)(0.67x tan) = 23.0 DegreeC' = 0.67C = 0.00 T/sq.m

    AS PER IS :6403-1981,TABLE-1 = 2.67 (from lab test)Nc' = 18.364 G = 2.67Nq' = 8.956 q = Yt X Df

    N' = 8.684 = 1.72 X 1.50 = 2.58 T/M `By = Width X Yt

    2.0 X 1.72 = 3.4 T/M AS PER IS :6403-1981,TABLE-2 Sc = 1.0 Sq = 1.0 Sy = 1.0 AS PER IS :6403-1981,5.1.2.2dc = 1.21 dq = 1.10 d = 1.10 (Since > 10)

    AS PER IS :6403-1981,5.1.2.3ic = 1 iq = 1 i = 1 W = 0.5

    0.5Qult = (C NcSc dc ic)+y.d.(Nq-1)Sq dq iq+1/2 By NySy dy Iy W'

    = x 18.36 x 1.0 x 1.21 x 1+ 2.58 x 7.956 x 1.0 x 1.10 x 1+ 0.5 x 3.4 x 8.68 x 1.0 x 1.10 x 1.0 x 0.5

    = 0.0 + 22.58 + 8.2151= 30.794 T/M

    Qult = 30.79 T/sq.M3

    SBC = 10.26 T/sq.m

    0.000

    Assuming the Factor of Safety as =

    Based on the above 'N' value the following ' ' values are obtained from the fig.1 of the IS: 6403-1981 less soils (C=0). And for cohesive soils ( =0) the 'c' value is considered from the relation "Note:- Where ever the test results are not available the same was assumed based on the available values.

    Specific gravity of soil at 1.5 m depth (G)

    Assuming the depth factor, shape factor and load inclination factors as unity.Assuming the water table correction factor (W') as the ultimate bearing capacity is calculated as below:

    CADD CONSULTING ENGINEERS (P) LTD Bore hole no:-2GEO - TECHNICAL INVESTIGATION & Sheet No :- 1

    FOUNDATION ENGINEERING.

    Corrected '

  • 43

    NAME OF THE WORK : SOIL INVESTIGATION WORKS FOR GOLE BAZAR CHHAK.Data for the safe Bearing capacity calculation:

    (NonCohesive Soil)SPT 'N' = 31 unconfined compressive strength qu = N/7.5 kg/cm2

    = 23 C = qu/2 = 0.00 T/sq.mDepth = 4.5 M = 34 degreeWidth = 2.0 M yt = 1.74 gm/cc

    If the 36 General shear failure condition is to be considered.

    LOCAL SHEAR FAILURE CONDITION' = tan^ (-1)(0.67x tan) = 24.0 DegreeC' = 0.67C = 0.00 T/sq.m

    AS PER IS :6403-1981,TABLE-1 = 2.67 (from lab test)Nc' = 19.542 G = 2.67Nq' = 9.808 q = Yt X Df

    N' = 9.782 = 1.74 X 4.50 = 7.83 T/M `By = Width X Yt

    2.0 X 1.74 = 3.5 T/M AS PER IS :6403-1981,TABLE-2

    Sc = 1.0 Sq = 1.0 Sy = 1.0 AS PER IS :6403-1981,5.1.2.2

    dc = 1.66 dq = 1.33 d = 1.33 (Since > 10) AS PER IS :6403-1981,5.1.2.3

    ic = 1 iq = 1 i = 1 W = 0.5

    0.5Qult = (C NcSc dc ic)+y.d.(Nq-1)Sq dq iq+1/2 By NySy dy Iy W'

    = x 19.54 x 1.0 x 1.66 x 1+ 7.83 x 8.808 x 1.0 x 1.33 x 1+ 0.5 x 3.5 x 9.78 x 1.0 x 1.33 x 1.0 x 0.5

    = 0.0 + 91.7256312 + 11.32= 103.044 T/M

    Qult = 103.04 T/sq.M3

    SBC = 34.35 T/sq.m

    CADD CONSULTING ENGINEERS (P) LTD Bore hole no:-2GEO - TECHNICAL INVESTIGATION & Sheet No :- 1

    FOUNDATION ENGINEERING.

    Corrected 'N'

    0.000

    Assuming the Factor of Safety as =

    Based on the above 'N' value the following ' ' values are obtained from the fig.1 of the IS: 6403-1981 for cohesion less soils (C=0). And for cohesive soils ( =0) the 'c' value is considered from the relation "Note:- Where ever the test results are not available the same was assumed based on the available values.

    Specific gravity of soil at 4.5 m depth (G)

    Assuming the depth factor, shape factor and load inclination factors as unity.Assuming the water table correction factor (W') as the ultimate bearing capacity is calculated as below:

  • 44

    NAME OF THE WORK : SOIL INVESTIGATION WORKS FOR GOLE BAZAR CHHAK.Data for the safe Bearing capacity calculation:

    (NonCohesive Soil)SPT 'N' = 38 unconfined compressive strength qu = N/7.5 kg/cm2

    = 27 C = qu/2 = 0.00 T/sq.mDepth = 6.0 M = 35 degreeWidth = 2.0 M yt = 1.77 gm/cc

    If the 36 General shear failure condition is to be considered.

    LOCAL SHEAR FAILURE CONDITION' = tan^ (-1)(0.67x tan) = 25.0 DegreeC' = 0.67C = 0.00 T/sq.m

    AS PER IS :6403-1981,TABLE-1 = 2.67 (from lab test)Nc' = 20.720 G = 2.67Nq' = 10.660 q = Yt X Df

    N' = 10.880 = 1.77 X 6.00 = 10.62 T/M `By = Width X Yt

    2.0 X 1.77 = 3.5 T/M AS PER IS :6403-1981,TABLE-2

    Sc = 1.0 Sq = 1.0 Sy = 1.0 AS PER IS :6403-1981,5.1.2.2

    dc = 1.89 dq = 1.44 d = 1.44 (Since > 10) AS PER IS :6403-1981,5.1.2.3

    ic = 1 iq = 1 i = 1 W = 0.5

    0.5Qult = (C NcSc dc ic)+y.d.(Nq-1)Sq dq iq+1/2 By NySy dy Iy W'

    = x 20.72 x 1.0 x 1.89 x 1+ 10.62 x 9.66 x 1.0 x 1.44 x 1+ 0.5 x 3.5 x 10.88 x 1.0 x 1.44 x 1.0 x 0.5

    = 0.0 + 147.728448 + 13.87= 161.594 T/M

    Qult = 161.59 T/sq.M3

    SBC = 53.86 T/sq.m

    CADD CONSULTING ENGINEERS (P) LTD Bore hole no:-2GEO - TECHNICAL INVESTIGATION & Sheet No :- 1

    FOUNDATION ENGINEERING.

    Corrected 'N'

    0.000

    Assuming the Factor of Safety as =

    Based on the above 'N' value the following ' ' values are obtained from the fig.1 of the IS: 6403-1981 for cohesion less soils (C=0). And for cohesive soils ( =0) the 'c' value is considered from the relation "Note:- Where ever the test results are not available the same was assumed based on the available values.

    Specific gravity of soil at 6.0m depth (G)

    Assuming the depth factor, shape factor and load inclination factors as unity.Assuming the water table correction factor (W') as the ultimate bearing capacity is calculated as below:

  • 45

    Depth of foundation = 3.0 mtr = 300 cmWidth of the footing = 2.0 mtr = 200 cm (Assumed)

    C = 0.38 kg/cm (From lab test) = 3 (From lab test)

    Void ratio e = 0.75 (Assumed)' =' = 2

    G = 2.67Satureted

    density =(G+e)/ (1+e) = 1.95 gm/cc

    Ys = 0.954 gm/ccq = 0.954 x 300 / 1000 = 0.286 kg/cm

    B = 0.954 x 200 / 1000 = 0.191 kg/cm AS PER IS :6403-1981,TABLE-1

    Nc' = 5.68Nq' = 1.228

    N' = 0.18 AS PER IS :6403-1981,TABLE-2

    Sc = 1.3 Sq = 1.2 S = 0.8 AS PER IS :6403-1981,5.1.2.2 ( shape factor for square foundation)

    dc = 1.26 dq = 1.00 d = 1.00 (Since

  • 46

    Depth of foundation = 3.0 mtr = 300 cmWidth of the footing = 2.0 mtr = 200 cm (Assumed)

    C = 0.38 kg/cm (From lab test) = 3 (From lab test)

    Void ratio e = 0.55 (Assumed)

    G = 2.67Satureted

    density =(G+e)/ (1+e) = 2.08 gm/cc

    Ys = 1.077 gm/ccq = 1.077 x 300 / 1000 = 0.323 kg/cm

    B = 1.077 x 200 / 1000 = 0.215 kg/cm AS PER IS :6403-1981,TABLE-1

    Nc = 5.95Nq = 1.342

    N = 0.27 AS PER IS :6403-1981,TABLE-2

    Sc = 1.3 Sq = 1.2 S = 0.8 ( shape factor for square foundation) AS PER IS :6403-1981,5.1.2.2

    dc = 1.26 dq = 1.00 d = 1.00 (Since

  • 47

    Depth of foundation = 3.0 m = 300 cm Width of foundation = 2.0 m = 200 cm

    FMC = 18%Y = 1.90 gm/ccC = 0.38= 3 G= 2.67e= 0.65

    Ysub= 1.01q = 0.30

    A= bearing at 0.75(void ratio) = 2.42B= bearing at 0.55(void ratio) = 3.85F= void ratio at 0.65 = 0.65D= void ratio 0.75 = 0.75N= Requiard bearing capacity

    at 0.65(void ratio)

    N = A+{(B-A)(D-F)}/0.20N = [ 2.42 + { ( 3.85 - 2.42 ) x ( 0.75 - 0.65 )}] / 0.20

    = 2.42 0.715 = 3.13 kg/cm

    Taking factor of safety = 2.5

    SBC = N / 2.5 + Yd / 1000= 3.13 / 2.5 + 0.304= 1.25328 + 0.30= 1.557 kg/cm= 15.57 T/M

    FOUNDATION ENGINEERING.

    +

    CALCULATION OF SBC AT 3.0M DEPTH INTORPOLATION FOR ACTUAL VOID RATIO 0.65

    Bore hole no-2Sheet No : 3

    CADD CONSULTING ENGINEERS (P) LTDGEO - TECHNICAL INVESTIGATION &

  • 48

    BORE HOLE NO : 2 Size of foundation = 2 m. Depth of Foundation = m.

    Significant depth = 1.5 x 2 = 3.0 m.

    FROM IS CODE : 8009 (PART - 1) -1976 Sf = H X Cc / ( 1 + e0 ) x [ log10 x ( po + ^p ) / po ].

    WL = Yt = G = Yd = W = Ysub = {( G - 1 ) / ( 1 + e ) } = Compression Index = Cc = x( WL - 10 )

    = x( 33 - 10 )=

    Initial Pressure = po = ( Ysub x Df )= T/M

    Void Ratio = e0 = {( G x Yw )/ Yd )- 1= {( x 1 ) / )- 1= ( / ) - 1=

    Height of Compressive Layer = Mtr. Final Settlement

    Sf = H X Cc / ( 1 + e0 ) x [ log10 x ( po + ^p ) / po ]= 3 X / ( 1 + ) x [ x ( + 1 ) / ]= / x x ( / ]= X= X

    = Mtr.

    = mm.

    Safe Bearing Capacity = T/M

    Limiting Bearing Pressure for allowable Settlement 50mm.= ( x 50 )/ 46= T/M

    SHEET NO : 1

    0.621

    46

    15.57

    0.658

    2.67

    3

    1.61

    3.0211.658 log10 4.021013.021log10 3.0210.207 0.6584

    16.77

    0.374 log10 1.3310.374 0.124

    0.0464

    15.57

    1.6118

    0.009

    2.67 1.61

    0.0090.207

    3.021

    LOCATION:-GOLE BAZAR CHHAK.

    1.007

    CADD CONSULTING ENGINEERS (P) LTDGEO - TECHNICAL INVESTIGATION &

    FOUNDATION ENGINEERING.

    SETTLEMENT CALCULATION OF FOUNDATION ON COHESIVE SOIL

    3.0

    33 1.902.67

  • 49

    SUMMARY OF GEOTECHNICAL PARAMETERS & SAFE BEARING CAPACITY

    BH DEPTH

    BGL

    TYPE OF BULK DENSITY, SPT-N N

    CORRECTION

    ARRIVED

    ALLOWABLE

    BERING PRESSURE

    ALLOWABLE BERING PRESSURE

    ALLOWABLE BERING

    PRESSURE

    NO (M) SAMPLE gm/cc VALUE VALUEC

    KG/CM2

    DEGREE SBC T/MFOR 50

    mm SETTELEMENT T/M

    FOR 25mm SETTELEME

    NT T/M

    FOR 40mm SETTELEMENT

    T/M

    3.0

    -SPT

    FOOTING IN M

    SHEAR PARAMETER

    -2X21.5

    0.38 31.90

    20 -

    (2X2)

    BH NO :- 2 SHEET NO : 1

    34.35 10.42 16.67

    CADD CONSULTING ENGINEERS (P) LTD.GEO - TECHNICAL INVESTIGATION &

    FOUNDATION ENGINEERING.

    31

    -

    23 -

    8.33 13.3310.26

    NAME OF WORK:- SOIL INVESTIGATION WORKS FOR GOLE BAZAR CHHAK.

    -

    UDS -(2X2) 15.57 --

    18

    4.5

    13.89 22.226.0 (2X2) SPT - 38 27

    2

    -

    16.77

    -

    -- - 53.86

    SPT -

  • 50

    CADD CONSULTING ENGINEERS PVT.LTD GEO-TECHNICAL INVESTIGATION &

    FOUNDATION ENGINEERING.

    Sheet No:1

    ANALYSIS OF THE SUB SOIL INVESTIGATION TEST RESULT

    PROJECT: GOLE BAZAR CHHAK.

    BOREHOLE NO- 2

    Borehole no- 2, was sunk up to an average depth of 10.4m the sub soil strata of the Borehole is given in litho

    logical form and summarized as follows.

    STRATUM

    The top layer up to an average depth up to 1.5 m consists of packing boulders and from 1.5m to 7.2m depth is hard clay.

    The stratum below an average depth from 7.2 m to 10.4 m is consists rock strata

    The strata are moderately medium to dense compact and medium plasticity.

    The SPT value tabulated in bore log data sheet. The core recovery was observed during investigation and tabulated in bore log data sheet.

    The ground water table was encountered at 1.9m within boring depth.

  • PROPERTIES OF BORE HOLE 03

  • ENGINEERING PROPERTIES OF SOIL

    PROJECT: ARABIND SCHOOL,CHAINGE-1421.8M (BH NO- 3 )

    Sl. N

    o.

    soil

    sam

    ple

    colle

    cted

    at

    Type

    of s

    ampl

    e co

    llecte

    d at

    Grain size analysis Atterbergs Limits in %

    Field

    Moi

    sture

    Co

    nten

    t in

    % Bu

    lk De

    nsity

    in

    gm/cc

    . Dr

    y De

    nsity

    in

    gm/cc

    . Co

    hesio

    n (C

    ) Kg

    f/cm

    Angl

    e of s

    hear

    ing

    resis

    tance

    ()

    In d

    egre

    e Sp

    ecifi

    c Gra

    vity

    Void

    Rati

    o

    D.F.

    S. in

    %

    Field

    S.P

    .T. v

    alue

    Grou

    p of

    soil

    Fine

    Gra

    vel in

    %

    (10m

    m to

    4.75

    mm

    )

    Coar

    se sa

    nd in

    %

    (4.75

    mm

    to

    2.00m

    m)

    Medi

    um sa

    nd in

    %

    (2m

    m to

    0.42

    5mm

    ) Fi

    ne sa

    nd in

    %

    (0.42

    5mm

    to

    0.075

    mm

    ) Si

    lt & C

    lay in

    %

    (0.07

    5mm

    to

    0.001

    mm

    )

    Liqu

    id L

    imit i

    n %

    Plas

    tic L

    imit i

    n %

    Plas

    ticity

    Inde

    x in

    %

    1 1.5 SPT - 6 18 71 5 NP NP NP 12 - - - - 2.61 - 11 SP

    2 3.0 SPT - 8 21 67 4 NP NP NP 12 - - - - 2.60 - 16 SP

    3 4.5 SPT - 10 18 66 6 NP NP NP 13 - - - - 2.60 - 18 SP

    4 6.0 SPT - 6 11 25 58 31 14 17 18 - - - - 2.67 - 24 40 CL

    5 7.5 SPT - 8 13 19 60 31 15 16 18 - - - - 2.67 - 28 42 CL

    6 9.0 SPT - 6 21 23 50 30 14 16 18 - - - - 2.66 - 57 CL 9.5M TO 10.5M CORE RECOVERY =22% & RQD =NIL 10.5M TO 11.5M CORE RECOVERY = 25% & RQD =12% 11.5M TO 12.5M CORE RECOVERY = 30% & RQD = 18%

    12.5M TO 13.5M CORE RECOVERY = 38% & RQD =24%

    13.5M TO 14.5M CORE RECOVERY =40% & RQD = 31%

    14.5M TO 15.0M CORE RECOVERY = 52% & RQD = 40% 52

  • 54

    SOAK

    ED

    UNSO

    AKED

    9.5m to

    10.5m22% NIL 0.28% 12.1% 4.1 - - - 82 2.68 2.68 42.9 1

    10.5m to 11.5m 25% 12% 0.27% 10.6% 4.2 4.5 108 112 84 2.67 2.66 42.0 2

    11.5m to 12.5m 30% 18% 0.26% 10.2% 4.4 5.1 123 129 87 2.67 2.66 41.1 3

    12.5m to 13.5m 38% 24% 0.29% 11.4% 4.7 5.5 132 139 88 2.69 2.66 43.8 4

    13.5m to 14.5m 40% 31% 0.31% 11.4% 5.2 5.8 141 147 87 2.67 2.66 45.5 5

    14.5m to 15.0m 52% 40% 0.31% 11.0% 5.5 6.1 147 153 88 2.67 2.66 45.5 6

    NOTE:- Nj = 0.1qs= S.B.C OF ROCK IN T/M2qs (qu) X NjSBC is conservatively Restricted to 80 T / M2 for designed purposed.

    BORE HOLE NO -03

    CADD CONSULTING ENGINEERS PVT.LTD.GEO - TECHNICAL INVESTIGATION &

    UNIT

    WEI

    GHT

    OF R

    OCK

    (g/cc

    )

    HARD

    NESS

    (H,S

    CALE

    MOH

    S)

    SOUN

    DNES

    S

    FOUNDATION ENGINEERING.SUMMARY OF FOUNDATION DETAILS OF ROCK SAMPLES

    LOCATION:-R&B SAMBALPUR (ARABIND SCHOOL),(CHAINGE-1421.8M).

    SAMP

    LES

    REF:

    NO

    BORE

    HOL

    E

    DEPT

    H OF

    FOU

    NDAT

    ION

    BGL

    (m)

    PORO

    SITY

    (MG/

    (1+M

    G)X1

    00

    1 BH-3

    SPEC

    IFIC

    GRA

    VITY

    RQD

    %

    CORE

    REC

    OVER

    Y %

    SL. N

    O

    UNCO

    NFIN

    ED

    COMP

    RESS

    ION

    ST

    RENG

    TH O

    F RO

    CK

    IN T

    /M2

    (qs =

    qu

    * NJ)

    POIN

    T LO

    AD S

    TREN

    GTH

    INDE

    X

    MOIS

    TER

    CONT

    ENT

    (%)

    SLAK

    E UD

    RABI

    LITY

    INDE

    X (1

    0 m

    nts c

    ycle)

  • 55

    LOCATION:-ARABIND SCHOOL,(CHAINGE-1421.8M).

    10.5M TO 11.5M

    qs = qc x Nj

    From laboratory test data qc = 108 = 1080 T / M2

    qs = 1080 x 0.1 = 108 T / M2

    SBC is conservatively Restricted to 80 T / M2 for designed purposed.

    Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) = Thickness of discontinues (cm)S = Spacing of discontinues (cm)Bf = Footing Width

    From table 4 of IS :12070 For spacing of discontinues from 30 cm to 100 cm Nj = 0.1

    kg / cm2

    Including FOS 3

    GEO - TECHNICAL INVESTIGATION & FOUNDATION ENGINEERING.

    DEPTH OF FOUNDATION -

    AS PER CI .6 OF IS:12070

    qs = Safe Bearing Pressure (gross)

    CADD CONSULTING ENGINEERS PVT.LTD.

    Where :

    BH NO -03

    qc = Average UCS of rock coresNj = Empirical coefficient

  • 56

    LOCATION:-ARABIND SCHOOL,(CHAINGE-1421.8M).

    11.5M TO 12.5M

    qs = qc x Nj

    From laboratory test data qc = 123 = 1230 T / M2

    qs = 1230 x 0.1 = 123 T / M2

    SBC is conservatively Restricted to 80 T / M2 for designed purposed.

    Nj = Empirical coefficient

    Including FOS 3Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) = Thickness of discontinues (cm)S = Spacing of discontinues (cm)Bf = Footing Width

    AS PER CI .6 OF IS:12070

    Where : qs = Safe Bearing Pressure (gross)qc = Average UCS of rock cores

    From table 4 of IS :12070 For spacing of discontinues from 30 cm to 100 cm Nj = 0.1

    kg / cm2

    CADD CONSULTING ENGINEERS PVT.LTD.GEO - TECHNICAL INVESTIGATION &

    FOUNDATION ENGINEERING.BH NO -03

    DEPTH OF FOUNDATION -

  • 57

    LOCATION:-ARABIND SCHOOL,(CHAINGE-1421.8M).

    12.5M TO 13.5M

    qs = qc x Nj

    From laboratory test data qc = 132 = 1320 T / M2

    qs = 1320 x 0.1 = 132 T / M2

    SBC is conservatively Restricted to 80 T / M2 for designed purposed.

    Nj = Empirical coefficient

    Including FOS 3Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) = Thickness of discontinues (cm)S = Spacing of discontinues (cm)Bf = Footing Width

    AS PER CI .6 OF IS:12070

    Where : qs = Safe Bearing Pressure (gross)qc = Average UCS of rock cores

    From table 4 of IS :12070 For spacing of discontinues from 30 cm to 100 cm Nj = 0.1

    kg / cm2

    CADD CONSULTING ENGINEERS PVT.LTD.GEO - TECHNICAL INVESTIGATION &

    FOUNDATION ENGINEERING.BH NO -03

    DEPTH OF FOUNDATION -

  • 58

    LOCATION:-ARABIND SCHOOL,(CHAINGE-1421.8M).

    13.5M TO 14.5M

    qs = qc x Nj

    From laboratory test data qc = 141 = 1410 T / M2

    qs = 1410 x 0.1 = 141 T / M2

    SBC is conservatively Restricted to 80 T / M2 for designed purposed.

    Nj = Empirical coefficient

    Including FOS 3Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) = Thickness of discontinues (cm)S = Spacing of discontinues (cm)Bf = Footing Width

    AS PER CI .6 OF IS:12070

    Where : qs = Safe Bearing Pressure (gross)qc = Average UCS of rock cores

    From table 4 of IS :12070 For spacing of discontinues from 30 cm to 100 cm Nj = 0.1

    kg / cm2

    CADD CONSULTING ENGINEERS PVT.LTD.GEO - TECHNICAL INVESTIGATION &

    FOUNDATION ENGINEERING.BH NO -03

    DEPTH OF FOUNDATION -

  • 59

    LOCATION:-ARABIND SCHOOL,(CHAINGE-1421.8M).

    14.5M TO 15.0

    qs = qc x Nj

    From laboratory test data qc = 147 = 1470 T / M2

    qs = 1470 x 0.1 = 147 T / M2

    SBC is conservatively Restricted to 80 T / M2 for designed purposed.

    Nj = Empirical coefficient

    Including FOS 3Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) = Thickness of discontinues (cm)S = Spacing of discontinues (cm)Bf = Footing Width

    AS PER CI .6 OF IS:12070

    Where : qs = Safe Bearing Pressure (gross)qc = Average UCS of rock cores

    From table 4 of IS :12070 For spacing of discontinues from 30 cm to 100 cm Nj = 0.1

    kg / cm2

    CADD CONSULTING ENGINEERS PVT.LTD.GEO - TECHNICAL INVESTIGATION &

    FOUNDATION ENGINEERING.BH NO -03

    DEPTH OF FOUNDATION -

  • 60

    = 2.0 m = 200 cm= 1.5 m = 150 cm= 0.5 m

    SPT 'N' VALUE OBSERVED = 11

    = 11Due to over burden pressureAs per IS 8009 part I 1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976 Figure - 9 , P.P-17

    = 0.030 m d = ( WT - D)= 30.00 mm (After applying W') d/b= 60 mm Adopted water table correction (W')

    Premissable settlement = 25 mm

    Therefore Allowable Bearing pressure

    = 25 / 60= 0.417 kg/cm2

    = 4.17 T/m2

    Corrected N value

    CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-03Sheet No : 1

    ALLOWABLE BEARING PRESSURE FOR 25 MM SETTLEMENT

    Width of footing (B)Depth of footing (D)Water table correction(W')

    NAME OF PROJECT:-SOIL INVESTIGATION NEAR ARABIND SCHOOL. CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE

    GEOTECHNICAL INVESTIGATIONS &FOUNDATION ENGINEERING

  • 61

    = 2.0 m = 200 cm= 3.0 m = 300 cm= 0.5 m

    SPT 'N' VALUE OBSERVED = 16

    = 16Due to over burden pressureAs per IS 8009 part I 1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976 Figure - 9 , P.P-17

    = 0.017 m d = ( WT - D)= 17.00 mm (After applying W') d/b= 34 mm Adopted water table correction (W')

    Premissable settlement = 25 mm

    Therefore Allowable Bearing pressure

    = 25 / 34= 0.735 kg/cm2

    = 7.35 T/m2

    Corrected N value

    CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-03Sheet No : 1

    FOUNDATION ENGINEERING

    CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE NAME OF PROJECT:-SOIL INVESTIGATION NEAR ARABIND SCHOOL.

    ALLOWABLE BEARING PRESSURE FOR 25 MM SETTLEMENT

    Width of footing (B)Depth of footing (D)Water table correction(W')

    GEOTECHNICAL INVESTIGATIONS &

  • 62

    = 2.0 m = 200 cm= 4.5 m = 450 cm= 0.5 m

    SPT 'N' VALUE OBSERVED = 18

    = 17Due to over burden pressureAs per IS 8009 part I 1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976 Figure - 9 , P.P-17

    = 0.016 m d = ( WT - D)= 16.00 mm (After applying W') d/b= 32 mm Adopted water table correction (W')

    Premissable settlement = 25 mm

    Therefore Allowable Bearing pressure

    = 25 / 32= 0.781 kg/cm2

    = 7.81 T/m2

    Corrected N value

    CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-03Sheet No : 1

    FOUNDATION ENGINEERING

    CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE NAME OF PROJECT:-SOIL INVESTIGATION NEAR ARABIND SCHOOL.

    ALLOWABLE BEARING PRESSURE FOR 25 MM SETTLEMENT

    Width of footing (B)Depth of footing (D)Water table correction(W')

    GEOTECHNICAL INVESTIGATIONS &

  • 63

    = 2.0 m = 200 cm= 6.0 m = 600 cm= 0.5 m

    SPT 'N' VALUE OBSERVED = 40

    = 28Due to over burden pressureAs per IS 8009 part I 1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976 Figure - 9 , P.P-17

    = 0.009 m d = ( WT - D)= 9.00 mm (After applying W') d/b= 18 mm Adopted water table correction (W')

    Premissable settlement = 25 mm

    Therefore Allowable Bearing pressure

    = 25 / 18= 1.389 kg/cm2

    = 13.89 T/m2

    Corrected N value

    CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-03Sheet No : 1

    FOUNDATION ENGINEERING

    CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE NAME OF PROJECT:-SOIL INVESTIGATION NEAR ARABIND SCHOOL.

    ALLOWABLE BEARING PRESSURE FOR 25 MM SETTLEMENT

    Width of footing (B)Depth of footing (D)Water table correction(W')

    GEOTECHNICAL INVESTIGATIONS &

  • 64

    = 2.0 m = 200 cm= 7.5 m = 750 cm= 0.5 m

    SPT 'N' VALUE OBSERVED = 42

    = 29Due to over burden pressureAs per IS 8009 part I 1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976 Figure - 9 , P.P-17

    = 0.0085 m d = ( WT - D)= 8.50 mm (After applying W') d/b= 17 mm Adopted water table correction (W')

    Premissable settlement = 25 mm

    Therefore Allowable Bearing pressure

    = 25 / 17= 1.471 kg/cm2

    = 14.71 T/m2

    Corrected N value

    CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-03Sheet No : 1

    FOUNDATION ENGINEERING

    CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE NAME OF PROJECT:-SOIL INVESTIGATION NEAR ARABIND SCHOOL.

    ALLOWABLE BEARING PRESSURE FOR 25 MM SETTLEMENT

    Width of footing (B)Depth of footing (D)Water table correction(W')

    GEOTECHNICAL INVESTIGATIONS &

  • 65

    = 2.0 m = 200 cm= 9.0 m = 900 cm= 0.5 m

    SPT 'N' VALUE OBSERVED = 57

    = 36Due to over burden pressureAs per IS 8009 part I 1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976 Figure - 9 , P.P-17

    = 0.0065 m d = ( WT - D)= 6.50 mm (After applying W') d/b= 13 mm Adopted water table correction (W')

    Premissable settlement = 25 mm

    Therefore Allowable Bearing pressure

    = 25 / 13= 1.923 kg/cm2

    = 19.23 T/m2

    Corrected N value

    CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-03Sheet No : 1

    FOUNDATION ENGINEERING

    CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE NAME OF PROJECT:-SOIL INVESTIGATION NEAR ARABIND SCHOOL.

    ALLOWABLE BEARING PRESSURE FOR 25 MM SETTLEMENT

    Width of footing (B)Depth of footing (D)Water table correction(W')

    GEOTECHNICAL INVESTIGATIONS &

  • 66

    = 2.0 m = 200 cm= 1.5 m = 150 cm= 0.5 m

    SPT 'N' VALUE OBSERVED = 11

    = 11Due to over burden pressureAs per IS 8009 part I 1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976 Figure - 9 , P.P-17

    = 0.030 m d = ( WT - D)= 30.00 mm (After applying W') d/b= 60 mm Adopted water table correction (W')

    Premissable settlement = 40 mm

    Therefore Allowable Bearing pressure

    = 40 / 60= 0.667 kg/cm2

    = 6.67 T/m2

    Corrected N value

    CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-03Sheet No : 1

    ALLOWABLE BEARING PRESSURE FOR 40 MM SETTLEMENT

    Width of footing (B)Depth of footing (D)Water table correction(W')

    NAME OF PROJECT:-SOIL INVESTIGATION NEAR ARABIND SCHOOL. CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE

    GEOTECHNICAL INVESTIGATIONS &FOUNDATION ENGINEERING

  • 67

    = 2.0 m = 200 cm= 3.0 m = 300 cm= 0.5 m

    SPT 'N' VALUE OBSERVED = 16

    = 16Due to over burden pressureAs per IS 8009 part I 1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976 Figure - 9 , P.P-17

    = 0.017 m d = ( WT - D)= 17.00 mm (After applying W') d/b= 34 mm Adopted water table correction (W')

    Premissable settlement = 40 mm

    Therefore Allowable Bearing pressure

    = 40 / 34= 1.176 kg/cm2

    = 11.76 T/m2

    Corrected N value

    CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-03Sheet No : 1

    FOUNDATION ENGINEERING

    CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE NAME OF PROJECT:-SOIL INVESTIGATION NEAR ARABIND SCHOOL.

    ALLOWABLE BEARING PRESSURE FOR 40 MM SETTLEMENT

    Width of footing (B)Depth of footing (D)Water table correction(W')

    GEOTECHNICAL INVESTIGATIONS &

  • 68

    = 2.0 m = 200 cm= 4.5 m = 450 cm= 0.5 m

    SPT 'N' VALUE OBSERVED = 18

    = 17Due to over burden pressureAs per IS 8009 part I 1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976 Figure - 9 , P.P-17

    = 0.016 m d = ( WT - D)= 16.00 mm (After applying W') d/b= 32 mm Adopted water table correction (W')

    Premissable settlement = 40 mm

    Therefore Allowable Bearing pressure

    = 40 / 32= 1.250 kg/cm2

    = 12.50 T/m2

    Corrected N value

    CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-03Sheet No : 1

    FOUNDATION ENGINEERING

    CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE NAME OF PROJECT:-SOIL INVESTIGATION NEAR ARABIND SCHOOL.

    ALLOWABLE BEARING PRESSURE FOR 40 MM SETTLEMENT

    Width of footing (B)Depth of footing (D)Water table correction(W')

    GEOTECHNICAL INVESTIGATIONS &

  • 69

    = 2.0 m = 200 cm= 6.0 m = 600 cm= 0.5 m

    SPT 'N' VALUE OBSERVED = 40

    = 28Due to over burden pressureAs per IS 8009 part I 1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976 Figure - 9 , P.P-17

    = 0.009 m d = ( WT - D)= 9.00 mm (After applying W') d/b= 18 mm Adopted water table correction (W')

    Premissable settlement = 40 mm

    Therefore Allowable Bearing pressure

    = 40 / 18= 2.222 kg/cm2

    = 22.22 T/m2

    Corrected N value

    CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-03Sheet No : 1

    FOUNDATION ENGINEERING

    CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE NAME OF PROJECT:-SOIL INVESTIGATION NEAR ARABIND SCHOOL.

    ALLOWABLE BEARING PRESSURE FOR 40 MM SETTLEMENT

    Width of footing (B)Depth of footing (D)Water table correction(W')

    GEOTECHNICAL INVESTIGATIONS &

  • 70

    = 2.0 m = 200 cm= 7.5 m = 750 cm= 0.5 m

    SPT 'N' VALUE OBSERVED = 42

    = 29Due to over burden pressureAs per IS 8009 part I 1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976 Figure - 9 , P.P-17

    = 0.0085 m d = ( WT - D)= 8.50 mm (After applying W') d/b= 17 mm Adopted water table correction (W')

    Premissable settlement = 40 mm

    Therefore Allowable Bearing pressure

    = 40 / 17= 2.353 kg/cm2

    = 23.53 T/m2

    Corrected N value

    CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-03Sheet No : 1

    FOUNDATION ENGINEERING

    CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE NAME OF PROJECT:-SOIL INVESTIGATION NEAR ARABIND SCHOOL.

    ALLOWABLE BEARING PRESSURE FOR 40 MM SETTLEMENT

    Width of footing (B)Depth of footing (D)Water table correction(W')

    GEOTECHNICAL INVESTIGATIONS &

  • 71

    = 2.0 m = 200 cm= 9.0 m = 900 cm= 0.5 m

    SPT 'N' VALUE OBSERVED = 57

    = 36Due to over burden pressureAs per IS 8009 part I 1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976 Figure - 9 , P.P-17

    = 0.0065 m d = ( WT - D)= 6.50 mm (After applying W') d/b= 13 mm Adopted water table correction (W')

    Premissable settlement = 40 mm

    Therefore Allowable Bearing pressure

    = 40 / 13= 3.077 kg/cm2

    = 30.77 T/m2

    Corrected N value

    CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-03Sheet No : 1

    FOUNDATION ENGINEERING

    CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE NAME OF PROJECT:-SOIL INVESTIGATION NEAR ARABIND SCHOOL.

    ALLOWABLE BEARING PRESSURE FOR 40 MM SETTLEMENT

    Width of footing (B)Depth of footing (D)Water table correction(W')

    GEOTECHNICAL INVESTIGATIONS &

  • 72

    NAME OF THE WORK : SOIL INVESTIGATION WORKS NEAR ARABIND SCHOOL.Data for the safe Bearing capacity calculation:

    (NonCohesive Soil)SPT 'N' = 11 unconfined compressive strength qu = N/7.5 kg/cm2

    = 11 C = qu/2 = 0.00 T/sq.mDepth = 1.5 M = 32 degreeWidth = 2.0 M yt = 1.72 gm/cc

    If the 36 General shear failure condition is to be considered.

    LOCAL SHEAR FAILURE CONDITION' = tan^ (-1)(0.67x tan) = 23.0 DegreeC' = 0.67C = 0.00 T/sq.m

    AS PER IS :6403-1981,TABLE-1 = 2.61 (from lab test)Nc' = 18.364 G = 2.61Nq' = 8.956 q = Yt X Df

    N' = 8.684 = 1.72 X 1.50 = 2.58 T/M `By = Width X Yt

    2.0 X 1.72 = 3.4 T/M AS PER IS :6403-1981,TABLE-2 Sc = 1.0 Sq = 1.0 Sy = 1.0 AS PER IS :6403-1981,5.1.2.2dc = 1.21 dq = 1.10 d = 1.10 (Since > 10)

    AS PER IS :6403-1981,5.1.2.3ic = 1 iq = 1 i = 1 W = 0.5

    0.5Qult = (C NcSc dc ic)+y.d.(Nq-1)Sq dq iq+1/2 By NySy dy Iy W'

    = x 18.36 x 1.0 x 1.21 x 1+ 2.58 x 7.956 x 1.0 x 1.10 x 1+ 0.5 x 3.4 x 8.68 x 1.0 x 1.10 x 1.0 x 0.5

    = 0.0 + 22.58 + 8.2151= 30.794 T/M

    Qult = 30.79 T/sq.M3

    SBC = 10.26 T/sq.m

    0.000

    Assuming the Factor of Safety as =

    Based on the above 'N' value the following ' ' values are obtained from the fig.1 of the IS: 6403-1981 less soils (C=0). And for cohesive soils ( =0) the 'c' value is considered from the relation "Note:- Where ever the test results are not available the same was assumed based on the available values.

    Specific gravity of soil at 1.5 m depth (G)

    Assuming the depth factor, shape factor and load inclination factors as unity.Assuming the water table correction factor (W') as the ultimate bearing capacity is calculated as below:

    CADD CONSULTING ENGINEERS (P) LTD Bore hole no:-3GEO - TECHNICAL INVESTIGATION & Sheet No :- 1

    FOUNDATION ENGINEERING.

    Corrected '

  • 13

    73

    NAME OF THE WORK : SOIL INVESTIGATION WORKS NEAR ARABIND SCHOOL. 0Data for the safe Bearing capacity calculation:

    (NonCohesive Soil)SPT 'N' = 16 unconfined compressive strength qu = N/7.5 kg/cm2

    = 16 C = qu/2 = 0.00 T/sq.mDepth = 3.0 M = 33 degreeWidth = 2.0 M yt = 1.74 gm/cc

    If the 36 General shear failure condition is to be considered.

    LOCAL SHEAR FAILURE CONDITION' = tan^ (-1)(0.67x tan) = 23.0 DegreeC' = 0.67C = 0.00 T/sq.m

    AS PER IS :6403-1981,TABLE-1 = 2.60 (from lab test)Nc' = 18.364 G = 2.60Nq' = 8.956 q = Yt X Df

    N' = 8.684 = 1.74 X 3.00 = 5.22 T/M `By = Width X Yt

    2.0 X 1.74 = 3.5 T/M AS PER IS :6403-1981,TABLE-2

    Sc = 1.0 Sq = 1.0 Sy = 1.0 AS PER IS :6403-1981,5.1.2.2

    dc = 1.43 dq = 1.21 d = 1.21 (Since > 10) AS PER IS :6403-1981,5.1.2.3

    ic = 1 iq = 1 i = 1 W = 0.5

    0.5Qult = (C NcSc dc ic)+y.d.(Nq-1)Sq dq iq+1/2 By NySy dy Iy W'

    = x 18.36 x 1.0 x 1.43 x 1+ 5.22 x 7.956 x 1.0 x 1.21 x 1+ 0.5 x 3.5 x 8.68 x 1.0 x 1.21 x 1.0 x 0.5

    = 0.0 + 50.2516872 + 9.142= 59.393 T/M

    Qult = 59.39 T/sq.M3

    SBC = 19.80 T/sq.m

    CADD CONSULTING ENGINEERS (P) LTD Bore hole no:-3GEO - TECHNICAL INVESTIGATION & Sheet No :- 1

    FOUNDATION ENGINEERING.

    Corrected 'N'

    0.000

    Assuming the Factor of Safety as =

    Based on the above 'N' value the following ' ' values are obtained from the fig.1 of the IS: 6403-1981 for cohesion less soils (C=0). And for cohesive soils ( =0) the 'c' value is considered from the relation "Note:- Where ever the test results are not available the same was assumed based on the available values.

    Specific gravity of soil at 3.0 m depth (G)

    Assuming the depth factor, shape factor and load inclination factors as unity.Assuming the water table correction factor (W') as the ultimate bearing capacity is calculated as below:

  • 74

    NAME OF THE WORK : SOIL INVESTIGATION WORKS NEAR ARABIND SCHOOL.Data for the safe Bearing capacity calculation:

    (NonCohesive Soil)SPT 'N' = 18 unconfined compressive strength qu = N/7.5 kg/cm2

    = 17 C = qu/2 = 0.00 T/sq.mDepth = 4.5 M = 33 degreeWidth = 2.0 M yt = 1.77 gm/cc

    If the 36 General shear failure condition is to be considered.

    LOCAL SHEAR FAILURE CONDITION' = tan^ (-1)(0.67x tan) = 23.0 DegreeC' = 0.67C = 0.00 T/sq.m

    AS PER IS :6403-1981,TABLE-1 = 2.60 (from lab test)Nc' = 18.364 G = 2.60Nq' = 8.956 q = Yt X Df

    N' = 8.684 = 1.77 X 4.50 = 7.97 T/M `By = Width X Yt

    2.0 X 1.77 = 3.5 T/M AS PER IS :6403-1981,TABLE-2

    Sc = 1.0 Sq = 1.0 Sy = 1.0 AS PER IS :6403-1981,5.1.2.2

    dc = 1.65 dq = 1.32 d = 1.32 (Since > 10) AS PER IS :6403-1981,5.1.2.3

    ic = 1 iq = 1 i = 1 W = 0.5

    0.5Qult = (C NcSc dc ic)+y.d.(Nq-1)Sq dq iq+1/2 By NySy dy Iy W'

    = x 18.36 x 1.0 x 1.65 x 1+ 7.97 x 7.956 x 1.0 x 1.32 x 1+ 0.5 x 3.5 x 8.68 x 1.0 x 1.32 x 1.0 x 0.5

    = 0.0 + 83.6477928 + 10.14= 93.792 T/M

    Qult = 93.79 T/sq.M3

    SBC = 31.26 T/sq.m

    CADD CONSULTING ENGINEERS (P) LTD Bore hole no:-3GEO - TECHNICAL INVESTIGATION & Sheet No :- 1

    FOUNDATION ENGINEERING.

    Corrected 'N'

    0.000

    Assuming the Factor of Safety as =

    Based on the above 'N' value the following ' ' values are obtained from the fig.1 of the IS: 6403-1981 for cohesion less soils (C=0). And for cohesive soils ( =0) the 'c' value is considered from the relation "Note:- Where ever the test results are not available the same was assumed based on the available values.

    Specific gravity of soil at 4.5m depth (G)

    Assuming the depth factor, shape factor and load inclination factors as unity.Assuming the water table correction factor (W') as the ultimate bearing capacity is calculated as below:

  • 75

    NAME OF THE WORK : SOIL INVESTIGATION WORKS NEAR ARABIND SCHOOL.Data for the safe Bearing capacity calculation:

    (NonCohesive Soil)SPT 'N' = 40 unconfined compressive strength qu = N/7.5 kg/cm2

    = 28 C = qu/2 = 0.00 T/sq.mDepth = 6.0 M = 35 degreeWidth = 2.0 M yt = 1.77 gm/cc

    If the 36 General shear failure condition is to be considered.

    LOCAL SHEAR FAILURE CONDITION' = tan^ (-1)(0.67x tan) = 25.0 DegreeC' = 0.67C = 0.00 T/sq.m

    AS PER IS :6403-1981,TABLE-1 = 2.67 (from lab test)Nc' = 20.720 G = 2.67Nq' = 10.660 q = Yt X Df

    N' = 10.880 = 1.77 X 6.00 = 10.62 T/M `By = Width X Yt

    2.0 X 1.77 = 3.5 T/M AS PER IS :6403-1981,TABLE-2

    Sc = 1.0 Sq = 1.0 Sy = 1.0 AS PER IS :6403-1981,5.1.2.2

    dc = 1.89 dq = 1.44 d = 1.44 (Since > 10) AS PER IS :6403-1981,5.1.2.3

    ic = 1 iq = 1 i = 1 W = 0.5

    0.5Qult = (C NcSc dc ic)+y.d.(Nq-1)Sq dq iq+1/2 By NySy dy Iy W'

    = x 20.72 x 1.0 x 1.89 x 1+ 10.62 x 9.66 x 1.0 x 1.44 x 1+ 0.5 x 3.5 x 10.88 x 1.0 x 1.44 x 1.0 x 0.5

    = 0.0 + 147.728448 + 13.87= 161.594 T/M

    Qult = 161.59 T/sq.M3

    SBC = 53.86 T/sq.m

    CADD CONSULTING ENGINEERS (P) LTD Bore hole no:-3GEO - TECHNICAL INVESTIGATION & Sheet No :- 1

    FOUNDATION ENGINEERING.

    Corrected 'N'

    0.000

    Assuming the Factor of Safety as =

    Based on the above 'N' value the following ' ' values are obtained from the fig.1 of the IS: 6403-1981 for cohesion less soils (C=0). And for cohesive soils ( =0) the 'c' value is considered from the relation "Note:- Where ever the test results are not available the same was assumed based on the available values.

    Specific gravity of soil at 6.0m depth (G)

    Assuming the depth factor, shape factor and load inclination factors as unity.Assuming the water table correction factor (W') as the ultimate bearing capacity is calculated as below:

  • 76

    NAME OF THE WORK : SOIL INVESTIGATION WORKS NEAR ARABIND SCHOOL.Data for the safe Bearing capacity calculation:

    (NonCohesive Soil)SPT 'N' = 42 unconfined compressive strength qu = N/7.5 kg/cm2

    = 29 C = qu/2 = 0.00 T/sq.mDepth = 7.5 M = 35 degreeWidth = 2.0 M yt = 1.77 gm/cc

    If the 36 General shear failure condition is to be considered.

    LOCAL SHEAR FAILURE CONDITION' = tan^ (-1)(0.67x tan) = 25.0 DegreeC' = 0.67C = 0.00 T/sq.m

    AS PER IS :6403-1981,TABLE-1 = 2.67 (from lab test)Nc' = 20.720 G = 2.67Nq' = 10.660 q = Yt X Df

    N' = 10.880 = 1.77 X 7.50 = 13.28 T/M `By = Width X Yt

    2.0 X 1.77 = 3.5 T/M AS PER IS :6403-1981,TABLE-2

    Sc = 1.0 Sq = 1.0 Sy = 1.0 AS PER IS :6403-1981,5.1.2.2

    dc = 2.12 dq = 1.56 d = 1.56 (Since > 10) AS PER IS :6403-1981,5.1.2.3

    ic = 1 iq = 1 i = 1 W = 0.5

    0.5Qult = (C NcSc dc ic)+y.d.(Nq-1)Sq dq iq+1/2 By NySy dy Iy W'

    = x 20.72 x 1.0 x 2.12 x 1+ 13.28 x 9.66 x 1.0 x 1.56 x 1+ 0.5 x 3.5 x 10.88 x 1.0 x 1.56 x 1.0 x 0.5

    = 0.0 + 200.04894 + 15.02= 215.070 T/M

    Qult = 215.07 T/sq.M3

    SBC = 71.69 T/sq.m

    CADD CONSULTING ENGINEERS (P) LTD Bore hole no:-3GEO - TECHNICAL INVESTIGATION & Sheet No :- 1

    FOUNDATION ENGINEERING.

    Corrected 'N'

    0.000

    Assuming the Factor of Safety as =

    Based on the above 'N' value the following ' ' values are obtained from the fig.1 of the IS: 6403-1981 for cohesion less soils (C=0). And for cohesive soils ( =0) the 'c' value is considered from the relation "Note:- Where ever the test results are not available the same was assumed based on the available values.

    Specific gravity of soil at 7.5m depth (G)

    Assuming the depth factor, shape factor and load inclination factors as unity.Assuming the water table correction factor (W') as the ultimate bearing capacity is calculated as below:

  • 77

    NAME OF THE WORK : SOIL INVESTIGATION WORKS NEAR ARABIND SCHOOL.Data for the safe Bearing capacity calculation:

    (NonCohesive Soil)SPT 'N' = 57 unconfined compressive strength qu = N/7.5 kg/cm2

    = 36 C = qu/2 = 0.00 T/sq.mDepth = 7.5 M = 38 degreeWidth = 2.0 M yt = 1.68 gm/cc

    If the 36 General shear failure condition is to be considered.

    LOCAL SHEAR FAILURE CONDITION' = tan^ (-1)(0.67x tan) = 27.0 DegreeC' = 0.67C = 0.00 T/sq.m

    AS PER IS :6403-1981,TABLE-1 = 2.66 (from lab test)Nc' = 24.488 G = 2.66Nq' = 13.756 q = Yt X Df

    N' = 15.486 = 1.68 X 7.50 = 12.60 T/M `By = Width X Yt

    2.0 X 1.68 = 3.4 T/M AS PER IS :6403-1981,TABLE-2

    Sc = 1.0 Sq = 1.0 Sy = 1.0 AS PER IS :6403-1981,5.1.2.2

    dc = 2.41 dq = 1.70 d = 1.70 (Since > 10) AS PER IS :6403-1981,5.1.2.3

    ic = 1 iq = 1 i = 1 W = 0.5

    0.5Qult = (C NcSc dc ic)+y.d.(Nq-1)Sq dq iq+1/2 By NySy dy Iy W'

    = x 24.49 x 1.0 x 2.41 x 1+ 12.60 x 12.756 x 1.0 x 1.70 x 1+ 0.5 x 3.4 x 15.49 x 1.0 x 1.70 x 1.0 x 0.5

    = 0.0 + 273.23352 + 22.11= 295.348 T/M

    Qult = 295.35 T/sq.M3

    SBC = 98.45 T/sq.m

    CADD CONSULTING ENGINEERS (P) LTD Bore hole no:-3GEO - TECHNICAL INVESTIGATION & Sheet No :- 1

    FOUNDATION ENGINEERING.

    Corrected 'N'

    0.000

    Assuming the Factor of Safety as =

    Based on the above 'N' value the following ' ' values are obtained from the fig.1 of the IS: 6403-1981 for cohesion less soils (C=0). And for cohesive soils ( =0) the 'c' value is considered from the relation "Note:- Where ever the test results are not available the same was assumed based on the available values.

    Specific gravity of soil at 9.0m depth (G)

    Assuming the depth factor, shape factor and load inclination factors as unity.Assuming the water table correction factor (W') as the ultimate bearing capacity is calculated as below:

  • 78

    SUMMARY OF GEOTECHNICAL PARAMETERS & SAFE BEARING CAPACITY

    BH DEPTH

    BGLTYPE OF BULK DENSITY, SPT-N

    N CORRECTI

    ON ARRIVED ALLOWABLE BERING PRESSURE

    ALLOWABLE BERING PRESSURE

    NO (M) SAMPLE gm/cc VALUE VALUEC

    KG/CM2

    DEGREE SBC T/MFOR 25mm

    SETTELEMENT T/MFOR 40mm

    SETTELEMENT T/M

    57 36

    29

    - - 98.45 19.23 30.77

    3

    9.0 (2X2) SPT -

    14.71 23.53

    - - 53.86 13.89 22.22

    - - 71.697.5 (2X2) SPT - 42

    6.0 (2X2) SPT - 40 28

    NAME OF WORK:- SOIL INVESTIGATION WORKS NEAR ARABIND SCHOOL. SAMBALPUR

    -

    SPT 16(2X2) 19.80 11.767.35

    11

    4.5 SPT - 18

    16

    17 -

    4.17 6.67

    (2X2)

    BH NO :- 3 SHEET NO : 1

    31.26 7.81 12.50

    CADD CONSULTING ENGINEERS (P) LTD.GEO - TECHNICAL INVESTIGATION &

    FOUNDATION ENGINEERING.

    3.0

    -SPT

    FOOTING IN M

    SHEAR PARAMETER

    -2X2 10.261.5

    - --

    11 -

  • 79

    CADD CONSULTING ENGINEERS PVT.LTD GEO-TECHNICAL INVESTIGATION &

    FOUNDATION ENGINEERING.

    Sheet No:1

    ANALYSIS OF THE SUB SOIL INVESTIGATION TEST RESULT

    PROJECT:R&B ,SAMBALPUR( NEAR ARABIND SCHOOL, CHAINGE-1421.8M (BH NO- 3 )

    BOREHOLE NO- 3

    Borehole no- 3, was sunk up to an average depth of 15.0m the sub soil strata of the Borehole is given in litho logical form and summarized as follows.

    STRATUM

    The top layer up to an average depth up to 0.5 m consists of packing boulders and from 0.5m to 4.5m depth is fine gravels. And from 4.5m to 9.5m depth is clay soil with mixed with sand.

    The stratum below an average depth from 9.5 m to 15.0 m is consists rock strata

    The strata are moderately medium to dense compact and low to medium plasticity. The SPT value tabulated in bore log data sheet.

    The core recovery was observed during investigation and tabulated in bore log data sheet. The ground water table was encountered at 1.3m within boring depth.

  • PROPERTIES OF BORE HOLE 04

  • ENGINEERING PROPERTIES OF SOIL PROJECT: INFRONT OF NEW MAHILA THANA. (BH NO- 4)

    \

    Sl. N

    o.

    soil

    sam

    ple c

    ollec

    ted

    at

    Type

    of s

    ampl

    e co

    llecte

    d at

    Grain size analysis Atterbergs Limits in %

    Field

    Moi

    sture

    Con

    tent

    in %

    Bu

    lk De

    nsity

    in g

    m/cc

    .

    Dry

    Dens

    ity in

    gm/cc

    .

    Cohe

    sion

    (C) K

    gf/cm

    Angl

    e of s

    hear

    ing

    resis

    tance

    ()

    In d

    egre

    e Sp

    ecifi

    c Gra

    vity

    Void

    Rati

    o

    D.F.

    S. in

    %

    Field

    S.P

    .T. v

    alue

    Grou

    p of

    soil

    Fine

    Gra

    vel in

    %

    (10m

    m to

    4.75

    mm

    )

    Coar

    se sa

    nd in

    %

    (4.75

    mm

    to 2.

    00m

    m)

    Medi

    um sa

    nd in

    %

    (2m

    m to

    0.42

    5mm

    ) Fi

    ne sa

    nd in

    %

    (0.42

    5mm

    to

    0.075

    mm

    ) Si

    lt & C

    lay in

    %

    (0.07

    5mm

    to

    0.001

    mm

    )

    Liqu

    id L

    imit i

    n %

    Plas

    tic L

    imit i

    n %

    Plas

    ticity

    Inde

    x in

    %

    1 1.5 SPT 8 6 12 26 48 30 14 16 18 - - - - 2.66 - 14 18 SC

    2 3.0 SPT 35 12 8 19 26 23 NP NP 14 - - - - 2.62 - - 29 GM

    3 4.5 SPT 6 8 10 52 24 18 NP NP 15 - - - - 2.63 - - 48 SP-SM

    4 6.0 SPT 8 12 14 45 21 18 NP NP 15 - - - - 2.63 - - >100 SP-SM

    9.5M TO 10.5M CORE RECOVERY =71% & RQD =61%

    81

  • 83

    SOAK

    ED

    UNSO

    AKED

    1 BH-49.5m

    to 10.5m

    71% 61% 0.28% 12.1% 5.8 8.4 208 214 82 2.68 2.68 42.9 1

    NOTE:- Nj = 0.1qs= S.B.C OF ROCK IN T/M2qs (qu) X NjSBC is conservatively Restricted to 80 T / M2 for designed purposed.

    SL. N

    O

    BORE HOLE NO -04

    UNIT

    WEI

    GHT

    OF R

    OCK

    (g/cc

    )

    HARD

    NESS

    (H,S

    CALE

    MOH

    S)

    SOUN

    DNES

    S

    SAMP

    LES

    REF:

    NO

    BORE

    HOL

    E

    DEPT

    H OF

    FOU

    NDAT

    ION

    BGL

    (m)

    UNCO

    NFIN

    ED

    COMP

    RESS

    ION

    ST

    RENG

    TH O

    F RO

    CK

    IN T

    /M2

    (qs =

    qu

    * NJ)

    POIN

    T LO

    AD S

    TREN

    GTH

    INDE

    X

    FOUNDATION ENGINEERING.S