CERTIFICATE
This is to certify that the samples are collected from the
proposed site CONSTRUCTION OF FLYOVER AT LAXMI TALKIES SQUARE AT
SAMBALPUR IN THE STATE OF ODISHA by CADD CONSULTING ENGINEERS PVT
LTD, BHUBANESWAR. The laboratory tests have been performed under
the supervision of qualified personal, as per the Indian
standards and that this report is prepared on the basis of these
tests results and expert experience.
FOR: CADD CONSULTING ENGINEERS PVT. LTD
1
-
INTRODUCTION
It is intended to investigate the sub soil strata at the
proposed site of CONSTRUCTION OF FLYOVER AT LAXMI TALKIES SQUARE AT
SAMBALPUR IN THE STATE OF ODISHA OBJECT
The object of the Geo technical investigation is to:-
Optimize the foundation system, assuring the safe bearing
capacity of the soil.
Determination of type, size and depth of foundation.
Analyzing the soil properties.
Suggesting an economically viable of foundation system to be
adopted for the proposed
structures. SCOPE OF WORK It consists of the following:-
Visual reconnaissance of the site.
Field and laboratory investigation.
Engineering judgment based on the current practice.
LIMITATIONS OF INVESTIGATION
The scope of Geo- technical Sub soil investigation is confined
within the framework of
agreement and Technical specification with the client. However
all the field and laboratory experiments will be carried out as per
the relevant Indian standard code of practice?
2
-
THE DETAILED GEO-TECHNICAL INVESTIGATION WORK TO BE CARRIED OUT
CONSISTS OF TWO PARTS.
1. FIELD INVESTIGATION
Location of bore holes.
Boring /drilling up to specified depth below G.L.
Conducting standard penetration test.
Collection UDS samples.
Collecting DS samples.
Determining the depth of water table.
Study of site condition and surroundings.
Taking observation of surrounding structure.
Transportation of all soil samples to laboratory.
2. LABORATORY INVESTIGATION :- Grain size analysis.
Determination of moisture content.
Unconfined compressive strength.
Determination of Bulk density.
Determination of dry density.
Determination of Void ratio.
Determination of liquid limit.
Determination of plastic limit & plastic index.
Determination of specific gravity.
Determination of shear parameters & settlement
calculation.
Determination of DFS test.
LOCATION The proposed site of construction OF CONSTRUCTION OF
FLYOVER AT LAXMI TALKIES SQUARE AT SAMBALPUR IN THE STATE OF
ODISHA
3
-
FIELD WORK
1. SELECTION OF BORE HOLES :-
1) 4,Nos number of bore holes ware selected by the Engineer In
Charge in order to
obtain comprehensive sub-soil data for this site up to specified
depth in BH No-1 to BH No-4 , below G.L. For detailed laboratory
investigation SPT is conducted in suitable intervals and Disturbed
/undisturbed soil samples from the above bore hole were collected
at different levels from as per the instruction of the client
with
observation of the ground water level during investigation.
2. BORING :- 2) The sub-soil exploration work at the proposed
site was carried out using 150mm
diameter rotary calyx rig boring equipments.
3. STANDARD PENETRATION TESTS :-
3) Standard penetration tests we are conducted in different
levels in a continuous manner
using a spilt spoon sampler. The SPT sampler was lower inside
the bore hole after drilling the required level and is driven by a
63.6 kg. Hammer with a free fall of
750mm. In three stages 150mm each and the numbers of blows for
each 150mm penetration was recorded. The details of location and
SPT value [N] is shown in bore log data.
4. GROUND WATER TABLE :- 4) During the field work ground water
level was observation in bore hole and the level of
ground water table are shown in bore log data sheet.
4
-
LABORATORY TESTS The laboratory tests were conducted on selected
SPT / disturbed / undisturbed soil samples collected from the bore
holes drilled at the proposed site. The tests include grain size
analysis, natural moisture content, D.F.S specific Gravity, liquid
limit, plastic limit, plasticity index test and shear test.
Particles size distribution tests on representative soil sample
were also carried out. The laboratory test confirming to the
requirement of I.S and specification were conducted on the soil,
sample. The results of all these tests are given in test result
sheet separately.
GRAIN SIZE ANALYSIS: The grain size analysis of different soil
samples were done as per the requirement of IS: 2720(Pt- IV) 1975
method of test for soil, Grain size analysis. The details of the
test results are shown test result sheet separately in tabular as
well as graphically. The result of grain size analysis is used to
classify the soil in various depths of bore holes.
NATURAL MOISTURE CONTENT: The natural moisture content were
determined as per IS: 2720(Pt II) 1973 Method of test for soil,
determination of water content.
DETERMINATION OF BULK DENSITY: The Bulk densities were
determined in the laboratory from the UDS samples at different
levels and the result are shown separately in tabular form.
DETERMINATION OF DRY DENSITY: The dry density of the UDS/DS
samples was determined at the known moisture content and bulk
density.
DETERMINATION OF SPECIFIC GRAVITY: The specific gravity of the
UDS/DS sample was determined at different levels and the results
are shown separately.
DETERMINATION OF VOID RATIO: The void ratios of the UDS/DS
samples were determined at different levels and the results are
shown separately.
LIQUID LIMIT & PLASTIC LIMIT: [AS PER IS : 2720 Pt IV] : The
liquid and plastic limit of soils were other index properties of
soil have also been determined as per the relevant IS code of
practice. The liquid and plastic limits of soil samples have been
determined in the laboratory and results are shown separately.
DETERMINATION OF SHEAR PARAMETERS: Un consolidated and un
drained Tri-axial shear tests were carried out from soil samples
collected as per IS : 2720 Pt IX 1971 with three different cell
pressures of 1,2,3kg/sq.cm using Tri axial shear testing machine
and result are shown separately in tabular and graphical
manner.
5
-
P R E F A C E
The general soil profiles and the geological stratification have
been determined FOR CONSTRUCTION OF FLYOVER AT LAXMI TAKIES SQUARE
AT SAMBALPUR (ODISHA).
The objective of this investigation is to ascertain the
characteristics of Sub-soil to present necessary information for
sub-surface. It was endeavored to study in detail the sub-surface
conditions at the project site.
.
The field and laboratory works have been conducted as per
relevant Bureau of Indian standards (BIS).
6
-
FIELD OPERATIONS
In an attempt for optimization in the design of foundation for
the proposed building to be constructed at this site, Geo-technical
investigation was done. The entire investigation work had been
divided mainly into two parts (I) Field Work & (ii) Laboratory
tests Field work determines the types of sub- soil deposit and
their characteristics. Laboratory tests help in determining the
relevant geo-technical properties of the sub-surface deposited
leading to finalization of foundation depth of the structure basing
on Bearing capacities of the foundation strata as well as Influence
zone
GROUND WATER TABLE & TERMINATION DEPTH
BORE HOLE
NO GROUND
LEVEL LOCATION CHANAGE (M)
TERMINATION DEPTH IN MTR.
WATER TABLE FROM
THE G.L IN MTR.
01 (P 23) 90.938 Gole Bazer Square 1.000 Km 12.5 3.6
02 (P 10) 90.827 Gole Bazer Square 0.650 Km 10.4 1.9
03 (P 36) 92.111 Near Arbind School 1.400 Km 15.0 1.3
04 (A 1) 95.477 In front of new Mahila Thana 0.330 Km 10.5
0.5
BORING & SITU TESTS
Wash boring method was adapted to bores in the soil up to
specified depth as mentioned above below the G.L for BH -01 to BH
-04. The SPT were conducted at regular intervals and the samples
were brought to the laboratory with proper identification and
labeling standard split spoon sampler was used for conducting
standard penetration test. The number of blows required to drive
the sampler for the 1st, 2nd and 3rd 15cm depths were recorded. The
total number of blows required to drive the split spoon sampler due
to the free fall of a 63.5kg. Hammer trough distance of 75cm for
the 2nd, and 3rd 15cm penetration were taken together as the field
N-value (penetration resistance) of the soil.
7
-
NOTATIONS C Cohesion Angle of internal fraction of soil DS
Disturbed Sample UDS Undisturbed Sample NMC Natural Moisture
Content NP Non plastic soil G Special gravity G Gravel Content M
Slit Content C Clay Content LL Liquid Limit PL Plastic Limit Pl
Plasticity index Cc Compression index K Coefficient of permeability
UCS Unconfined Compression N SPT Value BH Bore Hole Suffix The
Number of Bore Holes Nc,Nq,N Bearing Capacity Factor Sc,Sq,S S hape
factors Density of soil D Depth of foundation FS Factor of safety
Cv Coefficient of consolidation UU Unconsolidated untrained
triaxial test CU Consolidated drained triaxial test GC Clayey
Gravels GP Poorly Graded Gravels GW Well Graded Gravels SC Clayey
Sand SM Silty Sand SW Wel Graded Sand SP Poorly Graded Sand CH
Clays of High Plasticity Cl Clays of Intermediate Plasticity CL
Clays of Low Plasticity MH Slits of High Plasticity MI Silts of
intermediate Plasticity ML Silts of Low Plasticity
8
-
PROPERTIES OF BORE HOLE 01
-
ENGINEERING PROPERTIES OF SOIL PROJECT: GOLE BAZAR CHHAK (BH NO-
1 )
\
Sl. N
o.
soil
sam
ple
colle
cted
at
Type
of s
ampl
e co
llecte
d at
Grain size analysis Atterbergs Limits in %
Field
Moi
sture
Co
nten
t in
% Bu
lk De
nsity
in
gm/cc
. Dr
y De
nsity
in
gm/cc
. Co
hesio
n (C
) Kg
f/cm
Angl
e of s
hear
ing
resis
tance
()
In d
egre
e Sp
ecifi
c Gra
vity
Void
Rati
o
D.F.
S. in
%
Field
S.P
.T. v
alue
Grou
p of
soil
Fine
Gra
vel in
%
(10m
m to
4.75
mm
)
Coar
se sa
nd in
%
(4.75
mm
to
2.00m
m)
Medi
um sa
nd in
%
(2m
m to
0.42
5mm
) Fi
ne sa
nd in
%
(0.42
5mm
to
0.075
mm
) Si
lt & C
lay in
%
(0.07
5mm
to
0.001
mm
)
Liqu
id L
imit i
n %
Plas
tic L
imit i
n %
Plas
ticity
Inde
x in
%
1 0.5 DS - 8 12 74 6 NP NP NP 8 1.88 - - - 2.59 - - - SP
2 1.5 SPT - 6 18 58 18 18 NP NP 9 - - - - 2.62 - - >100
SP-SM
3 3.0 SPT 85 6 3 4 2 NP NP NP 7 - - - - 2.56 - - >100 GW 4.0M
TO 5.0M CORE RECOVERY =20% & RQD =NIL 5.0M TO 6.0M CORE
RECOVERY = 22% & RQD =NIL
6.0M TO 7.0M CORE RECOVERY = 25% & RQD = 14%
7.0M TO 8.0M CORE RECOVERY = 28% & RQD =18%
8.0M TO 9.0M CORE RECOVERY =30% & RQD = 24%
9.0M TO 10.0M CORE RECOVERY = 35% & RQD = 26%
10.0M TO 11.0M CORE RECOVERY = 40% & RQD = 32%
11.00M TO 12.0M CORE RECOVERY = 50% & RQD = 41%
12..0M TO 12.5M CORE RECOVERY = 87% & RQD = 73%
10
-
12
SUMMARY OF FOUNDATION DETAILS OF ROCK SAMPLES
SOAK
ED
UNSO
AKED
4.0m to 5.0m 20% NIL 0.28% 12.1% 4.1 - - - 82 2.68 2.68 42.9
1
5.0m to 6.0m 22% NIL 0.27% 10.6% 4.2 - - - 84 2.67 2.66 42.0
2
6.0m to 7.0m 25% 14% 0.26% 10.2% 4.4 4.5 112 122 87 2.67 2.66
41.1 3
7.0m to 8.0m 28% 18% 0.29% 11.4% 4.7 5.1 122 129 88 2.69 2.66
43.8 4
8.0m to9.0m 30% 24% 0.31% 11.4% 5.2 5.5 131 137 87 2.67 2.66
45.5 5
9.0m to 10.0m 35% 26% 0.31% 11.0% 5.5 5.7 137 143 88 2.67 2.66
45.5 6
10.0m to 11.0m 40% 32% 0.31% 11.0% 5.8 6.3 152 159 88 2.67 2.66
45.5 7
11.0m to 12.0m 50% 41% 0.31% 11.0% 6.1 6.6 159 170 88 2.67 2.66
45.5 8
12.0m to 12.5m 87% 73% 0.31% 11.0% 6.5 10.5 252 270 88 2.67 2.66
45.5 9
NOTE:- Nj = 0.1
qs= S.B.C OF ROCK IN T/M2
qs (qu) X NjSBC is conservatively Restricted to 80 T / M2 for
designed purposed.
1 BH-1
SPEC
IFIC
GRA
VITY
RQD
%
CORE
REC
OVER
Y %
SL. N
O
SLAK
E UD
RABI
LITY
INDE
X (1
0 m
nts c
ycle)
MOIS
TER
CONT
ENT
(%)
SOUN
DNES
S
LOCATION:-GOLE BAZAR CHHAK
CADD CONSULTING ENGINEERS PVT.LTD.GEO - TECHNICAL INVESTIGATION
&
FOUNDATION ENGINEERING.
UNIT
WEI
GHT
OF R
OCK
(g/cc
)
HARD
NESS
(H,S
CALE
MOH
S)
BORE HOLE NO -01
SAMP
LES
REF:
NO
BORE
HOL
E
DEPT
H OF
FOU
NDAT
ION
BGL
(m)
UNCO
NFIN
ED
COMP
RESS
ION
ST
RENG
TH O
F RO
CK
IN T
/M2
(qs =
qu
* NJ)
POIN
T LO
AD S
TREN
GTH
INDE
X
PORO
SITY
(MG/
(1+M
G)X1
00
-
13
6.0M TO 7.0M
qs = qc x Nj
From laboratory test data qc = 112 = 1120 T / M2
qs = 1120 x 0.1 = 112 T / M2
Where : qs = Safe Bearing Pressure (gross)qc = Average UCS of
rock coresNj = Empirical coefficient
Including FOS 3
GEO - TECHNICAL INVESTIGATION & FOUNDATION ENGINEERING.
LOCATION:- GOL BAZER CHHAK, SAMBALPUR
DEPTH OF FOUNDATION -
CADD CONSULTING ENGINEERS PVT.LTD.
SBC is conservatively Restricted to 80 T / M2 for designed
purposed.
Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) = Thickness of
discontinues (cm)S = Spacing of discontinues (cm)Bf = Footing
Width
From table 4 of IS :12070 For spacing of discontinues from 30 cm
to 100 cm Nj = 0.1
kg / cm2
AS PER CI .6 OF IS:12070
-
14
7.0M TO 8.0 M
qs = qc x Nj
From laboratory test data qc = 122 = 1220 T / M2
qs = 1220 x 0.1 = 122 T / M2
SBC is conservatively Restricted to 80 T / M2 for designed
purposed.
Where : qs = Safe Bearing Pressure (gross)qc = Average UCS of
rock coresNj = Empirical coefficient
Including FOS 3Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) =
Thickness of discontinues (cm)S = Spacing of discontinues (cm)Bf =
Footing Width
CADD CONSULTING ENGINEERS PVT.LTD.
From table 4 of IS :12070 For spacing of discontinues from 30 cm
to 100 cm Nj = 0.1
kg / cm2
GEO - TECHNICAL INVESTIGATION & FOUNDATION ENGINEERING.
LOCATION:- GOL BAZER CHHAK, SAMBALPUR
DEPTH OF FOUNDATION -
AS PER CI .6 OF IS:12070
-
15
8.0 M TO 9.0M
qs = qc x Nj
From laboratory test data qc = 131 = 1310 T / M2
qs = 1310 x 0.1 = 131 T / M2
SBC is conservatively Restricted to 80 T / M2 for designed
purposed.
Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) = Thickness of
discontinues (cm)S = Spacing of discontinues (cm)Bf = Footing
Width
From table 4 of IS :12070 For spacing of discontinues from 30 cm
to 100 cm Nj = 0.1
kg / cm2
AS PER CI .6 OF IS:12070
Where : qs = Safe Bearing Pressure (gross)qc = Average UCS of
rock coresNj = Empirical coefficient
Including FOS 3
GEO - TECHNICAL INVESTIGATION & FOUNDATION ENGINEERING.
LOCATION:- GOL BAZER CHHAK, SAMBALPUR
DEPTH OF FOUNDATION -
CADD CONSULTING ENGINEERS PVT.LTD.
-
16
9.0 M TO 10.0 M
qs = qc x Nj
From laboratory test data qc = 137 = 1370 T / M2
qs = 1370 x 0.1 = 137 T / M2
SBC is conservatively Restricted to 80 T / M2 for designed
purposed.
Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) = Thickness of
discontinues (cm)S = Spacing of discontinues (cm)Bf = Footing
Width
From table 4 of IS :12070 For spacing of discontinues from 30 cm
to 100 cm Nj = 0.1
kg / cm2
AS PER CI .6 OF IS:12070
Where : qs = Safe Bearing Pressure (gross)qc = Average UCS of
rock coresNj = Empirical coefficient
Including FOS 3
GEO - TECHNICAL INVESTIGATION & FOUNDATION ENGINEERING.
LOCATION:- GOL BAZER CHHAK, SAMBALPUR
DEPTH OF FOUNDATION -
CADD CONSULTING ENGINEERS PVT.LTD.
-
17
10.0 M TO 11.0 M
qs = qc x Nj
From laboratory test data qc = 152 = 1520 T / M2
qs = 1520 x 0.1 = 152 T / M2
SBC is conservatively Restricted to 80 T / M2 for designed
purposed.
Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) = Thickness of
discontinues (cm)S = Spacing of discontinues (cm)Bf = Footing
Width
From table 4 of IS :12070 For spacing of discontinues from 30 cm
to 100 cm Nj = 0.1
kg / cm2
AS PER CI .6 OF IS:12070
Where : qs = Safe Bearing Pressure (gross)qc = Average UCS of
rock coresNj = Empirical coefficient
Including FOS 3
CADD CONSULTING ENGINEERS PVT.LTD.GEO - TECHNICAL INVESTIGATION
&
FOUNDATION ENGINEERING.
LOCATION:- GOL BAZER CHHAK, SAMBALPUR
DEPTH OF FOUNDATION -
-
18
10.0 M TO 11.0 M
qs = qc x Nj
From laboratory test data qc = 159 = 1590 T / M2
qs = 1590 x 0.1 = 159 T / M2
SBC is conservatively Restricted to 80 T / M2 for designed
purposed.
Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) = Thickness of
discontinues (cm)S = Spacing of discontinues (cm)Bf = Footing
Width
From table 4 of IS :12070 For spacing of discontinues from 30 cm
to 100 cm Nj = 0.1
kg / cm2
AS PER CI .6 OF IS:12070
Where : qs = Safe Bearing Pressure (gross)qc = Average UCS of
rock coresNj = Empirical coefficient
Including FOS 3
CADD CONSULTING ENGINEERS PVT.LTD.GEO - TECHNICAL INVESTIGATION
&
FOUNDATION ENGINEERING.
LOCATION:- GOL BAZER CHHAK, SAMBALPUR
DEPTH OF FOUNDATION -
-
19
11.5M TO 12.5M
qs = qc x Nj
From laboratory test data qc = 252 = 2520 T / M2
qs = 2520 x 0.1 = 252 T / M2
SBC is conservatively Restricted to 80 T / M2 for designed
purposed.
Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) = Thickness of
discontinues (cm)S = Spacing of discontinues (cm)Bf = Footing
Width
From table 4 of IS :12070 For spacing of discontinues from 30 cm
to 100 cm Nj = 0.1
kg / cm2
AS PER CI .6 OF IS:12070
Where : qs = Safe Bearing Pressure (gross)qc = Average UCS of
rock coresNj = Empirical coefficient
Including FOS 3
CADD CONSULTING ENGINEERS PVT.LTD.GEO - TECHNICAL INVESTIGATION
&
FOUNDATION ENGINEERING.
LOCATION:- GOL BAZER CHHAK, SAMBALPUR
DEPTH OF FOUNDATION -
-
20
= 2.0 m = 200 cm= 1.5 m = 150 cm= 1.0 m
SPT 'N' VALUE OBSERVED = 100
= 58Due to over burden pressureAs per IS 8009 part I
1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976
Figure - 9 , P.P-17
= 0.0045 m d = ( WT - D)= 4.50 mm (After applying W') d/b= 4.5
mm Adopted water table correction (W')
Premissable settlement = 25 mm
Therefore Allowable Bearing pressure
= 25 / 4.5= 5.556 kg/cm2
= 55.56 T/m2
CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N'
VALUE
CADD CONSULTING ENGINEERS (P) LTD BORE HOLE:-1GEO - TECHNICAL
INVESTIGATION & Sheet No : 1
FOUNDATION ENGINEERING.
Water table correction(W')
Corrected N value
NAME OF THE WORK: SOIL INVESTIGATION WORKS FOR GOLE BAZAR
CHHAK
ALLOWABLE BEARING PRESSURE FOR 25MM SETTLEMENT
Width of footing (B)Depth of footing (D)
-
21
= 2.0 m = 200 cm= 1.5 m = 150 cm= 1.0 m
SPT 'N' VALUE OBSERVED = 100
= 58Due to over burden pressureAs per IS 8009 part I
1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976
Figure - 9 , P.P-17
= 0.0045 m d = ( WT - D)= 4.50 mm (After applying W') d/b= 4.5
mm Adopted water table correction (W')
Premissable settlement = 40 mm
Therefore Allowable Bearing pressure
= 40 / 4.5= 8.889 kg/cm2
= 88.89 T/m2
CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N'
VALUE
CADD CONSULTING ENGINEERS (P) LTD BORE HOLE:-1GEO - TECHNICAL
INVESTIGATION & Sheet No : 1
FOUNDATION ENGINEERING.
Water table correction(W')
Corrected N value
NAME OF THE WORK: SOIL INVESTIGATION WORKS FOR GOLE BAZAR
CHHAK
ALLOWABLE BEARING PRESSURE FOR 40MM SETTLEMENT
Width of footing (B)Depth of footing (D)
-
22
= 2.0 m = 200 cm= 3.0 m = 300 cm= 1.0 m
SPT 'N' VALUE OBSERVED = 100
= 58Due to over burden pressureAs per IS 8009 part I
1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976
Figure - 9 , P.P-17
= 0.0045 m d = ( WT - D)= 4.50 mm (After applying W') d/b= 4.5
mm Adopted water table correction (W')
Premissable settlement = 25 mm
Therefore Allowable Bearing pressure
= 25 / 4.5= 5.556 kg/cm2
= 55.56 T/m2
CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N'
VALUE
CADD CONSULTING ENGINEERS (P) LTD BORE HOLE:-1GEO - TECHNICAL
INVESTIGATION & Sheet No : 1
FOUNDATION ENGINEERING.
Water table correction(W')
Corrected N value
NAME OF THE WORK: SOIL INVESTIGATION WORKS FOR GOLE BAZAR
CHHAK
ALLOWABLE BEARING PRESSURE FOR 25MM SETTLEMENT
Width of footing (B)Depth of footing (D)
-
23
= 2.0 m = 200 cm= 3.0 m = 300 cm= 1.0 m
SPT 'N' VALUE OBSERVED = 100
= 58Due to over burden pressureAs per IS 8009 part I
1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976
Figure - 9 , P.P-17
= 0.0045 m d = ( WT - D)= 4.50 mm (After applying W') d/b= 4.5
mm Adopted water table correction (W')
Premissable settlement = 40 mm
Therefore Allowable Bearing pressure
= 40 / 4.5= 8.889 kg/cm2
= 88.89 T/m2
CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N'
VALUE
CADD CONSULTING ENGINEERS (P) LTD BORE HOLE:-1GEO - TECHNICAL
INVESTIGATION & Sheet No : 1
FOUNDATION ENGINEERING.
Water table correction(W')
Corrected N value
NAME OF THE WORK: SOIL INVESTIGATION WORKS FOR GOLE BAZAR
CHHAK
ALLOWABLE BEARING PRESSURE FOR 40MM SETTLEMENT
Width of footing (B)Depth of footing (D)
-
24
NAME OF THE WORK : SOIL INVESTIGATION WORKS FOR GOLE BAZAR
CHHAKData for the safe Bearing capacity calculation:
(NonCohesive Soil)SPT 'N' = 100 unconfined compressive strength
qu = N/7.5 kg/cm2
= 58 C = qu/2 = 0.00 T/sq.mDepth = 1.5 M = 42 degreeWidth = 2.0
M yt = 1.72 gm/cc
If the 36 General shear failure condition is to be
considered.
LOCAL SHEAR FAILURE CONDITION' = tan^ (-1)(0.67x tan) = 31.0
DegreeC' = 0.67C = 0.00 T/sq.m
AS PER IS :6403-1981,TABLE-1 = 2.59 (from lab test)Nc' = 33.336
G = 2.59Nq' = 21.380 q = Yt X Df
N' = 27.526 = 1.72 X 1.50 = 2.58 T/M `By = Width X Yt
2.0 X 1.72 = 3.4 T/M AS PER IS :6403-1981,TABLE-2 Sc = 1.0 Sq =
1.0 Sy = 1.0 AS PER IS :6403-1981,5.1.2.2dc = 1.25 dq = 1.12 d =
1.12 (Since > 10)
AS PER IS :6403-1981,5.1.2.3ic = 1 iq = 1 i = 1 W = 1.0
1.0Qult = (C NcSc dc ic)+y.d.(Nq-1)Sq dq iq+1/2 By NySy dy Iy
W'
= x 33.34 x 1.0 x 1.25 x 1+ 2.58 x 20.38 x 1.0 x 1.12 x 1+ 0.5 x
3.4 x 27.53 x 1.0 x 1.12 x 1.0 x 1.0
= 0.0 + 58.89 + 53.026= 111.916 T/M
Qult = 111.92 T/sq.M3
SBC = 37.31 T/sq.m
0.000
Assuming the Factor of Safety as =
Based on the above 'N' value the following ' ' values are
obtained from the fig.1 of the IS: 6403-1981 less soils (C=0). And
for cohesive soils ( =0) the 'c' value is considered from the
relation "Note:- Where ever the test results are not available the
same was assumed based on the available values.
Specific gravity of soil at 1.5 m depth (G)
Assuming the depth factor, shape factor and load inclination
factors as unity.Assuming the water table correction factor (W') as
the ultimate bearing capacity is calculated as below:
CADD CONSULTING ENGINEERS (P) LTD Bore hole no:-1GEO - TECHNICAL
INVESTIGATION & Sheet No :- 1
FOUNDATION ENGINEERING.
Corrected '
-
25
NAME OF THE WORK : SOIL INVESTIGATION WORKS FOR GOLE BAZAR
CHHAKData for the safe Bearing capacity calculation:
(NonCohesive Soil)SPT 'N' = 100 (ASSUMED) unconfined compressive
strength qu = N/7.5 kg/cm2
= 58 C = qu/2 = 0.00 T/sq.mDepth = 3.0 M = 42 degreeWidth = 2.0
M yt = 1.72 gm/cc
If the 36 General shear failure condition is to be
considered.
LOCAL SHEAR FAILURE CONDITION' = tan^ (-1)(0.67x tan) = 31.0
DegreeC' = 0.67C = 0.00 T/sq.m
AS PER IS :6403-1981,TABLE-1 = 2.62 (from lab test)Nc' = 33.336
G = 2.62Nq' = 21.380 q = Yt X Df
N' = 27.526 = 1.72 X 3.00 = 5.16 T/M `By = Width X Yt
2.0 X 1.72 = 3.4 T/M AS PER IS :6403-1981,TABLE-2
Sc = 1.0 Sq = 1.0 Sy = 1.0 AS PER IS :6403-1981,5.1.2.2
dc = 1.50 dq = 1.25 d = 1.25 (Since > 10) AS PER IS
:6403-1981,5.1.2.3
ic = 1 iq = 1 i = 1 W = 1.0
1.0Qult = (C NcSc dc ic)+y.d.(Nq-1)Sq dq iq+1/2 By NySy dy Iy
W'
= x 33.34 x 1.0 x 1.50 x 1+ 5.16 x 20.38 x 1.0 x 1.25 x 1+ 0.5 x
3.4 x 27.53 x 1.0 x 1.25 x 1.0 x 1.0
= 0.0 + 131.451 + 59.18= 190.632 T/M
Qult = 190.63 T/sq.M3
SBC = 63.54 T/sq.m
CADD CONSULTING ENGINEERS (P) LTD Bore hole no:-1GEO - TECHNICAL
INVESTIGATION & Sheet No :- 1
FOUNDATION ENGINEERING.
Corrected 'N'
0.000
Assuming the Factor of Safety as =
Based on the above 'N' value the following ' ' values are
obtained from the fig.1 of the IS: 6403-1981 for cohesion less
soils (C=0). And for cohesive soils ( =0) the 'c' value is
considered from the relation "Note:- Where ever the test results
are not available the same was assumed based on the available
values.
Specific gravity of soil at 3.0 m depth (G)
Assuming the depth factor, shape factor and load inclination
factors as unity.Assuming the water table correction factor (W') as
the ultimate bearing capacity is calculated as below:
-
26
SUMMARY OF GEOTECHNICAL PARAMETERS & SAFE BEARING
CAPACITY
BH DEPTH
BGLTYPE OF BULK DENSITY, SPT-N
N CORRECTI
ON ARRIVED ALLOWABLE BERING PRESSURE
ALLOWABLE BERING PRESSURE
NO (M) SAMPLE gm/cc VALUE VALUEC
KG/CM2
DEGREE SBC T/MFOR 25mm
SETTELEMENT T/MFOR 40mm
SETTELEMENT T/M
-0.5
- -
-
CADD CONSULTING ENGINEERS (P) LTD.GEO - TECHNICAL INVESTIGATION
&
FOUNDATION ENGINEERING.
1.5
-DS
FOOTING IN M
SHEAR PARAMETER
1
2X2 - -
(2X2)
BH NO :- 1 SHEET NO : 1
63.54 55.6
-
88.9SPT N>100
58
58
-
-
NAME OF WORK:- SOIL INVESTIGATION WORKS FOR GOLE BAZAR
CHHAK.
-
SPT N>100(2X2) 37.31 88.955.6
-
3.0
-
27
CADD CONSULTING ENGINEERS PVT.LTD GEO-TECHNICAL INVESTIGATION
&
FOUNDATION ENGINEERING.
Sheet No:1
ANALYSIS OF THE SUB SOIL INVESTIGATION TEST RESULT
LOCATION: -GOLE BAZAR CHHAK(390 MT).
BOREHOLE NO- 1
Borehole no- -1, was sunk up to an average depth of 12.5m the
sub soil strata of the Borehole is given in
litho logical form and summarized as follows.
STRATUM
The top layer up to an average depth up to 0.5 m consists of
sand and from 0.5m to 1.5m depth is compacted fine sand mixed with
gravel. And from 1.5m to 3.0m depth is boulders.
The stratum below an average depth from 3.0 m to 11.5 m is
consists soft rock and from 11.5m to 12.5m depth is hard granite
rock,
The strata are moderately medium to very dense compact and low
to medium plasticity. The SPT value tabulated in bore log data
sheet.
The core recovery was observed during investigation and
tabulated in bore log data sheet. The ground water table was
encountered at 3.6m within boring depth.
-
PROPERTIES OF BORE HOLE 02
-
ENGINEERING PROPERTIES OF SOIL PROJECT: GOLE BAZAR CHHAK (BH NO
- 02 )
\
Sl. N
o.
soil
sam
ple c
ollec
ted at
Type
of s
ampl
e co
llecte
d at
Grain size analysis Atterbergs Limits in %
Field
Moi
sture
Con
tent
in %
Bu
lk De
nsity
in g
m/cc
.
Dry
Dens
ity in
gm/cc
.
Cohe
sion
(C) K
gf/cm
Angl
e of s
hear
ing
resis
tance
()
In d
egre
e Sp
ecifi
c Gra
vity
Void
Rati
o
D.F.
S. in
%
Field
S.P
.T. v
alue
Grou
p of
soil
Fine
Gra
vel in
%
(10m
m to
4.75
mm
)
Coar
se sa
nd in
%
(4.75
mm
to 2.
00m
m)
Medi
um sa
nd in
%
(2m
m to
0.42
5mm
)
Fine
sand
in %
(0
.425m
m to
0.07
5mm
)
Silt &
Clay
in %
(0
.075m
m to
0.00
1mm
)
Liqu
id L
imit i
n %
Plas
tic L
imit i
n %
Plas
ticity
Inde
x in
%
1 1.5 SPT - 2 4 12 82 34 15 19 14 - - - - 2.67 - 27 20 CL
2 3.0 UDS - 2 3 15 80 33 15 18 18 1.90 1.61 0.38 3 2.67 0.65 29
- CL
3 4.5 SPT - 3 4 18 75 33 16 17 18 - - - - 2.67 - 27 31 CL
4 6.0 SPT - 3 5 17 75 33 17 16 18 - - - - 2.67 - 26 38 CL
7.2M TO 8.2M CORE RECOVERY =30% & RQD =18%
8.2M TO 9.2M CORE RECOVERY = 82% & RQD =62%
9.2M TO 10.2M CORE RECOVERY = 85% & RQD =66%
29
-
32
SOAK
ED
UNSO
AKED
7.2m to 8.2m
30% 18% 0.28% 12.1% 4.1 5.4 130 135 82 2.68 2.68 42.9 1
8.2m to 9.2m
82% 62% 0.27% 10.6% 5.4 7.5 179 188 84 2.67 2.66 42.0 2
9.2m to 10.2m 85% 66% 0.26% 10.2% 5.9 9.1 218 222 92 2.67 2.66
41.1 3
NOTE:- Nj = 0.1qs= S.B.C OF ROCK IN T/M2qs (qu) X NjSBC is
conservatively Restricted to 80 T / M2 for designed purposed.
1 BH-2SP
ECIF
IC G
RAVI
TY
RQD
%
CORE
REC
OVER
Y %
SL. N
O
UNCO
NFIN
ED
COMP
RESS
ION
ST
RENG
TH O
F RO
CK
IN T
/M2
(qs =
qu
* NJ)
POIN
T LO
AD S
TREN
GTH
INDE
X
MOIS
TER
CONT
ENT
(%)
SLAK
E UD
RABI
LITY
INDE
X (1
0 m
nts c
ycle)
UNIT
WEI
GHT
OF R
OCK
(g/cc
)
HARD
NESS
(H,S
CALE
MOH
S)
SOUN
DNES
S
FOUNDATION ENGINEERING.SUMMARY OF FOUNDATION DETAILS OF ROCK
SAMPLES
LOCATION:-GOLE BAZAR CHHAK.
SAMP
LES
REF:
NO
BORE
HOL
E
DEPT
H OF
FOU
NDAT
ION
BGL
(m)
PORO
SITY
(MG/
(1+M
G)X1
00
BORE HOLE NO -02
CADD CONSULTING ENGINEERS PVT.LTD.GEO - TECHNICAL INVESTIGATION
&
-
33
LOCATION:-GOLE BAZER CHHAK
7.2M TO 8.2M
qs = qc x Nj
From laboratory test data qc = 130 = 1300 T / M2
qs = 1300 x 0.1 = 130 T / M2
CADD CONSULTING ENGINEERS PVT.LTD.
Where :
BH NO -02
qc = Average UCS of rock coresNj = Empirical coefficient
Including FOS 3
GEO - TECHNICAL INVESTIGATION & FOUNDATION ENGINEERING.
DEPTH OF FOUNDATION -
AS PER CI .6 OF IS:12070
qs = Safe Bearing Pressure (gross)
SBC is conservatively Restricted to 80 T / M2 for designed
purposed.
Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) = Thickness of
discontinues (cm)S = Spacing of discontinues (cm)Bf = Footing
Width
From table 4 of IS :12070 For spacing of discontinues from 30 cm
to 100 cm Nj = 0.1
kg / cm2
-
34
LOCATION:-GOLE BAZER CHHAK
8.2M TO 9.2M
qs = qc x Nj
From laboratory test data qc = 179 = 1790 T / M2
qs = 1790 x 0.1 = 179 T / M2
CADD CONSULTING ENGINEERS PVT.LTD.GEO - TECHNICAL INVESTIGATION
&
FOUNDATION ENGINEERING.BH NO -02
DEPTH OF FOUNDATION -
AS PER CI .6 OF IS:12070
Where : qs = Safe Bearing Pressure (gross)qc = Average UCS of
rock cores
From table 4 of IS :12070 For spacing of discontinues from 30 cm
to 100 cm Nj = 0.1
kg / cm2
SBC is conservatively Restricted to 80 T / M2 for designed
purposed.
Nj = Empirical coefficient
Including FOS 3Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) =
Thickness of discontinues (cm)S = Spacing of discontinues (cm)Bf =
Footing Width
-
35
LOCATION:-GOLE BAZER CHHAK
9.2M TO 10.2M
qs = qc x Nj
From laboratory test data qc = 218 = 2180 T / M2
qs = 2180 x 0.1 = 218 T / M2
CADD CONSULTING ENGINEERS PVT.LTD.GEO - TECHNICAL INVESTIGATION
&
FOUNDATION ENGINEERING.BH NO -02
DEPTH OF FOUNDATION -
AS PER CI .6 OF IS:12070
Where : qs = Safe Bearing Pressure (gross)qc = Average UCS of
rock cores
From table 4 of IS :12070 For spacing of discontinues from 30 cm
to 100 cm Nj = 0.1
kg / cm2
SBC is conservatively Restricted to 80 T / M2 for designed
purposed.
Nj = Empirical coefficient
Including FOS 3Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) =
Thickness of discontinues (cm)S = Spacing of discontinues (cm)Bf =
Footing Width
-
36
= 2.0 m = 200 cm= 1.5 m = 150 cm= 0.5 m
SPT 'N' VALUE OBSERVED = 20
= 18Due to over burden pressureAs per IS 8009 part I
1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976
Figure - 9 , P.P-17
= 0.015 m d = ( WT - D)= 15.00 mm (After applying W') d/b= 30 mm
Adopted water table correction (W')
Premissable settlement = 25 mm
Therefore Allowable Bearing pressure
= 25 / 30= 0.833 kg/cm2
= 8.33 T/m2
Corrected N value
CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-02Sheet No : 1
ALLOWABLE BEARING PRESSURE FOR 25 MM SETTLEMENT
Width of footing (B)Depth of footing (D)Water table
correction(W')
NAME OF PROJECT:-SOIL INVESTIGATION FOR GOLE BAZAR CHHAK.
CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N'
VALUE
GEOTECHNICAL INVESTIGATIONS &FOUNDATION ENGINEERING
-
37
= 2.0 m = 200 cm= 4.5 m = 450 cm= 0.5 m
SPT 'N' VALUE OBSERVED = 31
= 23Due to over burden pressureAs per IS 8009 part I
1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976
Figure - 9 , P.P-17
= 0.012 m d = ( WT - D)= 12.00 mm (After applying W') d/b= 24 mm
Adopted water table correction (W')
Premissable settlement = 25 mm
Therefore Allowable Bearing pressure
= 25 / 24= 1.042 kg/cm2
= 10.42 T/m2
Corrected N value
CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-02Sheet No : 1
FOUNDATION ENGINEERING
CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE
NAME OF PROJECT:-SOIL INVESTIGATION FOR GOLE BAZAR CHHAK.
ALLOWABLE BEARING PRESSURE FOR 25 MM SETTLEMENT
Width of footing (B)Depth of footing (D)Water table
correction(W')
GEOTECHNICAL INVESTIGATIONS &
-
38
= 2.0 m = 200 cm= 6.0 m = 600 cm= 0.5 m
SPT 'N' VALUE OBSERVED = 38
= 27Due to over burden pressureAs per IS 8009 part I
1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976
Figure - 9 , P.P-17
= 0.009 m d = ( WT - D)= 9.00 mm (After applying W') d/b= 18 mm
Adopted water table correction (W')
Premissable settlement = 25 mm
Therefore Allowable Bearing pressure
= 25 / 18= 1.389 kg/cm2
= 13.89 T/m2
Corrected N value
CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-02Sheet No : 1
FOUNDATION ENGINEERING
CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE
NAME OF PROJECT:-SOIL INVESTIGATION FOR GOLE BAZAR CHHAK.
ALLOWABLE BEARING PRESSURE FOR 25 MM SETTLEMENT
Width of footing (B)Depth of footing (D)Water table
correction(W')
GEOTECHNICAL INVESTIGATIONS &
-
39
= 2.0 m = 200 cm= 1.5 m = 150 cm= 0.5 m
SPT 'N' VALUE OBSERVED = 20
= 18Due to over burden pressureAs per IS 8009 part I
1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976
Figure - 9 , P.P-17
= 0.015 m d = ( WT - D)= 15.00 mm (After applying W') d/b= 30 mm
Adopted water table correction (W')
Premissable settlement = 40 mm
Therefore Allowable Bearing pressure
= 40 / 30= 1.333 kg/cm2
= 13.33 T/m2
Corrected N value
CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-02Sheet No : 1
ALLOWABLE BEARING PRESSURE FOR 40 MM SETTLEMENT
Width of footing (B)Depth of footing (D)Water table
correction(W')
NAME OF PROJECT:-SOIL INVESTIGATION FOR GOLE BAZAR CHHAK.
CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N'
VALUE
GEOTECHNICAL INVESTIGATIONS &FOUNDATION ENGINEERING
-
40
= 2.0 m = 200 cm= 4.5 m = 450 cm= 0.5 m
SPT 'N' VALUE OBSERVED = 31
= 23Due to over burden pressureAs per IS 8009 part I
1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976
Figure - 9 , P.P-17
= 0.012 m d = ( WT - D)= 12.00 mm (After applying W') d/b= 24 mm
Adopted water table correction (W')
Premissable settlement = 40 mm
Therefore Allowable Bearing pressure
= 40 / 24= 1.667 kg/cm2
= 16.67 T/m2
Corrected N value
CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-02Sheet No : 1
FOUNDATION ENGINEERING
CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE
NAME OF PROJECT:-SOIL INVESTIGATION FOR GOLE BAZAR CHHAK.
ALLOWABLE BEARING PRESSURE FOR 40 MM SETTLEMENT
Width of footing (B)Depth of footing (D)Water table
correction(W')
GEOTECHNICAL INVESTIGATIONS &
-
41
= 2.0 m = 200 cm= 6.0 m = 600 cm= 0.5 m
SPT 'N' VALUE OBSERVED = 38
= 27Due to over burden pressureAs per IS 8009 part I
1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976
Figure - 9 , P.P-17
= 0.009 m d = ( WT - D)= 9.00 mm (After applying W') d/b= 18 mm
Adopted water table correction (W')
Premissable settlement = 40 mm
Therefore Allowable Bearing pressure
= 40 / 18= 2.222 kg/cm2
= 22.22 T/m2
Corrected N value
CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-02Sheet No : 1
FOUNDATION ENGINEERING
CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE
NAME OF PROJECT:-SOIL INVESTIGATION FOR GOLE BAZAR CHHAK.
ALLOWABLE BEARING PRESSURE FOR 40 MM SETTLEMENT
Width of footing (B)Depth of footing (D)Water table
correction(W')
GEOTECHNICAL INVESTIGATIONS &
-
42
NAME OF THE WORK : SOIL INVESTIGATION WORKS FOR GOLE BAZAR
CHHAK.Data for the safe Bearing capacity calculation:
(NonCohesive Soil)SPT 'N' = 20 unconfined compressive strength
qu = N/7.5 kg/cm2
= 18 C = qu/2 = 0.00 T/sq.mDepth = 1.5 M = 33 degreeWidth = 2.0
M yt = 1.72 gm/cc
If the 36 General shear failure condition is to be
considered.
LOCAL SHEAR FAILURE CONDITION' = tan^ (-1)(0.67x tan) = 23.0
DegreeC' = 0.67C = 0.00 T/sq.m
AS PER IS :6403-1981,TABLE-1 = 2.67 (from lab test)Nc' = 18.364
G = 2.67Nq' = 8.956 q = Yt X Df
N' = 8.684 = 1.72 X 1.50 = 2.58 T/M `By = Width X Yt
2.0 X 1.72 = 3.4 T/M AS PER IS :6403-1981,TABLE-2 Sc = 1.0 Sq =
1.0 Sy = 1.0 AS PER IS :6403-1981,5.1.2.2dc = 1.21 dq = 1.10 d =
1.10 (Since > 10)
AS PER IS :6403-1981,5.1.2.3ic = 1 iq = 1 i = 1 W = 0.5
0.5Qult = (C NcSc dc ic)+y.d.(Nq-1)Sq dq iq+1/2 By NySy dy Iy
W'
= x 18.36 x 1.0 x 1.21 x 1+ 2.58 x 7.956 x 1.0 x 1.10 x 1+ 0.5 x
3.4 x 8.68 x 1.0 x 1.10 x 1.0 x 0.5
= 0.0 + 22.58 + 8.2151= 30.794 T/M
Qult = 30.79 T/sq.M3
SBC = 10.26 T/sq.m
0.000
Assuming the Factor of Safety as =
Based on the above 'N' value the following ' ' values are
obtained from the fig.1 of the IS: 6403-1981 less soils (C=0). And
for cohesive soils ( =0) the 'c' value is considered from the
relation "Note:- Where ever the test results are not available the
same was assumed based on the available values.
Specific gravity of soil at 1.5 m depth (G)
Assuming the depth factor, shape factor and load inclination
factors as unity.Assuming the water table correction factor (W') as
the ultimate bearing capacity is calculated as below:
CADD CONSULTING ENGINEERS (P) LTD Bore hole no:-2GEO - TECHNICAL
INVESTIGATION & Sheet No :- 1
FOUNDATION ENGINEERING.
Corrected '
-
43
NAME OF THE WORK : SOIL INVESTIGATION WORKS FOR GOLE BAZAR
CHHAK.Data for the safe Bearing capacity calculation:
(NonCohesive Soil)SPT 'N' = 31 unconfined compressive strength
qu = N/7.5 kg/cm2
= 23 C = qu/2 = 0.00 T/sq.mDepth = 4.5 M = 34 degreeWidth = 2.0
M yt = 1.74 gm/cc
If the 36 General shear failure condition is to be
considered.
LOCAL SHEAR FAILURE CONDITION' = tan^ (-1)(0.67x tan) = 24.0
DegreeC' = 0.67C = 0.00 T/sq.m
AS PER IS :6403-1981,TABLE-1 = 2.67 (from lab test)Nc' = 19.542
G = 2.67Nq' = 9.808 q = Yt X Df
N' = 9.782 = 1.74 X 4.50 = 7.83 T/M `By = Width X Yt
2.0 X 1.74 = 3.5 T/M AS PER IS :6403-1981,TABLE-2
Sc = 1.0 Sq = 1.0 Sy = 1.0 AS PER IS :6403-1981,5.1.2.2
dc = 1.66 dq = 1.33 d = 1.33 (Since > 10) AS PER IS
:6403-1981,5.1.2.3
ic = 1 iq = 1 i = 1 W = 0.5
0.5Qult = (C NcSc dc ic)+y.d.(Nq-1)Sq dq iq+1/2 By NySy dy Iy
W'
= x 19.54 x 1.0 x 1.66 x 1+ 7.83 x 8.808 x 1.0 x 1.33 x 1+ 0.5 x
3.5 x 9.78 x 1.0 x 1.33 x 1.0 x 0.5
= 0.0 + 91.7256312 + 11.32= 103.044 T/M
Qult = 103.04 T/sq.M3
SBC = 34.35 T/sq.m
CADD CONSULTING ENGINEERS (P) LTD Bore hole no:-2GEO - TECHNICAL
INVESTIGATION & Sheet No :- 1
FOUNDATION ENGINEERING.
Corrected 'N'
0.000
Assuming the Factor of Safety as =
Based on the above 'N' value the following ' ' values are
obtained from the fig.1 of the IS: 6403-1981 for cohesion less
soils (C=0). And for cohesive soils ( =0) the 'c' value is
considered from the relation "Note:- Where ever the test results
are not available the same was assumed based on the available
values.
Specific gravity of soil at 4.5 m depth (G)
Assuming the depth factor, shape factor and load inclination
factors as unity.Assuming the water table correction factor (W') as
the ultimate bearing capacity is calculated as below:
-
44
NAME OF THE WORK : SOIL INVESTIGATION WORKS FOR GOLE BAZAR
CHHAK.Data for the safe Bearing capacity calculation:
(NonCohesive Soil)SPT 'N' = 38 unconfined compressive strength
qu = N/7.5 kg/cm2
= 27 C = qu/2 = 0.00 T/sq.mDepth = 6.0 M = 35 degreeWidth = 2.0
M yt = 1.77 gm/cc
If the 36 General shear failure condition is to be
considered.
LOCAL SHEAR FAILURE CONDITION' = tan^ (-1)(0.67x tan) = 25.0
DegreeC' = 0.67C = 0.00 T/sq.m
AS PER IS :6403-1981,TABLE-1 = 2.67 (from lab test)Nc' = 20.720
G = 2.67Nq' = 10.660 q = Yt X Df
N' = 10.880 = 1.77 X 6.00 = 10.62 T/M `By = Width X Yt
2.0 X 1.77 = 3.5 T/M AS PER IS :6403-1981,TABLE-2
Sc = 1.0 Sq = 1.0 Sy = 1.0 AS PER IS :6403-1981,5.1.2.2
dc = 1.89 dq = 1.44 d = 1.44 (Since > 10) AS PER IS
:6403-1981,5.1.2.3
ic = 1 iq = 1 i = 1 W = 0.5
0.5Qult = (C NcSc dc ic)+y.d.(Nq-1)Sq dq iq+1/2 By NySy dy Iy
W'
= x 20.72 x 1.0 x 1.89 x 1+ 10.62 x 9.66 x 1.0 x 1.44 x 1+ 0.5 x
3.5 x 10.88 x 1.0 x 1.44 x 1.0 x 0.5
= 0.0 + 147.728448 + 13.87= 161.594 T/M
Qult = 161.59 T/sq.M3
SBC = 53.86 T/sq.m
CADD CONSULTING ENGINEERS (P) LTD Bore hole no:-2GEO - TECHNICAL
INVESTIGATION & Sheet No :- 1
FOUNDATION ENGINEERING.
Corrected 'N'
0.000
Assuming the Factor of Safety as =
Based on the above 'N' value the following ' ' values are
obtained from the fig.1 of the IS: 6403-1981 for cohesion less
soils (C=0). And for cohesive soils ( =0) the 'c' value is
considered from the relation "Note:- Where ever the test results
are not available the same was assumed based on the available
values.
Specific gravity of soil at 6.0m depth (G)
Assuming the depth factor, shape factor and load inclination
factors as unity.Assuming the water table correction factor (W') as
the ultimate bearing capacity is calculated as below:
-
45
Depth of foundation = 3.0 mtr = 300 cmWidth of the footing = 2.0
mtr = 200 cm (Assumed)
C = 0.38 kg/cm (From lab test) = 3 (From lab test)
Void ratio e = 0.75 (Assumed)' =' = 2
G = 2.67Satureted
density =(G+e)/ (1+e) = 1.95 gm/cc
Ys = 0.954 gm/ccq = 0.954 x 300 / 1000 = 0.286 kg/cm
B = 0.954 x 200 / 1000 = 0.191 kg/cm AS PER IS
:6403-1981,TABLE-1
Nc' = 5.68Nq' = 1.228
N' = 0.18 AS PER IS :6403-1981,TABLE-2
Sc = 1.3 Sq = 1.2 S = 0.8 AS PER IS :6403-1981,5.1.2.2 ( shape
factor for square foundation)
dc = 1.26 dq = 1.00 d = 1.00 (Since
-
46
Depth of foundation = 3.0 mtr = 300 cmWidth of the footing = 2.0
mtr = 200 cm (Assumed)
C = 0.38 kg/cm (From lab test) = 3 (From lab test)
Void ratio e = 0.55 (Assumed)
G = 2.67Satureted
density =(G+e)/ (1+e) = 2.08 gm/cc
Ys = 1.077 gm/ccq = 1.077 x 300 / 1000 = 0.323 kg/cm
B = 1.077 x 200 / 1000 = 0.215 kg/cm AS PER IS
:6403-1981,TABLE-1
Nc = 5.95Nq = 1.342
N = 0.27 AS PER IS :6403-1981,TABLE-2
Sc = 1.3 Sq = 1.2 S = 0.8 ( shape factor for square foundation)
AS PER IS :6403-1981,5.1.2.2
dc = 1.26 dq = 1.00 d = 1.00 (Since
-
47
Depth of foundation = 3.0 m = 300 cm Width of foundation = 2.0 m
= 200 cm
FMC = 18%Y = 1.90 gm/ccC = 0.38= 3 G= 2.67e= 0.65
Ysub= 1.01q = 0.30
A= bearing at 0.75(void ratio) = 2.42B= bearing at 0.55(void
ratio) = 3.85F= void ratio at 0.65 = 0.65D= void ratio 0.75 =
0.75N= Requiard bearing capacity
at 0.65(void ratio)
N = A+{(B-A)(D-F)}/0.20N = [ 2.42 + { ( 3.85 - 2.42 ) x ( 0.75 -
0.65 )}] / 0.20
= 2.42 0.715 = 3.13 kg/cm
Taking factor of safety = 2.5
SBC = N / 2.5 + Yd / 1000= 3.13 / 2.5 + 0.304= 1.25328 + 0.30=
1.557 kg/cm= 15.57 T/M
FOUNDATION ENGINEERING.
+
CALCULATION OF SBC AT 3.0M DEPTH INTORPOLATION FOR ACTUAL VOID
RATIO 0.65
Bore hole no-2Sheet No : 3
CADD CONSULTING ENGINEERS (P) LTDGEO - TECHNICAL INVESTIGATION
&
-
48
BORE HOLE NO : 2 Size of foundation = 2 m. Depth of Foundation =
m.
Significant depth = 1.5 x 2 = 3.0 m.
FROM IS CODE : 8009 (PART - 1) -1976 Sf = H X Cc / ( 1 + e0 ) x
[ log10 x ( po + ^p ) / po ].
WL = Yt = G = Yd = W = Ysub = {( G - 1 ) / ( 1 + e ) } =
Compression Index = Cc = x( WL - 10 )
= x( 33 - 10 )=
Initial Pressure = po = ( Ysub x Df )= T/M
Void Ratio = e0 = {( G x Yw )/ Yd )- 1= {( x 1 ) / )- 1= ( / ) -
1=
Height of Compressive Layer = Mtr. Final Settlement
Sf = H X Cc / ( 1 + e0 ) x [ log10 x ( po + ^p ) / po ]= 3 X / (
1 + ) x [ x ( + 1 ) / ]= / x x ( / ]= X= X
= Mtr.
= mm.
Safe Bearing Capacity = T/M
Limiting Bearing Pressure for allowable Settlement 50mm.= ( x 50
)/ 46= T/M
SHEET NO : 1
0.621
46
15.57
0.658
2.67
3
1.61
3.0211.658 log10 4.021013.021log10 3.0210.207 0.6584
16.77
0.374 log10 1.3310.374 0.124
0.0464
15.57
1.6118
0.009
2.67 1.61
0.0090.207
3.021
LOCATION:-GOLE BAZAR CHHAK.
1.007
CADD CONSULTING ENGINEERS (P) LTDGEO - TECHNICAL INVESTIGATION
&
FOUNDATION ENGINEERING.
SETTLEMENT CALCULATION OF FOUNDATION ON COHESIVE SOIL
3.0
33 1.902.67
-
49
SUMMARY OF GEOTECHNICAL PARAMETERS & SAFE BEARING
CAPACITY
BH DEPTH
BGL
TYPE OF BULK DENSITY, SPT-N N
CORRECTION
ARRIVED
ALLOWABLE
BERING PRESSURE
ALLOWABLE BERING PRESSURE
ALLOWABLE BERING
PRESSURE
NO (M) SAMPLE gm/cc VALUE VALUEC
KG/CM2
DEGREE SBC T/MFOR 50
mm SETTELEMENT T/M
FOR 25mm SETTELEME
NT T/M
FOR 40mm SETTELEMENT
T/M
3.0
-SPT
FOOTING IN M
SHEAR PARAMETER
-2X21.5
0.38 31.90
20 -
(2X2)
BH NO :- 2 SHEET NO : 1
34.35 10.42 16.67
CADD CONSULTING ENGINEERS (P) LTD.GEO - TECHNICAL INVESTIGATION
&
FOUNDATION ENGINEERING.
31
-
23 -
8.33 13.3310.26
NAME OF WORK:- SOIL INVESTIGATION WORKS FOR GOLE BAZAR
CHHAK.
-
UDS -(2X2) 15.57 --
18
4.5
13.89 22.226.0 (2X2) SPT - 38 27
2
-
16.77
-
-- - 53.86
SPT -
-
50
CADD CONSULTING ENGINEERS PVT.LTD GEO-TECHNICAL INVESTIGATION
&
FOUNDATION ENGINEERING.
Sheet No:1
ANALYSIS OF THE SUB SOIL INVESTIGATION TEST RESULT
PROJECT: GOLE BAZAR CHHAK.
BOREHOLE NO- 2
Borehole no- 2, was sunk up to an average depth of 10.4m the sub
soil strata of the Borehole is given in litho
logical form and summarized as follows.
STRATUM
The top layer up to an average depth up to 1.5 m consists of
packing boulders and from 1.5m to 7.2m depth is hard clay.
The stratum below an average depth from 7.2 m to 10.4 m is
consists rock strata
The strata are moderately medium to dense compact and medium
plasticity.
The SPT value tabulated in bore log data sheet. The core
recovery was observed during investigation and tabulated in bore
log data sheet.
The ground water table was encountered at 1.9m within boring
depth.
-
PROPERTIES OF BORE HOLE 03
-
ENGINEERING PROPERTIES OF SOIL
PROJECT: ARABIND SCHOOL,CHAINGE-1421.8M (BH NO- 3 )
Sl. N
o.
soil
sam
ple
colle
cted
at
Type
of s
ampl
e co
llecte
d at
Grain size analysis Atterbergs Limits in %
Field
Moi
sture
Co
nten
t in
% Bu
lk De
nsity
in
gm/cc
. Dr
y De
nsity
in
gm/cc
. Co
hesio
n (C
) Kg
f/cm
Angl
e of s
hear
ing
resis
tance
()
In d
egre
e Sp
ecifi
c Gra
vity
Void
Rati
o
D.F.
S. in
%
Field
S.P
.T. v
alue
Grou
p of
soil
Fine
Gra
vel in
%
(10m
m to
4.75
mm
)
Coar
se sa
nd in
%
(4.75
mm
to
2.00m
m)
Medi
um sa
nd in
%
(2m
m to
0.42
5mm
) Fi
ne sa
nd in
%
(0.42
5mm
to
0.075
mm
) Si
lt & C
lay in
%
(0.07
5mm
to
0.001
mm
)
Liqu
id L
imit i
n %
Plas
tic L
imit i
n %
Plas
ticity
Inde
x in
%
1 1.5 SPT - 6 18 71 5 NP NP NP 12 - - - - 2.61 - 11 SP
2 3.0 SPT - 8 21 67 4 NP NP NP 12 - - - - 2.60 - 16 SP
3 4.5 SPT - 10 18 66 6 NP NP NP 13 - - - - 2.60 - 18 SP
4 6.0 SPT - 6 11 25 58 31 14 17 18 - - - - 2.67 - 24 40 CL
5 7.5 SPT - 8 13 19 60 31 15 16 18 - - - - 2.67 - 28 42 CL
6 9.0 SPT - 6 21 23 50 30 14 16 18 - - - - 2.66 - 57 CL 9.5M TO
10.5M CORE RECOVERY =22% & RQD =NIL 10.5M TO 11.5M CORE
RECOVERY = 25% & RQD =12% 11.5M TO 12.5M CORE RECOVERY = 30%
& RQD = 18%
12.5M TO 13.5M CORE RECOVERY = 38% & RQD =24%
13.5M TO 14.5M CORE RECOVERY =40% & RQD = 31%
14.5M TO 15.0M CORE RECOVERY = 52% & RQD = 40% 52
-
54
SOAK
ED
UNSO
AKED
9.5m to
10.5m22% NIL 0.28% 12.1% 4.1 - - - 82 2.68 2.68 42.9 1
10.5m to 11.5m 25% 12% 0.27% 10.6% 4.2 4.5 108 112 84 2.67 2.66
42.0 2
11.5m to 12.5m 30% 18% 0.26% 10.2% 4.4 5.1 123 129 87 2.67 2.66
41.1 3
12.5m to 13.5m 38% 24% 0.29% 11.4% 4.7 5.5 132 139 88 2.69 2.66
43.8 4
13.5m to 14.5m 40% 31% 0.31% 11.4% 5.2 5.8 141 147 87 2.67 2.66
45.5 5
14.5m to 15.0m 52% 40% 0.31% 11.0% 5.5 6.1 147 153 88 2.67 2.66
45.5 6
NOTE:- Nj = 0.1qs= S.B.C OF ROCK IN T/M2qs (qu) X NjSBC is
conservatively Restricted to 80 T / M2 for designed purposed.
BORE HOLE NO -03
CADD CONSULTING ENGINEERS PVT.LTD.GEO - TECHNICAL INVESTIGATION
&
UNIT
WEI
GHT
OF R
OCK
(g/cc
)
HARD
NESS
(H,S
CALE
MOH
S)
SOUN
DNES
S
FOUNDATION ENGINEERING.SUMMARY OF FOUNDATION DETAILS OF ROCK
SAMPLES
LOCATION:-R&B SAMBALPUR (ARABIND
SCHOOL),(CHAINGE-1421.8M).
SAMP
LES
REF:
NO
BORE
HOL
E
DEPT
H OF
FOU
NDAT
ION
BGL
(m)
PORO
SITY
(MG/
(1+M
G)X1
00
1 BH-3
SPEC
IFIC
GRA
VITY
RQD
%
CORE
REC
OVER
Y %
SL. N
O
UNCO
NFIN
ED
COMP
RESS
ION
ST
RENG
TH O
F RO
CK
IN T
/M2
(qs =
qu
* NJ)
POIN
T LO
AD S
TREN
GTH
INDE
X
MOIS
TER
CONT
ENT
(%)
SLAK
E UD
RABI
LITY
INDE
X (1
0 m
nts c
ycle)
-
55
LOCATION:-ARABIND SCHOOL,(CHAINGE-1421.8M).
10.5M TO 11.5M
qs = qc x Nj
From laboratory test data qc = 108 = 1080 T / M2
qs = 1080 x 0.1 = 108 T / M2
SBC is conservatively Restricted to 80 T / M2 for designed
purposed.
Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) = Thickness of
discontinues (cm)S = Spacing of discontinues (cm)Bf = Footing
Width
From table 4 of IS :12070 For spacing of discontinues from 30 cm
to 100 cm Nj = 0.1
kg / cm2
Including FOS 3
GEO - TECHNICAL INVESTIGATION & FOUNDATION ENGINEERING.
DEPTH OF FOUNDATION -
AS PER CI .6 OF IS:12070
qs = Safe Bearing Pressure (gross)
CADD CONSULTING ENGINEERS PVT.LTD.
Where :
BH NO -03
qc = Average UCS of rock coresNj = Empirical coefficient
-
56
LOCATION:-ARABIND SCHOOL,(CHAINGE-1421.8M).
11.5M TO 12.5M
qs = qc x Nj
From laboratory test data qc = 123 = 1230 T / M2
qs = 1230 x 0.1 = 123 T / M2
SBC is conservatively Restricted to 80 T / M2 for designed
purposed.
Nj = Empirical coefficient
Including FOS 3Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) =
Thickness of discontinues (cm)S = Spacing of discontinues (cm)Bf =
Footing Width
AS PER CI .6 OF IS:12070
Where : qs = Safe Bearing Pressure (gross)qc = Average UCS of
rock cores
From table 4 of IS :12070 For spacing of discontinues from 30 cm
to 100 cm Nj = 0.1
kg / cm2
CADD CONSULTING ENGINEERS PVT.LTD.GEO - TECHNICAL INVESTIGATION
&
FOUNDATION ENGINEERING.BH NO -03
DEPTH OF FOUNDATION -
-
57
LOCATION:-ARABIND SCHOOL,(CHAINGE-1421.8M).
12.5M TO 13.5M
qs = qc x Nj
From laboratory test data qc = 132 = 1320 T / M2
qs = 1320 x 0.1 = 132 T / M2
SBC is conservatively Restricted to 80 T / M2 for designed
purposed.
Nj = Empirical coefficient
Including FOS 3Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) =
Thickness of discontinues (cm)S = Spacing of discontinues (cm)Bf =
Footing Width
AS PER CI .6 OF IS:12070
Where : qs = Safe Bearing Pressure (gross)qc = Average UCS of
rock cores
From table 4 of IS :12070 For spacing of discontinues from 30 cm
to 100 cm Nj = 0.1
kg / cm2
CADD CONSULTING ENGINEERS PVT.LTD.GEO - TECHNICAL INVESTIGATION
&
FOUNDATION ENGINEERING.BH NO -03
DEPTH OF FOUNDATION -
-
58
LOCATION:-ARABIND SCHOOL,(CHAINGE-1421.8M).
13.5M TO 14.5M
qs = qc x Nj
From laboratory test data qc = 141 = 1410 T / M2
qs = 1410 x 0.1 = 141 T / M2
SBC is conservatively Restricted to 80 T / M2 for designed
purposed.
Nj = Empirical coefficient
Including FOS 3Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) =
Thickness of discontinues (cm)S = Spacing of discontinues (cm)Bf =
Footing Width
AS PER CI .6 OF IS:12070
Where : qs = Safe Bearing Pressure (gross)qc = Average UCS of
rock cores
From table 4 of IS :12070 For spacing of discontinues from 30 cm
to 100 cm Nj = 0.1
kg / cm2
CADD CONSULTING ENGINEERS PVT.LTD.GEO - TECHNICAL INVESTIGATION
&
FOUNDATION ENGINEERING.BH NO -03
DEPTH OF FOUNDATION -
-
59
LOCATION:-ARABIND SCHOOL,(CHAINGE-1421.8M).
14.5M TO 15.0
qs = qc x Nj
From laboratory test data qc = 147 = 1470 T / M2
qs = 1470 x 0.1 = 147 T / M2
SBC is conservatively Restricted to 80 T / M2 for designed
purposed.
Nj = Empirical coefficient
Including FOS 3Nj = ( 3 + S / Bf ) / (10(1 + 300 / S)) =
Thickness of discontinues (cm)S = Spacing of discontinues (cm)Bf =
Footing Width
AS PER CI .6 OF IS:12070
Where : qs = Safe Bearing Pressure (gross)qc = Average UCS of
rock cores
From table 4 of IS :12070 For spacing of discontinues from 30 cm
to 100 cm Nj = 0.1
kg / cm2
CADD CONSULTING ENGINEERS PVT.LTD.GEO - TECHNICAL INVESTIGATION
&
FOUNDATION ENGINEERING.BH NO -03
DEPTH OF FOUNDATION -
-
60
= 2.0 m = 200 cm= 1.5 m = 150 cm= 0.5 m
SPT 'N' VALUE OBSERVED = 11
= 11Due to over burden pressureAs per IS 8009 part I
1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976
Figure - 9 , P.P-17
= 0.030 m d = ( WT - D)= 30.00 mm (After applying W') d/b= 60 mm
Adopted water table correction (W')
Premissable settlement = 25 mm
Therefore Allowable Bearing pressure
= 25 / 60= 0.417 kg/cm2
= 4.17 T/m2
Corrected N value
CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-03Sheet No : 1
ALLOWABLE BEARING PRESSURE FOR 25 MM SETTLEMENT
Width of footing (B)Depth of footing (D)Water table
correction(W')
NAME OF PROJECT:-SOIL INVESTIGATION NEAR ARABIND SCHOOL.
CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N'
VALUE
GEOTECHNICAL INVESTIGATIONS &FOUNDATION ENGINEERING
-
61
= 2.0 m = 200 cm= 3.0 m = 300 cm= 0.5 m
SPT 'N' VALUE OBSERVED = 16
= 16Due to over burden pressureAs per IS 8009 part I
1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976
Figure - 9 , P.P-17
= 0.017 m d = ( WT - D)= 17.00 mm (After applying W') d/b= 34 mm
Adopted water table correction (W')
Premissable settlement = 25 mm
Therefore Allowable Bearing pressure
= 25 / 34= 0.735 kg/cm2
= 7.35 T/m2
Corrected N value
CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-03Sheet No : 1
FOUNDATION ENGINEERING
CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE
NAME OF PROJECT:-SOIL INVESTIGATION NEAR ARABIND SCHOOL.
ALLOWABLE BEARING PRESSURE FOR 25 MM SETTLEMENT
Width of footing (B)Depth of footing (D)Water table
correction(W')
GEOTECHNICAL INVESTIGATIONS &
-
62
= 2.0 m = 200 cm= 4.5 m = 450 cm= 0.5 m
SPT 'N' VALUE OBSERVED = 18
= 17Due to over burden pressureAs per IS 8009 part I
1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976
Figure - 9 , P.P-17
= 0.016 m d = ( WT - D)= 16.00 mm (After applying W') d/b= 32 mm
Adopted water table correction (W')
Premissable settlement = 25 mm
Therefore Allowable Bearing pressure
= 25 / 32= 0.781 kg/cm2
= 7.81 T/m2
Corrected N value
CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-03Sheet No : 1
FOUNDATION ENGINEERING
CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE
NAME OF PROJECT:-SOIL INVESTIGATION NEAR ARABIND SCHOOL.
ALLOWABLE BEARING PRESSURE FOR 25 MM SETTLEMENT
Width of footing (B)Depth of footing (D)Water table
correction(W')
GEOTECHNICAL INVESTIGATIONS &
-
63
= 2.0 m = 200 cm= 6.0 m = 600 cm= 0.5 m
SPT 'N' VALUE OBSERVED = 40
= 28Due to over burden pressureAs per IS 8009 part I
1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976
Figure - 9 , P.P-17
= 0.009 m d = ( WT - D)= 9.00 mm (After applying W') d/b= 18 mm
Adopted water table correction (W')
Premissable settlement = 25 mm
Therefore Allowable Bearing pressure
= 25 / 18= 1.389 kg/cm2
= 13.89 T/m2
Corrected N value
CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-03Sheet No : 1
FOUNDATION ENGINEERING
CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE
NAME OF PROJECT:-SOIL INVESTIGATION NEAR ARABIND SCHOOL.
ALLOWABLE BEARING PRESSURE FOR 25 MM SETTLEMENT
Width of footing (B)Depth of footing (D)Water table
correction(W')
GEOTECHNICAL INVESTIGATIONS &
-
64
= 2.0 m = 200 cm= 7.5 m = 750 cm= 0.5 m
SPT 'N' VALUE OBSERVED = 42
= 29Due to over burden pressureAs per IS 8009 part I
1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976
Figure - 9 , P.P-17
= 0.0085 m d = ( WT - D)= 8.50 mm (After applying W') d/b= 17 mm
Adopted water table correction (W')
Premissable settlement = 25 mm
Therefore Allowable Bearing pressure
= 25 / 17= 1.471 kg/cm2
= 14.71 T/m2
Corrected N value
CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-03Sheet No : 1
FOUNDATION ENGINEERING
CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE
NAME OF PROJECT:-SOIL INVESTIGATION NEAR ARABIND SCHOOL.
ALLOWABLE BEARING PRESSURE FOR 25 MM SETTLEMENT
Width of footing (B)Depth of footing (D)Water table
correction(W')
GEOTECHNICAL INVESTIGATIONS &
-
65
= 2.0 m = 200 cm= 9.0 m = 900 cm= 0.5 m
SPT 'N' VALUE OBSERVED = 57
= 36Due to over burden pressureAs per IS 8009 part I
1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976
Figure - 9 , P.P-17
= 0.0065 m d = ( WT - D)= 6.50 mm (After applying W') d/b= 13 mm
Adopted water table correction (W')
Premissable settlement = 25 mm
Therefore Allowable Bearing pressure
= 25 / 13= 1.923 kg/cm2
= 19.23 T/m2
Corrected N value
CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-03Sheet No : 1
FOUNDATION ENGINEERING
CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE
NAME OF PROJECT:-SOIL INVESTIGATION NEAR ARABIND SCHOOL.
ALLOWABLE BEARING PRESSURE FOR 25 MM SETTLEMENT
Width of footing (B)Depth of footing (D)Water table
correction(W')
GEOTECHNICAL INVESTIGATIONS &
-
66
= 2.0 m = 200 cm= 1.5 m = 150 cm= 0.5 m
SPT 'N' VALUE OBSERVED = 11
= 11Due to over burden pressureAs per IS 8009 part I
1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976
Figure - 9 , P.P-17
= 0.030 m d = ( WT - D)= 30.00 mm (After applying W') d/b= 60 mm
Adopted water table correction (W')
Premissable settlement = 40 mm
Therefore Allowable Bearing pressure
= 40 / 60= 0.667 kg/cm2
= 6.67 T/m2
Corrected N value
CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-03Sheet No : 1
ALLOWABLE BEARING PRESSURE FOR 40 MM SETTLEMENT
Width of footing (B)Depth of footing (D)Water table
correction(W')
NAME OF PROJECT:-SOIL INVESTIGATION NEAR ARABIND SCHOOL.
CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N'
VALUE
GEOTECHNICAL INVESTIGATIONS &FOUNDATION ENGINEERING
-
67
= 2.0 m = 200 cm= 3.0 m = 300 cm= 0.5 m
SPT 'N' VALUE OBSERVED = 16
= 16Due to over burden pressureAs per IS 8009 part I
1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976
Figure - 9 , P.P-17
= 0.017 m d = ( WT - D)= 17.00 mm (After applying W') d/b= 34 mm
Adopted water table correction (W')
Premissable settlement = 40 mm
Therefore Allowable Bearing pressure
= 40 / 34= 1.176 kg/cm2
= 11.76 T/m2
Corrected N value
CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-03Sheet No : 1
FOUNDATION ENGINEERING
CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE
NAME OF PROJECT:-SOIL INVESTIGATION NEAR ARABIND SCHOOL.
ALLOWABLE BEARING PRESSURE FOR 40 MM SETTLEMENT
Width of footing (B)Depth of footing (D)Water table
correction(W')
GEOTECHNICAL INVESTIGATIONS &
-
68
= 2.0 m = 200 cm= 4.5 m = 450 cm= 0.5 m
SPT 'N' VALUE OBSERVED = 18
= 17Due to over burden pressureAs per IS 8009 part I
1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976
Figure - 9 , P.P-17
= 0.016 m d = ( WT - D)= 16.00 mm (After applying W') d/b= 32 mm
Adopted water table correction (W')
Premissable settlement = 40 mm
Therefore Allowable Bearing pressure
= 40 / 32= 1.250 kg/cm2
= 12.50 T/m2
Corrected N value
CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-03Sheet No : 1
FOUNDATION ENGINEERING
CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE
NAME OF PROJECT:-SOIL INVESTIGATION NEAR ARABIND SCHOOL.
ALLOWABLE BEARING PRESSURE FOR 40 MM SETTLEMENT
Width of footing (B)Depth of footing (D)Water table
correction(W')
GEOTECHNICAL INVESTIGATIONS &
-
69
= 2.0 m = 200 cm= 6.0 m = 600 cm= 0.5 m
SPT 'N' VALUE OBSERVED = 40
= 28Due to over burden pressureAs per IS 8009 part I
1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976
Figure - 9 , P.P-17
= 0.009 m d = ( WT - D)= 9.00 mm (After applying W') d/b= 18 mm
Adopted water table correction (W')
Premissable settlement = 40 mm
Therefore Allowable Bearing pressure
= 40 / 18= 2.222 kg/cm2
= 22.22 T/m2
Corrected N value
CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-03Sheet No : 1
FOUNDATION ENGINEERING
CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE
NAME OF PROJECT:-SOIL INVESTIGATION NEAR ARABIND SCHOOL.
ALLOWABLE BEARING PRESSURE FOR 40 MM SETTLEMENT
Width of footing (B)Depth of footing (D)Water table
correction(W')
GEOTECHNICAL INVESTIGATIONS &
-
70
= 2.0 m = 200 cm= 7.5 m = 750 cm= 0.5 m
SPT 'N' VALUE OBSERVED = 42
= 29Due to over burden pressureAs per IS 8009 part I
1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976
Figure - 9 , P.P-17
= 0.0085 m d = ( WT - D)= 8.50 mm (After applying W') d/b= 17 mm
Adopted water table correction (W')
Premissable settlement = 40 mm
Therefore Allowable Bearing pressure
= 40 / 17= 2.353 kg/cm2
= 23.53 T/m2
Corrected N value
CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-03Sheet No : 1
FOUNDATION ENGINEERING
CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE
NAME OF PROJECT:-SOIL INVESTIGATION NEAR ARABIND SCHOOL.
ALLOWABLE BEARING PRESSURE FOR 40 MM SETTLEMENT
Width of footing (B)Depth of footing (D)Water table
correction(W')
GEOTECHNICAL INVESTIGATIONS &
-
71
= 2.0 m = 200 cm= 9.0 m = 900 cm= 0.5 m
SPT 'N' VALUE OBSERVED = 57
= 36Due to over burden pressureAs per IS 8009 part I
1976.Settlement, For 1 kg/cm2 Read from IS 8009 ( part I) 1976
Figure - 9 , P.P-17
= 0.0065 m d = ( WT - D)= 6.50 mm (After applying W') d/b= 13 mm
Adopted water table correction (W')
Premissable settlement = 40 mm
Therefore Allowable Bearing pressure
= 40 / 13= 3.077 kg/cm2
= 30.77 T/m2
Corrected N value
CADD CONSULTING ENGINEERS PVT.LTD BORE HOLE:-03Sheet No : 1
FOUNDATION ENGINEERING
CALCULATION OF ALLOWABLE BEARING PRESSURE BASED ON SPT 'N' VALUE
NAME OF PROJECT:-SOIL INVESTIGATION NEAR ARABIND SCHOOL.
ALLOWABLE BEARING PRESSURE FOR 40 MM SETTLEMENT
Width of footing (B)Depth of footing (D)Water table
correction(W')
GEOTECHNICAL INVESTIGATIONS &
-
72
NAME OF THE WORK : SOIL INVESTIGATION WORKS NEAR ARABIND
SCHOOL.Data for the safe Bearing capacity calculation:
(NonCohesive Soil)SPT 'N' = 11 unconfined compressive strength
qu = N/7.5 kg/cm2
= 11 C = qu/2 = 0.00 T/sq.mDepth = 1.5 M = 32 degreeWidth = 2.0
M yt = 1.72 gm/cc
If the 36 General shear failure condition is to be
considered.
LOCAL SHEAR FAILURE CONDITION' = tan^ (-1)(0.67x tan) = 23.0
DegreeC' = 0.67C = 0.00 T/sq.m
AS PER IS :6403-1981,TABLE-1 = 2.61 (from lab test)Nc' = 18.364
G = 2.61Nq' = 8.956 q = Yt X Df
N' = 8.684 = 1.72 X 1.50 = 2.58 T/M `By = Width X Yt
2.0 X 1.72 = 3.4 T/M AS PER IS :6403-1981,TABLE-2 Sc = 1.0 Sq =
1.0 Sy = 1.0 AS PER IS :6403-1981,5.1.2.2dc = 1.21 dq = 1.10 d =
1.10 (Since > 10)
AS PER IS :6403-1981,5.1.2.3ic = 1 iq = 1 i = 1 W = 0.5
0.5Qult = (C NcSc dc ic)+y.d.(Nq-1)Sq dq iq+1/2 By NySy dy Iy
W'
= x 18.36 x 1.0 x 1.21 x 1+ 2.58 x 7.956 x 1.0 x 1.10 x 1+ 0.5 x
3.4 x 8.68 x 1.0 x 1.10 x 1.0 x 0.5
= 0.0 + 22.58 + 8.2151= 30.794 T/M
Qult = 30.79 T/sq.M3
SBC = 10.26 T/sq.m
0.000
Assuming the Factor of Safety as =
Based on the above 'N' value the following ' ' values are
obtained from the fig.1 of the IS: 6403-1981 less soils (C=0). And
for cohesive soils ( =0) the 'c' value is considered from the
relation "Note:- Where ever the test results are not available the
same was assumed based on the available values.
Specific gravity of soil at 1.5 m depth (G)
Assuming the depth factor, shape factor and load inclination
factors as unity.Assuming the water table correction factor (W') as
the ultimate bearing capacity is calculated as below:
CADD CONSULTING ENGINEERS (P) LTD Bore hole no:-3GEO - TECHNICAL
INVESTIGATION & Sheet No :- 1
FOUNDATION ENGINEERING.
Corrected '
-
13
73
NAME OF THE WORK : SOIL INVESTIGATION WORKS NEAR ARABIND SCHOOL.
0Data for the safe Bearing capacity calculation:
(NonCohesive Soil)SPT 'N' = 16 unconfined compressive strength
qu = N/7.5 kg/cm2
= 16 C = qu/2 = 0.00 T/sq.mDepth = 3.0 M = 33 degreeWidth = 2.0
M yt = 1.74 gm/cc
If the 36 General shear failure condition is to be
considered.
LOCAL SHEAR FAILURE CONDITION' = tan^ (-1)(0.67x tan) = 23.0
DegreeC' = 0.67C = 0.00 T/sq.m
AS PER IS :6403-1981,TABLE-1 = 2.60 (from lab test)Nc' = 18.364
G = 2.60Nq' = 8.956 q = Yt X Df
N' = 8.684 = 1.74 X 3.00 = 5.22 T/M `By = Width X Yt
2.0 X 1.74 = 3.5 T/M AS PER IS :6403-1981,TABLE-2
Sc = 1.0 Sq = 1.0 Sy = 1.0 AS PER IS :6403-1981,5.1.2.2
dc = 1.43 dq = 1.21 d = 1.21 (Since > 10) AS PER IS
:6403-1981,5.1.2.3
ic = 1 iq = 1 i = 1 W = 0.5
0.5Qult = (C NcSc dc ic)+y.d.(Nq-1)Sq dq iq+1/2 By NySy dy Iy
W'
= x 18.36 x 1.0 x 1.43 x 1+ 5.22 x 7.956 x 1.0 x 1.21 x 1+ 0.5 x
3.5 x 8.68 x 1.0 x 1.21 x 1.0 x 0.5
= 0.0 + 50.2516872 + 9.142= 59.393 T/M
Qult = 59.39 T/sq.M3
SBC = 19.80 T/sq.m
CADD CONSULTING ENGINEERS (P) LTD Bore hole no:-3GEO - TECHNICAL
INVESTIGATION & Sheet No :- 1
FOUNDATION ENGINEERING.
Corrected 'N'
0.000
Assuming the Factor of Safety as =
Based on the above 'N' value the following ' ' values are
obtained from the fig.1 of the IS: 6403-1981 for cohesion less
soils (C=0). And for cohesive soils ( =0) the 'c' value is
considered from the relation "Note:- Where ever the test results
are not available the same was assumed based on the available
values.
Specific gravity of soil at 3.0 m depth (G)
Assuming the depth factor, shape factor and load inclination
factors as unity.Assuming the water table correction factor (W') as
the ultimate bearing capacity is calculated as below:
-
74
NAME OF THE WORK : SOIL INVESTIGATION WORKS NEAR ARABIND
SCHOOL.Data for the safe Bearing capacity calculation:
(NonCohesive Soil)SPT 'N' = 18 unconfined compressive strength
qu = N/7.5 kg/cm2
= 17 C = qu/2 = 0.00 T/sq.mDepth = 4.5 M = 33 degreeWidth = 2.0
M yt = 1.77 gm/cc
If the 36 General shear failure condition is to be
considered.
LOCAL SHEAR FAILURE CONDITION' = tan^ (-1)(0.67x tan) = 23.0
DegreeC' = 0.67C = 0.00 T/sq.m
AS PER IS :6403-1981,TABLE-1 = 2.60 (from lab test)Nc' = 18.364
G = 2.60Nq' = 8.956 q = Yt X Df
N' = 8.684 = 1.77 X 4.50 = 7.97 T/M `By = Width X Yt
2.0 X 1.77 = 3.5 T/M AS PER IS :6403-1981,TABLE-2
Sc = 1.0 Sq = 1.0 Sy = 1.0 AS PER IS :6403-1981,5.1.2.2
dc = 1.65 dq = 1.32 d = 1.32 (Since > 10) AS PER IS
:6403-1981,5.1.2.3
ic = 1 iq = 1 i = 1 W = 0.5
0.5Qult = (C NcSc dc ic)+y.d.(Nq-1)Sq dq iq+1/2 By NySy dy Iy
W'
= x 18.36 x 1.0 x 1.65 x 1+ 7.97 x 7.956 x 1.0 x 1.32 x 1+ 0.5 x
3.5 x 8.68 x 1.0 x 1.32 x 1.0 x 0.5
= 0.0 + 83.6477928 + 10.14= 93.792 T/M
Qult = 93.79 T/sq.M3
SBC = 31.26 T/sq.m
CADD CONSULTING ENGINEERS (P) LTD Bore hole no:-3GEO - TECHNICAL
INVESTIGATION & Sheet No :- 1
FOUNDATION ENGINEERING.
Corrected 'N'
0.000
Assuming the Factor of Safety as =
Based on the above 'N' value the following ' ' values are
obtained from the fig.1 of the IS: 6403-1981 for cohesion less
soils (C=0). And for cohesive soils ( =0) the 'c' value is
considered from the relation "Note:- Where ever the test results
are not available the same was assumed based on the available
values.
Specific gravity of soil at 4.5m depth (G)
Assuming the depth factor, shape factor and load inclination
factors as unity.Assuming the water table correction factor (W') as
the ultimate bearing capacity is calculated as below:
-
75
NAME OF THE WORK : SOIL INVESTIGATION WORKS NEAR ARABIND
SCHOOL.Data for the safe Bearing capacity calculation:
(NonCohesive Soil)SPT 'N' = 40 unconfined compressive strength
qu = N/7.5 kg/cm2
= 28 C = qu/2 = 0.00 T/sq.mDepth = 6.0 M = 35 degreeWidth = 2.0
M yt = 1.77 gm/cc
If the 36 General shear failure condition is to be
considered.
LOCAL SHEAR FAILURE CONDITION' = tan^ (-1)(0.67x tan) = 25.0
DegreeC' = 0.67C = 0.00 T/sq.m
AS PER IS :6403-1981,TABLE-1 = 2.67 (from lab test)Nc' = 20.720
G = 2.67Nq' = 10.660 q = Yt X Df
N' = 10.880 = 1.77 X 6.00 = 10.62 T/M `By = Width X Yt
2.0 X 1.77 = 3.5 T/M AS PER IS :6403-1981,TABLE-2
Sc = 1.0 Sq = 1.0 Sy = 1.0 AS PER IS :6403-1981,5.1.2.2
dc = 1.89 dq = 1.44 d = 1.44 (Since > 10) AS PER IS
:6403-1981,5.1.2.3
ic = 1 iq = 1 i = 1 W = 0.5
0.5Qult = (C NcSc dc ic)+y.d.(Nq-1)Sq dq iq+1/2 By NySy dy Iy
W'
= x 20.72 x 1.0 x 1.89 x 1+ 10.62 x 9.66 x 1.0 x 1.44 x 1+ 0.5 x
3.5 x 10.88 x 1.0 x 1.44 x 1.0 x 0.5
= 0.0 + 147.728448 + 13.87= 161.594 T/M
Qult = 161.59 T/sq.M3
SBC = 53.86 T/sq.m
CADD CONSULTING ENGINEERS (P) LTD Bore hole no:-3GEO - TECHNICAL
INVESTIGATION & Sheet No :- 1
FOUNDATION ENGINEERING.
Corrected 'N'
0.000
Assuming the Factor of Safety as =
Based on the above 'N' value the following ' ' values are
obtained from the fig.1 of the IS: 6403-1981 for cohesion less
soils (C=0). And for cohesive soils ( =0) the 'c' value is
considered from the relation "Note:- Where ever the test results
are not available the same was assumed based on the available
values.
Specific gravity of soil at 6.0m depth (G)
Assuming the depth factor, shape factor and load inclination
factors as unity.Assuming the water table correction factor (W') as
the ultimate bearing capacity is calculated as below:
-
76
NAME OF THE WORK : SOIL INVESTIGATION WORKS NEAR ARABIND
SCHOOL.Data for the safe Bearing capacity calculation:
(NonCohesive Soil)SPT 'N' = 42 unconfined compressive strength
qu = N/7.5 kg/cm2
= 29 C = qu/2 = 0.00 T/sq.mDepth = 7.5 M = 35 degreeWidth = 2.0
M yt = 1.77 gm/cc
If the 36 General shear failure condition is to be
considered.
LOCAL SHEAR FAILURE CONDITION' = tan^ (-1)(0.67x tan) = 25.0
DegreeC' = 0.67C = 0.00 T/sq.m
AS PER IS :6403-1981,TABLE-1 = 2.67 (from lab test)Nc' = 20.720
G = 2.67Nq' = 10.660 q = Yt X Df
N' = 10.880 = 1.77 X 7.50 = 13.28 T/M `By = Width X Yt
2.0 X 1.77 = 3.5 T/M AS PER IS :6403-1981,TABLE-2
Sc = 1.0 Sq = 1.0 Sy = 1.0 AS PER IS :6403-1981,5.1.2.2
dc = 2.12 dq = 1.56 d = 1.56 (Since > 10) AS PER IS
:6403-1981,5.1.2.3
ic = 1 iq = 1 i = 1 W = 0.5
0.5Qult = (C NcSc dc ic)+y.d.(Nq-1)Sq dq iq+1/2 By NySy dy Iy
W'
= x 20.72 x 1.0 x 2.12 x 1+ 13.28 x 9.66 x 1.0 x 1.56 x 1+ 0.5 x
3.5 x 10.88 x 1.0 x 1.56 x 1.0 x 0.5
= 0.0 + 200.04894 + 15.02= 215.070 T/M
Qult = 215.07 T/sq.M3
SBC = 71.69 T/sq.m
CADD CONSULTING ENGINEERS (P) LTD Bore hole no:-3GEO - TECHNICAL
INVESTIGATION & Sheet No :- 1
FOUNDATION ENGINEERING.
Corrected 'N'
0.000
Assuming the Factor of Safety as =
Based on the above 'N' value the following ' ' values are
obtained from the fig.1 of the IS: 6403-1981 for cohesion less
soils (C=0). And for cohesive soils ( =0) the 'c' value is
considered from the relation "Note:- Where ever the test results
are not available the same was assumed based on the available
values.
Specific gravity of soil at 7.5m depth (G)
Assuming the depth factor, shape factor and load inclination
factors as unity.Assuming the water table correction factor (W') as
the ultimate bearing capacity is calculated as below:
-
77
NAME OF THE WORK : SOIL INVESTIGATION WORKS NEAR ARABIND
SCHOOL.Data for the safe Bearing capacity calculation:
(NonCohesive Soil)SPT 'N' = 57 unconfined compressive strength
qu = N/7.5 kg/cm2
= 36 C = qu/2 = 0.00 T/sq.mDepth = 7.5 M = 38 degreeWidth = 2.0
M yt = 1.68 gm/cc
If the 36 General shear failure condition is to be
considered.
LOCAL SHEAR FAILURE CONDITION' = tan^ (-1)(0.67x tan) = 27.0
DegreeC' = 0.67C = 0.00 T/sq.m
AS PER IS :6403-1981,TABLE-1 = 2.66 (from lab test)Nc' = 24.488
G = 2.66Nq' = 13.756 q = Yt X Df
N' = 15.486 = 1.68 X 7.50 = 12.60 T/M `By = Width X Yt
2.0 X 1.68 = 3.4 T/M AS PER IS :6403-1981,TABLE-2
Sc = 1.0 Sq = 1.0 Sy = 1.0 AS PER IS :6403-1981,5.1.2.2
dc = 2.41 dq = 1.70 d = 1.70 (Since > 10) AS PER IS
:6403-1981,5.1.2.3
ic = 1 iq = 1 i = 1 W = 0.5
0.5Qult = (C NcSc dc ic)+y.d.(Nq-1)Sq dq iq+1/2 By NySy dy Iy
W'
= x 24.49 x 1.0 x 2.41 x 1+ 12.60 x 12.756 x 1.0 x 1.70 x 1+ 0.5
x 3.4 x 15.49 x 1.0 x 1.70 x 1.0 x 0.5
= 0.0 + 273.23352 + 22.11= 295.348 T/M
Qult = 295.35 T/sq.M3
SBC = 98.45 T/sq.m
CADD CONSULTING ENGINEERS (P) LTD Bore hole no:-3GEO - TECHNICAL
INVESTIGATION & Sheet No :- 1
FOUNDATION ENGINEERING.
Corrected 'N'
0.000
Assuming the Factor of Safety as =
Based on the above 'N' value the following ' ' values are
obtained from the fig.1 of the IS: 6403-1981 for cohesion less
soils (C=0). And for cohesive soils ( =0) the 'c' value is
considered from the relation "Note:- Where ever the test results
are not available the same was assumed based on the available
values.
Specific gravity of soil at 9.0m depth (G)
Assuming the depth factor, shape factor and load inclination
factors as unity.Assuming the water table correction factor (W') as
the ultimate bearing capacity is calculated as below:
-
78
SUMMARY OF GEOTECHNICAL PARAMETERS & SAFE BEARING
CAPACITY
BH DEPTH
BGLTYPE OF BULK DENSITY, SPT-N
N CORRECTI
ON ARRIVED ALLOWABLE BERING PRESSURE
ALLOWABLE BERING PRESSURE
NO (M) SAMPLE gm/cc VALUE VALUEC
KG/CM2
DEGREE SBC T/MFOR 25mm
SETTELEMENT T/MFOR 40mm
SETTELEMENT T/M
57 36
29
- - 98.45 19.23 30.77
3
9.0 (2X2) SPT -
14.71 23.53
- - 53.86 13.89 22.22
- - 71.697.5 (2X2) SPT - 42
6.0 (2X2) SPT - 40 28
NAME OF WORK:- SOIL INVESTIGATION WORKS NEAR ARABIND SCHOOL.
SAMBALPUR
-
SPT 16(2X2) 19.80 11.767.35
11
4.5 SPT - 18
16
17 -
4.17 6.67
(2X2)
BH NO :- 3 SHEET NO : 1
31.26 7.81 12.50
CADD CONSULTING ENGINEERS (P) LTD.GEO - TECHNICAL INVESTIGATION
&
FOUNDATION ENGINEERING.
3.0
-SPT
FOOTING IN M
SHEAR PARAMETER
-2X2 10.261.5
- --
11 -
-
79
CADD CONSULTING ENGINEERS PVT.LTD GEO-TECHNICAL INVESTIGATION
&
FOUNDATION ENGINEERING.
Sheet No:1
ANALYSIS OF THE SUB SOIL INVESTIGATION TEST RESULT
PROJECT:R&B ,SAMBALPUR( NEAR ARABIND SCHOOL, CHAINGE-1421.8M
(BH NO- 3 )
BOREHOLE NO- 3
Borehole no- 3, was sunk up to an average depth of 15.0m the sub
soil strata of the Borehole is given in litho logical form and
summarized as follows.
STRATUM
The top layer up to an average depth up to 0.5 m consists of
packing boulders and from 0.5m to 4.5m depth is fine gravels. And
from 4.5m to 9.5m depth is clay soil with mixed with sand.
The stratum below an average depth from 9.5 m to 15.0 m is
consists rock strata
The strata are moderately medium to dense compact and low to
medium plasticity. The SPT value tabulated in bore log data
sheet.
The core recovery was observed during investigation and
tabulated in bore log data sheet. The ground water table was
encountered at 1.3m within boring depth.
-
PROPERTIES OF BORE HOLE 04
-
ENGINEERING PROPERTIES OF SOIL PROJECT: INFRONT OF NEW MAHILA
THANA. (BH NO- 4)
\
Sl. N
o.
soil
sam
ple c
ollec
ted
at
Type
of s
ampl
e co
llecte
d at
Grain size analysis Atterbergs Limits in %
Field
Moi
sture
Con
tent
in %
Bu
lk De
nsity
in g
m/cc
.
Dry
Dens
ity in
gm/cc
.
Cohe
sion
(C) K
gf/cm
Angl
e of s
hear
ing
resis
tance
()
In d
egre
e Sp
ecifi
c Gra
vity
Void
Rati
o
D.F.
S. in
%
Field
S.P
.T. v
alue
Grou
p of
soil
Fine
Gra
vel in
%
(10m
m to
4.75
mm
)
Coar
se sa
nd in
%
(4.75
mm
to 2.
00m
m)
Medi
um sa
nd in
%
(2m
m to
0.42
5mm
) Fi
ne sa
nd in
%
(0.42
5mm
to
0.075
mm
) Si
lt & C
lay in
%
(0.07
5mm
to
0.001
mm
)
Liqu
id L
imit i
n %
Plas
tic L
imit i
n %
Plas
ticity
Inde
x in
%
1 1.5 SPT 8 6 12 26 48 30 14 16 18 - - - - 2.66 - 14 18 SC
2 3.0 SPT 35 12 8 19 26 23 NP NP 14 - - - - 2.62 - - 29 GM
3 4.5 SPT 6 8 10 52 24 18 NP NP 15 - - - - 2.63 - - 48 SP-SM
4 6.0 SPT 8 12 14 45 21 18 NP NP 15 - - - - 2.63 - - >100
SP-SM
9.5M TO 10.5M CORE RECOVERY =71% & RQD =61%
81
-
83
SOAK
ED
UNSO
AKED
1 BH-49.5m
to 10.5m
71% 61% 0.28% 12.1% 5.8 8.4 208 214 82 2.68 2.68 42.9 1
NOTE:- Nj = 0.1qs= S.B.C OF ROCK IN T/M2qs (qu) X NjSBC is
conservatively Restricted to 80 T / M2 for designed purposed.
SL. N
O
BORE HOLE NO -04
UNIT
WEI
GHT
OF R
OCK
(g/cc
)
HARD
NESS
(H,S
CALE
MOH
S)
SOUN
DNES
S
SAMP
LES
REF:
NO
BORE
HOL
E
DEPT
H OF
FOU
NDAT
ION
BGL
(m)
UNCO
NFIN
ED
COMP
RESS
ION
ST
RENG
TH O
F RO
CK
IN T
/M2
(qs =
qu
* NJ)
POIN
T LO
AD S
TREN
GTH
INDE
X
FOUNDATION ENGINEERING.S