PROJECT TENDERING AND TRACKING APPLICATION PROJECT TYPE: IDP A PROJECT REPORT Submitted by: DEVANG MISTRY [110410107063] KRUNAL PATEL [110410107004] ACHAL PATEL [110410107016] NAME OF THE INDUSTRY: MGVCL Guided by: Industry Guide: Internal Guide: C N Pendor Barkha M Joshi Superintending Engineer, MGVCL Assistant Professor, SVIT In fulfillment for the award of the degree of BACHELOR OF ENGINEERING in COMPUTER ENGINEERING SARDAR VALLABHBHAI PATEL INSTITUTE OF TECHNOLOGY, VASAD Gujarat Technological University, Ahmedabad May, 2015
This document is posted to help you gain knowledge. Please leave a comment to let me know what you think about it! Share it to your friends and learn new things together.
Transcript
PROJECT TENDERING AND TRACKING APPLICATION
PROJECT TYPE: IDP
A PROJECT REPORT
Submitted by:
DEVANG MISTRY [110410107063]
KRUNAL PATEL [110410107004]
ACHAL PATEL [110410107016]
NAME OF THE INDUSTRY: MGVCL
Guided by:
Industry Guide: Internal Guide:
C N Pendor Barkha M Joshi
Superintending Engineer, MGVCL Assistant Professor, SVIT
In fulfillment for the award of the degree
of
BACHELOR OF ENGINEERING
in
COMPUTER ENGINEERING
SARDAR VALLABHBHAI PATEL INSTITUTE OF TECHNOLOGY,
VASAD
Gujarat Technological University, Ahmedabad
May, 2015
SARDAR VALLABHBHAI PATEL INSTITUTE OF TECHNOLOGY,
VASAD
Computer Engineering
2015
CERTIFICATE
Date:
This is to certify that the project entitled “Project Tendering And Tracking
Application” has been carried out by Krunal Patel (110410107004) , Devang
Mistry(110410107063) and Achal Patel(110410107016) under my guidance in
fulfillment of the degree of Bachelor of Engineering in Department of
Computer Engineering (8th Semester) of Gujarat Technological University,
Ahmedabad during the academic year 2014-15.
Internal Guide: Head of Department:
Prof. Barkha M Joshi Prof. Bijal J.Talati
Assistant Professor, Head of the Department,
C.E. Department C.E. Department
S.V.I.T., Vasad S.V.I.T., Vasad
Scanned by CamScanner
Scanned by CamScanner
Scanned by CamScanner
GUJARAT TECHNOLOGICAL UNIVERSITYCERTIFICATE FOR COMPLETION OF ALL ACTIVITIES AT ONLINE PROJECT PORTAL
B.E. SEMESTER VIII, ACADEMIC YEAR 2014-2015
Date of certificate generation : 20 May 2015 (13:17)
Plagiarism Search Report
Final Project Report
Patent Drafting Exercise (PDE)
Business Model Canvas (Report)
Business Model Canvas (Image)
Submitted Four Periodic Progress Reports (PPR)
Uploaded
Uploaded
Completed
Uploaded
Uploaded
Completed
This is to certify that, Achal Ghanshyambhai Patel (Enrolment
Number-110410107016) working on project entitled with Project
Tendering And Tracking System from Computer Engineering
department of Sardar Vallabhbhai Patel Institute Of
Technology, Vasad had submitted following details at online
project portal.
Name of Student :
Signature of Student :
Achal Ghanshyambhai Patel
*Signature of Guide :
Name of Guide : Ms. Barkha Malay Joshi
This is a computer generated copy and does not indicate that your data has been evaluated. This is the receipt
that GTU has received a copy of the data that you have uploaded and submitted as your project work.
Disclaimer :
*Guide has to sign the certificate, Only if all above activities has been Completed / Uploaded.
GUJARAT TECHNOLOGICAL UNIVERSITYCERTIFICATE FOR COMPLETION OF ALL ACTIVITIES AT ONLINE PROJECT PORTAL
B.E. SEMESTER VIII, ACADEMIC YEAR 2014-2015
Date of certificate generation : 21 May 2015 ( 0:03)
Plagiarism Search Report
Final Project Report
Patent Drafting Exercise (PDE)
Business Model Canvas (Report)
Business Model Canvas (Image)
Submitted Four Periodic Progress Reports (PPR)
Uploaded
Uploaded
Completed
Uploaded
Uploaded
Completed
This is to certify that, Devang Devendrakumar Mistry
(Enrolment Number-110410107063) working on project entitled
with Project Tendering And Tracking System from Computer
Engineering department of Sardar Vallabhbhai Patel Institute
Of Technology, Vasad had submitted following details at online
project portal.
Name of Student :
Signature of Student :
Devang Devendrakumar Mistry
*Signature of Guide :
Name of Guide : Ms. Barkha Malay Joshi
This is a computer generated copy and does not indicate that your data has been evaluated. This is the receipt
that GTU has received a copy of the data that you have uploaded and submitted as your project work.
Disclaimer :
*Guide has to sign the certificate, Only if all above activities has been Completed / Uploaded.
GUJARAT TECHNOLOGICAL UNIVERSITYCERTIFICATE FOR COMPLETION OF ALL ACTIVITIES AT ONLINE PROJECT PORTAL
B.E. SEMESTER VIII, ACADEMIC YEAR 2014-2015
Date of certificate generation : 20 May 2015 (23:47)
Plagiarism Search Report
Final Project Report
Patent Drafting Exercise (PDE)
Business Model Canvas (Report)
Business Model Canvas (Image)
Submitted Four Periodic Progress Reports (PPR)
Uploaded
Uploaded
Completed
Uploaded
Uploaded
Completed
This is to certify that, Krunal Ashwinkumar Patel (Enrolment
Number-110410107004) working on project entitled with Project
Tendering And Tracking System from Computer Engineering
department of Sardar Vallabhbhai Patel Institute Of
Technology, Vasad had submitted following details at online
project portal.
Name of Student :
Signature of Student :
Krunal Ashwinkumar Patel
*Signature of Guide :
Name of Guide : Ms. Barkha Malay Joshi
This is a computer generated copy and does not indicate that your data has been evaluated. This is the receipt
that GTU has received a copy of the data that you have uploaded and submitted as your project work.
Disclaimer :
*Guide has to sign the certificate, Only if all above activities has been Completed / Uploaded.
1. feasibility assessment is to determine the positive economic 2. their applicability to the expected needs of the proposed 3. Typically this means estimating how long the system will 4. to develop, and if it can be completed 5. a given time period using some methods like payback http://www.slideshare.net/MRIGANKAMANDAL/feasibility-report-29350738
plagiarised from source: >1%
1. feasibility assessment is to determine the positive economic 2. their applicability to the expected needs of the proposed 3. Typically this means estimating how long the system will 4. to develop, and if it can be completed 5. a given time period using some methods like payback http://www.academia.edu/8021930/Any_Housing_Scheme_Undertaken_without_Feasibility_Studies_Cannot_suc
ceed_Preparation_for_economic plagiarised from source: >1% 1. feasibility assessment is to determine the positive economic 2. their applicability to the expected needs of the proposed 3. Typically this means estimating how long the system will 4. to develop, and if it can be completed 5. a given time period using some methods like payback http://www.essay.uk.com/free-essays/information-technology/smile-farm-e-revolution-farmers.php
plagiarised from source: >1%
1. manipulate information then system get re-configure and user get configuration 2. requires regular maintenance so it won’t 3. failure and we can prevent data 4. When a team member knows that he will be unable to http://www.slideshare.net/emperorofghostkumar12/computer-application-project-on
plagiarised from source: >1%
1. approach to be followed based on the internal and external 2. Some situations where the use of Waterfall model is most appropriate are 3. are very well documented, clear and fixed. Product definition is stable. Technology 4. implementation, testing, installation, troubleshooting, and ends up at operation and http://tutsdaddy.com/what-is-android.html
plagiarised from source: >1%
1. swiping, tapping, pinching and reverse pinching to manipulate on-screen 2. Internal Hardware such as accelerometers, gyroscopes and proximity sensors are used
3. customize their home screens with shortcuts to applications and widgets 4. allow users to display live content, such as emails and http://www.slideshare.net/sureshca505/sdlc-tutorial
plagiarised from source: >1%
1. approach to be followed based on the internal and external 2. Some situations where the use of Waterfall model is most appropriate are 3. implementation, testing, installation, troubleshooting, and ends up at operation and http://www.academia.edu/6722998/STEPS_INVOLVED_IN_SYSTEM_ANALYSIS_AND_DESIGN_LIFE_CYCLE_O
F_SYSTEMSANALYSIS_AND_DESIGN plagiarised from source: >1% 1. Typically this means estimating how long the system will 2. to develop, and if it can be completed 3. a given time period using some methods like payback http://www.tutorialspoint.com/sdlc/sdlc_waterfall_model.htm
plagiarised from source: >1%
1. approach to be followed based on the internal and external 2. Some situations where the use of Waterfall model is most appropriate are 3. implementation, testing, installation, troubleshooting, and ends up at operation and http://itsabacus.com/android/
plagiarised from source: >1%
1. Internal Hardware such as accelerometers, gyroscopes and proximity sensors are used 2. customize their home screens with shortcuts to applications and widgets 3. allow users to display live content, such as emails and http://www.slideshare.net/MuhammadUsman19/android-media-player-project-proposal
plagiarised from source: >1%
1. Linux kernel, and designed primarily for touch 2. customize their home screens with shortcuts to applications and widgets 3. allow users to display live content, such as emails and http://en.wikipedia.org/wiki/Android_(operating_system)
plagiarised from source: >1%
1. Android was unveiled in 2007 along with the founding 2. the Open Handset Alliance: a consortium of hardware, software 3. swiping, tapping, pinching and reverse pinching to manipulate on-screen http://www.slideshare.net/abisek123/final-report-internavisek-signed
plagiarised from source: >1%
1. Typically this means estimating how long the system will 2. to develop, and if it can be completed 3. a given time period using some methods like payback http://www.slideshare.net/Dishaan/android-ppt-36511838
plagiarised from source: >1%
1. Internal Hardware such as accelerometers, gyroscopes and proximity sensors are used 2. customize their home screens with shortcuts to applications and widgets 3. allow users to display live content, such as emails and http://www.academia.edu/6409654/OBJECT_ORIENTED_PROGRAMMING_PRINCIPLES
plagiarised from source: >1%
1. that describe the object) and associated procedures known as 2. interact with one another to design applications and computer programs http://www.macs.hw.ac.uk/~rs46/posts/2014-02-03-objects-boxes-actors-agents.html
plagiarised from source: >1%
1. represents concepts as "objects" that have data fields 2. interact with one another to design applications and computer programs http://jaider.net/key-concepts/
plagiarised from source: >1%
1. represents concepts as "objects" that have data fields 2. that describe the object) and associated procedures known as http://www.quora.com/What-are-some-facts-about-coding-in-the-Java-programming-language-that-every-compu
ter-student-should-know plagiarised from source: >1% 1. represents concepts as "objects" that have data fields 2. that describe the object) and associated procedures known as https://msritse2012.wordpress.com/2013/01/29/unit-3-programming-paradigm-kishore-k/
plagiarised from source: >1%
1. represents concepts as "objects" that have data fields 2. interact with one another to design applications and computer programs http://simpledeveloper.com/object-oriented-programming-in-php-part-i/
plagiarised from source: >1%
1. represents concepts as "objects" that have data fields 2. that describe the object) and associated procedures known as http://coddicted.com/oops-concepts/
plagiarised from source: >1%
1. represents concepts as "objects" that have data fields 2. that describe the object) and associated procedures known as http://w3guy.com/books-learn-php-object-oriented-programing/
plagiarised from source: >1%
1. that describe the object) and associated procedures known as 2. interact with one another to design applications and computer programs http://www.slideshare.net/khannabwn/150-17280879
plagiarised from source: >1%
1. Typically this means estimating how long the system will 2. to develop, and if it can be completed https://www.weheartswift.com/object-oriented-programming-swift/
plagiarised from source: >1%
1. that describe the object) and associated procedures known as 2. interact with one another to design applications and computer programs http://www.slideshare.net/Girase123rakesh/main-zota-abstract
plagiarised from source: >1%
1. with a brief study of different hardware used in the computerized 2. All the hardware needed here are generally
1. data from all other codes and 2. those qualities that make it unique within its http://www.slideshare.net/rupenparte/database-management-systems-40150526
plagiarised from source: >1%
1. entity B there is only one instance of entity 2. associated with one, zero or many instances of another http://help.bizagi.com/bpmsuite/en/relationship_types.htm
plagiarised from source: >1%
1. entity B there is only one instance of entity 2. associated with one, zero or many instances of another http://www.webopedia.com/TERM/E/entity_relationship_diagram.html
plagiarised from source: >1%
1. entity B there is only one instance of entity 2. associated with one, zero or many instances of another http://www.slideshare.net/tusharsoni58/college-stationery-management-system-45146236
plagiarised from source: >1%
1. Typically this means estimating how long the system will 2. to develop, and if it can be completed http://www.infobridgesolutions.com/technicalshowcase/android
plagiarised from source: >1%
1. Android was unveiled in 2007 along with the founding 2. the Open Handset Alliance: a consortium of hardware, software http://www.cloudiply.com/services/mobileapplications
plagiarised from source: >1%
1. Android was unveiled in 2007 along with the founding 2. the Open Handset Alliance: a consortium of hardware, software http://devoops.me/themes/devoops/ajax/ui_jquery-ui.html
plagiarised from source: >1%
1. Android was unveiled in 2007 along with the founding 2. the Open Handset Alliance: a consortium of hardware, software http://digimark.bg/en/mobile-os-platforms
plagiarised from source: >1%
1. Android was unveiled in 2007 along with the founding 2. the Open Handset Alliance: a consortium of hardware, software http://apid.com.tr/android.php
plagiarised from source: >1%
1. Android was unveiled in 2007 along with the founding 2. the Open Handset Alliance: a consortium of hardware, software https://hub.scaleway.com/android.html
plagiarised from source: >1%
1. Android was unveiled in 2007 along with the founding
2. swiping, tapping, pinching and reverse pinching to manipulate on-screen http://www.slideshare.net/shassan573/process-models-38930047
plagiarised from source: >1%
1. approach to be followed based on the internal and external 2. Some situations where the use of Waterfall model is most appropriate are http://www.hcltech.com/sites/default/files/android_graphics_power_consumption_optimization_nitin_kumar_gar g_-
_v2.0.pdf plagiarised from source: >1% 1. swiping, tapping, pinching and reverse pinching to manipulate on-screen 2. Internal Hardware such as accelerometers, gyroscopes and proximity sensors are used http://www.slideshare.net/smitpatel10192/etender-system
plagiarised from source: >1%
1. with a brief study of different hardware used in the computerized 2. All the hardware needed here are generally http://www.pacepacker-services.co.uk/feasibility-studies.htm
plagiarised from source: >1%
1. Typically this means estimating how long the system will 2. a given time period using some methods like payback http://www.evenja.org/doc/versus/oop
plagiarised from source: >1%
1. represents concepts as "objects" that have data fields 2. interact with one another to design applications and computer programs http://www.academia.edu/5070224/An_Airline_Seat_Reservation_System
plagiarised from source: >1%
1. The phased operation changeover method involves 2. In this approach risk of errors or failures is limited http://www.answers.com/Q/Changeover_methods_in_Management_information_systems
plagiarised from source: >1%
1. The phased operation changeover method involves 2. In this approach risk of errors or failures is limited http://www.answers.com/Q/What_are_the_changeover_approaches_of_an_information_system
plagiarised from source: >1%
1. The phased operation changeover method involves 2. In this approach risk of errors or failures is limited http://www.slideshare.net/sumitpaul14203/software-engineering-unit-1
plagiarised from source: >1%
1. the tasks within the time estimated in the project http://seminarprojects.com/Thread-payroll-management-system-full-report
plagiarised from source: >1%
1. implementation, testing, installation, troubleshooting, and ends up at operation and http://www.academia.edu/6328712/SDLC
plagiarised from source: >1%
1. implementation, testing, installation, troubleshooting, and ends up at operation and http://www.slideshare.net/ManoharIyer/comp-info-sys-asignments
plagiarised from source: >1%
1. implementation, testing, installation, troubleshooting, and ends up at operation and http://en.wikibooks.org/wiki/Systems_Analysis_and_Design/Introduction
plagiarised from source: >1%
1. implementation, testing, installation, troubleshooting, and ends up at operation and http://searchsoftwarequality.techtarget.com/definition/waterfall-model
plagiarised from source: >1%
1. implementation, testing, installation, troubleshooting, and ends up at operation and http://www.slideshare.net/darshakmehta9/software-project-management-tools-45807859
plagiarised from source: >1%
1. the tasks within the time estimated in the project https://www.theseus.fi/bitstream/handle/10024/6803/Ma_Jun.pdf?sequence=1
plagiarised from source: >1%
1. their applicability to the expected needs of the proposed https://tr.linkedin.com/in/srturgut
plagiarised from source: >1%
1. their applicability to the expected needs of the proposed http://www.slideshare.net/jeesuwarrior/documentation-of-railway-reservation-system
plagiarised from source: >1%
1. their applicability to the expected needs of the proposed https://blog.udemy.com/php-oop-tutorial/
plagiarised from source: >1%
1. represents concepts as "objects" that have data fields http://www.slideshare.net/usriarc/final-sdlc-project-2
plagiarised from source: >1%
1. their applicability to the expected needs of the proposed http://www.academia.edu/4935972/ONLINE_ORDERING_SYSTEM_PROJECT_PROPOSAL
plagiarised from source: >1% 1. their applicability to the expected needs of the proposed http://highered.mheducation.com/sites/0072853182/student_view0/chapter24/chapter_summary.html
plagiarised from source: >1%
1. the tasks within the time estimated in the project http://rubygarage.github.io/public/oop/
plagiarised from source: >1%
1. that describe the object) and associated procedures known as http://a4academics.com/final-year-be-project/11-be-it-cse-computer-science-project/63-data-structures-and-algo
rithms-visualization-tool plagiarised from source: >1%
1. The study will decide if the proposed system will http://www.academia.edu/1840549/IFIP_Virtual_University_Case_Study
plagiarised from source: >1%
1. The study will decide if the proposed system will http://www.slideshare.net/ravalsneh/android-application-and-unity3d-game-documentation
plagiarised from source: >1%
1. The study will decide if the proposed system will http://docarvin.mdl2.com/
plagiarised from source: >1%
1. interact with one another to design applications and computer programs http://www.tutorialspoint.com/object_oriented_analysis_design/ooad_object_oriented_paradigm.htm
plagiarised from source: >1%
1. interact with one another to design applications and computer programs http://coding-school.com/perl-oop/
plagiarised from source: >1%
1. representing essential features without including the background details or http://learn2expert.net/Interview/OOPS_Part05
plagiarised from source: >1%
1. representing essential features without including the background details or http://www.slideshare.net/praveenjigajinni/5-general-oop-concepts
plagiarised from source: >1%
1. representing essential features without including the background details or http://www.javatechnologycenter.com/question/java/
plagiarised from source: >1%
1. representing essential features without including the background details or http://www.academia.edu/1737964/Object_Oriented_Programming_2_Mark_Questions
plagiarised from source: >1%
1. representing essential features without including the background details or http://www.cpp-home.com/archives/206.html
plagiarised from source: >1%
1. representing essential features without including the background details or http://www.techopedia.com/definition/3736/abstraction
plagiarised from source: >1%
1. representing essential features without including the background details or http://wiki.tcl.tk/13398
plagiarised from source: >1%
1. representing essential features without including the background details or http://www.slideshare.net/AsadMasoodQazi/all-net-questions
plagiarised from source: >1%
1. data from all other codes and
http://planopedia.com/wiki/telos/
plagiarised from source: >1%
1. feasibility assessment is to determine the positive economic http://solidswiki.com/index.php?title=Feasibility_Studies
plagiarised from source: >1%
1. to develop, and if it can be completed http://www.shumon.me/decode/qa/
plagiarised from source: >1%
1. data from all other codes and http://www.micc.unifi.it/bertini/download/labtecinf/C A Beginner's Guide 2nd Edition (2003).pdf
plagiarised from source: >1%
1. those qualities that make it unique within its http://www.devarticles.com/c/a/Java/An-Overview-of-Java/1/
plagiarised from source: >1%
1. those qualities that make it unique within its http://www.academia.edu/5903896/Chapter_1_The_Creation_of_C
plagiarised from source: >1%
1. those qualities that make it unique within its http://www.iosrjournals.org/iosr-jce/papers/Vol15-issue1/K1515966.pdf?id=7571
plagiarised from source: >1%
1. those qualities that make it unique within its http://www.byte-notes.com/oop-concepts-c
plagiarised from source: >1%
1. those qualities that make it unique within its http://i-learn.uitm.edu.my/OERApp/CourseFile/818391780/Topic 1 - Introduction to Object Oriented
Programm.swf plagiarised from source: >1% 1. those qualities that make it unique within its http://www.java-samples.com/showtutorial.php?tutorialid=42
plagiarised from source: >1%
1. those qualities that make it unique within its http://www.slideshare.net/SafiUllah2/hospital-management-system-25384877
plagiarised from source: >1%
1. entity B there is only one instance of entity http://www.slideshare.net/vilasitanandamuri/vilasitaoracle-basic-fundamentals
plagiarised from source: >1%
1. entity B there is only one instance of entity http://www.slideshare.net/edhole/mba-ebooks-edhole-35029754
plagiarised from source: >1%
1. a given time period using some methods like payback
1. entity B there is only one instance of entity http://ecomputernotes.com/fundamental/what-is-a-database/basic-construction-of-e-r-modeling
plagiarised from source: >1%
1. entity B there is only one instance of entity http://www.freetutes.com/systemanalysis/sa7-degree-of-entity-relationship-type.html
plagiarised from source: >1%
1. entity B there is only one instance of entity http://www.slideshare.net/roying/lecture-2-conceptualizing-a-festive-event
plagiarised from source: >1%
1. a given time period using some methods like payback https://www.st.cs.uni-saarland.de/edu/se/2013/files/slides/04-Managing Projects.pdf
plagiarised from source: >1%
1. Known risks are those that can be uncovered http://www.slideshare.net/JalPari13/document-for-voice-banking-system-mini-project
plagiarised from source: >1%
1. associated with one, zero or many instances of another http://feedback.bizagi.com/suite/en/responses/data-navigation-from-a-collection-attached-to-wfuser
plagiarised from source: >1%
1. associated with one, zero or many instances of another http://post.milathan.com/2015/01/
plagiarised from source: >1%
1. .Net is considered by many to http://www.velmultimedia.com/android.pdf
plagiarised from source: >1%
1. Linux kernel, and designed primarily for touch https://www.st.cs.uni-saarland.de/edu/se/2012/lecture-slides/06-Managing-Projects.pdf
plagiarised from source: >1%
1. Known risks are those that can be uncovered http://www.bashguru.com/2009_12_01_archive.html
plagiarised from source: >1%
1. Linux kernel, and designed primarily for touch http://www.bashguru.com/2010/12/shell-script-to-generate-fibonacci.html
plagiarised from source: >1%
1. Linux kernel, and designed primarily for touch http://www.bashguru.com/2008_03_01_archive.html
plagiarised from source: >1%
1. Linux kernel, and designed primarily for touch http://www.bashguru.com/2010/03/unixlinux-advanced-file-permissions.html
plagiarised from source: >1% 1. Linux kernel, and designed primarily for touch http://www.onestoplinux.com/p/android_25.html
plagiarised from source: >1%
1. Linux kernel, and designed primarily for touch http://www.leagoo.com.my/cs-knowledge.html
plagiarised from source: >1%
1. Linux kernel, and designed primarily for touch https://rs2tech.com/RS2WebApp/Universalv3.aspx
plagiarised from source: >1%
1. mobile devices such as smart phones and tablet https://www.devbridge.com/chicago-mobile-development/
plagiarised from source: >1%
1. mobile devices such as smart phones and tablet http://www.wccnet.edu/about-us/mobile/
plagiarised from source: >1%
1. mobile devices such as smart phones and tablet http://www.insitesoft.com/blog/is-your-website-ready-for-mobile-friendly-search/
plagiarised from source: >1%
1. mobile devices such as smart phones and tablet https://www.vasont.com/news-releases/vasont-app-support.html
plagiarised from source: >1%
1. mobile devices such as smart phones and tablet http://adxmedia.com/mobile-web-design.html
plagiarised from source: >1%
1. mobile devices such as smart phones and tablet http://www.aaos.org/news/aaosnow/jun12/clinical11.asp
plagiarised from source: >1%
1. mobile devices such as smart phones and tablet http://www.bbc.com/news/business-13962653
plagiarised from source: >1%
1. mobile devices such as smart phones and tablet http://ijrcm.org.in/download.php?name=ijrcm-2-IJRCM-2_vol-3_2013_issue-11-art-16.pdf&path=uploaddata/ijrc m-
2-IJRCM-2_vol-3_2013_issue-11-art-16.pdf plagiarised from source: >1% 1. feasibility assessment is to determine the positive economic http://www.infobridgesolutions.com/technical-showcase
plagiarised from source: >1%
1. Android was unveiled in 2007 along with the founding http://www.angieslist.com/articles/how-much-does-new-lawn-mower-cost.htm
plagiarised from source: >1% 1. requires regular maintenance so it won’t https://readytogo.microsoft.com/en-us/_layouts/Download.aspx?SourceUrl=https://readytogo.microsoft.com/en-
us/Asset/RTG Anonymous Asset Library/40 ModernBiz - Demo Script.docx plagiarised from source: >1% 1. failure and we can prevent data http://www.fibtex.lodz.pl/2014/5/34.pdf
plagiarised from source: >1%
1. be assessed as very low http://onlinelibrary.wiley.com/doi/10.1111/j.1574-695X.2006.00101.x/full
plagiarised from source: >1%
1. be assessed as very low https://fp7.portals.mbs.ac.uk/Portals/59/docs/MC deliverables/WP2 S Durst working
paper1_IntangibleRiskDisclosure.pdf plagiarised from source: >1% 1. be assessed as very low http://www.mrc.ac.uk/documents/pdf/mrc-submission-ec-concept-paper-on-revision-of-clinical-trials-directive-m ay-
2011/ plagiarised from source: >1% 1. be assessed as very low http://www.academia.edu/6169082/Report_on_Android
plagiarised from source: >1%
1. the Open Handset Alliance: a consortium of hardware, software http://thegamesdb.net/platforms/
plagiarised from source: >1%
1. the Open Handset Alliance: a consortium of hardware, software http://codexdesign.in/android-applications-development/
plagiarised from source: >1%
1. swiping, tapping, pinching and reverse pinching to manipulate on-screen http://www.scielo.br/scielo.php?pid=S1519-69842013000200279&script=sci_arttext&tlng=es
plagiarised from source: >1%
1. be assessed as very low http://canadiantaskforce.ca/files/guidelines/2015-lung-cancer-protocol-en.pdf
plagiarised from source: >1%
1. be assessed as very low http://www.underconsideration.com/brandnew/archives/new_logo_for_android.php
plagiarised from source: >1%
1. swiping, tapping, pinching and reverse pinching to manipulate on-screen http://techcrunch.com/topic/product/android/
plagiarised from source: >1%
1. swiping, tapping, pinching and reverse pinching to manipulate on-screen http://en.wikipedia.org/wiki/LuneOS
plagiarised from source: >1%
1. swiping, tapping, pinching and reverse pinching to manipulate on-screen http://www.gsu.by/biglib/GSU/Иностранных языков/Презентации студентов/Английский для математиков/Android.ppt
plagiarised from source: >1% 1. Internal Hardware such as accelerometers, gyroscopes and proximity sensors are used http://knowyourmeme.com/memes/subcultures/android-os
plagiarised from source: >1%
1. Internal Hardware such as accelerometers, gyroscopes and proximity sensors are used http://jderobot.org/Evelinfv
plagiarised from source: >1%
1. Internal Hardware such as accelerometers, gyroscopes and proximity sensors are used http://www.youtube.com/watch?v=6Nyt_gjiLU8
plagiarised from source: >1%
1. Internal Hardware such as accelerometers, gyroscopes and proximity sensors are used http://www.slideshare.net/fdgiraldo/m-project-planning
plagiarised from source: >1%
1. be assessed as very low http://www.sanfoundry.com/software-engg-mcqs-project-management/
plagiarised from source: >1%
1. be assessed as very low http://www.oiirj.org/oiirj/jan-feb2014/30.pdf
plagiarised from source: >1%
1. customize their home screens with shortcuts to applications and widgets http://www.edbpriser.dk/skaerm/philips-272s4lpjcb-sort-id-8958560.aspx
plagiarised from source: >1%
1. customize their home screens with shortcuts to applications and widgets http://itsabacus.com/mobile-application/
plagiarised from source: >1%
1. customize their home screens with shortcuts to applications and widgets http://www.academia.edu/10096820/B041130610
plagiarised from source: >1%
1. customize their home screens with shortcuts to applications and widgets http://www.liceomundofeliz.com/web/track-iphone/whatsapp-spy-location.html
plagiarised from source: >1%
1. allow users to display live content, such as emails and http://www.finalconcept.com.au/article/view/android-account-manager-step-by-step-2
plagiarised from source: >1%
1. allow users to display live content, such as emails and http://odvkc.com/logos/sms-location/phone-tracker-location.html
plagiarised from source: >1%
1. allow users to display live content, such as emails and http://www.youtube.com/watch?v=cESqm80XPXk
plagiarised from source: >1%
1. allow users to display live content, such as emails and http://pubs.sciepub.com/ajmm/2/2/1/
plagiarised from source: >1%
1. feasibility assessment is to determine the positive economic http://www.answers.com/Q/What_is_direct_changeover
plagiarised from source: >1%
1. The phased operation changeover method involves http://www.answers.com/Q/Criticism_of_system_approach
plagiarised from source: >1%
1. In this approach risk of errors or failures is limited http://www.answers.com/Q/What_is_a_phase_changeover
plagiarised from source: >1%
1. The phased operation changeover method involves https://www.linkedin.com/pulse/value-feasibility-studies-david-fisher-the-web-lender
plagiarised from source: >1%
1. feasibility assessment is to determine the positive economic http://www.answers.com/Q/What_is_a_SALS_approach_lighting_system
plagiarised from source: >1%
1. In this approach risk of errors or failures is limited http://www.slideshare.net/mahmoudghonim/dot-net-interviewquestions-29529402
plagiarised from source: >1%
1. data from all other codes and
GUJARAT TECHNOLOGICAL UNIVERSITY
[UNDERTAKING ABOUT ORIGINALITY OF WORK]
We hereby certify that we are the sole authors of this IDP/UDP project report and that neither any part of
this IDP/UDP project report nor the whole of the IDP/UDP Project report has been submitted for a degree
by other student(s) to any other University or Institution.
We certify that, to the best of our knowledge, the current IDP/UDP Project report does not infringe upon
anyone’s copyright nor violate any proprietary rights and that any ideas, techniques, quotations or any
other material from the work of other people included in our IDP/UDP Project report, published or
otherwise, are fully acknowledged in accordance with the standard referencing practices. Furthermore, to
the extent that we have included copyrighted material that surpasses the boundary of fair dealing within
the meaning of the Indian Copyright (Amendment) Act 2012, we certify that we have obtained a written
permission from the copyright owner(s) to include such material(s) in the current IDP/UDP Project report
and have included copies of such copyright clearances to our appendix.
We have checked the write up of the present IDP/UDP Project report using anti-plagiarism database and it
is in the allowable limit. In case of any complaints pertaining to plagiarism, we certify that we shall be solely
responsible for the same and we understand that as per norms, University can even revoke BE degree
conferred upon the student(s) submitting this IDP/UDP Project report, in case it is found to be plagiarised.
Team:
Enrolment number Name Signature
110410107004 Krunal Ashwinkumar Patel
110410107063 Devang Devendrakumar Mistry
110410107016 Achal Ghanshyambhai Patel
Place: Vadodara Date: 20/05/2015
Name of Guide Prof. Barkha M Joshi Signature of Guide
Page i
ACKNOWLEDGEMENT
Our efforts in making this project, a success, would not have been of use without the kind
support and help of many individuals and seniors. We would like to extend our sincere thanks
to all of them.
We are very grateful to our Principal DR. J. V. Deshkar for providing us with an
environment where we could able to complete our project successfully.
We are grateful to Prof. BARKHA M. JOSHI for her guidance and constant supervision as
well as for providing necessary information regarding the project and also for her support in
completing the project. We would also like to thank Prof. BIJAL J. TALATI (Head of the
Department) for helping us and providing her support for carrying out this project.
We would like to express gratitude towards our parents & friends for their kind co-operation
and encouragement which helped us in completion of this project. We would like to express
special gratitude and thank you to faculties and technicians of our college for giving us such
attention and time.
Our thank you and appreciation also goes to MGVCL, for providing us the necessary
infrastructure and facilities, along with worthy guidance in developing this project. It has
been a great experience working with MGVCL, while undertaking this project. Also we
would like to thank you our project guide Mr. C N Pendor (Superintending Engineer) for
all his support during the development of the project.
Page ii
ABSTRACT
In this project we take up one segment of the MGVCL (GEB), which is the
tendering and tracking of the various projects in different sectors. In this
project we build a web application which will contain the 3 different modules.
The first module will contain the Authentication process i.e. User management
and Vendor Management(Corporation interested to work for the project
proposed by MGVCL (GEB) for e.g. companies like reliance, TATA etc.).
The registered and authenticated vendors will be allowed to access the
database. The MGVCL (GEB) will provide their project plans and definition as
per the need in different sectors. The Second Module will contain the tendering
process where the optimum and reliable vendor will be selected which meets
the requirements of MGVCL (GEB) and the confirmation of reject or approval
will be announced through mails to each vendor. The third module will contain
the project progress report where the MGVCL (GEB) will assign milestones
and the project manager to the vendor. Additionally we will develop a mobile
application that will be used for live project tracking. With this system
MGVCL (GEB) can propose the project and can do their progress track
efficiently. This will also reduce the complexity and manual work involved in
tracking process.
FRONT - END: ASP.NET, HTML 5, ANDROID
BACK – END: SQL
Page iii
LIST OF TABLES
Table No. Table Description Page No.
1 Risk Analysis 11
2 Staff Data Dictionary 34
3 Vendor Data Dictionary 34
4 Project Data Dictionary 34
5 Bid Data Dictionary 35
6 Milestone Data Dictionary 35
7 Intermediate Report Data Dictionary 35
8 Test Values/Cases 57
Page iv
LIST OF FIGURES
Figure No. Figure Description Page No.
1 System Flow 7
2 Gantt Chart 8
3 Waterfall Model 13
4 Class Diagram 16
5 Vendor Management Use Case Diagram 18
6 Staff Management Use Case Diagram 19
7 Project Announcement and
Configuration Use Case Diagram 20
8 Tender Bidding Use Case Diagram 21
9 Project Progress Tracking Use Case Diagram 22
10 Project Progress Analysis Use Case Diagram 23
11 Vendor Registration Sequence Diagram 25
12 Tender Selection and Project Progress
Analysis Sequence Diagram 25
13 Vendor Management Activity Diagram 27
14 Project Progress Tracking Activity Diagram 28
15 Database Design Diagram 29
16 Entity-Relationship (ER) Diagram 31
17 State Diagram 33
18 Observation Matrix Canvas 36
Page v
19 Ideation Canvas 38
20 .NET Architecture 39
21 Android Architecture 40
22 Phase Implementation Environment 41
23 Sign Up for Vendor 42
24 Sign Up Validation Parameters for Vendor 42
25 Sign In for Vendor, Admin and Staff 43
26 Password Recovery 43
27 Dashboard (Admin Side) 44
28 List of Accepted or Awarded Projects (Vendor Side) 44
GTU ‐ Project Monitoring and Mentoring SystemWelcome Achal Ghanshyambhai PatelSign Out
My Account Task Manage
Periodic Progess Report : First PPR
Project : Project Tendering And Tracking System
Status : Reviewed (Freeze)
What Progress you have made in the Project ?
I am currently working in the coding phase where I am simultaneously working on the ASP.Net and Android. Along with my team members, in project I have donecoding in various section of our Web application like staff management, Vendor Management, Project Announcement, etc.
What challenge you have faced ?
Challenge I have faced with my team members during project coding phase was to implement the Three tier architecture. Also we had few more challenges duringthe design phase as we have to deliver to some specific requirements which would have made the application more sophisticated.
What support you need ?
Currently I think we don’t need any support as we are able to proceed smoothly and are able to get things conveniently.
Which literature you have referred ?
Books referred during coding phase are Asp.Net 2.0 Black Book, The Complete Reference Asp.Net by Robert Standefer III for Asp.Net. Also for Android, bookreferred is Programming Android of O’riley publication. Apart from Books we have use help from certain internet websites too like www.w3schools.com/aspnet,asp.nettutorials.com.
Document : No document uploaded
Comment by Internal Guide :
Done proper analysis for the particular definition. Complete the analysis phase within the time period which is given by the dept.
GTU ‐ Project Monitoring and Mentoring SystemWelcome Achal Ghanshyambhai PatelSign Out
My Account Task Manage
Periodic Progess Report : Second PPR
Project : Project Tendering And Tracking System
Status : Reviewed (Freeze)
What Progress you have made in the Project ?
Currently I am in the coding phase where I am working on the ASP.Net and Android, simultaneously. Along with my team members in project I have done coding invarious section of our Web application like staff management, Vendor Management, Project Announcement. Also I have started developing android application inwhich login page for staff is done.
What challenge you have faced ?
Challenges come across when you start making progress. As the step further was taken in the project, time consuming and brain teasing problems came to our doorstep. Challenge right now is to make a communication possible between Android Application and Web Application. This is needed because in order to send someinformation like photos and description from Android phone to Web Application and vice versa.
What support you need ?
Currently no support is needed of any kind as all things are going as per plan. Also the help and support needed from our internal and external guide because of theirimmense experience in this particular field is available as asked during the progress of project. Thus, right now we are well supported and guided.
Which literature you have referred ?
Books referred during coding phase are Asp.Net 2.0 Black Book, The Complete Reference Asp.Net by Robert Standefer III for Asp.Net. Also for Android, bookreferred is Programming Android of O’riley publication. Apart from Books we have use help from Google.
Document : No document uploaded
Comment by Internal Guide :
Completed designing phase with in the time period Done the proper changes in the diagram which is required and also done proper data dictionaries as per therequirements.
GTU ‐ Project Monitoring and Mentoring SystemWelcome Achal Ghanshyambhai PatelSign Out
My Account Task Manage
Periodic Progess Report : Third PPR
Project : Project Tendering And Tracking System
Status : Reviewed (Freeze)
What Progress you have made in the Project ?
I am currently working simultaneously on the ASP.Net and Android. Along with my team members in project I have done coding in various section of our Webapplication like staff management, Vendor Management, Project Announcement, Project Planning, Bid Selection. Also we have implemented android application thatcan send photo taken by device camera along with GPS coordinates to SQL server for tracking purpose.
What challenge you have faced ?
We need to use camera and GPS coordinates of device in android application. Implementation of these features was bit of challenge. The process we wanted to dowas to send the GPS coordinates and photo from the android app to the SQL server so that it can be accessed into the web application. The process waschallenging as it was whole new approach for us.
What support you need ?
Right now the progress in project is going as per the plan. We have dealt with every constraint that came our way. Also we are well guided by our internal guide aswell as external guide. So no support currently is required.
Which literature you have referred ?
Books referred during coding phase are Asp.Net 2.0 Black Book, The Complete Reference Asp.Net by Robert Standefer III for Asp.Net. Also for Android, bookreferred is Programming Android of O’riley publication. Apart from Books we have use help from Google.
Document : No document uploaded
Comment by Internal Guide :
Work on the implementing the software and that is about to complete with in the time period. simultaneously they are testing the functionality too.
GTU ‐ Project Monitoring and Mentoring SystemWelcome Achal Ghanshyambhai PatelSign Out
My Account Task Manage
Periodic Progess Report : Forth PPR
Project : Project Tendering And Tracking System
Status : Reviewed (Freeze)
What Progress you have made in the Project ?
I am currently working simultaneously on the ASP.Net and Android. Along with my team members in project I have done coding in various section of our Webapplication and mobile application(Android). Project undertaken by us under the company MGVCL has finally been completed. The implementation of all the modulesas defined is completed. The web application as well as mobile application coding has been done and both applications are working with ease. To conclude, theproject has been completed with all the functionality intact.
What challenge you have faced ?
We need to use map integration in order to show the admin the exact location of site for ongoing projects, of which, staff is doing tracking process. Also we neededpie charts for the purpose of performance analysis. Implementation of these two functionality was bit of a challenge. The process we wanted to do was to send theGPS coordinates to the SQL server so that it can be accessed and with the help of those coordinates the map would have been shown to admin into the webapplication. The process was challenging as it was whole new approach for us.
What support you need ?
project has been completed as per the plan. We have dealt with every constraint that came our way. Also we are well guided by our internal guide as well as externalguide. So no support currently is required.
Which literature you have referred ?
Books referred during coding phase are Asp.Net 2.0 Black Book, The Complete Reference Asp.Net by Robert Standefer III for Asp.Net. Also for Android, bookreferred is Programming Android of O’riley publication. Apart from Books we have use help from Google.
Document : Download
Comment by Internal Guide :
almost the testing phase is complete and the are making more test cases to check the functionality of the software. Simultaneously they are working on thedocumentation of the software. They have completed their work within the time period.
GTU ‐ Project Monitoring and Mentoring SystemWelcome Krunal Ashwinkumar PatelSign Out
My Account Task
Periodic Progess Report : First PPR
Project : Project Tendering And Tracking System
Status : Reviewed (Freeze)
What Progress you have made in the Project ?
I am currently working in the coding phase. Along with my team members in project I have done coding in various section of our Web application like staffmanagement, Project Announcement and made user interface for android application.
What challenge you have faced ?
I have faced a challenge with my team members during project coding phase was to implement three tier architecture.
What support you need ?
Currently I think we don’t need any support as we are able to proceed smoothly and are able to get things conveniently.
Which literature you have referred ?
Books referred during coding phase are Asp.Net 2.0 Black Book, The Complete Reference Asp.Net by Robert Standefer III for Asp.Net. Also for Android, bookreferred is Programming Android of O’riley publication. Apart from Books we have use help from Google and websites for android development .
Document : No document uploaded
Comment by Internal Guide :
Done proper analysis for the particular definition. Complete the analysis phase within the time period which is given by the dept.
GTU ‐ Project Monitoring and Mentoring SystemWelcome Krunal Ashwinkumar PatelSign Out
My Account Task
Periodic Progess Report : Second PPR
Project : Project Tendering And Tracking System
Status : Reviewed (Freeze)
What Progress you have made in the Project ?
I am currently working in the coding phase where I am simultaneously working on the ASP.Net and Android. Along with my team members in project I have donecoding in various section of our Web application like staff management, Vendor Management, Project Announcement. And we have started developing androidapplication and login process for staff is done.
What challenge you have faced ?
Challenging part of our project right now is to make possible the communication between the ASP.Net Web Application and Android Application. As without thecommunication made active between these two different applications it is not possible to go ahead and as the coding to make possible this communication is bit ofcomplex, it is taking time as well as much effort.
What support you need ?
Right now the progress in project is going as per the plan. We have dealt with every constraint that came our way. Also we are well guided by our internal guide aswell as external guide. So no support currently is required.
Which literature you have referred ?
Books referred during coding phase are Asp.Net 2.0 Black Book, The Complete Reference Asp.Net by Robert Standefer III for Asp.Net. Also for Android, bookreferred is Programming Android of O’riley publication. Apart from Books we have use help from Google.
Document : No document uploaded
Comment by Internal Guide :
Completed designing phase with in the time period Done the proper changes in the diagram which is required and also done proper data dictionaries as per therequirements.
GTU ‐ Project Monitoring and Mentoring SystemWelcome Krunal Ashwinkumar PatelSign Out
My Account Task
Periodic Progess Report : Third PPR
Project : Project Tendering And Tracking System
Status : Reviewed (Freeze)
What Progress you have made in the Project ?
I am currently working simultaneously on the ASP.Net and Android. Along with my team members in project I have done coding in various section of our Webapplication like staff management, Vendor Management, Project Announcement, project planning, bid selection. And we have implemented android application thatcan send photo taken by device’s camera and GPS coordination to SQL server for tracking purpose.
What challenge you have faced ?
We need to use camera and GPS coordination of device in android application. Implementation of these was bit of challenge. The process we wanted to do was tosend the GPS coordinates and photo from the android app to the SQL server so that it can be accessed into the web application. The process was challenging as itwas whole new approach for us.
What support you need ?
Right now the progress in project is going as per the plan. We have dealt with every constraint that came our way. Also we are well guided by our internal guide aswell as external guide. So no support currently is required.
Which literature you have referred ?
Books referred during coding phase are Asp.Net 2.0 Black Book, The Complete Reference Asp.Net by Robert Standefer III for Asp.Net. Also for Android, bookreferred is Programming Android of O’riley publication. Apart from Books we have use help from Google.
Document : No document uploaded
Comment by Internal Guide :
Work on the implementing the software and that is about to complete with in the time period. simultaneously they are testing the functionality too.
GTU ‐ Project Monitoring and Mentoring SystemWelcome Krunal Ashwinkumar PatelSign Out
My Account Task
Periodic Progess Report : Forth PPR
Project : Project Tendering And Tracking System
Status : Reviewed (Freeze)
What Progress you have made in the Project ?
I am currently working simultaneously on the ASP.Net and Android. Along with my team members in project I have done coding in various section of our Webapplication and mobile application(Android). Project undertaken by us under the company MGVCL has finally been completed. The implementation of all the modulesas defined is completed. The web application as well as mobile application coding has been done and both applications are working with ease. To conclude, theproject has been completed with all the functionality intact.
What challenge you have faced ?
We need to use map integration in order to show the admin the exact location of site for ongoing projects, of which, staff is doing tracking process. Also we neededpie charts for the purpose of performance analysis. Implementation of these two functionality was bit of a challenge. The process we wanted to do was to send theGPS coordinates to the SQL server so that it can be accessed and with the help of those coordinates the map would have been shown to admin into the webapplication. The process was challenging as it was whole new approach for us.
What support you need ?
project has been completed as per the plan. We have dealt with every constraint that came our way. Also we are well guided by our internal guide as well as externalguide. So no support currently is required.
Which literature you have referred ?
Books referred during coding phase are Asp.Net 2.0 Black Book, The Complete Reference Asp.Net by Robert Standefer III for Asp.Net. Also for Android, bookreferred is Programming Android of O’riley publication. Apart from Books we have use help from Google.
Document : Download
Comment by Internal Guide :
almost the testing phase is complete and the are making more test cases to check the functionality of the software. Simultaneously they are working on thedocumentation of the software. They have completed their work within the time period.
GTU ‐ Project Monitoring and Mentoring SystemWelcome Devang Devendrakumar MistrySign Out
My Account Task
Periodic Progess Report : First PPR
Project : Project Tendering And Tracking System
Status : Reviewed (Freeze)
What Progress you have made in the Project ?
Currently I am working in the project coding phase where I am simultaneously working on the ASP.Net and Android. Along with my team members in project I havedone coding in various sections of our Web application like Vendor Management and Project Management. Also, we are going to make 2 android apps. So, I amworking on the android portion too and started designing UI design as well as coding for the app.
What challenge you have faced ?
Challenging task for me and my group members was the Three Tier Implementation as we are implementing our project in three tier architecture : Presentation tier,Business logic tier and data tier.
What support you need ?
Currently I think we don’t need any support as we are able to proceed smoothly and are able to get things conveniently.
Which literature you have referred ?
Books referred during coding phase are Asp.Net 2.0 Black Book, Advance .Net Technology by Chirag Patel (Dreamtech Press) .For Android, I preferred AndroidProgramming by O’riley publication. Apart from Books I have also taken help from Google as well as Android Developers official Website.
Document : No document uploaded
Comment by Internal Guide :
Done proper analysis for the particular definition. Complete the analysis phase within the time period which is given by the dept.
GTU ‐ Project Monitoring and Mentoring SystemWelcome Devang Devendrakumar MistrySign Out
My Account Task
Periodic Progess Report : Second PPR
Project : Project Tendering And Tracking System
Status : Reviewed (Freeze)
What Progress you have made in the Project ?
Currently I am in the coding phase where I am working on the ASP.Net and Android, simultaneously. Along with my team members in project I have done coding invarious section of our Web application like staff management, Vendor Management, Project Announcement. Also I have started developing android application inwhich Log in page for staff is done.
What challenge you have faced ?
Challenging part of our project right now is to make possible the communication between the ASP.Net Web Application and Android Application. As without thecommunication between these two different applications it is not possible to go ahead and the coding for this communication is a bit of complex, it is taking time aswell as much effort.
What support you need ?
Currently no support is needed of any kind as all things are going as per plan. Also the help and support needed from our internal and external guide because of theirimmense experience in this particular field is available as asked during the progress of project. Thus, right now we are well supported and guided.
Which literature you have referred ?
Books referred during coding phase are Asp.Net 2.0 Black Book, The Complete Reference Asp.Net by Robert Standefer III for Asp.Net. Also for Android, bookreferred is Programming Android of O’riley publication. Apart from Books we have use help from Google.
Document : No document uploaded
Comment by Internal Guide :
Completed designing phase with in the time period Done the proper changes in the diagram which is required and also done proper data dictionaries as per therequirements.
GTU ‐ Project Monitoring and Mentoring SystemWelcome Devang Devendrakumar MistrySign Out
My Account Task
Periodic Progess Report : Third PPR
Project : Project Tendering And Tracking System
Status : Reviewed (Freeze)
What Progress you have made in the Project ?
I am currently working simultaneously on the ASP.Net and Android. Along with my team members in project I have done coding in various section of our Webapplication like milestone, project planning, bid selection. And we have implemented android application that can send photo taken by device’s camera along withGPS coordinates to SQL server for tracking purpose.
What challenge you have faced ?
We needed to use camera of the device and GPS coordinates for location in android application. Implementation of these was bit of a challenge. The process wewanted to do was to send the GPS coordinates and photo from the android app to the SQL server so that it can be accessed into the web application. The processwas challenging as it was whole new approach for us.
What support you need ?
Currently no support is needed of any kind as all things are going as per plan. Also the help and support needed from our internal and external guide because of theirimmense experience in this particular field is available as asked during the progress of project. Thus, right now we are well supported and guided.
Which literature you have referred ?
Books referred during coding phase are Asp.Net 2.0 Black Book, The Complete Reference Asp.Net by Robert Standefer III for Asp.Net. Also for Android, bookreferred is Programming Android of O’riley publication. Apart from Books we have use help from Google and Android Developers website.
Document : No document uploaded
Comment by Internal Guide :
Work on the implementing the software and that is about to complete with in the time period. simultaneously they are testing the functionality too.
GTU ‐ Project Monitoring and Mentoring SystemWelcome Devang Devendrakumar MistrySign Out
My Account Task
Periodic Progess Report : Forth PPR
Project : Project Tendering And Tracking System
Status : Reviewed (Freeze)
What Progress you have made in the Project ?
Project undertaken by us under the company MGVCL has finally been completed. The implementation of all the modules as defined is completed. The webapplication as well as mobile application coding has been done and both applications are working with ease. To conclude, the project has been completed with all thefunctionality intact.
What challenge you have faced ?
We needed to use map integration in order to show the admin the exact location of site for ongoing projects, of which, staff is doing tracking process. Also weneeded pie charts for the purpose of performance analysis. Implementation of these two functionality was bit of a challenge. The process we wanted to do was tosend the GPS coordinates to the SQL server so that it can be accessed and with the help of those coordinates the map would have been shown to admin into theweb application. The process was challenging as it was whole new approach for us.
What support you need ?
project has been completed as per the plan. We have dealt with every constraint that came our way. Also we are well guided by our internal guide as well as externalguide. So no support currently is required.
Which literature you have referred ?
Books referred during coding phase are Asp.Net 2.0 Black Book, The Complete Reference Asp.Net by Robert Standefer III for Asp.Net. Also for Android, bookreferred is Programming Android of O’riley publication. Apart from Books we have use help from Google.
Document : Download
Comment by Internal Guide :
almost the testing phase is complete and the are making more test cases to check the functionality of the software. Simultaneously they are working on thedocumentation of the software. They have completed their work within the time period.